=Text=
=Text=
{{#Wiki_filter:ary 24, 2003
{{#Wiki_filter:January 24, 2003


==SUBJECT:==
==SUBJECT:==
Line 45: Line 45:


===Enclosure:===
===Enclosure:===
Inspection Report 50-373/02-06; 50-374/02-06 See Attached Distribution DOCUMENT NAME: C:\ORPCheckout\FileNET\ML030280404.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII   RIII RIII RIII NAME GWright/trn BBurgess DATE 01/23/03 01/24/03 OFFICIAL RECORD COPY  
Inspection Report 50-373/02-06;
 
50-374/02-06 See Attached Distribution DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030280404.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME GWright/trn BBurgess DATE 01/23/03 01/24/03 OFFICIAL RECORD COPY  


REGION III==
REGION III==
Docket Nos: 50-373; 50-374 License Nos: NPF-11; NPF-18 Report No: 50-373/02-06; 50-374/02-06 Licensee: Exelon Generation Company Facility: LaSalle County Station, Units 1 and 2 Location: 2601 N. 21st Road Marseilles, IL 61341 Dates: October 1 through December 28, 2002 Inspectors: E. Duncan, Senior Resident Inspector D. Eskins, Resident Inspector D. Jones, Reactor Engineer M. Mitchell, Radiation Specialist W. Slawinski, Senior Radiation Specialist D. Wrona, Reactor Engineer J. Yesinowski, Illinois Department of Nuclear Safety Approved by: Bruce L. Burgess, Chief Branch 2 Division of Reactor Projects Enclosure
Docket Nos:
50-373; 50-374 License Nos:
NPF-11; NPF-18 Report No:
50-373/02-06; 50-374/02-06 Licensee:
Exelon Generation Company Facility:
LaSalle County Station, Units 1 and 2 Location:
2601 N. 21st Road Marseilles, IL 61341 Dates:
October 1 through December 28, 2002 Inspectors:
E. Duncan, Senior Resident Inspector D. Eskins, Resident Inspector D. Jones, Reactor Engineer M. Mitchell, Radiation Specialist W. Slawinski, Senior Radiation Specialist D. Wrona, Reactor Engineer J. Yesinowski, Illinois Department of Nuclear Safety Approved by:
Bruce L. Burgess, Chief Branch 2 Division of Reactor Projects
 
Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
Line 57: Line 70:
This report covers a 3-month period of baseline resident inspection and announced baseline inspections on access control, radioactive material processing and shipping, and inservice inspection. The inspection was conducted by the LaSalle resident inspectors and Division of Reactor Safety (DRS) specialist inspectors. One Green finding was identified which was the subject of a Non-Cited Violation. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609 Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.
This report covers a 3-month period of baseline resident inspection and announced baseline inspections on access control, radioactive material processing and shipping, and inservice inspection. The inspection was conducted by the LaSalle resident inspectors and Division of Reactor Safety (DRS) specialist inspectors. One Green finding was identified which was the subject of a Non-Cited Violation. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609 Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.


A.     Inspector-Identified and Self-Revealing Findings
A.
 
Inspector-Identified and Self-Revealing Findings


===Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity, and===
===Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity, and===
Emergency Preparedness
Emergency Preparedness
: '''Green.'''
: '''Green.'''
Line 67: Line 81:
The issue was of very low safety significance since no actual power oscillations occurred and the region was exited promptly after the condition was identified. A violation of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, was identified since this condition had occurred previously, but had not been identified.
The issue was of very low safety significance since no actual power oscillations occurred and the region was exited promptly after the condition was identified. A violation of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, was identified since this condition had occurred previously, but had not been identified.


        (Section 4OA3)
(Section 4OA3)
B.     Licensee-Identified Violation One violation of very low safety significance which was identified by the licensee has been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program. This violation and corrective action tracking number is listed in Section 4OA7 of this report.
B.
 
Licensee-Identified Violation One violation of very low safety significance which was identified by the licensee has been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program. This violation and corrective action tracking number is listed in Section 4OA7 of this report.


=REPORT DETAILS=
=REPORT DETAILS=


===Summary of Plant Status===
===Summary of Plant Status===
Unit 1 operated at or near full power until November 4, when power was reduced to about 77 percent to repair an electro-hydraulic control (EHC) leak on the #1 turbine stop valve emergency trip system oil line. Repairs were completed and Unit 1 was returned to full power on November 5, 2002. Unit 1 operated at full power until November 18 when power was reduced to about 77 percent in response to a feedwater heater transient and then reduced to about 70 percent the next day in response to a second transient. Repairs were completed and Unit 1 was returned to full power on November 21, 2002. Unit 1 operated at or near full power for the remainder of the inspection period, except for power reductions to perform pre-planned maintenance and surveillance testing activities, and rod pattern adjustments.
Unit 1 operated at or near full power until November 4, when power was reduced to about 77 percent to repair an electro-hydraulic control (EHC) leak on the #1 turbine stop valve emergency trip system oil line. Repairs were completed and Unit 1 was returned to full power on November 5, 2002. Unit 1 operated at full power until November 18 when power was reduced to about 77 percent in response to a feedwater heater transient and then reduced to about 70 percent the next day in response to a second transient. Repairs were completed and Unit 1 was returned to full power on November 21, 2002. Unit 1 operated at or near full power for the remainder of the inspection period, except for power reductions to perform pre-planned maintenance and surveillance testing activities, and rod pattern adjustments.


Line 79: Line 94:


==REACTOR SAFETY==
==REACTOR SAFETY==
===Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity, and===
===Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity, and===
Emergency Preparedness {{a|1R01}}


Emergency Preparedness {{a|1R01}}
==1R01 Adverse Weather Protection==
==1R01 Adverse Weather Protection==
{{IP sample|IP=IP 71111.01}}
{{IP sample|IP=IP 71111.01}}
Line 94: Line 108:
====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R04}}
No findings of significance were identified. {{a|1R04}}
==1R04 Equipment Alignment==
==1R04 Equipment Alignment==
{{IP sample|IP=IP 71111.04}}
{{IP sample|IP=IP 71111.04}}
Line 107: Line 122:
====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R08}}
No findings of significance were identified. {{a|1R08}}
==1R08 Inservice Inspection (ISI) Activities==
==1R08 Inservice Inspection (ISI) Activities==
{{IP sample|IP=IP 71111.08}}
{{IP sample|IP=IP 71111.08}}
Line 112: Line 128:
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors conducted a review of the licensees inservice inspection program for monitoring degradation of the reactor coolant system boundary and the risk significant piping system boundaries. Specifically, the inspectors conducted a record review of the following examinations performed during the Unit 1 Refueling Outage during January 10 through February 4, 2002 (L1R09):
The inspectors conducted a review of the licensees inservice inspection program for monitoring degradation of the reactor coolant system boundary and the risk significant piping system boundaries. Specifically, the inspectors conducted a record review of the following examinations performed during the Unit 1 Refueling Outage during January 10 through February 4, 2002 (L1R09):
Weld Number             System                                 Nondestructive Testing Type 1-NIR-2B                 Reactor Pressure Vessel (RPV)         Ultrasonic 1-NIR-2D                 Reactor Pressure Vessel (RPV)         Ultrasonic 1FW-1001-71A             Feedwater (FW)                         Ultrasonic/Magnetic Particle IRI-1001-05             Reactor Core Isolation Cooling         Ultrasonic IRR-1055-13             Reactor Recirculation (RR)             Ultrasonic/Liquid Penetrant These examinations were evaluated for compliance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements. The inspectors also reviewed inservice inspection procedures, personnel certifications, and NIS-2 forms for Code repairs performed during the Unit 1 outage to confirm that ASME Code requirements were met.
Weld Number System Nondestructive Testing Type 1-NIR-2B Reactor Pressure Vessel (RPV)
Ultrasonic 1-NIR-2D Reactor Pressure Vessel (RPV)
Ultrasonic 1FW-1001-71A Feedwater (FW)
Ultrasonic/Magnetic Particle IRI-1001-05 Reactor Core Isolation Cooling Ultrasonic IRR-1055-13 Reactor Recirculation (RR)
Ultrasonic/Liquid Penetrant These examinations were evaluated for compliance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements. The inspectors also reviewed inservice inspection procedures, personnel certifications, and NIS-2 forms for Code repairs performed during the Unit 1 outage to confirm that ASME Code requirements were met.


The inspectors also reviewed a sample of inservice inspection related problems documented in the licensees corrective action program, to assess conformance with 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requirements. In addition, the inspectors verified that operating experience was correctly assessed for applicability by the ISI group.
The inspectors also reviewed a sample of inservice inspection related problems documented in the licensees corrective action program, to assess conformance with 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requirements. In addition, the inspectors verified that operating experience was correctly assessed for applicability by the ISI group.
Line 118: Line 138:
====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R11}}
No findings of significance were identified. {{a|1R11}}
==1R11 Licensed Operator Requalification==
==1R11 Licensed Operator Requalification==
{{IP sample|IP=IP 71111.11}}
{{IP sample|IP=IP 71111.11}}
Line 124: Line 145:
On October 10, 2002, the inspectors observed two licensed operator re-qualification training scenario:
On October 10, 2002, the inspectors observed two licensed operator re-qualification training scenario:
ESG50, CRD [Control Rod Drive] FCV [Flow Control Valve] Setpoint Failure/TDRFP [Turbine-Driven Reactor Feedwater Pump] Turbine Lube Oil Leak/Heater String Isolation/Loss of Stator Cooling/5-Rod ATWS [Anticipated Transient Without Scram]; and ESG47, RWLCS [Reactor Water Level Control System] Trouble/Loss of RPS
ESG50, CRD [Control Rod Drive] FCV [Flow Control Valve] Setpoint Failure/TDRFP [Turbine-Driven Reactor Feedwater Pump] Turbine Lube Oil Leak/Heater String Isolation/Loss of Stator Cooling/5-Rod ATWS [Anticipated Transient Without Scram]; and ESG47, RWLCS [Reactor Water Level Control System] Trouble/Loss of RPS
              [Reactor Protection System] A/APRM [Average Power Range Monitor] C Failure/Loss of Both RR [Reactor Recirculation] Pumps/Failure to Automatic Scram/K SRV [Safety Relief Valve] Leakage/RHR [Residual Heat Removal]
[Reactor Protection System] A/APRM [Average Power Range Monitor] C Failure/Loss of Both RR [Reactor Recirculation] Pumps/Failure to Automatic Scram/K SRV [Safety Relief Valve] Leakage/RHR [Residual Heat Removal]
Heat Exchanger Tube Rupture.
Heat Exchanger Tube Rupture.


Line 131: Line 152:
====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R13}}
No findings of significance were identified. {{a|1R13}}
==1R13 Maintenance Risk Assessment and Emergent Work Evaluation==
==1R13 Maintenance Risk Assessment and Emergent Work Evaluation==
{{IP sample|IP=IP 71111.13}}
{{IP sample|IP=IP 71111.13}}
Line 146: Line 168:
====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R14}}
No findings of significance were identified. {{a|1R14}}
==1R14 Non-Routine Evolutions==
==1R14 Non-Routine Evolutions==
{{IP sample|IP=IP 71111.14}}
{{IP sample|IP=IP 71111.14}}
===.1 Unexpected Loss of Voltage Regulating Transformer 2APD7E===
===.1 Unexpected Loss of Voltage Regulating Transformer 2APD7E===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the stations response to an unexpected loss of voltage regulating transformer 2APD7E on October 8, 2002, which rendered the B main control room and auxiliary electrical equipment room ventilation (VC/VE) systems inoperable. This transformer failure was identified by a non-licensed operator on routine rounds who noted a strong acrid odor in the vicinity of the transformer panel. In particular, the inspectors verified that operations response was appropriate for the event and in accordance with plant procedures. The inspectors reviewed the licensees plans, procedures, briefings, and contingency plans associated with the restoration of the transformer. Relevant schematics were also reviewed to verify that all equipment impacted by the loss of the transformer had been properly identified.
The inspectors reviewed the stations response to an unexpected loss of voltage regulating transformer 2APD7E on October 8, 2002, which rendered the B main control room and auxiliary electrical equipment room ventilation (VC/VE) systems inoperable. This transformer failure was identified by a non-licensed operator on routine rounds who noted a strong acrid odor in the vicinity of the transformer panel. In particular, the inspectors verified that operations response was appropriate for the event and in accordance with plant procedures. The inspectors reviewed the licensees plans, procedures, briefings, and contingency plans associated with the restoration of the transformer. Relevant schematics were also reviewed to verify that all equipment impacted by the loss of the transformer had been properly identified.
Line 157: Line 180:


===.2 Unit 2B Emergency Diesel Generator (EDG) Voltage Regulator Replacement===
===.2 Unit 2B Emergency Diesel Generator (EDG) Voltage Regulator Replacement===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the stations response to an unexpected failure of the 2B EDG voltage regulator identified during High Pressure Core Spray (HPCS) system post-maintenance testing. The inspectors reviewed the activities associated with the voltage regulator replacement, establishing initial regulator settings, the Infrequently Performed Activity (IPA) briefing, and post-maintenance testing conducted in accordance with LaSalle Special Test (LST) 2002-034, 2B Diesel Generator Voltage Regulator PMT [Post-Maintenance Test], Revision 0.
The inspectors reviewed the stations response to an unexpected failure of the 2B EDG voltage regulator identified during High Pressure Core Spray (HPCS) system post-maintenance testing. The inspectors reviewed the activities associated with the voltage regulator replacement, establishing initial regulator settings, the Infrequently Performed Activity (IPA) briefing, and post-maintenance testing conducted in accordance with LaSalle Special Test (LST) 2002-034, 2B Diesel Generator Voltage Regulator PMT [Post-Maintenance Test], Revision 0.
Line 165: Line 187:


===.3 Unit 2 Fuel Sipping===
===.3 Unit 2 Fuel Sipping===
The inspectors observed Unit 2 fuel sipping operations conducted to identify leaking fuel on Unit 2. In particular, the inspectors verified that the sipping equipment was installed and operated in accordance with LaSalle Fuel Procedure (LFP) 400-6, Installation and Operation of Sipping Equipment.
The inspectors observed Unit 2 fuel sipping operations conducted to identify leaking fuel on Unit 2. In particular, the inspectors verified that the sipping equipment was installed and operated in accordance with LaSalle Fuel Procedure (LFP) 400-6, Installation and Operation of Sipping Equipment.


====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R15}}
No findings of significance were identified. {{a|1R15}}
==1R15 Operability Evaluations==
==1R15 Operability Evaluations==
{{IP sample|IP=IP 71111.15}}
{{IP sample|IP=IP 71111.15}}
Line 177: Line 199:


The following evaluations were reviewed:
The following evaluations were reviewed:
* OE02-12         Unit 1 Turbine Control Valve (TCV) #1 Foreign Material
* OE02-12 Unit 1 Turbine Control Valve (TCV) #1 Foreign Material
* EC339629         Unit 2 Safety Relief Valve (SRV) Piping Supports Pinned
* EC339629 Unit 2 Safety Relief Valve (SRV) Piping Supports Pinned
* OE02-04         Revision 1: Unit 1 Main Steam Isolation Valve Limit Switch Temperatures
* OE02-04 Revision 1: Unit 1 Main Steam Isolation Valve Limit Switch Temperatures


====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R16}}
No findings of significance were identified. {{a|1R16}}
==1R16 Operator Workarounds (OWAs)==
==1R16 Operator Workarounds (OWAs)==
{{IP sample|IP=IP 71111.16}}
{{IP sample|IP=IP 71111.16}}
===.1 Routine Operator Workaround Review===
===.1 Routine Operator Workaround Review===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed Operator Challenges (OCs) to identify any potentially adverse impact on the function of mitigating systems or the ability to implement an abnormal or emergency operating procedure. The following item was reviewed:
The inspectors reviewed Operator Challenges (OCs) to identify any potentially adverse impact on the function of mitigating systems or the ability to implement an abnormal or emergency operating procedure. The following item was reviewed:
Line 195: Line 218:


===.2 Operator Workaround Cumulative Effects Assessment===
===.2 Operator Workaround Cumulative Effects Assessment===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the cumulative effects of all documented OWAs and OCs on reliability, availability, and potential for mis-operation of a system; the cumulative effects of operator workarounds that could affect multiple mitigating systems; and the ability of operators to respond in a correct and timely manner to plant transients and accidents.
The inspectors reviewed the cumulative effects of all documented OWAs and OCs on reliability, availability, and potential for mis-operation of a system; the cumulative effects of operator workarounds that could affect multiple mitigating systems; and the ability of operators to respond in a correct and timely manner to plant transients and accidents.
Line 201: Line 223:
====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R19}}
No findings of significance were identified. {{a|1R19}}
==1R19 Post-Maintenance Testing==
==1R19 Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19}}
{{IP sample|IP=IP 71111.19}}
Line 206: Line 229:
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed and observed the following post-maintenance testing activities involving risk significant equipment associated with the following work orders (WOs):
The inspectors reviewed and observed the following post-maintenance testing activities involving risk significant equipment associated with the following work orders (WOs):
* WO 00468913           Replace Unit 2 Division 2 125 Volt Direct Current (VDC)
* WO 00468913 Replace Unit 2 Division 2 125 Volt Direct Current (VDC)
Battery Cell 9 and Battery Cell 23 The inspectors observed post-maintenance testing and reviewed the test procedure to verify that the test was adequate for the scope of the maintenance work which had been performed and that the testing acceptance criteria was clear and demonstrated operational readiness consistent with the design and licensing basis documents. The observations and reviews were also conducted to verify that the impact of the testing had been properly characterized during the pre-job briefing; the test was performed as written and all testing prerequisites were satisfied; and that the test data was complete, appropriately verified, and met the requirements of the testing procedure. The inspectors also observed or reviewed post testing conditions to verify that the test equipment was removed, and that the equipment was returned to a condition in which it could perform its safety function.
Battery Cell 9 and Battery Cell 23 The inspectors observed post-maintenance testing and reviewed the test procedure to verify that the test was adequate for the scope of the maintenance work which had been performed and that the testing acceptance criteria was clear and demonstrated operational readiness consistent with the design and licensing basis documents. The observations and reviews were also conducted to verify that the impact of the testing had been properly characterized during the pre-job briefing; the test was performed as written and all testing prerequisites were satisfied; and that the test data was complete, appropriately verified, and met the requirements of the testing procedure. The inspectors also observed or reviewed post testing conditions to verify that the test equipment was removed, and that the equipment was returned to a condition in which it could perform its safety function.


====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R20}}
No findings of significance were identified. {{a|1R20}}
==1R20 Refueling and Outage Activities==
 
==1R20 Refueling and Outage Activities


====a. Inspection Scope====
====a. Inspection Scope====
==
The inspectors observed the performance of LaSalle Unit 2 Maintenance Outage L2P02 and evaluated licensee outage activities to ensure that the licensee considered risk in developing the outage schedule; adhered to administrative risk reduction methodologies developed to control plant configuration; developed mitigation strategies for losses of key safety functions; and adhered to the operating license and Technical Specification requirements that ensured defense-in-depth. The following specific outage-related activities were accomplished:
The inspectors observed the performance of LaSalle Unit 2 Maintenance Outage L2P02 and evaluated licensee outage activities to ensure that the licensee considered risk in developing the outage schedule; adhered to administrative risk reduction methodologies developed to control plant configuration; developed mitigation strategies for losses of key safety functions; and adhered to the operating license and Technical Specification requirements that ensured defense-in-depth. The following specific outage-related activities were accomplished:
* Outage Plan Review The inspectors reviewed the licensees outage control plan to verify that the licensee had appropriately considered risk, industry experience, and previous site-specific problems. The inspectors also confirmed that contingency plans for losses of key safety functions had been established.
* Outage Plan Review The inspectors reviewed the licensees outage control plan to verify that the licensee had appropriately considered risk, industry experience, and previous site-specific problems. The inspectors also confirmed that contingency plans for losses of key safety functions had been established.
Line 226: Line 251:
====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|1R22}}
No findings of significance were identified. {{a|1R22}}
==1R22 Surveillance Testing==
==1R22 Surveillance Testing==
{{IP sample|IP=IP 71111.22}}
{{IP sample|IP=IP 71111.22}}
Line 253: Line 279:
To determine whether the affected area coolers would have been actually impacted in the event of a design basis earthquake, the licensee performed a more in-depth engineering analysis than that which was accomplished as part of their prompt operability review. At the end of the inspection period, the results of this analysis were still pending. As a result, this issue is considered an Unresolved Item (50-373/0206-01(DRP); 50-374/0206-01(DRP)) pending a review of these engineering analysis results.
To determine whether the affected area coolers would have been actually impacted in the event of a design basis earthquake, the licensee performed a more in-depth engineering analysis than that which was accomplished as part of their prompt operability review. At the end of the inspection period, the results of this analysis were still pending. As a result, this issue is considered an Unresolved Item (50-373/0206-01(DRP); 50-374/0206-01(DRP)) pending a review of these engineering analysis results.
{{a|1EP4}}
{{a|1EP4}}
==1EP4 Emergency Action Level and Emergency Plan Changes==
==1EP4 Emergency Action Level and Emergency Plan Changes==
{{IP sample|IP=IP 71114.04}}
{{IP sample|IP=IP 71114.04}}
Line 263: Line 290:


==RADIATION SAFETY==
==RADIATION SAFETY==
===Cornerstone: Occupational Radiation Safety===
===Cornerstone: Occupational Radiation Safety===
2OS1 Access Control to Radiologically Significant Areas (71121.01)
2OS1 Access Control to Radiologically Significant Areas (71121.01)


===.1 Plant Walkdowns===
===.1 Plant Walkdowns===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the radiological conditions of work areas within radiation areas and high radiation areas in the Auxiliary and Radwaste Buildings. The inspectors performed walkdowns and reviewed licensee controls to determine if the controls (i.e., surveys, postings, and barricades) were adequate to meet the requirements of 10 CFR Part 20 and the licensees Technical Specifications. Additionally, the inspectors reviewed the licensees practices during the last refueling outage for controlling access to contaminated areas and for declaring airborne contamination areas to determine if controls were acceptable.
The inspectors reviewed the radiological conditions of work areas within radiation areas and high radiation areas in the Auxiliary and Radwaste Buildings. The inspectors performed walkdowns and reviewed licensee controls to determine if the controls (i.e., surveys, postings, and barricades) were adequate to meet the requirements of 10 CFR Part 20 and the licensees Technical Specifications. Additionally, the inspectors reviewed the licensees practices during the last refueling outage for controlling access to contaminated areas and for declaring airborne contamination areas to determine if controls were acceptable.
Line 277: Line 301:


===Cornerstone: Public Radiation Safety===
===Cornerstone: Public Radiation Safety===
2PS2 Radioactive Material Processing and Transportation (71122.02)
2PS2 Radioactive Material Processing and Transportation (71122.02)


===.1 Walkdown of Radioactive Waste Systems===
===.1 Walkdown of Radioactive Waste Systems===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the liquid and solid radioactive waste system description in the UFSAR and the most recent information regarding the types and amounts of radioactive waste generated and disposed. The inspectors performed walkdowns of the liquid and solid radwaste processing systems to verify that the systems agreed with the descriptions in the UFSAR and the Process Control Program, and to assess the material condition and operability of the systems. The inspectors reviewed the current processes for transferring waste resins into transportation containers to determine if appropriate waste stream mixing and sampling procedures were utilized. The inspectors also reviewed the methodologies for waste concentration averaging to determine if representative samples of the waste product were provided for the purposes of waste classification in accordance with 10 CFR 61.55. During this inspection, the licensee was not conducting waste processing.
The inspectors reviewed the liquid and solid radioactive waste system description in the UFSAR and the most recent information regarding the types and amounts of radioactive waste generated and disposed. The inspectors performed walkdowns of the liquid and solid radwaste processing systems to verify that the systems agreed with the descriptions in the UFSAR and the Process Control Program, and to assess the material condition and operability of the systems. The inspectors reviewed the current processes for transferring waste resins into transportation containers to determine if appropriate waste stream mixing and sampling procedures were utilized. The inspectors also reviewed the methodologies for waste concentration averaging to determine if representative samples of the waste product were provided for the purposes of waste classification in accordance with 10 CFR 61.55. During this inspection, the licensee was not conducting waste processing.
Line 289: Line 311:


===.2 Waste Characterization and Classification===
===.2 Waste Characterization and Classification===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the licensees radiochemical sample analysis results for each of the licensees waste streams, including dry active waste, resins, and filters. The inspectors also reviewed the licensees use of scaling factors to quantify difficult-to-measure radionuclides (e.g., pure alpha or beta emitting radionuclides). The reviews were conducted to verify that the licensees program assured compliance with 10 CFR 61.55 and 10 CFR 61.56, as required by Appendix G of 10 CFR Part 20. The inspectors also reviewed the licensees waste characterization and classification program to ensure that the waste stream composition data accounted for changing operational parameters and thus remained valid between the annual sample analysis updates.
The inspectors reviewed the licensees radiochemical sample analysis results for each of the licensees waste streams, including dry active waste, resins, and filters. The inspectors also reviewed the licensees use of scaling factors to quantify difficult-to-measure radionuclides (e.g., pure alpha or beta emitting radionuclides). The reviews were conducted to verify that the licensees program assured compliance with 10 CFR 61.55 and 10 CFR 61.56, as required by Appendix G of 10 CFR Part 20. The inspectors also reviewed the licensees waste characterization and classification program to ensure that the waste stream composition data accounted for changing operational parameters and thus remained valid between the annual sample analysis updates.
Line 297: Line 318:


===.3 Transportation Records===
===.3 Transportation Records===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed six non-exempted package shipment manifests completed in years 2001 and 2002 to verify compliance with NRC and Department of Transportation requirements (i.e., 10 CFR Parts 20 and 71 and 49 CFR Parts 172 and 173). The licensee did not have any non-exempt package preparation or shipping underway during the inspection.
The inspectors reviewed six non-exempted package shipment manifests completed in years 2001 and 2002 to verify compliance with NRC and Department of Transportation requirements (i.e., 10 CFR Parts 20 and 71 and 49 CFR Parts 172 and 173). The licensee did not have any non-exempt package preparation or shipping underway during the inspection.
Line 305: Line 325:


===.4 Identification and Resolution of Problems===
===.4 Identification and Resolution of Problems===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the most recent Nuclear Oversight Quality Assurance audit of the Radioactive Waste and Transportation Programs, along with departmental Focused Area Self-Assessments of the Radioactive Waste and Transportation Programs to evaluate the effectiveness of the self-assessment process to identify, characterize, and prioritize problems. The inspectors also reviewed corrective action documentation to verify that previous radioactive waste and radioactive materials transportation related issues were adequately addressed. The inspectors also selectively reviewed year 2001 and 2002 Condition Reports (CRs) that addressed radioactive waste and radioactive materials transportation program deficiencies, to verify that the licensee had effectively implemented the corrective action program.
The inspectors reviewed the most recent Nuclear Oversight Quality Assurance audit of the Radioactive Waste and Transportation Programs, along with departmental Focused Area Self-Assessments of the Radioactive Waste and Transportation Programs to evaluate the effectiveness of the self-assessment process to identify, characterize, and prioritize problems. The inspectors also reviewed corrective action documentation to verify that previous radioactive waste and radioactive materials transportation related issues were adequately addressed. The inspectors also selectively reviewed year 2001 and 2002 Condition Reports (CRs) that addressed radioactive waste and radioactive materials transportation program deficiencies, to verify that the licensee had effectively implemented the corrective action program.
Line 314: Line 333:
==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
{{a|4OA2}}
{{a|4OA2}}
==4OA2 Identification and Resolution of Problems==
==4OA2 Identification and Resolution of Problems==
{{IP sample|IP=IP 71152}}
{{IP sample|IP=IP 71152}}
Line 330: Line 350:
====b. Findings====
====b. Findings====
No findings of significance were identified. {{a|4OA3}}
No findings of significance were identified. {{a|4OA3}}
==4OA3 Event Followup==
==4OA3 Event Followup==
{{IP sample|IP=IP 71153}}
{{IP sample|IP=IP 71153}}
Line 362: Line 383:


{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings==
==4OA6 Meetings==
 
===.1===
===.1 Exit Meeting Summary===
===Exit Meeting Summary===
 
The inspectors presented the inspection results to Mr. G. Barnes and other members of licensee management at the conclusion of the inspection on January 3, 2003. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
The inspectors presented the inspection results to Mr. G. Barnes and other members of licensee management at the conclusion of the inspection on January 3, 2003. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.


===.2 Interim Exit Meetings===
===.2 Interim Exit Meetings===
Interim exits were conducted for:
Interim exits were conducted for:
* Access Control, Radiation Material Processing and Transportation inspection with Mr. G. Barnes on November 8, 2002.
* Access Control, Radiation Material Processing and Transportation inspection with Mr. G. Barnes on November 8, 2002.
Line 376: Line 396:


{{a|4OA7}}
{{a|4OA7}}
==4OA7 Licensee Identified Violations==
==4OA7 Licensee Identified Violations==
The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section VI of the NRC Enforcement Manual, NUREG-1600, for being dispositioned as an NCV.
The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section VI of the NRC Enforcement Manual, NUREG-1600, for being dispositioned as an NCV.


===Cornerstone: Occupational Radiation Exposure===
===Cornerstone: Occupational Radiation Exposure===
Technical Specification 5.4.1 requires, in part, that the licensee establish and implement procedures covering activities recommended in Regulatory Guide 1.33 (Revision 2),
Technical Specification 5.4.1 requires, in part, that the licensee establish and implement procedures covering activities recommended in Regulatory Guide 1.33 (Revision 2),
Appendix A, February 1978. The Regulatory Guide recommended procedures included radiation protection procedures for access control. Radiation protection procedures require that an area with radiation levels of 1000 mrem/hour or greater be locked and posted as a locked high radiation area, which did not occur for several hours in the Unit 1 Cooler/Condenser Room of the Off Gas Building on February 11-12, 2002. The problem is described in CR 00094760 and its associated apparent cause evaluation report. There were no unauthorized entries into the Cooler/Condenser Room while it was not properly controlled or posted and since area radiation levels coupled with the duration of the problem precluded a substantial potential for an overexposure, the issue was determined to be of very low safety significance. Consequently, it is being treated as an NCV (50-373/0206-03(DRP)).
Appendix A, February 1978. The Regulatory Guide recommended procedures included radiation protection procedures for access control. Radiation protection procedures require that an area with radiation levels of 1000 mrem/hour or greater be locked and posted as a locked high radiation area, which did not occur for several hours in the Unit 1 Cooler/Condenser Room of the Off Gas Building on February 11-12, 2002. The problem is described in CR 00094760 and its associated apparent cause evaluation report. There were no unauthorized entries into the Cooler/Condenser Room while it was not properly controlled or posted and since area radiation levels coupled with the duration of the problem precluded a substantial potential for an overexposure, the issue was determined to be of very low safety significance. Consequently, it is being treated as an NCV (50-373/0206-03(DRP)).
KEY POINTS OF CONTACT Licensee Personnel G. Barnes, Site Vice President S. Landahl, Station Manager T. Connor, Design Engineering Supervisor D. Czufin, Site Engineering Manager D. Enright, Operations Manager F. Gogliotti, System Engineering Manager K. Hobbs, Radiation Protection Manager G. Kaegi, Regulatory Assurance Manager A. Kochis, ISI Coordinator C. Wilson, Station Security Manager NRC Personnel E. Duncan, Senior Resident Inspector D. Eskins, Resident Inspector D. Jones, Reactor Engineer M. Mitchell, Radiation Specialist W. Slawinski, Senior Radiation Specialist D. Wrona, Reactor Engineer J. Yesinowski, Illinois Department of Nuclear Safety ITEMS OPENED, CLOSED, AND DISCUSSED Opened 50-373/374/0206-01 URI       Missing ECCS Area Cooler Screws 50-373/374/0206-02 NCV       Entry Into Region B of the Power-To-Flow Map 50-373/0206-03         NCV   Uncontrolled High Radiation Area Closed 50-373/374/0206-02 NCV       Entry Into Region B of the Power-To-Flow Map 50-373/0206-03         NCV   Uncontrolled High Radiation Area Discussed None LIST OF ACRONYMS AEER Auxiliary Electric Equipment Room ALARA As-Low-As-Reasonably Achievable APRM Average Power Range Monitor ASME American Society of Mechanical Engineers ATWS Anticipated Transient Without Scram CR   Condition Report CRD   Control Rod Drive CST   Condensate Storage Tank DRP   Division of Reactor Projects DRS   Division of Reactor Safety EC   Engineering Change ECCS Emergency Core Cooling System EDG   Emergency Diesel Generator EHC   Electro-Hydraulic Control ENS   Emergency Notification System FCV   Flow Control Valve FW   Feedwater HPCS High Pressure Core Spray IMC   Inspection Manual Chapter IPA   Infrequently Performed Activity ISI   Inservice Inspection LFP   LaSalle Fuel Procedure LOS   LaSalle Operating Surveillance LSH   Lake Screenhouse LST   LaSalle Special Test LTS   LaSalle Technical Surveillance MT   Magnetic Particle Testing MWe   Megawatts Electric NCV   Non-Cited Violation OC   Operator Challenge OE   Operability Evaluation OWA   Operator Workaround PMT   Post-Maintenance Test PT   Penetrant Testing QNE   Qualified Nuclear Engineer RCIC Reactor Core Isolation Cooling RCS   Reactor Coolant System RHR   Residual Heat Removal RHRSW Residual Heat Removal Service Water ROP   Reactor Oversight Process RPS   Reactor Protection System RPV   Reactor Pressure Vessel RR   Reactor Recirculation RWLCS Reactor Water Level Control System SDP   Significance Determination Process LIST OF ACRONYMS (cont)
KEY POINTS OF CONTACT Licensee Personnel G. Barnes, Site Vice President S. Landahl, Station Manager T. Connor, Design Engineering Supervisor D. Czufin, Site Engineering Manager D. Enright, Operations Manager F. Gogliotti, System Engineering Manager K. Hobbs, Radiation Protection Manager G. Kaegi, Regulatory Assurance Manager A. Kochis, ISI Coordinator C. Wilson, Station Security Manager NRC Personnel E. Duncan, Senior Resident Inspector D. Eskins, Resident Inspector D. Jones, Reactor Engineer M. Mitchell, Radiation Specialist W. Slawinski, Senior Radiation Specialist D. Wrona, Reactor Engineer J. Yesinowski, Illinois Department of Nuclear Safety ITEMS OPENED, CLOSED, AND DISCUSSED Opened 50-373/374/0206-01 URI Missing ECCS Area Cooler Screws 50-373/374/0206-02 NCV Entry Into Region B of the Power-To-Flow Map 50-373/0206-03 NCV Uncontrolled High Radiation Area Closed 50-373/374/0206-02 NCV Entry Into Region B of the Power-To-Flow Map 50-373/0206-03 NCV Uncontrolled High Radiation Area Discussed None LIST OF ACRONYMS AEER Auxiliary Electric Equipment Room ALARA As-Low-As-Reasonably Achievable APRM Average Power Range Monitor ASME American Society of Mechanical Engineers ATWS Anticipated Transient Without Scram CR Condition Report CRD Control Rod Drive CST Condensate Storage Tank DRP Division of Reactor Projects DRS Division of Reactor Safety EC Engineering Change ECCS Emergency Core Cooling System EDG Emergency Diesel Generator EHC Electro-Hydraulic Control ENS Emergency Notification System FCV Flow Control Valve FW Feedwater HPCS High Pressure Core Spray IMC Inspection Manual Chapter IPA Infrequently Performed Activity ISI Inservice Inspection LFP LaSalle Fuel Procedure LOS LaSalle Operating Surveillance LSH Lake Screenhouse LST LaSalle Special Test LTS LaSalle Technical Surveillance MT Magnetic Particle Testing MWe Megawatts Electric NCV Non-Cited Violation OC Operator Challenge OE Operability Evaluation OWA Operator Workaround PMT Post-Maintenance Test PT Penetrant Testing QNE Qualified Nuclear Engineer RCIC Reactor Core Isolation Cooling RCS Reactor Coolant System RHR Residual Heat Removal RHRSW Residual Heat Removal Service Water ROP Reactor Oversight Process RPS Reactor Protection System RPV Reactor Pressure Vessel RR Reactor Recirculation RWLCS Reactor Water Level Control System SDP Significance Determination Process LIST OF ACRONYMS (cont)
SRV   Safety Relief Valve SSC   Structure, System, or Component TCV   Turbine Control Valve TDRFP Turbine-Drive Reactor Feedwater Pump UFSAR Updated Final Safety Analysis Report URI   Unresolved Item UT   Ultrasonic Testing VC   Control Room Ventilation VDC   Volt Direct Current VE   Auxiliary Electric Equipment Room Ventilation VX   Essential Switchgear Room Ventilation WO   Work Order LIST OF  
SRV Safety Relief Valve SSC Structure, System, or Component TCV Turbine Control Valve TDRFP Turbine-Drive Reactor Feedwater Pump UFSAR Updated Final Safety Analysis Report URI Unresolved Item UT Ultrasonic Testing VC Control Room Ventilation VDC Volt Direct Current VE Auxiliary Electric Equipment Room Ventilation VX Essential Switchgear Room Ventilation WO Work Order LIST OF  


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Adverse Weather Protection
Adverse Weather Protection
LOS-ZZ-A2         Preparation for Winter/Summer Operation     Revision 24
LOS-ZZ-A2
Preparation for Winter/Summer Operation
Revision 24
Equipment Alignment
Equipment Alignment
LOP-HP-2M             Unit 2 HPCS System Mechanical Checklist
LOP-HP-2M
LOP-HP-2E             Unit 2 HPCS System Electrical Checklist
Unit 2 HPCS System Mechanical Checklist
LOP-RH-2M             Unit 2 B RHR System Mechanical Checklist
LOP-HP-2E
LOP-RH-3M             Unit 2 C RHR System Mechanical Checklist
Unit 2 HPCS System Electrical Checklist
LOP-RH-4E             Unit 2 B/C RHR System Electrical Checklist
LOP-RH-2M
LOP-RHRSW-2BM         Unit 2 B RHRSW System Mechanical Checklist
Unit 2 B RHR System Mechanical Checklist
LOP-RHRSW-3E           Unit 2 B RHRSW System Electrical Checklist
LOP-RH-3M
Unit 2 C RHR System Mechanical Checklist
LOP-RH-4E
Unit 2 B/C RHR System Electrical Checklist
LOP-RHRSW-2BM
Unit 2 B RHRSW System Mechanical Checklist
LOP-RHRSW-3E
Unit 2 B RHRSW System Electrical Checklist
Fire Protection
Fire Protection
Updated Final Safety Analysis           Appendix H                    Revision 13
Updated Final Safety Analysis
Report
Report
Appendix H
Revision 13
Inservice Inspection
Inservice Inspection
MT-EXLN-           Procedure for Magnetic Particle Examination Using   January 5, 2002
MT-EXLN-
2V0              AC Yoke, Dry Powder, or Wet Visible
2V0
PT-EXLN-104V0       Procedure for Liquid Penetrant Examination Color   January 5, 2002
Procedure for Magnetic Particle Examination Using
AC Yoke, Dry Powder, or Wet Visible
January 5, 2002
PT-EXLN-104V0
Procedure for Liquid Penetrant Examination Color
Contrast (Visible) Solvent Removable
Contrast (Visible) Solvent Removable
GE-UT-311           Procedure for Manual Ultrasonic Examination of     January 5, 2002
January 5, 2002
GE-UT-311
Procedure for Manual Ultrasonic Examination of
Nozzle Inner Radii and Bore
Nozzle Inner Radii and Bore
GE-PDI-UT-1         PDI Generic Procedure for the Ultrasonic           January 5, 2002
January 5, 2002
GE-PDI-UT-1
PDI Generic Procedure for the Ultrasonic
Examination of Ferritic Piping Welds
Examination of Ferritic Piping Welds
GE-PDI-UT-2         PDI Generic Procedure for the Ultrasonic           January 5, 2002
January 5, 2002
GE-PDI-UT-2
PDI Generic Procedure for the Ultrasonic
Examination of Austenitic Pipe Welds
Examination of Austenitic Pipe Welds
ISI Program         Second Ten-Year Inspection Interval, LaSalle       December 14,
January 5, 2002
Plan                County Nuclear Power Station, Units 1 and 2         2001
ISI Program
CR 135708           Liquid Penetrant Examination Report Discrepancy
Plan
Attachment
Second Ten-Year Inspection Interval, LaSalle
County Nuclear Power Station, Units 1 and 2
December 14,
2001
CR 135708
Liquid Penetrant Examination Report Discrepancy
 
Operator Licensing Requalification
Operator Licensing Requalification
ESG 50     CRD FCV Setpoint Failure/TDRFP Turbine Lube Oil Leak/Heater           Revision
ESG 50
String Isolation/Loss of Stator Cooling/5-Rod ATWS                     0
CRD FCV Setpoint Failure/TDRFP Turbine Lube Oil Leak/Heater
ESG47       RWLCS Trouble/Loss of RPS A/APRM C Failure/Loss of Both           Revision
String Isolation/Loss of Stator Cooling/5-Rod ATWS
RR Pumps/Failure to Automatic Scram/K SRV Leakage/RHR Heat           0
Revision
ESG47
RWLCS Trouble/Loss of RPS A/APRM C Failure/Loss of Both
RR Pumps/Failure to Automatic Scram/K SRV Leakage/RHR Heat
Exchanger Tube Rupture
Exchanger Tube Rupture
Revision
Maintenance Risk Assessment and Emergent Work Evaluation
Maintenance Risk Assessment and Emergent Work Evaluation
LaSalle 7-Day Look-     Various
LaSalle 7-Day Look-
Ahead Schedule
Ahead Schedule
WO00490705             Change Control Power Fuse for 1AP76E-F3-F       October 1, 2002
Various
EC338741               Change Control Power Fuse for 1AP76E-F3-F       September 24, 2002
WO00490705
LaSalle 3-Day Look-     Various
Change Control Power Fuse for 1AP76E-F3-F
October 1, 2002
EC338741
Change Control Power Fuse for 1AP76E-F3-F
September 24, 2002
LaSalle 3-Day Look-
Ahead Schedule
Ahead Schedule
Various
Personnel Performance During Nonroutine Plant Evolutions
Personnel Performance During Nonroutine Plant Evolutions
Drawing 1E-0-4432AG       Control Room HVAC System VC - Part 7             Revision P
Drawing 1E-0-4432AG
Drawing 1E-0-4432AX       Control Room HVAC System VC - Part 22             Revision J
Control Room HVAC System VC - Part 7
Drawing 1E-0-4432AJ       Control Room HVAC System VC - Part 9             Revision T
Revision P
Drawing 1E-0-4432AM       Control Room HVAC System VC - Part 12             Revision J
Drawing 1E-0-4432AX
Drawing 1E-0-4432BD       Control Room HVAC System VC - Part 28             Revision E
Control Room HVAC System VC - Part 22
Drawing 1E-0-4432AL       Control Room HVAC Alarms System VC - Part 11     Revision H
Revision J
Drawing 1E-0-4432BF       Control Room HVAC System VC - Part 30             Revision Q
Drawing 1E-0-4432AJ
Drawing 1E-0-4432BH       Control Room HVAC System VC - Part 32             Revision B
Control Room HVAC System VC - Part 9
Drawing 1E-0-4432AW       Control Room HVAC System VC - Part 21             Revision F
Revision T
Drawing 1E-0-4432AU       Control Room HVAC System VC - Part 19             Revision E
Drawing 1E-0-4432AM
Drawing 1E-0-4432AN       Control Room HVAC System VC - Part 13             Revision N
Control Room HVAC System VC - Part 12
Drawing 1E-0-4432AH       Control Room HVAC System VC - Part 8             Revision P
Revision J
LFP-400-6                 Installation and Operation of Sipping Equipment     Revision 6
Drawing 1E-0-4432BD
LFP-400-1                 Fuel and Nuclear Component Movements Within         Revision 23
Control Room HVAC System VC - Part 28
Revision E
Drawing 1E-0-4432AL
Control Room HVAC Alarms System VC - Part 11
Revision H
Drawing 1E-0-4432BF
Control Room HVAC System VC - Part 30
Revision Q
Drawing 1E-0-4432BH
Control Room HVAC System VC - Part 32
Revision B
Drawing 1E-0-4432AW
Control Room HVAC System VC - Part 21
Revision F
Drawing 1E-0-4432AU
Control Room HVAC System VC - Part 19
Revision E
Drawing 1E-0-4432AN
Control Room HVAC System VC - Part 13
Revision N
Drawing 1E-0-4432AH
Control Room HVAC System VC - Part 8
Revision P
LFP-400-6
Installation and Operation of Sipping Equipment
Revision 6
LFP-400-1
Fuel and Nuclear Component Movements Within
the Reactor and Spent Fuel Storage Pools
the Reactor and Spent Fuel Storage Pools
Attachment
Revision 23
LST-2002-034               2B Diesel Generator Voltage Regulator PMT           Revision 0
 
CR 127728                 2B Voltage Regulator Very Erratic                   October 16,
LST-2002-034
2B Diesel Generator Voltage Regulator PMT
Revision 0
CR 127728
2B Voltage Regulator Very Erratic
October 16,
2002
2002
IPA Briefing Sheet         2B Diesel Generator Voltage Regulator PMT           Revision 0
IPA Briefing Sheet
WO 498416-01               Replace 2B Diesel Generator Voltage Regulator
2B Diesel Generator Voltage Regulator PMT
Vendor Manual J-157       Basler Diesel Generator Voltage Regulator
Revision 0
EC 339411                 Division 3 EDG Testing Assessment With Unit 2 in   Revision 1
WO 498416-01
Replace 2B Diesel Generator Voltage Regulator
Vendor Manual J-157
Basler Diesel Generator Voltage Regulator
EC 339411
Division 3 EDG Testing Assessment With Unit 2 in
Mode 1
Mode 1
EC 339388                 Failed Fuel Vacuum Sipping Equipment               Revision 0
Revision 1
EC 339388
Failed Fuel Vacuum Sipping Equipment
Revision 0
Operability Evaluations
Operability Evaluations
OE02-12           Unit 1 Turbine Control Valve (TCV) #1 Foreign Material   Revision 0
OE02-12
CR00120773         Unit 1 #1 Turbine Control Valve Strainer Plugged         August 27,
Unit 1 Turbine Control Valve (TCV) #1 Foreign Material
Revision 0
CR00120773
Unit 1 #1 Turbine Control Valve Strainer Plugged
August 27,
2002
2002
CR00120659         Prompt Investigation Report - Unit 1 #1 Turbine Control Revision 0
CR00120659
Prompt Investigation Report - Unit 1 #1 Turbine Control
Valve Strainer Plugged
Valve Strainer Plugged
EC339629           Unit 2 Safety Relief Valve (SRV) Piping Supports         Revision 0
Revision 0
EC339629
Unit 2 Safety Relief Valve (SRV) Piping Supports
Pinned
Pinned
Dwg M-900         Main Steam Piping                                       Sheet 19
Revision 0
Dwg M-900         Main Steam Piping                                       Sheet 10
Dwg M-900
Dwg M09-           Support MS04-2604C                                      Sheet 1
Main Steam Piping
Sheet 19
Dwg M-900
Main Steam Piping
Sheet 10
Dwg M09-
MS04-2604C
MS04-2604C
Dwg M09-          Support MS04-2605C                                      Sheet 1
Support MS04-2604C
Sheet 1
Dwg M09-
MS04-2605C
MS04-2605C
Dwg M-900         Main Steam Piping                                       Sheet 24
Support MS04-2605C
OE02-04           Unit 1 Main Steam Isolation Valve Limit Switches         Revision 1
Sheet 1
Dwg M-900
Main Steam Piping
Sheet 24
OE02-04
Unit 1 Main Steam Isolation Valve Limit Switches
Revision 1
Operator Workarounds
Operator Workarounds
Operator Workaround                                                       October 2, 2002
Operator Workaround
List
List
Operator Challenge 238       Emergency Diesel Generator Relief Valve     October 2, 2002
October 2, 2002
Operator Challenge 238
Emergency Diesel Generator Relief Valve
Sticking
Sticking
Attachment
October 2, 2002
 
Post-Maintenance Testing
Post-Maintenance Testing
WO00468913             Replace Cell #23 For Unit 2 Division 2 125
WO00468913
Replace Cell #23 For Unit 2 Division 2 125
VDC Battery
VDC Battery
LEP-DC-02             Individual or Multiple Battery Cell Performance Revision 12
LEP-DC-02
Individual or Multiple Battery Cell Performance
Test
Test
LEP-DC-03             Individual Battery Cell Modified Performance     Revision 0
Revision 12
LEP-DC-03
Individual Battery Cell Modified Performance
Test
Test
LEP-DC-04             Installation of Division 2 Batteries             Revision 12
Revision 0
CR L2000-04873         Station Battery Evaluation                       August 31, 2000
LEP-DC-04
CR 129595             Foreign Material Noted in Several Battery Cells October 30, 2002
Installation of Division 2 Batteries
LES-DC-101B           Division 2 125 Volt Battery Inspection for Units Revision 10
Revision 12
CR L2000-04873
Station Battery Evaluation
August 31, 2000
CR 129595
Foreign Material Noted in Several Battery Cells
October 30, 2002
LES-DC-101B
Division 2 125 Volt Battery Inspection for Units
and 2
and 2
Revision 10
Refueling and Outage Activities
Refueling and Outage Activities
LFP-400-1     Fuel and Nuclear Component Movements Within the         Revision 23
LFP-400-1
Fuel and Nuclear Component Movements Within the
Reactor and Spent Fuel Storage Pools
Reactor and Spent Fuel Storage Pools
L2P02 Shutdown Safety Management Program                 October 8, 2002
Revision 23
EC 339413     Evaluate the Use of Spent Fuel Pool Cooling as an       Revision 0
L2P02 Shutdown Safety Management Program
October 8, 2002
EC 339413
Evaluate the Use of Spent Fuel Pool Cooling as an
Alternate Decay Heat Removal Source for Shutdown
Alternate Decay Heat Removal Source for Shutdown
Safety
Safety
EC 339466     Unit 2 Spent Fuel Pool Cooling System Heat Removal       Revision 0
Revision 0
EC 339466
Unit 2 Spent Fuel Pool Cooling System Heat Removal
Capacity
Capacity
NF0200148     LaSalle Unit 2 Cycle 9A Design Basis Loading Plan       Revision 0
Revision 0
NF0200149     L2C9A Fuel Move Sequence to Replace Failed Fuel         Revision 0
NF0200148
LaSalle Unit 2 Cycle 9A Design Basis Loading Plan
Revision 0
NF0200149
L2C9A Fuel Move Sequence to Replace Failed Fuel
Assemblies and Beginning of Cycle Shutdown Margin
Assemblies and Beginning of Cycle Shutdown Margin
PORC 02-30     Plant Onsite Review Committee (PORC) Approval of         Revision 0
Revision 0
PORC 02-30
Plant Onsite Review Committee (PORC) Approval of
LaSalle Unit 2 Restart From L2P02
LaSalle Unit 2 Restart From L2P02
DCP           RPV Cavity Grating, Ladder, and Insulation Frame         October 21, 1999
Revision 0
9900210        Bolting Modifications
DCP
LGP-1-1       Normal Unit Startup                                     Revision 68
9900210
LOP-FW-04     Startup of Turbine Driven Reactor Feed Pump             Revision 36
RPV Cavity Grating, Ladder, and Insulation Frame
                (TDRFP)
Bolting Modifications
LOP-RL-01     Operation of the Reactor Water Level Control System     Revision 16
October 21, 1999
Attachment
LGP-1-1
Normal Unit Startup
Revision 68
LOP-FW-04
Startup of Turbine Driven Reactor Feed Pump
(TDRFP)
Revision 36
LOP-RL-01
Operation of the Reactor Water Level Control System
Revision 16
 
Surveillance Testing
Surveillance Testing
LOS-DG-M2             1A(2A) Diesel Generator Operability Test                 Revision 52
LOS-DG-M2
LTS-200-19, Att.       ECCS Cubicle Area Cooler Flowrate Test - Unit 2 HPCS     Revision 9
1A(2A) Diesel Generator Operability Test
B                      Area Cooler
Revision 52
M-1366 Sheet 2         Unit 2 Reactor Building Ventilation System - 694       Revision F
LTS-200-19, Att.
LTS-200-19, Att.       ECCS Cubicle Area Cooler Flowrate Test - Unit 2 HPCS     June 1, 2001
B
B                      Area Cooler
ECCS Cubicle Area Cooler Flowrate Test - Unit 2 HPCS
Area Cooler
Revision 9
M-1366 Sheet 2
Unit 2 Reactor Building Ventilation System - 694
Revision F
LTS-200-19, Att.
B
ECCS Cubicle Area Cooler Flowrate Test - Unit 2 HPCS
Area Cooler
June 1, 2001
Emergency Action Level and Emergency Plan Changes
Emergency Action Level and Emergency Plan Changes
LaSalle Station Annex to Exelons Standardized Emergency Plan             Revision 11
LaSalle Station Annex to Exelons Standardized Emergency Plan
LaSalle Station Annex to Exelons Standardized Emergency Plan             Revision 12
Revision 11
LaSalle Station Annex to Exelons Standardized Emergency Plan             Revision 13
LaSalle Station Annex to Exelons Standardized Emergency Plan
Revision 12
LaSalle Station Annex to Exelons Standardized Emergency Plan
Revision 13
Identification and Resolution of Problems
Identification and Resolution of Problems
HU-AA-101       Human Performance Tools & Verification Practices           October 31, 2001
HU-AA-101
HU-AA-         Pre-Job, Heightened Level of Awareness, Infrequent Plant   July 29, 2002
Human Performance Tools & Verification Practices
211            Activity & Post Job Briefings
October 31, 2001
Exelon Nuclear Human Performance Baseline                 September 23,
HU-AA-
Assessment                                                2002
211
Exelon Nuclear Human Performance Baseline                 March 14, 2002
Pre-Job, Heightened Level of Awareness, Infrequent Plant
Activity & Post Job Briefings
July 29, 2002
Exelon Nuclear Human Performance Baseline
Assessment
September 23,
2002
Exelon Nuclear Human Performance Baseline
Assessment
Assessment
LaSalle Station Human Performance Review - July 2002       August 28, 2002
March 14, 2002
LaSalle Station Human Performance Review - August         October 4, 2002
LaSalle Station Human Performance Review - July 2002
August 28, 2002
LaSalle Station Human Performance Review - August
2002
2002
October 4, 2002
Event Followup
Event Followup
CR 132370               Powerplex Indication of Entry Into     November 19, 2001
CR 132370
Powerplex Indication of Entry Into
Region B - Extent of Condition
Region B - Extent of Condition
Prompt                   Unplanned Entry Into Region B of the
November 19, 2001
Investigation Report    Power-to-Flow Map
Prompt
CR 103964               Unplanned Entry Into Region B of the   November 10, 2002
Investigation Report
Unplanned Entry Into Region B of the
Power-to-Flow Map
CR 103964
Unplanned Entry Into Region B of the
Power-to-Flow Map
Power-to-Flow Map
Attachment
November 10, 2002
Root Cause Report     Unplanned Entry Into Region B of the
 
Root Cause Report
Unplanned Entry Into Region B of the
Power-to-Flow Map
Power-to-Flow Map
LOA-RR-201             LaSalle County Station Power-to-Flow     Revision 0
LOA-RR-201
A          Map
A
Reactivity Maneuver   LaSalle Unit 2 - Withdrawal of Array     Cycle 9A
LaSalle County Station Power-to-Flow
(ReMa) Form            10B Rods
Map
LAP-100-35             Reactivity Management Controls           Revision 12
Revision 0
Reactivity Maneuver
(ReMa) Form
LaSalle Unit 2 - Withdrawal of Array
10B Rods
Cycle 9A
LAP-100-35
Reactivity Management Controls
Revision 12
Access Controls For Radiologically Significant Areas
Access Controls For Radiologically Significant Areas
RP-AA-222       Methods For Estimating Internal Exposure From In       Revision 1
RP-AA-222
Methods For Estimating Internal Exposure From In
Vivo and In Vitro Bioassay Data
Vivo and In Vitro Bioassay Data
RP-AA-350       Assessment of Radiologically Contaminated               Revision 0
Revision 1
RP-AA-350
Assessment of Radiologically Contaminated
Personnel
Personnel
RP-AA-400       ALARA Program                                           Revision 2
Revision 0
RP-AA-401       Operational ALARA Planning and Controls                 Revision 2
RP-AA-400
RP-AA-605       10 CFR 61 Program                                       Revision 0
ALARA Program
CR 130190       Individual Not Following Radiologically Controlled     November 4, 2002
Revision 2
RP-AA-401
Operational ALARA Planning and Controls
Revision 2
RP-AA-605
CFR 61 Program
Revision 0
CR 130190
Individual Not Following Radiologically Controlled
Area Egress Procedure
Area Egress Procedure
CR 130198       Observed Individuals Deconning Themselves               November 2, 2002
November 4, 2002
CR 130198
Observed Individuals Deconning Themselves
Without Radiation Protection Technician Help
Without Radiation Protection Technician Help
CR 130270       Individual Not Monitoring Properly at Radiologically   November 4, 2002
November 2, 2002
CR 130270
Individual Not Monitoring Properly at Radiologically
Controlled Area Egress
Controlled Area Egress
CR 130412       Contamination of Unit 2 820 Reactor Building           November 6, 2002
November 4, 2002
CR 130412
Contamination of Unit 2 820 Reactor Building
During Backwash of 2B Reactor Water Cleanup
During Backwash of 2B Reactor Water Cleanup
Filter
Filter
November 6, 2002
Radioactive Material Processing and Transportation
Radioactive Material Processing and Transportation
RW-AA-100           Process Control Program for Radioactive Wastes         Revision 2
RW-AA-100
RP-AA-600           Radioactive Material/Waste Shipments                   Revision 5
Process Control Program for Radioactive Wastes
LAP-100-27         Guidelines for Radioactive Waste/Material             Revision 22
Revision 2
RP-AA-600
Radioactive Material/Waste Shipments
Revision 5
LAP-100-27
Guidelines for Radioactive Waste/Material
Shipments
Shipments
LOP-WX-26           Dry Active Waste Sorting For Radioactive Waste         Revision 0
Revision 22
LOP-WX-26
Dry Active Waste Sorting For Radioactive Waste
Packaging and Compaction
Packaging and Compaction
Attachment
Revision 0
LOP-WX-29     Loading of Radioactive Waste Shipments Using     Revision 5
 
LOP-WX-29
Loading of Radioactive Waste Shipments Using
High Integrity Containers
High Integrity Containers
Report 01-071 2000 Annual Radioactive Effluent Report and       April 30, 2001
Revision 5
Report 01-071
2000 Annual Radioactive Effluent Report and
Triannual Chlorine Survey Report
Triannual Chlorine Survey Report
NOA-LS-01-3Q Nuclear Oversight Continuous Assessment Report   October 25, 2001
April 30, 2001
NOA-LS-01-3Q
Nuclear Oversight Continuous Assessment Report
LaSalle Station July-September, 2001
LaSalle Station July-September, 2001
Memorandum   LaSalle Station Focus Area Self Assessment on     October 21, 2002
October 25, 2001
Memorandum
LaSalle Station Focus Area Self Assessment on
Radioactive Material Shipping
Radioactive Material Shipping
Memorandum   Focus Area Self-Assessment on Radwaste Material   July 2, 2002
October 21, 2002
Memorandum
Focus Area Self-Assessment on Radwaste Material
Condition/Equipment Reliability
Condition/Equipment Reliability
CR 00082954   Inadequate Planning for Rad Material Shipment     June 25, 2002
July 2, 2002
              (SRVs)
CR 00082954
CR 00085525   Inadequate Pre-Planning for CRD Shipment         December 5, 2001
Inadequate Planning for Rad Material Shipment
CR 00091013   Failure to Follow the CRD Shipping Schedule       January 17, 2002
(SRVs)
CR 00092513   Inadequate Communication Resulted in Delay of     January 25, 2002
June 25, 2002
CR 00085525
Inadequate Pre-Planning for CRD Shipment
December 5, 2001
CR 00091013
Failure to Follow the CRD Shipping Schedule
January 17, 2002
CR 00092513
Inadequate Communication Resulted in Delay of
Radioactive Material Shipment
Radioactive Material Shipment
CR 00094766   Inadequate Planning for Radioactive Material     February 11, 2002
January 25, 2002
CR 00094766
Inadequate Planning for Radioactive Material
Shipment
Shipment
CR 00098690   Shipping/Shipper Qualifications Not Tracked Using March 11, 2002
February 11, 2002
CR 00098690
Shipping/Shipper Qualifications Not Tracked Using
PQD
PQD
CR 00114692   Delays in Electro-Hydraulic Control Fluid Sample July 8, 2002
March 11, 2002
CR 00114692
Delays in Electro-Hydraulic Control Fluid Sample
Transfer
Transfer
CR 00109212   PQD Implementation-DTC Concerns                   November 11,
July 8, 2002
CR 00109212
PQD Implementation-DTC Concerns
November 11,
2001
2001
CR 00111958   RW Solids Manager Has Not Completed               June 14, 2002
CR 00111958
RW Solids Manager Has Not Completed
Qualification Cards for Shipping
Qualification Cards for Shipping
CR 00112133   Qualifications Tracking Deficiency/Focused Area   February 20, 2002
June 14, 2002
CR 00112133
Qualifications Tracking Deficiency/Focused Area
Self-Assessment Documentation Condition Report
Self-Assessment Documentation Condition Report
              #1
#1
CR 00123259   Inadequate Drum Sealing Ring for Department of   September 17,
February 20, 2002
Transportation 7A Type A Container               2002
CR 00123259
CR 00127988   Radioactive Waste Manifest Software Error         October 15, 2002
Inadequate Drum Sealing Ring for Department of
CR 00129968   Unplanned Radioactive Material Shipment           October 31, 2002
Transportation 7A Type A Container
CR 00113516   Inadequate Number of 4-Digit Orange Panels for   June 25, 2002
September 17,
2002
CR 00127988
Radioactive Waste Manifest Software Error
October 15, 2002
CR 00129968
Unplanned Radioactive Material Shipment
October 31, 2002
CR 00113516
Inadequate Number of 4-Digit Orange Panels for
Radioactive Material Shipment
Radioactive Material Shipment
Attachment
June 25, 2002
CR 00114141 Radwaste Shipment Issue                         June 28, 2002
 
CR 00118691 Rad Waste Shipment Arrived at Wrong Destination August 8, 2002
CR 00114141
CR L2001-   ALPS Area of Radwaste Truckbay Found           May 12, 2001
Radwaste Shipment Issue
2870      Contaminated
June 28, 2002
CR L2001-   Radwaste Shipping Cask Gasket Failure          June 5, 2001
CR 00118691
Rad Waste Shipment Arrived at Wrong Destination
August 8, 2002
CR L2001-
2870
ALPS Area of Radwaste Truckbay Found
Contaminated
May 12, 2001
CR L2001-
295
295
CR L2001-  Radwaste Discussion of Byron Event              June 22, 2001
Radwaste Shipping Cask Gasket Failure
June 5, 2001
CR L2001-
03728
03728
CR L2001-   Identified Safety Issue                        August 23, 2001
Radwaste Discussion of Byron Event
June 22, 2001
CR L2001-
04878
04878
CR 00113070 2A Phase Separator Transfer Loop Problems       June 24, 2002
Identified Safety Issue
CR 00130752 NRC Identified Radwaste IRSF Log Procedure     November 6,
August 23, 2001
Adherence Issue                                2002;
CR 00113070
LW01-13     Radwaste Shipment Documentation Package
2A Phase Separator Transfer Loop Problems
LW01-27     Radwaste Shipment Documentation Package
June 24, 2002
LW01-28     Radwaste Shipment Documentation Package
CR 00130752
LW02-08     Radwaste Shipment Documentation Package
NRC Identified Radwaste IRSF Log Procedure
LW02-16     Radwaste Shipment Documentation Package
Adherence Issue
LW02-17     Radwaste Shipment Documentation Package
November 6,
Attachment
2002;
LW01-13
Radwaste Shipment Documentation Package
LW01-27
Radwaste Shipment Documentation Package
LW01-28
Radwaste Shipment Documentation Package
LW02-08
Radwaste Shipment Documentation Package
LW02-16
Radwaste Shipment Documentation Package
LW02-17
Radwaste Shipment Documentation Package
}}
}}

Latest revision as of 13:00, 16 January 2025

IR 05000373-02-006, IR 05000374-02-006, on 10/01 - 12/28/2002, Exelon Generation Company, LLC; LaSalle County Station, Units 1 & 2. Event Followup
ML030280404
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/24/2003
From: Burgess B
NRC/RGN-III/DRP/RPB2
To: Skolds J
Exelon Generation Co, Exelon Nuclear
References
IR-02-006
Download: ML030280404 (38)


Text

January 24, 2003

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2 NRC INTEGRATED INSPECTION REPORT 50-373/02-06; 50-374/02-06

Dear Mr. Skolds:

On December 28, 2002, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your LaSalle County Station, Units 1 and 2. The enclosed report documents the inspection findings which were discussed on January 3, 2003, with Mr. G. Barnes and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Since the terrorist attacks on September 11, 2001, the NRC has issued two Orders (dated February 25, 2002, and January 7, 2003) and several threat advisories to licensees of commercial power reactors to strengthen licensee capabilities, improve security force readiness, and enhance access authorization. The NRC also issued Temporary Instruction 2515/148 on August 28, 2002, that provided guidance to inspectors to audit and inspect licensee implementation of the interim compensatory measures (ICMs) required by the February 25th Order. Phase 1 of TI 2515/148 was completed at all commercial nuclear power plants during calendar year (CY) 02, and the remaining inspections are scheduled for completion in CY 03. Additionally, table-top security drills were conducted at several licensees to evaluate the impact of expanded adversary characteristics and the ICMs on licensee protection and mitigative strategies. Information gained and discrepancies identified during the audits and drills were reviewed and dispositioned by the Office of Nuclear Security and Incident Response. For CY 03, the NRC will continue to monitor overall safeguards and security controls, conduct inspections, and resume force-on-force exercises at selected power plants.

Should threat conditions change, the NRC may issue additional Orders, advisories, and temporary instructions to ensure adequate safety is being maintained at all commercial power reactors.

Based on the results of this inspection, one self-revealing finding of very low safety significance (Green) was identified which was determined to involve a violation of NRC requirements.

However, because of the very low safety significance and because it was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV) consistent with Section VI.A of the NRC Enforcement Policy. Additionally, one licensee identified violation is listed in Section 4OA7 of this report. If you contest any NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 801 Warrenville Road, Lisle, IL 60532-4351; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector Office at LaSalle County Station.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Bruce L. Burgess, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

Inspection Report 50-373/02-06;

50-374/02-06 See Attached Distribution DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030280404.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME GWright/trn BBurgess DATE 01/23/03 01/24/03 OFFICIAL RECORD COPY

REGION III==

Docket Nos:

50-373; 50-374 License Nos:

NPF-11; NPF-18 Report No:

50-373/02-06; 50-374/02-06 Licensee:

Exelon Generation Company Facility:

LaSalle County Station, Units 1 and 2 Location:

2601 N. 21st Road Marseilles, IL 61341 Dates:

October 1 through December 28, 2002 Inspectors:

E. Duncan, Senior Resident Inspector D. Eskins, Resident Inspector D. Jones, Reactor Engineer M. Mitchell, Radiation Specialist W. Slawinski, Senior Radiation Specialist D. Wrona, Reactor Engineer J. Yesinowski, Illinois Department of Nuclear Safety Approved by:

Bruce L. Burgess, Chief Branch 2 Division of Reactor Projects

Enclosure

SUMMARY OF FINDINGS

IR 05000373-02-06, IR 05000374-02-06; Exelon; on 10/01-12/28/02; LaSalle County Station;

Units 1 & 2. Event Followup.

This report covers a 3-month period of baseline resident inspection and announced baseline inspections on access control, radioactive material processing and shipping, and inservice inspection. The inspection was conducted by the LaSalle resident inspectors and Division of Reactor Safety (DRS) specialist inspectors. One Green finding was identified which was the subject of a Non-Cited Violation. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609 Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.

A.

Inspector-Identified and Self-Revealing Findings

Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity, and

Emergency Preparedness

Green.

Licensee personnel inadvertently placed Unit 2 in a prohibited region of the power-to-flow map during a control rod maneuver on November 10, 2002. Entry into this region increased the likelihood of power oscillations.

The issue was of very low safety significance since no actual power oscillations occurred and the region was exited promptly after the condition was identified. A violation of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, was identified since this condition had occurred previously, but had not been identified.

(Section 4OA3)

B.

Licensee-Identified Violation One violation of very low safety significance which was identified by the licensee has been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program. This violation and corrective action tracking number is listed in Section 4OA7 of this report.

REPORT DETAILS

Summary of Plant Status

Unit 1 operated at or near full power until November 4, when power was reduced to about 77 percent to repair an electro-hydraulic control (EHC) leak on the #1 turbine stop valve emergency trip system oil line. Repairs were completed and Unit 1 was returned to full power on November 5, 2002. Unit 1 operated at full power until November 18 when power was reduced to about 77 percent in response to a feedwater heater transient and then reduced to about 70 percent the next day in response to a second transient. Repairs were completed and Unit 1 was returned to full power on November 21, 2002. Unit 1 operated at or near full power for the remainder of the inspection period, except for power reductions to perform pre-planned maintenance and surveillance testing activities, and rod pattern adjustments.

Unit 2 operated at or near full power until October 25, 2002 when the unit was shut down to accomplish LaSalle Maintenance Outage L2P02. All scheduled work was completed and Unit 2 was restarted on November 2, 2002. The unit was shut down shortly after going critical due to problems encountered while placing the turning gear on the main turbine. The turning gear problem was repaired, Unit 2 was restarted and synchronized to the grid on November 5, and returned to full power on November 11. Unit 2 operated at or near full power for the remainder of the inspection period, except for power reductions to perform pre-planned maintenance and surveillance testing activities, and rod pattern adjustments.

REACTOR SAFETY

Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity, and

Emergency Preparedness

1R01 Adverse Weather Protection

a. Inspection Scope

The inspectors reviewed the following systems to verify that the design features and licensee procedures protecting Unit 1 and Unit 2 systems from the effects of low temperature during the winter season were adequate. The inspectors focused on the following:

Condensate Storage Tank (CST) heaters and heat tracing; Control Room Ventilation (VC) heating; Lake Screen House (LSH) heating; Emergency Diesel Generator (EDG) room heating; Auxiliary Electric Equipment Room (AEER) Ventilation (VE) heating; and Essential Switchgear Room (VX) heating.

For these areas, the inspectors reviewed LaSalle Operating Surveillance (LOS) ZZ-A2, Preparation for Winter/Summer Operation, Revision 24. The inspectors walked down portions of the systems listed above to verify that the systems had been properly aligned for cold weather operation.

b. Findings

No findings of significance were identified.

1R04 Equipment Alignment

a. Inspection Scope

The inspectors performed partial walkdowns of accessible portions of trains of risk-significant mitigating systems during times when the trains were of increased importance due to the redundant trains or other related equipment being unavailable.

The inspectors utilized the valve and electric breaker checklists listed at the end of this report to verify that the components were properly positioned and that support systems were lined up as needed. The inspectors also examined the material condition of the components and observed operating parameters of equipment to verify that there were no obvious deficiencies. The inspectors reviewed outstanding work orders and condition reports (CRs) associated with the trains to verify that those documents did not reveal issues that could affect train function. The inspectors used the information in the appropriate sections of the Updated Final Safety Analysis Report (UFSAR) to determine the functional requirements of the systems.

The inspectors verified the alignment of the following trains with the Unit 2 A RHR sub-system unavailable due to planned maintenance:

Unit 2 B and C Residual Heat Removal (RHR) sub-systems; Unit 2 B Residual Heat Removal Service Water (RHRSW) sub-system; and Unit 2 High Pressure Core Spray (HPCS) system on December 2, 2002.

b. Findings

No findings of significance were identified.

1R08 Inservice Inspection (ISI) Activities

a. Inspection Scope

The inspectors conducted a review of the licensees inservice inspection program for monitoring degradation of the reactor coolant system boundary and the risk significant piping system boundaries. Specifically, the inspectors conducted a record review of the following examinations performed during the Unit 1 Refueling Outage during January 10 through February 4, 2002 (L1R09):

Weld Number System Nondestructive Testing Type 1-NIR-2B Reactor Pressure Vessel (RPV)

Ultrasonic 1-NIR-2D Reactor Pressure Vessel (RPV)

Ultrasonic 1FW-1001-71A Feedwater (FW)

Ultrasonic/Magnetic Particle IRI-1001-05 Reactor Core Isolation Cooling Ultrasonic IRR-1055-13 Reactor Recirculation (RR)

Ultrasonic/Liquid Penetrant These examinations were evaluated for compliance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements. The inspectors also reviewed inservice inspection procedures, personnel certifications, and NIS-2 forms for Code repairs performed during the Unit 1 outage to confirm that ASME Code requirements were met.

The inspectors also reviewed a sample of inservice inspection related problems documented in the licensees corrective action program, to assess conformance with 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requirements. In addition, the inspectors verified that operating experience was correctly assessed for applicability by the ISI group.

b. Findings

No findings of significance were identified.

1R11 Licensed Operator Requalification

a. Inspection Scope

On October 10, 2002, the inspectors observed two licensed operator re-qualification training scenario:

ESG50, CRD [Control Rod Drive] FCV [Flow Control Valve] Setpoint Failure/TDRFP [Turbine-Driven Reactor Feedwater Pump] Turbine Lube Oil Leak/Heater String Isolation/Loss of Stator Cooling/5-Rod ATWS [Anticipated Transient Without Scram]; and ESG47, RWLCS [Reactor Water Level Control System] Trouble/Loss of RPS

[Reactor Protection System] A/APRM [Average Power Range Monitor] C Failure/Loss of Both RR [Reactor Recirculation] Pumps/Failure to Automatic Scram/K SRV [Safety Relief Valve] Leakage/RHR [Residual Heat Removal]

Heat Exchanger Tube Rupture.

The inspectors observed operator actions to assess crew performance in terms of clarity and formality of communication; the ability to take timely action in the safe direction; the prioritizing, interpreting, and verifying of alarms; the correct use and implementation of procedures, including alarm response procedures; timely control board operation and manipulation, including high-risk operator actions; the oversight and direction by the shift manager, including the ability to identify and implement appropriate Technical Specification actions such as reporting and emergency plan actions and notifications; and the group dynamics.

b. Findings

No findings of significance were identified.

1R13 Maintenance Risk Assessment and Emergent Work Evaluation

a. Inspection Scope

The inspectors reviewed the licensees evaluation of plant risk, scheduling, configuration control, and performance of maintenance associated with planned and emergent work activities to verify that scheduled and emergent work activities were adequately managed. In particular, the inspectors reviewed the licensees program for conducting maintenance risk safety assessments and verified that the licensees planning, risk management tools, and the assessment and management of online risk was adequate.

The inspectors also assessed the licensee actions to address increased online risk during these periods, such as establishing compensatory actions, minimizing the duration of the activity, obtaining appropriate management approval, and informing appropriate plant staff, were accomplished when online risk was increased due to maintenance on risk-significant structures, systems and components (SSCs). The following specific activities were reviewed:

  • Maintenance risk assessment for work planned during the week of September 29, 2002.
  • Maintenance risk assessment for work planned during the week of October 6, 2002.
  • Maintenance risk assessment for work planned during the week of October 13, 2002.
  • Maintenance risk assessment for work planned during the week of November 3, 2002.
  • Maintenance risk assessment for work planned during the week of December 8, 2002.

b. Findings

No findings of significance were identified.

1R14 Non-Routine Evolutions

.1 Unexpected Loss of Voltage Regulating Transformer 2APD7E

a. Inspection Scope

The inspectors reviewed the stations response to an unexpected loss of voltage regulating transformer 2APD7E on October 8, 2002, which rendered the B main control room and auxiliary electrical equipment room ventilation (VC/VE) systems inoperable. This transformer failure was identified by a non-licensed operator on routine rounds who noted a strong acrid odor in the vicinity of the transformer panel. In particular, the inspectors verified that operations response was appropriate for the event and in accordance with plant procedures. The inspectors reviewed the licensees plans, procedures, briefings, and contingency plans associated with the restoration of the transformer. Relevant schematics were also reviewed to verify that all equipment impacted by the loss of the transformer had been properly identified.

b. Findings

No findings of significance were identified.

.2 Unit 2B Emergency Diesel Generator (EDG) Voltage Regulator Replacement

a. Inspection Scope

The inspectors reviewed the stations response to an unexpected failure of the 2B EDG voltage regulator identified during High Pressure Core Spray (HPCS) system post-maintenance testing. The inspectors reviewed the activities associated with the voltage regulator replacement, establishing initial regulator settings, the Infrequently Performed Activity (IPA) briefing, and post-maintenance testing conducted in accordance with LaSalle Special Test (LST) 2002-034, 2B Diesel Generator Voltage Regulator PMT [Post-Maintenance Test], Revision 0.

b. Findings

No findings of significance were identified.

.3 Unit 2 Fuel Sipping

The inspectors observed Unit 2 fuel sipping operations conducted to identify leaking fuel on Unit 2. In particular, the inspectors verified that the sipping equipment was installed and operated in accordance with LaSalle Fuel Procedure (LFP) 400-6, Installation and Operation of Sipping Equipment.

b. Findings

No findings of significance were identified.

1R15 Operability Evaluations

a. Inspection Scope

The inspectors reviewed selected Operability Evaluations (OEs) and Engineering Changes (ECs) of degraded and non-conforming conditions affecting mitigating systems and barrier integrity to ensure that operability was properly justified and the component or system remained available, such that no unrecognized increase in risk had occurred.

The following evaluations were reviewed:

  • OE02-12 Unit 1 Turbine Control Valve (TCV) #1 Foreign Material

b. Findings

No findings of significance were identified.

1R16 Operator Workarounds (OWAs)

.1 Routine Operator Workaround Review

a. Inspection Scope

The inspectors reviewed Operator Challenges (OCs) to identify any potentially adverse impact on the function of mitigating systems or the ability to implement an abnormal or emergency operating procedure. The following item was reviewed:

b. Findings

No findings of significance were identified.

.2 Operator Workaround Cumulative Effects Assessment

a. Inspection Scope

The inspectors reviewed the cumulative effects of all documented OWAs and OCs on reliability, availability, and potential for mis-operation of a system; the cumulative effects of operator workarounds that could affect multiple mitigating systems; and the ability of operators to respond in a correct and timely manner to plant transients and accidents.

b. Findings

No findings of significance were identified.

1R19 Post-Maintenance Testing

a. Inspection Scope

The inspectors reviewed and observed the following post-maintenance testing activities involving risk significant equipment associated with the following work orders (WOs):

  • WO 00468913 Replace Unit 2 Division 2 125 Volt Direct Current (VDC)

Battery Cell 9 and Battery Cell 23 The inspectors observed post-maintenance testing and reviewed the test procedure to verify that the test was adequate for the scope of the maintenance work which had been performed and that the testing acceptance criteria was clear and demonstrated operational readiness consistent with the design and licensing basis documents. The observations and reviews were also conducted to verify that the impact of the testing had been properly characterized during the pre-job briefing; the test was performed as written and all testing prerequisites were satisfied; and that the test data was complete, appropriately verified, and met the requirements of the testing procedure. The inspectors also observed or reviewed post testing conditions to verify that the test equipment was removed, and that the equipment was returned to a condition in which it could perform its safety function.

b. Findings

No findings of significance were identified.

==1R20 Refueling and Outage Activities

a. Inspection Scope

==

The inspectors observed the performance of LaSalle Unit 2 Maintenance Outage L2P02 and evaluated licensee outage activities to ensure that the licensee considered risk in developing the outage schedule; adhered to administrative risk reduction methodologies developed to control plant configuration; developed mitigation strategies for losses of key safety functions; and adhered to the operating license and Technical Specification requirements that ensured defense-in-depth. The following specific outage-related activities were accomplished:

  • Outage Plan Review The inspectors reviewed the licensees outage control plan to verify that the licensee had appropriately considered risk, industry experience, and previous site-specific problems. The inspectors also confirmed that contingency plans for losses of key safety functions had been established.
  • Monitoring of Shutdown Activities The inspectors observed the Unit 2 shutdown to Maintenance Outage L2P02 to verify that the plant was operated in accordance with regulatory requirements and plant procedures, in particular, that cool-down restrictions were followed.
  • Licensee Control of Outage Activities The inspectors reviewed the licensees management of equipment during the outage to ensure that a defense-in-depth commensurate with the outage risk plan for key safety functions and applicable Technical Specifications was maintained. The reviews also served to verified that outage activities were appropriately managed. In particular, out-of-service activities were reviewed to ensure that tags were properly hung to support the out-of-service. Reactor coolant system instrumentation was verified to be configured to provide adequate indication of reactor vessel pressure, temperature, and level. In addition, the inspectors routinely observed decay heat removal system parameters to verify that decay heat removal systems were functioning properly.

The inspectors monitored flow paths, configurations, and alternative means for inventory addition and decay heat removal to ensure they were consistent with the outage risk plan. The inspectors reviewed the licensees control of reactivity and secondary containment to ensure they were in accordance with Technical Specifications.

  • Refueling Activities The inspectors observed fuel handling operations to verify they were conducted in accordance with Technical Specifications and approved procedures, and that the location of fuel assemblies was tracked from core offload through core reload.
  • Monitoring of Heatup and Startup Activities The inspectors reviewed Technical Specifications, license conditions, and other prerequisites, commitments, and administrative procedure prerequisites for mode changes to ensure they were met prior to changing modes or plant configurations. The inspectors conducted a walkdown of containment prior to restart to verify that debris had not been left which could adversely impact the Emergency Core Cooling System (ECCS) suction strainers.
  • Identification and Resolution of Problems The inspectors reviewed the licensees identification of problems related to refueling outage activities to ensure they were identified at an appropriate threshold and that they were entered into the corrective action program.

b. Findings

No findings of significance were identified.

1R22 Surveillance Testing

a. Inspection Scope

The inspectors observed surveillance testing on risk-significant equipment to verify that the SSCs selected were capable of performing their intended safety function and that the surveillance tests satisfied the requirements contained in Technical Specifications, the Updated Final Safety Analysis Report (UFSAR), and licensee procedures. The surveillance testing observations were also conducted to verify that the test was adequate to demonstrate operational readiness consistent with design and licensing basis documents, and that the testing acceptance criteria was clear. The reviews and observations also served to verify that the impact of the testing had been properly characterized during the pre-job briefing; the test was performed as written and all testing prerequisites were satisfied; the test data was complete, appropriately verified, and met the requirements of the testing procedure; and that the test equipment range and accuracy was consistent with the application, and the calibration was current.

Observations following the completion of the test were used to verify that the test equipment was removed, and that the equipment was returned to a condition in which it could perform its safety function.

The following surveillance testing activities were observed:

  • LOS-DG-M2, Attachment 2A, 2A Diesel Generator Operability Test - Idle Start
  • LaSalle Technical Surveillance (LTS) 200-19, Attachment B, ECCS [Emergency Core Cooling System] Cubicle Area Cooler Flowrate Test - HPCS [High Pressure Core Spray] Pump Room Area Cooler Fan 2VY02C

b. Findings

Introduction One Unresolved Item (URI) was identified associated with the identification of screws missing from the Unit 2 Division 3 High Pressure Core Spray (HPCS) system area cooler, the Unit 2 Division 2 B/C Residual Heat Removal (RHR) system area cooler, and the Unit 1 Division 2 B/C RHR system area cooler, which potentially impacted the ability of these systems to perform their safety function.

Description On November 21, 2002, the inspectors observed LTS 200-19, ECCS [Emergency Core Cooling System] Cubicle Area Cooler Flowrate Test, Attachment B, Test HPCS [High Pressure Core Spray] Pump Room Area Cooler Fan 2VY02C. This surveillance consisted of a visual inspection of the Unit 2 HPCS area cooler with the system shut down followed by a flow rate test with the system running.

Following the completion of the visual inspection portion of the surveillance by engineering personnel, the inspectors independently reviewed the material condition of the area cooler. During that review, the inspectors identified numerous fasteners (screws) missing from the cooler internal framework. On November 22, engineering personnel determined that the function of these fasteners was to attach the cooler tubesheet to the cooler frame to prevent damage to the cooler during a seismic event.

Due to the large number of missing fasteners (33 of 48), the Unit 2 HPCS system was declared inoperable and an Emergency Notification System (ENS) notification was made in accordance with 10 CFR 50.72 for a loss of an accident mitigation function.

The fasteners were installed, followed by an extent of condition review on November 23.

That review identified similar issues with the Unit 2 Division 2 area cooler (no screws installed) and the Unit 1 Division 2 area cooler (15 of 48 screws missing). These coolers were promptly repaired and a supplement to the original ENS notification was made.

To determine whether the affected area coolers would have been actually impacted in the event of a design basis earthquake, the licensee performed a more in-depth engineering analysis than that which was accomplished as part of their prompt operability review. At the end of the inspection period, the results of this analysis were still pending. As a result, this issue is considered an Unresolved Item (50-373/0206-01(DRP); 50-374/0206-01(DRP)) pending a review of these engineering analysis results.

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

The inspector reviewed Revisions 11, 12, and 13 of the LaSalle Station Annex to Exelons Standardized Emergency Plan to determine whether changes identified reduced the effectiveness of the licensees emergency planning, pending onsite inspection of the implementation of these changes.

b. Findings

No findings of significance were identified.

RADIATION SAFETY

Cornerstone: Occupational Radiation Safety

2OS1 Access Control to Radiologically Significant Areas (71121.01)

.1 Plant Walkdowns

a. Inspection Scope

The inspectors reviewed the radiological conditions of work areas within radiation areas and high radiation areas in the Auxiliary and Radwaste Buildings. The inspectors performed walkdowns and reviewed licensee controls to determine if the controls (i.e., surveys, postings, and barricades) were adequate to meet the requirements of 10 CFR Part 20 and the licensees Technical Specifications. Additionally, the inspectors reviewed the licensees practices during the last refueling outage for controlling access to contaminated areas and for declaring airborne contamination areas to determine if controls were acceptable.

b. Findings

No findings of significance were identified.

Cornerstone: Public Radiation Safety

2PS2 Radioactive Material Processing and Transportation (71122.02)

.1 Walkdown of Radioactive Waste Systems

a. Inspection Scope

The inspectors reviewed the liquid and solid radioactive waste system description in the UFSAR and the most recent information regarding the types and amounts of radioactive waste generated and disposed. The inspectors performed walkdowns of the liquid and solid radwaste processing systems to verify that the systems agreed with the descriptions in the UFSAR and the Process Control Program, and to assess the material condition and operability of the systems. The inspectors reviewed the current processes for transferring waste resins into transportation containers to determine if appropriate waste stream mixing and sampling procedures were utilized. The inspectors also reviewed the methodologies for waste concentration averaging to determine if representative samples of the waste product were provided for the purposes of waste classification in accordance with 10 CFR 61.55. During this inspection, the licensee was not conducting waste processing.

b. Findings

No findings of significance were identified.

.2 Waste Characterization and Classification

a. Inspection Scope

The inspectors reviewed the licensees radiochemical sample analysis results for each of the licensees waste streams, including dry active waste, resins, and filters. The inspectors also reviewed the licensees use of scaling factors to quantify difficult-to-measure radionuclides (e.g., pure alpha or beta emitting radionuclides). The reviews were conducted to verify that the licensees program assured compliance with 10 CFR 61.55 and 10 CFR 61.56, as required by Appendix G of 10 CFR Part 20. The inspectors also reviewed the licensees waste characterization and classification program to ensure that the waste stream composition data accounted for changing operational parameters and thus remained valid between the annual sample analysis updates.

b. Findings

No findings of significance were identified.

.3 Transportation Records

a. Inspection Scope

The inspectors reviewed six non-exempted package shipment manifests completed in years 2001 and 2002 to verify compliance with NRC and Department of Transportation requirements (i.e., 10 CFR Parts 20 and 71 and 49 CFR Parts 172 and 173). The licensee did not have any non-exempt package preparation or shipping underway during the inspection.

b. Findings

No findings of significance were identified.

.4 Identification and Resolution of Problems

a. Inspection Scope

The inspectors reviewed the most recent Nuclear Oversight Quality Assurance audit of the Radioactive Waste and Transportation Programs, along with departmental Focused Area Self-Assessments of the Radioactive Waste and Transportation Programs to evaluate the effectiveness of the self-assessment process to identify, characterize, and prioritize problems. The inspectors also reviewed corrective action documentation to verify that previous radioactive waste and radioactive materials transportation related issues were adequately addressed. The inspectors also selectively reviewed year 2001 and 2002 Condition Reports (CRs) that addressed radioactive waste and radioactive materials transportation program deficiencies, to verify that the licensee had effectively implemented the corrective action program.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES

4OA2 Identification and Resolution of Problems

a. Inspection Scope

During this inspection, the inspectors reviewed corrective actions associated with the following issue to verify the effectiveness of the licensees corrective actions:

  • Adverse Trend in Human Performance Errors Attributes considered during the review included the following:
  • Complete and accurate identification of the problem in a timely manner commensurate with its significance and ease of discovery.
  • Evaluations and disposition of performance issues associated with maintenance effectiveness.
  • Consideration of extent of condition, generic implications, common cause, and previous occurrences.
  • Classification and prioritization of the resolution of the problem commensurate with its safety significance.
  • Identification of root cause and contributing causes of the problem.
  • Identification of corrective actions which are appropriately focused to correct the problem.
  • Completion of corrective actions in a timely manner commensurate with the safety significance of the issue.

b. Findings

No findings of significance were identified.

4OA3 Event Followup

a. Inspection Scope

The inspector reviewed the circumstances surrounding an inadvertent entry into Region B of the power-to-flow map which occurred during a Unit 2 rod pattern adjustment on November 10, 2002.

b. Findings

Introduction One Green finding and an associated violation of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, was identified following an inadvertent entry into Region B of the Unit 2 power-to-flow map during a control rod maneuver on November 10, 2002.

Description On November 10, 2002, during power ascension from LaSalle Maintenance Outage L2P02, a control rod maneuver was performed as part of the process to achieve the final target control rod pattern. Unit 2 was reduced in power to about 700 Megawatts Electric (MWe) to perform the required control rod maneuvers. Control rods associated with three arrays were sequentially withdrawn. Before withdrawing each array, the powerplex predictor was used to predict the conditions that would result from withdrawing the array. Powerplex predicted that following the withdrawal of the fourth and final array, that approximately a 2 percent margin would exist between actual core conditions and the power-to-flow map Region B limit of 109 percent flow control line.

Following withdrawal of the final array, a nuclear engineer submitted a powerplex case to confirm that the core response was within the preconditioning limits. Following a review of those results, the operating crew determined that Unit 2 had entered Region B of the power-to-flow map; a restricted region requiring an immediate exit due to power stability concerns. The last array withdrawn was re-inserted to its previous position and Region B of the power-to-flow map was confirmed to have been exited.

The licensee conducted a root cause evaluation which identified a number of programmatic and human performance deficiencies. These deficiencies included the following:

  • Inadequate communication and implementation of changes in operational strategies as a result of changes in the fuel pre-conditioning rules which resulted in weak worker knowledge for monitoring near Region B of the power-to-flow map.
  • Insufficient guidance for predicting core response to reactivity changes.
  • Weaknesses in operator knowledge regarding the impact and monitoring of core parameters following rod maneuvers below Region B of the power-to-flow map.
  • Use of inadequate indications for monitoring reactor power and flow during operation near Region B of the power-to-flow map.
  • Failure to use all available tools, such as OD3 (heat balance) results and the electronic power-to-flow map on the computer, as rods were withdrawn.
  • Inadequate pre-job briefing prior to the reactivity changes which failed to discuss the use of the power-to-flow map, proper communication between the Qualified Nuclear Engineer (QNE) and Operations, and roles and responsibilities.

The root cause investigation also determined that a previously unidentified entry into Region B occurred during a planned power maneuver. A review of the powerplex data during power maneuvers for both units, following implementation of the revised pre-conditioning limits, indicated Region B had been entered on Unit 2 on September 1, 2002. The September 1 entry was determined to be due to the same causes as the November 10, 2002 entry.

Analysis The inspectors determined that the issue described above constituted a finding as defined by the Reactor Oversight Process (ROP) since the issue was related to a licensee performance deficiency. In this case, the issue resulted in not meeting the licensee requirement to operate outside Region B of the power-to-flow map which was within the licensees ability to foresee, and which should have been prevented.

The inspectors reviewed this issue against the guidance contained in Appendix B, Issue Dispositioning Screening, of Inspection Manual Chapter (IMC) 0612, Power Reactor Inspection Reports. The inspectors compared this finding to the findings identified in Appendix E, Examples of Minor Issues, of IMC 0612 to determine whether the finding was minor. Following that review, the inspectors determined that the examples provided in Appendix E did not fit the specific situation being reviewed. As a result, the finding was reviewed against the questions in Section C, Minor Questions, of Appendix B to IMC 0612. During the review of this finding against Question 4, Is the finding associated with one of the below cornerstone attributes and does the finding affect the associated cornerstone objective?, the inspectors determined that the finding was associated with the configuration control, procedure quality, and human performance attributes of the barrier integrity cornerstone. The inspectors also determined that the finding affected the cornerstone objective of providing reasonable assurance that physical design barriers (e.g. fuel cladding) protect the public from radionuclide releases caused by accidents or events since operation outside established operational limits, such as the power-to-flow map, can lead to a violation of thermal limits and fuel cladding damage. As a result, the inspectors concluded that the finding was more than minor.

As a result, the inspectors reviewed this finding against the questions continued in Section C, SDP Questions, to Appendix B, Issue Dispositioning Screening, of IMC 0612. The inspectors determined that since the finding was associated with the Barrier Integrity cornerstone and the finding was associated with the integrity of fuel cladding, that the finding could be evaluated using the SDP. Utilizing the SDP Phase 1 Screening Worksheet for IE [Initiating Events], MS [Mitigating Systems], and B [Barrier Integrity] Cornerstones, the inspectors determined that since the issue involved the fuel barrier of the Reactor Coolant System, that in accordance with the screening worksheet the issue screened out as Green.

Enforcement 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires that conditions adverse to quality, such as deficiencies and deviations, be promptly identified and corrected. The failure to identify a September 1, 2002, Unit 2 entry into Region B of the power-to-flow map until November 2002 was an example where the requirements of 10 CFR 50, Appendix B, Criterion XVI, were not met and was a violation. However, because of its low safety significance and because it was entered into the corrective action program, the NRC is treating this issue as a Non-Cited Violation (NCV 50-373/0206-02(DRP); 50-374/0206-02(DRP)), in accordance with Section VI.A.1 of the NRCs Enforcement Policy. The issue was entered into the licensees corrective action program as Condition Report (CR) 130964.

4OA6 Meetings

.1

Exit Meeting Summary

The inspectors presented the inspection results to Mr. G. Barnes and other members of licensee management at the conclusion of the inspection on January 3, 2003. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.

.2 Interim Exit Meetings

Interim exits were conducted for:

  • Access Control, Radiation Material Processing and Transportation inspection with Mr. G. Barnes on November 8, 2002.
  • Radioactive Material Processing and Shipping inspection with Mr. G. Barnes on November 15, 2002.
  • Inservice Inspection with Mr. G. Barnes on December 18, 2002.

4OA7 Licensee Identified Violations

The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of Section VI of the NRC Enforcement Manual, NUREG-1600, for being dispositioned as an NCV.

Cornerstone: Occupational Radiation Exposure

Technical Specification 5.4.1 requires, in part, that the licensee establish and implement procedures covering activities recommended in Regulatory Guide 1.33 (Revision 2),

Appendix A, February 1978. The Regulatory Guide recommended procedures included radiation protection procedures for access control. Radiation protection procedures require that an area with radiation levels of 1000 mrem/hour or greater be locked and posted as a locked high radiation area, which did not occur for several hours in the Unit 1 Cooler/Condenser Room of the Off Gas Building on February 11-12, 2002. The problem is described in CR 00094760 and its associated apparent cause evaluation report. There were no unauthorized entries into the Cooler/Condenser Room while it was not properly controlled or posted and since area radiation levels coupled with the duration of the problem precluded a substantial potential for an overexposure, the issue was determined to be of very low safety significance. Consequently, it is being treated as an NCV (50-373/0206-03(DRP)).

KEY POINTS OF CONTACT Licensee Personnel G. Barnes, Site Vice President S. Landahl, Station Manager T. Connor, Design Engineering Supervisor D. Czufin, Site Engineering Manager D. Enright, Operations Manager F. Gogliotti, System Engineering Manager K. Hobbs, Radiation Protection Manager G. Kaegi, Regulatory Assurance Manager A. Kochis, ISI Coordinator C. Wilson, Station Security Manager NRC Personnel E. Duncan, Senior Resident Inspector D. Eskins, Resident Inspector D. Jones, Reactor Engineer M. Mitchell, Radiation Specialist W. Slawinski, Senior Radiation Specialist D. Wrona, Reactor Engineer J. Yesinowski, Illinois Department of Nuclear Safety ITEMS OPENED, CLOSED, AND DISCUSSED Opened 50-373/374/0206-01 URI Missing ECCS Area Cooler Screws 50-373/374/0206-02 NCV Entry Into Region B of the Power-To-Flow Map 50-373/0206-03 NCV Uncontrolled High Radiation Area Closed 50-373/374/0206-02 NCV Entry Into Region B of the Power-To-Flow Map 50-373/0206-03 NCV Uncontrolled High Radiation Area Discussed None LIST OF ACRONYMS AEER Auxiliary Electric Equipment Room ALARA As-Low-As-Reasonably Achievable APRM Average Power Range Monitor ASME American Society of Mechanical Engineers ATWS Anticipated Transient Without Scram CR Condition Report CRD Control Rod Drive CST Condensate Storage Tank DRP Division of Reactor Projects DRS Division of Reactor Safety EC Engineering Change ECCS Emergency Core Cooling System EDG Emergency Diesel Generator EHC Electro-Hydraulic Control ENS Emergency Notification System FCV Flow Control Valve FW Feedwater HPCS High Pressure Core Spray IMC Inspection Manual Chapter IPA Infrequently Performed Activity ISI Inservice Inspection LFP LaSalle Fuel Procedure LOS LaSalle Operating Surveillance LSH Lake Screenhouse LST LaSalle Special Test LTS LaSalle Technical Surveillance MT Magnetic Particle Testing MWe Megawatts Electric NCV Non-Cited Violation OC Operator Challenge OE Operability Evaluation OWA Operator Workaround PMT Post-Maintenance Test PT Penetrant Testing QNE Qualified Nuclear Engineer RCIC Reactor Core Isolation Cooling RCS Reactor Coolant System RHR Residual Heat Removal RHRSW Residual Heat Removal Service Water ROP Reactor Oversight Process RPS Reactor Protection System RPV Reactor Pressure Vessel RR Reactor Recirculation RWLCS Reactor Water Level Control System SDP Significance Determination Process LIST OF ACRONYMS (cont)

SRV Safety Relief Valve SSC Structure, System, or Component TCV Turbine Control Valve TDRFP Turbine-Drive Reactor Feedwater Pump UFSAR Updated Final Safety Analysis Report URI Unresolved Item UT Ultrasonic Testing VC Control Room Ventilation VDC Volt Direct Current VE Auxiliary Electric Equipment Room Ventilation VX Essential Switchgear Room Ventilation WO Work Order LIST OF

DOCUMENTS REVIEWED

Adverse Weather Protection

LOS-ZZ-A2

Preparation for Winter/Summer Operation

Revision 24

Equipment Alignment

LOP-HP-2M

Unit 2 HPCS System Mechanical Checklist

LOP-HP-2E

Unit 2 HPCS System Electrical Checklist

LOP-RH-2M

Unit 2 B RHR System Mechanical Checklist

LOP-RH-3M

Unit 2 C RHR System Mechanical Checklist

LOP-RH-4E

Unit 2 B/C RHR System Electrical Checklist

LOP-RHRSW-2BM

Unit 2 B RHRSW System Mechanical Checklist

LOP-RHRSW-3E

Unit 2 B RHRSW System Electrical Checklist

Fire Protection

Updated Final Safety Analysis

Report

Appendix H

Revision 13

Inservice Inspection

MT-EXLN-

2V0

Procedure for Magnetic Particle Examination Using

AC Yoke, Dry Powder, or Wet Visible

January 5, 2002

PT-EXLN-104V0

Procedure for Liquid Penetrant Examination Color

Contrast (Visible) Solvent Removable

January 5, 2002

GE-UT-311

Procedure for Manual Ultrasonic Examination of

Nozzle Inner Radii and Bore

January 5, 2002

GE-PDI-UT-1

PDI Generic Procedure for the Ultrasonic

Examination of Ferritic Piping Welds

January 5, 2002

GE-PDI-UT-2

PDI Generic Procedure for the Ultrasonic

Examination of Austenitic Pipe Welds

January 5, 2002

ISI Program

Plan

Second Ten-Year Inspection Interval, LaSalle

County Nuclear Power Station, Units 1 and 2

December 14,

2001

CR 135708

Liquid Penetrant Examination Report Discrepancy

Operator Licensing Requalification

ESG 50

CRD FCV Setpoint Failure/TDRFP Turbine Lube Oil Leak/Heater

String Isolation/Loss of Stator Cooling/5-Rod ATWS

Revision

ESG47

RWLCS Trouble/Loss of RPS A/APRM C Failure/Loss of Both

RR Pumps/Failure to Automatic Scram/K SRV Leakage/RHR Heat

Exchanger Tube Rupture

Revision

Maintenance Risk Assessment and Emergent Work Evaluation

LaSalle 7-Day Look-

Ahead Schedule

Various

WO00490705

Change Control Power Fuse for 1AP76E-F3-F

October 1, 2002

EC338741

Change Control Power Fuse for 1AP76E-F3-F

September 24, 2002

LaSalle 3-Day Look-

Ahead Schedule

Various

Personnel Performance During Nonroutine Plant Evolutions

Drawing 1E-0-4432AG

Control Room HVAC System VC - Part 7

Revision P

Drawing 1E-0-4432AX

Control Room HVAC System VC - Part 22

Revision J

Drawing 1E-0-4432AJ

Control Room HVAC System VC - Part 9

Revision T

Drawing 1E-0-4432AM

Control Room HVAC System VC - Part 12

Revision J

Drawing 1E-0-4432BD

Control Room HVAC System VC - Part 28

Revision E

Drawing 1E-0-4432AL

Control Room HVAC Alarms System VC - Part 11

Revision H

Drawing 1E-0-4432BF

Control Room HVAC System VC - Part 30

Revision Q

Drawing 1E-0-4432BH

Control Room HVAC System VC - Part 32

Revision B

Drawing 1E-0-4432AW

Control Room HVAC System VC - Part 21

Revision F

Drawing 1E-0-4432AU

Control Room HVAC System VC - Part 19

Revision E

Drawing 1E-0-4432AN

Control Room HVAC System VC - Part 13

Revision N

Drawing 1E-0-4432AH

Control Room HVAC System VC - Part 8

Revision P

LFP-400-6

Installation and Operation of Sipping Equipment

Revision 6

LFP-400-1

Fuel and Nuclear Component Movements Within

the Reactor and Spent Fuel Storage Pools

Revision 23

LST-2002-034

2B Diesel Generator Voltage Regulator PMT

Revision 0

CR 127728

2B Voltage Regulator Very Erratic

October 16,

2002

IPA Briefing Sheet

2B Diesel Generator Voltage Regulator PMT

Revision 0

WO 498416-01

Replace 2B Diesel Generator Voltage Regulator

Vendor Manual J-157

Basler Diesel Generator Voltage Regulator

EC 339411

Division 3 EDG Testing Assessment With Unit 2 in

Mode 1

Revision 1

EC 339388

Failed Fuel Vacuum Sipping Equipment

Revision 0

Operability Evaluations

OE02-12

Unit 1 Turbine Control Valve (TCV) #1 Foreign Material

Revision 0

CR00120773

Unit 1 #1 Turbine Control Valve Strainer Plugged

August 27,

2002

CR00120659

Prompt Investigation Report - Unit 1 #1 Turbine Control

Valve Strainer Plugged

Revision 0

EC339629

Unit 2 Safety Relief Valve (SRV) Piping Supports

Pinned

Revision 0

Dwg M-900

Main Steam Piping

Sheet 19

Dwg M-900

Main Steam Piping

Sheet 10

Dwg M09-

MS04-2604C

Support MS04-2604C

Sheet 1

Dwg M09-

MS04-2605C

Support MS04-2605C

Sheet 1

Dwg M-900

Main Steam Piping

Sheet 24

OE02-04

Unit 1 Main Steam Isolation Valve Limit Switches

Revision 1

Operator Workarounds

Operator Workaround

List

October 2, 2002

Operator Challenge 238

Emergency Diesel Generator Relief Valve

Sticking

October 2, 2002

Post-Maintenance Testing

WO00468913

Replace Cell #23 For Unit 2 Division 2 125

VDC Battery

LEP-DC-02

Individual or Multiple Battery Cell Performance

Test

Revision 12

LEP-DC-03

Individual Battery Cell Modified Performance

Test

Revision 0

LEP-DC-04

Installation of Division 2 Batteries

Revision 12

CR L2000-04873

Station Battery Evaluation

August 31, 2000

CR 129595

Foreign Material Noted in Several Battery Cells

October 30, 2002

LES-DC-101B

Division 2 125 Volt Battery Inspection for Units

and 2

Revision 10

Refueling and Outage Activities

LFP-400-1

Fuel and Nuclear Component Movements Within the

Reactor and Spent Fuel Storage Pools

Revision 23

L2P02 Shutdown Safety Management Program

October 8, 2002

EC 339413

Evaluate the Use of Spent Fuel Pool Cooling as an

Alternate Decay Heat Removal Source for Shutdown

Safety

Revision 0

EC 339466

Unit 2 Spent Fuel Pool Cooling System Heat Removal

Capacity

Revision 0

NF0200148

LaSalle Unit 2 Cycle 9A Design Basis Loading Plan

Revision 0

NF0200149

L2C9A Fuel Move Sequence to Replace Failed Fuel

Assemblies and Beginning of Cycle Shutdown Margin

Revision 0

PORC 02-30

Plant Onsite Review Committee (PORC) Approval of

LaSalle Unit 2 Restart From L2P02

Revision 0

DCP

9900210

RPV Cavity Grating, Ladder, and Insulation Frame

Bolting Modifications

October 21, 1999

LGP-1-1

Normal Unit Startup

Revision 68

LOP-FW-04

Startup of Turbine Driven Reactor Feed Pump

(TDRFP)

Revision 36

LOP-RL-01

Operation of the Reactor Water Level Control System

Revision 16

Surveillance Testing

LOS-DG-M2

1A(2A) Diesel Generator Operability Test

Revision 52

LTS-200-19, Att.

B

ECCS Cubicle Area Cooler Flowrate Test - Unit 2 HPCS

Area Cooler

Revision 9

M-1366 Sheet 2

Unit 2 Reactor Building Ventilation System - 694

Revision F

LTS-200-19, Att.

B

ECCS Cubicle Area Cooler Flowrate Test - Unit 2 HPCS

Area Cooler

June 1, 2001

Emergency Action Level and Emergency Plan Changes

LaSalle Station Annex to Exelons Standardized Emergency Plan

Revision 11

LaSalle Station Annex to Exelons Standardized Emergency Plan

Revision 12

LaSalle Station Annex to Exelons Standardized Emergency Plan

Revision 13

Identification and Resolution of Problems

HU-AA-101

Human Performance Tools & Verification Practices

October 31, 2001

HU-AA-

211

Pre-Job, Heightened Level of Awareness, Infrequent Plant

Activity & Post Job Briefings

July 29, 2002

Exelon Nuclear Human Performance Baseline

Assessment

September 23,

2002

Exelon Nuclear Human Performance Baseline

Assessment

March 14, 2002

LaSalle Station Human Performance Review - July 2002

August 28, 2002

LaSalle Station Human Performance Review - August

2002

October 4, 2002

Event Followup

CR 132370

Powerplex Indication of Entry Into

Region B - Extent of Condition

November 19, 2001

Prompt

Investigation Report

Unplanned Entry Into Region B of the

Power-to-Flow Map

CR 103964

Unplanned Entry Into Region B of the

Power-to-Flow Map

November 10, 2002

Root Cause Report

Unplanned Entry Into Region B of the

Power-to-Flow Map

LOA-RR-201

A

LaSalle County Station Power-to-Flow

Map

Revision 0

Reactivity Maneuver

(ReMa) Form

LaSalle Unit 2 - Withdrawal of Array

10B Rods

Cycle 9A

LAP-100-35

Reactivity Management Controls

Revision 12

Access Controls For Radiologically Significant Areas

RP-AA-222

Methods For Estimating Internal Exposure From In

Vivo and In Vitro Bioassay Data

Revision 1

RP-AA-350

Assessment of Radiologically Contaminated

Personnel

Revision 0

RP-AA-400

ALARA Program

Revision 2

RP-AA-401

Operational ALARA Planning and Controls

Revision 2

RP-AA-605

CFR 61 Program

Revision 0

CR 130190

Individual Not Following Radiologically Controlled

Area Egress Procedure

November 4, 2002

CR 130198

Observed Individuals Deconning Themselves

Without Radiation Protection Technician Help

November 2, 2002

CR 130270

Individual Not Monitoring Properly at Radiologically

Controlled Area Egress

November 4, 2002

CR 130412

Contamination of Unit 2 820 Reactor Building

During Backwash of 2B Reactor Water Cleanup

Filter

November 6, 2002

Radioactive Material Processing and Transportation

RW-AA-100

Process Control Program for Radioactive Wastes

Revision 2

RP-AA-600

Radioactive Material/Waste Shipments

Revision 5

LAP-100-27

Guidelines for Radioactive Waste/Material

Shipments

Revision 22

LOP-WX-26

Dry Active Waste Sorting For Radioactive Waste

Packaging and Compaction

Revision 0

LOP-WX-29

Loading of Radioactive Waste Shipments Using

High Integrity Containers

Revision 5

Report 01-071

2000 Annual Radioactive Effluent Report and

Triannual Chlorine Survey Report

April 30, 2001

NOA-LS-01-3Q

Nuclear Oversight Continuous Assessment Report

LaSalle Station July-September, 2001

October 25, 2001

Memorandum

LaSalle Station Focus Area Self Assessment on

Radioactive Material Shipping

October 21, 2002

Memorandum

Focus Area Self-Assessment on Radwaste Material

Condition/Equipment Reliability

July 2, 2002

CR 00082954

Inadequate Planning for Rad Material Shipment

(SRVs)

June 25, 2002

CR 00085525

Inadequate Pre-Planning for CRD Shipment

December 5, 2001

CR 00091013

Failure to Follow the CRD Shipping Schedule

January 17, 2002

CR 00092513

Inadequate Communication Resulted in Delay of

Radioactive Material Shipment

January 25, 2002

CR 00094766

Inadequate Planning for Radioactive Material

Shipment

February 11, 2002

CR 00098690

Shipping/Shipper Qualifications Not Tracked Using

PQD

March 11, 2002

CR 00114692

Delays in Electro-Hydraulic Control Fluid Sample

Transfer

July 8, 2002

CR 00109212

PQD Implementation-DTC Concerns

November 11,

2001

CR 00111958

RW Solids Manager Has Not Completed

Qualification Cards for Shipping

June 14, 2002

CR 00112133

Qualifications Tracking Deficiency/Focused Area

Self-Assessment Documentation Condition Report

  1. 1

February 20, 2002

CR 00123259

Inadequate Drum Sealing Ring for Department of

Transportation 7A Type A Container

September 17,

2002

CR 00127988

Radioactive Waste Manifest Software Error

October 15, 2002

CR 00129968

Unplanned Radioactive Material Shipment

October 31, 2002

CR 00113516

Inadequate Number of 4-Digit Orange Panels for

Radioactive Material Shipment

June 25, 2002

CR 00114141

Radwaste Shipment Issue

June 28, 2002

CR 00118691

Rad Waste Shipment Arrived at Wrong Destination

August 8, 2002

CR L2001-

2870

ALPS Area of Radwaste Truckbay Found

Contaminated

May 12, 2001

CR L2001-

295

Radwaste Shipping Cask Gasket Failure

June 5, 2001

CR L2001-

03728

Radwaste Discussion of Byron Event

June 22, 2001

CR L2001-

04878

Identified Safety Issue

August 23, 2001

CR 00113070

2A Phase Separator Transfer Loop Problems

June 24, 2002

CR 00130752

NRC Identified Radwaste IRSF Log Procedure

Adherence Issue

November 6,

2002;

LW01-13

Radwaste Shipment Documentation Package

LW01-27

Radwaste Shipment Documentation Package

LW01-28

Radwaste Shipment Documentation Package

LW02-08

Radwaste Shipment Documentation Package

LW02-16

Radwaste Shipment Documentation Package

LW02-17

Radwaste Shipment Documentation Package