IR 05000250/2016005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 34: | Line 34: | ||
===Enclosure:=== | ===Enclosure:=== | ||
Turkey Point Inspection/Activity Plan (09/01/2016 - 06/30/2018) | Turkey Point Inspection/Activity Plan (09/01/2016 - 06/30/2018) | ||
cc: Distribution via Listserv | cc: Distribution via Listserv | ||
__________________ __ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE LFP1 LJB4 NAME LPressley LSuggs DATE 8/25/2016 8/29/2016 E-MAIL COPY? YES NO YES NO Letter to Mano Nazar from LaDonna B. Suggs dated August 31, 2016 | |||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4 - NRC INSPECTION REPORT 05000250/2016005 AND 05000251/2016005 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) | |||
Page 1 of 208/31/201607:01:43Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteTurkey PointInspection / Activity Plan09/01/2016-06/30/2018OL EXAM-INITIAL LICENSE EXAM3 3 TURKEY POINT AUGUST 2016 INITIAL EXAM AT POWER FACILITIESV2347608/22/201609/02/2016TFPI-TRIENNIAL FIRE PROTECTION INSPECTION5 3,4IPFire Protection [Triennial]7111105T10/31/201611/04/2016 3,4IPFire Protection [Triennial]7111105T11/28/201612/02/2016HS-TRIENNIAL HEAT SINK PERFORMANCE1 3,4IPHeat Sink Performance7111107T11/28/201612/02/2016RP-RP PUBLIC RAD SAFETY BASELINE2 3,4IPRadioactive Gaseous and Liquid Effluent Treatment71124.0612/12/201612/16/2016 3,4IPRadiological Environmental Monitoring Program71124.0712/12/201612/16/2016 3,4IPPerformance Indicator Verification7115112/12/201612/16/2016EP-EP EXERCISE6 3,4IPExercise Evaluation711140102/20/201702/24/2017 3,4IPEmergency Action Level and Emergency Plan Changes711140402/20/201702/24/2017 3,4IPExercise Evaluation - Scenario Review711140802/20/201702/24/2017 3,4IPPerformance Indicator Verification7115102/20/201702/24/2017ISI-UNIT 3 IN-SERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P04/03/201704/07/2017SGISI-UNIT 3 SG IN-SERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P04/10/201704/14/2017CDBI-COMPONENT DESIGN BASIS INSPECTION7 3,4IPComponent Design Bases Inspection711112106/26/201706/30/2017 3,4IPComponent Design Bases Inspection711112107/17/201707/21/2017 3,4IPComponent Design Bases Inspection711112107/31/201708/04/2017 3,4IPComponent Design Bases Inspection711112108/14/201708/18/2017OL RQ-REQUAL INSPECTION2 3,4IPLicensed Operator Requalification Program7111111B09/18/201709/22/2017OL EXAM-INITIAL LICENSE EXAM PREP3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIESV2349209/25/201709/29/2017ISI-UNIT 4 IN-SERVICE INSPECTION1 4IPInservice Inspection Activities - PWR7111108P10/09/201710/13/2017RP-RP OCCUPATIONAL INSPECTION WEEK 13 3,4IPRadiological Hazard Assessment and Exposure Controls71124.0110/16/201710/20/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
Page 2 of 208/31/201607:01:43Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteTurkey PointInspection / Activity Plan09/01/2016-06/30/2018RP-RP OCCUPATIONAL INSPECTION WEEK 13 3,4IPOccupational ALARA Planning and Controls71124.0210/16/201710/20/2017 3,4IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/16/201710/20/2017 3,4IPOccupational Dose Assessment71124.0410/16/201710/20/2017 3,4IPRadiation Monitoring Instrumentation71124.0510/16/201710/20/2017 3,4IPPerformance Indicator Verification7115110/16/201710/20/2017SGISI-UNIT 4 SG IN-SERVICE INSPECTION1 4IPInservice Inspection Activities - PWR7111108P10/16/201710/20/2017OL EXAM-INITIAL LICENSE EXAM3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIESV2349210/23/201711/10/2017RP-RP OCCUPATIONAL INSPECTION WEEK 22 3,4IPRadiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 3,4IPOccupational ALARA Planning and Controls71124.0211/13/201711/17/2017 3,4IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 3,4IPOccupational Dose Assessment71124.0411/13/201711/17/2017 3,4IPRadiation Monitoring Instrumentation71124.0511/13/201711/17/2017 3,4IPPerformance Indicator Verification7115111/13/201711/17/2017EP-EP PROGRAM INSPECTION3 3,4IPAlert and Notification System Testing711140201/22/201801/26/2018 3,4IPEmergency Preparedness Organization Staffing and Augmentation System711140301/22/201801/26/2018 3,4IPEmergency Action Level and Emergency Plan Changes711140401/22/201801/26/2018 3,4IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/22/201801/26/2018 3,4IPPerformance Indicator Verification7115101/22/201801/26/2018RP-RP PUBLIC INSPECTION2 3,4IPRadioactive Gaseous and Liquid Effluent Treatment71124.0601/29/201802/02/2018 3,4IPRadiological Environmental Monitoring Program71124.0701/29/201802/02/2018 3,4IPOccupational Exposure Control Effectiveness71151-OR0101/29/201802/02/2018 3,4IPRETS/ODCM Radiological Effluent Occurrences71151-PR0101/29/201802/02/2018MODS-PLANT MODIFICATIONS INSPECTION3 3,4IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T01/29/201802/02/2018 3,4IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/12/201802/16/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Revision as of 12:51, 10 May 2018
| ML16244A285 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/31/2016 |
| From: | Suggs L B NRC/RGN-II/DRP/RPB3 |
| To: | Nazar M Florida Power & Light Co |
| References | |
| IR 2016005 | |
| Download: ML16244A285 (6) | |
Text
August 31, 2016
Mano Nazar, President, Nuclear Division and CNO Florida Power & Light Co. Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4 - NRC INSPECTION REPORT 05000250/2016005 AND 05000251/2016005
Dear Mr. Nazar:
On August 9, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Turkey Point Nuclear Generating Unit 3 and Unit 4 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Turkey Point Nuclear Generating Station Unit 3 and Unit 4 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."
In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4539 with any questions you have regarding this letter.
Sincerely,/RA/ LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
Enclosure:
Turkey Point Inspection/Activity Plan (09/01/2016 - 06/30/2018)
cc: Distribution via Listserv
__________________ __ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE LFP1 LJB4 NAME LPressley LSuggs DATE 8/25/2016 8/29/2016 E-MAIL COPY? YES NO YES NO Letter to Mano Nazar from LaDonna B. Suggs dated August 31, 2016
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4 - NRC INSPECTION REPORT 05000250/2016005 AND 05000251/2016005 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
Page 1 of 208/31/201607:01:43Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteTurkey PointInspection / Activity Plan09/01/2016-06/30/2018OL EXAM-INITIAL LICENSE EXAM3 3 TURKEY POINT AUGUST 2016 INITIAL EXAM AT POWER FACILITIESV2347608/22/201609/02/2016TFPI-TRIENNIAL FIRE PROTECTION INSPECTION5 3,4IPFire Protection [Triennial]7111105T10/31/201611/04/2016 3,4IPFire Protection [Triennial]7111105T11/28/201612/02/2016HS-TRIENNIAL HEAT SINK PERFORMANCE1 3,4IPHeat Sink Performance7111107T11/28/201612/02/2016RP-RP PUBLIC RAD SAFETY BASELINE2 3,4IPRadioactive Gaseous and Liquid Effluent Treatment71124.0612/12/201612/16/2016 3,4IPRadiological Environmental Monitoring Program71124.0712/12/201612/16/2016 3,4IPPerformance Indicator Verification7115112/12/201612/16/2016EP-EP EXERCISE6 3,4IPExercise Evaluation711140102/20/201702/24/2017 3,4IPEmergency Action Level and Emergency Plan Changes711140402/20/201702/24/2017 3,4IPExercise Evaluation - Scenario Review711140802/20/201702/24/2017 3,4IPPerformance Indicator Verification7115102/20/201702/24/2017ISI-UNIT 3 IN-SERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P04/03/201704/07/2017SGISI-UNIT 3 SG IN-SERVICE INSPECTION1 3 IPInservice Inspection Activities - PWR7111108P04/10/201704/14/2017CDBI-COMPONENT DESIGN BASIS INSPECTION7 3,4IPComponent Design Bases Inspection711112106/26/201706/30/2017 3,4IPComponent Design Bases Inspection711112107/17/201707/21/2017 3,4IPComponent Design Bases Inspection711112107/31/201708/04/2017 3,4IPComponent Design Bases Inspection711112108/14/201708/18/2017OL RQ-REQUAL INSPECTION2 3,4IPLicensed Operator Requalification Program7111111B09/18/201709/22/2017OL EXAM-INITIAL LICENSE EXAM PREP3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIESV2349209/25/201709/29/2017ISI-UNIT 4 IN-SERVICE INSPECTION1 4IPInservice Inspection Activities - PWR7111108P10/09/201710/13/2017RP-RP OCCUPATIONAL INSPECTION WEEK 13 3,4IPRadiological Hazard Assessment and Exposure Controls71124.0110/16/201710/20/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 208/31/201607:01:43Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteTurkey PointInspection / Activity Plan09/01/2016-06/30/2018RP-RP OCCUPATIONAL INSPECTION WEEK 13 3,4IPOccupational ALARA Planning and Controls71124.0210/16/201710/20/2017 3,4IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/16/201710/20/2017 3,4IPOccupational Dose Assessment71124.0410/16/201710/20/2017 3,4IPRadiation Monitoring Instrumentation71124.0510/16/201710/20/2017 3,4IPPerformance Indicator Verification7115110/16/201710/20/2017SGISI-UNIT 4 SG IN-SERVICE INSPECTION1 4IPInservice Inspection Activities - PWR7111108P10/16/201710/20/2017OL EXAM-INITIAL LICENSE EXAM3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIESV2349210/23/201711/10/2017RP-RP OCCUPATIONAL INSPECTION WEEK 22 3,4IPRadiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 3,4IPOccupational ALARA Planning and Controls71124.0211/13/201711/17/2017 3,4IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 3,4IPOccupational Dose Assessment71124.0411/13/201711/17/2017 3,4IPRadiation Monitoring Instrumentation71124.0511/13/201711/17/2017 3,4IPPerformance Indicator Verification7115111/13/201711/17/2017EP-EP PROGRAM INSPECTION3 3,4IPAlert and Notification System Testing711140201/22/201801/26/2018 3,4IPEmergency Preparedness Organization Staffing and Augmentation System711140301/22/201801/26/2018 3,4IPEmergency Action Level and Emergency Plan Changes711140401/22/201801/26/2018 3,4IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/22/201801/26/2018 3,4IPPerformance Indicator Verification7115101/22/201801/26/2018RP-RP PUBLIC INSPECTION2 3,4IPRadioactive Gaseous and Liquid Effluent Treatment71124.0601/29/201802/02/2018 3,4IPRadiological Environmental Monitoring Program71124.0701/29/201802/02/2018 3,4IPOccupational Exposure Control Effectiveness71151-OR0101/29/201802/02/2018 3,4IPRETS/ODCM Radiological Effluent Occurrences71151-PR0101/29/201802/02/2018MODS-PLANT MODIFICATIONS INSPECTION3 3,4IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T01/29/201802/02/2018 3,4IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/12/201802/16/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.