IR 05000445/2016006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 31: | Line 31: | ||
===Enclosure:=== | ===Enclosure:=== | ||
Comanche Peak Inspection/Activity Plan | Comanche Peak Inspection/Activity Plan | ||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS C: DRP/A DD:DRP NAME RAlexander AVegel JGroom RLantz SIGNATURE /RA/ /RA JClark for/ /RA/ /RA/ DATE 02/16/2017 2/23/17 2/27/17 2/23/17 Comanche PeakInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 1 of 302/23/2017 11:44:123EXAM-INITIAL EXAM1 05/15/201705/19/2017X02589INITIAL EXAM CP U1 (06/2017) 2 05/15/201705/19/2017X02590INITIAL EXAM CP U2 (06/2017)1 06/12/201706/16/2017X02589INITIAL EXAM CP U1 (06/2017) 2 06/12/201706/16/2017X02590INITIAL EXAM CP U2 (06/2017)3EB1-07T-CP HEAT SINK PERFORMANCE1,2 01/30/201702/03/2017IP7111107THeat Sink Performance2RS 13 PI-RADIATION SAFETY1,2 04/10/201704/14/2017IP71124.01Radiological Hazard Assessment and Exposure Controls1,2 04/10/201704/14/2017IP71124.03In-Plant Airborne Radioactivity Control and Mitigation1,2 04/10/201704/14/2017IP71151-OR01Occupational Exposure Control Effectiveness1,2 04/10/201704/14/2017IP71151-PR01RETS/ODCM Radiological Effluent Occurrences171111.08-INSERVICE INSPECTION 2RF16 2 04/10/201704/21/2017IP7111108PInservice Inspection Activities - PWR4TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE1,2 05/15/201705/19/2017IP2515/191Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20124EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION1,2 06/12/201706/16/2017IP7111105TFire Protection [Triennial]1,2 06/26/201706/30/2017IP7111105TFire Protection [Triennial]2EP-1-IN-OFFICE EP SCENARIO REVIEW1,2 06/12/201707/21/2017IP7111408Exercise Evaluation - Scenario Review4EP-2-BIENNIAL EP EXERCISE INSPECTION1,2 08/14/201708/18/2017IP7111401Exercise Evaluation1,2 08/14/201708/18/2017IP7111404Emergency Action Level and Emergency Plan Changes1EP-3-EP PERFORMANCE INDICATOR VERIFICATION1,2 08/14/201708/18/2017IP71151-EP01Drill/Exercise Performance1,2 08/14/201708/18/2017IP71151-EP02ERO Readiness1,2 08/14/201708/18/2017IP71151-EP03Alert & Notification System Reliability171111.08-INSERVICE INSPECTION 1RF191 10/16/201710/27/2017IP7111108PInservice Inspection Activities - PWR2RS 24-RADIATION SAFETY1,2 11/06/201711/10/2017IP71124.02Occupational ALARA Planning and Controls1,2 11/06/201711/10/2017IP71124.04Occupational Dose AssessmentThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
Comanche PeakInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 2 of 302/23/2017 11:44:124TSB 52B-BIENNIAL PI&R1,2 11/27/201712/01/2017IP71152BProblem Identification and Resolution1,2 12/11/201712/15/2017IP71152BProblem Identification and Resolution5EB1-21N-CP DESIGN BASIS PROGRAMS INSPECTION1,2 12/04/201712/15/2017IP7111121NComponent Design Bases Inspection (Programs)8EXAM-INITIAL EXAM1 05/14/201805/18/2018X02620INITIAL EXAM CP U1(06/18) 2 05/14/201805/18/2018X02621INITIAL EXAM CP U2(6/18)1 06/11/201806/15/2018X02620INITIAL EXAM CP U1(06/18) 2 06/11/201806/15/2018X02621INITIAL EXAM CP U2(6/18)4RS 5678-RAD SAFETY1,2 05/07/201805/11/2018IP71124.05Radiation Monitoring Instrumentation1,2 05/07/201805/11/2018IP71124.06Radioactive Gaseous and Liquid Effluent Treatment1,2 05/07/201805/11/2018IP71124.07Radiological Environmental Monitoring Program1,2 05/07/201805/11/2018IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation6EB1-21M-CP DESIGN BASES INSPECTION TEAMS1,2 06/25/201807/13/2018IP7111121MComponent Design Bases Inspection (Teams)2RS 12PI-RAD SAFETY1,2 10/15/201810/19/2018IP71124.01Radiological Hazard Assessment and Exposure Controls1,2 10/15/201810/19/2018IP71124.02Occupational ALARA Planning and Controls1,2 10/15/201810/19/2018IP71151-OR01Occupational Exposure Control Effectiveness1,2 10/15/201810/19/2018IP71151-PR01RETS/ODCM Radiological Effluent Occurrences171111.08-INSERVICE INSPECTION 2R17 2 10/15/201810/26/2018IP7111108PInservice Inspection Activities - PWR1EP-1-EP PROGRAM INSPECTION1,2 11/26/201811/30/2018IP7111402Alert and Notification System Testing1,2 11/26/201811/30/2018IP7111403Emergency Preparedness Organization Staffing and Augmentation System1,2 11/26/201811/30/2018IP7111404Emergency Action Level and Emergency Plan Changes1,2 11/26/201811/30/2018IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies1,2 11/26/201811/30/2018IP71151-EP01Drill/Exercise Performance1,2 11/26/201811/30/2018IP71151-EP02ERO ReadinessThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
Comanche PeakInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 3 of 302/23/2017 11:44:121EP-1-EP PROGRAM INSPECTION1,2 11/26/201811/30/2018IP71151-EP03Alert & Notification System ReliabilityComments:This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Revision as of 09:21, 10 May 2018
| ML17059D562 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/01/2017 |
| From: | Groom J R NRC/RGN-IV/DRP/RPB-A |
| To: | Peters K J TEX Operations Company |
| JEREMY GROOM | |
| References | |
| IR 2016006 | |
| Download: ML17059D562 (6) | |
Text
March 1, 2017
Ken J. Peters, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs TEX Operations Company LLC P.O. Box 1002 Glen Rose, TX 76043
SUBJECT: ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2016006 AND 05000446/2016006)
Dear Mr. Peters:
On February 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Comanche Peak Nuclear Power Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans." This inspection will be conducted at Comanche Peak Nuclear Power Plant, Units 1 and 2, to confirm the station's full implementation of Commission Orders EA-12-049 and EA-12-051. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (817) 200-1148 with any questions you have regarding this letter.
Sincerely,/RA/ Jeremy R. Groom, Chief Project Branch A Division of Reactor Projects Docket Nos. 05000445, 05000446 License Nos. NPF-87 and NPF-89
Enclosure:
Comanche Peak Inspection/Activity Plan
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS C: DRP/A DD:DRP NAME RAlexander AVegel JGroom RLantz SIGNATURE /RA/ /RA JClark for/ /RA/ /RA/ DATE 02/16/2017 2/23/17 2/27/17 2/23/17 Comanche PeakInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 1 of 302/23/2017 11:44:123EXAM-INITIAL EXAM1 05/15/201705/19/2017X02589INITIAL EXAM CP U1 (06/2017) 2 05/15/201705/19/2017X02590INITIAL EXAM CP U2 (06/2017)1 06/12/201706/16/2017X02589INITIAL EXAM CP U1 (06/2017) 2 06/12/201706/16/2017X02590INITIAL EXAM CP U2 (06/2017)3EB1-07T-CP HEAT SINK PERFORMANCE1,2 01/30/201702/03/2017IP7111107THeat Sink Performance2RS 13 PI-RADIATION SAFETY1,2 04/10/201704/14/2017IP71124.01Radiological Hazard Assessment and Exposure Controls1,2 04/10/201704/14/2017IP71124.03In-Plant Airborne Radioactivity Control and Mitigation1,2 04/10/201704/14/2017IP71151-OR01Occupational Exposure Control Effectiveness1,2 04/10/201704/14/2017IP71151-PR01RETS/ODCM Radiological Effluent Occurrences171111.08-INSERVICE INSPECTION 2RF16 2 04/10/201704/21/2017IP7111108PInservice Inspection Activities - PWR4TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE1,2 05/15/201705/19/2017IP2515/191Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20124EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION1,2 06/12/201706/16/2017IP7111105TFire Protection [Triennial]1,2 06/26/201706/30/2017IP7111105TFire Protection [Triennial]2EP-1-IN-OFFICE EP SCENARIO REVIEW1,2 06/12/201707/21/2017IP7111408Exercise Evaluation - Scenario Review4EP-2-BIENNIAL EP EXERCISE INSPECTION1,2 08/14/201708/18/2017IP7111401Exercise Evaluation1,2 08/14/201708/18/2017IP7111404Emergency Action Level and Emergency Plan Changes1EP-3-EP PERFORMANCE INDICATOR VERIFICATION1,2 08/14/201708/18/2017IP71151-EP01Drill/Exercise Performance1,2 08/14/201708/18/2017IP71151-EP02ERO Readiness1,2 08/14/201708/18/2017IP71151-EP03Alert & Notification System Reliability171111.08-INSERVICE INSPECTION 1RF191 10/16/201710/27/2017IP7111108PInservice Inspection Activities - PWR2RS 24-RADIATION SAFETY1,2 11/06/201711/10/2017IP71124.02Occupational ALARA Planning and Controls1,2 11/06/201711/10/2017IP71124.04Occupational Dose AssessmentThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Comanche PeakInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 2 of 302/23/2017 11:44:124TSB 52B-BIENNIAL PI&R1,2 11/27/201712/01/2017IP71152BProblem Identification and Resolution1,2 12/11/201712/15/2017IP71152BProblem Identification and Resolution5EB1-21N-CP DESIGN BASIS PROGRAMS INSPECTION1,2 12/04/201712/15/2017IP7111121NComponent Design Bases Inspection (Programs)8EXAM-INITIAL EXAM1 05/14/201805/18/2018X02620INITIAL EXAM CP U1(06/18) 2 05/14/201805/18/2018X02621INITIAL EXAM CP U2(6/18)1 06/11/201806/15/2018X02620INITIAL EXAM CP U1(06/18) 2 06/11/201806/15/2018X02621INITIAL EXAM CP U2(6/18)4RS 5678-RAD SAFETY1,2 05/07/201805/11/2018IP71124.05Radiation Monitoring Instrumentation1,2 05/07/201805/11/2018IP71124.06Radioactive Gaseous and Liquid Effluent Treatment1,2 05/07/201805/11/2018IP71124.07Radiological Environmental Monitoring Program1,2 05/07/201805/11/2018IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation6EB1-21M-CP DESIGN BASES INSPECTION TEAMS1,2 06/25/201807/13/2018IP7111121MComponent Design Bases Inspection (Teams)2RS 12PI-RAD SAFETY1,2 10/15/201810/19/2018IP71124.01Radiological Hazard Assessment and Exposure Controls1,2 10/15/201810/19/2018IP71124.02Occupational ALARA Planning and Controls1,2 10/15/201810/19/2018IP71151-OR01Occupational Exposure Control Effectiveness1,2 10/15/201810/19/2018IP71151-PR01RETS/ODCM Radiological Effluent Occurrences171111.08-INSERVICE INSPECTION 2R17 2 10/15/201810/26/2018IP7111108PInservice Inspection Activities - PWR1EP-1-EP PROGRAM INSPECTION1,2 11/26/201811/30/2018IP7111402Alert and Notification System Testing1,2 11/26/201811/30/2018IP7111403Emergency Preparedness Organization Staffing and Augmentation System1,2 11/26/201811/30/2018IP7111404Emergency Action Level and Emergency Plan Changes1,2 11/26/201811/30/2018IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies1,2 11/26/201811/30/2018IP71151-EP01Drill/Exercise Performance1,2 11/26/201811/30/2018IP71151-EP02ERO ReadinessThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Comanche PeakInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 3 of 302/23/2017 11:44:121EP-1-EP PROGRAM INSPECTION1,2 11/26/201811/30/2018IP71151-EP03Alert & Notification System ReliabilityComments:This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.