{{#Wiki_filter:Page 1 of 1                                                                                    Watts Bar 03/04/2002    16:34:21                                                                Inspection / Activity Plan Report 22 03/04/2002 - 03/31/2003 Unit                                                                                                                                No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                    Title                                              on Site       Start      End            Type EB2-ISI       - INSERVICE INSPECTION                                                                                             1 1                IP 7111108            Inservice Inspection Activities                                                                            03/06/2002 03/08/2002 Baseline Inspections PS-RP         - RADIATION PROTECTION                                                                                             3 1                IP 7112101            Access Control to Radiologically Significant Areas                                                         03/11/2002 03/15/2002 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                                                 03/11/2002 03/15/2002 Baseline Inspections 1                IP 7112202            Radioactive Material Processing and Transportation                                                         03/11/2002 03/15/2002 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                                         03/11/2002 03/15/2002 Baseline Inspections PS-SEC        - SECURITY                                                                                                        2 1                IP 7113003            Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)             04/29/2002  05/03/2002 Baseline Inspections PS-RP         - RADIATION PROTECTION AT MUSCLE SHOALS                                                                           1 1                IP 7112203            Radiological Environmental Monitoring Program                                                              07/10/2002 07/12/2002 Baseline Inspections OL-RQ         - REQUAL INSPECTION                                                                                               2 1                IP 7111111B            Licensed Operator Requalification                                                                          08/12/2002 08/16/2002 Baseline Inspections PS-SEC         - SECURITY                                                                                                         1 1                IP 7113001            Access Authorization Program (Behavior Observation Only)                                                   10/07/2002 10/11/2002 Baseline Inspections 1                IP 7113002            Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)             10/07/2002 10/11/2002 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                                         10/07/2002 10/11/2002 Baseline Inspections PB6LAYUP - UNIT 2 SYSTEM LAYUP                                                                                                    1 1                IP 92050              Review Of Quality Assurance For Extended Construction Delays                                               10/21/2002  10/24/2002 Other Routine OL-EP         - EMERGENCY PLANNING INSPECTION                                                                                   1 1                IP 7111402            Alert and Notification System Testing                                                                       11/04/2002 11/08/2002 Baseline Inspections 1                IP 7111403            Emergency Response Organization Augmentation Testing                                                       11/04/2002 11/08/2002 Baseline Inspections 1                IP 7111404            Emergency Action Level and Emergency Plan Changes                                                           11/04/2002 11/08/2002 Baseline Inspections 1                IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies                                           11/04/2002 11/08/2002 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                                         11/04/2002  11/08/2002 Baseline Inspections PB6-AWP       - FREEZE PROTECTION                                                                                               1 1                IP 7111101            Adverse Weather Protection                                                                                  11/11/2002 11/15/2002 Baseline Inspections OL-EXAM       - INITIAL EXAM                                                                                                     3 1                    V23161            WATTS BARR 1/INITIAL EXAMS AT POWER FACILITIES                                                              12/02/2002 12/06/2002 Not Applicable PB6-FP         - FLOOD PROTECTION                                                                                                 1 1                IP 7111106            Flood Protection Measures                                                                                  02/10/2003 02/14/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
{{#Wiki_filter:Watts Bar Inspection / Activity Plan 03/04/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/04/2002 16:34:21 Report 22 1
EB2-ISI
- INSERVICE INSPECTION Baseline Inspections 03/06/2002 03/08/2002 Inservice Inspection Activities IP 7111108 1
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 03/11/2002 03/15/2002 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 03/11/2002 03/15/2002 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 03/11/2002 03/15/2002 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 03/11/2002 03/15/2002 Performance Indicator Verification IP 71151 1
2 PS-SEC
- SECURITY Baseline Inspections 04/29/2002 05/03/2002 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)
IP 7113003 1
1 PS-RP
- RADIATION PROTECTION AT MUSCLE SHOALS Baseline Inspections 07/10/2002 07/12/2002 Radiological Environmental Monitoring Program IP 7112203 1
2 OL-RQ
- REQUAL INSPECTION Baseline Inspections 08/12/2002 08/16/2002 Licensed Operator Requalification IP 7111111B 1
1 PS-SEC
- SECURITY Baseline Inspections 10/07/2002 10/11/2002 Access Authorization Program (Behavior Observation Only)
IP 7113001 1
Baseline Inspections 10/07/2002 10/11/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 1
Baseline Inspections 10/07/2002 10/11/2002 Performance Indicator Verification IP 71151 1
1 PB6LAYUP
- UNIT 2 SYSTEM LAYUP Other Routine 10/21/2002 10/24/2002 Review Of Quality Assurance For Extended Construction Delays IP 92050 1
1 OL-EP
- EMERGENCY PLANNING INSPECTION Baseline Inspections 11/04/2002 11/08/2002 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 11/04/2002 11/08/2002 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 11/04/2002 11/08/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 11/04/2002 11/08/2002 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 11/04/2002 11/08/2002 Performance Indicator Verification IP 71151 1
1 PB6-AWP
- FREEZE PROTECTION Baseline Inspections 11/11/2002 11/15/2002 Adverse Weather Protection IP 7111101 1
3 OL-EXAM
- INITIAL EXAM Not Applicable 12/02/2002 12/06/2002 WATTS BARR 1/INITIAL EXAMS AT POWER FACILITIES V23161 1
1 PB6-FP
- FLOOD PROTECTION Baseline Inspections 02/10/2003 02/14/2003 Flood Protection Measures IP 7111106 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 19:44, 16 January 2025

Inspection/Activity Plan - 03/04/2002 - 03/31/2003
ML020650629
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/04/2002
From:
Division Reactor Projects II
To:
References
Download: ML020650629 (1)


Text

Watts Bar Inspection / Activity Plan 03/04/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/04/2002 16:34:21 Report 22 1

EB2-ISI

- INSERVICE INSPECTION Baseline Inspections 03/06/2002 03/08/2002 Inservice Inspection Activities IP 7111108 1

3 PS-RP

- RADIATION PROTECTION Baseline Inspections 03/11/2002 03/15/2002 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 03/11/2002 03/15/2002 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 03/11/2002 03/15/2002 Radioactive Material Processing and Transportation IP 7112202 1

Baseline Inspections 03/11/2002 03/15/2002 Performance Indicator Verification IP 71151 1

2 PS-SEC

- SECURITY Baseline Inspections 04/29/2002 05/03/2002 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)

IP 7113003 1

1 PS-RP

- RADIATION PROTECTION AT MUSCLE SHOALS Baseline Inspections 07/10/2002 07/12/2002 Radiological Environmental Monitoring Program IP 7112203 1

2 OL-RQ

- REQUAL INSPECTION Baseline Inspections 08/12/2002 08/16/2002 Licensed Operator Requalification IP 7111111B 1

1 PS-SEC

- SECURITY Baseline Inspections 10/07/2002 10/11/2002 Access Authorization Program (Behavior Observation Only)

IP 7113001 1

Baseline Inspections 10/07/2002 10/11/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)

IP 7113002 1

Baseline Inspections 10/07/2002 10/11/2002 Performance Indicator Verification IP 71151 1

1 PB6LAYUP

- UNIT 2 SYSTEM LAYUP Other Routine 10/21/2002 10/24/2002 Review Of Quality Assurance For Extended Construction Delays IP 92050 1

1 OL-EP

- EMERGENCY PLANNING INSPECTION Baseline Inspections 11/04/2002 11/08/2002 Alert and Notification System Testing IP 7111402 1

Baseline Inspections 11/04/2002 11/08/2002 Emergency Response Organization Augmentation Testing IP 7111403 1

Baseline Inspections 11/04/2002 11/08/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 11/04/2002 11/08/2002 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1

Baseline Inspections 11/04/2002 11/08/2002 Performance Indicator Verification IP 71151 1

1 PB6-AWP

- FREEZE PROTECTION Baseline Inspections 11/11/2002 11/15/2002 Adverse Weather Protection IP 7111101 1

3 OL-EXAM

- INITIAL EXAM Not Applicable 12/02/2002 12/06/2002 WATTS BARR 1/INITIAL EXAMS AT POWER FACILITIES V23161 1

1 PB6-FP

- FLOOD PROTECTION Baseline Inspections 02/10/2003 02/14/2003 Flood Protection Measures IP 7111106 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.