Millstone Inspection/Activity Plan cc w/encl: Distribution via ListServ
Millstone Inspection/Activity Plan cc w/encl: Distribution via ListServ  
 
ML16239A167 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JAmbrosini via email KWarner GDentel DATE 8/23/16 8/23/16 8/24/16 Letter to Mr. David Heacock from Glenn T. Dentel dated August 31, 2016
 
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORT 05000336/2016005 AND 05000423/2016005)
Distribution w/encl: (via email) DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS PKrohn, DRS GDentel, DRP JSchussler, DRP KWarner, DRP JAmbrosini, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI ARancourt, DRP, AA JBowen, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPReports Resource DRS Branch Chiefs (6)
NMcNamara, SLO DTifft, SLO DScrenci, PAO NSheehan, PAO ROPAssessment Resource RidsNrrDirslpab Resource Page 1 of 308/29/201612:43:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteMillstoneInspection / Activity Plan07/01/2016-06/30/2018EXM8/8-MILLSTONE 2 INITIAL EXAMINATION4 2 FY16-MS2 INITIAL OPERATOR LICENSING EXAMU0192708/08/201608/12/2016 2 FY16-MS2 INITIAL OPERATOR LICENSING EXAMU0192709/05/201609/09/201671152BI-PI&R BIENNIAL4 2,3 IPProblem Identification and Resolution71152B06/27/201607/01/2016EP-EP EXERCISE EVALUATION9 2,3 IPExercise Evaluation711140108/15/201608/19/2016TRI FI-TRIENNIAL FIRE PROTECTION7 2,3 IPFire Protection [Triennial]7111105T07/25/201607/29/2016 2,3 IPFire Protection [Triennial]7111105T08/08/201608/12/2016BI-RADIOLOGICAL SAFETY - EXT EXPOSURE1 2,3 IPOccupational Dose Assessment71124.0408/01/201608/05/20167111107T-TRIENNIAL HEAT SINK1 2,3 IPHeat Sink Performance7111107T09/12/201609/16/20167111111B-MS2 REQUAL INSP WITH P/F RESULTS2 2 IPLicensed Operator Requalification Program7111111B10/31/201611/04/2016TI-191-FUKUSHIMA LESSONS-LEARNED1 2,3 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19110/24/201610/28/20167111117T-PERMANENT PLANT MODIFICATIONS4 2,3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/31/201611/04/2016 2,3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T11/14/201611/18/201692702-CONFIRMATORY ORDER INSPECTION (U2 50.59)1 2 IPFollowup On Corrective Actions For Violations And Deviations9270210/31/201611/18/201692702-SL III FOLLOWUP INSPECTION (SLOD)1 2,3 IPFollowup On Corrective Actions For Violations And Deviations9270210/31/201611/18/2016BI-RADIOLOGICAL SAFETY - RAD HAZ & PIV1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0111/14/201611/18/2016 2,3 IPOccupational Exposure Control Effectiveness71151-OR0111/14/201611/18/2016 2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/14/201611/18/201671124-RADIOLOGICAL SAFETY - ALARA1 2,3 IPOccupational ALARA Planning and Controls71124.0201/23/201701/27/201771124.08-RADWASTE1 2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/06/201702/10/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 308/29/201612:43:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteMillstoneInspection / Activity Plan07/01/2016-06/30/201871124-RADIATION SAFETY - RAD HAZ PIV1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/201704/14/2017 2,3 IPOccupational Exposure Control Effectiveness71151-OR0104/10/201704/14/2017 2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0104/10/201704/14/20177111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P04/17/201704/28/20177111111B-MS3 REQUAL INSP WITH P/F RESULTS2 3 IPLicensed Operator Requalification Program7111111B08/14/201708/18/201712/3EXM-MILLSTONE 3 INITIAL EXAM4 3 FY18-MS3 INITIAL OPERATOR LICENSING EXAMU0194611/06/201711/10/2017 3 FY18-MS3 INITIAL OPERATOR LICENSING EXAMU0194612/04/201712/08/201771124-RADIATION SAFETY - TEAM INST RETS REMP3 2,3 IPRadiation Monitoring Instrumentation71124.0507/10/201707/14/2017 2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/10/201707/14/2017 2,3 IPRadiological Environmental Monitoring Program71124.0707/10/201707/14/2017EP-EP PROGRAM INSPECTION1 2,3 IPAlert and Notification System Testing711140208/07/201708/11/2017 2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/07/201708/11/2017 2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/07/201708/11/2017 2,3 IPPerformance Indicator Verification7115108/07/201708/11/20177111108P-U3 INSERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P10/16/201710/27/2017HP-ALARA1 2 IPOccupational ALARA Planning and Controls71124.0201/29/201802/03/2018EP-EXERCISE INSPECTION4 2,3 IPExercise Evaluation711140103/19/201803/23/2018HP-RAD HAZARD1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/12/201803/16/20187111121-CDBI7 2,3 IPComponent Design Bases Inspection711112104/23/201804/27/2018 2,3 IPComponent Design Bases Inspection711112105/07/201805/11/2018 2,3 IPComponent Design Bases Inspection711112105/21/201805/25/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 3 of 308/29/201612:43:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteMillstoneInspection / Activity Plan07/01/2016-06/30/2018ISFSI-ISFSI LOADING CAMPAIGN INSPECTION3 2,3 IPOperation Of An ISFSI6085505/28/201806/01/2018 2,3 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.105/28/201806/01/2018HP-RAD AIRBORNE1 2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/04/201806/08/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 12:56, 10 May 2018

Mid-Cycle Assessment Letter for Millstone Power Station, Units 2 and 3 (Report 05000336/2016005 and 05000423/2016005)
ML16239A167
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/31/2016
From: Dentel G T
Reactor Projects Branch 2
To: Heacock D
Dominion Resources
Dentel G T
References
IR 2016005
Download: ML16239A167 (7)


Text

August 31, 2016

Mr. David Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORT 05000336/2016005 AND 05000423/2016005)

Dear Mr. Heacock:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Millstone Power Station (Millstone), Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Millstone Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Millstone Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. As discussed in the End-of-Cycle letter dated March 2, 2016, the NRC will be following up on the following traditional enforcement actions to Millstone: EA-14-126, a Severity Level III Notice of Violation for impeding the regulatory process issued February 10, 2015; EA-13-188, an Alternative Dispute Resolution Confirmatory Order issued August 26, 2015; and a Severity Level IV violation for impeding the regulatory process issued on June 12, 2015. In accordance with Inspection Manual Chapter 0305, Sections 13.02.a and 13.02.b, the NRC will follow-up on these violations through Inspection Procedure 92702, "Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders." The NRC staff received the Millstone Final Compliance letter for Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC staff issued the Millstone Safety Evaluation on July 1, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16099A171) and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."

In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," (ADAMS Accession No. ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5233 with any questions you have regarding this letter.

Sincerely,/RA/ Glenn T. Dentel, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49

Enclosure:

Millstone Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML16239A167 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JAmbrosini via email KWarner GDentel DATE 8/23/16 8/23/16 8/24/16 Letter to Mr. David Heacock from Glenn T. Dentel dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORT 05000336/2016005 AND 05000423/2016005)

Distribution w/encl: (via email) DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS PKrohn, DRS GDentel, DRP JSchussler, DRP KWarner, DRP JAmbrosini, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI ARancourt, DRP, AA JBowen, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPReports Resource DRS Branch Chiefs (6)

NMcNamara, SLO DTifft, SLO DScrenci, PAO NSheehan, PAO ROPAssessment Resource RidsNrrDirslpab Resource Page 1 of 308/29/201612:43:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteMillstoneInspection / Activity Plan07/01/2016-06/30/2018EXM8/8-MILLSTONE 2 INITIAL EXAMINATION4 2 FY16-MS2 INITIAL OPERATOR LICENSING EXAMU0192708/08/201608/12/2016 2 FY16-MS2 INITIAL OPERATOR LICENSING EXAMU0192709/05/201609/09/201671152BI-PI&R BIENNIAL4 2,3 IPProblem Identification and Resolution71152B06/27/201607/01/2016EP-EP EXERCISE EVALUATION9 2,3 IPExercise Evaluation711140108/15/201608/19/2016TRI FI-TRIENNIAL FIRE PROTECTION7 2,3 IPFire Protection [Triennial]7111105T07/25/201607/29/2016 2,3 IPFire Protection [Triennial]7111105T08/08/201608/12/2016BI-RADIOLOGICAL SAFETY - EXT EXPOSURE1 2,3 IPOccupational Dose Assessment71124.0408/01/201608/05/20167111107T-TRIENNIAL HEAT SINK1 2,3 IPHeat Sink Performance7111107T09/12/201609/16/20167111111B-MS2 REQUAL INSP WITH P/F RESULTS2 2 IPLicensed Operator Requalification Program7111111B10/31/201611/04/2016TI-191-FUKUSHIMA LESSONS-LEARNED1 2,3 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19110/24/201610/28/20167111117T-PERMANENT PLANT MODIFICATIONS4 2,3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/31/201611/04/2016 2,3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T11/14/201611/18/201692702-CONFIRMATORY ORDER INSPECTION (U2 50.59)1 2 IPFollowup On Corrective Actions For Violations And Deviations9270210/31/201611/18/201692702-SL III FOLLOWUP INSPECTION (SLOD)1 2,3 IPFollowup On Corrective Actions For Violations And Deviations9270210/31/201611/18/2016BI-RADIOLOGICAL SAFETY - RAD HAZ & PIV1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0111/14/201611/18/2016 2,3 IPOccupational Exposure Control Effectiveness71151-OR0111/14/201611/18/2016 2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/14/201611/18/201671124-RADIOLOGICAL SAFETY - ALARA1 2,3 IPOccupational ALARA Planning and Controls71124.0201/23/201701/27/201771124.08-RADWASTE1 2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/06/201702/10/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 308/29/201612:43:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteMillstoneInspection / Activity Plan07/01/2016-06/30/201871124-RADIATION SAFETY - RAD HAZ PIV1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/201704/14/2017 2,3 IPOccupational Exposure Control Effectiveness71151-OR0104/10/201704/14/2017 2,3 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0104/10/201704/14/20177111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P04/17/201704/28/20177111111B-MS3 REQUAL INSP WITH P/F RESULTS2 3 IPLicensed Operator Requalification Program7111111B08/14/201708/18/201712/3EXM-MILLSTONE 3 INITIAL EXAM4 3 FY18-MS3 INITIAL OPERATOR LICENSING EXAMU0194611/06/201711/10/2017 3 FY18-MS3 INITIAL OPERATOR LICENSING EXAMU0194612/04/201712/08/201771124-RADIATION SAFETY - TEAM INST RETS REMP3 2,3 IPRadiation Monitoring Instrumentation71124.0507/10/201707/14/2017 2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/10/201707/14/2017 2,3 IPRadiological Environmental Monitoring Program71124.0707/10/201707/14/2017EP-EP PROGRAM INSPECTION1 2,3 IPAlert and Notification System Testing711140208/07/201708/11/2017 2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/07/201708/11/2017 2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/07/201708/11/2017 2,3 IPPerformance Indicator Verification7115108/07/201708/11/20177111108P-U3 INSERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P10/16/201710/27/2017HP-ALARA1 2 IPOccupational ALARA Planning and Controls71124.0201/29/201802/03/2018EP-EXERCISE INSPECTION4 2,3 IPExercise Evaluation711140103/19/201803/23/2018HP-RAD HAZARD1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/12/201803/16/20187111121-CDBI7 2,3 IPComponent Design Bases Inspection711112104/23/201804/27/2018 2,3 IPComponent Design Bases Inspection711112105/07/201805/11/2018 2,3 IPComponent Design Bases Inspection711112105/21/201805/25/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 3 of 308/29/201612:43:16Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteMillstoneInspection / Activity Plan07/01/2016-06/30/2018ISFSI-ISFSI LOADING CAMPAIGN INSPECTION3 2,3 IPOperation Of An ISFSI6085505/28/201806/01/2018 2,3 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.105/28/201806/01/2018HP-RAD AIRBORNE1 2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/04/201806/08/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.