APPENDIX F
U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
CABLE TRAY SUPPORT MODIFICATIONS INSPECTIONS
NRC Inspection Report:
50-446/85-11
CP:
CPPR-127
Docket:
50-446
Category:
A2
Applicant:
Texas Utilities Electric Company
400 North Olive Street
Da11as, Texas 75201
Facility Name:
Comanche Peak Steam Electric Station (CPSES), Unit 2
Inspection At:
Glen Rose Texas
'
Inspection Conducted:
Se tember 30 - October 2, 1985
(
Inspector
__
p////6
L. V.)M lbcf t, Reactor Inspector
Aa)Af
b.wo
Jf/r/5'4
Reviewed By:
*
1. Barnes, Group Leader, Region IV
Date
CPSES Group
Approved:
I
b
~Y M/4
T. F. Westerman, Chief, Region IV CPSES Group Date
0 fifdtcr
?N/n,'
V
R. E. Ireland, Chief, ErfiIiieering Section
D' ate
Reactor Safety Branch
0603100533 060306
DR
ADUCK 05000445
PDR
.
-
-
- .
.
.
  *
                                            APPENDIX F
                              U. S. NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                      CABLE TRAY SUPPORT MODIFICATIONS INSPECTIONS
    NRC Inspection Report:        50-446/85-11              CP:          CPPR-127
    Docket:  50-446                                        Category:                A2
    Applicant:      Texas Utilities Electric Company
                    400 North Olive Street
                    Da11as, Texas 75201
    Facility Name:    Comanche Peak Steam Electric Station (CPSES), Unit 2
    Inspection At:    Glen Rose Texas
                                                                                            '
    Inspection Conducted:      Se tember 30 - October 2, 1985
                                    (
    Inspector              __
                                                                            p////6
                L. V.)M lbcf t, Reactor Inspector                          Aa)Af
    Reviewed By:  *
                        b.wo                                              Jf/r/5'4
                1. Barnes, Group Leader, Region IV                          Date
                    CPSES Group
    Approved:              I          b
                T. F. Westerman, Chief, Region IV CPSES Group Date
                                                                              ~Y M/4
                        V  0 fifdtcr
                R. E. Ireland, Chief, ErfiIiieering Section
                                                                            ?N/n,'
                                                                            D' ate
                Reactor Safety Branch
    0603100533
      DR          060306
            ADUCK 05000445
                        PDR


                                                        .   _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
l                                                                                                                         I
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
l
I
-2-
!
,
,
                                          -2-                                                                              !
Inspection Summary
  Inspection Summary
Inspection Conducted September 30 - October 2, 1985 (Report 50-446/85-11)
  Inspection Conducted September 30 - October 2, 1985 (Report 50-446/85-11)
Areas Inspected:
  Areas Inspected:   Routine, unannounced inspection of cable tray support                                                 ,
Routine, unannounced inspection of cable tray support
  modifications.   The inspection involved 24 inspector-hours onsite by one NRC
,
  inspector.
modifications.
  Results: Within the area inspected, no violations or deviations were
The inspection involved 24 inspector-hours onsite by one NRC
) identified.
inspector.
Results: Within the area inspected, no violations or deviations were
)
identified.
l
l
.
.
                                                                                                                          l
l
                                                                                                                          ,
,
l
l
l
l
Line 75: Line 107:
l
l
l
l
                                                                                                                            ,
,
i
i
l
l
i
i
- _ . - - - _ . _ _ - - - - - - _ _ - - - _ - - _ - - - - _ - _ - - - - . - . _ . - - - _ - - - - - - _ - - - - - - - - - _ . _ _ - _ _ - - - - - - - - - - , - - - _ . . - - - - -
- - . - - - - - -
- - - -
- - - - - -
- -
. - -
- -


  .
o
    o
.
                                            -3-
-3-
                                          DETAILS
DETAILS
      1. Persons Contacted
1.
          Applicant Personnel
Persons Contacted
        *P. Halstead, Site QC Mana y r
Applicant Personnel
          Brown A Root (BAR) Emp_loyees
*P. Halstead, Site QC Mana y r
          W. E. Baker, Senior Project Nelding Engineer                                 ,
Brown A Root (BAR) Emp_loyees
          D. Mantz, Cable Tray Hanger General Foreman
W. E. Baker, Senior Project Nelding Engineer
          D. Geeo, Cable Tray Hanger Foreman
,
l         Other contractor personnel were also contacted during the course of this
D. Mantz, Cable Tray Hanger General Foreman
          inspection activity.
D. Geeo, Cable Tray Hanger Foreman
        * Denotes those present at the exit interview.
l
      2. Safety-Related Cable Tray S'apport Modifications
Other contractor personnel were also contacted during the course of this
inspection activity.
* Denotes those present at the exit interview.
2.
Safety-Related Cable Tray S'apport Modifications
l
l
l
l        The NRC inspector reviewed the documentation traveler packages and
The NRC inspector reviewed the documentation traveler packages and
I         inspected the weldments for 12 cable tray supports that had been modified
I
l         using tube steel in the new design. The following supports were
inspected the weldments for 12 cable tray supports that had been modified
          inspected:
l
                                                                                      '
using tube steel in the new design.
The following supports were
i
i
inspected:
'
l
l
            Suppnrt                                 Classification
Suppnrt
          CTH-2-11843                                   Class 1
Classification
          CTH-2-11846                                   Class 1
CTH-2-11843
          CTH-2-11841                                   Class 1
Class 1
l        CTH-2-11684                                    Class 1
CTH-2-11846
          CTH-2-10040                                    Class 1
Class 1
          CTH-2-9741                                    Class 1
CTH-2-11841
          CTH-2-11542                                    Class 1
Class 1
l        CTH-2-11541                                    Class 1
!        CTH-2-11540                                    Class 1
!        CTH-2-9732                                    Class 1
l        CTH-2-9733                                    Class 1
l        CTH-2-10033                                    Class 1
l
l
l         In the areas inspected, the cable tray support weldments complied with the
CTH-2-11684
:         requirements for welding in Weld Procedure Specification No. 10046 and the
Class 1
!         requirements for visual weld inspection in Instruction QI-QP-11.21-1. The
CTH-2-10040
!         documentation for the supports was consistent with the status of the work.
Class 1
          No violations or deviations were identified.
CTH-2-9741
Class 1
CTH-2-11542
Class 1
l
CTH-2-11541
Class 1
!
CTH-2-11540
Class 1
!
CTH-2-9732
Class 1
l
CTH-2-9733
Class 1
l
CTH-2-10033
Class 1
l
l
In the areas inspected, the cable tray support weldments complied with the
:
requirements for welding in Weld Procedure Specification No. 10046 and the
!
requirements for visual weld inspection in Instruction QI-QP-11.21-1.
The
!
documentation for the supports was consistent with the status of the work.
No violations or deviations were identified.
l
l
l
l
Line 127: Line 198:
;
;
I
I
-
-


                                                                                                                                                                _ _ - . -- _ _ _ _ _ _ .                                                                                                 _ _ _ _
_ _ - . -- _ _ _ _ _ _ .
                                                                                                                                                                                                                                                                                                l
_ _ _ _
                                                                                                                                                -4-
l
                                      3. Exit Interview
-4-
3.
Exit Interview
.
.
                                        The NRC inspector met with the applicant representative denoted in
The NRC inspector met with the applicant representative denoted in
;                                       paragraph 1 on October 2,1985, and sumarized the scope and findings of
;
                                        the inspection.
paragraph 1 on October 2,1985, and sumarized the scope and findings of
'
'
                                                                                                                                                                                                                                                                                                l
the inspection.
l
l
                                                                                                                                                                                                                                                                                                i
l
l
i
l
l
l
l
                                                                                                                                                                                                                                                                                                r
l
                                                                                                                                                                                                                                                                                                I
r
I
l
l
t
t
l
l
!                                                                                                                                                                                                                                                                                               1
!
                                                                                                                                                                                                                                                                                                '
1
'
1
1
r
r
Line 160: Line 237:
l
l
!
!
                                                                                                                                                                                                                                                                                                !
!
                                                                                                                                                                                                                                                                                                l
l
  _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _      _ _ _ _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _    _ _ _ . . -                         _ _ _ _ _ . _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ . _ . _ _ . _ _ . _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _
.
. .
.
.
.
.
. . -
.
. .
.
.
.
.
.
.
}}
}}

Latest revision as of 19:39, 24 May 2025

Cable Tray Support Mods Insp Rept 50-446/85-11 on 850930-1002.No Violations or Deviations Identified.Major Areas Inspected:Cable Tray Support Mods
ML20141P083
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/04/1986
From: Barnes I, Gilbert L, Ireland R, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20141P047 List:
References
50-446-86-11, NUDOCS 8603180533
Download: ML20141P083 (4)


See also: IR 05000446/1985011

Text

_ _ _ _ _ .

_ _ _ _ _ _

.

APPENDIX F

U. S. NUCLEAR REGULATORY COMMISSION

REGION IV

CABLE TRAY SUPPORT MODIFICATIONS INSPECTIONS

NRC Inspection Report:

50-446/85-11

CP:

CPPR-127

Docket:

50-446

Category:

A2

Applicant:

Texas Utilities Electric Company

400 North Olive Street

Da11as, Texas 75201

Facility Name:

Comanche Peak Steam Electric Station (CPSES), Unit 2

Inspection At:

Glen Rose Texas

'

Inspection Conducted:

Se tember 30 - October 2, 1985

(

Inspector

__

p////6

L. V.)M lbcf t, Reactor Inspector

Aa)Af

b.wo

Jf/r/5'4

Reviewed By:

1. Barnes, Group Leader, Region IV

Date

CPSES Group

Approved:

I

b

~Y M/4

T. F. Westerman, Chief, Region IV CPSES Group Date

0 fifdtcr

?N/n,'

V

R. E. Ireland, Chief, ErfiIiieering Section

D' ate

Reactor Safety Branch

0603100533 060306

DR

ADUCK 05000445

PDR

.

-

-

- .

.

.

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

l

I

-2-

!

,

Inspection Summary

Inspection Conducted September 30 - October 2, 1985 (Report 50-446/85-11)

Areas Inspected:

Routine, unannounced inspection of cable tray support

,

modifications.

The inspection involved 24 inspector-hours onsite by one NRC

inspector.

Results: Within the area inspected, no violations or deviations were

)

identified.

l

.

l

,

l

l

l

l

l

,

i

l

i

- _ . - - - _ . _ _ - - - - - - _ _ - - - _ - - _ - - - - _ - _ - - - - . - . _ . - - - _ - - - - - - _ - - - - - - - - - _ . _ _ - _ _ - - - - - - - - - - , - - - _ . . - - - - -

- - . - - - - - -

- - - -

- - - - - -

- -

. - -

- -

o

.

-3-

DETAILS

1.

Persons Contacted

Applicant Personnel

  • P. Halstead, Site QC Mana y r

Brown A Root (BAR) Emp_loyees

W. E. Baker, Senior Project Nelding Engineer

,

D. Mantz, Cable Tray Hanger General Foreman

D. Geeo, Cable Tray Hanger Foreman

l

Other contractor personnel were also contacted during the course of this

inspection activity.

  • Denotes those present at the exit interview.

2.

Safety-Related Cable Tray S'apport Modifications

l

l

The NRC inspector reviewed the documentation traveler packages and

I

inspected the weldments for 12 cable tray supports that had been modified

l

using tube steel in the new design.

The following supports were

i

inspected:

'

l

Suppnrt

Classification

CTH-2-11843

Class 1

CTH-2-11846

Class 1

CTH-2-11841

Class 1

l

CTH-2-11684

Class 1

CTH-2-10040

Class 1

CTH-2-9741

Class 1

CTH-2-11542

Class 1

l

CTH-2-11541

Class 1

!

CTH-2-11540

Class 1

!

CTH-2-9732

Class 1

l

CTH-2-9733

Class 1

l

CTH-2-10033

Class 1

l

l

In the areas inspected, the cable tray support weldments complied with the

requirements for welding in Weld Procedure Specification No. 10046 and the

!

requirements for visual weld inspection in Instruction QI-QP-11.21-1.

The

!

documentation for the supports was consistent with the status of the work.

No violations or deviations were identified.

l

l

l

I

-

-

_ _ - . -- _ _ _ _ _ _ .

_ _ _ _

l

-4-

3.

Exit Interview

.

The NRC inspector met with the applicant representative denoted in

paragraph 1 on October 2,1985, and sumarized the scope and findings of

'

the inspection.