{{#Wiki_filter: OFFICIAL USE ONLY - SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this transmittal document is decontrolled
{{#Wiki_filter:OFFICIAL USE ONLY  
LIMITED INTERNAL DISTRIBUTION PERMITTED OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION January 16, 2014  Mr. Mano Nazar  
- SECURITY RELATED INFORMATION
  UNITED STATES NUCLEAR REGULATORY COMMISSION  
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
  Enclosure
  transmitted herewith contains SUNSI.  When separated from enclosure, this  
transmittal document is decontrolled
 
LIMITED INTERNAL
DISTRIBUTION PERMITTED
  OFFICIAL USE ONLY  
- SECURITY-RELATED INFORMATION
  January 16, 2014  
  Mr. Mano Nazar  
Executive Vice President  
Executive Vice President  
   and Chief Nuclear Officer  
   and Chief Nuclear Officer  
Florida Power and Light Company  
Florida Power and Light Company  
P.O. Box 14000 Juno Beach, FL  33408-0420   
P.O. Box 14000 Juno Beach, FL  33408-0420  
   
  SUBJECT:  TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR  
  SUBJECT:  TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR  
INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)   
INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND  
05000251/2014404)  
   
Dear Mr. Nazar:  
Dear Mr. Nazar:  
   
   
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &  
4, on May 19 - 23, 2014.  The inspection team will be led by Mr. Rodney Fanner, Reactor  
4, on May 19 - 23, 2014.  The inspection team will be led by Mr. Rodney Fanner, Reactor  
Inspector, of the NRC RII office.  The team will be composed of personnel from the NRC RII office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).   
Inspector, of the NRC RII office.  The team  
The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7."  The TI inspection will be performed to evaluate and verify your ability to meet the interim milestone requirements of the NRC's Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks." During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya of your staff, arrangements for an information-gathering site visit and a one-week onsite  
will be composed of personnel from the NRC RII office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).   
inspection.  The schedule is as follows:   * Information gathering visit:  April 29 - May 1, 2014  * Onsite inspection:  May 19 - 23, 2014  The purpose of the information gathering visit is to: (1) obtain information and documentation needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power  
The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7."  The TI inspection will be performed to evaluate and verify your ability to meet the interim milestone requirements of the NRC's Cyber Security Rule, Title 10, Code of Federal Regulations (CFR)
, Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks." During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya of your staff, arrangements for an information-gathering site visit and a one-week onsite  
inspection.  The schedule is as follows:
* Information gathering visit:  April 29 - May 1, 2014   
* Onsite inspection:  May 19 - 23, 2014  
  The purpose of the information gathering visit is to: (1) obtain information and documentation needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power  
Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as   
Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as   
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION M. Nazar 2 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.  
OFFICIAL USE ONLY  
- SECURITY RELATED INFORMATION
M. Nazar 2 OFFICIAL USE  
ONLY - SECURITY RELATED INFORMATION
  office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.  
 
  In order to assure a productive TI inspection, we have enclosed a request for documents needed to ensure the inspectors are adequately prepared.  These documents have been  
  In order to assure a productive TI inspection, we have enclosed a request for documents needed to ensure the inspectors are adequately prepared.  These documents have been  
divided into three groups (I, II, & III).  Group I lists information necessary to aid the inspectors in  
divided into three groups (I, II, & III).  Group I lists information necessary to aid the inspectors in  
Line 43: Line 70:
this information be provided to the lead inspector as the information is generated during the TI inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the  
this information be provided to the lead inspector as the information is generated during the TI inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the TI inspection.  
onsite portions of the TI inspection.  
   
   
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a  
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office
of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document  
request for information or an information collection requirement unless the requesting document  
displays a currently valid Office of Management and Budget control number.   
displays a currently valid Office of Management and Budget control number.   
  Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection, or the inspection team's information or logistical needs, please  
  Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection, or the inspection team's information or logistical needs, please  
contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.  
contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.  
    
    
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION M. Nazar 3 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  However, because of the security-related concerns  
OFFICIAL USE ONLY  
- SECURITY RELATED INFORMATION
M. Nazar 3 OFFICIAL USE  
ONLY - SECURITY RELATED INFORMATION
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) co
mponent of NRC's document system, ADAMS.  
  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).  However, because of the security-related concerns  
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters  
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters  
enclosure will not be available for public inspection.   Sincerely,        /RA/  Scott M. Shaeffer, Chief Engineering Branch 2  
enclosure will not be available for public inspection.
Division of Reactor Safety  
Sincerely,  
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41   
       /RA/  
   Scott M. Shaeffer, Chief Engineering Branch 2  
 
Division of Reactor Safety
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41  
   
Enclosure:  Document Request For Cyber Security   
Enclosure:  Document Request For Cyber Security   
         Temporary Instruction (TI) 2201/004 Interim          Milestones 1-7 Inspection         (OFFICIAL USE ONLY)   
         Temporary Instruction
(TI) 2201/004 Interim          Milestones 1-7 Inspection
          (OFFICIAL USE ONLY)  
    
cc:  (See page 4)   
cc:  (See page 4)   
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION M. Nazar 3 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  However, because of the security-related concerns
 
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
_ML14021A097__________  x SUNSI REVIEW COMPLETE  
enclosure will not be available for public inspection.  Sincerely,        /RA/  Scott M. Shaeffer, Chief Engineering Branch 2
G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE    RJF2 SMS            NAME RFANNER SSHAEFFER      DATE 1/16/2014 1/ 16/2014 1/    /2014 1/    /2014 1/    /2014 1/    /2014 1/      /2014 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    
Division of Reactor Safety 
OFFICIAL USE ONLY  
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 
- SECURITY RELATED INFORMATION
Enclosure:  Document Request For Cyber Security 
M. Nazar 4 OFFICIAL USE ONLY  
        Temporary Instruction (TI) 2201/004 Interim          Milestones 1-7 Inspection          (OFFICIAL USE ONLY)  cc:  (See page 4)
- SECURITY RELATED INFORMATION
  cc: Michael Kiley  
Site Vice President  
 
Turkey Point Nuclear Power Plant P.O. Box 14000  
X PUBLICLY AVAILABLE                                                SENSITIVE  X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_ML14021A097__________  x SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE    RJF2 SMS            NAME RFANNER SSHAEFFER      DATE 1/16/2014 1/ 16/2014 1/    /2014 1/    /2014 1/    /2014 1/    /2014 1/      /2014 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     OFFICIAL RECORD COPY          DOCUMENT NAME:  S:\DRS\Eng Branch 2\Cyber Inspection Reports\CYBER - TURKEY POINT\TURKEY POINT CYBER SECURITY NOTIFICATION LETTER W-OUO.DOCX   
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION M. Nazar 4 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION cc: Michael Kiley  
Site Vice President Turkey Point Nuclear Power Plant P.O. Box 14000  
Juno Beach, FL  33408-0420  
Juno Beach, FL  33408-0420  
   
   
Robert Tomonto  
Robert Tomonto  
Licensing Manager Turkey Point Nuclear Power Plant P.O. Box 14000  
Licensing Manager  
Turkey Point Nuclear Power Plant P.O. Box 14000  
Juno Beach, FL 33408-0420  
Juno Beach, FL 33408-0420  
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION   OFFICIAL USE ONLY - SECURITY RELATED INFORMATION Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014   
OFFICIAL USE ONLY  
- SECURITY RELATED INFORMATION
    OFFICIAL USE ONLY  
- SECURITY RELATED INFORMATION
  Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014  
   
SUBJECT:  TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR INFORMATION (NRC  
SUBJECT:  TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR INFORMATION (NRC  
INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)   
INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)  
Distribution: RidsNrrPMTurkey Point  
    
C. Evans, RII EICS  L. Douglas, RII EICS G. West, NSIR (hard copy w/ encl)  
Distribution:
RIDSNRRDIRS  
RidsNrrPMTurkey Point  
C. Evans, RII EICS  L. Douglas, RII EICS  
     
G. West, NSIR (hard copy w/ encl)  
 
RIDSNRRDIRS
   
 
 
 
 
 
     
 
}}
}}

Revision as of 01:53, 3 July 2018

Turkey Point Nuclear Power Plant - Notification of Cyber Security Ti Milestones 1-7 Inspection and Request for Information (NRC Inspection Report No. 05000250-14-404 and 05000251-14-404)
ML14021A097
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/16/2014
From: Shaeffer S M
NRC/RGN-II/DRS/EB2
To: Nazar M
Florida Power & Light Co
References
IR-14-404
Download: ML14021A097 (6)


See also: IR 05000250/2014404

Text

OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

Enclosure

transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled

LIMITED INTERNAL

DISTRIBUTION PERMITTED

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

January 16, 2014

Mr. Mano Nazar

Executive Vice President

and Chief Nuclear Officer

Florida Power and Light Company

P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT: TURKEY POINT NUCLEAR POWER PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR

INFORMATION (NRC INSPECTION REPORT NO. 05000250/2014404 AND

05000251/2014404)

Dear Mr. Nazar:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements specified by the conditions of your operating license at the Turkey Point Nuclear Plant Units 3 &

4, on May 19 - 23, 2014. The inspection team will be led by Mr. Rodney Fanner, Reactor

Inspector, of the NRC RII office. The team

will be composed of personnel from the NRC RII office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).

The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7." The TI inspection will be performed to evaluate and verify your ability to meet the interim milestone requirements of the NRC's Cyber Security Rule, Title 10, Code of Federal Regulations (CFR)

, Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks." During a telephone conversation on January 13, 2014, Mr. Fanner confirmed with Mr. P. Czaya of your staff, arrangements for an information-gathering site visit and a one-week onsite

inspection. The schedule is as follows:

  • Information gathering visit: April 29 - May 1, 2014
  • Onsite inspection: May 19 - 23, 2014

The purpose of the information gathering visit is to: (1) obtain information and documentation needed to support the TI inspection; (2) become familiar with the Turkey Point Nuclear Power

Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as

OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION

M. Nazar 2 OFFICIAL USE

ONLY - SECURITY RELATED INFORMATION

office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.

In order to assure a productive TI inspection, we have enclosed a request for documents needed to ensure the inspectors are adequately prepared. These documents have been

divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in

planning for the TI inspection prior to the information gathering visit. It is requested that this

information be provided to the lead inspector via mail no later than April 18, 2014. Group II lists

information and possible areas for discussion necessary to assist the inspectors during the TI inspection. It is requested this information be available during the information gathering visit April 29, 2014. Group III consists of those items that the inspectors will review, or need access

to, during the TI inspection. Group III also lists the information necessary to aid the inspectors

in tracking questions and answers identified as a result of the TI inspection. It is requested that

this information be provided to the lead inspector as the information is generated during the TI inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the

onsite portions of the TI inspection.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office

of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Fanner at (404) 997-4638, or me at (404) 997-4521.

OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION

M. Nazar 3 OFFICIAL USE

ONLY - SECURITY RELATED INFORMATION

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) co

mponent of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure: Document Request For Cyber Security

Temporary Instruction

(TI) 2201/004 Interim Milestones 1-7 Inspection

(OFFICIAL USE ONLY)

cc: (See page 4)

_ML14021A097__________ x SUNSI REVIEW COMPLETE

G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RJF2 SMS NAME RFANNER SSHAEFFER DATE 1/16/2014 1/ 16/2014 1/ /2014 1/ /2014 1/ /2014 1/ /2014 1/ /2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION

M. Nazar 4 OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION

cc: Michael Kiley

Site Vice President

Turkey Point Nuclear Power Plant P.O. Box 14000

Juno Beach, FL 33408-0420

Robert Tomonto

Licensing Manager

Turkey Point Nuclear Power Plant P.O. Box 14000

Juno Beach, FL 33408-0420

OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION

OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION

Letter to Mano Nazar from Scott Shaeffer dated Janaury 16, 2014

SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC

INSPECTION REPORT NO. 05000250/2014404 AND 05000251/2014404)

Distribution:

RidsNrrPMTurkey Point

C. Evans, RII EICS L. Douglas, RII EICS

G. West, NSIR (hard copy w/ encl)

RIDSNRRDIRS