{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                        NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                            REGION I
REGION I  
                                2100 RENAISSANCE BLVD., SUITE 100
2100 RENAISSANCE BLVD., SUITE 100  
                          KING OF PRUSSIA, PENNSLYVANIA 19406-2713
KING OF PRUSSIA, PENNSLYVANIA 19406-2713  
                                      February 22, 2021
Mr. David P. Rhoades
Senior Vice President
February 22, 2021  
Exelon Generation Company, LLC
President and Chief Nuclear Officer
Exelon Nuclear
Mr. David P. Rhoades  
4300 Winfield Road
Senior Vice President  
Warrenville, IL 60555
Exelon Generation Company, LLC  
SUBJECT:       CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 -
President and Chief Nuclear Officer  
                INFORMATION REQUEST FOR A TRIENNIAL BASELINE DESIGN BASES
Exelon Nuclear  
                ASSURANCE INSPECTION (TEAM); INSPECTION REPORT
4300 Winfield Road  
                05000317/2021010 AND 05000318/2021010
Warrenville, IL 60555  
Dear Mr. Rhoades:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
SUBJECT:  
Region I staff will conduct a Design Bases Assurance Inspection (DBAI) at Calvert Cliffs, Units 1
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 -  
and 2. Paul Cataldo, a Senior Reactor Inspector from the NRCs Region I Office, will lead the
INFORMATION REQUEST FOR A TRIENNIAL BASELINE DESIGN BASES  
inspection team. The inspection will be conducted in accordance with Inspection Procedure
ASSURANCE INSPECTION (TEAM); INSPECTION REPORT  
71111.21M, Design Bases Assurance Inspection (Team), dated December 8, 2016 (ADAMS
05000317/2021010 AND 05000318/2021010  
Accession No. ML16340B000).
The inspection will evaluate the capability of risk-significant/low-margin components to function
Dear Mr. Rhoades:  
as designed to support proper system operation. The inspection will also include a review of
selected modifications, operating experience, and as applicable, operator actions.
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
During a telephone conversation on February 16, 2021, with Mr. Kenneth Greene, Calvert Cliffs
Region I staff will conduct a Design Bases Assurance Inspection (DBAI) at Calvert Cliffs, Units 1  
Regulatory Assurance, we confirmed arrangements for the receipt of scoping documents for
and 2. Paul Cataldo, a Senior Reactor Inspector from the NRCs Region I Office, will lead the  
information gathering and remote review, and the two-week onsite inspection(**), as follows:
inspection team. The inspection will be conducted in accordance with Inspection Procedure  
    * Information gathering and remote review: Weeks of March 22 through April 26, 2021
71111.21M, Design Bases Assurance Inspection (Team), dated December 8, 2016 (ADAMS  
    * Onsite weeks**: Weeks of June 7 and June 21, 2021
Accession No. ML16340B000).  
    ** Due to the current Covid PHE, some activities may be conducted remotely.
The purpose of the information-gathering and remote review is to identify risk-significant
The inspection will evaluate the capability of risk-significant/low-margin components to function  
components, modifications, operator actions, and operating experience items. Information and
as designed to support proper system operation. The inspection will also include a review of  
documentation needed to support the inspection will also be identified. Frank Arner, a Region I
selected modifications, operating experience, and as applicable, operator actions.  
Senior Risk Analyst, will support Paul Cataldo during the information-gathering visit and remote
review, to evaluate probabilistic risk assessment data and identify components to be examined
During a telephone conversation on February 16, 2021, with Mr. Kenneth Greene, Calvert Cliffs  
during the inspection.
Regulatory Assurance, we confirmed arrangements for the receipt of scoping documents for  
information gathering and remote review, and the two-week onsite inspection(**), as follows:  
*  
Information gathering and remote review: Weeks of March 22 through April 26, 2021  
*  
Onsite weeks**: Weeks of June 7 and June 21, 2021  
** Due to the current Covid PHE, some activities may be conducted remotely.
The purpose of the information-gathering and remote review is to identify risk-significant  
components, modifications, operator actions, and operating experience items. Information and  
documentation needed to support the inspection will also be identified. Frank Arner, a Region I  
Senior Risk Analyst, will support Paul Cataldo during the information-gathering visit and remote  
review, to evaluate probabilistic risk assessment data and identify components to be examined  
during the inspection.  


D. Rhoades                                         2
D. Rhoades  
Experience with previous baseline design/modification inspections of similar depth and length
2  
has shown this type of inspection is resource intensive, both for the NRC inspectors and the
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
Experience with previous baseline design/modification inspections of similar depth and length  
inspection for both parties, we have enclosed a request for information needed for the
has shown this type of inspection is resource intensive, both for the NRC inspectors and the
inspection.
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive  
It is important that all of these documents are up-to-date and complete in order to minimize the
inspection for both parties, we have enclosed a request for information needed for the  
number of additional documents requested during the preparation and/or the onsite portions of
inspection.  
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into two groups:
It is important that all of these documents are up-to-date and complete in order to minimize the  
    *   The first group lists information necessary for our initial inspection scoping activities.
number of additional documents requested during the preparation and/or the onsite portions of  
        After discussion with Mr. Greene, in recognition of the outage-related activities in March
the inspection. Insofar as possible, this information should be provided electronically to the lead  
        2021, a majority of this information that should be easily and readily available for
inspector. The information request has been divided into two groups:  
        uploading to Sharefile, should be provided to the lead inspector by the week of
        March 22, 2021. Additionally, the remainder of the documents not uploaded due to
*  
        outage conflicts should be available to the lead inspector by April 12, 2021. By the week
The first group lists information necessary for our initial inspection scoping activities.
        of April 26, 2021, the lead inspector will communicate the initial selected set of
After discussion with Mr. Greene, in recognition of the outage-related activities in March  
        components and modifications.
2021, a majority of this information that should be easily and readily available for  
    *   The second group of documents requested is those items needed to support our in-
uploading to Sharefile, should be provided to the lead inspector by the week of
        office preparation activities. This set of documents, specific to the selected components
March 22, 2021. Additionally, the remainder of the documents not uploaded due to  
        and modifications, should be provided to the lead inspector no later than May 28, 2021.
outage conflicts should be available to the lead inspector by April 12, 2021. By the week  
        During the in-office preparation activities, the team may identify additional information
of April 26, 2021, the lead inspector will communicate the initial selected set of  
        needed to support the inspection, and those items will be communicated directly to
components and modifications.  
        Mr. Greene.
If there are any questions about the inspection or the material requested in the enclosure,
*  
please contact the lead inspector at 603-395-5536 or via e-mail at pcc1@nrc.gov.
The second group of documents requested is those items needed to support our in-
This letter does not contain new or amended information collection requirements subject to the
office preparation activities. This set of documents, specific to the selected components  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
and modifications, should be provided to the lead inspector no later than May 28, 2021.
During the in-office preparation activities, the team may identify additional information  
needed to support the inspection, and those items will be communicated directly to
Mr. Greene.  
If there are any questions about the inspection or the material requested in the enclosure,  
please contact the lead inspector at 603-395-5536 or via e-mail at pcc1@nrc.gov.  
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control Number 3150-
requirements were approved by the Office of Management and Budget, Control Number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document
request for information or an information collection requirement unless the requesting document  
displays a currently valid Office of Management and Budget Control Number.
displays a currently valid Office of Management and Budget Control Number.  


D. Rhoades                                       3
D. Rhoades  
This letter and its enclosure will be made available for public inspection and copying at
3  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
This letter and its enclosure will be made available for public inspection and copying at  
Exemptions, Requests for Withholding.
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
                                            Sincerely,
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,  
                                                X   /RA/
Exemptions, Requests for Withholding.  
                                                Signed by: Melvin K. Gray
                                            Mel Gray, Chief
Sincerely,  
                                            Engineering Branch 1
X /RA/
                                            Division of Reactor Safety
Signed by: Melvin K. Gray
Docket Nos. 05000317 and 05000318
License Nos. DPR-53 and DPR-69
Mel Gray, Chief  
Enclosure:
Engineering Branch 1  
Document Request for Design Bases
Division of Reactor Safety  
Assurance Inspection
cc: Distribution via ListServ
Docket Nos. 05000317 and 05000318  
License Nos. DPR-53 and DPR-69  
Enclosure:  
Document Request for Design Bases
Assurance Inspection  
cc: Distribution via ListServ  




  ML21053A314
  ML21053A314
                                            Non-Sensitive                               Publicly Available
      SUNSI Review
SUNSI Review
                                            Sensitive                                    Non-Publicly Available
   
  OFFICE         RI/DRS             RI/DRS                 RI/DRS
Non-Sensitive  
  NAME           PCataldo           FArner                 MGray
Sensitive
  DATE           2/17/21             2/17/21               2/22/21
                                         
Publicly Available  
            DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
Non-Publicly Available  
Inspection Report:                05000317/2021010 and 05000318/2021010
Onsite Inspection Dates:          June 7 through June 11, 2021; and
OFFICE  
                                  June 21 through June 25, 2021
RI/DRS  
Inspection Procedure:            Inspection Procedure 71111.21M, Design Bases Assurance
RI/DRS  
                                  Inspection (Team)
RI/DRS  
Lead Inspector:                  Paul Cataldo, Senior Reactor Inspector
                                  603-395-5536
                                  PCC1@nrc.gov
NAME  
  I.    Information Requested for Selection of Components and Modifications
PCataldo  
    The following information is requested by March 22, 2021 (and April 12, 2021 for remaining
FArner  
    documents not provided due to outage-related conflicts) to facilitate inspection preparation.
MGray  
    Feel free to contact the lead inspector as soon as possible if you have any questions
    regarding this information request. Please provide the information electronically
    (Certrec/Sharefile) in pdf files, Excel, or other searchable formats. Also, we understand
DATE  
    the prevailing use of Sharefile for inspection-related information for the Exelon fleet,
2/17/21  
    therefore, the files should contain descriptive names, and indexed and hyperlinked to
2/17/21  
    facilitate ease of use by the inspectors. Information in lists should contain enough
2/22/21  
    information to be easily understood by someone who has knowledge of light water reactor
    technology.
    1.    The site probabilistic risk analysis (PRA) System Notebook and latest PRA Summary
          Document.
    2.    Risk ranking of top 250 basic events sorted by Risk Achievement Worth (>/= 1.3).
          Include values for Risk Reduction Worth, Birnbaum Importance, and Fussell-Vesely (as
          applicable). Please provide in an excel spreadsheet or other sortable format, and to
          include an understandable definition of the coded, basic events.
    3.    Risk-ranking of top 100 components from site-specific PRA sorted by Large Early
          Release Frequency.
    4.    If you have an External Events or Fire PRA Model, provide the information requested in
          Items 1 and 2 for external events and fire. Provide narrative description of each coded
          event, including fire and flood zone descriptions.
    5.    List of time-critical and/or risk significant operator actions.
    6.    List of emergency and abnormal operating procedures.
    7.    If available, any pre-existing evaluation or list of components and associated
          calculations with low design margins (e.g., pumps closest to the design limit for flow or
                                                                                          Enclosure


      DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION  
    pressure, diesel generator close to design required output, heat exchangers close to
Enclosure
    rated design heat removal).
Inspection Report:
8. If applicable, copy of any self-assessments and/or Quality Assurance assessments of
05000317/2021010 and 05000318/2021010
    low margin structures, systems and components (SSCs) completed since July 1, 2018.
9. List of available design margins in both the open and closed direction for valves in the
    motor-operated valve and air-operated valve programs (related to GL 96-05, looking for
Onsite Inspection Dates:
    resultant output - matrix of risk vs margin for MOVs and AOVs, as applicable); the fleet
June 7 through June 11, 2021; and
    or Calvert Cliffs-specific MOV Program procedure.
June 21 through June 25, 2021
10. The age and capacity of the safety-related DC batteries.
11. The In-Service Testing (IST) Program Basis document identifying the in-scope valves
    and pumps, and the associated IST Program requirements for each component (e.g.,
Inspection Procedure:
    IST valve table identifying category, active/passive function).
Inspection Procedure 71111.21M, Design Bases Assurance  
12. Access to IST trend data for the following pumps for both units: AFW pumps, HPSI
Inspection (Team)  
    pumps, LPSI/RHS pumps, and SW pumps. [Note: needed for each discrete component
    (e.g. for each RHR pump)]
13. Listing of MR (a)(1) systems, date entered into (a)(1) status, and brief description of
Lead Inspector:
    why (a)(1); if not included as part of Item 15 below, please include the latest System
Paul Cataldo, Senior Reactor Inspector
    Health report for those systems in (a)(1) status.
603-395-5536
14. List of MRFFs evaluations completed since July 1, 2018 (include those determined not
PCC1@nrc.gov
    to be a MRFF).
15. A copy of the most recent System Health and/or trending reports for the following
    systems (as applicable): SR 4KV, SR 480 Vac, HPSI, LPSI/RHS, SW, SR 125 Vdc, and
I.  
    EDGs.
Information Requested for Selection of Components and Modifications
16. A copy of the most recent Program Health and/or trending reports for the following
    programs, as applicable: GL 89-10 (MOVs), GL 89-13, IST, AOVs, breakers, relays.
The following information is requested by March 22, 2021 (and April 12, 2021 for remaining
17. List of open operability evaluations, and the associated implementing procedure for
documents not provided due to outage-related conflicts) to facilitate inspection preparation. 
    degraded and non-conforming conditions/operability evaluations; List of formal
Feel free to contact the lead inspector as soon as possible if you have any questions
    operability evaluations performed for the last 4 years.
regarding this information request. Please provide the information electronically
18. List of current operator work arounds/burdens.
(Certrec/Sharefile) in pdf files, Excel, or other searchable formats. Also, we understand
19. List of permanent plant modifications to SSCs that are field work complete since
the prevailing use of Sharefile for inspection-related information for the Exelon fleet,  
    July 1, 2018. For the purpose of this inspection, permanent plant modifications include
therefore, the files should contain descriptive names, and indexed and hyperlinked to
    permanent: plant changes, design changes, set point changes, equivalency
facilitate ease of use by the inspectors. Information in lists should contain enough
    evaluations, suitability analyses, and commercial grade dedications. The list should
information to be easily understood by someone who has knowledge of light water reactor
    contain the number of each document, title (sufficient to understand the purpose of the
technology.  
    modification), revision/date, and the affected system. Please provide the design change
    procedure that governs the implementation of the listed and applicable methods.
1.  
20. List of calculation changes (including new calculations) that have been issued for use
The site probabilistic risk analysis (PRA) System Notebook and latest PRA Summary
    since July 1, 2018.
Document.  
                                              2
2.  
Risk ranking of top 250 basic events sorted by Risk Achievement Worth (>/= 1.3).
Include values for Risk Reduction Worth, Birnbaum Importance, and Fussell-Vesely (as  
applicable).  Please provide in an excel spreadsheet or other sortable format, and to
include an understandable definition of the coded, basic events.  
3.  
Risk-ranking of top 100 components from site-specific PRA sorted by Large Early
Release Frequency.  
4.  
If you have an External Events or Fire PRA Model, provide the information requested in
Items 1 and 2 for external events and fire.  Provide narrative description of each coded
event, including fire and flood zone descriptions.  
5.  
List of time-critical and/or risk significant operator actions.  
6.  
List of emergency and abnormal operating procedures.  
7.  
If available, any pre-existing evaluation or list of components and associated
calculations with low design margins (e.g., pumps closest to the design limit for flow or 


            DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION  
      21. Corrective Action Program procedure.
      22. Procedures addressing the following: modifications, design changes, set point changes,
2
          equivalency evaluations or suitability analyses, commercial grade dedications, and
pressure, diesel generator close to design required output, heat exchangers close to
          post-modification testing.
rated design heat removal).
      23. List of corrective action documents (open and closed) that address permanent plant
          modifications issues, concerns, or processes, for the past four years; MOV-related
8.
          deficiencies, and any plant-level events that generated root or causal evaluations,
If applicable, copy of any self-assessments and/or Quality Assurance assessments of
          and/or associated Licensee Event Reports in the last four years.
low margin structures, systems and components (SSCs) completed since July 1, 2018.
      24. Any internal/external self-assessments and associated corrective action documents
          generated in preparation for this inspection.
9.  
      25. Updated Final Safety Analysis Report, Technical Specifications, Technical
List of available design margins in both the open and closed direction for valves in the  
          Specifications Bases, and Technical Requirements Manual.
motor-operated valve and air-operated valve programs (related to GL 96-05, looking for
      26. Electrical simple one-line drawings for 4KV, 480V, & 345KV (scalable for electronic
resultant output - matrix of risk vs margin for MOVs and AOVs, as applicable); the fleet
          viewing preferred).
or Calvert Cliffs-specific MOV Program procedure. 
      27. Copy of Exelons internal responses to any applicable NRC Information Notices,
          Generic Letters, or Regulatory Issue Summaries for the past four years.
10. The age and capacity of the safety-related DC batteries.    
      28. A list of NRC Part 21 Reports, determined to be applicable to Calvert Cliffs, for the past
          4 years.
11. The In-Service Testing (IST) Program Basis document identifying the in-scope valves
      29. DBDs (if applicable & available): SR 4KV, SR 480 Vac, HPSI, LPSI/RHS, SW, SR 125
and pumps, and the associated IST Program requirements for each component (e.g.,  
          Vdc, and EDGs.
IST valve table identifying category, active/passive function).  
  II.     Information Requested to Be Available by May 28, 2021
This information should be separated for each selected component and modification, especially
12. Access to IST trend data for the following pumps for both units: AFW pumps, HPSI
if provided electronically (e.g., a folder for each component and modification named after the
pumps, LPSI/RHS pumps, and SW pumps.  [Note: needed for each discrete component
component or modification that includes the information requested below). Items 1 through 11
(e.g. for each RHR pump)]
are associated with the selected components and Item 12 is for the selected modifications.
      1.  List of corrective action documents associated with each selected component for the
13. Listing of MR (a)(1) systems, date entered into (a)(1) status, and brief description of
          past four years.
why (a)(1); if not included as part of Item 15 below, please include the latest System
      2. Maintenance history (e.g., corrective, preventive, and elective) associated with each
Health report for those systems in (a)(1) status.
          selected component for the last five years. Identify frequency of preventive
          maintenance activities.
14. List of MRFFs evaluations completed since July 1, 2018 (include those determined not
      3Aging Management Program documents and/or License Renewal committed inspection
to be a MRFF).
          results applicable to each selected component.
      4List of calculations associated with each selected component, excluding data files. Pipe
15. A copy of the most recent System Health and/or trending reports for the following
          stress calculations are excluded from this request.
systems (as applicable): SR 4KV, SR 480 Vac, HPSI, LPSI/RHS, SW, SR 125 Vdc, and  
      5. System Health Report (last completed) and Design Basis Document associated with
EDGs.  
          each selected component, as applicable.
                                                    3
16. A copy of the most recent Program Health and/or trending reports for the following
programs, as applicable: GL 89-10 (MOVs), GL 89-13, IST, AOVs, breakers, relays.  
17. List of open operability evaluations, and the associated implementing procedure for  
degraded and non-conforming conditions/operability evaluations; List of formal
operability evaluations performed for the last 4 years.  
   
18. List of current operator work arounds/burdens.  
19. List of permanent plant modifications to SSCs that are field work complete since 
July 1, 2018For the purpose of this inspection, permanent plant modifications include
permanent: plant changes, design changes, set point changes, equivalency
evaluations, suitability analyses, and commercial grade dedicationsThe list should
contain the number of each document, title (sufficient to understand the purpose of the
modification), revision/date, and the affected system. Please provide the design change
procedure that governs the implementation of the listed and applicable methods.  
20. List of calculation changes (including new calculations) that have been issued for use
since July 1, 2018.  


      DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION  
6. Access to or copy of vendor manual(s) for each selected component.
7. List of open temporary modifications associated with each selected component, if
3
    applicable.
21. Corrective Action Program procedure.
8. Trend data/graphs on the selected components performance for the past three years
    (e.g., pump performance including IST, other vibration monitoring, oil sample results).
22. Procedures addressing the following: modifications, design changes, set point changes,
9. List of normal operating and alarm response procedures associated with each selected
equivalency evaluations or suitability analyses, commercial grade dedications, and
    component.
post-modification testing.
10. Last completed tests and surveillances for each selected component performed for the
    past three years. For those tests and surveillances performed at a periodicity of greater
23. List of corrective action documents (open and closed) that address permanent plant
    than three years, provide the latest test performed.
modifications issues, concerns, or processes, for the past four years; MOV-related
11. Schedule of surveillance testing of selected components that occur during the onsite
deficiencies, and any plant-level events that generated root or causal evaluations,
    and offsite inspection weeks.
and/or associated Licensee Event Reports in the last four years.
12. For each selected modification, copies of associated documents such as modification
    package, engineering changes, 50.59 screening or evaluation, relevant calculations,
24. Any internal/external self-assessments and associated corrective action documents
    post-modification test packages, associated corrective action documents, design
generated in preparation for this inspection.
    drawings, and new/revised preventive maintenance requirements.
                                            4
25. Updated Final Safety Analysis Report, Technical Specifications, Technical
Specifications Bases, and Technical Requirements Manual.
26. Electrical simple one-line drawings for 4KV, 480V, & 345KV (scalable for electronic
viewing preferred).
27. Copy of Exelons internal responses to any applicable NRC Information Notices,
Generic Letters, or Regulatory Issue Summaries for the past four years.
28. A list of NRC Part 21 Reports, determined to be applicable to Calvert Cliffs, for the past
4 years.
29. DBDs (if applicable & available): SR 4KV, SR 480 Vac, HPSI, LPSI/RHS, SW, SR 125
Vdc, and EDGs.
II.
Information Requested to Be Available by May 28, 2021
This information should be separated for each selected component and modification, especially
if provided electronically (e.g., a folder for each component and modification named after the
component or modification that includes the information requested below).  Items 1 through 11
are associated with the selected components and Item 12 is for the selected modifications.
1.
List of corrective action documents associated with each selected component for the
past four years.
2.
Maintenance history (e.g., corrective, preventive, and elective) associated with each
selected component for the last five years.  Identify frequency of preventive
maintenance activities.
3.
Aging Management Program documents and/or License Renewal committed inspection
results applicable to each selected component.
4.
List of calculations associated with each selected component, excluding data files.  Pipe
stress calculations are excluded from this request.
5.
System Health Report (last completed) and Design Basis Document associated with
each selected component, as applicable.
 
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
4
6.  
Access to or copy of vendor manual(s) for each selected component.  
7.  
List of open temporary modifications associated with each selected component, if  
applicable.  
8.  
Trend data/graphs on the selected components performance for the past three years  
(e.g., pump performance including IST, other vibration monitoring, oil sample results).  
9.  
List of normal operating and alarm response procedures associated with each selected  
component.  
10. Last completed tests and surveillances for each selected component performed for the  
past three years. For those tests and surveillances performed at a periodicity of greater  
than three years, provide the latest test performed.
11. Schedule of surveillance testing of selected components that occur during the onsite  
and offsite inspection weeks.  
12. For each selected modification, copies of associated documents such as modification  
package, engineering changes, 50.59 screening or evaluation, relevant calculations,  
post-modification test packages, associated corrective action documents, design  
drawings, and new/revised preventive maintenance requirements.
}}
}}

Latest revision as of 05:08, 16 March 2025

Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010
ML21053A314
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/22/2021
From: Mel Gray
Engineering Region 1 Branch 1
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
Gray M
References
IR 2021010
Download: ML21053A314 (8)


See also: IR 05000317/2021010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100

KING OF PRUSSIA, PENNSLYVANIA 19406-2713

February 22, 2021

Mr. David P. Rhoades

Senior Vice President

Exelon Generation Company, LLC

President and Chief Nuclear Officer

Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 -

INFORMATION REQUEST FOR A TRIENNIAL BASELINE DESIGN BASES

ASSURANCE INSPECTION (TEAM); INSPECTION REPORT

05000317/2021010 AND 05000318/2021010

Dear Mr. Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region I staff will conduct a Design Bases Assurance Inspection (DBAI) at Calvert Cliffs, Units 1

and 2. Paul Cataldo, a Senior Reactor Inspector from the NRCs Region I Office, will lead the

inspection team. The inspection will be conducted in accordance with Inspection Procedure

71111.21M, Design Bases Assurance Inspection (Team), dated December 8, 2016 (ADAMS

Accession No. ML16340B000).

The inspection will evaluate the capability of risk-significant/low-margin components to function

as designed to support proper system operation. The inspection will also include a review of

selected modifications, operating experience, and as applicable, operator actions.

During a telephone conversation on February 16, 2021, with Mr. Kenneth Greene, Calvert Cliffs

Regulatory Assurance, we confirmed arrangements for the receipt of scoping documents for

information gathering and remote review, and the two-week onsite inspection(**), as follows:

Information gathering and remote review: Weeks of March 22 through April 26, 2021

Onsite weeks**: Weeks of June 7 and June 21, 2021

    • Due to the current Covid PHE, some activities may be conducted remotely.

The purpose of the information-gathering and remote review is to identify risk-significant

components, modifications, operator actions, and operating experience items. Information and

documentation needed to support the inspection will also be identified. Frank Arner, a Region I

Senior Risk Analyst, will support Paul Cataldo during the information-gathering visit and remote

review, to evaluate probabilistic risk assessment data and identify components to be examined

during the inspection.

D. Rhoades

2

Experience with previous baseline design/modification inspections of similar depth and length

has shown this type of inspection is resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into two groups:

The first group lists information necessary for our initial inspection scoping activities.

After discussion with Mr. Greene, in recognition of the outage-related activities in March

2021, a majority of this information that should be easily and readily available for

uploading to Sharefile, should be provided to the lead inspector by the week of

March 22, 2021. Additionally, the remainder of the documents not uploaded due to

outage conflicts should be available to the lead inspector by April 12, 2021. By the week

of April 26, 2021, the lead inspector will communicate the initial selected set of

components and modifications.

The second group of documents requested is those items needed to support our in-

office preparation activities. This set of documents, specific to the selected components

and modifications, should be provided to the lead inspector no later than May 28, 2021.

During the in-office preparation activities, the team may identify additional information

needed to support the inspection, and those items will be communicated directly to

Mr. Greene.

If there are any questions about the inspection or the material requested in the enclosure,

please contact the lead inspector at 603-395-5536 or via e-mail at pcc1@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

D. Rhoades

3

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

X /RA/

Signed by: Melvin K. Gray

Mel Gray, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 05000317 and 05000318

License Nos. DPR-53 and DPR-69

Enclosure:

Document Request for Design Bases

Assurance Inspection

cc: Distribution via ListServ

ML21053A314

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI/DRS

RI/DRS

RI/DRS

NAME

PCataldo

FArner

MGray

DATE

2/17/21

2/17/21

2/22/21

DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION

Enclosure

Inspection Report: 05000317/2021010 and 05000318/2021010

Onsite Inspection Dates:

June 7 through June 11, 2021; and

June 21 through June 25, 2021

Inspection Procedure:

Inspection Procedure 71111.21M, Design Bases Assurance

Inspection (Team)

Lead Inspector:

Paul Cataldo, Senior Reactor Inspector

603-395-5536

PCC1@nrc.gov

I.

Information Requested for Selection of Components and Modifications

The following information is requested by March 22, 2021 (and April 12, 2021 for remaining

documents not provided due to outage-related conflicts) to facilitate inspection preparation.

Feel free to contact the lead inspector as soon as possible if you have any questions

regarding this information request. Please provide the information electronically

(Certrec/Sharefile) in pdf files, Excel, or other searchable formats. Also, we understand

the prevailing use of Sharefile for inspection-related information for the Exelon fleet,

therefore, the files should contain descriptive names, and indexed and hyperlinked to

facilitate ease of use by the inspectors. Information in lists should contain enough

information to be easily understood by someone who has knowledge of light water reactor

technology.

1.

The site probabilistic risk analysis (PRA) System Notebook and latest PRA Summary

Document.

2.

Risk ranking of top 250 basic events sorted by Risk Achievement Worth (>/= 1.3).

Include values for Risk Reduction Worth, Birnbaum Importance, and Fussell-Vesely (as

applicable). Please provide in an excel spreadsheet or other sortable format, and to

include an understandable definition of the coded, basic events.

3.

Risk-ranking of top 100 components from site-specific PRA sorted by Large Early

Release Frequency.

4.

If you have an External Events or Fire PRA Model, provide the information requested in

Items 1 and 2 for external events and fire. Provide narrative description of each coded

event, including fire and flood zone descriptions.

5.

List of time-critical and/or risk significant operator actions.

6.

List of emergency and abnormal operating procedures.

7.

If available, any pre-existing evaluation or list of components and associated

calculations with low design margins (e.g., pumps closest to the design limit for flow or

DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION

2

pressure, diesel generator close to design required output, heat exchangers close to

rated design heat removal).

8.

If applicable, copy of any self-assessments and/or Quality Assurance assessments of

low margin structures, systems and components (SSCs) completed since July 1, 2018.

9.

List of available design margins in both the open and closed direction for valves in the

motor-operated valve and air-operated valve programs (related to GL 96-05, looking for

resultant output - matrix of risk vs margin for MOVs and AOVs, as applicable); the fleet

or Calvert Cliffs-specific MOV Program procedure.

10. The age and capacity of the safety-related DC batteries.

11. The In-Service Testing (IST) Program Basis document identifying the in-scope valves

and pumps, and the associated IST Program requirements for each component (e.g.,

IST valve table identifying category, active/passive function).

12. Access to IST trend data for the following pumps for both units: AFW pumps, HPSI

pumps, LPSI/RHS pumps, and SW pumps. [Note: needed for each discrete component

(e.g. for each RHR pump)]

13. Listing of MR (a)(1) systems, date entered into (a)(1) status, and brief description of

why (a)(1); if not included as part of Item 15 below, please include the latest System

Health report for those systems in (a)(1) status.

14. List of MRFFs evaluations completed since July 1, 2018 (include those determined not

to be a MRFF).

15. A copy of the most recent System Health and/or trending reports for the following

systems (as applicable): SR 4KV, SR 480 Vac, HPSI, LPSI/RHS, SW, SR 125 Vdc, and

EDGs.

16. A copy of the most recent Program Health and/or trending reports for the following

programs, as applicable: GL 89-10 (MOVs), GL 89-13, IST, AOVs, breakers, relays.

17. List of open operability evaluations, and the associated implementing procedure for

degraded and non-conforming conditions/operability evaluations; List of formal

operability evaluations performed for the last 4 years.

18. List of current operator work arounds/burdens.

19. List of permanent plant modifications to SSCs that are field work complete since

July 1, 2018. For the purpose of this inspection, permanent plant modifications include

permanent: plant changes, design changes, set point changes, equivalency

evaluations, suitability analyses, and commercial grade dedications. The list should

contain the number of each document, title (sufficient to understand the purpose of the

modification), revision/date, and the affected system. Please provide the design change

procedure that governs the implementation of the listed and applicable methods.

20. List of calculation changes (including new calculations) that have been issued for use

since July 1, 2018.

DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION

3

21. Corrective Action Program procedure.

22. Procedures addressing the following: modifications, design changes, set point changes,

equivalency evaluations or suitability analyses, commercial grade dedications, and

post-modification testing.

23. List of corrective action documents (open and closed) that address permanent plant

modifications issues, concerns, or processes, for the past four years; MOV-related

deficiencies, and any plant-level events that generated root or causal evaluations,

and/or associated Licensee Event Reports in the last four years.

24. Any internal/external self-assessments and associated corrective action documents

generated in preparation for this inspection.

25. Updated Final Safety Analysis Report, Technical Specifications, Technical

Specifications Bases, and Technical Requirements Manual.

26. Electrical simple one-line drawings for 4KV, 480V, & 345KV (scalable for electronic

viewing preferred).

27. Copy of Exelons internal responses to any applicable NRC Information Notices,

Generic Letters, or Regulatory Issue Summaries for the past four years.

28. A list of NRC Part 21 Reports, determined to be applicable to Calvert Cliffs, for the past

4 years.

29. DBDs (if applicable & available): SR 4KV, SR 480 Vac, HPSI, LPSI/RHS, SW, SR 125

Vdc, and EDGs.

II.

Information Requested to Be Available by May 28, 2021

This information should be separated for each selected component and modification, especially

if provided electronically (e.g., a folder for each component and modification named after the

component or modification that includes the information requested below). Items 1 through 11

are associated with the selected components and Item 12 is for the selected modifications.

1.

List of corrective action documents associated with each selected component for the

past four years.

2.

Maintenance history (e.g., corrective, preventive, and elective) associated with each

selected component for the last five years. Identify frequency of preventive

maintenance activities.

3.

Aging Management Program documents and/or License Renewal committed inspection

results applicable to each selected component.

4.

List of calculations associated with each selected component, excluding data files. Pipe

stress calculations are excluded from this request.

5.

System Health Report (last completed) and Design Basis Document associated with

each selected component, as applicable.

DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION

4

6.

Access to or copy of vendor manual(s) for each selected component.

7.

List of open temporary modifications associated with each selected component, if

applicable.

8.

Trend data/graphs on the selected components performance for the past three years

(e.g., pump performance including IST, other vibration monitoring, oil sample results).

9.

List of normal operating and alarm response procedures associated with each selected

component.

10. Last completed tests and surveillances for each selected component performed for the

past three years. For those tests and surveillances performed at a periodicity of greater

than three years, provide the latest test performed.

11. Schedule of surveillance testing of selected components that occur during the onsite

and offsite inspection weeks.

12. For each selected modification, copies of associated documents such as modification

package, engineering changes, 50.59 screening or evaluation, relevant calculations,

post-modification test packages, associated corrective action documents, design

drawings, and new/revised preventive maintenance requirements.