{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
-1257 August 16, 2017 Steven Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078
-1257 August 16 , 2017 Steven Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078
-8985
-8985


SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/
SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/
2017005 AND 05000370/
201 7 005 AND 05000370/
2017005)
201 7 005)


==Dear Mr. Capps:==
==Dear Mr. Capps:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for McGuire Nuclear Station
The enclosed inspection plan lists the inspections scheduled through June 30, 20 19 for McGuire Nuclear Station
. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for securi ty-related inspections, which will be sent via separate, non
. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for securi ty-related inspections, which will be sent via separate, non
-publicly available correspondence.
-publicly available correspondence.


In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice,
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
" a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 61 1 with any questions you have regarding this letter.
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.


Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.
Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.
Line 40: Line 39:


===Enclosure:===
===Enclosure:===
McGuire Inspection/Activity Plan (09/01/2017 - 06/30/2019) cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/
McGuire Inspection/Activity Plan (0 9/01/201 7 - 06/3 0/201 9) cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/
2017005 AND 05000370/
201 7 005 AND 05000370/
2017005) August 16, 2017 DISTRIBUTION
201 7 005) August 16, 2017 DISTRIBUTION
: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII: DRP NAME JWorosilo MToth FEhrhardt DATE 8/15/2017 8/15/2017 8/15/2017 OFFICIAL AGENCY RECORD
ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII: DRP NAME JWorosilo MToth FEhrhardt DATE 8/15/2017 8/15/2017 8/15/2017 OFFICIAL AGENCY RECORD


Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteMcGuireInspection / Activity Plan 09/01/2017
Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site McGuireInspection / Activity Plan 09/01/2017
-06/30/2019 Page 1 of 2 08/14/2017 09:02:19 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/02/2017 10/06/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/02/2017 10/06/2017DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)
-06/30/2019 Page 1 of 2 08/14/2017 09:02:19 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)
61, 2 IPDesign Bases Assurance Inspection (Teams)7111121M01/22/2018 01/26/2018 1, 2 IPDesign Bases Assurance Inspection (Teams)7111121M02/12/2018 02/16/2018 1, 2 IPDesign Bases Assurance Inspection (Teams)7111121M02/26/2018 03/02/2018OL EXAM-INITIAL LICENSE EXAM PREP 31 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV2351103/19/2018 03/23/2018OL EXAM-INITIAL LICENSE EXAM 31 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV2351104/16/2018 04/27/2018 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 51, 2 IPFire Protection - NFPA 805 (Triennial)7111105X04/30/2018 05/04/2018 1, 2 IPFire Protection - NFPA 805 (Triennial)7111105X05/14/2018 05/18/2018 EP-EP PROGRAM INSPECTION 31, 2 IPAlert and Notification System Testing711140206/18/2018 06/22/2018 1, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/18/2018 06/22/2018 1, 2 IPEmergency Action Level and Emergency Plan Changes711140406/18/2018 06/22/2018 1, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/18/2018 06/22/2018 1, 2 IPPerformance Indicator Verification7115106/18/2018 06/22/2018OL RQ-REQUAL INSPECTION 21, 2 IPLicensed Operator Requalification Program7111111B06/18/2018 06/22/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 11, 2 IPHeat Sink Performance7111107T06/25/2018 06/29/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41, 2 IPProblem Identification and Resolution71152B07/09/2018 07/13/2018 1, 2 IPProblem Identification and Resolution71152B07/23/2018 07/27/2018 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 22 IPInservice Inspection Activities - PWR7111108P09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 1 31, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0109/24/2018 09/28/2018 1, 2 IPOccupational ALARA Planning and Controls71124.0209/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
6 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 01/22/2018 01/26/2018 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 02/12/2018 02/16/2018 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 02/26/2018 03/02/2018OL EXAM-INITIAL LICENSE EXAM PREP 3 1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV23511 03/19/2018 03/23/2018OL EXAM-INITIAL LICENSE EXAM 3 1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV23511 04/16/2018 04/27/2018 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 IP Fire Protection - NFPA 805 (Triennial)7111105X 04/30/2018 05/04/2018 1, 2 IP Fire Protection - NFPA 805 (Triennial)7111105X 05/14/2018 05/18/2018 EP-EP PROGRAM INSPECTION 3 1, 2 IP A lert and Notification System Testing7111402 06/18/2018 06/22/2018 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/18/2018 06/22/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 06/18/2018 06/22/2018 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/18/2018 06/22/2018 1, 2 IP Performance Indicator Verification71151 06/18/2018 06/22/2018OL RQ-REQUAL INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 06/18/2018 06/22/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 06/25/2018 06/29/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP Problem Identification and Resolution71152B 07/09/2018 07/13/2018 1, 2 IP Problem Identification and Resolution71152B 07/23/2018 07/27/2018 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 IP Inservice Inspection Activities - PWR7111108P 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/24/2018 09/28/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteMcGuireInspection / Activity Plan 09/01/2017
Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site McGuireInspection / Activity Plan 09/01/2017
-06/30/2019 Page 2 of 2 08/14/2017 09:02:19 RP-RP OCCUPATIONAL - WEEK 1 31, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/24/2018 09/28/2018 1, 2 IPOccupational Dose Assessment71124.0409/24/2018 09/28/2018 1, 2 IPRadiation Monitoring Instrumentation71124.0509/24/2018 09/28/2018 1, 2 IPOccupational Exposure Control Effectiveness71151-OR01 09/24/2018 09/28/2018 1, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 2 21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/15/2018 10/19/2018 1, 2 IPOccupational ALARA Planning and Controls71124.0210/15/2018 10/19/2018 1, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/15/2018 10/19/2018 1, 2 IPOccupational Dose Assessment71124.0410/15/2018 10/19/2018 1, 2 IPRadiation Monitoring Instrumentation71124.0510/15/2018 10/19/2018 1, 2 IPOccupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 1, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 10/15/2018 10/19/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/01/2019 04/05/2019 RP-RP RADHAZARD & TRANS 21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0104/01/2019 04/05/2019 1, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0804/01/2019 04/05/2019 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/01/2019 04/05/2019 RP-RP PUBLIC 21, 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/03/2019 06/07/2019 1, 2 IPRadiological Environmental Monitoring Program71124.0706/03/2019 06/07/2019 1, 2 IPOccupational Exposure Control Effectiveness71151-OR01 06/03/2019 06/07/2019 1, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-06/30/2019 Page 2 of 2 08/14/2017 09:02:19 RP-RP OCCUPATIONAL - WEEK 1 3 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/24/2018 09/28/2018 1, 2 IP Occupational Dose Assessment71124.04 09/24/2018 09/28/2018 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/24/2018 09/28/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 09/24/2018 09/28/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/15/2018 10/19/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/15/2018 10/19/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/15/2018 10/19/2018 1, 2 IP Occupational Dose Assessment71124.04 10/15/2018 10/19/2018 1, 2 IP Radiation Monitoring Instrumentation71124.05 10/15/2018 10/19/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 10/15/2018 10/19/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/01/2019 04/05/2019 RP-RP RADHAZARD & TRANS 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/01/2019 04/05/2019 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 04/01/2019 04/05/2019 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/01/2019 04/05/2019 RP-RP PUBLIC 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/03/2019 06/07/2019 1, 2 IP Radiological Environmental Monitoring Program71124.07 06/03/2019 06/07/2019 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 06/03/2019 06/07/2019 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 15:36, 7 July 2018

Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2017005 and 05000370/2017005
ML17230A280
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/16/2017
From: Ehrhardt F J
NRC/RGN-II/DRP/RPB1
To: Capps S D
Duke Energy Carolinas
References
IR 2017005
Download: ML17230A280 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 August 16 , 2017 Steven Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078

-8985

SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/

201 7 005 AND 05000370/

201 7 005)

Dear Mr. Capps:

The enclosed inspection plan lists the inspections scheduled through June 30, 20 19 for McGuire Nuclear Station

. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for securi ty-related inspections, which will be sent via separate, non

-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 61 1 with any questions you have regarding this letter.

Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.

50-369, 50-370 License Nos.
NPF-9, NPF-17

Enclosure:

McGuire Inspection/Activity Plan (0 9/01/201 7 - 06/3 0/201 9) cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/

201 7 005 AND 05000370/

201 7 005) August 16, 2017 DISTRIBUTION

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII: DRP NAME JWorosilo MToth FEhrhardt DATE 8/15/2017 8/15/2017 8/15/2017 OFFICIAL AGENCY RECORD

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site McGuireInspection / Activity Plan 09/01/2017

-06/30/2019 Page 1 of 2 08/14/2017 09:02:19 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)

6 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 01/22/2018 01/26/2018 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 02/12/2018 02/16/2018 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 02/26/2018 03/02/2018OL EXAM-INITIAL LICENSE EXAM PREP 3 1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV23511 03/19/2018 03/23/2018OL EXAM-INITIAL LICENSE EXAM 3 1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV23511 04/16/2018 04/27/2018 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 IP Fire Protection - NFPA 805 (Triennial)7111105X 04/30/2018 05/04/2018 1, 2 IP Fire Protection - NFPA 805 (Triennial)7111105X 05/14/2018 05/18/2018 EP-EP PROGRAM INSPECTION 3 1, 2 IP A lert and Notification System Testing7111402 06/18/2018 06/22/2018 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/18/2018 06/22/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 06/18/2018 06/22/2018 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/18/2018 06/22/2018 1, 2 IP Performance Indicator Verification71151 06/18/2018 06/22/2018OL RQ-REQUAL INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 06/18/2018 06/22/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 06/25/2018 06/29/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP Problem Identification and Resolution71152B 07/09/2018 07/13/2018 1, 2 IP Problem Identification and Resolution71152B 07/23/2018 07/27/2018 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 IP Inservice Inspection Activities - PWR7111108P 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/24/2018 09/28/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site McGuireInspection / Activity Plan 09/01/2017

-06/30/2019 Page 2 of 2 08/14/2017 09:02:19 RP-RP OCCUPATIONAL - WEEK 1 3 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/24/2018 09/28/2018 1, 2 IP Occupational Dose Assessment71124.04 09/24/2018 09/28/2018 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/24/2018 09/28/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 09/24/2018 09/28/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/15/2018 10/19/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/15/2018 10/19/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/15/2018 10/19/2018 1, 2 IP Occupational Dose Assessment71124.04 10/15/2018 10/19/2018 1, 2 IP Radiation Monitoring Instrumentation71124.05 10/15/2018 10/19/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 10/15/2018 10/19/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/01/2019 04/05/2019 RP-RP RADHAZARD & TRANS 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/01/2019 04/05/2019 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 04/01/2019 04/05/2019 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/01/2019 04/05/2019 RP-RP PUBLIC 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/03/2019 06/07/2019 1, 2 IP Radiological Environmental Monitoring Program71124.07 06/03/2019 06/07/2019 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 06/03/2019 06/07/2019 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.