ML052300322: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 1.0       USE AND APPLICATION ................................................                                             1.1-1 1.1             Definitions ................................................                                               1.1-1 1.2             Logical Connectors ................................................                                         1.2-1 1.3             Completion Times ................................................                                           1.3-1 1.4             Frequency ................................................                                                 1.4-1 2.0       SAFETY LIMITS (SLs) ................................................                                         TS/2.0-1 2.1             SLs ..................................................                                                 TS/2.0-1 2.2             SL Violations ................................................                                         TS/2.0-1 3.0       LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY ............. 3.0-1 3.0     SURVEILLANCE REQUIREMENT (SR) APPLICABILITY ....................... TS/3.0-4 3.1           REACTIVITY CONTROL SYSTEMS ................................................                                 3.1-1 3.1.1           Shutdown Margin (SDM) ................................................                                   3.1-1 3.1.2           Reactivity Anomalies ................................................                                   3.1-5 3.1.3           Control Rod OPERABILITY ................................................                                 3.1-7 3.1.4           Control Rod Scram Times ................................................                                 3.1-12 3.1.5           Control Rod Scram Accumulators ................................................                         3.1-15 3.1.6           Rod Pattern Control ................................................                                     3.1-18 3.1.7           Standby Liquid       Control     (SLC)     System     ................................................ 3.1-20 3.1.8           Scram Discharge Volume (SDV) Vent and Drain Valves                                   ............... TS/3.1-25 3.2         POWER DISTRIBUTION LIMITS ................................................                                   3.2-1 3.2.1           Average Planar Linear Heat Generatibn Rate (APLHGR) .................                                   3.2-1 3.2.2           Minimum Critical Power Ratio (MCPR) ..............................................                       3.2-3 3.2.3           Linear Heat Generation Rate (LHGR) ...............................................                       3.2-5 3.2.4           Average Power Range Monitor (APRM) Gain and Setpoints .............                                     3.2-7 3.3         INSTRUMENTATION ................................................                                             3.3-1 3.3.1.1         Reactor Protection System (RPS) Instrumentation ........................ TS/3.3-1 3.3.1.2         Source Range Monitor (SRM) Instrumentation .................................. 3.3-10 3.3.1.3         Oscillation Power Range Monitor (OPRM)
{{#Wiki_filter:TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 1.0 USE AND APPLICATION................................................
Instrumentation .......................                                                       TS/3.3-15a 3.3.2.1         Control Rod Block Instrumentation .......................                                               3.3-16 3.3.2.2         Feedwater - Main Turbine High Water Level Trip Instrumentation .................................                                                   3.3-21 3.3.3.1         Post Accident Monitoring           (PAM)       Instrumentation         .............................. 3.3-23 3.3.3.2         Remote Shutdown System .................................                                                 3.3-26 3.3.4.1         End of Cycle Recirculation Pump Trip (EOC-RPT)
1.1-1 1.1 Definitions................................................
Instrumentation ..                                                                                   3.3-29 3.3.4.2       Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation .                                                               3.3-33 3.3.5.1         Emergency       Core   Cooling     System       (ECCS)       Instrumentation         .......... TS/3.3-36 3.3.5.2         Reactor Core Isolation Cooling (RCIC) System Instrumentation ..................................                                                   3.3-48 3.3.6.1         Primary Containment Isolation Instrumentation ............................. TS/3.3-52 3.3.6.2         Secondary Containment Isolation Instrumentation ............................ 3.3-63 (continued)
1.1-1 1.2 Logical Connectors................................................
SUSQUEHANNA - UNIT 1                           TS/ TOC- 1                           Amendment 1t4, 2Z5, 2Y7, 2,2, 225
1.2-1 1.3 Completion Times................................................
1.3-1 1.4 Frequency................................................
1.4-1 2.0 SAFETY LIMITS (SLs)................................................
TS/2.0-1 2.1 SLs..................................................
TS/2.0-1 2.2 SL Violations................................................
TS/2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY............. 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY....................... TS/3.0-4 3.1 REACTIVITY CONTROL SYSTEMS................................................
3.1-1 3.1.1 Shutdown Margin (SDM)................................................
3.1-1 3.1.2 Reactivity Anomalies................................................
3.1-5 3.1.3 Control Rod OPERABILITY................................................
3.1-7 3.1.4 Control Rod Scram Times................................................
3.1-12 3.1.5 Control Rod Scram Accumulators................................................
3.1-15 3.1.6 Rod Pattern Control................................................
3.1-18 3.1.7 Standby Liquid Control (SLC) System................................................ 3.1-20 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves............... TS/3.1-25 3.2 POWER DISTRIBUTION LIMITS................................................
3.2-1 3.2.1 Average Planar Linear Heat Generatibn Rate (APLHGR)................. 3.2-1 3.2.2 Minimum Critical Power Ratio (MCPR).............................................. 3.2-3 3.2.3 Linear Heat Generation Rate (LHGR)............................................... 3.2-5 3.2.4 Average Power Range Monitor (APRM) Gain and Setpoints............. 3.2-7 3.3 INSTRUMENTATION................................................
3.3-1 3.3.1.1 Reactor Protection System (RPS) Instrumentation........................ TS/3.3-1 3.3.1.2 Source Range Monitor (SRM) Instrumentation.................................. 3.3-10 3.3.1.3 Oscillation Power Range Monitor (OPRM)
Instrumentation.......................
TS/3.3-15a 3.3.2.1 Control Rod Block Instrumentation.......................
3.3-16 3.3.2.2 Feedwater - Main Turbine High Water Level Trip Instrumentation.................................
3.3-21 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation.............................. 3.3-23 3.3.3.2 Remote Shutdown System.................................
3.3-26 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT)
Instrumentation..
3.3-29 3.3.4.2 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation.
3.3-33 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation.......... TS/3.3-36 3.3.5.2 Reactor Core Isolation Cooling (RCIC) System Instrumentation..................................
3.3-48 3.3.6.1 Primary Containment Isolation Instrumentation............................. TS/3.3-52 3.3.6.2 Secondary Containment Isolation Instrumentation............................ 3.3-63 (continued)
SUSQUEHANNA - UNIT 1 TS/ TOC-1 Amendment 1t4, 2Z5, 2Y7, 2,2, 225


TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 3.7         PLANT SYSTEMS ...........................................                             TS/3.7-1 3.7.1           Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS) .............................               TS/3.7-1 3.7.2           Emergency Service Water (ESW) System .............................                   3.7-4 3.7.3           Control Room Emergency Outside Air Supply (CREOAS) System ...........................................                   TS/3.7-6 3.7.4           Control Room Floor Cooling System ...........................................         3.7-10 3.7.5           Main Condenser Offgas ...........................................                     3.7-13 3.7.6           Main Turbine Bypass System...........................................           TS/3.7-15 3.7.7           Spent Fuel Storage Pool Water Level ...........................................     3.7-17 3.8         ELECTRICAL POWER SYSTEMS ...........................................                       3.8-1 3.8.1           AC Sources - Operating ...........................................                 TS/3.8-1 3.8.2           AC Sources - Shutdown ........................................... TS/3.8-17 3.8.3           Diesel Fuel Oil, Lube Oil, and Starting Air ..................................... TS/3.8-20 3.8.4           DC Sources - Operating ............................................                 3.8-23 3.8.5           DC Sources - Shutdown ...........................................                   3.8-29 3.8.6           Battery Cell Parameters ............................................                 3.8-32 3.8.7           Distribution Systems - Operating ...........................................     TS/3.8-37 3.8.8           Distribution Systems - Shutdown ...........................................       TS/3.8-41 3.9       REFUELING OPERATIONS ...........................................                         3.9-1 3.9.1           Refueling Equipment Interlocks ...........................................           3.9-1 3.9.2           Refuel Position One-Rod-Out Interlock ........................................... 3.9-3 3.9.3           Control Rod Position ...........................................                     3.9-5 3.9.4           Control Rod Position Indication ...........................................         3.9-6 3.9.5           Control Rod OPERABILITY - Refueling ...........................................     3.9-8 3.9.6           Reactor Pressure Vessel (RPV) Water Level ....................................       3.9-9 3.9.7           Residual Heat Removal (RHR) - High Water Level ..........................           3.9-10 3.9.8           Residual Heat Removal (RHR) - Low Water Level ...........................           3.9-13 3.10       SPECIAL OPERATIONS ...........................................                           3.10-1 3.10.1         Inservice Leak and Hydrostatic Testing Operation ............................       3.10-1 3.10.2         Reactor Mode Switch Interlock Testing ............................................ 3.10-4 3.10.3         Single Control Rod Withdrawal - Hot Shutdown ...............................         3.10-6 3.10.4         Single Control Rod Withdrawal - Cold Shutdown ..............................         3.10-9 3.10.5         Single Control Rod Drive (CRD) Removal - Refueling ......................           3.10-13 3.10.6         Multiple Control Rod Withdrawal - Refueling .................................... 3.10-16 3.10.7         Control Rod Testing-Operating ...........................................           3.10-18 3.10.8         SHUTDOWN MARGIN (SDM) Test - Refueling ................................             3.10-20 4.0     DESIGN FEATURES ...........................................                                 4.0-1 4.1         Site Location ...........................................                             4.0-1 4.2         Reactor Core ...........................................                               4.0-1 4.3         Fuel Storage ............................................                             4.0-1 (continued)
TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 3.7 PLANT SYSTEMS...........................................
TS/TOC-3                       Amendment 1$4, 2X7, 225 SUSQUEHANNA  -
TS/3.7-1 3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS).............................
UNIT 1I SUSQUEHANNA - UNIT                         TS/TOC-3                       Amendment i$4, 2Z7, 225
TS/3.7-1 3.7.2 Emergency Service Water (ESW) System.............................
3.7-4 3.7.3 Control Room Emergency Outside Air Supply (CREOAS) System...........................................
TS/3.7-6 3.7.4 Control Room Floor Cooling System...........................................
3.7-10 3.7.5 Main Condenser Offgas...........................................
3.7-13 3.7.6 Main Turbine Bypass System...........................................
TS/3.7-15 3.7.7 Spent Fuel Storage Pool Water Level...........................................
3.7-17 3.8 ELECTRICAL POWER SYSTEMS...........................................
3.8-1 3.8.1 AC Sources - Operating...........................................
TS/3.8-1 3.8.2 AC Sources - Shutdown........................................... TS/3.8-17 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air..................................... TS/3.8-20 3.8.4 DC Sources - Operating............................................
3.8-23 3.8.5 DC Sources - Shutdown...........................................
3.8-29 3.8.6 Battery Cell Parameters............................................
3.8-32 3.8.7 Distribution Systems - Operating...........................................
TS/3.8-37 3.8.8 Distribution Systems - Shutdown...........................................
TS/3.8-41 3.9 REFUELING OPERATIONS...........................................
3.9-1 3.9.1 Refueling Equipment Interlocks...........................................
3.9-1 3.9.2 Refuel Position One-Rod-Out Interlock...........................................
3.9-3 3.9.3 Control Rod Position...........................................
3.9-5 3.9.4 Control Rod Position Indication...........................................
3.9-6 3.9.5 Control Rod OPERABILITY - Refueling........................................... 3.9-8 3.9.6 Reactor Pressure Vessel (RPV) Water Level.................................... 3.9-9 3.9.7 Residual Heat Removal (RHR) - High Water Level.......................... 3.9-10 3.9.8 Residual Heat Removal (RHR) - Low Water Level........................... 3.9-13 3.10 SPECIAL OPERATIONS...........................................
3.10-1 3.10.1 Inservice Leak and Hydrostatic Testing Operation............................ 3.10-1 3.10.2 Reactor Mode Switch Interlock Testing............................................ 3.10-4 3.10.3 Single Control Rod Withdrawal - Hot Shutdown............................... 3.10-6 3.10.4 Single Control Rod Withdrawal - Cold Shutdown.............................. 3.10-9 3.10.5 Single Control Rod Drive (CRD) Removal - Refueling...................... 3.10-13 3.10.6 Multiple Control Rod Withdrawal - Refueling.................................... 3.10-16 3.10.7 Control Rod Testing-Operating...........................................
3.10-18 3.10.8 SHUTDOWN MARGIN (SDM) Test - Refueling................................ 3.10-20 4.0 DESIGN FEATURES...........................................
4.0-1 4.1 Site Location...........................................
4.0-1 4.2 Reactor Core...........................................
4.0-1 4.3 Fuel Storage............................................
4.0-1 (continued)
SUSQUEHANNA - UNIT I TS/TOC-3 Amendment 1$4, 2X7, 225 SUSQUEHANNA - UNIT 1 TS/TOC-3 Amendment i$4, 2Z7, 225


PPL Rev.
PPL Rev.
RPS Instrumentation 3.3.1.1 Table 3.3.1.1-1 (page 1 of 3)
RPS Instrumentation 3.3.1.1 Table 3.3.1.1-1 (page 1 of 3)
Reactor Protection System Instrumentation APPLICABLE                               CONDmONS MODES OR           REQUIRED           REFERENCED OTHER             CHANNELS               FROM SPECIFIED           PER TRIP           REQUIRED           SURVEILLANCE             ALLOWABLE FUNCTION               CONDmONS             SYSTEM             ACTION D.1         REQUIREMENTS                 VALUE
Reactor Protection System Instrumentation APPLICABLE CONDmONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDmONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
: 1. Intermediate Range Monitors
: 1. Intermediate Range Monitors
: a. Neutron                   2                   3                   G           SR 3.3.1.1.1         S 1221125 divisions Flux-High                                                                      SR 3.3.1.1.4         of full scale SR 3.3.1.1.6 SR 3.3.1.1.7 SR 3.3.1.1.11 SR 3.3.1.1.15 5 (a)                3                  H           SR 3.3.1.1.1         S 1221125 divisions SR 3.3.1.1.5         of full scale SR 3.3.1.1.11 SR 3.3.1.1.15
: a.
: b. Inop                     2                   3                   G           SR 3.3.1.1.4           NA SR 3.3.1.1.15 5(a)                  3                  H           SR 3.3.1.1.5           NA SR 3.3.1.1.15                             I
Neutron Flux-High 2
3 3
G SR 3.3.1.1.1 SR 3.3.1.1.4 SR 3.3.1.1.6 SR 3.3.1.1.7 SR 3.3.1.1.11 SR 3.3.1.1.15 H
SR 3.3.1.1.1 SR 3.3.1.1.5 SR 3.3.1.1.11 SR 3.3.1.1.15 S 1221125 divisions of full scale S 1221125 divisions of full scale 5 (a)
: b.
Inop 2
3 3
G SR 3.3.1.1.4 SR 3.3.1.1.15 H
SR 3.3.1.1.5 SR 3.3.1.1.15 NA 5(a)
NA I
: 2. Average Power Range Monitors
: 2. Average Power Range Monitors
: a. Neutron                   2                   2                   G           SR 3.3.1.1.1         S 20% RTP Flux-Hig,                                                                      SR 3.3.1.1A Setdown                                                                        SR 3.3.1.1.7 SR 3.3.1.1.8 SR 3.3.1.1.11 SR 3.3.1.1.15
: a.
: b. Flow Biased                                   2                   F           SR 3.3.1.1.1         S0.58W Simulated                                                                      SR 3.3.1.12           + 62%/e RTP() and Thermal                                                                        SR 3.3.1.1.3         S 115.5% RTP Power-High                                                                      SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.1.1.14 SR 3.3.1.1.15 SR 3.3.1.1.17 (a)       With any control rod withdrawn from a core cell containing one or more fuel assemblies.
Neutron Flux-Hig, Setdown 2
(b)         0.58 W + 57% RTP when reset for single loop operation per LCO 3.4.1, 'Recirculation Loops Operating.'
2 G
SUSQUEHANNA               - UNIT 1                               TS /3.3-7                               Amendment V8,22.5
SR 3.3.1.1.1 SR 3.3.1.1A SR 3.3.1.1.7 SR 3.3.1.1.8 SR 3.3.1.1.11 SR 3.3.1.1.15 S 20% RTP
: b.
Flow Biased Simulated Thermal Power-High 2
F SR 3.3.1.1.1 SR 3.3.1.12 SR 3.3.1.1.3 SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.1.1.14 SR 3.3.1.1.15 SR 3.3.1.1.17 S0.58W
+ 62%/e RTP() and S 115.5% RTP (a)
With any control rod withdrawn from a core cell containing one or more fuel assemblies.
(b) 0.58 W + 57% RTP when reset for single loop operation per LCO 3.4.1, 'Recirculation Loops Operating.'
SUSQUEHANNA - UNIT 1 TS /3.3-7 Amendment V8,22.5


PPL Rev.
PPL Rev.
ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS
ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS
                              --          --- NOTES--------------------
--- NOTES--------------------
: 1. Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
: 1.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a)for up to 6 hours for Functions 3.c and 3.e; and (b)for up to 6 hours for Functions other than 3.c and 3.e provided the associated Function or the redundant Function maintains ECCS initiation capability.
Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
SURVEILLANCE                                       FREQUENCY SR 3.3.5.1.1         Perform CHANNEL CHECK.                                 12 hours SR 3.3.5.1.2         ---                --
: 2.
A test of all required contacts does not have to be performed.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 3.c and 3.e; and (b) for up to 6 hours for Functions other than 3.c and 3.e provided the associated Function or the redundant Function maintains ECCS initiation capability.
Perform CHANNEL FUNCTIONAL TEST.                       92 days SR 3.3.5.1.3         Perform CHANNEL CALIBRATION.                           92 days SR 3.3.5.1.4         Perform CHANNEL CALIBRATION.                           24 months SR 3.3.5.1.5         Perform LOGIC SYSTEM FUNCTIONAL TEST.                 24 months SUSQUEHANNA - UNIT 1                     TS / 3.3-41                           Amendment 17A,       l 225,
SURVEILLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.
12 hours SR 3.3.5.1.2 A test of all required contacts does not have to be performed.
Perform CHANNEL FUNCTIONAL TEST.
92 days SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.
92 days SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.
24 months SR 3.3.5.1.5 Perform LOGIC SYSTEM FUNCTIONAL TEST.
24 months SUSQUEHANNA - UNIT 1 TS / 3.3-41 Amendment 17A, l
: 225,


PPL Rev.
PPL Rev.
AC Sources - Operating 3.8.1 ACTIONS CONDITION             REQUIRED ACTION                     COMPLETION TIME A. (continued)     A.3 Restore offsite circuit to OPERABLE   72 hours status.
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
AND 6 days from discovery of failure to meet LCO B. One required   B.1   Perform SR 3.8.1.1 for             1 hour DG inoperable.       OPERABLE offsite circuits.
A.3 Restore offsite circuit to OPERABLE 72 hours status.
AND Once per 8 hours thereafter AND B.2   Declare required feature(s),       4 hours from discovery of supported by the inoperable DG,     Condition B concurrent inoperable when the redundant       with inoperability of required feature(s) are inoperable. redundant required feature(s)
AND 6 days from discovery of failure to meet LCO B. One required B.1 Perform SR 3.8.1.1 for 1 hour DG inoperable.
OPERABLE offsite circuits.
AND Once per 8 hours thereafter AND B.2 Declare required feature(s),
4 hours from discovery of supported by the inoperable DG, Condition B concurrent inoperable when the redundant with inoperability of required feature(s) are inoperable.
redundant required feature(s)
AND (continued)
AND (continued)
SUSQUEHANNA - UNIT 1               TS /3.8-2                         Amendment1A 22 4 275
SUSQUEHANNA - UNIT 1 TS /3.8-2 Amendment1A 22 4 275


PPL Rev.
PPL Rev.
AC Sources-Shutdown 3.8.2 3.8   ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources-Shutdown LCO 3.8.2     The following AC electrical power sources shall be OPERABLE:
AC Sources-Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources-Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:
: a. One qualified circuit between the offsite transmission network and the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown"; and
: a.
: b. Two diesel generators (DGs) capable of supplying the onsite Class I E AC electrical power distribution subsystem(s) required by LCO 3.8.8.
One qualified circuit between the offsite transmission network and the onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown"; and
APPLICABILITY:   MODES 4 and 5                                                               I During movement of irradiated fuel assemblies in the secondary containment.
: b.
SUSQUEHANNA - UNIT 1                     TS / 3.8-17                       Amendment 1/8,     I 225
Two diesel generators (DGs) capable of supplying the onsite Class I E AC electrical power distribution subsystem(s) required by LCO 3.8.8.
APPLICABILITY:
MODES 4 and 5 During movement of irradiated fuel assemblies in the secondary containment.
I SUSQUEHANNA - UNIT 1 TS / 3.8-17 Amendment 1/8, 225 I


PPL Rev. 1 Distribution Systems - Operating 3.8.7 3.8   ELECTRICAL POWER SYSTEMS 3.8.7   Distribution Systems-Operating LCO 3.8.7           The electrical power distribution subsystems in Table 3.8.7-1 shall be OPERABLE.
PPL Rev. 1 Distribution Systems - Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The electrical power distribution subsystems in Table 3.8.7-1 shall be OPERABLE.
APPLICABILITY:         MODES 1,2, and 3.
APPLICABILITY:
ACTIONS CONDITION                         REQUIRED ACTION                     COMPLETION TIME A.-   --------- NOTE-   --          ----------- --
MODES 1, 2, and 3.
                              ----------            Note-------------
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.-  
Not applicable to DG E         Enter applicable Conditions and DC electrical power             Required Actions of LCO 3.8.4, subsystem.                     "DC Sources - Operating," for DC source(s) made inoperable One or more Unit 1             by inoperable power distribution AC electrical power             subsystem(s).
--------- NOTE-Note-------------
distribution                       --      ----
Not applicable to DG E Enter applicable Conditions and DC electrical power Required Actions of LCO 3.8.4, subsystem.  
subsystems inoperable.
"DC Sources - Operating," for DC source(s) made inoperable One or more Unit 1 by inoperable power distribution AC electrical power subsystem(s).
A.1     Restore Unit 1 AC electrical     8 hours power distribution subsystem(s) to OPERABLE         AND                         I status.
distribution subsystems inoperable.
16 hours from discovery of failure to meet LCO 3.8.7 except for Condition D or E           I B. ----------NOTE----------         B.1     Restore Unit 1 DC                 2 hours Not applicable to DG E                 electrical power distribution DC electrical power                     subsystem(s) to                   AND subsystem.                             OPERABLE status.                                             I One or more Unit 1                                                       16 hours from discovery DC electrical power                                                       of failure to meet distribution                                                             LCO 3.8.7 except for subsystems                                                               Condition D or E           I inoperable.
A.1 Restore Unit 1 AC electrical 8 hours power distribution subsystem(s) to OPERABLE AND status.
16 hours from discovery of failure to meet LCO 3.8.7 except for Condition D or E B. ----------NOTE----------
B.1 Restore Unit 1 DC 2 hours Not applicable to DG E electrical power distribution DC electrical power subsystem(s) to AND subsystem.
OPERABLE status.
One or more Unit 1 16 hours from discovery DC electrical power of failure to meet distribution LCO 3.8.7 except for subsystems Condition D or E inoperable.
(continued)
(continued)
SUSQUEHANNA         - UNIT 1                 T S /3.8-37                             Amendment 1-?8, 225
I I
I I
SUSQUEHANNA - UNIT 1 T S / 3.8-37 Amendment 1-?8, 225


PPL Rev.
PPL Rev.
Distribution Systems - Shutdown 3.8.8 3.8       ELECTRICAL POWER SYSTEMS 3.8.8         Distribution Systems-Shutdown LCO 3.8.8                 The necessary portions of the AC and DC electrical power distribution subsystems listed in Table 3.8.7-1 shall be OPERABLE to support equipment required to be OPERABLE.
Distribution Systems - Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Distribution Systems-Shutdown LCO 3.8.8 The necessary portions of the AC and DC electrical power distribution subsystems listed in Table 3.8.7-1 shall be OPERABLE to support equipment required to be OPERABLE.
APPLICABILITY:                 MODES 4 and 5,                                                                                                                 I During movement of irradiated fuel assemblies in the secondary containment.
APPLICABILITY:
ACTIONS
MODES 4 and 5, During movement of irradiated fuel assemblies in the secondary containment.
        -    _I_                                                 srn
I ACTIONS
                                                                      .lr W.J1 Z--------    -  -- -  ---------  -  --------    -  - - -- - -----------
.lr srn
_I_
W.J1 Z--------
LCO 3.0.3 is not applicable.
LCO 3.0.3 is not applicable.
CONDITION                                   REQUIRED ACTION                                         COMPLETION TIME A. ---------- NOTE------------                 A.1       Declare associated                                     Immediately Not applicable to DG E                             supported required DC electrical power                               feature(s) inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A. ---------- NOTE------------
A.1 Declare associated Immediately Not applicable to DG E supported required DC electrical power feature(s) inoperable.
subsystem.
subsystem.
OR One or more required AC or DC electrical power distribution subsystems inoperable.
OR One or more required AC or DC electrical power distribution subsystems inoperable.
(continued)
(continued)
SUSQUEHANNA - UNIT 1                                           TS /3.8-41                                                       Amendment 1/8, 225 1
SUSQUEHANNA - UNIT 1 T S / 3.8-41 Amendment 1/8, 225 1


TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 1.0     USE AND APPLICATION ...............................................                                               1.1-1 1.1            Definitions............................................................................................ 1.1-1 1.2            Logical Connectors ...............................................                                         1.2-1 1.3            Completion Times ................................................                                           1.3-1 1.4            Frequency............................................................................................       1.4-1 2.0      SAFETY LIMITS (SLs) ................................................                                       TS/2.0-1 2.1          SLs .................................................                                                 TS/2.0-1 2.2          SL Violations ...............................................                                         TS /2.0-1 3.0      LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY .............. 3.0-1 3.0      SURVEILLANCE REQUIREMENT (SR) APPLICABILITY ....................... TS/3.0-4 3.1          REACTIVITY CONTROL SYSTEMS ................................................ 3.1-1 3.1.1          Shutdown Margin (SDM) ...............................................                                     3.1-1 3.1.2          Reactivity Anomalies ...............................................                                       3.1-5 3.1.3          Control Rod OPERABILITY ...............................................                                   3.1-7 3.1.4          Control Rod Scram Times ................................................                                  3.1-12 3.1.5          Control Rod Scram Accumulators ................................................ 3.1-15 3.1.6          Rod Pattern Control ............................................... 3.1-18 3.1.7          Standby Liquid Control (SLC) System ............................................... 3.1-20 3.1.8          Scram Discharge Volume (SDV) Vent and Drain Valves ....... ........ TS/3.1-25 3.2        POWER DISTRIBUTION LIMITS ...............................................                                    3.2-1 3.2.1          Average Planar Linear Heat Generation Rate (APLHGR) ....... ..........                                   3.2-1 3.2.2          Minimum Critical Power Ratio (MCPR) ..............................................                        3.2-3 3.2.3          Linear Heat Generation Rate (LHGR) ...............................................                       3.2-5 3.2.4          Average Power Range Monitor (APRM) Gain and Setpoints .............                                       3.2-7 3.3        INSTRUMENTATION ............................................... 3.3-1 3.3.1.1        Reactor Protection System (RPS) Instrumentation ........................ TS/3.3-1                                I 3.3.1.2        Source Range Monitor (SRM) Instrumentation .................................. 3.3-10 3.3.1.3        Oscillation Power Range Monitor (OPRM)
TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 1.0 1.1 1.2 1.3 1.4 2.0 2.1 2.2 3.0 3.0 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.3 3.3.1.1 3.3.1.2 3.3.1.3 3.3.2.1 3.3.2.2 3.3.3.1 3.3.3.2 3.3.4.1 3.3.4.2 3.3.5.1 3.3.5.2 3.3.6.1 3.3.6.2 3.3.7.1 USE AND APPLICATION...............................................
Instrumentation ...........                   .................................... TS/3.3-15a 3.3.2.1        Control Rod Block Instrumentation ...............................................                         3.3-16 3.3.2.2        Feedwater - Main Turbine High Water Level Trip Instrumentation ............................................... 3.3-21 3.3.3.1        Post Accident Monitoring (PAM) Instrumentation ............ .................. 3.3-23 3.3.3.2        Remote Shutdown System ...............................................                                   3.3-27 3.3.4.1        End of Cycle Recirculation Pump Trip (EOC-RPT)
1.1-1 Definitions............................................................................................ 1.1-1 Logical Connectors...............................................
Instrumentation ............................................... 3.3-30 3.3.4.2        Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation ................. ................... 3.3-34 3.3.5.1        Emergency Core Cooling System (ECCS) Instrumentation .......... TS/3.3-37 3.3.5.2        Reactor Core Isolation Cooling (RCIC) System Instrumentation ............................................... 3.3-48 3.3.6.1        Primary Containment Isolation Instrumentation ............................. TS/3.3-52 3.3.6.2        Secondary Containment Isolation Instrumentation ...........                             ................. 3.3-63 3.3.7.1        Control Room Emergency Outside Air Supply (CREOAS)
1.2-1 Completion Times................................................
System Instrumentation ...............................................                                 3.3-67 (continued)
1.3-1 Frequency............................................................................................ 1.4-1 SAFETY LIMITS (SLs)................................................
SUSQUEHANNA - UNIT 2                           TS/rOC - 1                 Amendment g1, 108, 1Xb, 1,.2, A99, 202
TS/2.0-1 SLs.................................................
TS/2.0-1 SL Violations...............................................
TS /2.0-1 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY.............. 3.0-1 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY....................... TS/3.0-4 REACTIVITY CONTROL SYSTEMS................................................
3.1-1 Shutdown Margin (SDM)...............................................
3.1-1 Reactivity Anomalies...............................................
3.1-5 Control Rod OPERABILITY...............................................
3.1-7 Control Rod Scram Times................................................
3.1-12 Control Rod Scram Accumulators................................................
3.1-15 Rod Pattern Control............................................... 3.1-18 Standby Liquid Control (SLC) System............................................... 3.1-20 Scram Discharge Volume (SDV) Vent and Drain Valves.......  
........ TS/3.1-25 POWER DISTRIBUTION LIMITS...............................................
3.2-1 Average Planar Linear Heat Generation Rate (APLHGR).......  
.......... 3.2-1 Minimum Critical Power Ratio (MCPR).............................................. 3.2-3 Linear Heat Generation Rate (LHGR)............................................... 3.2-5 Average Power Range Monitor (APRM) Gain and Setpoints............. 3.2-7 INSTRUMENTATION............................................... 3.3-1 Reactor Protection System (RPS) Instrumentation........................ TS/3.3-1 Source Range Monitor (SRM) Instrumentation.................................. 3.3-10 Oscillation Power Range Monitor (OPRM)
Instrumentation...........  
.................................... TS/3.3-15a Control Rod Block Instrumentation...............................................
3.3-16 Feedwater - Main Turbine High Water Level Trip Instrumentation............................................... 3.3-21 Post Accident Monitoring (PAM) Instrumentation............  
.................. 3.3-23 Remote Shutdown System...............................................
3.3-27 End of Cycle Recirculation Pump Trip (EOC-RPT)
Instrumentation............................................... 3.3-30 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation.................  
................... 3.3-34 Emergency Core Cooling System (ECCS) Instrumentation.......... TS/3.3-37 Reactor Core Isolation Cooling (RCIC) System Instrumentation............................................... 3.3-48 Primary Containment Isolation Instrumentation............................. TS/3.3-52 Secondary Containment Isolation Instrumentation...........  
................. 3.3-63 Control Room Emergency Outside Air Supply (CREOAS)
System Instrumentation...............................................
3.3-67 I
(continued)
SUSQUEHANNA - UNIT 2 TS/rOC - 1 Amendment g1, 108, 1Xb, 1,.2, A99, 202


TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 3.7           PLANT SYSTEMS ..................................                                                   TS/3.7-1 3.7.1               Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS) ............................                             TS/3.7-1 3.7.2               Emergency Service Water (ESW) System ..................                             .......... 3.7-4 3.7.3               Control Room Emergency Outside Air Supply (CREOAS) System ...............................                                         TS/3.7-6 3.7.4               Control Room Floor Cooling System ............                         ................... 3.7-10 3.7.5               Main Condenser Offgas ...............................                                             3.7-13 3.7.6               Main Turbine Bypass System ...............................                                   TS/3.7-15 3.7.7               Spent Fuel Storage Pool Water Level ..............                         ................. 3.7-17 3.8           ELECTRICAL POWER SYSTEMS ...............................                                               3.8-1 3.8.1               AC Sources - Operating ..............................                                           TS/3.8-1 3.8.2               AC Sources -Shutdown ............................                                           TS /3.8-19 3.8.3               Diesel Fuel Oil, Lube Oil, and Starting Air ...                   ......................... TS/3.8-23 3.8.4               DC Sources - Operating ............................                                             3.8-26 3.8.5               DC Sources - Shutdown ............................                                               3.8-34 3.8.6               Battery Cell Parameters ............................                                             3.8-39 3.8.7               Distribution Systems - Operating ............................                                 TS/3.8-44 3.8.8               Distribution Systems - Shutdown ............................                                     3.8-50 3.9           REFUELING OPERATIONS ............................                                                     3.9-1 3.9.1               Refueling Equipment Interlocks ............................                                     3.9-1 3.9.2               Refuel Position One-Rod-Out Interlock ............                         ................ 3.9-3 3.9.3             Control Rod Position ............................                                               3.9-5 3.9.4               Control Rod Position Indication ............................                                     3.9-6 3.9.5             Control Rod OPERABILITY - Refueling ............................                                 3.9-8 3.9.6             Reactor Pressure Vessel (RPV) Water Level .................................... 3.9-9 3.9.7             Residual Heat Removal (RHR) - High Water Level .......................... 3.9-10 3.9.8             Residual Heat Removal (RHR) - Low Water Level .....                                             3.9-13 3.10         SPECIAL OPERATIONS .......................................... 3.10-1 3.10.1             Inservice Leak and Hydrostatic Testing Operation ............................ 3.10-1 3.10.2             Reactor Mode Switch Interlock Testing .......................................... 3.10-4 3.10.3             Single Control Rod Withdrawal - Hot Shutdown ........................                           3.......1.
TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 3.7 PLANT SYSTEMS..................................
I.0-6 3.10.4             Single Control Rod Withdrawal - Cold Shutdown.........                       .          .. 3.10-9 3.10.5             Single Control Rod Drive (CRD) Removal - Refueling ...................... 3.10-13 3.10.6             Multiple Control Rod Withdrawal - Refueling .................................... 3.10-16 3.10.7             Control Rod Testing - Operating ...........................................                     3.10-18 3.10.8             SHUTDOWN MARGIN (SDM)                     Test-     Refueling ................................ 3.10-20 4.0       DESIGN FEATURES.................................................................................       TS/4.0-1 4.1             Site Location ..........................................                                         TS/4.0-1 4.2             Reactor Core ..........................................                                         TS/4.0-1 4.3             Fuel Storage ...........................................                                         TS/4.0-1 (continued)
TS/3.7-1 3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS)............................
SUSUEHNN - UNI
TS/3.7-1 3.7.2 Emergency Service Water (ESW) System..................  
                  -        2                     TSIC-- 3                  mnmn               g             .,1         0 SUSQUEHANNA         UNIT 2                     TS/TOC                   Amendment 1%1,               18,       1P2, 202
.......... 3.7-4 3.7.3 Control Room Emergency Outside Air Supply (CREOAS) System...............................
TS/3.7-6 3.7.4 Control Room Floor Cooling System............  
................... 3.7-10 3.7.5 Main Condenser Offgas...............................
3.7-13 3.7.6 Main Turbine Bypass System...............................
TS/3.7-15 3.7.7 Spent Fuel Storage Pool Water Level..............  
................. 3.7-17 3.8 ELECTRICAL POWER SYSTEMS...............................
3.8-1 3.8.1 AC Sources - Operating..............................
TS/3.8-1 3.8.2 AC Sources -Shutdown............................
TS /3.8-19 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air...  
......................... TS/3.8-23 3.8.4 DC Sources - Operating............................
3.8-26 3.8.5 DC Sources - Shutdown............................
3.8-34 3.8.6 Battery Cell Parameters............................
3.8-39 3.8.7 Distribution Systems - Operating............................
TS/3.8-44 3.8.8 Distribution Systems - Shutdown............................
3.8-50 3.9 REFUELING OPERATIONS............................
3.9-1 3.9.1 Refueling Equipment Interlocks............................
3.9-1 3.9.2 Refuel Position One-Rod-Out Interlock............  
................ 3.9-3 3.9.3 Control Rod Position............................
3.9-5 3.9.4 Control Rod Position Indication............................
3.9-6 3.9.5 Control Rod OPERABILITY - Refueling............................
3.9-8 3.9.6 Reactor Pressure Vessel (RPV) Water Level....................................
3.9-9 3.9.7 Residual Heat Removal (RHR) - High Water Level.......................... 3.9-10 3.9.8 Residual Heat Removal (RHR) - Low Water Level.....
3.9-13 3.10 SPECIAL OPERATIONS.......................................... 3.10-1 3.10.1 Inservice Leak and Hydrostatic Testing Operation............................ 3.10-1 3.10.2 Reactor Mode Switch Interlock Testing.......................................... 3.10-4 3.10.3 Single Control Rod Withdrawal - Hot Shutdown........................
3.......1.
I.0-6 3.10.4 Single Control Rod Withdrawal - Cold Shutdown.........
3.10-9 3.10.5 Single Control Rod Drive (CRD) Removal - Refueling...................... 3.10-13 3.10.6 Multiple Control Rod Withdrawal - Refueling....................................
3.10-16 3.10.7 Control Rod Testing - Operating...........................................
3.10-18 3.10.8 SHUTDOWN MARGIN (SDM) Test-Refueling................................ 3.10-20 4.0 DESIGN FEATURES................................................................................. TS/4.0-1 4.1 Site Location..........................................
TS/4.0-1 4.2 Reactor Core..........................................
TS/4.0-1 4.3 Fuel Storage...........................................
TS/4.0-1 (continued)
SUSUEHNN  
- UNI 2 TSIC-mnmn g  
.,1 0
SUSQUEHANNA - UNIT 2 TS/TOC - 3 Amendment 1%1, 18, 1P2, 202


PPL Rev.
PPL Rev.
RPS Instrumentation 3.3.1.1 Table 3.3.1.1 1 (page 1 of 3)
RPS Instrumentation 3.3.1.1 Table 3.3.1.1 1 (page 1 of 3)
Reactor Protection System Instrumentation APPLICABLE                                   CONDmONS OTIHER             REQUIRED             REFERENCED             SURVEILLANCE         ALLOWABLE FUNCTION                SPECIFiED SPCIFIDON          CHANNELS TRIP SYSTEM  PER         ATO D.1.
Reactor Protection System Instrumentation APPLICABLE CONDmONS OTIHER REQUIRED REFERENCED SURVEILLANCE ALLOWABLE SPECIFiED CHANNELS PER ACTION D.1 REQUIREMENTS VALUE FUNCTION SPCIFIDON TRIP SYSTEM ATO
ACTION              REQUIREMENTS               VALUE
: 1. Intermediate Range Monitors
: 1. Intermediate Range Monitors
: a. Neutron                   2                       3                     G             SR 3.3.1.1.1       51221125 divisions Flux-High                                                                                                of full scale SR 3.3.1.1.4 SR 3.3.1.1.6 SR 3.3.1.1.7 SR 3.3.1.1.11 SR 3.3.1.1.15 5(a)                     3                     H             SR 3.3.1.1.1       S 122/125 divisions SR 3.3.1.1.5       of full scale SR 3.3.1.1.11 SR 3.3.1.1.15
: a. Neutron Flux-High 2
: b. Inop                     2                       3                     G             SR 3.3.1.1.4       NA SR 3.3.1.1.15 5(a)                    3                    H            SR 3.3.1.1.5       NA SR 3.3.1.1.15                           I
3 G
SR 3.3.1.1.1 SR 3.3.1.1.4 SR 3.3.1.1.6 SR 3.3.1.1.7 SR 3.3.1.1.11 SR 3.3.1.1.15 51221125 divisions of full scale 5(a) 3 H
SR 3.3.1.1.1 SR 3.3.1.1.5 SR 3.3.1.1.11 SR 3.3.1.1.15 S 122/125 divisions of full scale
: b. Inop 2
3 G
H SR 3.3.1.1.4 SR 3.3.1.1.15 SR 3.3.1.1.5 SR 3.3.1.1.15 NA 5(a) 3 NA I
: 2. Average Power Range Monitors
: 2. Average Power Range Monitors
: a. Neutron                   2                       2                     G             SR 3.3.1.1.1       S 20%/a RTP Flux-High.                                                                            SR 3.3.1.1.4 Setdown                                                                              SR 3.3.1.1.7 SR 3.3.1.1.8 SR 3.3.1.1.11 SR 3.3.1.1.15
: a. Neutron Flux-High.
: b. Flow Biased               1                       2                     F             SR 3.3.1.1.1       5 0.58W Simulated                                                                            SR 3.3.1.12       + 62%/RTPO) and Thermal                                                                              SR 3.3.1.1.3       S 115.5% RTP Power-High                                                                            SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.1.1.14 SR 3.3.1.1.15 SR 3.3.1.1.17 (continued)
Setdown 2
(a)   WIth any control rod withdrawn from a core cell containing one or more fuel assemblies.
2 G
(b)   0.58 W + 57% RTP when reset for single loop operation per LCO 3.4.1, 'Recirculatlon Loops Operating.
SR 3.3.1.1.1 SR 3.3.1.1.4 SR 3.3.1.1.7 SR 3.3.1.1.8 SR 3.3.1.1.11 SR 3.3.1.1.15 S 20%/a RTP
SUSQUEHANNA - UNIT 2                                   TS/3.3-7                                             Amendment 202 1    I
: b. Flow Biased Simulated Thermal Power-High 1
2 F
SR 3.3.1.1.1 SR 3.3.1.12 SR 3.3.1.1.3 SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.1.1.14 SR 3.3.1.1.15 SR 3.3.1.1.17 5 0.58W
+ 62%/ RTPO) and S 115.5% RTP (continued)
(a)
WIth any control rod withdrawn from a core cell containing one or more fuel assemblies.
(b) 0.58 W + 57% RTP when reset for single loop operation per LCO 3.4.1, 'Recirculatlon Loops Operating.
SUSQUEHANNA - UNIT 2 TS/3.3-7 Amendment 1 202 I


PPL Rev.
PPL Rev.
ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS
ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS
                                              -NOTES             ---------
-NOTES
: 1. Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
: 1.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 3.c and 3.e; and (b) for up to 6 hours for Functions other than 3.c and 3.e provided the associated Function or the redundant Function maintains ECCS initiation capability.
Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
SURVEILLANCE                                       FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.                                           12 hours SR 3.3.5.1.2                               _-        _--
: 2.
A test of all required contacts does not have to be performed.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 3.c and 3.e; and (b) for up to 6 hours for Functions other than 3.c and 3.e provided the associated Function or the redundant Function maintains ECCS initiation capability.
Perform CHANNEL FUNCTIONAL TEST.                               92 days SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.                                     92 days SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.                                     24 months SR 3.3.5.1.5 Perform LOGIC SYSTEM FUNCTIONAL TEST.                           24 months SUSQUEHANNA-UNIT2                       TS /3.3-42                         Amendment No. 1%1, 202
SURVEILLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.
12 hours SR 3.3.5.1.2 A test of all required contacts does not have to be performed.
Perform CHANNEL FUNCTIONAL TEST.
92 days SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.
92 days SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.
24 months SR 3.3.5.1.5 Perform LOGIC SYSTEM FUNCTIONAL TEST.
24 months SUSQUEHANNA-UNIT2 TS /3.3-42 Amendment No. 1%1, 202


PPL Rev.
PPL Rev.
AC Sources-Operating 3.8.1 ACTIONS CONDITION         REQUIRED ACTION                 COMPLETION TIME A. (continued)       A.2 Declare required feature(s)     24 hours from with no offsite power available discovery of no offsite inoperable when the             power to one 4.16 kV redundant required feature(s)   ESS bus concurrent are inoperable.                 with inoperability of redundant required feature(s).
AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
AND A.3 Restore offsite circuit to       72 hours OPERABLE status.
A.2 Declare required feature(s) 24 hours from with no offsite power available discovery of no offsite inoperable when the power to one 4.16 kV redundant required feature(s)
AND 6 days from discovery of failure to meet LCO (continued)
ESS bus concurrent are inoperable.
SUSQUEHANNA - UNIT 2     TS / 3.8-2                               Amendment 131 129 202
with inoperability of redundant required feature(s).
AND A.3 Restore offsite circuit to OPERABLE status.
72 hours AND 6 days from discovery of failure to meet LCO (continued)
SUSQUEHANNA - UNIT 2 TS / 3.8-2 Amendment 131 129 202


PPL Rev.
PPL Rev.
AC Sources-Shutdown 3.8.2 3.8       ELECTRICAL POWER SYSTEMS 3.8.2     AC Sources-Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:
AC Sources-Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources-Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:
: a. One qualified circuit between the offsite transmission network and the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown"; and
: a. One qualified circuit between the offsite transmission network and the onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown"; and
: b. Two diesel generators (DGs) capable of supplying the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8.
: b. Two diesel generators (DGs) capable of supplying the onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.8.
: c. One qualified circuit between the offsite transmission network and the Unit 1 onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown; and
: c. One qualified circuit between the offsite transmission network and the Unit 1 onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown; and
: d. The DG(s) capable of supplying the Unit 1 onsite Class 1E electrical power distribution subsystem(s) required by LCO 3.8.8.
: d. The DG(s) capable of supplying the Unit 1 onsite Class 1 E electrical power distribution subsystem(s) required by LCO 3.8.8.
APPLICABILITY:     MODES 4 and 5 During movement of irradiated fuel assemblies in the secondary containment.
APPLICABILITY:
SUSQUEHANNA - UNIT 2                   T S /3.8-19                           Amendment   ldl 2021
MODES 4 and 5 During movement of irradiated fuel assemblies in the secondary containment.
SUSQUEHANNA - UNIT 2 T S / 3.8-19 Amendment ldl 2021


PPL Rev. 1 Distribution Systems-Operating 3.8.7 3.8             ELECTRICAL POWER SYSTEMS 3.8.7           Distribution Systems-Operating LCO 3.8.7 The electrical power distribution subsystems in Table 3.8.7-1 shall be OPERABLE.
PPL Rev. 1 Distribution Systems-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The electrical power distribution subsystems in Table 3.8.7-1 shall be OPERABLE.
APPLICABILITY:         MODES 1, 2, and 3.
APPLICABILITY:
ACTIONS CONDITION                           REQUIRED ACTION                   COMPLETION TIME A. -------       NOTE------                 --------- Note----
MODES 1, 2, and 3.
Not applicable to DG E DC             Enter applicable Conditions and Bus OD597                             Required Actions of LCO 3.8.4,
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. -------
_----          -.--        DC Sources - Operating," for DC source(s) made inoperable One or more Unit 2 AC                 by inoperable power distribution electrical power distribution         subsystem(s).
NOTE------  
subsystems inoperable.                   -      -----      --
--------- Note----
A.1 Restore Unit 2 AC electrical         8 hours power distribution subsystem(s) to OPERABLE status.                   AND 16 hours from discovery of failure to meet LCO 3.8.7 except for Condition EorF B. --------------- NOTE-------------- B.1 Restore Unit 2 DC electrical           2 hours Not applicable to DG E DC             power distribution subsystem(s)
Not applicable to DG E DC Enter applicable Conditions and Bus OD597 Required Actions of LCO 3.8.4, DC Sources - Operating," for DC source(s) made inoperable One or more Unit 2 AC by inoperable power distribution electrical power distribution subsystem(s).
Bus OD597                             to OPERABLE status.                   AND One or more Unit 2 DC                                                       16 hours from electrical power distribution                                               discovery of failure to subsystems inoperable.                                                       meet LCO 3.8.7 except for Condition E or F C. One or more Unit 1 AC             C.1 Restore Unit 1 AC electrical           72 hours electrical power distribution         power distribution subsystem to subsystems inoperable.               OPERABLE status.
subsystems inoperable.
A.1 Restore Unit 2 AC electrical 8 hours power distribution subsystem(s) to OPERABLE status.
AND 16 hours from discovery of failure to meet LCO 3.8.7 except for Condition EorF B. --------------- NOTE--------------
B.1 Restore Unit 2 DC electrical 2 hours Not applicable to DG E DC power distribution subsystem(s)
Bus OD597 to OPERABLE status.
AND One or more Unit 2 DC 16 hours from electrical power distribution discovery of failure to subsystems inoperable.
meet LCO 3.8.7 except for Condition E or F C. One or more Unit 1 AC C.1 Restore Unit 1 AC electrical 72 hours electrical power distribution power distribution subsystem to subsystems inoperable.
OPERABLE status.
(continued)
(continued)
SUSQUEHANNA-UNIT 2                           TS / 3.8-44                           Amendment 'L81       I 202}}
SUSQUEHANNA-UNIT 2 TS / 3.8-44 Amendment 'L81 202 I}}

Latest revision as of 15:58, 15 January 2025

Technical Specification Pages Re Distribution Systems-Operating
ML052300322
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/17/2005
From:
NRC/NRR/DLPM/LPD1
To:
References
TAC MC4429, TAC MC4430, TSTF-16
Download: ML052300322 (15)


Text

TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 1.0 USE AND APPLICATION................................................

1.1-1 1.1 Definitions................................................

1.1-1 1.2 Logical Connectors................................................

1.2-1 1.3 Completion Times................................................

1.3-1 1.4 Frequency................................................

1.4-1 2.0 SAFETY LIMITS (SLs)................................................

TS/2.0-1 2.1 SLs..................................................

TS/2.0-1 2.2 SL Violations................................................

TS/2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY............. 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY....................... TS/3.0-4 3.1 REACTIVITY CONTROL SYSTEMS................................................

3.1-1 3.1.1 Shutdown Margin (SDM)................................................

3.1-1 3.1.2 Reactivity Anomalies................................................

3.1-5 3.1.3 Control Rod OPERABILITY................................................

3.1-7 3.1.4 Control Rod Scram Times................................................

3.1-12 3.1.5 Control Rod Scram Accumulators................................................

3.1-15 3.1.6 Rod Pattern Control................................................

3.1-18 3.1.7 Standby Liquid Control (SLC) System................................................ 3.1-20 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves............... TS/3.1-25 3.2 POWER DISTRIBUTION LIMITS................................................

3.2-1 3.2.1 Average Planar Linear Heat Generatibn Rate (APLHGR)................. 3.2-1 3.2.2 Minimum Critical Power Ratio (MCPR).............................................. 3.2-3 3.2.3 Linear Heat Generation Rate (LHGR)............................................... 3.2-5 3.2.4 Average Power Range Monitor (APRM) Gain and Setpoints............. 3.2-7 3.3 INSTRUMENTATION................................................

3.3-1 3.3.1.1 Reactor Protection System (RPS) Instrumentation........................ TS/3.3-1 3.3.1.2 Source Range Monitor (SRM) Instrumentation.................................. 3.3-10 3.3.1.3 Oscillation Power Range Monitor (OPRM)

Instrumentation.......................

TS/3.3-15a 3.3.2.1 Control Rod Block Instrumentation.......................

3.3-16 3.3.2.2 Feedwater - Main Turbine High Water Level Trip Instrumentation.................................

3.3-21 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation.............................. 3.3-23 3.3.3.2 Remote Shutdown System.................................

3.3-26 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT)

Instrumentation..

3.3-29 3.3.4.2 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation.

3.3-33 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation.......... TS/3.3-36 3.3.5.2 Reactor Core Isolation Cooling (RCIC) System Instrumentation..................................

3.3-48 3.3.6.1 Primary Containment Isolation Instrumentation............................. TS/3.3-52 3.3.6.2 Secondary Containment Isolation Instrumentation............................ 3.3-63 (continued)

SUSQUEHANNA - UNIT 1 TS/ TOC-1 Amendment 1t4, 2Z5, 2Y7, 2,2, 225

TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 3.7 PLANT SYSTEMS...........................................

TS/3.7-1 3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS).............................

TS/3.7-1 3.7.2 Emergency Service Water (ESW) System.............................

3.7-4 3.7.3 Control Room Emergency Outside Air Supply (CREOAS) System...........................................

TS/3.7-6 3.7.4 Control Room Floor Cooling System...........................................

3.7-10 3.7.5 Main Condenser Offgas...........................................

3.7-13 3.7.6 Main Turbine Bypass System...........................................

TS/3.7-15 3.7.7 Spent Fuel Storage Pool Water Level...........................................

3.7-17 3.8 ELECTRICAL POWER SYSTEMS...........................................

3.8-1 3.8.1 AC Sources - Operating...........................................

TS/3.8-1 3.8.2 AC Sources - Shutdown........................................... TS/3.8-17 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air..................................... TS/3.8-20 3.8.4 DC Sources - Operating............................................

3.8-23 3.8.5 DC Sources - Shutdown...........................................

3.8-29 3.8.6 Battery Cell Parameters............................................

3.8-32 3.8.7 Distribution Systems - Operating...........................................

TS/3.8-37 3.8.8 Distribution Systems - Shutdown...........................................

TS/3.8-41 3.9 REFUELING OPERATIONS...........................................

3.9-1 3.9.1 Refueling Equipment Interlocks...........................................

3.9-1 3.9.2 Refuel Position One-Rod-Out Interlock...........................................

3.9-3 3.9.3 Control Rod Position...........................................

3.9-5 3.9.4 Control Rod Position Indication...........................................

3.9-6 3.9.5 Control Rod OPERABILITY - Refueling........................................... 3.9-8 3.9.6 Reactor Pressure Vessel (RPV) Water Level.................................... 3.9-9 3.9.7 Residual Heat Removal (RHR) - High Water Level.......................... 3.9-10 3.9.8 Residual Heat Removal (RHR) - Low Water Level........................... 3.9-13 3.10 SPECIAL OPERATIONS...........................................

3.10-1 3.10.1 Inservice Leak and Hydrostatic Testing Operation............................ 3.10-1 3.10.2 Reactor Mode Switch Interlock Testing............................................ 3.10-4 3.10.3 Single Control Rod Withdrawal - Hot Shutdown............................... 3.10-6 3.10.4 Single Control Rod Withdrawal - Cold Shutdown.............................. 3.10-9 3.10.5 Single Control Rod Drive (CRD) Removal - Refueling...................... 3.10-13 3.10.6 Multiple Control Rod Withdrawal - Refueling.................................... 3.10-16 3.10.7 Control Rod Testing-Operating...........................................

3.10-18 3.10.8 SHUTDOWN MARGIN (SDM) Test - Refueling................................ 3.10-20 4.0 DESIGN FEATURES...........................................

4.0-1 4.1 Site Location...........................................

4.0-1 4.2 Reactor Core...........................................

4.0-1 4.3 Fuel Storage............................................

4.0-1 (continued)

SUSQUEHANNA - UNIT I TS/TOC-3 Amendment 1$4, 2X7, 225 SUSQUEHANNA - UNIT 1 TS/TOC-3 Amendment i$4, 2Z7, 225

PPL Rev.

RPS Instrumentation 3.3.1.1 Table 3.3.1.1-1 (page 1 of 3)

Reactor Protection System Instrumentation APPLICABLE CONDmONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDmONS SYSTEM ACTION D.1 REQUIREMENTS VALUE

1. Intermediate Range Monitors
a.

Neutron Flux-High 2

3 3

G SR 3.3.1.1.1 SR 3.3.1.1.4 SR 3.3.1.1.6 SR 3.3.1.1.7 SR 3.3.1.1.11 SR 3.3.1.1.15 H

SR 3.3.1.1.1 SR 3.3.1.1.5 SR 3.3.1.1.11 SR 3.3.1.1.15 S 1221125 divisions of full scale S 1221125 divisions of full scale 5 (a)

b.

Inop 2

3 3

G SR 3.3.1.1.4 SR 3.3.1.1.15 H

SR 3.3.1.1.5 SR 3.3.1.1.15 NA 5(a)

NA I

2. Average Power Range Monitors
a.

Neutron Flux-Hig, Setdown 2

2 G

SR 3.3.1.1.1 SR 3.3.1.1A SR 3.3.1.1.7 SR 3.3.1.1.8 SR 3.3.1.1.11 SR 3.3.1.1.15 S 20% RTP

b.

Flow Biased Simulated Thermal Power-High 2

F SR 3.3.1.1.1 SR 3.3.1.12 SR 3.3.1.1.3 SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.1.1.14 SR 3.3.1.1.15 SR 3.3.1.1.17 S0.58W

+ 62%/e RTP() and S 115.5% RTP (a)

With any control rod withdrawn from a core cell containing one or more fuel assemblies.

(b) 0.58 W + 57% RTP when reset for single loop operation per LCO 3.4.1, 'Recirculation Loops Operating.'

SUSQUEHANNA - UNIT 1 TS /3.3-7 Amendment V8,22.5

PPL Rev.

ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS

--- NOTES--------------------

1.

Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 3.c and 3.e; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 3.c and 3.e provided the associated Function or the redundant Function maintains ECCS initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.5.1.2 A test of all required contacts does not have to be performed.

Perform CHANNEL FUNCTIONAL TEST.

92 days SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.

92 days SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.

24 months SR 3.3.5.1.5 Perform LOGIC SYSTEM FUNCTIONAL TEST.

24 months SUSQUEHANNA - UNIT 1 TS / 3.3-41 Amendment 17A, l

225,

PPL Rev.

AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)

A.3 Restore offsite circuit to OPERABLE 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> status.

AND 6 days from discovery of failure to meet LCO B. One required B.1 Perform SR 3.8.1.1 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> DG inoperable.

OPERABLE offsite circuits.

AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND B.2 Declare required feature(s),

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of supported by the inoperable DG, Condition B concurrent inoperable when the redundant with inoperability of required feature(s) are inoperable.

redundant required feature(s)

AND (continued)

SUSQUEHANNA - UNIT 1 TS /3.8-2 Amendment1A 22 4 275

PPL Rev.

AC Sources-Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources-Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:

a.

One qualified circuit between the offsite transmission network and the onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown"; and

b.

Two diesel generators (DGs) capable of supplying the onsite Class I E AC electrical power distribution subsystem(s) required by LCO 3.8.8.

APPLICABILITY:

MODES 4 and 5 During movement of irradiated fuel assemblies in the secondary containment.

I SUSQUEHANNA - UNIT 1 TS / 3.8-17 Amendment 1/8, 225 I

PPL Rev. 1 Distribution Systems - Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The electrical power distribution subsystems in Table 3.8.7-1 shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.-


NOTE-Note-------------

Not applicable to DG E Enter applicable Conditions and DC electrical power Required Actions of LCO 3.8.4, subsystem.

"DC Sources - Operating," for DC source(s) made inoperable One or more Unit 1 by inoperable power distribution AC electrical power subsystem(s).

distribution subsystems inoperable.

A.1 Restore Unit 1 AC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> power distribution subsystem(s) to OPERABLE AND status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7 except for Condition D or E B. ----------NOTE----------

B.1 Restore Unit 1 DC 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Not applicable to DG E electrical power distribution DC electrical power subsystem(s) to AND subsystem.

OPERABLE status.

One or more Unit 1 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery DC electrical power of failure to meet distribution LCO 3.8.7 except for subsystems Condition D or E inoperable.

(continued)

I I

I I

SUSQUEHANNA - UNIT 1 T S / 3.8-37 Amendment 1-?8, 225

PPL Rev.

Distribution Systems - Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Distribution Systems-Shutdown LCO 3.8.8 The necessary portions of the AC and DC electrical power distribution subsystems listed in Table 3.8.7-1 shall be OPERABLE to support equipment required to be OPERABLE.

APPLICABILITY:

MODES 4 and 5, During movement of irradiated fuel assemblies in the secondary containment.

I ACTIONS

.lr srn

_I_

W.J1 Z--------

LCO 3.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. ---------- NOTE------------

A.1 Declare associated Immediately Not applicable to DG E supported required DC electrical power feature(s) inoperable.

subsystem.

OR One or more required AC or DC electrical power distribution subsystems inoperable.

(continued)

SUSQUEHANNA - UNIT 1 T S / 3.8-41 Amendment 1/8, 225 1

TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 1.0 1.1 1.2 1.3 1.4 2.0 2.1 2.2 3.0 3.0 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.3 3.3.1.1 3.3.1.2 3.3.1.3 3.3.2.1 3.3.2.2 3.3.3.1 3.3.3.2 3.3.4.1 3.3.4.2 3.3.5.1 3.3.5.2 3.3.6.1 3.3.6.2 3.3.7.1 USE AND APPLICATION...............................................

1.1-1 Definitions............................................................................................ 1.1-1 Logical Connectors...............................................

1.2-1 Completion Times................................................

1.3-1 Frequency............................................................................................ 1.4-1 SAFETY LIMITS (SLs)................................................

TS/2.0-1 SLs.................................................

TS/2.0-1 SL Violations...............................................

TS /2.0-1 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY.............. 3.0-1 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY....................... TS/3.0-4 REACTIVITY CONTROL SYSTEMS................................................

3.1-1 Shutdown Margin (SDM)...............................................

3.1-1 Reactivity Anomalies...............................................

3.1-5 Control Rod OPERABILITY...............................................

3.1-7 Control Rod Scram Times................................................

3.1-12 Control Rod Scram Accumulators................................................

3.1-15 Rod Pattern Control............................................... 3.1-18 Standby Liquid Control (SLC) System............................................... 3.1-20 Scram Discharge Volume (SDV) Vent and Drain Valves.......

........ TS/3.1-25 POWER DISTRIBUTION LIMITS...............................................

3.2-1 Average Planar Linear Heat Generation Rate (APLHGR).......

.......... 3.2-1 Minimum Critical Power Ratio (MCPR).............................................. 3.2-3 Linear Heat Generation Rate (LHGR)............................................... 3.2-5 Average Power Range Monitor (APRM) Gain and Setpoints............. 3.2-7 INSTRUMENTATION............................................... 3.3-1 Reactor Protection System (RPS) Instrumentation........................ TS/3.3-1 Source Range Monitor (SRM) Instrumentation.................................. 3.3-10 Oscillation Power Range Monitor (OPRM)

Instrumentation...........

.................................... TS/3.3-15a Control Rod Block Instrumentation...............................................

3.3-16 Feedwater - Main Turbine High Water Level Trip Instrumentation............................................... 3.3-21 Post Accident Monitoring (PAM) Instrumentation............

.................. 3.3-23 Remote Shutdown System...............................................

3.3-27 End of Cycle Recirculation Pump Trip (EOC-RPT)

Instrumentation............................................... 3.3-30 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation.................

................... 3.3-34 Emergency Core Cooling System (ECCS) Instrumentation.......... TS/3.3-37 Reactor Core Isolation Cooling (RCIC) System Instrumentation............................................... 3.3-48 Primary Containment Isolation Instrumentation............................. TS/3.3-52 Secondary Containment Isolation Instrumentation...........

................. 3.3-63 Control Room Emergency Outside Air Supply (CREOAS)

System Instrumentation...............................................

3.3-67 I

(continued)

SUSQUEHANNA - UNIT 2 TS/rOC - 1 Amendment g1, 108, 1Xb, 1,.2, A99, 202

TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 3.7 PLANT SYSTEMS..................................

TS/3.7-1 3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS)............................

TS/3.7-1 3.7.2 Emergency Service Water (ESW) System..................

.......... 3.7-4 3.7.3 Control Room Emergency Outside Air Supply (CREOAS) System...............................

TS/3.7-6 3.7.4 Control Room Floor Cooling System............

................... 3.7-10 3.7.5 Main Condenser Offgas...............................

3.7-13 3.7.6 Main Turbine Bypass System...............................

TS/3.7-15 3.7.7 Spent Fuel Storage Pool Water Level..............

................. 3.7-17 3.8 ELECTRICAL POWER SYSTEMS...............................

3.8-1 3.8.1 AC Sources - Operating..............................

TS/3.8-1 3.8.2 AC Sources -Shutdown............................

TS /3.8-19 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air...

......................... TS/3.8-23 3.8.4 DC Sources - Operating............................

3.8-26 3.8.5 DC Sources - Shutdown............................

3.8-34 3.8.6 Battery Cell Parameters............................

3.8-39 3.8.7 Distribution Systems - Operating............................

TS/3.8-44 3.8.8 Distribution Systems - Shutdown............................

3.8-50 3.9 REFUELING OPERATIONS............................

3.9-1 3.9.1 Refueling Equipment Interlocks............................

3.9-1 3.9.2 Refuel Position One-Rod-Out Interlock............

................ 3.9-3 3.9.3 Control Rod Position............................

3.9-5 3.9.4 Control Rod Position Indication............................

3.9-6 3.9.5 Control Rod OPERABILITY - Refueling............................

3.9-8 3.9.6 Reactor Pressure Vessel (RPV) Water Level....................................

3.9-9 3.9.7 Residual Heat Removal (RHR) - High Water Level.......................... 3.9-10 3.9.8 Residual Heat Removal (RHR) - Low Water Level.....

3.9-13 3.10 SPECIAL OPERATIONS.......................................... 3.10-1 3.10.1 Inservice Leak and Hydrostatic Testing Operation............................ 3.10-1 3.10.2 Reactor Mode Switch Interlock Testing.......................................... 3.10-4 3.10.3 Single Control Rod Withdrawal - Hot Shutdown........................

3.......1.

I.0-6 3.10.4 Single Control Rod Withdrawal - Cold Shutdown.........

3.10-9 3.10.5 Single Control Rod Drive (CRD) Removal - Refueling...................... 3.10-13 3.10.6 Multiple Control Rod Withdrawal - Refueling....................................

3.10-16 3.10.7 Control Rod Testing - Operating...........................................

3.10-18 3.10.8 SHUTDOWN MARGIN (SDM) Test-Refueling................................ 3.10-20 4.0 DESIGN FEATURES................................................................................. TS/4.0-1 4.1 Site Location..........................................

TS/4.0-1 4.2 Reactor Core..........................................

TS/4.0-1 4.3 Fuel Storage...........................................

TS/4.0-1 (continued)

SUSUEHNN

- UNI 2 TSIC-mnmn g

.,1 0

SUSQUEHANNA - UNIT 2 TS/TOC - 3 Amendment 1%1, 18, 1P2, 202

PPL Rev.

RPS Instrumentation 3.3.1.1 Table 3.3.1.1 1 (page 1 of 3)

Reactor Protection System Instrumentation APPLICABLE CONDmONS OTIHER REQUIRED REFERENCED SURVEILLANCE ALLOWABLE SPECIFiED CHANNELS PER ACTION D.1 REQUIREMENTS VALUE FUNCTION SPCIFIDON TRIP SYSTEM ATO

1. Intermediate Range Monitors
a. Neutron Flux-High 2

3 G

SR 3.3.1.1.1 SR 3.3.1.1.4 SR 3.3.1.1.6 SR 3.3.1.1.7 SR 3.3.1.1.11 SR 3.3.1.1.15 51221125 divisions of full scale 5(a) 3 H

SR 3.3.1.1.1 SR 3.3.1.1.5 SR 3.3.1.1.11 SR 3.3.1.1.15 S 122/125 divisions of full scale

b. Inop 2

3 G

H SR 3.3.1.1.4 SR 3.3.1.1.15 SR 3.3.1.1.5 SR 3.3.1.1.15 NA 5(a) 3 NA I

2. Average Power Range Monitors
a. Neutron Flux-High.

Setdown 2

2 G

SR 3.3.1.1.1 SR 3.3.1.1.4 SR 3.3.1.1.7 SR 3.3.1.1.8 SR 3.3.1.1.11 SR 3.3.1.1.15 S 20%/a RTP

b. Flow Biased Simulated Thermal Power-High 1

2 F

SR 3.3.1.1.1 SR 3.3.1.12 SR 3.3.1.1.3 SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.1.1.14 SR 3.3.1.1.15 SR 3.3.1.1.17 5 0.58W

+ 62%/ RTPO) and S 115.5% RTP (continued)

(a)

WIth any control rod withdrawn from a core cell containing one or more fuel assemblies.

(b) 0.58 W + 57% RTP when reset for single loop operation per LCO 3.4.1, 'Recirculatlon Loops Operating.

SUSQUEHANNA - UNIT 2 TS/3.3-7 Amendment 1 202 I

PPL Rev.

ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS

-NOTES

1.

Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 3.c and 3.e; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 3.c and 3.e provided the associated Function or the redundant Function maintains ECCS initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.5.1.2 A test of all required contacts does not have to be performed.

Perform CHANNEL FUNCTIONAL TEST.

92 days SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.

92 days SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.

24 months SR 3.3.5.1.5 Perform LOGIC SYSTEM FUNCTIONAL TEST.

24 months SUSQUEHANNA-UNIT2 TS /3.3-42 Amendment No. 1%1, 202

PPL Rev.

AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)

A.2 Declare required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from with no offsite power available discovery of no offsite inoperable when the power to one 4.16 kV redundant required feature(s)

ESS bus concurrent are inoperable.

with inoperability of redundant required feature(s).

AND A.3 Restore offsite circuit to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LCO (continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-2 Amendment 131 129 202

PPL Rev.

AC Sources-Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources-Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:

a. One qualified circuit between the offsite transmission network and the onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown"; and
b. Two diesel generators (DGs) capable of supplying the onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.8.
c. One qualified circuit between the offsite transmission network and the Unit 1 onsite Class 1 E AC electrical power distribution subsystem(s) required by LCO 3.8.8, Distribution Systems-Shutdown; and
d. The DG(s) capable of supplying the Unit 1 onsite Class 1 E electrical power distribution subsystem(s) required by LCO 3.8.8.

APPLICABILITY:

MODES 4 and 5 During movement of irradiated fuel assemblies in the secondary containment.

SUSQUEHANNA - UNIT 2 T S / 3.8-19 Amendment ldl 2021

PPL Rev. 1 Distribution Systems-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The electrical power distribution subsystems in Table 3.8.7-1 shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. -------

NOTE------


Note----

Not applicable to DG E DC Enter applicable Conditions and Bus OD597 Required Actions of LCO 3.8.4, DC Sources - Operating," for DC source(s) made inoperable One or more Unit 2 AC by inoperable power distribution electrical power distribution subsystem(s).

subsystems inoperable.

A.1 Restore Unit 2 AC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> power distribution subsystem(s) to OPERABLE status.

AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7 except for Condition EorF B. --------------- NOTE--------------

B.1 Restore Unit 2 DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Not applicable to DG E DC power distribution subsystem(s)

Bus OD597 to OPERABLE status.

AND One or more Unit 2 DC 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from electrical power distribution discovery of failure to subsystems inoperable.

meet LCO 3.8.7 except for Condition E or F C. One or more Unit 1 AC C.1 Restore Unit 1 AC electrical 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> electrical power distribution power distribution subsystem to subsystems inoperable.

OPERABLE status.

(continued)

SUSQUEHANNA-UNIT 2 TS / 3.8-44 Amendment 'L81 202 I