ML18037A828: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 Enclosure 1 Turkey Point Subsequent License Renewal  Application Enclosure Summary (4 Total Pages)
{{#Wiki_filter:Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251  
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Enclosure 2 - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Attachment 1 - CAW-17-4686 Affidavit for Westinghouse CUFs in SLR Tables (Enclosure 5 Attachment 1- SLRA Section 4, Attachment 4, & Attachment 5)   - CAW-17-4675 Affidavit for Westinghouse EAF Calculations (Enclosure 5 Attachment 1- SLRA Section 4 & Attachment 7) Attachment 3 - CAW-17-4621 Affidavit for Westinghouse LBB (Enclosure 5 Attachment 1- SLRA Section 4 & Attachment 9)  - EPRI Affidavit for MRP 2017-038 (Enclosure 5 Attachment 1 - SLRA Appendix C & Attachment 11)   - Areva Affidavit for Topical Reports  i. ANP-3646P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & Attachment 2) ii. ANP-3647P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & Attachment 3) Attachment 6 - Areva Affidavit for CUFs in SLRA Tables (Enclosure 5 Attachment 1 - SLRA Section 4, Attachment 4, & Attachment 5) Attachment 7 - Areva Affidavit for EAF Calculations (Enclosure 5 Attachment 1 - SLRA Section 4 & Attachment 8)  - PWROG Affidavit for PWROG 17033-P Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems dated October 2017 (Enclosure 5 Attachment 10)   - Westinghouse Affidavit CAW-17-4683 for withholding Data Package for Pressurizer Spray and Surge Nozzle Analysis (Enclosure 5  - SLRA Section 4 & Attachment 6) Enclosure 3 - Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Public Version) Enclosure 4 - Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) a. Attachment 1 -LTR-REA-17-116-NP, Revision 0, Reactor Vessel Neutron Exposure Data b. Attachment 2 - Areva Topical Report ANP-3646NP Revision 0 c. Attachment 3 - ArevaTopical Report ANP-3647NP Revision 0 d. Attachment 4 - SIA Report No. 1700109.402P, Revision 3 - REDACTED e. Attachment 5 - SIA Report No. 1700109.401P, Revision 3 - REDACTED Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 f. Attachment 6 - SIA Environmentally Assisted Fatigue Calculations i. Pressurizer Lower Head - 1700804.316P Revision 0 REDACTED, 1700804.317 Revision 0, and 1700804.318 Revision 0,  ii. Pressurizer Spray - 1700804.313P Revision 1 REDACTED, 1700804.314P Revision 1 REDACTED, and 1700804.315P Revision 1 REDACTED g. Attachment 7 - Westinghouse Environmentally Assisted Fatigue Calculations i. LTR-SDA-II-17-13-NP, Rev. 2, Pressurizer Upper Head, RV Core Support Blocks  ii. LTR-CECO-17-025-NP, Rev. 1, Replacement Steam Generators h. Attachment 8 - Areva Environmentally Assisted Fatigue Calculations: Areva Letter No. AREVA-17-02742, dated December 6, 2017, Final CUFEN Results - Turkey Point 3 & 4 - SLR EAF Analyses  i. 32-9280707, Rev. 0, CRDM Nozzle to Adapter Weld Connection  ii. 32-9280708, Rev. 0, Replacement RVCH J Groove iii. 32-9280709, Rev. 0, CRDM Latch Housing iv. 32-9280710, Rev. 0, Vent Nozzle  v. 32-9280711, Rev. 0, Reactor Vessel Flange vi. 32-9280712, Rev. 0, CRDM Lower Joint  i. Attachment 9 - PWROG-17031-NP, Rev. 0  - Update for Subsequent License Renewal: WCAP-15338-A j. Attachment 10 - PWROG-17011-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-14535A and WCAP-15666-A k. Attachment 11 - WCAP-15354-NP, Rev. 1, Technical Justification for Eliminating Primary Loop Pipe Rupture as a Structural Design Basis l. Attachment 12 - SIA Leak-Before-Break Evaluation for Auxiliary Lines 0901350-401 Rev. 3 and 0901350-304 Rev. 3 m. Attachment 13 - PWROG-17033-NP, Rev. 0, Update for Subsequent License Renewal: WCAP-13045 Enclosure 5 - 10 CFR 2.390 Withheld Proprietary Documents a. Attachment 1 - Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Proprietary Version)  b. Attachment 2 - Areva Topical Report ANP-3646P Revision 0 c. Attachment 3 - Areva Topical Report ANP-3647P Revision 0 d. Attachment 4 - SIA Task 1 Report - SIA Report No. 1700109.402P Revision 3 e. Attachment 5 - SIA Task 2 Report - SIA Report No. 1700109.401P Revision 3 f. Attachment 6 - SIA EAF Calculations Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 i. Pressurizer Lower Head - SIA Calculation No. 1700804.316P Revision 0. ii. Pressurizer Spray - SIA Calculation Nos. 1700804.313P Revision 1, 1700804.314P Revision 1, and 1700804.315P Revision 1  g. Attachment 7 - Westinghouse EAF Calculations i. Pressurizer Upper Head, RV Core Support Blocks - LTR-SDA-II-17-13-P, Revision 2 ii. Steam Generators LTR-CECO-17-025-P, Revision 1 h. Attachment 8 - Areva EAF Calculations (6) i. CRDM Bi-Metallic - Areva Calculation No. 32-9279174, Revision 1, 12/14/17 ii. CRDM J-Groove Weld - Areva Calculation No. 32-9279212, Revision 1, 12/12/17 iii. CRDM Latch Housing - Areva Calculation No. 32-9279367, Revision 1, 12/15/17 iv. CRDM Vent Nozzle - Areva Calculation No. 32-9279362, Revision 1, 12/14/17 v. CRDM Vessel Flange - Areva Calculation No. 32-9279161, Revision 1, 12/14/17 vi. CRDM Lower Joint - Areva Calculation No. 32-9280202, Revision 1, 12/15/17 i. Attachment 9 - WCAP-15354-P, Revision 1, Westinghouse LBB Analysis - Proprietary  j. Attachment 10 - PWROG-17033-P, Revision 0 - RCP Code Case N-481 - Proprietary k. Attachment 11 - MRP 2017-038}}
 
L-2018-004 Enclosure 1 Enclosure 1 Turkey Point Subsequent License Renewal  Application Enclosure Summary (4 Total Pages)  
 
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251  
 
L-2018-004 Enclosure 1   - Turkey Point Subsequent License Renewal Application Enclosure Summary Enclosure 2 - Applications for Withholding Pr oprietary Information from Public Disclosure Pursuant to 10 CFR 2.390   - CAW-17-4686 Affidavit for Westinghouse CUFs in SLR Tables (Enclosure 5 Attachment 1- SLRA Section 4, Attachment 4, & )  
 
- CAW-17-4675 Affidavit for Westinghouse EAF Calculations (Enclosure 5 Attachment 1- SLRA Section 4 & Attachment 7)
- CAW-17-4621 Affidavit for Westinghouse LBB (Enclosure 5 - SLRA Section 4 & Attachment 9)  
   - EPRI Affidavit for MRP 2017-038 (Enclosure 5 Attachment 1 -
SLRA Appendix C & Attachment 11)  
 
- Areva Affidavit for Topical Reports  i. ANP-3646P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & ) ii. ANP-3647P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & )   - Areva Affidavit for CUFs in SLRA Tables (Enclosure 5   - SLRA Section 4, , & Attachment 5)
- Areva Affidavit for EAF Calculations (Enclosure 5 Attachment 1  
- SLRA Section 4 & Attachment 8)  
   - PWROG Affidavit for PWROG 17033-P Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code  
 
Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems dated October 2017 (Enclosure 5 0)  
 
- Westinghouse Affidavit CA W-17-4683 for withholding Data Package for Pressurizer Spray and Surge Nozzle Analysis (Enclosure 5  
   - SLRA Section 4 & Attachment 6)
- Turkey Point Nuclear Plant Unit s 3 and 4 Subsequent License Renewal Application (Public Version)   - Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)  
: a. Attachment 1
-LTR-REA-17-116-NP, Revision 0, Reactor Vessel Neutron Exposure Data  
: b. Attachment 2
- Areva Topical Report ANP-3646NP Revision 0  
: c. Attachment 3
- ArevaTopical Report ANP-3647NP Revision 0  
: d. Attachment 4
- SIA Report No. 1700109.402P, Revision 3 - REDACTED  
: e. Attachment 5
- SIA Report No. 1700109.401P, Revision 3 - REDACTED Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251  
 
L-2018-004 Enclosure 1  
: f. Attachment 6 - SIA Environmentally Assisted Fatigue Calculations i. Pressurizer Lower Head - 1700804.316P Revision 0 REDACTED, 1700804.317 Revision 0, and 1700804.318 Revision 0,  ii. Pressurizer Spray - 1700804.313P Revision 1 REDACTED, 1700804.314P Revision 1 REDACTED, and 1700804.315P Revision 1 REDACTED  
: g. Attachment 7 - Westinghouse Environmentally Assisted Fatigue Calculations i. LTR-SDA-II-17-13-NP, Rev. 2, Pressurizer Upper Head, RV Core Support Blocks  ii. LTR-CECO-17-025-NP, Rev. 1, Replacement Steam Generators  
: h. Attachment 8
- Areva Environmentally Assisted Fatigue Calculations: Areva Letter No. AREVA-17-02742, dated December 6, 2017, Final CUFEN Results - Turkey Point 3 & 4 - SLR EAF Analyses  i. 32-9280707, Rev. 0, CRDM Nozzle to Adapter Weld Connection  ii. 32-9280708, Rev. 0, Replacement RVCH J Groove iii. 32-9280709, Rev. 0, CRDM Latch Housing iv. 32-9280710, Rev.
0, Vent Nozzle  v. 32-9280711, Rev. 0, Reactor Vessel Flange vi. 32-9280712, Rev. 0, CRDM Lower Joint   
: i. Attachment 9
- PWROG-17031-NP, Rev. 0  - Update for Subsequent License Renewal: WCAP-15338-A j. Attachment 10
- PWROG-17011-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-14535A and WCAP-15666-A  
: k. Attachment 11 - WCAP-15354-NP, Rev. 1, Te chnical Justification for Eliminating Primary Loop Pipe Rupture as a Stru ctural Design Basis  
: l. Attachment 12 - SIA Leak-Before-Break Eval uation for Auxiliary Lines 0901350-401 Rev. 3 and 0901350-304 Rev. 3  
: m. Attachment 13
- PWROG-17033-NP, Rev. 0, Update for Subsequent License Renewal: WCAP-13045
- 10 CFR 2.390 Withheld Proprietary Documents  
: a. Attachment 1
- Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Proprietary Version)   
: b. Attachment 2 - Areva Topical Report ANP-3646P Revision 0  
: c. Attachment 3 - Areva Topical Report ANP-3647P Revision 0  
: d. Attachment 4 - SIA Task 1 Report - SIA Report No. 1700109.402P Revision 3  
: e. Attachment 5 - SIA Task 2 Report - SIA Report No. 1700109.401P Revision 3  
: f. Attachment 6 - SIA EAF Calculations Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251  
 
L-2018-004 Enclosure 1 i. Pressurizer Lower Head - SIA Calculation No. 1700804.316P Revision 0. ii. Pressurizer Spray - SIA Calcul ation Nos. 1700804.313 P Revision 1, 1700804.314P Revision 1, and 1700804.315P Revision 1   
: g. Attachment 7 - Westinghouse EAF Calculations i. Pressurizer Upper Head, RV Core Support Blocks - LTR-SDA-II-17-13-P, Revision 2 ii. Steam Generators LTR-CE CO-17-025-P, Revision 1  
: h. Attachment 8 - Areva EAF Calculations (6) i. CRDM Bi-Metallic - Areva Calculation No. 32-9279174, Revision 1, 12/14/17 ii. CRDM J-Groove Weld - Areva Calcul ation No. 32-9279212, Revision 1, 12/12/17 iii. CRDM Latch Housing - Areva Calc ulation No. 32-9279367, Revision 1, 12/15/17 iv. CRDM Vent Nozzle - Areva Calculation No. 32-9279362, Revision 1, 12/14/17 v. CRDM Vessel Flange - Areva Calculation No. 32-9279161, Revision 1, 12/14/17 vi. CRDM Lower Joint - Areva Calculation No. 32-9280202, Revision 1, 12/15/17  
: i. Attachment 9 - WCAP-15354-P, Revision 1, Westinghouse LBB Analysis  
- Proprietary  j. Attachment 10
- PWROG-17033-P, Revision 0 - RCP Code Case N-481  
- Proprietary  
: k. Attachment 11 - MRP 2017-038}}

Revision as of 02:54, 29 June 2018

Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary
ML18037A828
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/30/2018
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18037A812 List:
References
L-2018-004
Download: ML18037A828 (4)


Text

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251

L-2018-004 Enclosure 1 Enclosure 1 Turkey Point Subsequent License Renewal Application Enclosure Summary (4 Total Pages)

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251

L-2018-004 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Enclosure 2 - Applications for Withholding Pr oprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 - CAW-17-4686 Affidavit for Westinghouse CUFs in SLR Tables (Enclosure 5 Attachment 1- SLRA Section 4, Attachment 4, & )

- CAW-17-4675 Affidavit for Westinghouse EAF Calculations (Enclosure 5 Attachment 1- SLRA Section 4 & Attachment 7)

- CAW-17-4621 Affidavit for Westinghouse LBB (Enclosure 5 - SLRA Section 4 & Attachment 9)

- EPRI Affidavit for MRP 2017-038 (Enclosure 5 Attachment 1 -

SLRA Appendix C & Attachment 11)

- Areva Affidavit for Topical Reports i. ANP-3646P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & ) ii. ANP-3647P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & ) - Areva Affidavit for CUFs in SLRA Tables (Enclosure 5 - SLRA Section 4, , & Attachment 5)

- Areva Affidavit for EAF Calculations (Enclosure 5 Attachment 1

- SLRA Section 4 & Attachment 8)

- PWROG Affidavit for PWROG 17033-P Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code

Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems dated October 2017 (Enclosure 5 0)

- Westinghouse Affidavit CA W-17-4683 for withholding Data Package for Pressurizer Spray and Surge Nozzle Analysis (Enclosure 5

- SLRA Section 4 & Attachment 6)

- Turkey Point Nuclear Plant Unit s 3 and 4 Subsequent License Renewal Application (Public Version) - Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)

a. Attachment 1

-LTR-REA-17-116-NP, Revision 0, Reactor Vessel Neutron Exposure Data

b. Attachment 2

- Areva Topical Report ANP-3646NP Revision 0

c. Attachment 3

- ArevaTopical Report ANP-3647NP Revision 0

d. Attachment 4

- SIA Report No. 1700109.402P, Revision 3 - REDACTED

e. Attachment 5

- SIA Report No. 1700109.401P, Revision 3 - REDACTED Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251

L-2018-004 Enclosure 1

f. Attachment 6 - SIA Environmentally Assisted Fatigue Calculations i. Pressurizer Lower Head - 1700804.316P Revision 0 REDACTED, 1700804.317 Revision 0, and 1700804.318 Revision 0, ii. Pressurizer Spray - 1700804.313P Revision 1 REDACTED, 1700804.314P Revision 1 REDACTED, and 1700804.315P Revision 1 REDACTED
g. Attachment 7 - Westinghouse Environmentally Assisted Fatigue Calculations i. LTR-SDA-II-17-13-NP, Rev. 2, Pressurizer Upper Head, RV Core Support Blocks ii. LTR-CECO-17-025-NP, Rev. 1, Replacement Steam Generators
h. Attachment 8

- Areva Environmentally Assisted Fatigue Calculations: Areva Letter No. AREVA-17-02742, dated December 6, 2017, Final CUFEN Results - Turkey Point 3 & 4 - SLR EAF Analyses i. 32-9280707, Rev. 0, CRDM Nozzle to Adapter Weld Connection ii. 32-9280708, Rev. 0, Replacement RVCH J Groove iii. 32-9280709, Rev. 0, CRDM Latch Housing iv. 32-9280710, Rev.

0, Vent Nozzle v. 32-9280711, Rev. 0, Reactor Vessel Flange vi. 32-9280712, Rev. 0, CRDM Lower Joint

i. Attachment 9

- PWROG-17031-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-15338-A j. Attachment 10

- PWROG-17011-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-14535A and WCAP-15666-A

k. Attachment 11 - WCAP-15354-NP, Rev. 1, Te chnical Justification for Eliminating Primary Loop Pipe Rupture as a Stru ctural Design Basis
l. Attachment 12 - SIA Leak-Before-Break Eval uation for Auxiliary Lines 0901350-401 Rev. 3 and 0901350-304 Rev. 3
m. Attachment 13

- PWROG-17033-NP, Rev. 0, Update for Subsequent License Renewal: WCAP-13045

- 10 CFR 2.390 Withheld Proprietary Documents

a. Attachment 1

- Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Proprietary Version)

b. Attachment 2 - Areva Topical Report ANP-3646P Revision 0
c. Attachment 3 - Areva Topical Report ANP-3647P Revision 0
d. Attachment 4 - SIA Task 1 Report - SIA Report No. 1700109.402P Revision 3
e. Attachment 5 - SIA Task 2 Report - SIA Report No. 1700109.401P Revision 3
f. Attachment 6 - SIA EAF Calculations Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251

L-2018-004 Enclosure 1 i. Pressurizer Lower Head - SIA Calculation No. 1700804.316P Revision 0. ii. Pressurizer Spray - SIA Calcul ation Nos. 1700804.313 P Revision 1, 1700804.314P Revision 1, and 1700804.315P Revision 1

g. Attachment 7 - Westinghouse EAF Calculations i. Pressurizer Upper Head, RV Core Support Blocks - LTR-SDA-II-17-13-P, Revision 2 ii. Steam Generators LTR-CE CO-17-025-P, Revision 1
h. Attachment 8 - Areva EAF Calculations (6) i. CRDM Bi-Metallic - Areva Calculation No. 32-9279174, Revision 1, 12/14/17 ii. CRDM J-Groove Weld - Areva Calcul ation No. 32-9279212, Revision 1, 12/12/17 iii. CRDM Latch Housing - Areva Calc ulation No. 32-9279367, Revision 1, 12/15/17 iv. CRDM Vent Nozzle - Areva Calculation No. 32-9279362, Revision 1, 12/14/17 v. CRDM Vessel Flange - Areva Calculation No. 32-9279161, Revision 1, 12/14/17 vi. CRDM Lower Joint - Areva Calculation No. 32-9280202, Revision 1, 12/15/17
i. Attachment 9 - WCAP-15354-P, Revision 1, Westinghouse LBB Analysis

- Proprietary j. Attachment 10

- PWROG-17033-P, Revision 0 - RCP Code Case N-481

- Proprietary

k. Attachment 11 - MRP 2017-038