Letter Sequence Other |
|---|
EPID:L-2018-RNW-0002, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Administration
- Withholding Request
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses, L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses, L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items, L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation, L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses, ML17338A134, ML17338A139, ML17360A054, ML18003A047, ML18037A824, ML18037A828, ML18037A829, ML18074A252, ML18080A175, ML18081A239, ML18081A257, ML18081A270, ML18081A278, ML18086A705, ML18087A433, ML18113A142, ML18160A012, ML18173A087, ML18183A445, ML18214A171, ML18230B482, ML18232A576, ML18299A114, ML18341A024, ML19032A536, ML19050A400, ML19162A072, ML19162A097, ML19162A117, ML19162A343, ML19200A070, ML19326C114, ML22073A122
|
MONTHYEARML19326C1141972-07-19019 July 1972 SLR Tech Specs from Authority File Project stage: Other L-2017-097, Request for Withholding Information from Public Disclosure Re Subsequent License Renewal Notification2017-05-17017 May 2017 Request for Withholding Information from Public Disclosure Re Subsequent License Renewal Notification Project stage: Withholding Request ML18080A1642017-05-25025 May 2017 U.S. Nuclear Regulatory Commission Approval of Florida Power & Light Company Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18081A2862017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Scoping and Screening Methodology Project stage: Meeting ML18080A1782017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Neutron Fluence Calculations Project stage: Meeting ML18080A1702017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant -Environmental Topics and SAMA Project stage: Meeting ML18080A1662017-08-23023 August 2017 Notice of Forthcoming Closed Meeting to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Reactor Vessel Internals Project stage: Meeting ML18080A1722017-09-0505 September 2017 Official Use Only - Proprietary Information - Unnamed Plant Meeting Prep for Environmental Pre-Application Call - Resent to Include an Additional Topic Project stage: Meeting ML18081A2342017-10-23023 October 2017 Notice of Teleconference to Discuss Pre-Application Activities for the Anticipated Submittal of a Subsequent License Renewal Application for an Unnamed Plant - Reactor Vessel Internals, Neutron Fluence, and Environmentally Assisted Fatigue Project stage: Meeting ML18081A2572017-11-0101 November 2017 Notice of Forthcoming Closed Telecon to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - GALL SLR Requirements for Assessment of Concrete Degradation Project stage: Other ML18081A2702017-11-17017 November 2017 Notice of Closed Telecon to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - GALL SLR Requirements for Cable and Electrical Aging Management Programs Project stage: Other ML18080A1682017-12-21021 December 2017 Summary of Pre-Application Meeting Between the NRC and FPL to Discuss AMP XI.M16A, PWR Vessel Internals Associated with the Turkey Point Units 3 and 4, Subsequent License Renewal Application Project stage: Meeting ML18081A0252017-12-28028 December 2017 September 11, 2017, Summary of Pre-Application Meeting That Was Scheduled to Be Held Between NRC and FPL to Discuss Neutron Fluence Associated with the Turkey Point Subsequent License Renewal Application Project stage: Meeting ML18080A1752018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on September 7, 2017, Between NRC and FPL to Discuss the Environmental Report Associated with the Turkey Point Subsequent License Renewal Application Project stage: Other ML18081A2782018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on November 21, 2017, Between NRC and FPL to Discuss Cable and Electrical Aging Management Programs Associated with the Turkey Point Subsequent License Renewal Application Project stage: Other ML18081A2932018-01-0505 January 2018 Summary of Closed Pre-Application Teleconference Held on September 12, 2017, Between NRC and FPL to Discuss Scoping and Screening Methodology Associated with the Turkey Point Unit Nos. 3 and 4 Subsequent License Renewal Application Project stage: Meeting ML18081A2632018-01-0505 January 2018 Summary of Closed Pre-Application Teleconference Between NRC and FPL to Discuss Concrete Degradation Associated with the Turkey Point Subsequent License Renewal Application Project stage: Meeting ML18081A2392018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on November 6, 2017, Between the NRC and FPL to Discuss MRP-227, Reactor Vessel Internals, and Environmentally Assisted Fatigue Associated with the Turkey Point Subsequent License Renewal Appli Project stage: Other L-2018-004, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)2018-01-30030 January 2018 Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) Project stage: Request ML18037A8122018-01-30030 January 2018, 31 January 2018 Submittal of Subsequent License Renewal Application Project stage: Request ML18037A8292018-01-30030 January 2018 Enclosure 2 - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Project stage: Other ML18037A8282018-01-30030 January 2018 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Project stage: Other ML18037A8242018-01-30030 January 2018 Submittal of Subsequent License Renewal Application Project stage: Other ML18113A1322018-01-31031 January 2018, 10 April 2018, 30 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 Project stage: Request L-2018-039, License Renewal Application - Supplement 12018-02-0909 February 2018 License Renewal Application - Supplement 1 Project stage: Supplement ML18053A1372018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Supplement L-2018-053, Replacement Pages to Enclosure 3, SLRA Section 42018-02-16016 February 2018 Replacement Pages to Enclosure 3, SLRA Section 4 Project stage: Request ML18053A1232018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Request ML18038A6912018-04-0303 April 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) Project stage: Other ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application Project stage: Other ML17338A1342018-04-13013 April 2018 Receipt and Availability of the Subsequent License Renewal Application for the Turkey Point Nuclear Generating Units 3 and 4 Project stage: Other ML17338A1392018-04-13013 April 2018 FRN for Receipt and Availability of the Subsequent License Renewal Application for the Turkey Point Nuclear Generating Units 3 and 4 Project stage: Other ML18087A4332018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Other ML18087A4742018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Request ML17360A0542018-04-25025 April 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other ML18003A0482018-04-26026 April 2018 Federal Register Notice (FRN) for Opportunity to Request a Hearing and to Petition for Leave to Intervene in the Review of FPLs Turkey Point Subsequent License Renewal Application Project stage: Approval ML18003A0472018-04-26026 April 2018 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from FPL for Subsequent Renewal of the Turkey Point Units 3 and 4 Project stage: Other ML18086A7052018-04-26026 April 2018 Plan for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18149A5702018-05-29029 May 2018 Draft RAI B.2.3.16 1, Fire Protection System Enhancements, for Turkey Point SLRA, for Public Teleconference on June 13, 2018 Project stage: Draft RAI ML18150A2552018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - Spanish Project stage: Meeting ML18150A2402018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English Project stage: Meeting ML18160A0122018-06-12012 June 2018 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18173A0872018-07-0505 July 2018 Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18183A4452018-07-23023 July 2018 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18214A1712018-08-0101 August 2018 Subsequent License Renewal Application Project stage: Other ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18218A1992018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - E-mail Project stage: RAI ML18218A1982018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 Project stage: Request ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: RAI 2018-02-09
[Table View] |
Text
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 Turkey Point Subsequent License Renewal Application Enclosure Summary (4 Total Pages)
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 - CAW-17-4686 Affidavit for Westinghouse CUFs in SLR Tables (Enclosure 5 Attachment 1-SLRA Section 4, Attachment 4, & ) - CAW-17-4675 Affidavit for Westinghouse EAF Calculations (Enclosure 5 Attachment 1-SLRA Section 4 & Attachment 7) - CAW-17-4621 Affidavit for Westinghouse LBB (Enclosure 5 - SLRA Section 4 & Attachment 9) - EPRI Affidavit for MRP 2017-038 (Enclosure 5 Attachment 1 -
SLRA Appendix C & Attachment 11) - Areva Affidavit for Topical Reports
- i.
ANP-3646P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & )
ii.
ANP-3647P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & ) - Areva Affidavit for CUFs in SLRA Tables (Enclosure 5 - SLRA Section 4, Attachment 4, & Attachment 5) - Areva Affidavit for EAF Calculations (Enclosure 5 Attachment 1
- SLRA Section 4 & Attachment 8) - PWROG Affidavit for PWROG 17033-P Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems dated October 2017 (Enclosure 5 0) - Westinghouse Affidavit CAW-17-4683 for withholding Data Package for Pressurizer Spray and Surge Nozzle Analysis (Enclosure 5 - SLRA Section 4 & Attachment 6) - Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Public Version) - Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)
- a. Attachment 1 -LTR-REA-17-116-NP, Revision 0, Reactor Vessel Neutron Exposure Data
- b. Attachment 2 - Areva Topical Report ANP-3646NP Revision 0
- c. Attachment 3 - ArevaTopical Report ANP-3647NP Revision 0
- d. Attachment 4 - SIA Report No. 1700109.402P, Revision 3 - REDACTED
- e. Attachment 5 - SIA Report No. 1700109.401P, Revision 3 - REDACTED
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1
- f. Attachment 6 - SIA Environmentally Assisted Fatigue Calculations
- i.
Pressurizer Lower Head - 1700804.316P Revision 0 REDACTED, 1700804.317 Revision 0, and 1700804.318 Revision 0, ii. Pressurizer Spray - 1700804.313P Revision 1 REDACTED, 1700804.314P Revision 1 REDACTED, and 1700804.315P Revision 1 REDACTED
- g. Attachment 7 - Westinghouse Environmentally Assisted Fatigue Calculations
- i. LTR-SDA-II-17-13-NP, Rev. 2, Pressurizer Upper Head, RV Core Support Blocks ii. LTR-CECO-17-025-NP, Rev. 1, Replacement Steam Generators
- h. Attachment 8 - Areva Environmentally Assisted Fatigue Calculations:
Areva Letter No. AREVA-17-02742, dated December 6, 2017, Final CUFEN Results - Turkey Point 3 & 4 - SLR EAF Analyses
- i. 32-9280707, Rev. 0, CRDM Nozzle to Adapter Weld Connection ii. 32-9280708, Rev. 0, Replacement RVCH J Groove iii. 32-9280709, Rev. 0, CRDM Latch Housing iv. 32-9280710, Rev. 0, Vent Nozzle
- v. 32-9280711, Rev. 0, Reactor Vessel Flange vi. 32-9280712, Rev. 0, CRDM Lower Joint
- i. Attachment 9 - PWROG-17031-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-15338-A
- j. Attachment 10 - PWROG-17011-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-14535A and WCAP-15666-A
- k. Attachment 11 - WCAP-15354-NP, Rev. 1, Technical Justification for Eliminating Primary Loop Pipe Rupture as a Structural Design Basis
- l. Attachment 12 - SIA Leak-Before-Break Evaluation for Auxiliary Lines 0901350-401 Rev. 3 and 0901350-304 Rev. 3
- m. Attachment 13 - PWROG-17033-NP, Rev. 0, Update for Subsequent License Renewal: WCAP-13045 - 10 CFR 2.390 Withheld Proprietary Documents
- a. Attachment 1 - Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Proprietary Version)
- b. Attachment 2 - Areva Topical Report ANP-3646P Revision 0
- c. Attachment 3 - Areva Topical Report ANP-3647P Revision 0
- d. Attachment 4 - SIA Task 1 Report - SIA Report No. 1700109.402P Revision 3
- e. Attachment 5 - SIA Task 2 Report - SIA Report No. 1700109.401P Revision 3
- f. Attachment 6 - SIA EAF Calculations
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1
- i. Pressurizer Lower Head - SIA Calculation No. 1700804.316P Revision 0.
ii. Pressurizer Spray - SIA Calculation Nos. 1700804.313P Revision 1, 1700804.314P Revision 1, and 1700804.315P Revision 1
- g. Attachment 7 - Westinghouse EAF Calculations
- i. Pressurizer Upper Head, RV Core Support Blocks - LTR-SDA-II-17-13-P, Revision 2 ii. Steam Generators LTR-CECO-17-025-P, Revision 1
- h. Attachment 8 - Areva EAF Calculations (6)
- i. CRDM Bi-Metallic - Areva Calculation No. 32-9279174, Revision 1, 12/14/17 ii. CRDM J-Groove Weld - Areva Calculation No. 32-9279212, Revision 1, 12/12/17 iii. CRDM Latch Housing - Areva Calculation No. 32-9279367, Revision 1, 12/15/17 iv. CRDM Vent Nozzle - Areva Calculation No. 32-9279362, Revision 1, 12/14/17
- v. CRDM Vessel Flange - Areva Calculation No. 32-9279161, Revision 1, 12/14/17 vi. CRDM Lower Joint - Areva Calculation No. 32-9280202, Revision 1, 12/15/17
- i. Attachment 9 - WCAP-15354-P, Revision 1, Westinghouse LBB Analysis
- Proprietary
- j. Attachment 10 - PWROG-17033-P, Revision 0 - RCP Code Case N-481
- Proprietary
- k. Attachment 11 - MRP 2017-038