APPENDIX F | |||
U. S. NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
CABLE TRAY SUPPORT MODIFICATIONS INSPECTIONS | |||
NRC Inspection Report: | |||
50-446/85-11 | |||
CP: | |||
CPPR-127 | |||
Docket: | |||
50-446 | |||
Category: | |||
A2 | |||
Applicant: | |||
Texas Utilities Electric Company | |||
400 North Olive Street | |||
Da11as, Texas 75201 | |||
Facility Name: | |||
Comanche Peak Steam Electric Station (CPSES), Unit 2 | |||
Inspection At: | |||
Glen Rose Texas | |||
' | |||
Inspection Conducted: | |||
Se tember 30 - October 2, 1985 | |||
( | |||
Inspector | |||
__ | |||
p////6 | |||
L. V.)M lbcf t, Reactor Inspector | |||
Aa)Af | |||
b.wo | |||
Jf/r/5'4 | |||
Reviewed By: | |||
* | |||
1. Barnes, Group Leader, Region IV | |||
Date | |||
CPSES Group | |||
Approved: | |||
I | |||
b | |||
~Y M/4 | |||
T. F. Westerman, Chief, Region IV CPSES Group Date | |||
0 fifdtcr | |||
?N/n,' | |||
V | |||
R. E. Ireland, Chief, ErfiIiieering Section | |||
D' ate | |||
Reactor Safety Branch | |||
0603100533 060306 | |||
DR | |||
ADUCK 05000445 | |||
PDR | |||
. | |||
- | |||
- | |||
- . | |||
. | . | ||
. | |||
l | _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ | ||
_ | |||
l | |||
I | |||
-2- | |||
! | |||
, | , | ||
Inspection Summary | |||
Inspection Conducted September 30 - October 2, 1985 (Report 50-446/85-11) | |||
Areas Inspected: | |||
Routine, unannounced inspection of cable tray support | |||
, | |||
modifications. | |||
The inspection involved 24 inspector-hours onsite by one NRC | |||
) identified. | inspector. | ||
Results: Within the area inspected, no violations or deviations were | |||
) | |||
identified. | |||
l | l | ||
. | . | ||
l | |||
, | |||
l | l | ||
l | l | ||
| Line 75: | Line 107: | ||
l | l | ||
l | l | ||
, | |||
i | i | ||
l | l | ||
i | i | ||
- _ . - - - _ . _ _ - - - - - - _ _ - - - _ - - _ - - - - _ - _ - - - - . - . _ . - - - _ - - - - - - _ - - - - - - - - - _ . _ _ - _ _ - - - - - - - - - - , - - - _ . . - - - - - | |||
- - . - - - - - - | |||
- - - - | |||
- - - - - - | |||
- - | |||
. - - | |||
- - | |||
o | |||
. | |||
-3- | |||
DETAILS | |||
1. | |||
Persons Contacted | |||
Applicant Personnel | |||
*P. Halstead, Site QC Mana y r | |||
Brown A Root (BAR) Emp_loyees | |||
W. E. Baker, Senior Project Nelding Engineer | |||
, | |||
l | D. Mantz, Cable Tray Hanger General Foreman | ||
D. Geeo, Cable Tray Hanger Foreman | |||
l | |||
Other contractor personnel were also contacted during the course of this | |||
inspection activity. | |||
* Denotes those present at the exit interview. | |||
2. | |||
Safety-Related Cable Tray S'apport Modifications | |||
l | |||
l | l | ||
The NRC inspector reviewed the documentation traveler packages and | |||
I | I | ||
l | inspected the weldments for 12 cable tray supports that had been modified | ||
l | |||
using tube steel in the new design. | |||
The following supports were | |||
i | i | ||
inspected: | |||
' | |||
l | l | ||
Suppnrt | |||
Classification | |||
CTH-2-11843 | |||
Class 1 | |||
CTH-2-11846 | |||
Class 1 | |||
CTH-2-11841 | |||
Class 1 | |||
l | l | ||
l | CTH-2-11684 | ||
: | Class 1 | ||
! | CTH-2-10040 | ||
! | Class 1 | ||
CTH-2-9741 | |||
Class 1 | |||
CTH-2-11542 | |||
Class 1 | |||
l | |||
CTH-2-11541 | |||
Class 1 | |||
! | |||
CTH-2-11540 | |||
Class 1 | |||
! | |||
CTH-2-9732 | |||
Class 1 | |||
l | |||
CTH-2-9733 | |||
Class 1 | |||
l | |||
CTH-2-10033 | |||
Class 1 | |||
l | |||
l | |||
In the areas inspected, the cable tray support weldments complied with the | |||
: | |||
requirements for welding in Weld Procedure Specification No. 10046 and the | |||
! | |||
requirements for visual weld inspection in Instruction QI-QP-11.21-1. | |||
The | |||
! | |||
documentation for the supports was consistent with the status of the work. | |||
No violations or deviations were identified. | |||
l | l | ||
l | l | ||
| Line 127: | Line 198: | ||
; | ; | ||
I | I | ||
- | |||
- | |||
_ _ - . -- _ _ _ _ _ _ . | |||
_ _ _ _ | |||
l | |||
-4- | |||
3. | |||
Exit Interview | |||
. | . | ||
The NRC inspector met with the applicant representative denoted in | |||
; | ; | ||
paragraph 1 on October 2,1985, and sumarized the scope and findings of | |||
' | ' | ||
the inspection. | |||
l | l | ||
l | l | ||
i | |||
l | l | ||
l | l | ||
l | |||
r | |||
I | |||
l | l | ||
t | t | ||
l | l | ||
! | ! | ||
1 | |||
' | |||
1 | 1 | ||
r | r | ||
| Line 160: | Line 237: | ||
l | l | ||
! | ! | ||
! | |||
l | |||
. | |||
. . | |||
. | |||
. | |||
. | |||
. | |||
. . - | |||
. | |||
. . | |||
. | |||
. | |||
. | |||
. | |||
. | |||
. | |||
}} | }} | ||
Latest revision as of 19:39, 24 May 2025
| ML20141P083 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/04/1986 |
| From: | Barnes I, Gilbert L, Ireland R, Westerman T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20141P047 | List: |
| References | |
| 50-446-86-11, NUDOCS 8603180533 | |
| Download: ML20141P083 (4) | |
See also: IR 05000446/1985011
Text
_ _ _ _ _ .
_ _ _ _ _ _
.
APPENDIX F
U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
CABLE TRAY SUPPORT MODIFICATIONS INSPECTIONS
NRC Inspection Report:
50-446/85-11
CP:
CPPR-127
Docket:
50-446
Category:
A2
Applicant:
Texas Utilities Electric Company
400 North Olive Street
Da11as, Texas 75201
Facility Name:
Comanche Peak Steam Electric Station (CPSES), Unit 2
Inspection At:
Glen Rose Texas
'
Inspection Conducted:
Se tember 30 - October 2, 1985
(
Inspector
__
p////6
L. V.)M lbcf t, Reactor Inspector
Aa)Af
b.wo
Jf/r/5'4
Reviewed By:
1. Barnes, Group Leader, Region IV
Date
CPSES Group
Approved:
I
b
~Y M/4
T. F. Westerman, Chief, Region IV CPSES Group Date
0 fifdtcr
?N/n,'
V
R. E. Ireland, Chief, ErfiIiieering Section
D' ate
Reactor Safety Branch
0603100533 060306
DR
ADUCK 05000445
.
-
-
- .
.
.
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
l
I
-2-
!
,
Inspection Summary
Inspection Conducted September 30 - October 2, 1985 (Report 50-446/85-11)
Areas Inspected:
Routine, unannounced inspection of cable tray support
,
modifications.
The inspection involved 24 inspector-hours onsite by one NRC
inspector.
Results: Within the area inspected, no violations or deviations were
)
identified.
l
.
l
,
l
l
l
l
l
,
i
l
i
- _ . - - - _ . _ _ - - - - - - _ _ - - - _ - - _ - - - - _ - _ - - - - . - . _ . - - - _ - - - - - - _ - - - - - - - - - _ . _ _ - _ _ - - - - - - - - - - , - - - _ . . - - - - -
- - . - - - - - -
- - - -
- - - - - -
- -
. - -
- -
o
.
-3-
DETAILS
1.
Persons Contacted
Applicant Personnel
- P. Halstead, Site QC Mana y r
Brown A Root (BAR) Emp_loyees
W. E. Baker, Senior Project Nelding Engineer
,
D. Mantz, Cable Tray Hanger General Foreman
D. Geeo, Cable Tray Hanger Foreman
l
Other contractor personnel were also contacted during the course of this
inspection activity.
- Denotes those present at the exit interview.
2.
Safety-Related Cable Tray S'apport Modifications
l
l
The NRC inspector reviewed the documentation traveler packages and
I
inspected the weldments for 12 cable tray supports that had been modified
l
using tube steel in the new design.
The following supports were
i
inspected:
'
l
Suppnrt
Classification
CTH-2-11843
Class 1
CTH-2-11846
Class 1
CTH-2-11841
Class 1
l
CTH-2-11684
Class 1
CTH-2-10040
Class 1
CTH-2-9741
Class 1
CTH-2-11542
Class 1
l
CTH-2-11541
Class 1
!
CTH-2-11540
Class 1
!
CTH-2-9732
Class 1
l
CTH-2-9733
Class 1
l
CTH-2-10033
Class 1
l
l
In the areas inspected, the cable tray support weldments complied with the
requirements for welding in Weld Procedure Specification No. 10046 and the
!
requirements for visual weld inspection in Instruction QI-QP-11.21-1.
The
!
documentation for the supports was consistent with the status of the work.
No violations or deviations were identified.
l
l
l
I
-
-
_ _ - . -- _ _ _ _ _ _ .
_ _ _ _
l
-4-
3.
Exit Interview
.
The NRC inspector met with the applicant representative denoted in
paragraph 1 on October 2,1985, and sumarized the scope and findings of
'
the inspection.