Surry Inspection / Activity Plan (09/01/2017 - 06/30/2019) | Surry Inspection / Activity Plan (09/01/2017 - 06/30/2019) | ||
ML OFFICE RII/DRP RII/DRP RII/DRP NAME BBishop SNinh AMasters DATE 8/15/2017 8/15/2017 8/ 21/2017 Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSurryInspection / Activity Plan09/01/2017-06/30/2019Page 1 of 208/21/2017 10:02:36DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)71,2 IPDesign Bases Assurance Inspection (Teams)7111121M08/28/201709/01/2017OL EXAM-INITIAL LICENSE EXAM PREP31 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIESV2350210/02/201710/06/2017OL EXAM-INITIAL LICENSE EXAM31 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIESV2350210/30/201711/10/2017RP-RP PUBLIC BASELINE INSPECTION21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/27/201712/01/20171,2 IPRadiological Environmental Monitoring Program71124.0711/27/201712/01/20171,2 IPPerformance Indicator Verification7115111/27/201712/01/2017TFPI-TRIENNIAL FIRE PROTECTION INSPECTION81,2 IPFire Protection [Triennial]7111105T02/26/201803/01/20181,2 IPFire Protection [Triennial]7111105T03/12/201803/16/2018EP-EP PROGRAM INSPECTION31,2 IPAlert and Notification System Testing711140204/09/201804/13/20181,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140304/09/201804/13/20181,2 IPEmergency Action Level and Emergency Plan Changes711140404/09/201804/13/20181,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140504/09/201804/13/20181,2 IPPerformance Indicator Verification7115104/09/201804/13/2018ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/30/201805/04/2018SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/30/201805/04/2018EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR31,2 IPDesign Bases Assurance Inspection (Programs)7111121N06/18/201806/22/20181,2 IPDesign Bases Assurance Inspection (Programs)7111121N07/09/201807/13/20181,2 IPDesign Bases Assurance Inspection (Programs)7111121N07/23/201807/27/2018PI&R-PROBLEM IDENTIFICATION AND RESOLUTION51,2 IPProblem Identification and Resolution71152B09/10/201809/14/20181,2 IPProblem Identification and Resolution71152B09/23/201809/27/2018ISI-UNIT 2 IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSurryInspection / Activity Plan09/01/2017-06/30/2019Page 2 of 208/21/2017 10:02:36RP-RP OCCUPATIONAL - WEEK 131,2 IPRadiological Hazard Assessment and Exposure Controls71124.0111/05/201811/09/20181,2 IPOccupational ALARA Planning and Controls71124.0211/05/201811/09/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/05/201811/09/20181,2 IPOccupational Dose Assessment71124.0411/05/201811/09/20181,2 IPRadiation Monitoring Instrumentation71124.0511/05/201811/09/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0111/05/201811/09/20181,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/05/201811/09/2018SGISI-UNIT 2 SG IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018RP-RP OCCUPATIONAL - WEEK 221,2 IPRadiological Hazard Assessment and Exposure Controls71124.0111/26/201811/30/20181,2 IPOccupational ALARA Planning and Controls71124.0211/26/201811/30/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/26/201811/30/20181,2 IPOccupational Dose Assessment71124.0411/26/201811/30/20181,2 IPRadiation Monitoring Instrumentation71124.0511/26/201811/30/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0111/26/201811/30/20181,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/26/201811/30/2018LR-POST-APPROVAL LR PHASE 421,2 IPPost-Approval Site Inspection for License Renewal7100301/28/201902/01/2019MODS-EVALUATIONS OF CHANGES, TESTS AND EXPERI31,2 IPEvaluations of Changes, Tests, and Experiments7111117T04/22/201904/26/2019RP-RP PUBLIC21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/20/201905/24/20191,2 IPRadiological Environmental Monitoring Program71124.0705/20/201905/24/20191,2 IPOccupational Exposure Control Effectiveness71151-OR0105/20/201905/24/20191,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/20/201905/24/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Revision as of 05:19, 10 May 2018
| ML17233A198 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 08/21/2017 |
| From: | Masters A D NRC/RGN-II/DRP/RPB5 |
| To: | Stoddard D G Virginia Electric & Power Co (VEPCO) |
| References | |
| IR 2017005 | |
| Download: ML17233A198 (5) | |
Text
August 21, 2017
Mr. Daniel President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT: UPDATED INSPECTION PLAN FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2017005 AND 05000281/2017005
Dear Mr. Stoddard:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Surry Power Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available, correspondence. Additionally, the NRC plans on conducting two non-ROP baseline inspections which include an initial license examination and Post Approval License Renewal Phase 4. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Please contact me at 404-997-4465 with any questions you may have regarding this letter.
Sincerely,/RA/ Anthony D. Masters, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
Enclosure:
Surry Inspection / Activity Plan (09/01/2017 - 06/30/2019)
ML OFFICE RII/DRP RII/DRP RII/DRP NAME BBishop SNinh AMasters DATE 8/15/2017 8/15/2017 8/ 21/2017 Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSurryInspection / Activity Plan09/01/2017-06/30/2019Page 1 of 208/21/2017 10:02:36DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)71,2 IPDesign Bases Assurance Inspection (Teams)7111121M08/28/201709/01/2017OL EXAM-INITIAL LICENSE EXAM PREP31 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIESV2350210/02/201710/06/2017OL EXAM-INITIAL LICENSE EXAM31 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIESV2350210/30/201711/10/2017RP-RP PUBLIC BASELINE INSPECTION21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/27/201712/01/20171,2 IPRadiological Environmental Monitoring Program71124.0711/27/201712/01/20171,2 IPPerformance Indicator Verification7115111/27/201712/01/2017TFPI-TRIENNIAL FIRE PROTECTION INSPECTION81,2 IPFire Protection [Triennial]7111105T02/26/201803/01/20181,2 IPFire Protection [Triennial]7111105T03/12/201803/16/2018EP-EP PROGRAM INSPECTION31,2 IPAlert and Notification System Testing711140204/09/201804/13/20181,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140304/09/201804/13/20181,2 IPEmergency Action Level and Emergency Plan Changes711140404/09/201804/13/20181,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140504/09/201804/13/20181,2 IPPerformance Indicator Verification7115104/09/201804/13/2018ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/30/201805/04/2018SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/30/201805/04/2018EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR31,2 IPDesign Bases Assurance Inspection (Programs)7111121N06/18/201806/22/20181,2 IPDesign Bases Assurance Inspection (Programs)7111121N07/09/201807/13/20181,2 IPDesign Bases Assurance Inspection (Programs)7111121N07/23/201807/27/2018PI&R-PROBLEM IDENTIFICATION AND RESOLUTION51,2 IPProblem Identification and Resolution71152B09/10/201809/14/20181,2 IPProblem Identification and Resolution71152B09/23/201809/27/2018ISI-UNIT 2 IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSurryInspection / Activity Plan09/01/2017-06/30/2019Page 2 of 208/21/2017 10:02:36RP-RP OCCUPATIONAL - WEEK 131,2 IPRadiological Hazard Assessment and Exposure Controls71124.0111/05/201811/09/20181,2 IPOccupational ALARA Planning and Controls71124.0211/05/201811/09/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/05/201811/09/20181,2 IPOccupational Dose Assessment71124.0411/05/201811/09/20181,2 IPRadiation Monitoring Instrumentation71124.0511/05/201811/09/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0111/05/201811/09/20181,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/05/201811/09/2018SGISI-UNIT 2 SG IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P11/05/201811/09/2018RP-RP OCCUPATIONAL - WEEK 221,2 IPRadiological Hazard Assessment and Exposure Controls71124.0111/26/201811/30/20181,2 IPOccupational ALARA Planning and Controls71124.0211/26/201811/30/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/26/201811/30/20181,2 IPOccupational Dose Assessment71124.0411/26/201811/30/20181,2 IPRadiation Monitoring Instrumentation71124.0511/26/201811/30/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0111/26/201811/30/20181,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/26/201811/30/2018LR-POST-APPROVAL LR PHASE 421,2 IPPost-Approval Site Inspection for License Renewal7100301/28/201902/01/2019MODS-EVALUATIONS OF CHANGES, TESTS AND EXPERI31,2 IPEvaluations of Changes, Tests, and Experiments7111117T04/22/201904/26/2019RP-RP PUBLIC21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/20/201905/24/20191,2 IPRadiological Environmental Monitoring Program71124.0705/20/201905/24/20191,2 IPOccupational Exposure Control Effectiveness71151-OR0105/20/201905/24/20191,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/20/201905/24/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.