ML061660368: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
ST. LUCIE RETAKE EXAM 05000335/2004302 & 05000389/2004302 DECEMBER 21, 2004 FINAL JPMS & OUTLINE
ST. LUCIE RETAKE EXAM 05000335/2004302 & 05000389/2004302 DECEMBER 21, 2004 FINAL JPMS & OUTLINE


ES-201                                       Examination Outline Quality Checklist                                     Form ES-201-2 Facility:                                                                                       Date of Examination:
ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility:
Item                                                       Task Description                                                       Initials a       b-     c#
Date of Examination:
: 1.       a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.
Item Task Description Initials a
W                                                                                                                                VIA       ,/0, R       b. Assess whether the outline was systematically and randomly prepared in accordance with I           Section D.1 of ES-401 and whether all K/A categories are appropriately sampled.                                           _
b-c#
T T      c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
: 1.
N       d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.
: a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.
: 2.     a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S             and major transients.
VIA  
M         b. Assess whether there are enough scenario sets (and spares) to test the projected number U             and mix of applicants in accordance with the expected crew composition and rotation schedule L             without compromising exam integrity, and ensure that each applicant can be tested using A             at least one new or significantly modified scenario, that no scenarios are duplicated T             from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days.
,/0, W
O0       c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R             and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
R
: 3.       a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
: b. Assess whether the outline was systematically and randomly prepared in accordance with I
(1) the outline(s) contain(s) the required number of control room and in-plant tasks W                   distributed among the safety functions as specified on the form
Section D.1 of ES-401 and whether all K/A categories are appropriately sampled.
    /             (2) task repetition from the last two NRC examinations is within the limits specified on the form T             (3) no tasks are duplicated from the applicants' audit test(s)                                         Olf,         N     lo (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
TT
: c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
N
: d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.
: 2.
: a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S
and major transients.
M
: b. Assess whether there are enough scenario sets (and spares) to test the projected number U
and mix of applicants in accordance with the expected crew composition and rotation schedule L
without compromising exam integrity, and ensure that each applicant can be tested using A
at least one new or significantly modified scenario, that no scenarios are duplicated T
from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days.
O0
: c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R
and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
: 3.
: a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks W
distributed among the safety functions as specified on the form
/
(2) task repetition from the last two NRC examinations is within the limits specified on the form T
(3) no tasks are duplicated from the applicants' audit test(s)
: Olf, N
lo (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
b Verify that the administrative outline meets the criteria specified on Form ES-301-1:
b Verify that the administrative outline meets the criteria specified on Form ES-301-1:
: 1) the tasks are distributed among the topics as specified on the form.-J 6I2) at least one task is new or significantly modified %'                                         -        -        *
: 1) the tasks are distributed among the topics as specified on the form.-J 6I2) at least one task is new or significantly modified %'
(3) no more than one task is repeated from the last two NRC licensing examinations /
(3) no more than one task is repeated from the last two NRC licensing examinations /
: c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
: c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
: 4.       a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
: 4.
G       b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
: a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
i_     ?
G
N       c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.
: b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
E       d. Check for duplication and overlap among exam sections.
i_  
NA A       e. Check the entire exam for balance of coverage.
?
: f. Assess whether the exam fits the appropriate job level (RO or SRO).                                  .
N
                                                                ,,Printe   Narge/Si     reDate
: c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.
: a. Author                                 sl   S.1.       Lo,7IAv*ev       */ JLA,                                                       .Dt
E
: b. Facility Reviewer(*)                         t       14 ut,                                                                   /0
: d. Check for duplication and overlap among exam sections.
: c. NRC Chief Examiner(#)                       Ae. //       ,o                                                                   /
NA A
: d. NRC Supervisor                                           /                                                                       //       CV.
: e. Check the entire exam for balance of coverage.
Note:                   # Independent NRC reviewer initial items in Column 'c"; chief examiner concurrence required.
: f. Assess whether the exam fits the appropriate job level (RO or SRO).  
,,Printe Narge/Si reDate
: a. Author sl S.1.
Lo,7IAv*ev
: JLA,  
/ *
.Dt
: b. Facility Reviewer(*)
t 14 u t,  
/0
: c. NRC Chief Examiner(#)
Ae. //  
,o  
/
: d. NRC Supervisor  
//  
/
CV.
Note:  
# Independent NRC reviewer initial items in Column 'c"; chief examiner concurrence required.
* _,/.-
* _,/.-
(f           /Wlin7 CVVJ                           /              AJ-i)C         Cl-/Vf~ly /           1,Al   C,01   r
(f  
                                                                                                                                                  ý_'L,)   a ES-201, Page 25 of 27 jOV
/Wlin7  
/
CVVJ AJ-i)C Cl-/Vf~ly /
1,Al C,01 r
ES-201, Page 25 of 27
ý_'L,)
a j OV


ES-301                                   Administrative Topics Outline                         Form ES-301-1 Facility:     Saint Lucie                                           Date of Examination: 12-21-04 Examination Level (circle one): RO(SR_                               Operating Test Number:
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Administrative Topic             Type                     Describe activity to be performed-(see Note)               Code*
Saint Lucie Date of Examination: 12-21-04 Examination Level (circle one): RO(SR_
Conduct of Operations                             FCV-26-2 Fails Open, apply Tech Specs 2.1.12                                 N Conduct of Operations                 N         Use Control Wiring Diagrams 2.1.24 Equipment Control                     N 2.2.26                                           Refueling Administrative Requirements Radiation Control                     N Release 1B Waste Monitor Tank 2.3.6 Emergency Plan                         N         Loss of Control Room Annunicators 2.4.32 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
Operating Test Number:
*Type Codes & Criteria:             (C)ontrol room (D)irect from bank (.L 3 for ROs; <4 for SROs & RO retakes)
Administrative Topic Type Describe activity to be performed-(see Note)
Code*
Conduct of Operations FCV-26-2 Fails Open, apply Tech Specs 2.1.12 N
Conduct of Operations N
Use Control Wiring Diagrams 2.1.24 Equipment Control N
2.2.26 Refueling Administrative Requirements Radiation Control N
Release 1 B Waste Monitor Tank 2.3.6 Emergency Plan N
Loss of Control Room Annunicators 2.4.32 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
*Type Codes & Criteria:
(C)ontrol room (D)irect from bank (.L 3 for ROs; <4 for SROs & RO retakes)
(N)ew or (M)odified form bank L> 1)
(N)ew or (M)odified form bank L> 1)
(P)revious 2 exams L< 1; randomly selected)
(P)revious 2 exams L< 1; randomly selected)
(S)imulator ES-301, Page 22 of 27
(S)imulator ES-301, Page 22 of 27


Operating Test Quality Checklist                                                     Form ES-301-3 ES-301 Date of Examination: !a1/j.5-           d-/4     rating TestNumber:
ES-301 Operating Test Quality Checklist Form ES-301-3 Facility:
Facility:                   L I"'FoL, Initials General Criteria                                                               a.      b-       c#
I"'
changes are consistent with                      _W 11
L F,
: a.       The operating test conforms with the previously approved outline; safet function distribution) .                                _
oL Date of Examination: !a1/j.5-d-/4 rating TestNumber:
55.45, operational im ortance, sampling requirements (e.g., 10 CFR tests to be administered            N        '/"      T
Initials
: b.       There is no day-to-day repetition between this and other operating durinn   this examination.
: a.
audit testis). (see Section D.1 .a.)
General Criteria b-c#
C.        The operating test shall not duplicate items from the applicants'
: a.
: d.         Overlap acceptable      the written examination and between different parts of the operating test is within withlimits.I                                                                                                  W/A -4               &#xfd; and less-than-competent                              -
The operating test conforms with the previously approved outline; changes are consistent with
: e.         It appears that the operating test will differentiate between competent applicants at the designated license level.
_W 11 sampling requirements (e.g., 10 CFR 55.45, operational im ortance, safet function distribution).
: b.
There is no day-to-day repetition between this and other operating tests to be administered N
'/"
T durinn this examination.
C.
The operating test shall not duplicate items from the applicants' audit testis). (see Section D.1.a.)
: d.
Overlap with the written examination and between different parts of the operating test is within W/A -4 acceptable limits.I
&#xfd;
: e.
It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
: 2. Walk-Through Criteria
: 2. Walk-Through Criteria
: a.         Each JPM includes the following, as applicable:
: a.
* initial conditions initiating cues references and tools, including associated procedures allowed for completion) and specific reasonable and validated time limits (average time if deemed to be time-critical   by the facility   licensee designation
Each JPM includes the following, as applicable:
* operationally important specific performance criteria that include:
initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:
                    -      detailed expected actions with exact criteria and nomenclature
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable
                    -      system response and other examiner cues by the applicant
: b.
                    -      statements describing important observations to be made
Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance A.,
                    -      criteria for successful completion of the task standards
criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
                    -      identification of critical steps and their associated performance if applicable
: 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with j4 4 Form ES-301-4 and a copy is attached.
                    -      restrictions on the sequence of steps, and administrative walk-through
Printed Name I Signature Date
: b.         Ensure that any changes from the previously approved systems                                                             A.,
: a.
from any of the acceptance outlines (Forms ES-301-1 and 2) have not caused the test to deviate last 2 NRC examinations) specified criteria (e.g., item distribution, bank use, repetition from the on those forms and Form ES-201-2.
Author ROXAl*
: 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.
T-  
j4          4    -
!_Wve /-
Date Printed Name I Signature
JW N
: a. Author                               ROXAl*           T-           !_Wve/-           JW                                       N       - 7_1 -
7_1 -
                                                                                                                                              /Z        -    O_
: b.
                                              -/                           14(Z.
Facility Reviewer()
: b. Facility Reviewer()
-/
                                                                                                                                          &#xfd;"2"Lj- C
14(Z.  
: c. NRC Chief Examiner (#)
/Z O_
1 4V
: c.
_z
NRC Chief Examiner (#)  
: d. NRC Supervisor tests.
&#xfd;"2"Lj-C
NOTE:            The facility signature is not applicable for NRC-developed initial items in Column     'c"; chief examiner concurrence required.
: d.
                #    Independent NRC reviewer ES-301, Page 24 of 27
NRC Supervisor
_z 1 4V NOTE:
The facility signature is not applicable for NRC-developed tests.
Independent NRC reviewer initial items in Column 'c"; chief examiner concurrence required.
ES-301, Page 24 of 27


REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM APPLY APPLICABLE TECH SPECS - UNIT 1 CANDIDATE EXAMINER
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM APPLY APPLICABLE TECH SPECS - UNIT 1 CANDIDATE EXAMINER


REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM APPLY APPLICABLE TECHNICAL SPECIFICATIONS UNIT 1 KA Statement:     Ability to apply technical specifications for a system.
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM APPLY APPLICABLE TECHNICAL SPECIFICATIONS UNIT 1 KA Statement:
KA #:             2.1.12 (2.9 / 4.0)
Ability to apply technical specifications for a system.
KA #:
2.1.12 (2.9 / 4.0)


==References:==
==References:==
OP-1-0010125A, Surveillance Data Sheets OPS-503, Operations Department Policy, Tech Spec Guidance ADM-68.01, Containment Leakage Rate Testing Program U2 FSAR Table 6.3-52 and Design Bases Unit 1 Technical Specifications Candidate:                                                     Time Start Name Time Finish Performance Rating:         Sat               Unsat Validation Time       15 minutes Examiner:                                         Signature:
OP-1-0010125A, Surveillance Data Sheets OPS-503, Operations Department Policy, Tech Spec Guidance ADM-68.01, Containment Leakage Rate Testing Program U2 FSAR Table 6.3-52 and Design Bases Unit 1 Technical Specifications Candidate:
Comments ST. LUCIE TRAINING DEPT.
Name Time Start Time Finish Performance Rating:
Sat Unsat Validation Time 15 minutes Examiner:
Comments Signature:
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 2
ADMINISTRATIVE JPM PAGE 2


Line 117: Line 195:
Consult OPS-503, Operations Department Policy, Technical Specification Guidance 3 /
Consult OPS-503, Operations Department Policy, Technical Specification Guidance 3 /
4.6.3 Containment Isolation Valves.
4.6.3 Containment Isolation Valves.
: 1. Any valve on a line that penetrates the containment may be a containment isolation valve.                                                                                     SAT STEP 1: A. To determine if it is a containment isolation valve reference ADM-68.01, Containment Leakage Rate Testing Program, Unit #1 UFSAR table 6.2-16                         UNSAT and Unit #2 tables 6.2-52 & 53.
: 1. Any valve on a line that penetrates the containment may be a containment isolation valve.
STANDARD:         DETERMINE FCV-26-5 is listed in Table 1 Unit 1 Containment Isolation Valves.
STEP 1:
COMMENTS:       V6565 isolates return flow from the Containment Air Monitoring System back to Containment. (Drawing 8770-G-092)
A. To determine if it is a containment isolation valve reference ADM-68.01, Containment Leakage Rate Testing Program, Unit #1 UFSAR table 6.2-16 and Unit #2 tables 6.2-52 & 53.
                                                                                                .4 STEP 2: If the valve in question is listed in ADM-68.01, then apply Tech Spec 3.6.3.1.
SAT UNSAT STANDARD:
SAT STANDARD:       APPLY Tech Spec 3.6.3.1 UNSAT COMMENTS:
DETERMINE FCV-26-5 is listed in Table 1 Unit 1 Containment Isolation Valves.
I ______________________
COMMENTS:
V6565 isolates return flow from the Containment Air Monitoring System back to Containment. (Drawing 8770-G-092)
.4 STEP 2: If the valve in question is listed in ADM-68.01, then apply Tech Spec 3.6.3.1.
STANDARD:
APPLY Tech Spec 3.6.3.1 COMMENTS:
SAT UNSAT I ______________________
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 4
ADMINISTRATIVE JPM PAGE 4


T STEP 3: 3.6.3.1 The containment isolation valves shall be OPERABLE:                               CRITICAL APPLICABILITY: MODES 1, 2, 3 and 4.                                                       STEP ACTION:
T STEP 3: 3.6.3.1 The containment isolation valves shall be OPERABLE:
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
With one or more of the isolation valve(s) inoperable, either:
With one or more of the isolation valve(s) inoperable, either:
: a. Restore the inoperable valve(s) to OPERABLE status within 4                         SAT hours, or
: a. Restore the inoperable valve(s) to OPERABLE status within 4 hours, or
: b. Isolate each affected penetration within 4 hours by use of at least UNSAT one deactivated automatic valve secured in the isolation position, or
: b. Isolate each affected penetration within 4 hours by use of at least one deactivated automatic valve secured in the isolation position, or
: c. Isolate each affected penetration within 4 hours by use of at least one closed manual valve or blind flange; or
: c. Isolate each affected penetration within 4 hours by use of at least one closed manual valve or blind flange; or
: d. Be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
: d. Be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
STANDARD:       ACTION
CRITICAL STEP SAT UNSAT STANDARD:
ACTION
: b. Isolate each affected penetration within 4 hours by use of at least one deactivated automatic valve secured in the isolation position.
: b. Isolate each affected penetration within 4 hours by use of at least one deactivated automatic valve secured in the isolation position.
(Remove power to FCV-26-6 solenoid, preferred) or
(Remove power to FCV-26-6 solenoid, preferred) or
Line 140: Line 226:
4.6.3 Containment Isolation Valves.
4.6.3 Containment Isolation Valves.
: 1. Any valve on a line that penetrates the containment may be a containment isolation valve.
: 1. Any valve on a line that penetrates the containment may be a containment isolation valve.
SAT STEP 4: G. For any inoperable containment isolation valve, consider any system Tech Specs that may apply.
STEP 4: G. For any inoperable containment isolation valve, consider any system Tech Specs that may apply.
UNSAT STANDARD:       DETERMINE atmosphere radioactivity monitor is INOPERABLE Per T.S. 3.4.6.1 The following RCS leakage detection systems will be OPERABLE COMMENTS:      V6565 isolates return flow from the Containment Air Monitoring System back to Containment. (Drawing 8770-G-092)
SAT UNSAT STANDARD:
COMMENTS:
DETERMINE atmosphere radioactivity monitor is INOPERABLE Per T.S. 3.4.6.1 The following RCS leakage detection systems will be OPERABLE V6565 isolates return flow from the Containment Air Monitoring System back to Containment. (Drawing 8770-G-092)
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 5
ADMINISTRATIVE JPM PAGE 5


T RCS Leakage Detection T.S. 3.4.6.1.b CRITICAL STEP 5:     With the required radioactivity monitor inoperable, analyze grab               STEP samples of the containment atmosphere or perform a RCS water inventory balance at least once per 24 hours, and restore the required radioactivity monitor to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD                         SAT SHUTDOWN within the following 30 hours.
T RCS Leakage Detection T.S. 3.4.6.1.b STEP 5:
UNSAT STANDARD:       DETERMINE that an RCS inventory balance (DS #1) or grab samples need to be performed every 24 hours and restore the radioactivity monitor within 30 days.
With the required radioactivity monitor inoperable, analyze grab samples of the containment atmosphere or perform a RCS water inventory balance at least once per 24 hours, and restore the required radioactivity monitor to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
EVALUATOR NOTE:         (Data Sheet #30, Unscheduled Surveillance and Evolutions Tracking would be filled out to track this)
STANDARD:
DETERMINE that an RCS inventory balance (DS #1) or grab samples need to be performed every 24 hours and restore the radioactivity monitor within 30 days.
EVALUATOR NOTE:
(Data Sheet #30, Unscheduled Surveillance and Evolutions Tracking would be filled out to track this)
CRITICAL STEP SAT UNSAT COMMENTS:
STEP (done):
Inform Candidate JPM is complete.
STANDARD:
SAT EXAMINER'S CUE:
THIS JPM IS COMPLETE.
COMMENTS:
COMMENTS:
STEP (done):    Inform Candidate JPM is complete.
UNSAT END OF TASK STOP TIME:
STANDARD:
SAT EXAMINER'S CUE:        THIS JPM IS COMPLETE.
COMMENTS:                                                                                        UNSAT END OF TASK STOP TIME:
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 6
ADMINISTRATIVE JPM PAGE 6
Line 160: Line 254:
Initiating Cue You are the Unit Supervisor. You are tasked to determine which Technical Specifications are applicable.
Initiating Cue You are the Unit Supervisor. You are tasked to determine which Technical Specifications are applicable.


                      -                  ST. LUCIE PLANT                             OPS-503
ST. LUCIE PLANT OPS-503 OPERATIONS DEPARTMENT POLICY Rev.
                      ,        OPERATIONS DEPARTMENT POLICY                       Rev. 10 Date   06/30/04 TECHNICAL SPECIFICATION GUIDANCE OPERATIONS DEPARTMENT                                                               Page 10 of 19 Operational Guidance for Section 3 / 4.6 3 /4.6.6.1       Shield Building Ventilation System When complying with action statement for Technical Specification 3.6.6.1 c the Spent Fuel Handling Machine is considered to have no load when no load is attached to the grapple.
10 Date 06/30/04 TECHNICAL SPECIFICATION GUIDANCE OPERATIONS DEPARTMENT Page 10 of 19 Operational Guidance for Section 3 / 4.6 3 /4.6.6.1 Shield Building Ventilation System When complying with action statement for Technical Specification 3.6.6.1 c the Spent Fuel Handling Machine is considered to have no load when no load is attached to the grapple.
With no load attached to the grapple the Spent Fuel Handling Machine May be operated over the Spent Fuel Pool.
With no load attached to the grapple the Spent Fuel Handling Machine May be operated over the Spent Fuel Pool.
3 / 4.6.3         Containment Isolation Valves NOTE
3 / 4.6.3 Containment Isolation Valves NOTE The inoperable containment isolation valve may be used to provide containment isolation in order to comply with Tech Spec 3.6.3.1.
        "    The inoperable containment isolation valve may be used to provide containment isolation in order to comply with Tech Spec 3.6.3.1.
Containment penetration check valves are typically not found in the DBD.
        "    Containment penetration check valves are typically not found in the DBD.
Tech Spec 3.6.3.1 applies to all containment isolation check valves.
Tech Spec 3.6.3.1 applies to all containment isolation check valves.
: 1.     Any valve on a line that penetrates the containment may be a containment isolation valve.
1.
A.       To determine if it is a containment isolation valve reference ADM-68.01, Containment Leakage Rate Testing Program, Unit #1 UFSAR table 6.2-16 and Unit #2 tables 6.2-52 & 53.
Any valve on a line that penetrates the containment may be a containment isolation valve.
B.       If the valve in question is listed in ADM-68.01, then apply Tech Spec 3.6.3.1.
A.
C.       If the valve in question is determined to be a containment isolation valve, but not listed in ADM 68.01, then consult the DBD (Design Basis Documents) to determine its safety related function(s).
To determine if it is a containment isolation valve reference ADM-68.01, Containment Leakage Rate Testing Program, Unit #1 UFSAR table 6.2-16 and Unit #2 tables 6.2-52 & 53.
D.       If any one of the DBD safety related functions require the valve to be closed, then apply Tech Spec 3.6.3.1 Containment Isolation Valves.
B.
E.       If all of the DBD safety related function(s) require the valve to be open, (for example: FCV-07-1A), then Tech Specs 3.6.1.1 and 3.6.3.1 are not applicable.
If the valve in question is listed in ADM-68.01, then apply Tech Spec 3.6.3.1.
F.       If the valve is required to be closed by the DBD and/or Tech Spec 3.6.3.1 and needs to be opened for any reason, then apply Tech Spec 3.6.1.1 Containment Vessel Integrity and refer to ADM-25.04 Technical Specification Bases for required contingency actions.
C.
G.       For any inoperable containment isolation valve, consider any system specific Tech Specs that may apply.
If the valve in question is determined to be a containment isolation valve, but not listed in ADM 68.01, then consult the DBD (Design Basis Documents) to determine its safety related function(s).
D.
If any one of the DBD safety related functions require the valve to be closed, then apply Tech Spec 3.6.3.1 Containment Isolation Valves.
E.
If all of the DBD safety related function(s) require the valve to be open, (for example: FCV-07-1A), then Tech Specs 3.6.1.1 and 3.6.3.1 are not applicable.
F.
If the valve is required to be closed by the DBD and/or Tech Spec 3.6.3.1 and needs to be opened for any reason, then apply Tech Spec 3.6.1.1 Containment Vessel Integrity and refer to ADM-25.04 Technical Specification Bases for required contingency actions.
G.
For any inoperable containment isolation valve, consider any system specific Tech Specs that may apply.


SCcL*                             ST. LUCIE PLANT                             OPS-503
SCcL*
            - ".            OPERATIONS DEPARTMENT POLICY                       Rev. 10 Date   06/30/04 TECHNICAL SPECIFICATION GUIDANCE OPE       rEPANTMEr ATIONS                                                                   Page     11 of 19 Operational Guidance for Section 3 / 4.6 (continued) 3 / 4.6.3       Containment Isolation Valves (continued)
ST. LUCIE PLANT OPS-503 OPERATIONS DEPARTMENT POLICY Rev.
: 2.     If DC power is lost to SE-07-5A / B / C or D, Containment Pressure Transmitter Isolation Valves, the associated valve will fail open and can NOT be operated by the operator. Loss of power does not negatively impact the ability to maintain an intact containment pressure boundary. Therefore, these valves are not considered out of service.
10 Date 06/30/04 TECHNICAL SPECIFICATION GUIDANCE OPE ATIONS rEPA NTMEr Page 11 of 19 Operational Guidance for Section 3 / 4.6 (continued) 3 / 4.6.3 Containment Isolation Valves (continued)
3 / 4.6.5       Vacuum Relief Valves
: 2.
: 1. The Primary Containment Vessel to Annulus Vacuum Relief Valves are OPERABLE when the actuation setpoint is between 9.5 to 10.2 inches of water gauge differential. Activation within the setpoint range ensures both containment relief and containment isolation functions of these valves.
If DC power is lost to SE-07-5A / B / C or D, Containment Pressure Transmitter Isolation Valves, the associated valve will fail open and can NOT be operated by the operator. Loss of power does not negatively impact the ability to maintain an intact containment pressure boundary. Therefore, these valves are not considered out of service.
: 2.     If a primary containment vessel to annulus vacuum relief valve is inoperable, then Tech. Spec. 3.6.3 for one isolation valve inoperable and Tech. Spec. 3.6.5 for one primary containment vessel to annulus vacuum relief valve shall be entered simultaneously.
3 / 4.6.5 Vacuum Relief Valves
: 3. Quarterly stroke testing of the Vacuum Relief valves in accordance with plant procedures does not render the valves inoperable. The open signal is momentary and does not prevent the vacuum reliefs from performing their design function.
: 1.
3 /4.6.6.2       Shield Building Integrity
The Primary Containment Vessel to Annulus Vacuum Relief Valves are OPERABLE when the actuation setpoint is between 9.5 to 10.2 inches of water gauge differential. Activation within the setpoint range ensures both containment relief and containment isolation functions of these valves.
: 1. Maintenance Hatch Seals A.       With one of the two hatch seals inoperable, the operability of the shield building can be maintained by closure of the manual isolation valve on the functioning seal.
: 2.
B.       Closure of the manual isolation valve (V1 8263 / V1 8248) directly upstream of the supply check valve precludes an active failure of the check valve, but must be performed in accordance with AP 1/2-0010123, Administrative Control of Valves, Locks and Switches.
If a primary containment vessel to annulus vacuum relief valve is inoperable, then Tech. Spec. 3.6.3 for one isolation valve inoperable and Tech. Spec. 3.6.5 for one primary containment vessel to annulus vacuum relief valve shall be entered simultaneously.
: 3.
Quarterly stroke testing of the Vacuum Relief valves in accordance with plant procedures does not render the valves inoperable. The open signal is momentary and does not prevent the vacuum reliefs from performing their design function.
3 /4.6.6.2 Shield Building Integrity
: 1.
Maintenance Hatch Seals A.
With one of the two hatch seals inoperable, the operability of the shield building can be maintained by closure of the manual isolation valve on the functioning seal.
B.
Closure of the manual isolation valve (V1 8263 / V1 8248) directly upstream of the supply check valve precludes an active failure of the check valve, but must be performed in accordance with AP 1/2-0010123, Administrative Control of Valves, Locks and Switches.


REVISION NO.:               PROCEDURE TITLE:                                                           PAGE:
REVISION NO.:
8A                     CONTAINMENT LEAKAGE RATE TESTING                                       22 of 32 PROCEDURE NO.:                                             PROGRAM ADM-68.01                                       ST. LUCIE PLANT TABLE 1 UNIT     1 CONTAINMENT             ISOLATION VALVES (Page 2 of 2)
PROCEDURE TITLE:
Valve Tag Number       Penetration                         Function                   Testable   Isolation Number                                                         During     Time Plant     (Sec)
PAGE:
8A CONTAINMENT LEAKAGE RATE TESTING 22 of 32 PROCEDURE NO.:
PROGRAM ADM-68.01 ST. LUCIE PLANT TABLE 1 UNIT 1 CONTAINMENT ISOLATION VALVES (Page 2 of 2)
Valve Tag Number Penetration Function Testable Isolation Number During Time Plant (Sec)
Operation B. Manual or Remote Manual
Operation B. Manual or Remote Manual
: 1. V18794                       8       Station air supply, Manual                         Yes         NA V1 8796
: 1. V18794 8
: 2. V-25-11,12                 56       Hydrogen purge outside air make-up, Manual         Yes         NA (NC)
Station air supply, Manual Yes NA V1 8796
: 3. V-25-13,14,15,16         57 & 58     Hydrogen purge exhaust, Manual (NC)                 Yes         NA
: 2.
: 4. V3463                       41       Safety injection tank test line, Manual (NC)       Yes         NA*
V-25-11,12 56 Hydrogen purge outside air make-up, Manual Yes NA (NC)
: 5. V07009                     41       Safety injection tank test line, Manual (NC)       Yes         NA*
: 3.
: 6. V07206, V07189             46       Refueling cavity purification flow inlet, Manual   Yes         NA (NC)
V-25-13,14,15,16 57 & 58 Hydrogen purge exhaust, Manual (NC)
: 7. V07170, V07188             47       Refueling cavity purification flow outlet, Manual   Yes         NA (NC)
Yes NA
: 8. FSE-27-1,2,3,4,8,11   48a & 48c     Hydrogen sampling line, Remote manual               Yes         NA*
: 4.
: 9. FSE-27-5,6,7,9,10     51a & 51c     Hydrogen sampling line, Remote manual               Yes         NA*
V3463 41 Safety injection tank test line, Manual (NC)
: 10. FCV-26-1 & 2               52a       Radiation monitoring                               Yes         NA
Yes NA*
: 11. FCV-26-3 & 4               52b       Radiation monitoring                               Yes         NA
: 5.
: 12. FCV-26-5 & 6               52c       Radiation monitoring, return                       Yes         NA
V07009 41 Safety injection tank test line, Manual (NC)
: 13. V00140                     52d       ILRT test tap                                       Yes         NA V00143
Yes NA*
: 14. V00139                     52e       ILRT test tap                                       Yes         NA V00144
: 6.
: 15. V00101                       54       ILRT pressure connection                           Yes         NA
V07206, V07189 46 Refueling cavity purification flow inlet, Manual Yes NA (NC)
: 16. FCV-03-1E & 1F               28       SI Tank Sample                                     Yes       NA**
: 7.
NA- Manual Valve-Isolation time not applicable.
V07170, V07188 47 Refueling cavity purification flow outlet, Manual Yes NA (NC)
* May be opened on an intermittent basis under administrative control.
: 8.
**    Normally closed valves - Isolation time not applicable.
FSE-27-1,2,3,4,8,11 48a & 48c Hydrogen sampling line, Remote manual Yes NA*
: 9.
FSE-27-5,6,7,9,10 51a & 51c Hydrogen sampling line, Remote manual Yes NA*
: 10. FCV-26-1 & 2 52a Radiation monitoring Yes NA
: 11. FCV-26-3 & 4 52b Radiation monitoring Yes NA
: 12. FCV-26-5 & 6 52c Radiation monitoring, return Yes NA
: 13. V00140 52d ILRT test tap Yes NA V00143
: 14. V00139 52e ILRT test tap Yes NA V00144
: 15. V00101 54 ILRT pressure connection Yes NA
: 16. FCV-03-1E & 1F 28 SI Tank Sample Yes NA**
NA-Manual Valve-Isolation time not applicable.
May be opened on an intermittent basis under administrative control.
Normally closed valves - Isolation time not applicable.
END OF TABLE 1
END OF TABLE 1


CONTAINMENT SYSTEMS 3/4.6.3     CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1     The containment isolation valves shall be OPERABLE:
CONTAINMENT SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1 The containment isolation valves shall be OPERABLE:
APPLICABILITY: MODES 1, 2, 3 and 4.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
ACTION:
With one or more of the isolation valve(s) inoperable, either:
With one or more of the isolation valve(s) inoperable, either:
: a. Restore the inoperable valve(s) to OPERABLE status within 4 hours, or
: a.
: b. Isolate each affected penetration within 4 hours by use of at least one deactivated automatic valve secured in the isolation position, or
Restore the inoperable valve(s) to OPERABLE status within 4 hours, or
: c. Isolate each affected penetration within 4 hours by use of at least one closed manual valve or blind flange; or
: b.
: d. Be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
Isolate each affected penetration within 4 hours by use of at least one deactivated automatic valve secured in the isolation position, or
SURVEILLANCE REQUIREMENTS 4.6.3.1.1   The isolation valves shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair or replacement work is performed on the valve or its associated actuator, control or power circuit by performance of the cycling test, and verification of isolation time.
: c.
ST. LUCIE - UNIT 1                                 3/4 6-18               Amendment No. 90, 149
Isolate each affected penetration within 4 hours by use of at least one closed manual valve or blind flange; or
: d.
Be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE REQUIREMENTS 4.6.3.1.1 The isolation valves shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair or replacement work is performed on the valve or its associated actuator, control or power circuit by performance of the cycling test, and verification of isolation time.
ST. LUCIE - UNIT 1 3/4 6-18 Amendment No. 90, 149


TABLE 3.3-6 RADIATION MONITORING INSTRUMENTATION MINIMUM CHANNELS     APPLICABLE          ALARM          MEASUREMENT INSTRUMENT                                       OPERABLE                         SETPOINT              RANGE MODES                                                ACTION
TABLE 3.3-6 RADIATION MONITORING INSTRUMENTATION MINIMUM CHANNELS INSTRUMENT OPERABLE
: 1. AREA MONITORS
: 1.
: a. Fuel Storage Pool Area                      1                          < 15 mR/hr 10    - 104 mR/hr       13
AREA MONITORS APPLICABLE MODES ALARM SETPOINT
: b. Containment (CIS)                           3             6              < 90 mR/hr         1-105 mR/hr             16
< 15 mR/hr
: c. Containment Area - Hi                       1              1,2,3, & 4    < 10 R/hr                                  15 Range                                                                                       1 - 107 R/hr
< 90 mR/hr
: 2. PROCESS MONITORS
: a. Fuel Storage Pool Area
: b. Containment (CIS) 1 3
MEASUREMENT RANGE 10
- 104 mR/hr 1-105 mR/hr 1 - 107 R/hr ACTION 6
13 16 15
: c. Containment Area - Hi Range
: 2.
PROCESS MONITORS
: a. Containment
: a. Containment
: i. Gaseous Activity                                     1,2,3&4        Not Applicable 1                                                10 -106 cpm            14 RCS Leakage Detection 10-106 cpm ii. Particulate Activity                                 1,2,3 &4      Not Applicable 1                                                                        14 RCS Leakage Detection
: i. Gaseous Activity RCS Leakage Detection ii. Particulate Activity RCS Leakage Detection
: b. Fuel Storage Pool Area Ventilation System
: b. Fuel Storage Pool Area Ventilation System
: i. Gaseous Activity                       1
: i.
                                                                  **t                                 10 105 pCi/cc     12 ii. Particulate Activity                    1 1 - 106 cpm           12
Gaseous Activity ii. Particulate Activity 1
* With fuel in the storage pool or building.
1,2,3, & 4
**    With irradiated fuel in the storage pool or whenever there is fuel movement within the pool or crane operation with loads over the storage pool.
< 10 R/hr 1
1 1,2,3&4 1,2,3 &4 Not Applicable Not Applicable 10 -106 cpm 10-106 cpm 14 14 1
1
**t 10 105 pCi/cc 1 - 106 cpm 12 12 With fuel in the storage pool or building.
With irradiated fuel in the storage pool or whenever there is fuel movement within the pool or crane operation with loads over the storage pool.
The Alarm Setpoints are determined and set in accordance with requirements of the Offsite Dose Calculation Manual.
The Alarm Setpoints are determined and set in accordance with requirements of the Offsite Dose Calculation Manual.
ST. LUCIE - UNIT 1                                                 3/4 3-22                     Amendment No. 59, Q-3,134
ST. LUCIE - UNIT 1 3/4 3-22 Amendment No. 59, Q-3,134


TABLE 3.3-6 (Continued)
TABLE 3.3-6 (Continued)
TABLE NOTATION ACTION 12 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.12.
TABLE NOTATION ACTION 12 -
ACTION 13    -  With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per 24 hours.
ACTION 13 -
ACTION 14 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.4.6.1.
ACTION 14 -
ACTION 15 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, either restore the inoperable Channel(s) to OPERABLE status within 72 hours, or:
ACTION 15 -
: 1)   Initiate the preplanned alternate method of monitoring the appropriate parameter(s), and
With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.12.
: 2)   Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per 24 hours.
ACTION 16 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirements, comply with the ACTION requirements of Specification 3.9.9.
With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.4.6.1.
ST. LUCIE - UNIT 1                               3/4 3-23               Amendment No. 59
With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, either restore the inoperable Channel(s) to OPERABLE status within 72 hours, or:
: 1)
Initiate the preplanned alternate method of monitoring the appropriate parameter(s), and
: 2)
Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirements, comply with the ACTION requirements of Specification 3.9.9.
ACTION 16 -
ST. LUCIE - UNIT 1 3/4 3-23 Amendment No. 59


REACTOR COOLANT SYSTEM 3/4.4.6     REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1     The following RCS leakage detection systems will be OPERABLE:
REACTOR COOLANT SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following RCS leakage detection systems will be OPERABLE:
: a. The reactor cavity sump inlet flow monitoring system; and
: a.
: b. One containment atmosphere radioactivity monitor (gaseous or particulate).
The reactor cavity sump inlet flow monitoring system; and
: b.
One containment atmosphere radioactivity monitor (gaseous or particulate).
APPLICABILITY: MODES 1, 2, 3, and 4.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
ACTION:
: a. With the required reactor cavity sump inlet flow monitoring system inoperable, perform a RCS water inventory balance at least once per 24 hours and restore the sump inlet flow monitoring system to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
: a.
: b. With the required radioactivity monitor inoperable, analyze grab samples of the containment atmosphere or perform a RCS water inventory balance at least once per 24 hours, and restore the required radioactivity monitor to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
With the required reactor cavity sump inlet flow monitoring system inoperable, perform a RCS water inventory balance at least once per 24 hours and restore the sump inlet flow monitoring system to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
: c. With all required monitors inoperable, enter LCO 3.0.3 immediately.
: b.
: d. The provisions of Specification 3.0.4 are not applicable if at least one of the required monitors is OPERABLE.
With the required radioactivity monitor inoperable, analyze grab samples of the containment atmosphere or perform a RCS water inventory balance at least once per 24 hours, and restore the required radioactivity monitor to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE REQUIREMENTS 4.4.6.1     The RCS leakage detection instruments shall be demonstrated OPERABLE by:
: c.
: a. Performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, and CHANNEL CALIBRATION of the required containment atmosphere radioactivity monitor at the frequencies specified in Table 4.3-3.
With all required monitors inoperable, enter LCO 3.0.3 immediately.
: b. Performance of the CHANNEL CALIBRATION of the required reactor cavity sump inlet flow monitoring system at least once per 18 months.
: d.
ST. LUCIE - UNIT 1                             3/4 4-12                 Amendment No. 144
The provisions of Specification 3.0.4 are not applicable if at least one of the required monitors is OPERABLE.
SURVEILLANCE REQUIREMENTS 4.4.6.1 The RCS leakage detection instruments shall be demonstrated OPERABLE by:
: a.
Performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, and CHANNEL CALIBRATION of the required containment atmosphere radioactivity monitor at the frequencies specified in Table 4.3-3.
: b.
Performance of the CHANNEL CALIBRATION of the required reactor cavity sump inlet flow monitoring system at least once per 18 months.
ST. LUCIE - UNIT 1 3/4 4-12 Amendment No. 144


REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM REFUELING ADMINISTRATIVE REQUIREMENTS CANDIDATE EXAMINER
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM REFUELING ADMINISTRATIVE REQUIREMENTS CANDIDATE EXAMINER


REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM REFUELING ADMINISTRATIVE REQUIREMENTS UNIT 1 KA Statement:       Knowledge of refueling administrative requirements.
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM REFUELING ADMINISTRATIVE REQUIREMENTS UNIT 1 KA Statement:
KA#:               2.2.26 (2.5 / 3.7)
Knowledge of refueling administrative requirements.
KA#:
2.2.26 (2.5 / 3.7)


==References:==
==References:==
    - Plant Physics Curve Figure D.3
- Plant Physics Curve Figure D.3
                - AP 1-0010250, Guidelines for use of the Unit 1 High Density Spent Fuel Racks Candidate:                                                   Time Start Name Time Finish Performance Rating:         Sat             Unsat Validation Time       15 minutes Examiner:                                       Signature:
- AP 1-0010250, Guidelines for use of the Unit 1 High Density Spent Fuel Racks Candidate:
Name Time Start Time Finish Performance Rating:
Sat Unsat Validation Time 15 minutes Examiner:
Signature:
Comments ST. LUCIE TRAINING DEPT.
Comments ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 2
ADMINISTRATIVE JPM PAGE 2
Line 278: Line 437:
Initial Conditions Reactor Engineering has provided a Recommended Move List to move 2 fuel assemblies in the Unit 1 Spent Fuel Pool. All equipment to perform fuel movement in the Spent Fuel Pool is operable. All funnels have been verified in the correct positions and Nuclear Fuels has verified fuel burnup history is correct for fuel storage requirements.
Initial Conditions Reactor Engineering has provided a Recommended Move List to move 2 fuel assemblies in the Unit 1 Spent Fuel Pool. All equipment to perform fuel movement in the Spent Fuel Pool is operable. All funnels have been verified in the correct positions and Nuclear Fuels has verified fuel burnup history is correct for fuel storage requirements.
Initiating Cue You are the Unit 1 Refueling Supervisor. Given the following Recommended Moves, determine if the moves are allowable.
Initiating Cue You are the Unit 1 Refueling Supervisor. Given the following Recommended Moves, determine if the moves are allowable.
RECOMMENDED MOVE LIST From                                               To Step   Assembly     Insert Orient Core   Bridge Trolley SFP NFS     Upndr   Core     Bridge   Trolly   SFP 1         U48                                               II
RECOMMENDED MOVE LIST From To Step Assembly Insert Orient Core Bridge Trolley SFP NFS Upndr Core Bridge Trolly SFP 1
* I-   -                I       I                     I         I*-'-''-'i       I       I                       R5 12     I     R53       205                                     nR FI                        I         I I     I         I         I'~LI3I ST. LUCIE TRAINING DEPT.
U48 I I
* I-I I
I I*-'-''-'i I
I R5 12 I
R53 205 FI nR I
I I
I I
I'~LI3I ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 3
ADMINISTRATIVE JPM PAGE 3


START TIME:
START TIME:
Retrieves a controlled copy of Plant Physics Curve 0.3 Spent Fuel Map STEP 1:      Retrieves a controlled copy of Plant Physics Curve D.3 Spent Fuel Map (Present Configuration) from the Control Room STANDARD:    OBTAINS copy of Plant Physics Curve D.3.
STEP 1:
SAT EXAMINER'S NOTE: HAND STUDENT Plant Physics Curve D.3 Spent Fuel Map UNSAT (Present Configuration) Page 1 of 2 COMMENTS:
STANDARD:
STEP 2:     Obtains current revision of AP 1-0010250, Guidelines for use of the Unit 1 High Density Spent Fuel Racks STANDARD:   OBTAINS and VERIFIES current copy of procedure.
Retrieves a controlled copy of Plant Physics Curve 0.3 Spent Fuel Map Retrieves a controlled copy of Plant Physics Curve D.3 Spent Fuel Map (Present Configuration) from the Control Room OBTAINS copy of Plant Physics Curve D.3.
SAT EXAMINER'S NOTE: HAND STUDENT AP 1-0010250, Guidelines for use of the Unit I             UNSAT High Density Spent Fuel Racks COMMENTS:
SAT UNSAT EXAMINER'S NOTE: HAND STUDENT Plant Physics Curve D.3 Spent Fuel Map (Present Configuration) Page 1 of 2 COMMENTS:
STEP 3:       Reviews Step 8.2 Rack Loading Restrictions CRITICAL STEP STANDARD:     DETERMINES for move to R5, does meet >75% load restrictions and MOVE IS ALLOWABLE.
STEP 2:
SAT (60 non-restricted / 79 total assemblies = 75.9%)
Obtains current revision of AP 1-0010250, Guidelines for use of the Unit 1 High Density Spent Fuel Racks STANDARD:
_UNSAT COMMENTS:
OBTAINS and VERIFIES current copy of procedure.
ST. LUCIE TRAINING DEPT.
EXAMINER'S NOTE: HAND STUDENT AP 1-0010250, Guidelines for use of the Unit I High Density Spent Fuel Racks COMMENTS:
STEP 3:
Reviews Step 8.2 Rack Loading Restrictions STANDARD:
DETERMINES for move to R5, does meet >75% load restrictions and MOVE IS ALLOWABLE.
(60 non-restricted / 79 total assemblies = 75.9%)
COMMENTS:
SAT UNSAT CRITICAL STEP SAT
_UNSAT ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 4
ADMINISTRATIVE JPM PAGE 4


STEP 4:     Reviews Step 8.2 Rack Loading Restrictions                             CRITICAL STEP STANDARD:    DETERMINES for move to Q13, does NOT meet >75% load restrictions and MOVE IS NOT ALLOWABLE.
STEP 4:
SAT (45 non-restricted / 61 total assemblies = 73.8%)
STANDARD:
Reviews Step 8.2 Rack Loading Restrictions DETERMINES for move to Q13, does NOT meet >75% load restrictions and MOVE IS NOT ALLOWABLE.
CRITICAL STEP SAT (45 non-restricted / 61 total assemblies = 73.8%)
UNSAT COMMENTS:
UNSAT COMMENTS:
STEP (done): Inform Candidate JPM is complete.
STEP (done):
Inform Candidate JPM is complete.
STANDARD:
STANDARD:
SAT EXAMINER'S CUE:       THIS JPM IS COMPLETE.
SAT EXAMINER'S CUE:
COMMENTS:                                                                                 UNSAT END OF TASK STOP TIME:
THIS JPM IS COMPLETE.
COMMENTS:
UNSAT END OF TASK STOP TIME:
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 5
ADMINISTRATIVE JPM PAGE 5
Line 306: Line 484:
Initial Conditions Reactor Engineering has provided a Recommended Move List to move 2 fuel assemblies in the Unit 1 Spent Fuel Pool. All equipment to perform fuel movement in the Spent Fuel Pool is operable. All funnels have been verified in the correct positions and Nuclear Fuels has verified fuel burnup history is correct for fuel storage requirements.
Initial Conditions Reactor Engineering has provided a Recommended Move List to move 2 fuel assemblies in the Unit 1 Spent Fuel Pool. All equipment to perform fuel movement in the Spent Fuel Pool is operable. All funnels have been verified in the correct positions and Nuclear Fuels has verified fuel burnup history is correct for fuel storage requirements.
Initiating Cue You are the Unit 1 Refueling Supervisor. Given the following Recommended Moves, determine if the moves are allowable.
Initiating Cue You are the Unit 1 Refueling Supervisor. Given the following Recommended Moves, determine if the moves are allowable.
RECOMMENDED MOVE LIST From                                               To Assembly   Insert Orient Core   Bridge Trolley SFP NFS     Upndr   Core   Bridge Trolly SFP U48                                           L33                                       R5 2   R53     205                                 D28                                       Q13
RECOMMENDED MOVE LIST From To Assembly Insert Orient Core Bridge Trolley SFP NFS Upndr Core Bridge Trolly SFP U48 L33 R5 2
R53 205 D28 Q13


Procedure No.
Procedure No.
ST. LUCIE UNIT 1                             1-0010250 ADMINISTRATIVE PROCEDURE                     Current Revision No.
ST. LUCIE UNIT 1 1-0010250 ADMINISTRATIVE PROCEDURE Current Revision No.
5C F PL                     SAFETY RELATED Effective Date 10/26/04
5C F PL Effective Date SAFETY RELATED 10/26/04


==Title:==
==Title:==
Line 316: Line 495:


==SUMMARY==
==SUMMARY==
to Revision 5C - Incorporated PCR 04-2964 to convert diocument from Word Perfect DOS 5.1 Microsoft Word. (Helga Baranowsky, 10/18/04)
Revision 5C - Incorporated PCR 04-2964 to convert di Microsoft Word. (Helga Baranowsky, 10/18/04)
Revision 5B - Incorporated PCR 03-1056 to change AF17 to AG17. (W. Mead, 04/16/03)
Revision 5B - Incorporated PCR 03-1056 to change A Revision 5A - Changed Fuel Resources to Nuclear Fu ocument from Word Perfect DOS 5.1 to F17 to AG17. (W. Mead, 04/16/03) els in Step 5.3. (Ray Klein, 05/07/99)
Revision 5A - Changed Fuel Resources to Nuclear Fu els in Step 5.3. (Ray Klein, 05/07/99)
_________________________________ 4 Revision FRG Review Date Approved By Approval Date S 1 OPS 0
_________________________________ 4 Revision FRG Review Date       Approved By       Approval Date             S 1 OPS 0         11/29/88           G. J. Boissy         01/30/89       DATE Plant General Manager                     DOCT         PROCEDURE Revision FRG Review Date       Approved By       Approval Date     DOCN             1-0010250 5C     02/24, 03/26/97         J. Scarola         03/26/97       SYS Plant General Manager                     COM           COMPLETED N/A                           ITM                 5C Designated Approver T. L. Patterson       10/18/04 Designated Approver (Minor Correction)
11/29/88 G. J. Boissy 01/30/89 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN 1-0010250 5C 02/24, 03/26/97 J. Scarola 03/26/97 SYS Plant General Manager COM COMPLETED N/A ITM 5C Designated Approver T. L. Patterson 10/18/04 Designated Approver (Minor Correction)


REVISION NO.:               PROCEDURE TITLE:                                                                                 PAGE:
REVISION NO.:
5C                     GUIDELINES FOR USE OF THE UNIT 1 HIGH                                                               2 of 24 PROCEDURE NO.:                                 DENSITY SPENT FUEL RACKS 1-0010250                                             ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION                                                                                                                           PAGE 1 .0   T IT LE ......................................................................................................................           3 2.0     R EV IEW A N D A PPRO VA L .................................................................................                             3 3 .0   S C O P E ...................................................................................................................             3 4 .0   P R E C A U T IO N S ..................................................................................................                   5 5.0     R E S P O NS IB ILIT IE S ............................................................................................                   6 6.0     R E FE R E NC E S .................................................................................................                       6 7.0     RECORDS AND NOTIFICATIONS .....................................................................                                           7 8.0     IN S T R UC T IO NS ................................................................................................                     8 8 .1     F ue l F un ne ls ..........................................................................................               . . 8 8.2     Rack Loading Restrictions .......................................................................                               9 8.3     R ack Indexing System .............................................................................                           10 8.4     Spent Fuel Pool Underwater Lighting ......................................................                                     11 8.5     Spent Fuel Funnel Handling Tool ............................................................                                   12 8.6     Boraflex Coupon Surveillance Program ..................................................                                       13 FIGURES FIGURE 1         UNIT 1 HIGH DENSITY SPENT FUEL RACKS .....................................                                                     14 FIGURE 2         INITIAL ENRICHMENT VS BURNUP REQUIREMENTS FOR REGION 2 SPENT FUEL STO RAG E .....................................................................                                   15 FIG U R E 3     R EG IO N 1 FU NN EL ...............................................................................                           16 FIG U R E 4     R EG IO N 2 FU NN EL ...............................................................................                           17 FIGURE 5         FUNNEL HANDLING TOOL GENERAL ARRANGEMENT DRAWING ...... 18 FIGURE 6         BORAFLEX SURVEILLANCE COUPON AND COUPON ASSEMBLY ...... 19 FIGURE 7       T-BAR LIGHT AND LOCATION OF T-BAR LIGHT HANGERS ................. 20 FIGURE 8       TOP VIEW SHOWING ADJACENT CELLS BLOCKED BY FUNNELS ...... 21 FIG UR E 9     IN D EX ING SYSTEM ...............................................................................                             22 FIGURE 10       FUNNEL HANDLING TOOL ALIGNMENT PLATE (CORRECT PO SITIO N O N FU NN EL) ......................................................................                                 23 FIGURE 11       FUNNEL FULLY SEATED IN SPENT FUEL STORAGE RACK ............. 24
PROCEDURE TITLE:
PAGE:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 2 of 24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION PAGE 1.0 T IT L E......................................................................................................................
3 2.0 R EV IEW A N D A PPRO VA L.................................................................................
3 3.0 S C O P E...................................................................................................................
3 4.0 P R E C A U T IO N S..................................................................................................
5 5.0 R E S P O N S IB ILIT IE S............................................................................................
6 6.0 R E FE R E N C E S................................................................................................. 6 7.0 RECORDS AND NOTIFICATIONS.....................................................................
7 8.0 IN S T R U C T IO N S................................................................................................
8 8.1 F ue l F un ne ls..........................................................................................  
.. 8 8.2 Rack Loading Restrictions.......................................................................
9 8.3 R ack Indexing System.............................................................................
10 8.4 Spent Fuel Pool Underwater Lighting...................................................... 11 8.5 Spent Fuel Funnel Handling Tool............................................................ 12 8.6 Boraflex Coupon Surveillance Program..................................................
13 FIGURES FIGURE 1 UNIT 1 HIGH DENSITY SPENT FUEL RACKS..................................... 14 FIGURE 2 INITIAL ENRICHMENT VS BURNUP REQUIREMENTS FOR REGION 2 SPENT FUEL STO RAG E.....................................................................
15 FIG U R E 3 R EG IO N 1 FU NN EL...............................................................................
16 FIG U R E 4 R EG IO N 2 FU NN EL...............................................................................
17 FIGURE 5 FUNNEL HANDLING TOOL GENERAL ARRANGEMENT DRAWING...... 18 FIGURE 6 BORAFLEX SURVEILLANCE COUPON AND COUPON ASSEMBLY...... 19 FIGURE 7 T-BAR LIGHT AND LOCATION OF T-BAR LIGHT HANGERS................. 20 FIGURE 8 TOP VIEW SHOWING ADJACENT CELLS BLOCKED BY FUNNELS...... 21 FIG U R E 9 IN D EX ING SYSTEM...............................................................................
22 FIGURE 10 FUNNEL HANDLING TOOL ALIGNMENT PLATE (CORRECT PO SITIO N O N FU NN EL)......................................................................
23 FIGURE 11 FUNNEL FULLY SEATED IN SPENT FUEL STORAGE RACK............. 24


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
5C               GUIDELINES FOR USE OF THE UNIT 1 HIGH                     3 of 24 PROCEDURE NO.:                     DENSITY SPENT FUEL RACKS 1-0010250                             ST. LUCIE UNIT 1 1.0     TITLE GUIDELINES FOR USE OF THE UNIT 1 HIGH DENSITY SPENT FUEL RACKS 2.0     REVIEW AND APPROVAL See cover page.
PROCEDURE TITLE:
3.0     SCOPE 3.1     Purpose
PAGE:
: 1.       This procedure provides guidelines for use of the Unit 1 high density spent fuel racks and associated components and tools.
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 3 of 24 PROCEDURE NO.:
3.2     Discussion
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 1.0 TITLE GUIDELINES FOR USE OF THE UNIT 1 HIGH DENSITY SPENT FUEL RACKS 2.0 REVIEW AND APPROVAL See cover page.
: 1.     To ensure that sufficient spent fuel storage continues to exist at St. Lucie Unit 1, new high density storage racks have been installed. Each cell of the new spent fuel storage racks has an 8.65 inch (nominal) square cross-section, which will accommodate a single Combustion Engineering, Advanced Nuclear Fuels or equivalent fuel assembly, from either St. Lucie Unit 1 or Unit 2. A total of 1706 cells are arranged in seventeen distinct modules of various sizes and divided into two regions.
3.0 SCOPE 3.1 Purpose
: 2.     The new position rack design allows for increased storage density of spent fuel.
: 1.
: 3.     This procedure will provide guidelines for use of the racks and its associated components.
This procedure provides guidelines for use of the Unit 1 high density spent fuel racks and associated components and tools.
3.3   Authority
3.2 Discussion
: 1.     This procedure implements plant guidelines intended to aid Operations in the use of the high density spent fuel racks and related components.
: 1.
To ensure that sufficient spent fuel storage continues to exist at St. Lucie Unit 1, new high density storage racks have been installed. Each cell of the new spent fuel storage racks has an 8.65 inch (nominal) square cross-section, which will accommodate a single Combustion Engineering, Advanced Nuclear Fuels or equivalent fuel assembly, from either St. Lucie Unit 1 or Unit 2. A total of 1706 cells are arranged in seventeen distinct modules of various sizes and divided into two regions.
: 2.
The new position rack design allows for increased storage density of spent fuel.
: 3.
This procedure will provide guidelines for use of the racks and its associated components.
3.3 Authority
: 1.
This procedure implements plant guidelines intended to aid Operations in the use of the high density spent fuel racks and related components.
Operations will utilize this procedure with Reactor Engineering guidance.
Operations will utilize this procedure with Reactor Engineering guidance.


REVISION NO.:           PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
5C               GUIDELINES FOR USE OF THE UNIT 1 HIGH                       4of24 PROCEDURE NO.:                     DENSITY SPENT FUEL RACKS 1-0010250                           ST. LUCIE UNIT 1 3.4     Definitions
PROCEDURE TITLE:
: 1.       REGION 1 - Designed to store fuel assemblies with enrichments up to 4.5 wt. % U235 with no minimum burnup restrictions. Region 1 consists of racks Al, A2, B1 and B2. Region 1 contains 342 cells with a nominal center to center pitch of 10.12 inches. Figure 1 shows a plan view of Region 1.
PAGE:
: 2.     REGION 2 - Designed to store spent fuel assemblies with various initial enrichments which have accumulated the minimum acceptable burnups as required by Tech. Spec. Figure 5.6-1 (Figure 2 of this OP). Region 2 consists of racks C1, C2, C3, C4, D1, D2, D3, El, E2, F1, G1, G2 and H1 as shown in Figure 1. Region 2 contains 1364 cells with a nominal center to center spacing of 8.86 inches.
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 4of24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 3.4 Definitions
: 1.
REGION 1 - Designed to store fuel assemblies with enrichments up to 4.5 wt. % U235 with no minimum burnup restrictions. Region 1 consists of racks Al, A2, B1 and B2. Region 1 contains 342 cells with a nominal center to center pitch of 10.12 inches. Figure 1 shows a plan view of Region 1.
: 2.
REGION 2 - Designed to store spent fuel assemblies with various initial enrichments which have accumulated the minimum acceptable burnups as required by Tech. Spec. Figure 5.6-1 (Figure 2 of this OP). Region 2 consists of racks C1, C2, C3, C4, D1, D2, D3, El, E2, F1, G1, G2 and H1 as shown in Figure 1. Region 2 contains 1364 cells with a nominal center to center spacing of 8.86 inches.
NOTE Region 1 funnels are not interchangeable with Region 2 funnels.
NOTE Region 1 funnels are not interchangeable with Region 2 funnels.
: 3.     REGION 1 FUNNEL - Provides lead-in guidance during insertion of a fuel assembly into a storage cell. The funnels are a duplex design as shown in Figure 3. Assemblies may be withdrawn through the duplex funnels without first removing the funnel. There are two variants of the Region 1 funnel.
: 3.
REGION 1 FUNNEL - Provides lead-in guidance during insertion of a fuel assembly into a storage cell. The funnels are a duplex design as shown in Figure 3. Assemblies may be withdrawn through the duplex funnels without first removing the funnel. There are two variants of the Region 1 funnel.
Funnels for cells on the interior of a rack are identified by a solid square tab.
Funnels for cells on the interior of a rack are identified by a solid square tab.
Funnels for cells on the periphery of a rack have a hole drilled through the square tab.
Funnels for cells on the periphery of a rack have a hole drilled through the square tab.
: 4.       REGION 2 FUNNEL - Provides lead-in guidance during insertion of a fuel assembly into a storage cell. The funnels are a duplex design as shown in Figure 4. Assemblies may be withdrawn through the duplex funnels without first removing the funnel.
: 4.
: 5.     FUNNEL HANDLING TOOLS - The funnel handling tool is used to install and remove individual funnels. Region 1 and Region 2 have the specific funnel handling tools differing only in dimension (due to cell pitch difference between Region 1 and Region 2). The otherwise identical funnel handling tools are mechanically actuated, lightweight aluminum hand held tools designed for use by one individual from the spent fuel machine bridge (see Figure 5).
REGION 2 FUNNEL - Provides lead-in guidance during insertion of a fuel assembly into a storage cell. The funnels are a duplex design as shown in Figure 4. Assemblies may be withdrawn through the duplex funnels without first removing the funnel.
: 6.     BORAFLEX - Boraflex is a brand name silicone based polymer containing fine particles of boron carbide in homogeneous, stable matrix and is an integral part of every cell wall.
: 5.
: 7.     POISON RACK DESIGN - Boraflex strips are sandwiched into the rack walls between the stainless steel plates to ensure K-effective remains below 0.95 in case flooding of the Spent Fuel Pool with pure unborated water occurs.
FUNNEL HANDLING TOOLS - The funnel handling tool is used to install and remove individual funnels. Region 1 and Region 2 have the specific funnel handling tools differing only in dimension (due to cell pitch difference between Region 1 and Region 2). The otherwise identical funnel handling tools are mechanically actuated, lightweight aluminum hand held tools designed for use by one individual from the spent fuel machine bridge (see Figure 5).
: 6.
BORAFLEX - Boraflex is a brand name silicone based polymer containing fine particles of boron carbide in homogeneous, stable matrix and is an integral part of every cell wall.
: 7.
POISON RACK DESIGN - Boraflex strips are sandwiched into the rack walls between the stainless steel plates to ensure K-effective remains below 0.95 in case flooding of the Spent Fuel Pool with pure unborated water occurs.


REVISION NO.:           PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
5C             GUIDELINES FOR USE OF THE UNIT 1 HIGH                       5 of 24 PROCEDURE NO.:                     DENSITY SPENT FUEL RACKS 1-0010250                           ST. LUCIE UNIT 1 3.4     Definitions (continued)
PROCEDURE TITLE:
: 8.       SURVEILLANCE COUPON - 5 x 15 inch boraflex coupons attached to support assemblies (see Figure 6) and placed in rack cell locations as designated by separate procedure to track possible boraflex degradation.
PAGE:
: 9.     UNDERWATER LIGHTS - Moveable lights with handles which fit into corresponding hangers on the side of the spent fuel pool walls (see Figure 7).
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 5 of 24 PROCEDURE NO.:
4.0     PRECAUTIONS GENERAL NOTE Rack locations marked with an X on Figure 1 of this procedure shall be used to store Unit 1 fuel only until dispositioned by FPL Engineering to accept Unit 2 fuel or consolidation canisters. Rack locations AG17, AH17 marked with an * (asterisk) shall receive no fuel.
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 3.4 Definitions (continued)
4.1     Prior to inserting a fuel assembly into a rack location, verification of the correct rack location via the rack indexing system, as well as the presence of a funnel (required on Region 2), shall be obtained by the spent fuel machine operator.
: 8.
4.2     Fuel assemblies shall be inserted into Region 2 only into rack locations that have funnels in place. Fuel assemblies may be placed into Region 1 without funnels if the Region 1 funnels or tool is inoperable.
SURVEILLANCE COUPON - 5 x 15 inch boraflex coupons attached to support assemblies (see Figure 6) and placed in rack cell locations as designated by separate procedure to track possible boraflex degradation.
STORAGE REQUIREMENTS 4.3     Region 1 of the spent fuel storage racks can be used to store fuel which has a U-235 enrichment less than or equal to 4.5 weight percent. Region 2 can be used to store fuel which has achieved sufficient burnup such that storage in Region 1 is not required. The initial enrichment versus burnup requirements of Figure 5.6-1 of the Tech. Specs. and Figure 2 of this Administrative Procedure shall be met prior to storage of fuel assemblies in Region 2.
: 9.
FUEL FUNNELS 4.4     Prior to fuel movement within the spent fuel pool, funnel placement needs shall be determined and satisfied.
UNDERWATER LIGHTS - Moveable lights with handles which fit into corresponding hangers on the side of the spent fuel pool walls (see Figure 7).
4.5     The Region 1 and Region 2 funnels are not interchangeable. For details on funnel design and purpose see definitions 3.4.3 and 3.4.4.
4.0 PRECAUTIONS GENERAL NOTE Rack locations marked with an X on Figure 1 of this procedure shall be used to store Unit 1 fuel only until dispositioned by FPL Engineering to accept Unit 2 fuel or consolidation canisters. Rack locations AG17, AH17 marked with an * (asterisk) shall receive no fuel.
4.1 Prior to inserting a fuel assembly into a rack location, verification of the correct rack location via the rack indexing system, as well as the presence of a funnel (required on Region 2), shall be obtained by the spent fuel machine operator.
4.2 Fuel assemblies shall be inserted into Region 2 only into rack locations that have funnels in place. Fuel assemblies may be placed into Region 1 without funnels if the Region 1 funnels or tool is inoperable.
STORAGE REQUIREMENTS 4.3 Region 1 of the spent fuel storage racks can be used to store fuel which has a U-235 enrichment less than or equal to 4.5 weight percent. Region 2 can be used to store fuel which has achieved sufficient burnup such that storage in Region 1 is not required. The initial enrichment versus burnup requirements of Figure 5.6-1 of the Tech. Specs. and Figure 2 of this Administrative Procedure shall be met prior to storage of fuel assemblies in Region 2.
FUEL FUNNELS 4.4 Prior to fuel movement within the spent fuel pool, funnel placement needs shall be determined and satisfied.
4.5 The Region 1 and Region 2 funnels are not interchangeable. For details on funnel design and purpose see definitions 3.4.3 and 3.4.4.


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
5C               GUIDELINES FOR USE OF THE UNIT 1 HIGH                     6of24 PROCEDURE NO.:                     DENSITY SPENT FUEL RACKS 1-0010250                             ST. LUCIE UNIT 1 4.6     Funnels effectively block all cells adjacent to the locations for which they provide lead-in surfaces (see Figure 8). Fuel funnels cannot be placed side by side. A minimum clearance of one rack cell location is required between lead-in funnels.
PROCEDURE TITLE:
5.0     RESPONSIBILITIES 5.1     The Operations Department is responsible for the administration and execution of this procedure.
PAGE:
5.2     Reactor Engineering is responsible for the determination of individual funnel locations prior to fuel movement in the spent fuel pool.
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 6of24 PROCEDURE NO.:
5.3     Nuclear Fuels will provide the burnup histories of spent fuel to determine the spent fuel storage requirements.
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 4.6 Funnels effectively block all cells adjacent to the locations for which they provide lead-in surfaces (see Figure 8). Fuel funnels cannot be placed side by side. A minimum clearance of one rack cell location is required between lead-in funnels.
 
5.0 RESPONSIBILITIES 5.1 The Operations Department is responsible for the administration and execution of this procedure.
==6.0    REFERENCES==
5.2 Reactor Engineering is responsible for the determination of individual funnel locations prior to fuel movement in the spent fuel pool.
5.3 Nuclear Fuels will provide the burnup histories of spent fuel to determine the spent fuel storage requirements.


==6.0 REFERENCES==
NOTE One or more of the following symbols may be used in this procedure:
NOTE One or more of the following symbols may be used in this procedure:
        &sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
&sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
T Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
T Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
T Indicates a step that requires a sign off on an attachment.
T Indicates a step that requires a sign off on an attachment.
6.1     Technical Specifications
6.1 Technical Specifications Section 5.6 - Fuel Storage 6.2 Updated Final Safety Analysis Report (UFSAR)
* Section 5.6 - Fuel Storage 6.2     Updated Final Safety Analysis Report (UFSAR)
Section 9.1.2.2.3 6.3 Procedures POP 3200090, Unit 1 Refueling Operation QI-5-PSL-1, Preparation, Revision, Review / Approval of Procedures 6.4 PCM-18-186, Spent Fuel Rerack
* Section 9.1.2.2.3 6.3     Procedures
* POP 3200090, Unit 1 Refueling Operation
* QI-5-PSL-1, Preparation, Revision, Review / Approval of Procedures 6.4     PCM-18-186, Spent Fuel Rerack


REVISION NO.:       PROCEDURE TITLE:
REVISION NO.:
5C            GUIDELINES FOR USE OF THE UNIT 1 HIGH PROCEDURE NO.:                  DENSITY SPENT FUEL RACKS 1-0010250                        ST. LUCIE UNIT 1 6.5     PCM-142-186, Modifications to Support Rerack 6.6    1-LOI-RE-09, Unit 1 Boraflex Blackness Testing 6.7    Technical Manual, HPS-1000/Q Lighting System Remote Ocean Systems, Inc 6.8    JPN-PSL-SEFT-93-014, St. Lucie Unit 1 Safety Evaluation of Spent Fuel Pool (SFP) Coupon Surveillance Program 7.0     RECORDS AND NOTIFICATIONS 7.1     None
5C PROCEDURE NO.:
1-0010250 PROCEDURE TITLE:
GUIDELINES FOR USE OF THE UNIT 1 HIGH DENSITY SPENT FUEL RACKS ST. LUCIE UNIT 1 6.5 6.6 6.7 6.8 PCM-142-186, Modifications to Support Rerack 1-LOI-RE-09, Unit 1 Boraflex Blackness Testing Technical Manual, HPS-1000/Q Lighting System Remote Ocean Systems, Inc JPN-PSL-SEFT-93-014, St. Lucie Unit 1 Safety Evaluation of Spent Fuel Pool (SFP) Coupon Surveillance Program 7.0 RECORDS AND NOTIFICATIONS 7.1 None


REVISION NO.:           PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
5C               GUIDELINES FOR USE OF THE UNIT 1 HIGH                       8of24 PROCEDURE NO.:                       DENSITY SPENT FUEL RACKS 1-0010250                             ST. LUCIE UNIT 1 8.0     INSTRUCTIONS CAUTION Prior to fuel movement, obtain the following information from Reactor Engineering:
PROCEDURE TITLE:
A) Procedure Data Sheet(s) outlining desired fuel movement B) Region burnup requirements C) Individual funnel placements needed 8.1     Fuel Funnels
PAGE:
: 1.       Prior to inserting a fuel assembly into a rack cell location, visually verify that a lead-in funnel is in proper position over that location.
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 8of24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.0 INSTRUCTIONS CAUTION Prior to fuel movement, obtain the following information from Reactor Engineering:
A) Procedure Data Sheet(s) outlining desired fuel movement B) Region burnup requirements C) Individual funnel placements needed 8.1 Fuel Funnels
: 1.
Prior to inserting a fuel assembly into a rack cell location, visually verify that a lead-in funnel is in proper position over that location.
NOTE Fuel may be inserted into Region 1 rack cell locations without funnels since slight lead-in surfaces are built into the racks.
NOTE Fuel may be inserted into Region 1 rack cell locations without funnels since slight lead-in surfaces are built into the racks.
: 2.       Movement of individual funnels should be accomplished using the hand held tools described in Section 8.5.
: 2.
Movement of individual funnels should be accomplished using the hand held tools described in Section 8.5.
NOTE For Region 1 there are two types of lead-in funnels. One type for interior cells of individual racks, the other for peripheral cells of individual racks.
NOTE For Region 1 there are two types of lead-in funnels. One type for interior cells of individual racks, the other for peripheral cells of individual racks.
Peripheral cell funnels have a hole drilled through the square identification tab.
Peripheral cell funnels have a hole drilled through the square identification tab.
: 3.       Fuel may be withdrawn through lead-in funnels, therefore funnels can be used as inspection funnels.
: 3.
Fuel may be withdrawn through lead-in funnels, therefore funnels can be used as inspection funnels.
END OF SECTION 8.1
END OF SECTION 8.1


REVISION NO.:         PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
5C           GUIDELINES FOR USE OF THE UNIT 1 HIGH                     9 of 24 PROCEDURE NO.:                   DENSITY SPENT FUEL RACKS 1-0010250                         ST. LUCIE UNIT 1 8.2     Rack Loading Restrictions
PROCEDURE TITLE:
: 1. Loading racks El, E2 and G1 shall be accomplished as outlined below:
PAGE:
A. Rack locations 17A through 17M, 18A through 18M of rack G1 and locations Q1 through Q16, R1 through R16, S1 through S16 of racks El and E2 are subject to the loading restrictions given below.
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 9 of 24 PROCEDURE NO.:
: 1. Restricted locations of racks El, E2 and G1 shall not be filled unless 75% of the total fuel assemblies loaded into each individual rack are placed into the non-restricted locations first.
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.2 Rack Loading Restrictions
: 1.
Loading racks El, E2 and G1 shall be accomplished as outlined below:
A.
Rack locations 17A through 17M, 18A through 18M of rack G1 and locations Q1 through Q16, R1 through R16, S1 through S16 of racks El and E2 are subject to the loading restrictions given below.
: 1.
Restricted locations of racks El, E2 and G1 shall not be filled unless 75% of the total fuel assemblies loaded into each individual rack are placed into the non-restricted locations first.
In support of this, loading rack G1 west to east and racks El and E2 south to north is recommended.
In support of this, loading rack G1 west to east and racks El and E2 south to north is recommended.
: 2. No fuel shall be placed in locations AG17, AHl7.
: 2.
No fuel shall be placed in locations AG17, AHl7.
* END OF SECTION 8.2
* END OF SECTION 8.2


REVISION NO.:         PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
5C             GUIDELINES FOR USE OF THE UNIT 1 HIGH                 10 of 24 PROCEDURE NO.:                   DENSITY SPENT FUEL RACKS 1-0010250                         ST. LUCIE UNIT 1 8.3     Rack Indexing System NOTE The indexing system in a approximate indication of rack storage cell location. Final adjustments in fuel assembly position should be made by the SFM operator, if required, to ensure smooth fuel assembly insertion into the rack.
PROCEDURE TITLE:
: 1. Region 1 and Region 2 have separate indexing systems (see Figure 9).
PAGE:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 10 of 24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.3 Rack Indexing System NOTE The indexing system in a approximate indication of rack storage cell location. Final adjustments in fuel assembly position should be made by the SFM operator, if required, to ensure smooth fuel assembly insertion into the rack.
: 1.
Region 1 and Region 2 have separate indexing systems (see Figure 9).
Region 1 index numbers and letters are red on white and are pre-fixed by an X. Region 2 index numbers and letters are black on white.
Region 1 index numbers and letters are red on white and are pre-fixed by an X. Region 2 index numbers and letters are black on white.
END OF SECTION 8.3
END OF SECTION 8.3


REVISION NO.:         PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
5C             GUIDELINES FOR USE OF THE UNIT 1 HIGH PROCEDURE NO.:                     DENSITY SPENT FUEL RACKS 1-0010250                           ST. LUCIE UNIT 1 8.4     Spent Fuel Pool Underwater Lighting
PROCEDURE TITLE:
: 1. The underwater lighting for the Unit 1 high density racks consists of hangers mounted to the spent fuel pool walls from which moveable underwater lights are hung. See Figure 7 for details on the hangers and underwater lights.
PAGE:
: 2. Each light assembly consists of a single positionable reflector light and weighs approximately 70 lbs.
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH PROCEDURE NO.:
: 3. Moving the underwater lights will be accomplished in the following manner:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.4 Spent Fuel Pool Underwater Lighting
A. Notify Health Physics for support if pulling lights out of pool.
: 1.
B. Disconnect electrical cord from outlet.
The underwater lighting for the Unit 1 high density racks consists of hangers mounted to the spent fuel pool walls from which moveable underwater lights are hung. See Figure 7 for details on the hangers and underwater lights.
C. Lift the light up and out from hanger and move light to desired hanger.
: 2.
D. Re-connect electrical cord to closest outlet.
Each light assembly consists of a single positionable reflector light and weighs approximately 70 lbs.
: 3.
Moving the underwater lights will be accomplished in the following manner:
A.
Notify Health Physics for support if pulling lights out of pool.
B.
Disconnect electrical cord from outlet.
C.
Lift the light up and out from hanger and move light to desired hanger.
D.
Re-connect electrical cord to closest outlet.
END OF SECTION 8.4
END OF SECTION 8.4


REVISION NO.:         PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
5C               GUIDELINES FOR USE OF THE UNIT 1 HIGH                     12 of 24 PROCEDURE NO.:                   DENSITY SPENT FUEL RACKS 1-0010250                             ST. LUCIE UNIT 1 8.5     Spent Fuel Funnel Handling Tool
PROCEDURE TITLE:
: 1. The funnel handling tools are designed for one man operation and is mechanically actuated. (See Figure 5, showing funnel handling tool design). Tool weighs about 45 lbs. Funnels weigh about 20 lbs. (Weights given are dry weights.)
PAGE:
: 2. Funnels are moved in the following manner:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 12 of 24 PROCEDURE NO.:
A. Insert funnel tool into center plug on the duplex funnel. Ensure the tool alignment plate is positioned as shown in Figure 10.
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.5 Spent Fuel Funnel Handling Tool
B. When the tool latches, a positive click will be felt as the tool seats.
: 1.
C. Pull up on the tool, observing the funnel to determine if the funnel is moving squarely out of its rack cell location. If not properly latched the funnel will tilt over to one side. To recover push down on the tool to latch both sides. Attempt to move the funnel again.
The funnel handling tools are designed for one man operation and is mechanically actuated. (See Figure 5, showing funnel handling tool design). Tool weighs about 45 lbs. Funnels weigh about 20 lbs. (Weights given are dry weights.)
D. Move funnel to its new location.
: 2.
E. Insert center plug into rack cell. Some side to side movement of the funnel may be necessary to get the chamfered plug to start into a cell. Insert funnel until fully seated as shown in side view, Figure 11.
Funnels are moved in the following manner:
F. Pull up on the release bar and remove tool. Repeat Steps A to F for each desired funnel move.
A.
Insert funnel tool into center plug on the duplex funnel. Ensure the tool alignment plate is positioned as shown in Figure 10.
B.
When the tool latches, a positive click will be felt as the tool seats.
C.
Pull up on the tool, observing the funnel to determine if the funnel is moving squarely out of its rack cell location. If not properly latched the funnel will tilt over to one side. To recover push down on the tool to latch both sides. Attempt to move the funnel again.
D.
Move funnel to its new location.
E.
Insert center plug into rack cell. Some side to side movement of the funnel may be necessary to get the chamfered plug to start into a cell. Insert funnel until fully seated as shown in side view, Figure 11.
F.
Pull up on the release bar and remove tool. Repeat Steps A to F for each desired funnel move.
END OF SECTION 8.5
END OF SECTION 8.5


REVISION NO.:         PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
5C             GUIDELINES FOR USE OF THE UNIT 1 HIGH                     13 of 24 PROCEDURE NO.:                   DENSITY SPENT FUEL RACKS 1-0010250                         ST. LUCIE UNIT 1 8.6     Boraflex Coupon Surveillance Program
PROCEDURE TITLE:
: 1. The inservice Boraflex Surveillance Program is part of FPL's commitment to the NRC to allow the reracking of the Unit 1 spent fuel pool. The Surveillance Program is intended to track and verify the integrity of the boraflex neutron absorber contained in the Region 1 and Region 2 high density racks. The Boraflex Surveillance Program consists of gamma dose determination to the boraflex and periodic blackness testing which replaced the Inservice Accelerated and Longterm Coupon Testing Program. Refer to reference 6.8.
PAGE:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 13 of 24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.6 Boraflex Coupon Surveillance Program
: 1.
The inservice Boraflex Surveillance Program is part of FPL's commitment to the NRC to allow the reracking of the Unit 1 spent fuel pool. The Surveillance Program is intended to track and verify the integrity of the boraflex neutron absorber contained in the Region 1 and Region 2 high density racks. The Boraflex Surveillance Program consists of gamma dose determination to the boraflex and periodic blackness testing which replaced the Inservice Accelerated and Longterm Coupon Testing Program. Refer to reference 6.8.
END OF SECTION 8.6
END OF SECTION 8.6


REVISION NO.:           PROCEDURE TITLE:                                                         PAGE:
REVISION NO.:
5C               GUIDELINES FOR USE OF THE UNIT 1 HIGH                                     15 of 24 PROCEDURE NO.:                       DENSITY SPENT FUEL RACKS 1-0010250                               ST. LUCIE UNIT 1 FIGURE 2 INITIAL ENRICHMENT VS BURNUP REQUIREMENTS FOR REGION 2 SPENT FUEL STORAGE (Page 1 of 1) 40 35 30 0
PROCEDURE TITLE:
                              -                       /
PAGE:
25 a-                      ACCEPrABLE/
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 15 of 24 PROCEDURE NO.:
z                      BURNUP DOMAIN
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 2 VS BURNUP REQUIREMENTS INITIAL ENRICHMENT FOR REGION 2 SPENT FUEL STORAGE (Page 1 of 1) 40 35 0
                                                          //
a-z Lu Lu Cd, 30 25 20 15 ACCEPrABLE/
Lu 20
BURNUP DOMAIN
                                                              / UNACCEPTABLE BURNUP DOMAIN 15                  //
/
Lu Cd,
/
                                  ~w                             _                  I'l 10 5
UNACCEPTABLE BURNUP DOMAIN
//
//
~w I'l 10 5
n, U
n, U
1.5       2.0         2.5           3.0     3.5       4.0             4.5 INITIAL ENRICHMENT, WT % U-235 (P/AP/1-0010250IF2-RO)
1.5 2.0 2.5 3.0 3.5 4.0 4.5 INITIAL ENRICHMENT, WT % U-235 (P/AP/1-0010250IF2-RO)


REVISION NO.:     PROCEDURE TITLE:                                                             PAGE:
REVISION NO.:
5C           GUIDELINES FOR USE OF THE UNIT 1 HIGH                                       16 of 24 PROCEDURE NO.:                       DENSITY SPENT FUEL RACKS 1-0010250                               ST. LUCIE UNIT 1 FIGURE 3 REGION 1 FUNNEL (Page 1 of 1)
PROCEDURE TITLE:
PAGE:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 16 of 24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 3 REGION 1 FUNNEL (Page 1 of 1)
Region 1 I.D. Tab
Region 1 I.D. Tab
[f i Hole inIdentification Tab Peripheral Funnels Only Lead in Surface
[f i
                                            \     /               ,,I                           I Flush with Rack Surface Tension                                           Center Springs                                           Plug Plug Chamfer (PIAP/1-0010250/F3-RO)
Hole in Identification Tab Peripheral Funnels Only Lead in Surface
\\
/  
,,I I
Flush with Rack Surface Tension Center Springs Plug Plug Chamfer (PIAP/1-0010250/F3-RO)


REVISION NO.:     PROCEDURE TITLE:                                                   PAGE:
REVISION NO.:
5C           GUIDELINES FOR USE OF THE UNIT 1 HIGH                             17 of 24 PROCEDURE NO.:               DENSITY SPENT FUEL RACKS 1-0010250                       ST. LUCIE UNIT 1 FIGURE 4 REGION 2 FUNNEL (Page 1 of 1)
PROCEDURE TITLE:
Center Plug             Lead in Surface
PAGE:
              *I           [IllI   ,                iL I
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 17 of 24 PROCEDURE NO.:
F    FFlush                     with Rack S urface Tension Springs Plug Chamfer (P/AP/1-0010250/F4-RO)
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 4 REGION 2 FUNNEL (Page 1 of 1)
Center Plug Lead in Surface
* I
[IllI Tension Springs i LI with urface F
FFlush Rack S Plug Chamfer (P/AP/1-0010250/F4-RO)


REVISION NO.:           PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
5C                 GUIDELINES FOR USE OF THE UNIT 1 HIGH                     18 of 24 PROCEDURE NO.:                     DENSITY SPENT FUEL RACKS 1-0010250                             ST. LUCIE UNIT 1 FIGURE 5 FUNNEL HANDLING TOOL GENERAL ARRANGEMENT DRAWING (Page 1 of 1)
PROCEDURE TITLE:
FUNNEL FUNNEL ALIGNMENT PLATE \
PAGE:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 18 of 24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 5 FUNNEL HANDLING TOOL GENERAL ARRANGEMENT DRAWING (Page 1 of 1)
FUNNEL FUNNEL ALIGNMENT PLATE \\
COMPRESSION SPRINGS FLAPPER Z STOP PLATE CENTER PLUG LEAD IN (PIAP/1-0010250/F5-RO)
COMPRESSION SPRINGS FLAPPER Z STOP PLATE CENTER PLUG LEAD IN (PIAP/1-0010250/F5-RO)


REVISION NO.:       PROCEDURE TITLE:                                                     PAGE:
REVISION NO.:
5C             GUIDELINES FOR USE OF THE UNIT 1 HIGH                               19 of 24 PROCEDURE NO.:                       DENSITY SPENT FUEL RACKS 1-0010250                               ST. LUCIE UNIT 1 FIGURE 6 BORAFLEX SURVEILLANCE COUPON AND COUPON ASSEMBLY (Page 1 of 1) 3/8 INCH HOLE 7/16 INCH TO CENTER t
PROCEDURE TITLE:
5 X 15 TYP. POISON COUPON (P/API1-0010250IF6-RO)
PAGE:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 19 of 24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 6 BORAFLEX SURVEILLANCE COUPON AND COUPON ASSEMBLY (Page 1 of 1) 3/8 INCH HOLE 7/16 INCH TO CENTER t
5 X 15 TYP. POISON COUPON (P/API1-00 10250IF6-RO)


REVISION NO.:                   PROCEDURE TITLE:                                                                 PAGE:
REVISION NO.:
5C                           GUIDELINES FOR USE OF THE UNIT 1 HIGH                                           20 of 24 PROCEDURE NO.:                               DENSITY SPENT FUEL RACKS 1-0010250                                       ST. LUCIE UNIT 1 FIGURE 7 T-BAR LIGHT AND LOCATION OF T-BAR LIGHT HANGERS (Page 1 of 1) 120 VAC                                 STAINLESS STEEL CONNECTOR                                    LIFT BAIL WITH STOP COLLAR TO PREVENT SLIPPING
PROCEDURE TITLE:
                                                        ,          HP LIGHT-ING             . rj WET MATEABLE CONNECTORS WITH                                   SYSTEM STAINLESS STEEL LOCKING RING                                                               7-         IN SEALED STAINLESS BALLAST POWER SUPPLY STEEL HOUSING LOWER POLE MODULE WET MATEABLE CONNECTORS WITH STAINLESS STEEL LOCKING RING I
PAGE:
REMOVEABLE pJ*    7-        QUICK RELEASE LOW PRO         OLLE F:                       LIGT     E WET MATEABLE--
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 20 of 24 PROCEDURE NO.:
CONNECTORRELCO I                     ADJUSTMENT 7
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 7 LOCATION OF T-BAR LIGHT HANGERS T-BAR LIGHT AND (Page 1 of 1) 120 VAC CONNECTOR STAINLESS STEEL LIFT BAIL WITH STOP COLLAR TO PREVENT SLIPPING HP LIGHT-ING rj WET MATEABLE CONNECTORS WITH STAINLESS STEEL LOCKING RING WET MATEABLE CONNECTORS WITH STAINLESS STEEL LOCKING RING SYSTEM 7-BALLAST POWER SUPPLY IN SEALED STAINLESS STEEL HOUSING LOWER POLE MODULE REMOVEABLE LOW PRO OLLE F:
ELECTRO- POLISHED K>      ~      REFLECTOR T- BAR LIGHT HIGH PRESSURE   -                              HANGER DETAIL SODIUM LAMP FRONT VIEW                            SIDE VIE W
LIGT E
                                                                    ,) K~'~
WET MATEABLE--
CONNECTORRELCO I
ADJUSTMENT T-BAR LIGHT HIGH PRESSURE HANGER DETAIL SODIUM LAMP I
pJ* 7-QUICK RELEASE ELECTRO-POLISHED K> 7 ~
REFLECTOR SIDE VIE W FRONT VIEW
,) K~'~
(P/A P/1-0010250/F7-RO)
(P/A P/1-0010250/F7-RO)


REVISION NO.:       PROCEDURE TITLE:                                             PAGE:
REVISION NO.:
5C           GUIDELINES FOR USE OF THE UNIT I HIGH                         21 of 24 PROCEDURE NO.:                 DENSITY SPENT FUEL RACKS 1-0010250                       ST. LUCIE UNIT 1 FIGURE 8 TOP VIEW SHOWING ADJACENT CELLS BLOCKED BY FUNNELS (Page 1 of 1)
PROCEDURE TITLE:
Rack Cell Location Adjacent cell blocked by (P/AP/1-0010250/F8-RO) funnel lead-in surfaces
PAGE:
5C GUIDELINES FOR USE OF THE UNIT I HIGH 21 of 24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 8 TOP VIEW SHOWING ADJACENT CELLS BLOCKED BY FUNNELS (Page 1 of 1)
Rack Cell Location Adjacent cell blocked by funnel lead-in surfaces (P/AP/1-0010250/F8-RO)


REVISION NO.:         PROCEDURE TITLE:                                                             PAGE:
REVISION NO.:
5C             GUIDELINES FOR USE OF THE UNIT 1 HIGH                                       22 of 24 PROCEDURE NO.:                     DENSITY SPENT FUEL RACKS 1-0010250                               ST. LUCIE UNIT 1 FIGURE 9 INDEXING SYSTEM (Page 1 of 1)
PROCEDURE TITLE:
                                            ...1.. . re -' -x RPdr L e2*-t u 1 1-i*7 e q  c--I  1                                                                         i--e W
PAGE:
b3a c k - r Zn N uzn e 1 i -iy          ytLI   e L -t -e &  1nc,      t 7 ie     A   3   L   ID 4
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 22 of 24 PROCEDURE NO.:
Number ring 3         4                   43       41       42 5     dXiXl             2F Cl U-'
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 9 INDEXING SYSTEM (Page 1 of 1)
...1...
re -' -x RPdr e q c--I 1
L e2*-t u 1 1-i *7 N uzn e 1 i -iy L -
-e t
: 1nc, Number ring W
i--e b3a c k - r Zn ytLI e t 7 ie A
3 L
ID 4
3 4
43 41 4 2 5
2F dXiXl Cl U-'
(1
(1
(-
(-
(PIAP/1-OO10250./F9-RO)
(PIAP/1-OO10250./F9-RO)


REVISION NO.:   PROCEDURE TITLE:                                               PAGE:
REVISION NO.:
5C       GUIDELINES FOR USE OF THE UNIT 1 HIGH                           23 of 24 PROCEDURE NO.:             DENSITY SPENT FUEL RACKS 1-0010250                 ST. LUCIE UNIT 1 FIGURE 10 FUNNEL HANDLING TOOL ALIGNMENT PLATE (CORRECT POSITION ON FUNNEL)
PROCEDURE TITLE:
PAGE:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 23 of 24 PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 10 FUNNEL HANDLING TOOL ALIGNMENT PLATE (CORRECT POSITION ON FUNNEL)
(.Page 1 of 1 )
(.Page 1 of 1 )
Duplex funnel Funnel Handling Tool
Duplex funnel Funnel Handling Tool Alignment Plate (PIAP/I-0010250iF1O-RO)
                                                        -      Alignment Plate TOP VIEW              (PIAP/I-0010250iF1O-RO)
TOP VIEW


REVISION NO.:       PROCEDURE TITLE:                         PAGE:
REVISION NO.:
5C           GUIDELINES FOR USE OF THE UNIT 1 HIGH PROCEDURE NO.:                 DENSITY SPENT FUEL RACKS 1-0010250                     ST. LUCIE UNIT 1 FIGURE 11 FUNNEL FULLY SEATED IN SPENT FUEL STORAGE RACK (Page 1 of 1)
PROCEDURE TITLE:
PAGE:
5C GUIDELINES FOR USE OF THE UNIT 1 HIGH PROCEDURE NO.:
DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 11 FUNNEL FULLY SEATED IN SPENT FUEL STORAGE RACK (Page 1 of 1)
Duplex Funnel Rack
Duplex Funnel Rack


REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM USE CONTROL WIRING DIAGRAMS - UNIT 1 CANDIDATE EXAMINER
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM USE CONTROL WIRING DIAGRAMS - UNIT 1 CANDIDATE EXAMINER


REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM USE CONTROL WIRING DIAGRAMS UNIT I KA Statement:     Ability to obtain and interpret station electrical and mechanical drawings.
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM USE CONTROL WIRING DIAGRAMS UNIT I KA Statement:
KA #:             2.1.24 (2.8 / 3.1)
KA #:


==References:==
==References:==
 
Ability to obtain and interpret station electrical and mechanical drawings.
Control Wiring Diagram   8770-B-327   Sheet 564 Control Wiring Diagram   8770-B-327   Sheet 501 Control Wiring Diagram 8770-B-327     Sheet 502 Control Wiring Diagram 8770-B-327     Sheet 645 Candidate:                                                     Time Start Name Time Finish Performance Rating:         Sat               Unsat Validation Time       15 minutes Examiner:                                         Signature:
2.1.24 (2.8 / 3.1)
Control Wiring Diagram 8770-B-327 Sheet 564 Control Wiring Diagram 8770-B-327 Sheet 501 Control Wiring Diagram 8770-B-327 Sheet 502 Control Wiring Diagram 8770-B-327 Sheet 645 Candidate:
Name Time Start Time Finish Performance Rating:
Sat Unsat Validation Time 15 minutes Examiner:
Signature:
Comments ST. LUCIE TRAINING DEPT.
Comments ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 2
ADMINISTRATIVE JPM PAGE 2
Line 520: Line 833:


START TIME:
START TIME:
STEP 1:     Determines from one of the following which CWD shows the solenoid of           CRITICAL STEP V6565:
STEP 1:
                  " Control Wiring Diagram (CWD) Index 8770-B-327 Sheet 1
STANDARD:
                  " Lotus Notes on a PC SAT
COMMENTS:
                  " FPL Mainframe on a PC STANDARD:    DETERMINES solenoid of V6565 is on 8770-B-327 Sheet 564.
Determines from one of the following which CWD shows the solenoid of V6565:
UNSAT COMMENTS:    Answer Key Attachment 1 i
Control Wiring Diagram (CWD) Index 8770-B-327 Sheet 1 Lotus Notes on a PC FPL Mainframe on a PC DETERMINES solenoid of V6565 is on 8770-B-327 Sheet 564.
8770-B-327 Sheet 564 CRITICAL STEP STEP 2:      Identifies the other CWD that are connected to the solenoid of V6565 is powered from.
CRITICAL STEP SAT UNSAT Answer Key Attachment 1 i
SAT STANDARD:    DETERMINES solenoid of V6565 is on 8770-B-327 Sheet 564 is connected to the following CWDs:
STEP 2:
UNSAT
STANDARD:
                "  SH 645: P15B and N15B, 125VDC
8770-B-327 Sheet 564 Identifies the other CWD that are connected to the solenoid of V6565 is powered from.
* SH 501: DDD 87 & 88
DETERMINES solenoid of V6565 is on 8770-B-327 Sheet 564 is connected to the following CWDs:
* SH 502: CC 38 & 39 COMMENTS:     Answer Key Attachment 1 8770-B-327 Sheet 501 STEP 3:       Determines from where the solenoid of V6565 is powered from:
SH 645: P15B and N15B, 125VDC SH 501: DDD 87 & 88 SH 502: CC 38 & 39 CRITICAL STEP SAT UNSAT COMMENTS:
STANDARD:     DETERMINES Sheet 501 does not provide power to V6565.                                 SAT COMMENTS:     Answer Key Attachment 2                                                                 IUNSAT ST. LUCIE TRAINING DEPT.
Answer Key Attachment 1 8770-B-327 Sheet 501 STEP 3:
Determines from where the solenoid of V6565 is powered from:
STANDARD:
DETERMINES Sheet 501 does not provide power to V6565.
SAT COMMENTS:
Answer Key Attachment 2 IUNSAT ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 4
ADMINISTRATIVE JPM PAGE 4


8770-B-327 Sheet 502 STEP 4:      Determines from where the solenoid of V6565 is powered from:
8770-B-327 Sheet 502 STEP 4:
STANDARD:    DETERMINES Sheet 502 does not provide power to V6565.                            SAT COMMENTS:    Answer Key Attachment 3                                                          UNSAT 8770-B-327 Sheet 645 CRITICAL STEP 5:      Determines from CWD where on RTGB the solenoid of V6565 is powered       STEP from.
Determines from where the solenoid of V6565 is powered from:
STANDARD:    DETERMINES from Sheet 645 to remove fuses in RTGB-105, EE F47 &                  SAT F48 125VDC.
_UNSAT COMMENTS:   Answer Key Attachment 4 STEP (done): Inform Candidate JPM is complete.
STANDARD:
STANDARD:
SAT EXAMINER'S CUE:     THIS JPM IS COMPLETE.
DETERMINES Sheet 502 does not provide power to V6565.
COMMENTS:                                                                                     UNSAT END OF TASK STOP TIME:
SAT COMMENTS:
Answer Key Attachment 3 UNSAT 8770-B-327 Sheet 645 CRITICAL STEP 5:
Determines from CWD where on RTGB the solenoid of V6565 is powered STEP from.
STANDARD:
DETERMINES from Sheet 645 to remove fuses in RTGB-105, EE F47 &
SAT F48 125VDC.
_UNSAT COMMENTS:
Answer Key Attachment 4 STEP (done):
Inform Candidate JPM is complete.
STANDARD:
SAT EXAMINER'S CUE:
THIS JPM IS COMPLETE.
COMMENTS:
UNSAT END OF TASK STOP TIME:
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 5
ADMINISTRATIVE JPM PAGE 5
Line 550: Line 879:
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS CANDIDATE EXAMINER
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS CANDIDATE EXAMINER


REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS UNIT I KA Statement:       Knowledge of the requirements for reviewing and approving release permits.
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS UNIT I KA Statement:
KA #:               2.3.6 (2.1 / 3.1)
KA #:


==References:==
==References:==
NOP-06.01, Controlled Liquid Release to Circulating Water Discharge Chemistry Pre-Release Calculations C-200, Offsite Dose Calculation Manual Candidate:                                                   Time Start Name Time Finish Performance Rating:         Sat             Unsat Validation Time        10 minutes Examiner:                                       Signature:
Knowledge of the requirements for reviewing and approving release permits.
Comments ST. LUCIE TRAINING DEPT.
2.3.6 (2.1 / 3.1) NOP-06.01, Controlled Liquid Release to Circulating Water Discharge Chemistry Pre-Release Calculations C-200, Offsite Dose Calculation Manual Candidate:
Name Time Start Time Finish Performance Rating:
Validation Time Sat Unsat 10 minutes Examiner:
Comments Signature:
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 2
ADMINISTRATIVE JPM PAGE 2


REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS UNIT 1 Directions to the candidate for Administrative JPMS:
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS UNIT 1 Directions to the candidate for Administrative JPMS:
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.
Initial Conditions Unit 1 is at 100% power. Chemistry has requested a release of the 1B WMT per LRP Permit # 1-04-55. All equipment is operable with the exception of Liquid Waste Monitor R-6627 which is out of service.
Initial Conditions Unit 1 is at 100% power. Chemistry has requested a release of the 1 B WMT per LRP Permit # 1-04-55. All equipment is operable with the exception of Liquid Waste Monitor R-6627 which is out of service.
Initiating Cue You are the Unit 1 Unit Supervisor. Process the Liquid Release Permit # 1-04-55 for this release.
Initiating Cue You are the Unit 1 Unit Supervisor. Process the Liquid Release Permit # 1-04-55 for this release.
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
Line 566: Line 899:


START TIME:
START TIME:
1-NOP-06.01, Controlled Liquid Release to Circulating Water Discharge STEP 1:       ENSURE Section 3.0, Prerequisites, completed.
1 -NOP-06.01, Controlled Liquid Release to Circulating Water Discharge STEP 1:
SAT STANDARD:     INITIAL Electrical power available and step after reviewing Section 3.0 EVALUATOR NOTE: All equipment is operable per initial conditions                                     UNSAT COMMENTS:
ENSURE Section 3.0, Prerequisites, completed.
STEP 2:       ENSURE Section 4.0, Prerequisites, completed.
STANDARD:
STANDARD:     INITIAL after reviewing Section 4.0                                                   SAT COMMENTS:                                                                                           UNSAT STEP 3:       REVIEW the Liquid Release Permit for appropriate signatures under AUTHORIZATION.
INITIAL Electrical power available and step after reviewing Section 3.0 EVALUATOR NOTE: All equipment is operable per initial conditions COMMENTS:
SAT STANDARD:     VERIFIES signatures and ENTERs 1-04-55 for Permit Number and                                                   UNSAT ENTERs 1B WMT for Tank releasing COMMENTS:
SAT UNSAT STEP 2:
ENSURE Section 4.0, Prerequisites, completed.
STANDARD:
INITIAL after reviewing Section 4.0 SAT COMMENTS:
UNSAT STEP 3:
REVIEW the Liquid Release Permit for appropriate signatures under AUTHORIZATION.
SAT STANDARD:
VERIFIES signatures and ENTERs 1-04-55 for Permit Number and UNSAT ENTERs 1 B WMT for Tank releasing COMMENTS:
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 4
ADMINISTRATIVE JPM PAGE 4


STEP 4:         REVIEW the Equipment Out of Service Log and determine if Channel R-6627, Liquid Waste Monitor has been declared Out of Service.
STEP 4:
SAT STANDARD:       DETERMINES R-6627 is Out of Service UNSAT EVALUATOR NOTE: R-6627 is not operable per initial conditions COMMENTS:
REVIEW the Equipment Out of Service Log and determine if Channel R-6627, Liquid Waste Monitor has been declared Out of Service.
If Channel R-6627 is Out of Service, Then PERFORM the following:
STANDARD:
STEP 5:         Has Chemistry attached two independent Radioactivity analysis of the tank to the Release Permit?
DETERMINES R-6627 is Out of Service EVALUATOR NOTE: R-6627 is not operable per initial conditions COMMENTS:
SAT STANDARD:       CHECK No UNSAT COMMENTS:
SAT UNSAT If Channel R-6627 is Out of Service, Then PERFORM the following:
If Channel R-6627 is Out of Service, Then PERFORM the following:
STEP 5:
STEP 6:         Has Chemistry attached two independent Release Rate Calculations for the tank on the Release Permit?
Has Chemistry attached two independent Radioactivity analysis of the tank to the Release Permit?
SAT STANDARD:     CHECK No UNSAT COMMENTS:
STANDARD:
ST. LUCIE TRAINING DEPT.
CHECK No COMMENTS:
SAT UNSAT If Channel R-6627 is Out of Service, Then PERFORM the following:
STEP 6:
Has Chemistry attached two independent Release Rate Calculations for the tank on the Release Permit?
STANDARD:
CHECK No COMMENTS:
SAT UNSAT ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 5
ADMINISTRATIVE JPM PAGE 5


If Channel R-6627 is Out of Service, Then PERFORM the following:
If Channel R-6627 is Out of Service, Then PERFORM the following:
STEP 7:         Have you arranged for independent verification of the discharge valve alignment?                                                                             SAT STANDARD:     CHECK No                                                                               UNSAT COMMENTS:      Unit Supervisor is the person who would arrange to this step done STEP 8:         If the answer to any of the above questions is "No", Then STOP, do not         CRITCAL STEP approve the Liquid Release Permit.
STEP 7:
STANDARD:       STOPS, does not approve the Liquid Release Permit.                                   SAT COMMENTS:
Have you arranged for independent verification of the discharge valve alignment?
UNSAT STEP (done):   Inform Candidate JPM is complete.
SAT STANDARD:
COMMENTS:
CHECK No Unit Supervisor is the person who would arrange to this step done UNSAT STEP 8:
If the answer to any of the above questions is "No", Then STOP, do not CRITCAL STEP approve the Liquid Release Permit.
STANDARD:
STOPS, does not approve the Liquid Release Permit.
SAT COMMENTS:
UNSAT STEP (done):
Inform Candidate JPM is complete.
STANDARD:
STANDARD:
SAT EXAMINER'S CUE:         THIS JPM IS COMPLETE.
SAT EXAMINER'S CUE:
COMMENTS:                                                                                             UNSAT END OF TASK STOP TIME:
THIS JPM IS COMPLETE.
COMMENTS:
UNSAT END OF TASK STOP TIME:
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 6
ADMINISTRATIVE JPM PAGE 6


UNIT 1         LIOUID RELEASE PERMIT TANK DATA A. LRP Permit #         B. Date and Time         C. Tank Name               D. Discharge Volume (Gallons) 1-04-55             21-DEC-2004 03:45           1B WMT                         4.0000E+04 lI   PRERELEASE             DATA           (jiCi/ml = micro curies per milliliter)
UNIT 1 LIOUID RELEASE PERMIT TANK DATA A. LRP Permit #
A. Total Concentration Of Solids                                                   3.574E+06     ttCi/ml B. Total Activity Of Solids                                                         5.411 E+02     zCi C. Tank Recirced As Per COP-01.05                                                         X       Initials D. Minimum Pumps During Release         3       CWP'-
B. Date and Time C. Tank Name D. Discharge Volume (Gallons) 1-04-55 21-DEC-2004 03:45 1B WMT 4.0000E+04 lI PRERELEASE DATA (jiCi/ml = micro curies per milliliter)
E. Maximum Release Rate During Re],--                                         "E+02       ),,    GPM F. Fraction Of 10 CFR 20 Limits At C         "3 v, ,                                       ,-02   Fl Canal (Solids) (Admin Limit <0.8)       ',(S           *      .t.j.     -
A. Total Concentration Of Solids 3.574E+06 ttCi/ml B. Total Activity Of Solids 5.411 E+02 zCi C. Tank Recirced As Per COP-01.05 X
G. Total Noble Gas Activity After Dilu                         ,        -0                       Fg (Gases) (Admin Limit < 1.60E-04)
Initials D. Minimum Pumps During Release 3
H. Liquid Radwaste Monitor Settings                                 L-'*
CWP'-
eA    A C
E. Maximum Release Rate During Re],--  
Alert Setting 4.500E-03 ACi/ml                           C             c I Have Verified These Settings Are En                     z,,, f Monitors Control Module In The Conti                                                           Initials I. Liquid Rad Waste Monitor Source Chec           6                                               Initials J. LRP LIMS Number 234878 Monitor                         .
),,
II. AUTHORIZATION A. Permit Preparer Verifies Release Will.                                                     ._,  Signature B. Release Approved By Permit Preparer I                                               ,          Signature C. Release Approved By Chemistry Supr. 1                 -= 25000 tzCi                 N/A       Signature D. Release Conditions Approved By ANPS                                                             Signature IV. ACTUAL RELEASE DATA A. Number Of Pumps Running                     CWP's             ICWP's B. Tank Level At Start Of Release C. Date and Time At Start Of Release D. Date and Time At End Of Release E. Tank Level At End Of Release F. Reviewed By ANPS                                                                               Signature V. POST       RELEASE           DATA A. Total Volume This Release                                                                       Gallons B. Total Activity Of Solids Released                                             _Ci C. Release Conditions Approved By ANPS                                                             Signature
"E+02 GPM F. Fraction Of 10 CFR 20 Limits At C "3 v,,  
,-02 Fl Canal (Solids) (Admin Limit <0.8)  
',(S  
.t.j.
G. Total Noble Gas Activity After Dilu  
-0 Fg (Gases) (Admin Limit < 1.60E-04) e C
H. Liquid Radwaste Monitor Settings A
L-'*
A Alert Setting 4.500E-03 ACi/ml C
c I Have Verified These Settings Are En z,,, f Monitors Control Module In The Conti Initials I. Liquid Rad Waste Monitor Source Chec 6
Initials J. LRP LIMS Number 234878 Monitor II.
AUTHORIZATION A. Permit Preparer Verifies Release Will.
Signature B. Release Approved By Permit Preparer I Signature C. Release Approved By Chemistry Supr. 1  
-= 25000 tzCi N/A Signature D. Release Conditions Approved By ANPS Signature IV.
ACTUAL RELEASE DATA A. Number Of Pumps Running CWP's ICWP's B. Tank Level At Start Of Release C. Date and Time At Start Of Release D. Date and Time At End Of Release E. Tank Level At End Of Release F. Reviewed By ANPS Signature V.
POST RELEASE DATA A. Total Volume This Release Gallons B. Total Activity Of Solids Released
_Ci C. Release Conditions Approved By ANPS Signature


FLORIDA POWER & LIGHT CO.     ST. LUCIE PLANT CHEMISTRY DEPARTMENT LIQUID RELEASE PERMIT 1       55 FINAL ACTIVITY REPORT FOR PRE-RELEASE CALCULATIONS SAMPLE I.D.       lB WMT                FILE: LRP.DAT                SAMPLE #    36 SAMOPLE TIME      12-21-2004 @ 8:10     RELEASE VOLUME:       4.0000E+04 gal.
FLORIDA POWER & LIGHT CO.
GEOMETRY FILE:    3GT67.CLB            RELEASE RATE    :    1.7000E+02 GPM COUNT TIME        1.0000E+03 SEC      DILUTION PUMPS:          1 ICWP  3 CWP SAMPLE VOLUME:     1.0000E+03 mls.     DILUTION RATE :       3.7750E+05 GPM
ST.
                          ** LRP PROGRAM Q.C. O.K. **
LUCIE PLANT CHEMISTRY DEPARTMENT LIQUID RELEASE PERMIT 1 55 FINAL ACTIVITY REPORT FOR PRE-RELEASE CALCULATIONS SAMPLE I.D.
NUCLIDE      SAMPLE      E.C.L.     E.C.L.     TANK UCI     TANK UCI   NUCLIDE SYMBOL      UCI/ML    UCI/ML     FRACTION   PRERELEAS POSTRELEA SYMBOL SB-125      5. 583E-07 3.E-05     8.381E-06   8.453E+01                 SB-125 C0-60      1. 783E-06 3.E-06     2.677E-04   2.700E+02                   -60 H-3    C  5.520E-02 1.E-03     2.486E-02 FE-55  C  9.880E-06 1.E-04     4.449E-05 SR-89  C  2 .400E-08 8.E-06     1.351E-06 Y-90    C  5. 000E-09 5.E-07     4.503E-06 Y-90    C  5. 000E-09 7.E-06     3.217E-07 TOTALS      2. 342E-06            2.519E-02   3.545E+02 LRP II.A.              F SUB L     LRP II.B.
SAMOPLE TIME GEOMETRY FILE:
C - denotes composite - only used for       F SUB L NUCLIDE     SAMPLE               DIL. CONC     TANK UCI     TANK UCI   NUCLIDE SYMBOL      UCI/ML                @ CANAL     PRERELEAS POSTRELEA SYMBOL TOTALS    0. O00E+00            0.000E+00   0.000E+00 F SUB G
COUNT TIME SAMPLE VOLUME:
lB WMT 12-21-2004 @ 8:10 3GT67.CLB 1.0000E+03 SEC 1.0000E+03 mls.
FILE: LRP.DAT RELEASE VOLUME:
RELEASE RATE DILUTION PUMPS:
DILUTION RATE SAMPLE #
36 4.0000E+04 gal.
1.7000E+02 GPM 1 ICWP 3
CWP 3.7750E+05 GPM NUCLIDE SYMBOL SB-125 C0-60 H-3 C
FE-55 C
SR-89 C
Y-90 C
Y-90 C
TOTALS SAMPLE UCI/ML
: 5. 583E-07
: 1. 783E-06 5.520E-02 9.880E-06 2.400E-08
: 5. 000E-09
: 5. 000E-09
: 2. 342E-06 LRP II.A.
LRP PROGRAM Q.C.
O.K.
E.C.L.
E.C.L.
TANK UCI TANK UCI NUCLIDE UCI/ML FRACTION PRERELEAS POSTRELEA SYMBOL 3.E-05 8.381E-06 8.453E+01 SB-125 3.E-06 2.677E-04 2.700E+02  
-60 1.E-03 2.486E-02 1.E-04 4.449E-05 8.E-06 1.351E-06 5.E-07 4.503E-06 7.E-06 3.217E-07 2.519E-02 3.545E+02 F SUB L LRP II.B.
C -
denotes composite -
only used for F SUB L NUCLIDE SYMBOL TOTALS SAMPLE UCI/ML
: 0. O00E+00 DIL.
CONC TANK UCI TANK UCI NUCLIDE
@ CANAL PRERELEAS POSTRELEA SYMBOL 0.000E+00 0.000E+00 F SUB G


CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
Line 615: Line 1,016:


Procedure No.
Procedure No.
ST. LUCIE UNIT 1                               1-NOP-06.01 NORMAL OPERATING                         Current Revision No.
ST. LUCIE UNIT 1 1-NOP-06.01 NORMAL OPERATING Current Revision No.
PROCEDURE                                 7A FPL                         SAFETY RELATED Effective Date 10/11104
PROCEDURE 7A FPL Effective Date SAFETY RELATED 10/11104


==Title:==
==Title:==
Line 630: Line 1,031:
REVISION 5 - Added note regarding low WMT level and guidance to adjust recirc to maintain flow. (William Green, 08/13/02)
REVISION 5 - Added note regarding low WMT level and guidance to adjust recirc to maintain flow. (William Green, 08/13/02)
REVISION 4 - Removed 14-day requirement for restoration of rad monitor per change in ODCM (C-200). (Kelly Korth, 05/14/02)
REVISION 4 - Removed 14-day requirement for restoration of rad monitor per change in ODCM (C-200). (Kelly Korth, 05/14/02)
Revision   FRG Review Date         Approved By       Approval Date         S 1 OPS 0         09/21/99             R. G. West         09/21/99       DATE Plant General Manager                   DOCT     PROCEDURE Revision   FRG Review Date         Approved By       Approval Date   DOCN     1-NOP-06.01 7A                                     N/A                           SYS Plant General Manager                   COM     COMPLETED J. R. Martin         01/21/04     ITM         7A Designated Approver J. R. Martin         10/06/04 Designated Approver (Minor Correction)
Revision FRG Review Date Approved By Approval Date S 1 OPS 0
09/21/99 R. G. West 09/21/99 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN 1-NOP-06.01 7A N/A SYS Plant General Manager COM COMPLETED J. R. Martin 01/21/04 ITM 7A Designated Approver J. R. Martin 10/06/04 Designated Approver (Minor Correction)


REVISION NO.:           PROCEDURE TITLEK'.                                                                         PAGE:
REVISION NO.:
7A                   CONTROLLED LIQUID RELEASE TO THE                                                         2 of 15 PROCEDURE NO.:                     CIRCULATING WATER DISCHARGE 1-NOP-06.01                                     ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION                                                                                                       PAGE 1.0     PURPO SE .................................................................................................         3
PROCEDURE TITLEK'.
PAGE:
7A CONTROLLED LIQUID RELEASE TO THE 2 of 15 PROCEDURE NO.:
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION PAGE 1.0 PURPO SE.................................................................................................
3


==2.0     REFERENCES==
==2.0 REFERENCES==
..........................................................................................              3 3.0     PREREQ UISITES ......................................................................................             4 4.0     PRECAUTIO NS / LIM ITATIONS ...............................................................                       4 5.0     RECO RDS REQ UIRED .............................................................................                   5 6.0     INSTRUCTIO NS ........................................................................................             6 6.1   Initial Conditions .............................................................................           6 6.2   Valve Alignm ent .............................................................................             7 6.3   Starting the Liquid Release .......................................................... 10 6.4   Com pleting the Liquid Release ...................................................... 14 FIGURES FIG URE 1     LIQ UID RELEASE PERM IT - UNIT 1 ...........................................                             15
3 3.0 PREREQ UISITES......................................................................................
4 4.0 PRECAUTIO NS / LIM ITATIONS...............................................................
4 5.0 RECO RDS REQ UIRED.............................................................................
5 6.0 INSTRUCTIO NS........................................................................................
6 6.1 Initial Conditions.............................................................................
6 6.2 Valve Alignm ent.............................................................................
7 6.3 Starting the Liquid Release..........................................................
10 6.4 Com pleting the Liquid Release...................................................... 14 FIGURES FIG URE 1 LIQ UID RELEASE PERM IT - UNIT 1...........................................
15


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
7A                 CONTROLLED LIQUID RELEASE TO THE                         3 of 15 PROCEDURE NO.:                 CIRCULATING WATER DISCHARGE 1-NOP-06.01                           ST. LUCIE UNIT 1 1.0     PURPOSE 1.1     This procedure provides instructions for the controlled release of liquid from the Waste Monitor Tanks (WMT).
PROCEDURE TITLE:
 
PAGE:
==2.0    REFERENCES==
7A CONTROLLED LIQUID RELEASE TO THE 3 of 15 PROCEDURE NO.:
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 1.0 PURPOSE 1.1 This procedure provides instructions for the controlled release of liquid from the Waste Monitor Tanks (WMT).


==2.0 REFERENCES==
NOTE One or more of the following symbols may be used in this procedure:
NOTE One or more of the following symbols may be used in this procedure:
        &sect;   Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
&sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
        &#xb6;   Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
&#xb6; Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
T Indicates a step that requires a sign off on an attachment.
T Indicates a step that requires a sign off on an attachment.
2.1     Technical Specifications
2.1 Technical Specifications Appendix B part 2 Technical Requirements Manual 2.2 Updated Final Safety Analysis Report (UFSAR) 0 Section 11.2.2.2 2.3 Management Directives and Regulatory Commitments 0  
* Appendix B part 2
&#xb6;j CR-1045 2.4 Procedures Chemistry Procedure C-200, Offsite Dose Calculation Manual (ODCM)
* Technical Requirements Manual 2.2     Updated Final Safety Analysis Report (UFSAR) 0       Section 11.2.2.2 2.3     Management Directives and Regulatory Commitments 0       &#xb6;j   CR-1045 2.4     Procedures
Radiation Protection Manual COP-01.05, Processing Aerated Liquid Waste 2.5 Miscellaneous Documents P&ID 8770-G-078, Sheets 161, 162, 164, 165
* Chemistry Procedure C-200, Offsite Dose Calculation Manual (ODCM)
* Radiation Protection Manual
* COP-01.05, Processing Aerated Liquid Waste 2.5     Miscellaneous Documents
* P&ID 8770-G-078, Sheets 161, 162, 164, 165


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
7A               CONTROLLED LIQUID RELEASE TO THE                       4 of 15 PROCEDURE NO.:                 CIRCULATING WATER DISCHARGE 1-NOP-06.01                           ST. LUCIE UNIT 1 3.0     PREREQUISITES                                                                 INITIAL 3.1     Electrical power is available to the following pumps:
PROCEDURE TITLE:
: 1.       1A Waste Monitor Pump Bkr. 1-40948
PAGE:
: 2.       1B Waste Monitor Pump Bkr. 1-41756
7A CONTROLLED LIQUID RELEASE TO THE 4 of 15 PROCEDURE NO.:
: 3.       Liquid Waste Control Panel (LWCP) PP-109, Ckt. 18 4.0     PRECAUTIONS / LIMITATIONS 4.1     Prior to release, the tank contents shall be sampled, analyzed and a Liquid Release Permit (LRP) prepared and approved. Once a sample has been drawn for release purposes, radioactive waste shall NOT be added to the tank.
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 3.0 PREREQUISITES INITIAL 3.1 Electrical power is available to the following pumps:
4.2     The Operator shall perform a release only after receipt of an approved Liquid Release Permit. Form similar to Figure 1.
: 1.
4.3     The Liquid Waste Monitor shall be in service during a release and frequently observed to assure that the count rate is below the trip point settings as noted on the Release Permit. If the Liquid Waste Monitor is determined to be inoperable, refer to C-200, Offsite Dose Calculation Manual (ODCM), Section 3.3.3.9 for required actions and provisions to proceed with the release.
1A Waste Monitor Pump Bkr. 1-40948
4.4     If activity reaches the high rate trip setpoint as indicated on the Release Permit, an alarm is activated in the Control Room and Flow Control Valve FCV-6627X trips closed. FCV-6627X may be closed from RTGB-105 to terminate the release at the Operator's discretion. Do not re-initiate a liquid release that has been terminated by a monitor alarm until authorized by the Chemistry Department.
: 2.
4.5   The minimum number of circulating water (CWP) and/or Intake Cooling Water Pumps (ICWP) should be in service during a release as specified by the Liquid Release Permit. Even though not desirable, a release may be made with only ICW pumps for dilution if administrative limits are not exceeded.
1B Waste Monitor Pump Bkr. 1-41756
: 3.
Liquid Waste Control Panel (LWCP) PP-109, Ckt. 18 4.0 PRECAUTIONS / LIMITATIONS 4.1 Prior to release, the tank contents shall be sampled, analyzed and a Liquid Release Permit (LRP) prepared and approved. Once a sample has been drawn for release purposes, radioactive waste shall NOT be added to the tank.
4.2 The Operator shall perform a release only after receipt of an approved Liquid Release Permit. Form similar to Figure 1.
4.3 The Liquid Waste Monitor shall be in service during a release and frequently observed to assure that the count rate is below the trip point settings as noted on the Release Permit. If the Liquid Waste Monitor is determined to be inoperable, refer to C-200, Offsite Dose Calculation Manual (ODCM), Section 3.3.3.9 for required actions and provisions to proceed with the release.
4.4 If activity reaches the high rate trip setpoint as indicated on the Release Permit, an alarm is activated in the Control Room and Flow Control Valve FCV-6627X trips closed. FCV-6627X may be closed from RTGB-105 to terminate the release at the Operator's discretion. Do not re-initiate a liquid release that has been terminated by a monitor alarm until authorized by the Chemistry Department.
4.5 The minimum number of circulating water (CWP) and/or Intake Cooling Water Pumps (ICWP) should be in service during a release as specified by the Liquid Release Permit. Even though not desirable, a release may be made with only ICW pumps for dilution if administrative limits are not exceeded.


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
7A                 CONTROLLED LIQUID RELEASE TO THE                         5 PROCEDURE NO.:                 CIRCULATING WATER DISCHARGE 1-NOP-06.01                           ST. LUCIE UNIT 1 4.6     The ODCM limits for liquid releases are the following:
PROCEDURE TITLE:
: 1. The concentration of radioactive material released from the site shall be limited to the concentrations specified in 10 CFR Part 20, Appendix B, Table 2, Column 2 for radionuclides other than dissolved or entrained noble gases. For dissolved or entrained noble gases, the concentration shall be limited to 2 x 1 0 .4 microcuries / ml total activity.
PAGE:
: 2. To ensure that the sum of radioactive releases from multiple release points on site do not exceed the site limits:
7A CONTROLLED LIQUID RELEASE TO THE 5
A.     No more than one batch release shall be made on site at the same time.
PROCEDURE NO.:
B. Administrative limits of 80% of the site limits shall be used for a batch release liquid release permit.
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 4.6 The ODCM limits for liquid releases are the following:
C.     Chemistry Department shall ensure as per COP-01.05 that the sum of all continuous and any batch release shall not exceed the site limit.
: 1.
The concentration of radioactive material released from the site shall be limited to the concentrations specified in 10 CFR Part 20, Appendix B, Table 2, Column 2 for radionuclides other than dissolved or entrained noble gases. For dissolved or entrained noble gases, the concentration shall be limited to 2 x 10.4 microcuries / ml total activity.
: 2.
To ensure that the sum of radioactive releases from multiple release points on site do not exceed the site limits:
A.
No more than one batch release shall be made on site at the same time.
B.
Administrative limits of 80% of the site limits shall be used for a batch release liquid release permit.
C.
Chemistry Department shall ensure as per COP-01.05 that the sum of all continuous and any batch release shall not exceed the site limit.
A continuous release is Steam Generator Blowdown to the discharge canal with primary-to-secondary leakage. A batch release is from a tank identified in the respective reactor unit's operating procedure for controlled liquid release to the circulating water discharge i.e. this procedure.
A continuous release is Steam Generator Blowdown to the discharge canal with primary-to-secondary leakage. A batch release is from a tank identified in the respective reactor unit's operating procedure for controlled liquid release to the circulating water discharge i.e. this procedure.
4.7     Applicable radiation protection, precautions and procedures shall be observed.
4.7 Applicable radiation protection, precautions and procedures shall be observed.
5.0     RECORDS REQUIRED 5.1     A completed Liquid Release Permit with the final activity page attachment and this procedure with signed off steps shall be maintained in the plant files in accordance with QI-1 7-PSL-1, Quality Assurance Records.
5.0 RECORDS REQUIRED 5.1 A completed Liquid Release Permit with the final activity page attachment and this procedure with signed off steps shall be maintained in the plant files in accordance with QI-1 7-PSL-1, Quality Assurance Records.
5.2     Normal Log Entries
5.2 Normal Log Entries


REVISION NO.:             PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
7A                   CONTROLLED LIQUID RELEASE TO THE                     6 of 15 PROCEDURE NO.:                     CIRCULATING WATER DISCHARGE 1-NOP-06.01                               ST. LUCIE UNIT 1 6.0     INSTRUCTIONS                                                                   INITIAL 6.1     Initial Conditions
PROCEDURE TITLE:
: 1.       ENSURE Section 3.0, Prerequisites, completed.
PAGE:
: 2.       REVIEW Section 4.0, Precautions /Limitations.
7A CONTROLLED LIQUID RELEASE TO THE 6 of 15 PROCEDURE NO.:
: 3.       REVIEW the Liquid Release Permit for appropriate signatures under AUTHORIZATION.
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.0 INSTRUCTIONS INITIAL 6.1 Initial Conditions
: 1.
ENSURE Section 3.0, Prerequisites, completed.
: 2.
REVIEW Section 4.0, Precautions /Limitations.
: 3.
REVIEW the Liquid Release Permit for appropriate signatures under AUTHORIZATION.
Permit Number Tank releasing CAUTION If the Liquid Waste Monitor is Out of Service, C-200, ODCM Control 3.3.3.9 requires two independent tank sample / analysis and two independent valve alignments to verify the discharge line valving.
Permit Number Tank releasing CAUTION If the Liquid Waste Monitor is Out of Service, C-200, ODCM Control 3.3.3.9 requires two independent tank sample / analysis and two independent valve alignments to verify the discharge line valving.
: 4.       &#xb6;j     REVIEW the Equipment Out of Service Log and determine if Channel R-6627, Liquid Waste Monitor has been declared Out of Service.
: 4.  
: 5.       If Channel R-6627 is Out of Service, Then PERFORM the following:
&#xb6;j REVIEW the Equipment Out of Service Log and determine if Channel R-6627, Liquid Waste Monitor has been declared Out of Service.
YES     NO A.     Has Chemistry attached two independent Radioactivity analysis of the tank to the Release Permit?
: 5.
B.     Has Chemistry attached two independent Release Rate Calculations for the tank on the Release Permit?
If Channel R-6627 is Out of Service, Then PERFORM the following:
C.     Have you arranged for independent verification of the discharge valve alignment?
YES NO A.
Has Chemistry attached two independent Radioactivity analysis of the tank to the Release Permit?
B.
Has Chemistry attached two independent Release Rate Calculations for the tank on the Release Permit?
C.
Have you arranged for independent verification of the discharge valve alignment?
If the answer to any of the above questions is "No", Then STOP, do not approve the Liquid Release Permit.
If the answer to any of the above questions is "No", Then STOP, do not approve the Liquid Release Permit.
END OF SECTION 6.1
END OF SECTION 6.1


REVISION NO.:         PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
7A               CONTROLLED LIQUID RELEASE TO THE                     7 of 15 PROCEDURE NO.:                 CIRCULATING WATER DISCHARGE 1-NOP-06.01                         ST. LUCIE UNIT 1 6.2     Valve Alignment CAUTION If the Liquid Waste Monitor is Out of Service, two independent valve alignments shall be performed to verify the discharge line valving.
PROCEDURE TITLE:
: 1.                                 ,a PERFORM the following valve alignment.
PAGE:
                                                            *            *I            I AT CCW PLATFORM VALVE NUMBER                       DESCRIPTION                   POSITION     INITIAL Waste Monitor Pumps Disch to Disch           LOCKED Canal Isol                                   CLOSED V06247       Waste Monitor Tanks Inlet Isol                 OPEN V06238       Waste Monitor Pumps Discharge Recirc         CLOSED Isol V06239       RE-6627 Upstrm Root                           OPEN V06240       RE-6627 Dwnstrm Root                           OPEN V06241       FE-6627 Upstrm Root                           OPEN V06242       FE-6627 Dwnstrm Root                           OPEN V38175       RE-6627 Demineralized Water Flush             CLOSED AT WASTE MONITOR PUMPS VALVE NUMBER                       DESCRIPTION                   POSITION   INITIAL V06221       1A/1 B Waste Monitor Tank Outlet             CLOSED Crossover Isol V06222       1A/1 B Waste Monitor Pump Recirc             CLOSED Crossover Isol                               CLOSED
7A CONTROLLED LIQUID RELEASE TO THE 7 of 15 PROCEDURE NO.:
: 2.     PERFORM the following valve alignment for the appropriate tank to be discharged: Valve alignment for the non-discharged tank is not necessary.
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.2 Valve Alignment CAUTION If the Liquid Waste Monitor is Out of Service, two independent valve alignments shall be performed to verify the discharge line valving.
I
, a
*I
: 1.
PERFORM the following valve alignment.
AT CCW PLATFORM VALVE NUMBER DESCRIPTION POSITION INITIAL Waste Monitor Pumps Disch to Disch LOCKED Canal Isol CLOSED V06247 Waste Monitor Tanks Inlet Isol OPEN V06238 Waste Monitor Pumps Discharge Recirc CLOSED Isol V06239 RE-6627 Upstrm Root OPEN V06240 RE-6627 Dwnstrm Root OPEN V06241 FE-6627 Upstrm Root OPEN V06242 FE-6627 Dwnstrm Root OPEN V38175 RE-6627 Demineralized Water Flush CLOSED AT WASTE MONITOR PUMPS VALVE NUMBER DESCRIPTION POSITION INITIAL V06221 1A/1 B Waste Monitor Tank Outlet CLOSED Crossover Isol V06222 1A/1 B Waste Monitor Pump Recirc CLOSED Crossover Isol CLOSED
: 2.
PERFORM the following valve alignment for the appropriate tank to be discharged: Valve alignment for the non-discharged tank is not necessary.
(Check appropriate tank.)
(Check appropriate tank.)


REVISION NO.:         PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
7A               CONTROLLED LIQUID RELEASE TO THE                       8 of 15 PROCEDURE NO.:                 CIRCULATING WATER DISCHARGE 1-NOP-06.01                         ST. LUCIE UNIT 1 6.2     Valve Alignment (continued)
PROCEDURE TITLE:
: 2.     (continued)
PAGE:
A.     If 1A Waste Monitor Tank is being discharged with the 1A Waste Monitor Pump, Then PERFORM the following alignment:
7A CONTROLLED LIQUID RELEASE TO THE 8 of 15 PROCEDURE NO.:
VALVE NUMBE NUMBER DESCRIPTION                   POSITION       INITIAL V06231       1 B Waste Monitor Pump Disch Isol         CLOSED V06207       1A Waste   Monitor Tank Outlet Isol             OPEN V06208       1A Waste   Monitor Pump Suct Isol               OPEN V06215       1A Waste   Monitor Pump Disch Isol           CLOSED V06220       1A Waste   Monitor Pump Disch Recirc Isol     OPEN Selected 1      to to HCV-06-6     Waste Monitor Tanks Inlet                     1 BWMT B.     If 1B Waste Monitor Tank is being discharged with the 1B Waste Monitor Pump, Then PERFORM the following alignment:
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.2 Valve Alignment (continued)
VALVE NUMBE                     DESCRIPTION                   POSITION NUMBER                                                                   INITIAL V06215       1A Waste Monitor Pump Discharge Isol         CLOSED V06223       1B Waste Monitor Tank Outlet Isol             OPEN V06224       1B Waste Monitor Pump Suct Isol               OPEN V06231       1 B Waste Monitor Pump Discharge Isol       CLOSED V06235       1B Waste Monitor Pump Disch Recirc Isol       OPEN Selected to HCV-06-6     Waste Monitor Tanks Inlet                   SAlWMt to 1A WMT
: 2.
(continued)
A.
If 1A Waste Monitor Tank is being discharged with the 1A Waste Monitor Pump, Then PERFORM the following alignment:
VALVE NUMBE DESCRIPTION POSITION INITIAL NUMBER V06231 1 B Waste Monitor Pump Disch Isol CLOSED V06207 1A Waste Monitor Tank Outlet Isol OPEN V06208 1A Waste Monitor Pump Suct Isol OPEN V06215 1A Waste Monitor Pump Disch Isol CLOSED V06220 1A Waste Monitor Pump Disch Recirc Isol OPEN Selected to HCV-06-6 Waste Monitor Tanks Inlet 1
to 1 BWMT B.
If 1 B Waste Monitor Tank is being discharged with the 1 B Waste Monitor Pump, Then PERFORM the following alignment:
VALVE NUMBE DESCRIPTION POSITION INITIAL NUMBER V06215 1A Waste Monitor Pump Discharge Isol CLOSED V06223 1 B Waste Monitor Tank Outlet Isol OPEN V06224 1 B Waste Monitor Pump Suct Isol OPEN V06231 1 B Waste Monitor Pump Discharge Isol CLOSED V06235 1 B Waste Monitor Pump Disch Recirc Isol OPEN Selected to HCV-06-6 Waste Monitor Tanks Inlet SAlWMt to 1A WMT


REVISION NO.:         PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
7A                 CONTROLLED LIQUID RELEASE TO THE                       9 of 15 PROCEDURE NO.:                 CIRCULATING WATER DISCHARGE 1-NOP-06.01                         ST. LUCIE UNIT 1 6.2     Valve Alignment (continued)
PROCEDURE TITLE:
: 2.     (continued)
PAGE:
C.     If 1A Waste Monitor Tank is being discharged with the 1 B waste monitor pump, Then PERFORM the following alignment:
7A CONTROLLED LIQUID RELEASE TO THE 9 of 15 PROCEDURE NO.:
VALVE NUMBE                     DESCRIPTION                     POSITION       INITIAL
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.2 Valve Alignment (continued)
      -NUMBER V06215       1A Waste   Monitor Pump Disch Isol             CLOSED V06223       1B Waste   Monitor Tank Outlet Isol           CLOSED V06224       1B Waste   Monitor Pump Suct Isol               OPEN V06231       1B Waste   Monitor Pump Disch Isol           CLOSED V06235       1B Waste   Monitor Pump Disch Recirc Isol     CLOSED Selected 1      tto HCV-06-6     Waste Monitor Tanks Inlet                       1BWMT V06221       1A/1 B Waste Monitor Tank Outlet               OPEN Crossover Isol V06207       1A Waste Monitor Tank Outlet Isol               OPEN V06222       1A/1B Waste Monitor Pump Recirc                 OPEN Crossover Isol V06220       1A Waste Monitor Pump Disch Recirc Isol         OPEN D.     If I B Waste Monitor Tank is being discharged with the 1A waste monitor pump, Then PERFORM the following alignment:
: 2.
VALVE NUMBE NUMBER                      DESCRIPTION                   POSITION       INITIAL V06231     1B Waste   Monitor Pump Disch Isol           CLOSED V06207     1A Waste   Monitor Tank Outlet Isol           CLOSED V06208     1A Waste   Monitor Pump Suct Isol               OPEN V06215     1A Waste   Monitor Pump Disch Isol           CLOSED V06220     1A Waste   Monitor Pump Disch Recirc Isol     CLOSED HCV-06-6     Waste Monitor Tanks Inlet                     Selected to 1A WMT V06221     1A/1 B Waste Monitor Tank Outlet                 OPEN Crossover Isol V06223     1B Waste Monitor Tank Outlet Isol               OPEN V06222     1A/1 B Waste Monitor Pump Recirc                 OPEN Crossover Isol V06235     1B Waste Monitor Pump Disch Recirc Isol         OPEN END OF SECTION 6.2
(continued)
C.
If 1A Waste Monitor Tank is being discharged with the 1 B waste monitor pump, Then PERFORM the following alignment:
VALVE NUMBE DESCRIPTION POSITION INITIAL
-NUMBER V06215 1A Waste Monitor Pump Disch Isol CLOSED V06223 1 B Waste Monitor Tank Outlet Isol CLOSED V06224 1 B Waste Monitor Pump Suct Isol OPEN V06231 1 B Waste Monitor Pump Disch Isol CLOSED V06235 1 B Waste Monitor Pump Disch Recirc Isol CLOSED Selected to HCV-06-6 Waste Monitor Tanks Inlet 1
t 1 BWMT V06221 1A/1 B Waste Monitor Tank Outlet OPEN Crossover Isol V06207 1A Waste Monitor Tank Outlet Isol OPEN V06222 1A/1B Waste Monitor Pump Recirc OPEN Crossover Isol V06220 1A Waste Monitor Pump Disch Recirc Isol OPEN D.
If I B Waste Monitor Tank is being discharged with the 1A waste monitor pump, Then PERFORM the following alignment:
VALVE NUMBE DESCRIPTION POSITION INITIAL NUMBER V06231 1 B Waste Monitor Pump Disch Isol CLOSED V06207 1A Waste Monitor Tank Outlet Isol CLOSED V06208 1A Waste Monitor Pump Suct Isol OPEN V06215 1A Waste Monitor Pump Disch Isol CLOSED V06220 1A Waste Monitor Pump Disch Recirc Isol CLOSED HCV-06-6 Waste Monitor Tanks Inlet Selected to 1A WMT V06221 1A/1 B Waste Monitor Tank Outlet OPEN Crossover Isol V06223 1 B Waste Monitor Tank Outlet Isol OPEN V06222 1A/1 B Waste Monitor Pump Recirc OPEN Crossover Isol V06235 1 B Waste Monitor Pump Disch Recirc Isol OPEN END OF SECTION 6.2


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
7A                 CONTROLLED LIQUID RELEASE TO THE PROCEDURE   NO.:                 CIRCULATING WATER DISCHARGE 1-NOP-06.01                             ST. LUCIE UNIT 1 6.3     Starting the Liquid Release NOTE Low WMT level may cause the flow switch for RE-6627 to actuate.
PROCEDURE TITLE:
: 1.       VERIFY that the minimum number of CW or ICW Pumps required by Liquid Release Permit is in service.
PAGE:
: 2.       ENTER the pumps in operation in section IV of permit.
7A CONTROLLED LIQUID RELEASE TO THE PROCEDURE NO.:
: 3.       ENSURE FIC-6627 Manual Control Knob is FULL counterclockwise.
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.3 Starting the Liquid Release NOTE Low WMT level may cause the flow switch for RE-6627 to actuate.
: 4.       ENSURE FIC-6627 is in MANUAL.
: 1.
: 5.       PLACE Liquid Waste Flow Valve Selector to FCV-6627X position.
VERIFY that the minimum number of CW or ICW Pumps required by Liquid Release Permit is in service.
: 6.       OPEN FCV-6627X using FIC-6627 Manual Control Knob.
: 2.
: 7.       If Waste Monitor Pump 1A is to be used, Then PERFORM the following:
ENTER the pumps in operation in section IV of permit.
A. START 1A Waste Monitor Pump
: 3.
: 1. If releasing the 1A Waste Monitor Tank, Then THROTTLE CLOSE V06220, 1A Waste Monitor Pump Discharge Recirc Isol, to attain 20 to 25 psig on PI-06-47A, 1A Waste Monitor Pump Press.
ENSURE FIC-6627 Manual Control Knob is FULL counterclockwise.
: 2.     If releasing the 1B Waste Monitor Tank, Then THROTTLE CLOSED V06235, 1B Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47A, 1A Waste Monitor Pump Pressure.
: 4.
B. OPEN V06215, 1A Waste Monitor Pump Discharge Isol.
ENSURE FIC-6627 is in MANUAL.
C. If pump discharge pressure does not return to approximately 20 to 25 psig after the discharge valve is opened, Then PERFORM the following:
: 5.
: 1.     CLOSE V06215, 1A Waste Monitor Pump Discharge Isolation.
PLACE Liquid Waste Flow Valve Selector to FCV-6627X position.
: 2.     STOP 1A Waste Monitor Pump.
: 6.
: 3.     VERIFY correct valve lineup before continuing.
OPEN FCV-6627X using FIC-6627 Manual Control Knob.
: 7.
If Waste Monitor Pump 1A is to be used, Then PERFORM the following:
A.
START 1A Waste Monitor Pump
: 1.
If releasing the 1A Waste Monitor Tank, Then THROTTLE CLOSE V06220, 1A Waste Monitor Pump Discharge Recirc Isol, to attain 20 to 25 psig on PI-06-47A, 1A Waste Monitor Pump Press.
: 2.
If releasing the 1 B Waste Monitor Tank, Then THROTTLE CLOSED V06235, 1 B Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47A, 1A Waste Monitor Pump Pressure.
B.
OPEN V06215, 1A Waste Monitor Pump Discharge Isol.
C.
If pump discharge pressure does not return to approximately 20 to 25 psig after the discharge valve is opened, Then PERFORM the following:
: 1.
CLOSE V06215, 1A Waste Monitor Pump Discharge Isolation.
: 2.
STOP 1A Waste Monitor Pump.
: 3.
VERIFY correct valve lineup before continuing.


REVISION NO.:           PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
7A                 CONTROLLED LIQUID RELEASE TO THE                         11 of 15 PROCEDURE   NO.:                 CIRCULATING WATER DISCHARGE 1-NOP-06.01                             ST. LUCIE UNIT 1 6.3     Starting the Liquid Release (continue)
PROCEDURE TITLE:
: 8.       If Waste Monitor Pump 1 B is to be used, Then PERFORM the following:
PAGE:
A. START 1B Waste Monitor Pump.
7A CONTROLLED LIQUID RELEASE TO THE 11 of 15 PROCEDURE NO.:
: 1.     If releasing I B Waste Monitor Tank, Then THROTTLE CLOSED V06235, 1B Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47B, 1B Waste Monitor Pump Press.
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.3 Starting the Liquid Release (continue)
: 2.     If releasing 1A Waste Monitor Tank, Then THROTTLE CLOSED V06220, 1A Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47B, 1B Waste Monitor Pump Pressure.
: 8.
B. OPEN V06231, 1B Waste Monitor Pump Discharge Isolation.
If Waste Monitor Pump 1 B is to be used, Then PERFORM the following:
C. If pump discharge pressure does not return to approximately 20 to 25 psig after the discharge valve is opened, Then PERFORM the following:
A.
: 1.     CLOSE V06231, 1B Waste Monitor Pump Disch Isol.
START 1 B Waste Monitor Pump.
: 2.     STOP 1B Waste Monitor Pump.
: 1.
: 3. VERIFY correct valve lineup before continuing.
If releasing I B Waste Monitor Tank, Then THROTTLE CLOSED V06235, 1 B Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47B, 1B Waste Monitor Pump Press.
: 9.       RECORD the following liquid release data in Section IVof LRP:
: 2.
A. Start date and time B. Starting tank level.
If releasing 1A Waste Monitor Tank, Then THROTTLE CLOSED V06220, 1A Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47B, 1 B Waste Monitor Pump Pressure.
: 10.     LOCK OPEN V21462, Waste Monitor Pumps Disch to Disch Canal Isol
B.
: 11.     MONITOR FR-6627 and ADJUST FIC-6627 to maintain release flow:
OPEN V06231, 1 B Waste Monitor Pump Discharge Isolation.
A. If releasing 1B Waste Monitor Tank, Then THROTTLE FCV-6627X by adjusting FIC-6627 Manual Control Knob, to attain no greater than 50 gpm on FR-6627.
C.
B. If releasing 1A Waste Monitor Tank, Then THROTTLE FCV-6627X by adjusting FIC-6627 Manual Control Knob, to attain no greater than 50 gpm on FR-6627.
If pump discharge pressure does not return to approximately 20 to 25 psig after the discharge valve is opened, Then PERFORM the following:
: 1.
CLOSE V06231, 1 B Waste Monitor Pump Disch Isol.
: 2.
STOP 1 B Waste Monitor Pump.
: 3.
VERIFY correct valve lineup before continuing.
: 9.
RECORD the following liquid release data in Section IV of LRP:
A.
Start date and time B.
Starting tank level.
: 10.
LOCK OPEN V21462, Waste Monitor Pumps Disch to Disch Canal Isol
: 11.
MONITOR FR-6627 and ADJUST FIC-6627 to maintain release flow:
A.
If releasing 1 B Waste Monitor Tank, Then THROTTLE FCV-6627X by adjusting FIC-6627 Manual Control Knob, to attain no greater than 50 gpm on FR-6627.
B.
If releasing 1A Waste Monitor Tank, Then THROTTLE FCV-6627X by adjusting FIC-6627 Manual Control Knob, to attain no greater than 50 gpm on FR-6627.


REVISION NO.:         PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
7A                 CONTROLLED LIQUID RELEASE TO THE PROCEDURE NO.:                   CIRCULATING WATER DISCHARGE 1-NOP-06.01                           ST. LUCIE UNIT 1 6.3     Starting the Liquid Release (continue)
PROCEDURE TITLE:
: 12. MONITOR liquid radwaste effluent radiation monitor activity (uCi/ml) to ensure rate below those specified on the LRP, for the first few minutes of the release.
PAGE:
: 13. MONITOR the Liquid Waste Control Panel for the following:
7A CONTROLLED LIQUID RELEASE TO THE PROCEDURE NO.:
A. Local Alarm B. ENSURE the Waste Monitor pump stops at Lo-Level setpoint.
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.3 Starting the Liquid Release (continue)
: 12.
MONITOR liquid radwaste effluent radiation monitor activity (uCi/ml) to ensure rate below those specified on the LRP, for the first few minutes of the release.
: 13.
MONITOR the Liquid Waste Control Panel for the following:
A.
Local Alarm B.
ENSURE the Waste Monitor pump stops at Lo-Level setpoint.
NOTE If the liquid waste monitor is out of service the release may continue until the Unit Supervisor determines that the release is complete.
NOTE If the liquid waste monitor is out of service the release may continue until the Unit Supervisor determines that the release is complete.
C. When the liquid waste monitor, R-6627, alarms on low sample flow (annunciator X-5), Then PERFORM the following:
C.
: 1.     Ifthe 1A Waste Monitor Pump is being used for liquid release, Then CLOSE V06215, 1A Waste Monitor Pump Discharge Isolation.
When the liquid waste monitor, R-6627, alarms on low sample flow (annunciator X-5), Then PERFORM the following:
OR If the 1B Waste Monitor Pump is being used for liquid release, Then CLOSE V06231, 1B Waste Monitor Pump Discharge Isolation.
: 1.
D. Ifthe Liquid Release Permit requests a RE-6627 Demin Flush, Then PERFORM the following:                                               "*
If the 1A Waste Monitor Pump is being used for liquid release, Then CLOSE V06215, 1A Waste Monitor Pump Discharge Isolation.
: 1. PLACE V06239, RE-6627 Upstrm Root, in the CLOSED position.
OR If the 1 B Waste Monitor Pump is being used for liquid release, Then CLOSE V06231, 1B Waste Monitor Pump Discharge Isolation.
: 2. NOTIFY the Control Room that Channel RE-6627 is OOS.
D.
: 3. PLACE V38175, DMW to RE-6627 Isol, in the OPEN (or throttled OPEN as needed) position.
If the Liquid Release Permit requests a RE-6627 Demin Flush, Then PERFORM the following:
: 4. FLUSH RE-6627 with Demineralized Water for approximately 4 minutes.
: 1.
: 5. PLACE V38175, DMW to RE-6627 Isol, in the CLOSED position.
PLACE V06239, RE-6627 Upstrm Root, in the CLOSED position.
: 2.
NOTIFY the Control Room that Channel RE-6627 is OOS.
: 3.
PLACE V38175, DMW to RE-6627 Isol, in the OPEN (or throttled OPEN as needed) position.
: 4.
FLUSH RE-6627 with Demineralized Water for approximately 4 minutes.
: 5.
PLACE V38175, DMW to RE-6627 Isol, in the CLOSED position.


REVISION NO.:         PROCEDURE TITLE:                                   PAGE:
REVISION NO.:
7A               CONTROLLED LIQUID RELEASE TO THE                 13 of 15 PROCEDURE NO-:               CIRCULATING WATER DISCHARGE 1-NOP-06.01                         ST. LUCIE UNIT 1 6.3     Starting the Liquid Release (continue)                               INITIAL /IV
PROCEDURE TITLE:
: 13. D.    (continued)
PAGE:
: 6. PLACE V06239, RE-6627 Upstrm Root, in the OPEN position.                                         /
7A CONTROLLED LIQUID RELEASE TO THE 13 of 15 PROCEDURE NO-:
: 7. NOTIFY the Control Room that Channel RE-6627 is back in service.
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.3 Starting the
E. PLACE FCV-6627X Selector switch to the CLOSED position.
: 13.
F. PLACE FIC-6627 Manual Control Knob full counter clockwise.
D.
G. OPEN the Waste Monitor Pump Discharge Isolation:
E.
* V06215, 1A Waste Monitor Pump Discharge Isolation OR
F.
* V06231, 1B Waste Monitor Pump Discharge Isolation END OF SECTION 6.3
G.
                                                                                        -J
Liquid Release (continue)
INITIAL /IV (continued)
: 6.
PLACE V06239, RE-6627 Upstrm Root, in the OPEN position.  
/
: 7.
NOTIFY the Control Room that Channel RE-6627 is back in service.
PLACE FCV-6627X Selector switch to the CLOSED position.
PLACE FIC-6627 Manual Control Knob full counter clockwise.
OPEN the Waste Monitor Pump Discharge Isolation:
V06215, 1A Waste Monitor Pump Discharge Isolation OR V06231, 1 B Waste Monitor Pump Discharge Isolation END OF SECTION 6.3
-J


REVISION NO.:             II PROCEDURE TITLE:                ___________________________________
REVISION NO.:
7A                     CONTROLLED LIQUID RELEASE TO THE PROCEDURE NO.:                     CIRCULATING WATER DISCHARGE 1-NOP-06.01                               ST. LUCIE UNIT 1 6.4     Completing the Liquid Release
7A PROCEDURE NO.:
: 1.       If the Liquid release is complete, Then RECORD the following data in Section IVon Release Permit:
1-NOP-06.01 I
A.         Release stop date and time B.         Monitor Tank ending level
IPROCEDURE TITLE:
: 2.       If the Liquid release is complete, Then PERFORM the following valve alignment:
CONTROLLED LIQUID RELEASE TO THE CIRCULATING WATER DISCHARGE ST. LUCIE UNIT 1 6.4 Completing the Liquid Release
VALVE NUMBER                           DESCRIPTION               POSITION     INITIAL V06207         1A Waste Monitor Tank Outlet Isol           OPEN V06208         1A Waste Monitor Pump Suct Isol             OPEN V06215         1A Waste Monitor Pump Disch Isol           CLOSED V06220         1A Waste Monitor Pump Disch Recirc Isol       OPEN V21462         Waste Monitor Pumps Disch to Disch           LOCKED Canal Isol                                   CLOSED
: 1.
                                                                            ---4    -
If the Liquid release is complete, Then RECORD the following data in Section IV on Release Permit:
V06221          1A/1 B Waste Monitor Tank Outlet Crossover Isol                             CLOSED V06222         1A/1B Waste Monitor Pump Recirc             CLOSED V06223         1B Waste Monitor Tank Outlet Isol             OPEN V062240C        1Brossover      Isol Waste Monitor                           C O E Pump Suct Isol         OPEN V06231         1B Waste Monitor Pump Disch Isol           CLOSED V06235         1B Waste Monitor Pump Disch Recirc Isol{     OPEN
A.
: 3.     ROUTE completed release package to Nuclear Plant Supervisor / Assistant Nuclear Plant Supervisor for review.
Release stop date and time B.
Monitor Tank ending level
: 2.
If the Liquid release is complete, Then PERFORM the following valve alignment:
VALVE NUMBER DESCRIPTION POSITION INITIAL V06207 1 A Waste Monitor Tank Outlet Isol OPEN V06208 1A Waste Monitor Pump Suct Isol OPEN V06215 1A Waste Monitor Pump Disch Isol CLOSED V06220 1A Waste Monitor Pump Disch Recirc Isol OPEN V21462 V06221 Waste Monitor Pumps Disch to Disch Canal Isol 1A/1 B Waste Monitor Tank Outlet Crossover Isol LOCKED CLOSED
--- 4 CLOSED V06222 1A/1B Waste Monitor Pump Recirc CLOSED 0C rossover Isol C O E V06223 1 B Waste Monitor Tank Outlet Isol OPEN V06224 1 B Waste Monitor Pump Suct Isol OPEN V06231 1B Waste Monitor Pump Disch Isol CLOSED V06235 1 B Waste Monitor Pump Disch Recirc Isol{
OPEN
: 3.
ROUTE completed release package to Nuclear Plant Supervisor / Assistant Nuclear Plant Supervisor for review.
END OF SECTION 6.4
END OF SECTION 6.4


REVISION NO.:           PROCEDURE TITLE:                                             PAGE:
REVISION NO.:
7A                 CONTROLLED LIQUID RELEASE TO THE                             15 of 15 PROCEDURE NO.:                     CIRCULATING WATER DISCHARGE 1-NOP-06.01                               ST. LUCIE UNIT 1 FIGURE 1 LIQUID RELEASE PERMIT - UNIT 1 (Page 1 of 1)
PROCEDURE TITLE:
I. TANK DATA A. IRP Permit #     B. Date and Time     C. Tank Name             D. Discharge Volume (Gallons)
PAGE:
II.PRE-RELEASE DATA (pCi/ml = micro curies per milliliter)
7A CONTROLLED LIQUID RELEASE TO THE 15 of 15 PROCEDURE NO.:
A. Total Concentration Of Solids                                               pCi/ml B. Total Activity Of Solids                                                       IpCi C. Tank Recirced As Per COP-01.05                                             Initials D. Minimum Pumps During Release                           CWPs                 ICWPs E. Maximum Release Rate During Release                                         GPM F. Fraction Of 10 CFR 20 Limits At Canal                                       FI Canal (Solids) (Admin Limit < 0.8)
CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 FIGURE 1 LIQUID RELEASE PERMIT - UNIT 1 (Page 1 of 1)
G. Total Noble Gas Activity After Dilution                                     Fg (Gases) (Admin Limit < 1.60E-04)
I. TANK DATA A. IRP Permit #
H. Liquid Radwaste Monitor Settings Alert Setting     _      pCi/ml High Setting   _  pCi/ml I Have Verified These Settings Are Entered On The Monitors Control Module In The Control Room.                                 Initials I. Liquid Rad Waste Monitor Source Check Performed By:                         Initials J. LRP LIMS Number                 Monitor Source Check LIMS Number Ill. AUTHORIZATION A. Permit Preparer Verifies Release Will Not Exceed Admin Limits               Signature B. Release Approved By Permit Preparer If II.B Is. 25000 pCi                   Signature C. Release Approved By Chemistry Supv If 11.1Is > 25000 pCi                   Signature D. Release Conditions Approved by ANPS:                                       Signature IV. ACTUAL RELEASE DATA A. Number Of Pumps Running                         CWPs                       ICWPs B. Tank Level At Start Of Release C. Date And Time At Start Of Release D. Date And Time At End Of Release E. Tank Level At End Of Release F. Reviewed By ANPS                                                           Signature V. POST RELEASE DATA A. Total Volume This Release                                                       Gallons B. Total Activity Of Solids Released                                             pCi C. Post Release Reviewed By Chemistry Supervisor                               Signature SOPS DATE DOCT DOCN_
B. Date and Time C. Tank Name D. Discharge Volume (Gallons)
II. PRE-RELEASE DATA (pCi/ml = micro curies per milliliter)
A.
Total Concentration Of Solids pCi/ml B.
Total Activity Of Solids IpCi C.
Tank Recirced As Per COP-01.05 Initials D.
Minimum Pumps During Release CWPs ICWPs E.
Maximum Release Rate During Release GPM F.
Fraction Of 10 CFR 20 Limits At Canal FI Canal (Solids) (Admin Limit < 0.8)
G.
Total Noble Gas Activity After Dilution Fg (Gases) (Admin Limit < 1.60E-04)
H.
Liquid Radwaste Monitor Settings Alert Setting pCi/ml High Setting pCi/ml I Have Verified These Settings Are Entered On The Monitors Control Module In The Control Room.
Initials I.
Liquid Rad Waste Monitor Source Check Performed By:
Initials J.
LRP LIMS Number Monitor Source Check LIMS Number Ill. AUTHORIZATION A.
Permit Preparer Verifies Release Will Not Exceed Admin Limits Signature B.
Release Approved By Permit Preparer If II.B Is. 25000 pCi Signature C.
Release Approved By Chemistry Supv If 11.1 Is > 25000 pCi Signature D.
Release Conditions Approved by ANPS:
Signature IV. ACTUAL RELEASE DATA A.
Number Of Pumps Running CWPs ICWPs B.
Tank Level At Start Of Release C.
Date And Time At Start Of Release D.
Date And Time At End Of Release E.
Tank Level At End Of Release F.
Reviewed By ANPS Signature V.
POST RELEASE DATA A.
Total Volume This Release Gallons B.
Total Activity Of Solids Released pCi C.
Post Release Reviewed By Chemistry Supervisor Signature SOPS DATE DOCT DOCN_
SYS COMP ITM_
SYS COMP ITM_


Page 18 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)
Page 18 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)
INSTRUMENTATION RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION CONTROLS 3.3.3.9       In accordance with St. Lucie Plant TS 6.8.4.f.1), the radioactive liquid effluent monitoring instrumentation channels shown in Table 3.3-12 shall be OPERABLE with their Alarm/Trip Setpoints set to ensure that the limits of Control 3.11.1.1 are not exceeded. The Alarm/Trip Setpoints of these channels shall be determined and adjusted in accordance with the methodology and parameters in the OFFSITE DOSE CALCULATION MANUAL (ODCM).
INSTRUMENTATION RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION CONTROLS 3.3.3.9 In accordance with St. Lucie Plant TS 6.8.4.f.1), the radioactive liquid effluent monitoring instrumentation channels shown in Table 3.3-12 shall be OPERABLE with their Alarm/Trip Setpoints set to ensure that the limits of Control 3.11.1.1 are not exceeded. The Alarm/Trip Setpoints of these channels shall be determined and adjusted in accordance with the methodology and parameters in the OFFSITE DOSE CALCULATION MANUAL (ODCM).
APPLICABILITY:     At all times.
APPLICABILITY:
At all times.
ACTION:
ACTION:
: a. With a radioactive liquid effluent monitoring instrumentation channel Alarm/Trip Setpoint less conservative than required by the above control, immediately suspend the release of radioactive liquid effluents monitored by the affected channel or declare the channel inoperable or change the setpoint so it is acceptably conservative.
: a.
: b. With less than the minimum number of radioactive liquid effluent monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-12.
With a radioactive liquid effluent monitoring instrumentation channel Alarm/Trip Setpoint less conservative than required by the above control, immediately suspend the release of radioactive liquid effluents monitored by the affected channel or declare the channel inoperable or change the setpoint so it is acceptably conservative.
: b.
With less than the minimum number of radioactive liquid effluent monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-12.
Restore the inoperable instrumentation to OPERABLE status within 30 days and, if unsuccessful, explain in the next Annual Radioactive Effluent Release Report why this inoperability was not corrected in a timely manner.
Restore the inoperable instrumentation to OPERABLE status within 30 days and, if unsuccessful, explain in the next Annual Radioactive Effluent Release Report why this inoperability was not corrected in a timely manner.
: c. Report all deviations in the Annual Radioactive Effluent Release Report.
: c.
SURVEILLANCE REQUIREMENTS 4.3.3.9     Each radioactive liquid effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST at the frequencies shown in Table 4.3-8.
Report all deviations in the Annual Radioactive Effluent Release Report.
SURVEILLANCE REQUIREMENTS 4.3.3.9 Each radioactive liquid effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST at the frequencies shown in Table 4.3-8.
St. Lucie Plant ODCM Controls
St. Lucie Plant ODCM Controls


Page 19 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)
Page 19 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)
TABLE 3.3-12 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION MINIMUM CHANNELS INSTRUMENT               OPERABLE ACTION
TABLE 3.3-12 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION MINIMUM CHANNELS INSTRUMENT OPERABLE ACTION
: 1. Radioactivity Monitors Providing Alarm and Automatic Termination of Release a) Liquid Radwaste Effluent Line             1     35 b) Steam Generator Blowdown               1/SG   36, 37 Effluent Line
: 1. Radioactivity Monitors Providing Alarm and Automatic Termination of Release a)
: 2. Flow Rate Measurement Devices a) Liquid Radwaste Effluent Line           N.A. 38 b) Discharge Canal                         N.A. 38 c) Steam Generator Blowdown               N.A. 38 Effluent Lines SG - Denotes Steam Generator St. Lucie Plant ODCM Controls
Liquid Radwaste Effluent Line 1
35 b)
Steam Generator Blowdown 1/SG 36, 37 Effluent Line
: 2. Flow Rate Measurement Devices a)
Liquid Radwaste Effluent Line N.A.
38 b)
Discharge Canal N.A.
38 c)
Steam Generator Blowdown N.A.
38 Effluent Lines SG - Denotes Steam Generator St. Lucie Plant ODCM Controls


Page 20 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)
Page 20 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)
TABLE 3.3-12 (Continued)
TABLE 3.3-12 (Continued)
ACTION STATEMENTS ACTION 35 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases may continue provided that prior to initiating a release:                                                                           /R25
ACTION STATEMENTS ACTION 35 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases may continue provided that prior to initiating a release:  
: a. At least two independent samples are analyzed in accordance with the Surveillance Requirement for concentration limit of Control 4.11.1.1.1. and
/R25
: b. At least two technically qualified members of the Facility Staff independently verify the release rate calculations and discharge line valving.
: a.
At least two independent samples are analyzed in accordance with the Surveillance Requirement for concentration limit of Control 4.11.1.1.1. and
: b.
At least two technically qualified members of the Facility Staff independently verify the release rate calculations and discharge line valving.
Otherwise, suspend release of radioactive effluents via this pathway.
Otherwise, suspend release of radioactive effluents via this pathway.
ACTION 36 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue for up to 30 days provided grab samples are analyzed for gross radioactivity (beta or gamma) at a limit of detection of at least 2.E-07 micro-Curie/ml:
ACTION 36 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue for up to 30 days provided grab samples are analyzed for gross radioactivity (beta or gamma) at a limit of detection of at least 2.E-07 micro-Curie/ml:
: a. At least once per 8 hours(1 ) when the specific activity of the secondary coolant is greater than 0.01 micro-Curies/gram DOSE EQUIVALENT 1-131 or
: a.
: b. At least once per 24 hours(') when the specific activity of the secondary coolant is less than or equal to 0.01 micro-Curies/gram DOSE EQUIVALENT 1-131.
At least once per 8 hours(1) when the specific activity of the secondary coolant is greater than 0.01 micro-Curies/gram DOSE EQUIVALENT 1-131 or
: b.
At least once per 24 hours(') when the specific activity of the secondary coolant is less than or equal to 0.01 micro-Curies/gram DOSE EQUIVALENT 1-131.
St. Lucie Plant ODCM Controls
St. Lucie Plant ODCM Controls


REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LOSS OF CONTROL ROOM ANNUNICATORS UNIT 1 CANDIDATE EXAMINER
REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LOSS OF CONTROL ROOM ANNUNICATORS UNIT 1 CANDIDATE EXAMINER


REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LOSS OF CONTROL ROOM ANNUNICATORS UNIT 1 KA Statement:     Knowledge of operator response to loss of all annunciators.
REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LOSS OF CONTROL ROOM ANNUNICATORS UNIT 1 KA Statement:
KA#:               2.4.32 (3.3 / 3.5)
Knowledge of operator response to loss of all annunciators.
KA#:
2.4.32 (3.3 / 3.5)


==References:==
==References:==
ONP 2-100.03, Partial or Complete Loss of Annunicators EPIP-01, Classification of Emergencies EPIP-08, Off-Site Notifications and Protective Action Recommendations Candidate:                                                   Time Start Name Time Finish Performance Rating:         Sat               Unsat Validation Time      30 minutes (Time Critical)
ONP 2-100.03, Partial or Complete Loss of Annunicators EPIP-01, Classification of Emergencies EPIP-08, Off-Site Notifications and Protective Action Recommendations Candidate:
Examiner:                                         Signature:
Name Time Start Time Finish Performance Rating:
Validation Time Sat Unsat 30 minutes (Time Critical)
Examiner:
Signature:
Comments ST. LUCIE TRAINING DEPT.
Comments ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 2
ADMINISTRATIVE JPM PAGE 2
Line 839: Line 1,424:
Initial Conditions Unit 1 is at 90% power performing a downpower to 45% due to electrical bus problems.
Initial Conditions Unit 1 is at 90% power performing a downpower to 45% due to electrical bus problems.
The Reactor Operator has just reported that numerous annunicators are not working.
The Reactor Operator has just reported that numerous annunicators are not working.
Initiating Cue You are the Shift Manager. Unit 1 has just tested all annunicators and determined that the annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning. 10 Meter wind speed is 12 mph and direction is 90. Complete the appropriate procedures as necessary. This is a time-criticalJPM.
Initiating Cue You are the Shift Manager. Unit 1 has just tested all annunicators and determined that the annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning. 10 Meter wind speed is 12 mph and direction is 90. Complete the appropriate procedures as necessary. This is a time-critical JPM.
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 3
ADMINISTRATIVE JPM PAGE 3
Line 845: Line 1,430:
START TIME:
START TIME:
ONP 2-100.03, Partial or Complete Loss of Annunicators":
ONP 2-100.03, Partial or Complete Loss of Annunicators":
STEP 1:     RECORD the time that annunciators were lost.
STEP 1:
SAT STANDARD:   RECORD current time.
RECORD the time that annunciators were lost.
SAT STANDARD:
RECORD current time.
UNSAT COMMENTS:
STEP 2:
TEST all Control Room alarm panels to determine the extent of any malfunction.
SAT STANDARD:
DETERMINE annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning.
UNSAT COMMENTS:
UNSAT COMMENTS:
STEP 2:     TEST all Control Room alarm panels to determine the extent of any malfunction.
STEP 3:
SAT STANDARD:    DETERMINE annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning.                                                                  UNSAT COMMENTS:
DETERMINE the affected annunciator panels (A, B, C, LR, etc.).
STEP 3:      DETERMINE the affected annunciator panels (A, B, C, LR, etc.).
SAT STANDARD:
SAT STANDARD:   DETERMINE annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning..
DETERMINE annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning..
_UNSAT COMMENTS:
_UNSAT COMMENTS:
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 4
ADMINISTRATIVE JPM PAGE 4


STEP 4:   From the table below, DETERMINE the percentage of Safety System             CRITICAL Annunciators that are lost by adding the percent of total for each         STEP affected panel.
STEP 4:
STANDARD:   DETERMINE the percentage > 75%                                                     SAT A       8.6%
From the table below, DETERMINE the percentage of Safety System Annunciators that are lost by adding the percent of total for each affected panel.
B       8.6%                                                                     UNSAT C       0.8%
CRITICAL STEP STANDARD:
D       0.0%
DETERMINE the percentage > 75%
K       4.8%
SAT A
L       6.3%
8.6%
M       6.3%
B 8.6%
N       4.2%
C 0.8%
P       6.7%
D 0.0%
Q       10.3%
K 4.8%
R       10.9%
L 6.3%
S       10.3%
M 6.3%
TOTAL     77.9%
N 4.2%
COMMENTS:
P 6.7%
CRTIA STEP 5:     If the percentage of safety system annunciators exceeds 50%, Then           CRITICAL EVALUATE and IMPLEMENT the E-Plan as required in EPIP-01,                   STEP Classification of Emergencies.
Q 10.3%
SAT STANDARD:  IMPLEMENT EPIP-01, Classification of Emergencies 8.B. LOSS OF ALARMS / COMMUNICATION /MONITORING UNSAT COMMENTS:
R 10.9%
S 10.3%
TOTAL 77.9%
UNSAT COMMENTS:
CRTIA STEP 5:
STANDARD:
If the percentage of safety system annunciators exceeds 50%, Then EVALUATE and IMPLEMENT the E-Plan as required in EPIP-01, Classification of Emergencies.
IMPLEMENT EPIP-01, Classification of Emergencies 8.B. LOSS OF ALARMS / COMMUNICATION /MONITORING CRITICAL STEP SAT UNSAT COMMENTS:
J ____________________
J ____________________
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 5
ADMINISTRATIVE JPM PAGE 5


EPIP-01 Attachment 1 Step 8.B Loss of Alarms/Communication/Monitoring CRITICAL STEP 6:       Classifies EAL ALERT per EPIP-01                                               STEP STANDARD:     CLASSIFIES ALERT due to Unplanned loss of most (greater than 75%) or all safety system annunicators and Plant transient in progress.                                                                             SAT EXAMINER'S NOTE:     Record the time initial event Declaration is made                     UNSAT This must be within 15 of JPM Start Time Your task is to now complete a FLORIDA NUCLEAR EXAMINER'S CUE:
EPIP-01 Attachment 1 Step 8.B Loss of Alarms/Communication/Monitoring CRITICAL STEP STEP 6:
PLANT NOTIFICATION FORM using EPIP-08.
Classifies EAL ALERT per EPIP-01 STANDARD:
EXAMINER'S NOTE:     HAND STUDENT EPIP-08 COMMENTS:
CLASSIFIES ALERT due to Unplanned loss of most (greater than 75%) or all safety system annunicators and Plant transient in progress.
EPIP-08 Attachment 1 Step 1A STEP 7:       Check appropriate box for drill or actual emergency as the case may be.         CRITICAL STEP During exercises, drills, or tests, each message shall be checked THIS IS A DRILL.                                                                                 SAT STANDARD:     CHECK THIS IS A DRILL UNSAT COMMENTS:
SAT UNSAT EXAMINER'S NOTE:
Record the time initial event Declaration is made This must be within 15 of JPM Start Time Your task is to now complete a FLORIDA NUCLEAR PLANT NOTIFICATION FORM using EPIP-08.
HAND STUDENT EPIP-08 EXAMINER'S CUE:
EXAMINER'S NOTE:
COMMENTS:
EPIP-08 Attachment 1 Step 1A STEP 7:
Check appropriate box for drill or actual emergency as the case may be.
During exercises, drills, or tests, each message shall be checked THIS IS A DRILL.
CRITICAL STEP SAT UNSAT STANDARD:
CHECK THIS IS A DRILL COMMENTS:
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 6
ADMINISTRATIVE JPM PAGE 6


I EPIP-08 Attachment 1 Step 2A STEP 8:      Enter today's date.                                                   CRITICAL STEP SAT STANDARD:   ENTER the current date.
I EPIP-08 Attachment 1 Step 2A Enter today's date.
UNSAT EVALUATOR'S NOTE: 2B is completed when contact with State Warning Point is made COMMENTS:
STEP 8:
I EPIP-08 Attachment 1 Step 2C STEP 9:      Enter the name of the person making the notification call.           CRITICAL STEP SAT STANDARD:   ENTER Candidates name.
CRITICAL STEP SAT UNSAT STANDARD:
UNSAT COMMENTS:
ENTER the current date.
EPIP-08 Attachment 1 Step 2D STEP 10:    Enter the message number.                                             CRITICAL STEP SAT STANDARD:   ENTER 1 UNSAT COMMENTS:
EVALUATOR'S NOTE: 2B is completed when contact with State Warning Point is made COMMENTS:
EPIP-08 Attachment 1 Step 2C Enter the name of the person making the notification call.
I STEP 9:
CRITICAL STEP SAT UNSAT STANDARD:
ENTER Candidates name.
COMMENTS:
EPIP-08 Attachment 1 Step 2D Enter the message number.
STEP 10:
CRITICAL STEP SAT UNSAT STANDARD:
ENTER 1 COMMENTS:
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 7
ADMINISTRATIVE JPM PAGE 7


EPIP-08 Attachment 1 Step 2E STEP 11:    Check where notification is being made from.                             CRITICAL STEP SAT STANDARD: CHECK Control Room UNSAT COMMENTS:
EPIP-08 Attachment 1 Step 2E Check where notification is being made from.
EPIP-08 Attachment 1 Step 3B STEP 12:  Check the box for the facility from which the notification is             CRITICAL STEP being made.
STEP 11:
SAT STANDARD: CHECK St. Lucie Unit 1 UNSAT COMMENTS:
STANDARD:
I1 EPIP-08 Attachment 1 Step 4A STEP 13:  Check the box corresponding to current accident classification           CRITICAL STEP declared.
CHECK Control Room COMMENTS:
SAT STANDARD: CHECK Alert UNSAT COMMENTS:
CRITICAL STEP SAT UNSAT STEP 12:
EPIP-08 Attachment 1 Step 3B Check the box for the facility from which the notification is being made.
CRITICAL STEP SAT UNSAT STANDARD:
CHECK St. Lucie Unit 1 COMMENTS:
I1 EPIP-08 Attachment 1 Step 4A Check the box corresponding to current accident classification declared.
STEP 13:
CRITICAL STEP SAT UNSAT STANDARD:
CHECK Alert COMMENTS:
L _____________________
L _____________________
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 8
ADMINISTRATIVE JPM PAGE 8


EPIP-08 Attachment 1 Step 5A STEP 14:   Check the box for the appropriate plant site for the emergency           CRITICAL STEP declaration.
EPIP-08 Attachment 1 Step 5A STEP 14:
SAT STANDARD:  CHECK Emergency Declaration.
Check the box for the appropriate plant site for the emergency declaration.
UNSAT COMMENTS:
CRITICAL STEP SAT UNSAT STANDARD:
ti-R-uJ  Attachment 1 Sitep 5 STEP 15:    Enter the date and time when the current emergency                      CRITICAL STEP classification was declared SAT STANDARD:  ENTER Date and Time UNSAT EXAMINER'S NOTE: Should be same time as Step 1 of JPM COMMENTS:
CHECK Emergency Declaration.
I__  _  _
EIPhI-U8 Attachment 1 Step 6B STEP 16:    Reason for Emergency Declaration                                         CRITICAL STEP SAT STANDARD:  CHECK "B" Description ENTER Unplanned loss of most (greater than 75%) or all safety system            UNSAT annunicators and plant transient in progress.
COMMENTS:
COMMENTS:
I                 I ST. LUCIE TRAINING DEPT.
ti-R-uJ Attachment 1 Sitep 5 STEP 15:
Enter the date and time when the current emergency classification was declared CRITICAL STEP SAT UNSAT STANDARD:
ENTER Date and Time EXAMINER'S NOTE: Should be same time as Step 1 of JPM COMMENTS:
I__
EIPhI-U8 Attachment 1 Step 6B STEP 16:
Reason for Emergency Declaration STANDARD:
CHECK "B" Description ENTER Unplanned loss of most (greater than 75%) or all safety system annunicators and plant transient in progress.
CRITICAL STEP SAT UNSAT COMMENTS:
I I
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 9
ADMINISTRATIVE JPM PAGE 9


EPIP-08 Attachment 1 Step 7A STEP 17:  Additional Information or Update SAT STANDARD: CHECK "A" None UNSAT COMMENTS:
EPIP-08 Attachment 1 Step 7A Additional Information or Update STEP 17:
EPIP-08 Attachment 1 Step 8 STEP 18:   Weather Data.                                                            CRITICAL STEP SAT STANDARD: A. Wind direction 900 B. Downwind Sectors Affected M, N, P UNSAT COMMENTS:
STANDARD:
EPIP-08 Attachment 1 Step 9A STEP 19:   Release Status                                                          CRITICAL STEP SAT STANDARD: CHECK "A" None (Go To Item 11)
CHECK "A" None COMMENTS:
UNSAT COMMENTS:
SAT UNSAT EPIP-08 Attachment 1 Step 8 Weather Data.
STEP 18:
CRITICAL STEP SAT UNSAT STANDARD:
A. Wind direction 900 B. Downwind Sectors Affected M, N, P COMMENTS:
EPIP-08 Attachment 1 Step 9A Release Status STEP 19:
CRITICAL STEP SAT UNSAT STANDARD:
CHECK "A" None (Go To Item 11)
COMMENTS:
I.________________________
I.________________________
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 10
ADMINISTRATIVE JPM PAGE 10


EPIP-08 Attachment 1 Step 10 STEP 20:  Release Significance Category SAT STANDARD:  Do Not Check Any Box in Item 10 UNSAT COMMENTS:
STEP 20:
i EPIP-08 Attachment 1 Step 1 1A STEP 21:  Determination of Protective Actions Recommendations (PARs)               CRITICAL STEP SAT STANDARD:  CHECK "A" No recommended Actions at this time UNSAT COMMENTS:
STANDARD:
EPIP-08 Attachment 1 Step 11 B STEP 22:  Utility Recommended Protective Actions                                   CRITICAL STEP SAT STANDARD:  Leave "B" blank UNSAT COMMENTS:
EPIP-08 Attachment 1 Step 10 Release Significance Category Do Not Check Any Box in Item 10 SAT UNSAT COMMENTS:
STEP 21:
STANDARD:
EPIP-08 Attachment 1 Step 1 1A Determination of Protective Actions Recommendations (PARs)
CHECK "A" No recommended Actions at this time i
CRITICAL STEP SAT UNSAT COMMENTS:
STEP 22:
STANDARD:
EPIP-08 Attachment 1 Step 11 B Utility Recommended Protective Actions Leave "B" blank CRITICAL STEP SAT UNSAT COMMENTS:
I _______________________
I _______________________
ST. LUCIE TRAINING DEPT.
ST. LUCIE TRAINING DEPT.
ADMINISTRATIVE JPM PAGE 11
ADMINISTRATIVE JPM PAGE 11


EPIP-08 Attachment 1 Step 11 C STEP 23:    Consideration Issuance of KI:                                                 CRITICAL STEP SAT STANDARD:   CHECK NO UNSAT COMMENTS:         Requires G.E. and Release in Progress to check YES EIP'IP-08 Attachment 1 Step 12                                             I.___________________________
EPIP-08 Attachment 1 Step 11 C Consideration Issuance of KI:
STEP 24:     Plant Conditions SAT STANDARD:   Leave Blank
STEP 23:
_UNSAT COMMENTS:
CRITICAL STEP SAT STANDARD:
STEP 25:     EC or RM Approval CRITICAL STEP STANDARD:   Sign, Date and Time on EC Approval Signature                                       SAT UNSAT EXAMINER'S NOTE:       RECORD THE TIME
CHECK NO UNSAT COMMENTS:
* TASK IS COMPLETE, COLLECT THE STATE NOTIFICATION FORM.
Requires G.E. and Release in Progress to check YES I. ___________________________
                              *MUST BE < 15 MINUTES FROM STEP 6 CLASSIFICATION TIME.
EIP'IP-08 Attachment 1 Step 12 STEP 24:
Plant Conditions STANDARD:
Leave Blank COMMENTS:
SAT
_UNSAT STEP 25:
EC or RM Approval CRITICAL STEP STANDARD:
Sign, Date and Time on EC Approval Signature SAT UNSAT EXAMINER'S NOTE:
RECORD THE TIME TASK IS COMPLETE, COLLECT THE STATE NOTIFICATION FORM.
*MUST BE < 15 MINUTES FROM STEP 6 CLASSIFICATION TIME.
COMMENTS:
COMMENTS:
END OF TASK I ________________________________
END OF TASK I ________________________________
Line 937: Line 1,591:
ADMINISTRATIVE JPM PAGE 12
ADMINISTRATIVE JPM PAGE 12


A T T A C HME NT 1I                      , # . . .. .
A T T A C H M E N T 1 I
FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 1)
FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 1)
On-line Verification:               El SWP/DEM                         El St. Lucie County                   [- Martin County
On-line Verification:
: 1. A. ID THIS IS A DRILL                                           B. El  THIS IS AN EMERGENCY
El SWP/DEM El St. Lucie County
: 2. A. Date: D/AT/E                         B. Contact Time:                                   C. Reported by: (Name) Candidate D. Message Number:        1                                E. Reported from: 0 Control Room El TSC El EOF
[-
: 3. Site:      A. E] Crystal River Unit 3                          B. Z St. Lucie Unit 1                           C. El St. Lucie Unit 2 D. El Turkey Point Unit 3                          E. El Turkey Point Unit 4
Martin County
: 4. Emergency Classification:              A      E Notification of Unusual Event                   C. El Site Area Emergency B      0 Alert                                             D. El General Emergency
: 1.
: 5. A. 0      Emergency Declaration:                        B. El Emergency Termination:                 Date: D/AT/E             Time:     TIME
A. ID THIS IS A DRILL
: 6. Reason for Emergency Declaration:*                     A. El EAL Number                   OR     B. 0
: 2.
 
A.
== Description:==
Date: D/AT/E D.
Message Number:
1
: 3.
Site:
A. E] Crystal River Unit 3 D. El Turkey Point Unit 3
: 4.
Emergency Classification:
A B
: 5.
A. 0 Emergency Declaration:
B. El THIS IS AN EMERGENCY B. Contact Time:
C. Reported by: (Name) Candidate E. Reported from: 0 Control Room El TSC El EOF B. Z St. Lucie Unit 1 E. El Turkey Point Unit 4 C. El St. Lucie Unit 2 C. El Site Area Emergency D. El General Emergency E Notification of Unusual Event 0 Alert B.
El Emergency Termination:
Date: D/AT/E Time:
TIME
: 6.
Reason for Emergency Declaration:*
A.
El EAL Number OR B. 0  


Unplanned loss of most (greater than 75%) or all safety system annunicators and Plant transient
==
      -in proaress.
Description:==
: 7. Additional Informnation or Update:                       A. 0l None         OR       B. El
Unplanned loss of most (greater than 75%) or all safety system annunicators and Plant transient 7.
: 8. Weather Data:         A. Wind direction from 90 degrees                       B. Downwind Sectors Affected:       M   NP
-in proaress.
Additional Informnation or Update:
A.
0l None OR B. El
: 8.
Weather Data:
A. Wind direction from 90 degrees
: 9.
Release Status:
A. 0 None (Go to Item 11)
: 10.
Release Significance Category (at the Site Boundary):
B. Downwind Sectors Affected:
M
_N.,
_N.,
: 9. Release Status:        A. 0  None (Go to Item 11)                    B. El Is occurring                   C. El Has occurred, but stopped
NP B. El Is occurring C. El Has occurred, but stopped A.
: 10. Release    Significance Category (at the Site Boundary):
B.
A. El     Information not available at this time.
C.
B. El         Release within normal operating limits (< 3.5 E-1 Ci/sec noble gas, _*4.6 E-5 Ci/sec iodine)
D.
C. E]     Non-Significant Fraction of PAG Range (release is > normal limits and < 500 mrem TEDE and 1000 mrem CDE)
El Information not available at this time.
D. El     PAG Range (_>500 mrem TEDE or _ 1000 mrem CDE)
El Release within normal operating limits (< 3.5 E-1 Ci/sec noble gas, _* 4.6 E-5 Ci/sec iodine)
: 11. Utility Recommended Protective Actions:
E]
A.     0D No recommended actions at this time.
Non-Significant Fraction of PAG Range (release is > normal limits and < 500 mrem TEDE and 1000 mrem CDE)
B.     El The utility recommends the following protective actions:
El PAG Range (_> 500 mrem TEDE or _ 1000 mrem CDE)
El Miles         No Action Sectors           Evacuate Sectors         Shelter Sectors 0-2 2-5 5-10 OR Shelter Zones / Areas:
: 11.
Utility Recommended Protective Actions:
A.
0D No recommended actions at this time.
B.
El The utility recommends the following protective actions:
El Miles No Action Sectors Evacuate Sectors Shelter Sectors 0-2 2-5 5-10 OR Shelter Zones / Areas:
Evacuate Zones / Areas:
Evacuate Zones / Areas:
C. Consider Issuance of KI: El Yes 0 No If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, continue with item 12.
C.
: 12. Plant Conditions:       A. Reactor Shutdown? [] Yes               E] No       B. Core Adequately Cooled? E] Yes E] No C. Containment Intact? El Yes              El No      D. Core Condition: [] Stable         [E Degrading
Consider Issuance of KI:
: 13. Weather Data:          A. Wind Speed       __       mph         B. Stability Class   __
El Yes 0 No If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, continue with item 12.
: 14. Additional Release Information: El N/A OR A. El Noble Gases           __      Curies per second             B. El lodines     __    Curies per second C. Airborne: Date Started           /     /       Time Started           __              Date Stopped     /   /           Time Stopped __
: 12.
D. Liquid:         Date Started     /     /       Time Started           __              Date Stopped     /   /           Time Stopped __
Plant Conditions:
Distance                               Projected Thyroid Dose (CDE) for 1 Hour                   Prniontprd Tntni fnn-q (TEDEF) for 1 Hnujr 1 Mile (Site Boundary)                  E.                                        mrem            F.                               mrem 2 Miles                                G.                                        mrem            H.                               mrem 5 Miles                                I.                                        mrem            J.                               mrem 10 Miles                                K.                                        mrem             L.                               mrem VVOI oiyr OLUIC.                   ~.bO, J*I.JOLC                               Date: D / AT / E           Time:   Time
: 13.
: 15. Message Received By: Name:                                                                         Date:    /    /            Time: __
Weather Data:
* If emergency class escalation is known to be necessary and a new notification form will be transmitted within 15 minutes, then you may go to line 15.                               1 ' - &#xfd; t\, 'E (2 - V E--
A. Reactor Shutdown? [] Yes E] No C. Containment Intact? El Yes El No B. Core Adequately Cooled?
Form PSL-F070                                 EPIP-08, Off-Site Notifications and Protective Action Recommendations                           Effec'tive Date: 08/29/03
E] Yes E] No D. Core Condition: [] Stable
[E Degrading A. Wind Speed __
mph B. Stability Class __
: 14.
Additional Release Information:
El N/A OR A. El Noble Gases Curies per second B. El lodines Curies per second C. Airborne:
Date Started  
/  
/
Time Started Date Stopped  
/  
/
D. Liquid:
Date Started  
/  
/
Time Started Date Stopped  
/  
/
Time Stopped __
Time Stopped __
Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for 1 Hour E.
mrem G.
mrem I.
mrem K.
mrem Prniontprd Tntni fnn-q (TEDEF) for 1 Hnujr F.
mrem H.
mrem J.
mrem L.
mrem VVOI oiyr OLUIC.  
~.bO, J*I.JOLC Date: D / AT / E Date:
/
/
Time:
Time Time: __
: 15.
Message Received By: Name:
If emergency class escalation is known to be necessary and a new notification form will be transmitted within 15 minutes, then you may go to line 15.
1 '  
&#xfd; t\\, 'E (2 -
V E--
PSL-F070 EPIP-08, Off-Site Notifications and Protective Action Recommendations Effec' Form tive Date: 08/29/03


CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)
Initial Conditions Unit 1 is at 90% power performing a downpower to 45% due to electrical bus problems.
Initial Conditions Unit 1 is at 90% power performing a downpower to 45% due to electrical bus problems.
The Reactor Operator has just reported that numerous annunicators are not working.
The Reactor Operator has just reported that numerous annunicators are not working.
Initiating Cue You are the Shift Manager. Unit 1 has just tested all annunicators and determined that the annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning. 10 Meter wind speed is 12 mph and direction is 90 . Complete the appropriate procedures as necessary. This is a time-criticalJPM.
Initiating Cue You are the Shift Manager. Unit 1 has just tested all annunicators and determined that the annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning. 10 Meter wind speed is 12 mph and direction is 90. Complete the appropriate procedures as necessary. This is a time-critical JPM.


REVISION NO.:             PROCEDURE TITLE:                                                                         PAGE:
REVISION NO.:
1B                                 PARTIAL OR COMPLETE LOSS                                                     2 of 6 PROCEDURE NO.:                                       OF ANNUNCIATORS 1-ONP-100.03                                         ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION                                                                                                         PAGE 1 .0 P UR P O S E ................................................................................................   ..3
PROCEDURE TITLE:
PAGE:
1B PARTIAL OR COMPLETE LOSS 2 of 6 PROCEDURE NO.:
OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION PAGE 1.0 P U R P O S E................................................................................................  
.. 3


==2.0 REFERENCES==
==2.0 REFERENCES==
............................................................................................                3 3.0 RECORDS REQUIRED .............................................................................                         3 4.0 ENTRY CONDITIONS ...............................................................................                       3 5.0 EXIT CONDITIONS ...................................................................................                   3 6.0 OPERATOR ACTIONS ................................................................................                     4 APPENDICES APPENDIX A             SAFETY SYSTEM ANNUNCIATORS ................................... 5 APPENDIX B             POW ER SUPPLIES .............................................................. 6
3 3.0 RECORDS REQUIRED.............................................................................
3 4.0 ENTRY CONDITIONS...............................................................................
3 5.0 EXIT CONDITIONS...................................................................................
3 6.0 OPERATOR ACTIONS................................................................................
4 APPENDICES APPENDIX A SAFETY SYSTEM ANNUNCIATORS................................... 5 APPENDIX B POW ER SUPPLIES.............................................................. 6


REVISION NO.:           PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
1B                     PARTIAL OR COMPLETE LOSS                         3 of 6 PROCEDURE NO.:                           OF ANNUNCIATORS 1-ONP-100.03                           ST. LUCIE UNIT 1 1.0   PURPOSE 1.1   This procedure provides guidance for resolving conditions resulting from the loss of Control Room annunciators. The actions listed are intended to be a guide in responding to the loss of annunciators and are NOT intended to be a substitute for good judgement based on plant conditions.
PROCEDURE TITLE:
 
PAGE:
==2.0    REFERENCES==
1B PARTIAL OR COMPLETE LOSS 3 of 6 PROCEDURE NO.:
OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 1.0 PURPOSE 1.1 This procedure provides guidance for resolving conditions resulting from the loss of Control Room annunciators. The actions listed are intended to be a guide in responding to the loss of annunciators and are NOT intended to be a substitute for good judgement based on plant conditions.


==2.0 REFERENCES==
NOTE One or more of the following symbols may be used in this procedure:
NOTE One or more of the following symbols may be used in this procedure:
        &sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
&sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
        &#xb6; Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
&#xb6; Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
T Indicates a step that requires a sign off on an attachment.
T Indicates a step that requires a sign off on an attachment.
2.1   UFSAR Section 7.5.1.6.3 2.2   &sect;1 EPIP-01, Classification of Emergencies.
2.1 UFSAR Section 7.5.1.6.3 2.2  
2.3   CWD 8770-B-327.
&sect;1 EPIP-01, Classification of Emergencies.
2.4   Annunciator Response Procedures 3.0   RECORDS REQUIRED 3.1   RCO Chronological log.
2.3 CWD 8770-B-327.
4.0   ENTRY CONDITIONS 4.1   Plant parameters exceed alarm setpoints without annunciation.
2.4 Annunciator Response Procedures 3.0 RECORDS REQUIRED 3.1 RCO Chronological log.
4.2   Annunciator check indicates a complete or partial loss of annunciation.
4.0 ENTRY CONDITIONS 4.1 Plant parameters exceed alarm setpoints without annunciation.
5.0   EXIT CONDITIONS 5.1   All annunciators have been returned to operation and are functioning properly.
4.2 Annunciator check indicates a complete or partial loss of annunciation.
5.0 EXIT CONDITIONS 5.1 All annunciators have been returned to operation and are functioning properly.


REVISION NO.:           PROCEDURE TITLE:                             PAGE:
REVISION NO.:
1B                       PARTIAL OR COMPLETE LOSS                 4 of 6 PROCEDURE NO.:                             OF ANNUNCIATORS 1-ONP-100.03                           ST. LUCIE UNIT 1 6.0   OPERATOR ACTIONS INSTRUCTIONS                           CONTINGENCY ACTIONS
PROCEDURE TITLE:
PAGE:
1B PARTIAL OR COMPLETE LOSS 4 of 6 PROCEDURE NO.:
OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 6.0 OPERATOR ACTIONS INSTRUCTIONS CONTINGENCY ACTIONS
: 1. RECORD the time that annunciators were lost.
: 1. RECORD the time that annunciators were lost.
: 2. TEST all Control Room alarm panels to determine the extent of any malfunction.
: 2. TEST all Control Room alarm panels to determine the extent of any malfunction.
: 3.   &sect;1 IMPLEMENT Appendix A.
: 3.  
: 4. PERFORM the following:
&sect;1 IMPLEMENT Appendix A.
: 4.
PERFORM the following:
* INCREASE the frequency of monitoring RTGB and local indications for plant equipment affected.
* INCREASE the frequency of monitoring RTGB and local indications for plant equipment affected.
              " Periodically EXAMINE available reflash panels on the affected annunciator panels.
" Periodically EXAMINE available reflash panels on the affected annunciator panels.
: 5. CHECK the annunciator power supplies in accordance with Appendix B.
: 5.
: 6. CONTACT I&C for trouble-shooting and repair.
CHECK the annunciator power supplies in accordance with Appendix B.
: 6.
CONTACT I&C for trouble-shooting and repair.
END OF SECTION 6.0
END OF SECTION 6.0


REVISION NO.:         PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
1B                       PARTIAL OR COMPLETE LOSS                           5 of 6 PROCEDURE NO.:                           OF ANNUNCIATORS 1-ONP-100.03                           ST. LUCIE UNIT 1 APPENDIX A SAFETY SYSTEM ANNUNCIATORS (Page 1 of 1)
PROCEDURE TITLE:
PAGE:
1B PARTIAL OR COMPLETE LOSS 5 of 6 PROCEDURE NO.:
OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 APPENDIX A SAFETY SYSTEM ANNUNCIATORS (Page 1 of 1)
NOTE The total below assumes a complete loss of an annunciator panel(s) resulting in the loss of all the safety system annunciators associated with that panel.
NOTE The total below assumes a complete loss of an annunciator panel(s) resulting in the loss of all the safety system annunciators associated with that panel.
: 1. DETERMINE the affected annunciator panels (A, B, C, LR, etc.).
: 1. DETERMINE the affected annunciator panels (A, B, C, LR, etc.).
: 2. From the table below, DETERMINE the percentage of Safety System Annunciators that are lost by adding the percent of total for each affected panel.
: 2. From the table below, DETERMINE the percentage of Safety System Annunciators that are lost by adding the percent of total for each affected panel.
: 3. If the percentage of safety system annunciators exceeds 50%, Then EVALUATE and IMPLEMENT the E-Plan as required in EPIP-01, Classification of Emergencies.
: 3. If the percentage of safety system annunciators exceeds 50%, Then EVALUATE and IMPLEMENT the E-Plan as required in EPIP-01, Classification of Emergencies.
PERCENTAGE OF SAFETY SYSTEM ANNUNICATORS PER PANEL PANEL           % OF TOTAL                      PANEL          % OF TOTAL A               8.6%                          M              6.3%
PERCENTAGE OF SAFETY SYSTEM ANNUNICATORS PER PANEL PANEL  
B               8.6%                          N              4.2%
% OF TOTAL A
C               0.8%                          P              6.7%
8.6%
D               0.0%                           Q              10.3%
B 8.6%
E              2.3%                           R              10.9%
C 0.8%
F              2.7%                           S              10.3%
D 0.0%
G              3.4%                           LR               0.8%
E 2.3%
H              5.5%                          X               2.3%
F 2.7%
J              1.3%                          Y               3.1%
G 3.4%
K              4.8%                          z               0.8%
H 5.5%
L              6.3%
J 1.3%
K 4.8%
L 6.3%
PANEL
% OF TOTAL M
6.3%
N 4.2%
P 6.7%
Q 10.3%
R 10.9%
S 10.3%
LR 0.8%
X 2.3%
Y 3.1%
z 0.8%
END OF APPENDIX A
END OF APPENDIX A


REVISION NO.:         PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
1BI                   PARTIAL OR COMPLETE LOSS                         6 of 6 PROCEDURE NO.:                           OF ANNUNCIATORS 1-ONP-100.03                           ST. LUCIE UNIT 1 APPENDIX B POWER SUPPLIES (Page 1 of 1)
PROCEDURE TITLE:
PAGE:
1BI PARTIAL OR COMPLETE LOSS 6 of 6 PROCEDURE NO.:
OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 APPENDIX B POWER SUPPLIES (Page 1 of 1)
NOTE The neon light on the back of RTGB alarm panels indicates the DC converter is operating. After power is removed from the panel, it may be necessa to remove and replace the fuse to restart the converter.
NOTE The neon light on the back of RTGB alarm panels indicates the DC converter is operating. After power is removed from the panel, it may be necessa to remove and replace the fuse to restart the converter.
: 1. VERIFY the following power supplies to the affected Control Room annunciators and reset as required.
: 1. VERIFY the following power supplies to the affected Control Room annunciators and reset as required.
RTGB     ANN. PAN.                 POWER   SUPPLY               GROUND DET.
RTGB ANN. PAN.
101     A, B, C, D   RTGB     101 KKK F-4, F-12 lAB DC CKT 6         GD-1 102       E,F,G     RTGB     101 KKK F-3, F-11 lAB DC CKT6         GD-2 103         H, J     RTGB     101 KKK F-5, F-13 lAB DC CKT 3         GD-3 104         K, L     RTGB     101 KKK F-6, F-14 lAB DC CKT 3         GD-4 105         M, N     RTGB     101 KKK F-8, F-16 lAB DC CKT 3         GD-5 106     P, Q, R, S   RTGB     101 KKK F-7, F-15 lAB DC CKT 3         GD-6 NOTE Power supply RTGB 101 KKK F-7, F-15 lAB DC Ckt. 3 also supplies seismic monitoring.
POWER SUPPLY GROUND DET.
CRAC Panel Y                 Fuses 11F5, 11F7           1 B DC CKT 25 CRAC Panel Z                Fuses 11F10, 11F12           1B DC CKT 25 Rad. Monitor                F-10 in Rad. Mon. Cabinet   DC PP 119 CKT 1
101 A, B, C, D RTGB 101 KKK F-4, F-12 lAB DC CKT 6 GD-1 102 E,F,G RTGB 101 KKK F-3, F-11 lAB DC CKT6 GD-2 103 H, J RTGB 101 KKK F-5, F-13 lAB DC CKT 3 GD-3 104 K, L RTGB 101 KKK F-6, F-14 lAB DC CKT 3 GD-4 105 M, N RTGB 101 KKK F-8, F-16 lAB DC CKT 3 GD-5 106 P, Q, R, S RTGB 101 KKK F-7, F-15 lAB DC CKT 3 GD-6 NOTE Power supply RTGB 101 KKK F-7, F-15 lAB DC Ckt. 3 also supplies seismic monitoring.
CRAC Panel Y CRAC Panel Z Rad. Monitor Fuses 11F5, 11F7 Fuses 11F10, 11F12 F-10 in Rad. Mon. Cabinet 1 B DC CKT 25 1B DC CKT 25 DC PP 119 CKT 1
: 2. TEST all the Control Room annunciator panels from the Control Room test panels.
: 2. TEST all the Control Room annunciator panels from the Control Room test panels.
: 3. TEST all the reflash modules feeding annunciators on the affected panels.
: 3. TEST all the reflash modules feeding annunciators on the affected panels.
Line 1,048: Line 1,820:


Procedure No.
Procedure No.
ST. LUCIE PLANT                                 EPIP-01 EMERGENCY PLAN                         Current Revision No.
ST. LUCIE PLANT EPIP-01 EMERGENCY PLAN Current Revision No.
IMPLEMENTING PROCEDURE                                 8 FPL                           SAFETY RELATED Effective Date 10/29/04
IMPLEMENTING PROCEDURE 8
FPL Effective Date SAFETY RELATED 10/29/04


==Title:==
==Title:==
Line 1,063: Line 1,836:
(J. R. Walker, 02/09/01)
(J. R. Walker, 02/09/01)
Revision 2 - Clarified initiating conditions and emergency action levels to correspond to changes in the PSL emergency plan in accordance with PMAI PM99-09-154, defined classification table and made editorial changes. (J. R. Walker, 10/13/00)
Revision 2 - Clarified initiating conditions and emergency action levels to correspond to changes in the PSL emergency plan in accordance with PMAI PM99-09-154, defined classification table and made editorial changes. (J. R. Walker, 10/13/00)
Revision     FRG Review Date         Approved By       Approval Date         S   OPS 0             12/15/97             J. Scarola         12/15/97     DATE Plant General Manager                   DOCT     PROCEDURE Revision     FRG Review Date         Approved By       Approval Date   DOCN       EPIP-01 8             10/27/04           G. L. Johnston         10/27/04     SYS Plant General Manager                   COM       COMPLETED N/A                           ITM           8 Designated Approver N/A Designated Approver (Minor Correction)
Revision FRG Review Date Approved By Approval Date S
OPS 0
12/15/97 J. Scarola 12/15/97 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN EPIP-01 8
10/27/04 G. L. Johnston 10/27/04 SYS Plant General Manager COM COMPLETED N/A ITM 8
Designated Approver N/A Designated Approver (Minor Correction)


REVISION NO.:             PROCEDURE TITLE:                                                                             PAGE:
REVISION NO.:
8                         CLASSIFICATION OF EMERGENCIES                                                         2 of 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                           ST. LUCIE PLANT TABLE OF CONTENTS SECTION                                                                                                           PAGE 1 .0   P UR P O S E .................................................................................................       . .3
PAGE:
8 CLASSIFICATION OF EMERGENCIES 2 of 32 PROCEDURE NO.:
EPIP-01 ST. LUCIE PLANT TABLE OF CONTENTS SECTION PAGE 1.0 P U R P O S E.................................................................................................  
.. 3


==2.0     REFERENCES==
==2.0 REFERENCES==
  / RECORDS REQUIRED / COMMITMENT DOCUMENTS .. 3 3.0     R ES PO NS IBILIT IE S .................................................................................               4 4 .0   DE F INITIO NS ..........................................................................................         .. 5 5.0     INST R UC T IO NS .......................................................................................               9 ATTACHMENTS ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE ............................. 13
  / RECORDS REQUIRED / COMMITMENT DOCUMENTS.. 3 3.0 R ES PO N S IB ILIT IE S.................................................................................
4 4.0 D E F IN IT IO N S..........................................................................................  
.. 5 5.0 IN S T R U C T IO N S.......................................................................................
9 ATTACHMENTS ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE............................. 13


REVISION NO.:           PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
8                   CLASSIFICATION OF EMERGENCIES                       3 of 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                           ST. LUCIE PLANT 1.0     PURPOSE This procedure provides instructions on the classification of emergencies at St.
PAGE:
8 CLASSIFICATION OF EMERGENCIES 3 of 32 PROCEDURE NO.:
EPIP-01 ST. LUCIE PLANT 1.0 PURPOSE This procedure provides instructions on the classification of emergencies at St.
Lucie Plant.
Lucie Plant.
Emergency classifications in order of increasing seriousness are:
Emergency classifications in order of increasing seriousness are:
* Unusual Event
Unusual Event Alert Site Area Emergency General Emergency Specific criteria are provided to assure proper escalation and de-escalation between emergency classification levels.
* Alert
* Site Area Emergency
* General Emergency Specific criteria are provided to assure proper escalation and de-escalation between emergency classification levels.


==2.0     REFERENCES==
==2.0 REFERENCES==
  / RECORDS REQUIRED / COMMITMENT DOCUMENTS NOTE One or more of the following symbols may be used in this procedure:
  / RECORDS REQUIRED / COMMITMENT DOCUMENTS NOTE One or more of the following symbols may be used in this procedure:
        &sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
&sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
        &#xb6;1 Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
&#xb6;1 Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
T Indicates a step that requires a sign off on an attachment.
T Indicates a step that requires a sign off on an attachment.
2.1     References
2.1 References
: 1.     St. Lucie Plant Radiological Emergency Plan (E-Plan)
: 1.
: 2.       E-Plan Implementing Procedures (EPIP 00-13)
St. Lucie Plant Radiological Emergency Plan (E-Plan)
: 3.     C-200, Offsite Dose Calculation Manual (ODCM)
: 2.
: 4.     AP 0010502, Oil and Hazardous Material Emergency Response Plan
E-Plan Implementing Procedures (EPIP 00-13)
: 5.     $1     NUREG-1022, Section 3.1.1
: 3.
C-200, Offsite Dose Calculation Manual (ODCM)
: 4.
AP 0010502, Oil and Hazardous Material Emergency Response Plan
: 5.  
$1 NUREG-1022, Section 3.1.1


REVISION NO.:           PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
8                   CLASSIFICATION OF EMERGENCIES                     4 of 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                           ST. LUCIE PLANT 2.1     References (continued)
PAGE:
: 6.     &#xb6;12   NRC IEN No. 85-80, Timely Declaration of an Emergency Class, Implementation of an Emergency Plan, and Emergency Notifications, October 15, 1985
8 CLASSIFICATION OF EMERGENCIES 4 of 32 PROCEDURE NO.:
: 7.     &#xb6;3   NRC EPPOS No. 2, Emergency Preparedness Position (EPPOS) on Timeliness of Classification of Emergency Conditions, August, 1995
EPIP-01 ST. LUCIE PLANT 2.1 References (continued)
: 8.     &#xb6;4   PMAI PM98-01-017, Loss of Seismic Monitoring Capability 2.2     Records Required The basis for classifying an emergency condition shall be recorded in appropriate emergency logs.
: 6.  
2.3     Commitment Documents
&#xb6;12 NRC IEN No. 85-80, Timely Declaration of an Emergency Class, Implementation of an Emergency Plan, and Emergency Notifications, October 15, 1985
                &sect;1   CR 00-0614 (RCS leakage during shutdown cooling)
: 7.  
                &sect;2   PMAI PM99-09-154 (IC and EAL changes submitted under FPL letter L-98-2000)
&#xb6;3 NRC EPPOS No. 2, Emergency Preparedness Position (EPPOS) on Timeliness of Classification of Emergency Conditions, August, 1995
                &#xb6;5 T    NRC Safeguards Advisory for Operating Power Reactors, SA-04-07 3.0     RESPONSIBILITIES 3.1     Shift Manager (SM)
: 8.  
: 1. The Shift Manager is responsible to promptly classify abnormal situations into one of the four defined categories.
&#xb6;4 PMAI PM98-01-017, Loss of Seismic Monitoring Capability 2.2 Records Required The basis for classifying an emergency condition shall be recorded in appropriate emergency logs.
: 2.     If an emergency has been declared, the Shift Manager is responsible for assuming the position of Emergency Coordinator and retaining this position until relieved.
2.3 Commitment Documents
3.2     Emergency Coordinator (EC)
&sect;1 CR 00-0614 (RCS leakage during shutdown cooling)
&sect;2 PMAI PM99-09-154 (IC and EAL changes submitted under FPL letter L-98-2000)
T &#xb6;5 NRC Safeguards Advisory for Operating Power Reactors, SA-04-07 3.0 RESPONSIBILITIES 3.1 Shift Manager (SM)
: 1.
The Shift Manager is responsible to promptly classify abnormal situations into one of the four defined categories.
: 2.
If an emergency has been declared, the Shift Manager is responsible for assuming the position of Emergency Coordinator and retaining this position until relieved.
3.2 Emergency Coordinator (EC)
The Emergency Coordinator is responsible to continually evaluate changes in plant conditions against the classification table in this procedure.
The Emergency Coordinator is responsible to continually evaluate changes in plant conditions against the classification table in this procedure.


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
8                   CLASSIFICATION OF EMERGENCIES                         5 of 32 PROCEDURE NO.:                                                                         5 EPIP-01                             ST. LUCIE PLANT 4.0     DEFINITIONS 4.1     Emergency Action Level (EAL)
PROCEDURE TITLE:
: 1. A pre-determined, site-specific, observable threshold for a plant Initiating Condition that places the plant in a given emergency class. An EAL can be:
PAGE:
8 CLASSIFICATION OF EMERGENCIES 5 of 32 PROCEDURE NO.:
5 EPIP-01 ST. LUCIE PLANT 4.0 DEFINITIONS 4.1 Emergency Action Level (EAL)
: 1.
A pre-determined, site-specific, observable threshold for a plant Initiating Condition that places the plant in a given emergency class. An EAL can be:
an instrument reading; an equipment status indicator; a measurable parameter (on-site or off-site); a discrete, observable event; results of analyses; entry into specific emergency operating procedures; or another phenomenon which, if it occurs, indicates entry into a particular emergency class.
an instrument reading; an equipment status indicator; a measurable parameter (on-site or off-site); a discrete, observable event; results of analyses; entry into specific emergency operating procedures; or another phenomenon which, if it occurs, indicates entry into a particular emergency class.
4.2     Emergency Classes
4.2 Emergency Classes
: 1. Unusual Event This classification is represented by off-normal events or conditions at the plant for which no significant degradation of the level of safety of the plant has occurred or is expected. Any releases of radioactive material which may have occurred or which may be expected are minor and constitute no appreciable health hazard.
: 1.
: 2. Alert This classification is represented by events which involve an actual or potential substantial degradation of the level of safety of the plant combined with a potential for limited uncontrolled releases of radioactivity from the plant.
Unusual Event This classification is represented by off-normal events or conditions at the plant for which no significant degradation of the level of safety of the plant has occurred or is expected. Any releases of radioactive material which may have occurred or which may be expected are minor and constitute no appreciable health hazard.
: 3.     Site Area Emergency This classification is composed of events which involve actual or likely major failures of plant functions needed for protection of the public combined with a potential for significant uncontrolled releases of radioactivity from the plant.
: 2.
: 4. General Emergency This classification is composed of events which involve actual or imminent substantial core degradation and potential loss of containment integrity combined with a likelihood of significant uncontrolled releases of radioactivity from the plant.
Alert This classification is represented by events which involve an actual or potential substantial degradation of the level of safety of the plant combined with a potential for limited uncontrolled releases of radioactivity from the plant.
: 3.
Site Area Emergency This classification is composed of events which involve actual or likely major failures of plant functions needed for protection of the public combined with a potential for significant uncontrolled releases of radioactivity from the plant.
: 4.
General Emergency This classification is composed of events which involve actual or imminent substantial core degradation and potential loss of containment integrity combined with a likelihood of significant uncontrolled releases of radioactivity from the plant.


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
8                     CLASSIFICATION OF EMERGENCIES                       6 of 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                             ST. LUCIE PLANT 4.3     Classification Table A composite   of Initiating Conditions (ICs) and their Emergency Action Levels (EALs) used   to evaluate off normal/emergency conditions resulting in declaration of one of the four Emergency Classes, as appropriate. The Table is arranged in the following categories:
PAGE:
: 1.     Events Affecting Primary Pressure A. Abnormal Primary Leak Rate B. Abnormal Primary/Secondary Leak Rate C. Loss of Secondary Coolant
8 CLASSIFICATION OF EMERGENCIES 6 of 32 PROCEDURE NO.:
: 2. Abnormal Radiation, Contamination and Effluent Releases A.     Uncontrolled Effluent Release B.     High Radiation Levels in Plant
EPIP-01 ST. LUCIE PLANT 4.3 Classification Table A composite of Initiating Conditions (ICs) and their Emergency Action Levels (EALs) used to evaluate off normal/emergency conditions resulting in declaration of one of the four Emergency Classes, as appropriate. The Table is arranged in the following categories:
: 3.     Fires, Explosions
: 1.
: 4.     Accident Involving Fuel A.     Fuel Element Failure B.     Fuel Handling
Events Affecting Primary Pressure A.
: 5.     Natural Emergencies A.     Earthquake B. Hurricane C. Tornado D.     Abnormal Water Level
Abnormal Primary Leak Rate B.
: 6.     Miscellaneous Events A.     Increased Awareness or Potential Core Melt
Abnormal Primary/Secondary Leak Rate C.
: 7.     Electrical Malfunctions A.     Loss of Power
Loss of Secondary Coolant
: 2.
Abnormal Radiation, Contamination and Effluent Releases A.
Uncontrolled Effluent Release B.
High Radiation Levels in Plant
: 3.
Fires, Explosions
: 4.
Accident Involving Fuel A.
Fuel Element Failure B.
Fuel Handling
: 5.
Natural Emergencies A.
Earthquake B.
Hurricane C.
Tornado D.
Abnormal Water Level
: 6.
Miscellaneous Events A.
Increased Awareness or Potential Core Melt
: 7.
Electrical Malfunctions A.
Loss of Power


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
8                     CLASSIFICATION OF EMERGENCIES                       7 of 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                             ST. LUCIE PLANT 4.3     Classification Table (continued)
PAGE:
: 8.       Degradation of Control Capabilities A. Loss of Plant Control Functions B. Loss of Alarms, Communications, Monitoring
8 CLASSIFICATION OF EMERGENCIES 7 of 32 PROCEDURE NO.:
: 9.       Hazards to Station Operation A.     Aircraft, Missile B. Turbine Failure C. Toxic or Flammable Gas
EPIP-01 ST. LUCIE PLANT 4.3 Classification Table (continued)
: 10.       Security Threat 4.4     Initiating Condition (IC)
: 8.
: 1.       One of a predetermined subset of nuclear power plant conditions where either the potential exists for a radiological emergency, or such an emergency has occurred.
Degradation of Control Capabilities A.
4.5     Plant - The St. Lucie Plant, Unit 1 and Unit 2 4.6     Site - A general term referring to the location of the St. Lucie Nuclear Power Plant.
Loss of Plant Control Functions B.
Loss of Alarms, Communications, Monitoring
: 9.
Hazards to Station Operation A.
Aircraft, Missile B.
Turbine Failure C.
Toxic or Flammable Gas
: 10.
Security Threat 4.4 Initiating Condition (IC)
: 1.
One of a predetermined subset of nuclear power plant conditions where either the potential exists for a radiological emergency, or such an emergency has occurred.
4.5 Plant - The St. Lucie Plant, Unit 1 and Unit 2 4.6 Site - A general term referring to the location of the St. Lucie Nuclear Power Plant.
Other terms related to the site are given below:
Other terms related to the site are given below:
: 1.       Owner Controlled Area - That portion of FPL property surrounding and including the St. Lucie Nuclear Power Plant which is subject to limited access and control as deemed appropriate by FPL.
: 1.
: 2.       Protected Area - The area (within the Owner Controlled Area) occupied by the nuclear units and associated equipment and facilities enclosed with the security perimeter fence. The area within which accountability of personnel is maintained in an emergency.
Owner Controlled Area - That portion of FPL property surrounding and including the St. Lucie Nuclear Power Plant which is subject to limited access and control as deemed appropriate by FPL.
: 2.
Protected Area - The area (within the Owner Controlled Area) occupied by the nuclear units and associated equipment and facilities enclosed with the security perimeter fence. The area within which accountability of personnel is maintained in an emergency.


REVISION NO.:           PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                     CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                       8 of 32 EPIP-01                           ST. LUCIE PLANT 4.6     Site (continued)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
: 3.       &sect;2 Power Block - Structures, systems or components in the areas listed below that support the production of power. This includes any equipment needed for the direct generation of power or necessary for safe operation and/or shutdown of one or both of the reactors.
8 of 32 EPIP-01 ST. LUCIE PLANT 4.6 Site (continued)
A. Reactor Containment and Shield Buildings B. Reactor Auxiliary Buildings including the following areas:
: 3.  
: 1.     Refueling Water Tank (RWT)
&sect;2 Power Block - Structures, systems or components in the areas listed below that support the production of power. This includes any equipment needed for the direct generation of power or necessary for safe operation and/or shutdown of one or both of the reactors.
: 2.       Component Cooling Water (CCW) platform area
A.
: 3.       Diesel Generator Buildings and Fuel Oil Storage Tanks
Reactor Containment and Shield Buildings B.
: 4.       Fuel Handling Building
Reactor Auxiliary Buildings including the following areas:
: 5.       Primary Water Tank and Pumps C. Intake Area D. Discharge Canal & Headwall E. Ultimate Heat Sink Structure F. Fire Protection System including the fire pumps and the City Water Storage Tanks (CWST), but not including parts of the system associated with the North or South Service Buildings or other outlying facilities.
: 1.
G. Turbine Buildings (all levels)
Refueling Water Tank (RWT)
H. Condensate Storage Tanks (CST)
: 2.
I. Main, Auxiliary and Startup Transformers J. Steam Trestles K. Turbine Lube Oil Storage Tanks L. Gas House
Component Cooling Water (CCW) platform area
: 3.
Diesel Generator Buildings and Fuel Oil Storage Tanks
: 4.
Fuel Handling Building
: 5.
Primary Water Tank and Pumps C.
Intake Area D.
Discharge Canal & Headwall E.
Ultimate Heat Sink Structure F.
Fire Protection System including the fire pumps and the City Water Storage Tanks (CWST), but not including parts of the system associated with the North or South Service Buildings or other outlying facilities.
G.
Turbine Buildings (all levels)
H.
Condensate Storage Tanks (CST)
I.
Main, Auxiliary and Startup Transformers J.
Steam Trestles K.
Turbine Lube Oil Storage Tanks L.
Gas House


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
8                   CLASSIFICATION OF EMERGENCIES                         9 of 32 PROCEDURE NO.:                                                                       9 EPIP-01                           ST. LUCIE PLANT 5.0     INSTRUCTIONS 5.1     Direct Initial Investigative and Mitigating Actions to Address the Event
PROCEDURE TITLE:
: 1. If the event involves entry into the Off-Normal Operating Procedures (ONOPs) or Emergency Operating Procedures (EOPs), Then perform steps per ONOPs or EOPs until appropriate or directed to classify event.
PAGE:
: 2. If the event involves a release of hazardous materials to the environment, Then respond per AP 0010502, Oil and Hazardous Material Emergency Response Plan.
8 CLASSIFICATION OF EMERGENCIES 9 of 32 PROCEDURE NO.:
: 3.     If the event involves a release of radioactive material to the environment, Then direct Chemistry personnel to implement EPIP-09, Off-site Dose Calculations.
9 EPIP-01 ST. LUCIE PLANT 5.0 INSTRUCTIONS 5.1 Direct Initial Investigative and Mitigating Actions to Address the Event
: 1.
If the event involves entry into the Off-Normal Operating Procedures (ONOPs) or Emergency Operating Procedures (EOPs), Then perform steps per ONOPs or EOPs until appropriate or directed to classify event.
: 2.
If the event involves a release of hazardous materials to the environment, Then respond per AP 0010502, Oil and Hazardous Material Emergency Response Plan.
: 3.
If the event involves a release of radioactive material to the environment, Then direct Chemistry personnel to implement EPIP-09, Off-site Dose Calculations.
END OF SECTION 5.1
END OF SECTION 5.1


REVISION NO.:               PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
8                     CLASSIFICATION OF EMERGENCIES                         10 of 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                 ST. LUCIE PLANT NOTE Initiating Conditions / Emergency Action Levels are applicable to all modes unless otherwise indicated.
PAGE:
5.2     Classifying the Event
8 CLASSIFICATION OF EMERGENCIES 10 of 32 PROCEDURE NO.:
: 1.       &#xb6;13   A goal of fifteen (15) minutes should be used for assessing and classifying an emergency once indications (Emergency Action Levels (EALs)) are available to Control Room Operators that an Initiating Condition (IC) has been met and/or exceeded.
EPIP-01 ST. LUCIE PLANT NOTE Initiating Conditions / Emergency Action Levels are applicable to all modes unless otherwise indicated.
A.       This goal should allow time for determination of indications (leak rate, etc.) and detailed review of Attachment 1, Emergency Classification Table.
5.2 Classifying the Event
: 2.       Use the best information available when working through the Emergency Classification Table. When confronted with conflicting information for which resolution is not apparent, classify the condition at the highest appropriate emergency class.
: 1.  
: 3.       If, in the judgement of the Shift Manager (SM) /Emergency Coordinator (EC), a situation is more serious than indicated by instrument readings or other parameters, Then classify the emergency condition at the more serious level (i.e., at the highest appropriate emergency class).
&#xb6;13 A goal of fifteen (15) minutes should be used for assessing and classifying an emergency once indications (Emergency Action Levels (EALs)) are available to Control Room Operators that an Initiating Condition (IC) has been met and/or exceeded.
: 4.       &#xb6;5       Security Event If the Control Room is contacted by any of the following: Security, NRC, FBI or NORAD that a terrorist attack on the plant site is imminent or is occurring, Then perform the actions in the applicable Appendix to Security Force Instruction (SFI) #4, Appendix C, Unit 1 Operations Department Recommended Defensive Strategy or Appendix D, Unit 2 Operations Department Recommended Defensive Strategy.
A.
: 5.       Multiple and Dual Unit Events CAUTION There can not be two concurrent declared emergency classes under the St. Lucie Plant Radiological Emergency Plan.                                         I A.       If one Unit is in a classified event and the same or the other Unit enters into an event where the same or lesser Emergency Class would apply, Then a new classification should NOT be declared. The event should be documented on a SNF as "Additional Information or Update" and issued as soon as practicable.
This goal should allow time for determination of indications (leak rate, etc.) and detailed review of Attachment 1, Emergency Classification Table.
: 2.
Use the best information available when working through the Emergency Classification Table. When confronted with conflicting information for which resolution is not apparent, classify the condition at the highest appropriate emergency class.
: 3.
If, in the judgement of the Shift Manager (SM) /Emergency Coordinator (EC), a situation is more serious than indicated by instrument readings or other parameters, Then classify the emergency condition at the more serious level (i.e., at the highest appropriate emergency class).
: 4.  
&#xb6;5 Security Event If the Control Room is contacted by any of the following: Security, NRC, FBI or NORAD that a terrorist attack on the plant site is imminent or is occurring, Then perform the actions in the applicable Appendix to Security Force Instruction (SFI) #4, Appendix C, Unit 1 Operations Department Recommended Defensive Strategy or Appendix D, Unit 2 Operations Department Recommended Defensive Strategy.
: 5.
Multiple and Dual Unit Events CAUTION There can not be two concurrent declared emergency classes under the St. Lucie Plant Radiological Emergency Plan.
I A.
If one Unit is in a classified event and the same or the other Unit enters into an event where the same or lesser Emergency Class would apply, Then a new classification should NOT be declared. The event should be documented on a SNF as "Additional Information or Update" and issued as soon as practicable.


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
8                   CLASSIFICATION OF EMERGENCIES                     I PROCEDURE NO.:                                                                       1 EPIP-01                             ST. LUCIE PLANT 5.2     Classifying the Event (continued)
PROCEDURE TITLE:
: 5.     (continued)
PAGE:
B.       Ifone Unit is in a classified event and the other Unit enters into a more severe event in which a higher Emergency Class would apply, Then the new classification shall be declared and promptly, within the regulatory time limits, issued to the State, Counties and the NRC.
8 CLASSIFICATION OF EMERGENCIES I
: 6.     &#xb6;2   If an EAL was met and the condition completely cleared prior to an emergency classification being declared, Then:
PROCEDURE NO.:
A.     Classify the event in accordance with Attachment 1.
1 EPIP-01 ST. LUCIE PLANT 5.2 Classifying the Event (continued)
B.     Termination of the event
: 5.
: 1. An event classified as an Unusual Event or Alert may be terminated at the time of declaration by the EC.
(continued)
: 2. An event classified as a Site Area Emergency or General Emergency may only be downgraded and/or terminated by the Recovery Manager (RM).
B.
If one Unit is in a classified event and the other Unit enters into a more severe event in which a higher Emergency Class would apply, Then the new classification shall be declared and promptly, within the regulatory time limits, issued to the State, Counties and the NRC.
: 6.  
&#xb6;2 If an EAL was met and the condition completely cleared prior to an emergency classification being declared, Then:
A.
Classify the event in accordance with Attachment 1.
B.
Termination of the event
: 1.
An event classified as an Unusual Event or Alert may be terminated at the time of declaration by the EC.
: 2.
An event classified as a Site Area Emergency or General Emergency may only be downgraded and/or terminated by the Recovery Manager (RM).
END OF SECTION 5.2
END OF SECTION 5.2


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
8                   CLASSIFICATION OF EMERGENCIES                       12 of 32 PROCEDURE NO.:                                                                       1 EPIP-01                             ST. LUCIE PLANT 5.3     &sect;, T, Classification of An Event Based On Subsequent Information
PROCEDURE TITLE:
: 1. If subsequent information of a more detailed nature (e.g., sampling results) becomes available after the initial classification has been made, Then reclassify as appropriate.
PAGE:
: 2. If results of a protracted review (i.e., Engineering Evaluation, CR disposition, etc.) of an event indicate that conditions were met for an Emergency Classification, and the condition has completely cleared prior to recognition of possible classification, Then notify NRC within one hour of discovery of the undeclared event.
8 CLASSIFICATION OF EMERGENCIES 12 of 32 PROCEDURE NO.:
A.     Contact Emergency Preparedness for briefing of state and local agencies.
1 EPIP-01 ST. LUCIE PLANT 5.3  
&sect;, T, Classification of An Event Based On Subsequent Information
: 1.
If subsequent information of a more detailed nature (e.g., sampling results) becomes available after the initial classification has been made, Then reclassify as appropriate.
: 2.
If results of a protracted review (i.e., Engineering Evaluation, CR disposition, etc.) of an event indicate that conditions were met for an Emergency Classification, and the condition has completely cleared prior to recognition of possible classification, Then notify NRC within one hour of discovery of the undeclared event.
A.
Contact Emergency Preparedness for briefing of state and local agencies.
END OF SECTION 5.3
END OF SECTION 5.3


REVISION NO.:           PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                                       CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                                                                                           1[3 of 32 EPIP-01                                                                         ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 1 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
1[ 3 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 1 of 20)
CAUTION
CAUTION
                                                          &sect;2   Section 1.A should not be used for a steam generator tube leak / rupture.
&sect;2 Section 1.A should not be used for a steam generator tube leak / rupture.
EVENT/CLASS                   UNUSUAL EVENT                                      ALERT                        SITE AREA EMERGENCY                        GENERAL EMERGENCY 1.A. ABNORMAL PRIMARY     Reactor Coolant System (RCS) Leakage       &sect;1 RCS Leakage GREATER THAN 50 ,pm LEAK RATE                                                                                                    LOCA GREATER THAN capacity of            A release has occurred or is in progress (Page 1 of 2)                                                                                                charging pumps                            resulting in:
EVENT/CLASS 1.A.
: 1. RCS leakage GREATER THAN                1. Unisolable RCS leakage as indicated by 10 gpm as indicated by:                      Charging/letdown mismatch greater than   1. RCS leakage greater than available    1. Containment High Range Radiation 50 gpm but less than available charging     charging pump capacity occurring with     monitor greater than 1.46 X 10' R/hr (If A. Control Room observation              pump capacity.                              RCS pressure above HPSI shutoff QR                                                                                                              CHRRM inoperable, Post-LOCA OR                      head.                                    monitors greater than 1000 m R/hr).
ABNORMAL PRIMARY LEAK RATE (Page 1 of 2)
B. Inventory balance calculation        2. Unisolable measured RCS leakage                              OR OR                                                                                                                                OR indicating greater than 50 gpm but less  2. RCS leakage greater than available    2. Performance of EPIP-09 (Off-site Dose C. Field observation                    than available charging pump capacity.      makeup occurring with RCS pressure        Calculations) or measured dose rates OR                                                                    below HPSI shutoff head.                  from off-site surveys indicate site
UNUSUAL EVENT Reactor Coolant System (RCS) Leakage
: 0. Emergency Coordinator judgement                                                                    OR OQR                                                                                                            boundary (1 mile) exposure levels have
: 1. RCS leakage GREATER THAN 10 gpm as indicated by:
: 3. Loss of RCS subcooled margin due to      been exceeded as indicated by either
A.
: 2. Indication of leaking RCS safety or RCS leakage (saturated conditions).      A, B, C or D below:
Control Room observation QR B. Inventory balance calculation OR C.
relief valve which causes RCS                                                                            OR pressure to drop below setpoints:                                                    4. Containment High Range Radiation          A. 1000 mrem/hr (total dose rate)
Field observation OR
Unit 1 - 1600 psia Monitors indicate 7.3 X 103 R/hr (If Unit 2 - 1736 psia CHRRM inoperable, Post-LOCA              B. 1000 mrem (total dose - TEDE) monitors indicate between 100 and 1000 mR/hr).                              C. 5000 mrem/hr (thyroid dose rate)
: 0. Emergency Coordinator judgement OQR
D. 5000 mrem (thyroid dose - CDE)
: 2. Indication of leaking RCS safety or relief valve which causes RCS pressure to drop below setpoints:
(continued on next page) 1.A. ABNORMAL PRIMARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
Unit 1 - 1600 psia Unit 2 - 1736 psia ALERT
&sect;1 RCS Leakage GREATER THAN 50,pm
: 1. Unisolable RCS leakage as indicated by Charging/letdown mismatch greater than 50 gpm but less than available charging pump capacity.
OR
: 2. Unisolable measured RCS leakage indicating greater than 50 gpm but less than available charging pump capacity.
SITE AREA EMERGENCY LOCA GREATER THAN capacity of charging pumps
: 1. RCS leakage greater than available charging pump capacity occurring with RCS pressure above HPSI shutoff head.
OR
: 2.
RCS leakage greater than available makeup occurring with RCS pressure below HPSI shutoff head.
OR
: 3.
Loss of RCS subcooled margin due to RCS leakage (saturated conditions).
OR
: 4. Containment High Range Radiation Monitors indicate 7.3 X 103 R/hr (If CHRRM inoperable, Post-LOCA monitors indicate between 100 and 1000 mR/hr).
GENERAL EMERGENCY A release has occurred or is in progress resulting in:
: 1. Containment High Range Radiation monitor greater than 1.46 X 10' R/hr (If CHRRM inoperable, Post-LOCA monitors greater than 1000 m R/hr).
OR
: 2. Performance of EPIP-09 (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile) exposure levels have been exceeded as indicated by either A, B, C or D below:
A.
1000 mrem/hr (total dose rate)
B.
1000 mrem (total dose - TEDE)
C.
5000 mrem/hr (thyroid dose rate)
D.
5000 mrem (thyroid dose - CDE)
(continued on next page) 1.A.
ABNORMAL PRIMARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:         PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                         14 of 32 EPIP-01                                         ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 2 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
EVENT/CLASS             UNUSUAL EVENT             ALERT         SITE AREA EMERGENCY       GENERAL EMERGENCY 1.A. ABNORMAL PRIMARY LEAK RATE                                                                                Loss of 2 of the 3 fission product (Page 2 of 2)                                                                          barriers with imminent loss of the third (any two of the following exit and the third is imminent).
14 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 2 of 20)
EVENT/CLASS 1.A. ABNORMAL PRIMARY LEAK RATE (Page 2 of 2)
UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY Loss of 2 of the 3 fission product barriers with imminent loss of the third (any two of the following exit and the third is imminent).
: 1. Fuel element failure (confirmed DEQ 1-131 activity greater than 275 pCi/mL).
: 1. Fuel element failure (confirmed DEQ 1-131 activity greater than 275 pCi/mL).
AND
AND
Line 1,220: Line 2,144:
1.A. ABNORMAL PRIMARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
1.A. ABNORMAL PRIMARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:         PROCEDURE TITLE:                                                                                                               PAGE:
REVISION NO.:
8                                             CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                                         ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 3 of 20)
PAGE:
EVENT/CLASS               UNUSUAL EVENT                            ALERT                      SITE AREA EMERGENCY                  GENERAL EMERGENCY
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
: 1. B. ABNORMAL         RCS PRI/SEC Leakage               Rapid gross failure of one steam   Rapid gross failure of steam        Loss of 2 of the 3 fission product PRIMARY TO                                          generator tube (WITHIN charging     generator tubes (GREATER THAN        barriers with imminent loss of the SECONDARY LEAK    1. Measured RCS to secondary      pump capacity) with loss of offsite charging pump capacity) with a loss  third (any two of the following exist RATE                leakage exceeds Tech. Spec. power                              of offsite power                     and the third is imminent).
EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 3 of 20)
(Page 1 of 2)        limits.
EVENT/CLASS
AND                  1. Measured RCS to secondary        1. Measured RCS to secondary         1. Fuel element failure (confirmed
: 1. B.
: 2. Secondary plant activity is        leakage greater than Tech. Spec. leakage is greater than charging      DEQ 1-131 activity greater than detected.                          Limits and within charging pump      pump capacity.                        275 pCi/mL).
ABNORMAL PRIMARY TO SECONDARY LEAK RATE (Page 1 of 2)
capacity.                                        AND                                  AND AND                 2. Secondary plant activity is      2. LOCA or Tube rupture on
UNUSUAL EVENT RCS PRI/SEC Leakage
: 2. Secondary plant activity is         detected.                            unisolable steam generator.
: 1. Measured RCS to secondary leakage exceeds Tech. Spec.
detected.                                        AND                                   AND AND                3. Loss of both Non-Vital 4.16 KV   3. Containment integrity breached.
limits.
: 3. Loss of both Non-Vital 4.16 KV       buses.
AND
buses.
: 2. Secondary plant activity is detected.
(continued on next page)             (continued on next page)
ALERT Rapid gross failure of one steam generator tube (WITHIN charging pump capacity) with loss of offsite power
: 1. Measured RCS to secondary leakage greater than Tech. Spec.
Limits and within charging pump capacity.
AND
: 2. Secondary plant activity is detected.
AND
: 3. Loss of both Non-Vital 4.16 KV buses.
(continued on next page)
SITE AREA EMERGENCY Rapid gross failure of steam generator tubes (GREATER THAN charging pump capacity) with a loss of offsite power
: 1. Measured RCS to secondary leakage is greater than charging pump capacity.
AND
: 2. Secondary plant activity is detected.
AND
: 3. Loss of both Non-Vital 4.16 KV buses.
(continued on next page)
GENERAL EMERGENCY Loss of 2 of the 3 fission product barriers with imminent loss of the third (any two of the following exist and the third is imminent).
: 1. Fuel element failure (confirmed DEQ 1-131 activity greater than 275 pCi/mL).
AND
: 2.
LOCA or Tube rupture on unisolable steam generator.
AND
: 3.
Containment integrity breached.
NOTE Also refer to Potential Core Melt Event/Class 6.A.
NOTE Also refer to Potential Core Melt Event/Class 6.A.
1.B. ABNORMAL PRIMARY TO SECONDARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
1.B.
ABNORMAL PRIMARY TO SECONDARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:         PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                                       16 of 32 EPIP-01                                             ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 4 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
EVENTICLASS           UNUSUAL EVENT                    ALERT                      SITE AREA EMERGENCY            GENERAL EMERGENCY 1.B. ABNORMAL                                 Rapid failure of steam generator PRIMARY TO                                                               &sect;2 Rapid failure of steam generator tubes (GREATER THAN charging       tube(s) (GREATER THAN charging SECONDARY LEAK                            pump capacity)
16 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 4 of 20)
RATE                                                                          pump capacity) with steam release in (Page 2 of 2)                                                                progress
EVENTICLASS 1.B. ABNORMAL PRIMARY TO SECONDARY LEAK RATE (Page 2 of 2)
: 1. Measured RCS to secondary leakage greater than charging   1. Measured RCS to secondary pump capacity.                        leakage greater than charging AND                    pump capacity.
UNUSUAL EVENT ALERT Rapid failure of steam generator tubes (GREATER THAN charging pump capacity)
: 2. Secondary plant activity is                      AND detected.                        2. Secondary plant activity is detected.
: 1. Measured RCS to secondary leakage greater than charging pump capacity.
AND
AND
: 3. Secondary steam release in progress from affected generator (i.e., ADVs, stuck steam safety(s) or unisolable leak.)
: 2. Secondary plant activity is detected.
1.B. ABNORMAL PRIMARY TO SECONDARYLEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
SITE AREA EMERGENCY
&sect;2 Rapid failure of steam generator tube(s) (GREATER THAN charging pump capacity) with steam release in progress
: 1.
Measured RCS to secondary leakage greater than charging pump capacity.
AND
: 2.
Secondary plant activity is detected.
AND
: 3.
Secondary steam release in progress from affected generator (i.e., ADVs, stuck steam safety(s) or unisolable leak.)
GENERAL EMERGENCY 1.B.
ABNORMAL PRIMARY TO SECONDARYLEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:       PROCEDURE TITLE:                                                                                                                   PAGE:
REVISION NO.:
8                                             CLASSIFICATION OF EMERGENCIES                                                                     17of32 PROCEDURE NO.:                                                                                                                                       I EPIP-01                                                           ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 5 of 20)
PROCEDURE TITLE:
EVENT/CLASS             UNUSUAL EVENT                                ALERT                      SITE AREA EMERGENCY                GENERAL EMERGENCY 1.C. LOSS OF         Rapid depressurization of secondary   Maior steam leak with             Major steam leak with                A release has occurred or is in SECONDARY        Diant                                GREATER THAN 10 qpm                 GREATER THAN 50 qpm                  proaress resulting in:
PAGE:
COOLANT                                                primary/secondary leakage           primary/secondary leakage and fuel (Page 1 of 2)    1. Rapid drop in either steam                                             damage indicated                    1. Containment High Range generator pressure to less than   1. Rapid drop in either steam                                               Radiation monitor greater than 600 psia.                             generator pressure to less than 1. Rapid drop in either steam            1.46 X 10' R/hr (IfCHRRM 600 psia.                            generator pressure to less than    inoperable, Post-LOCA monitors AND                    600 psia.                          greater than 1000 mR/hr).
8 CLASSIFICATION OF EMERGENCIES 17of32 PROCEDURE NO.:
: 2. Known pri/sec leak of greater                      AND                                OR than 10 gpm.                    2. Known pri/sec leak of greater    2. Performance of EPIP-09 (Off-site AND                    than 50 gpm.                        Dose Calculations) or measured
I EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 5 of 20)
: 3. Secondary plant activity is                        AND                  dose rates from off-site surveys detected.                      3. Secondary plant activity is          indicate site boundary (1 mile) detected.                            exposure levels have been AND                  exceeded as indicated by either
EVENT/CLASS 1.C. LOSS OF SECONDARY COOLANT (Page 1 of 2)
: 4. Fuel element damage is indicated      A, B, C or D below:.
UNUSUAL EVENT Rapid depressurization of secondary Diant
Total loss of feedwater                (Refer to Fuel Element Failure Event/Class 4.A).                  A. 1000 mrem/hr (total dose
: 1. Rapid drop in either steam generator pressure to less than 600 psia.
: 1. No main or auxiliary feedwater                                                rate) flow available for greater than 15 minutes when required for                                            B. 1000 mrem (total dose -
ALERT Maior steam leak with GREATER THAN 10 qpm primary/secondary leakage
heat removal.                  TLOF with once-through cooling              TEDE)
: 1. Rapid drop in either steam generator pressure to less than 600 psia.
AND                initiated
AND
: 2. Steam Generator levels are less                                          C. 5000 mrem/hr (thyroid dose than 40% wide range.                                                         rate)
: 2. Known pri/sec leak of greater than 10 gpm.
AND
: 3. Secondary plant activity is detected.
Total loss of feedwater
: 1. No main or auxiliary feedwater flow available for greater than 15 minutes when required for heat removal.
AND
: 2. Steam Generator levels are less than 40% wide range.
SITE AREA EMERGENCY Major steam leak with GREATER THAN 50 qpm primary/secondary leakage and fuel damage indicated
: 1. Rapid drop in either steam generator pressure to less than 600 psia.
AND
: 2. Known pri/sec leak of greater than 50 gpm.
AND
: 3. Secondary plant activity is detected.
AND
: 4. Fuel element damage is indicated (Refer to Fuel Element Failure Event/Class 4.A).
GENERAL EMERGENCY A release has occurred or is in proaress resulting in:
: 1. Containment High Range Radiation monitor greater than 1.46 X 10' R/hr (If CHRRM inoperable, Post-LOCA monitors greater than 1000 mR/hr).
OR
: 2.
Performance of EPIP-09 (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile) exposure levels have been exceeded as indicated by either A, B, C or D below:.
A. 1000 mrem/hr (total dose rate)
B. 1000 mrem (total dose -
TEDE)
C. 5000 mrem/hr (thyroid dose rate)
D. 5000 mrem (thyroid dose-CDE)
(continued on next page)
TLOF with once-through cooling initiated
: 1. No main or auxiliary feedwater flow available.
: 1. No main or auxiliary feedwater flow available.
D. 5000 mrem (thyroid dose-AND
AND
: 2. PORV(s) have been opened to               CDE) facilitate core heat removal.
: 2. PORV(s) have been opened to facilitate core heat removal.
(continued on next page) 1.C. LOSS OF SECONDARY COOLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
1.C. LOSS OF SECONDARY COOLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO-:       PROCEDURE TITLE:                                                                           PAGE:
REVISION NO-:
8                               CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                       18 of 32 EPIP-01                                       ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 6 of 20)
PROCEDURE TITLE:
EVENT/CLASS           UNUSUAL EVENT             ALERT             SITE AREA EMERGENCY       GENERAL EMERGENCY 1.C. LOSS OF SECONDARY                                                                              Loss of 2 of the 3 fission product COOLANT                                                                                barriers with imminent loss of the (Page 2 of 2)                                                                          third (any two of the following exis and the third is imminent).
PAGE:
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
18 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 6 of 20)
EVENT/CLASS 1.C. LOSS OF SECONDARY COOLANT (Page 2 of 2)
UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY Loss of 2 of the 3 fission product barriers with imminent loss of the third (any two of the following exis and the third is imminent).
: 1. Fuel element failure (confirmed DEQ 1-131 activity greater than 275 pCi/mL).
: 1. Fuel element failure (confirmed DEQ 1-131 activity greater than 275 pCi/mL).
AND
AND
: 2. LOCA or Tube rupture on unisolable steam generator.
: 2.
LOCA or Tube rupture on unisolable steam generator.
AND
AND
: 3. Containment Integrity Breached.
: 3.
Containment Integrity Breached.
NOTE Also refer to Potential Core Melt Event/Class 6.A.
NOTE Also refer to Potential Core Melt Event/Class 6.A.
1.C. LOSS OF SECONDARY COOLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
1.C. LOSS OF SECONDARY COOLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:           PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                                           CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                                                                                         19 of 32 EPIP-01                                                                             ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 7 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
EVENT/CLASS                   UNUSUAL EVENT                                            ALERT                          SITE AREA EMERGENCY                    GENERAL EMERGENCY 2.A. UNCONTROLLED       Radiological effluent limits exceeded           A release has occurred or is in          &sect;2 A release has occurred or is in      A release has occurred or is in EFFLUENT RELEASE                                                    progress that is 10 times the effluent       progress resulting in:                progress resulting in:
19 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 7 of 20)
: 1. Plant effluent monitor(s) exceed             limit alarm setpoint(s).                                                                       1. Containment High Range            1. Containment High Range AND                         1. Plant effluent monitor(s)                  Radiation Monitor greater than
EVENT/CLASS 2.A.
: 2. Confirmed analysis results for                                                                                                     Radiation monitor greater than significantly exceed alarm                7.3 X 103 R/hr (Post-LOCA             1.46 X 10' R/hr (If CHRRM gaseous or liquid release which                  setpoints.                                monitors indicate between exceeds ODCM limits.                                                                                                            inoperable, Post-LOCA monitors AND                        100 and 1000 mR/hr, if CHRRM        greater than 1000 mR/hr).
UNCONTROLLED EFFLUENT RELEASE UNUSUAL EVENT Radiological effluent limits exceeded
: 2. Confirmed analysis results for            inoperable).                                        OR gaseous or liquid release which                          OR                2. Performance of EPIP-09 (Off-site exceeds 10 times ODCM limits.          2. Measured Dose Rates or Offsite      Dose Calculations) or measured Dose Calculation (EPIP-09)          dose rates from off-site surveys NOTE                                              NOTE                        worksheet values at one mile in      indicate site boundary (1 mile)
: 1. Plant effluent monitor(s) exceed alarm setpoint(s).
If analysis is not available within                If analysis is not available within        excess of:                          exposure levels have been one hour and it is expected that                    one hour and it is expected that                                                exceeded as indicated by either A, release is greater than ODCM                        release is equal to or greater            A. 50 mrem/hr (total dose rate)      B, C or D below limit, classify as UNUSUAl                        than 10 times ODCM limit,                      or 250 mrem/hr (thyroid dose EVENT.                                            classify as ALERT.                              rate) for 1/2 hour.              A. 1000 mrem/hr (total dose rate)
AND
OR B. 500 mrem/hr (total dose rate)    B. 1000 mrem (total dose - TEDE) or 2500 mrem/hr (thyroid dose rate) for two minutes at    C. 5000 mrem/hr (thyroid dose one mile.                            rate)
: 2.
Confirmed analysis results for gaseous or liquid release which exceeds ODCM limits.
NOTE If analysis is not available within one hour and it is expected that release is greater than ODCM limit, classify as UNUSUAl EVENT.
ALERT A release has occurred or is in progress that is 10 times the effluent limit
: 1. Plant effluent monitor(s) significantly exceed alarm setpoints.
AND
: 2.
Confirmed analysis results for gaseous or liquid release which exceeds 10 times ODCM limits.
NOTE If analysis is not available within one hour and it is expected that release is equal to or greater than 10 times ODCM limit, classify as ALERT.
SITE AREA EMERGENCY
&sect;2 A release has occurred or is in progress resulting in:
: 1. Containment High Range Radiation Monitor greater than 7.3 X 103 R/hr (Post-LOCA monitors indicate between 100 and 1000 mR/hr, if CHRRM inoperable).
OR
: 2.
Measured Dose Rates or Offsite Dose Calculation (EPIP-09) worksheet values at one mile in excess of:
A. 50 mrem/hr (total dose rate) or 250 mrem/hr (thyroid dose rate) for 1/2 hour.
OR B. 500 mrem/hr (total dose rate) or 2500 mrem/hr (thyroid dose rate) for two minutes at one mile.
GENERAL EMERGENCY A release has occurred or is in progress resulting in:
: 1. Containment High Range Radiation monitor greater than 1.46 X 10' R/hr (If CHRRM inoperable, Post-LOCA monitors greater than 1000 mR/hr).
OR
: 2. Performance of EPIP-09 (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile) exposure levels have been exceeded as indicated by either A, B, C or D below A. 1000 mrem/hr (total dose rate)
B. 1000 mrem (total dose - TEDE)
C. 5000 mrem/hr (thyroid dose rate)
D. 5000 mrem (thyroid dose-CDE)
D. 5000 mrem (thyroid dose-CDE)
ODCM - refers to Chemistry Procedure C-200, Offsite Dose Calculation Manual (ODCM) 2.A. UNCONTROLLED EFFLUENT RELEASE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
ODCM - refers to Chemistry Procedure C-200, Offsite Dose Calculation Manual (ODCM) 2.A.
UNCONTROLLED EFFLUENT RELEASE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:         PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                         20 of 32 EPIP-01                                               ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 8 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
EVENT/CLASS             UNUSUAL EVENT                      ALERT                  SITE AREA EMERGENCY GENERAL EMERGENCY 2.B. HIGH RADIATION LEVELS IN PLANT                             High radiation levels or high airborne contamination which indicates a severe degradation in the control of radioactive materials
20 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 8 of 20)
EVENT/CLASS 2.B. HIGH RADIATION LEVELS IN PLANT UNUSUAL EVENT ALERT High radiation levels or high airborne contamination which indicates a severe degradation in the control of radioactive materials
: 1. Any valid area monitor alarm from an unplanned source with meter near or greater than full scale deflection (10' mR/hr).
: 1. Any valid area monitor alarm from an unplanned source with meter near or greater than full scale deflection (10' mR/hr).
OR
OR
Line 1,297: Line 2,314:
OR
OR
: 3. Unexpected direct radiation dose rate reading or unexpected airborne radioactivity concentration from an unplanned source in excess of 1000 times normal levels.
: 3. Unexpected direct radiation dose rate reading or unexpected airborne radioactivity concentration from an unplanned source in excess of 1000 times normal levels.
2.B. HIGH RADIATION LEVELS IN PLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
SITE AREA EMERGENCY GENERAL EMERGENCY 2.B. HIGH RADIATION LEVELS IN PLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:       PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                                 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                                                                         21 of 32 EPIP-01                                                               ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 9 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
EVENTICLASS               UNUSUAL EVENT                                  ALERT                              SITE AREA EMERGENCY              GENERAL EMERGENCY
21 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 9 of 20)
: 3. FIRE           &sect;z Uncontrolled fire within the Power       Uncontrolled fire                          &sect;2 Fire compromising the function of                NOTE Block lasting more than 10 minutes.                                                     safety systems (e.g.. both trains    Refer to Potential Core Melt
EVENTICLASS
: 1. Potentially affecting safety             rendered inoperable).                Event/Class 6.A.
: 3.
systems.
FIRE EXPLOSION UNUSUAL EVENT
&sect;z Uncontrolled fire within the Power Block lasting more than 10 minutes.
ALERT Uncontrolled fire
: 1. Potentially affecting safety systems.
AND
AND
: 2. Requiring off-site support in the opinion of the SM/EC.
: 2. Requiring off-site support in the opinion of the SM/EC.
                                    &sect;2 Ex losion is defined as a rapid chemical reaction SNOTE  resulting in noise, heat and rapid expansion of aas. I EXPLOSION          Occurrence of an explosion within     &sect;2 Damage to structures/components in       &sect;2 Severe damage to safe shutdown the Owner Controlled Area.                the Protected Area by explosion               equipment from explosion (e.g., both which affects plant operation,               trains rendered inoperable.
SITE AREA EMERGENCY
: 3. FIRE EXPLOSION AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
&sect;2 Fire compromising the function of safety systems (e.g.. both trains rendered inoperable).
GENERAL EMERGENCY NOTE Refer to Potential Core Melt Event/Class 6.A.
SNOTE I
&sect;2 Ex losion is defined as a rapid chemical reaction resulting in noise, heat and rapid expansion of aas.
Occurrence of an explosion within the Owner Controlled Area.
&sect;2 Damage to structures/components in  
&sect;2 Severe damage to safe shutdown the Protected Area by explosion equipment from explosion (e.g., both which affects plant operation, trains rendered inoperable.
: 3.
FIRE EXPLOSION AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:       PROCEDURE TITLE:                                                                                                                         PAGE:
REVISION NO.:
8                                                 CLASSIFICATION OF EMERGENCIES PROCEDURE NO,:                                                                                                                                                       22 of 32 EPIP-01                                                               ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 10 of 20)
PROCEDURE TITLE:
EVENT/CLASS               UNUSUAL EVENT                                  ALERT                  SITE AREA EMERGENCY                    GENERAL EMERGENCY 4.A. FUEL ELEMENT     Fuel element damage                       Fuel element failure FAILURE                                                                                      Fuel element failure with in2ehinIIate A release has occurred or is in core cooling                          Progress resulting in:
PAGE:
: 1. Process monitors or area               1. Process monitors or area radiation surveys indicate               radiation surveys indicate    1. RCS DEQ 1-131 activity greater     1. Containment High Range increased letdown activity              increased letdown activity and    than or equal to 275 pCi/mL.         Radiation monitor greater than AND                      confirmed RCS Samples                          AND                      1.46 X 10' R/hr (If CHRRM
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO,:
: 2. Confirmed RCS sample                      indicating DEQ 1-131 activity 2. Highest CET per core quadrant         inoperable, Post-LOCA monitors indicating:                              greater than or equal to            indicates greater than 10&deg;F           greater than 1000 mR/hr).
22 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 10 of 20)
275 pCi/mL.                        superheat or 700&deg;F.
EVENT/CLASS 4.A. FUEL ELEMENT FAILURE UNUSUAL EVENT Fuel element damage
A. Coolant activity greater than                                                                                                   OR the Tech Spec limit for iodine                                                                            2. Performance of EPIP-09 (Off-site spike (Tech Spec                                                                                              Dose Calculations) or measured Figure 3.4-1.).                                                                                              dose rates from off-site surveys OR                                                                                                indicate site boundary (1 mile)
: 1. Process monitors or area radiation surveys indicate increased letdown activity AND
B. Coolant activity greater than                                                                                  exposure levels have been 100/E pCi/gram specific                                                                                      exceeded as indicated by either A, activity.                                                                                                    B, C or D below:
: 2. Confirmed RCS sample indicating:
A. Coolant activity greater than the Tech Spec limit for iodine spike (Tech Spec Figure 3.4-1.).
OR B. Coolant activity greater than 100/E pCi/gram specific activity.
NOTE If analysis is not available within one hour and it is expected that activity is greater than Tech Spec limit, classify as UNUSUAL EVENT.
ALERT Fuel element failure
: 1. Process monitors or area radiation surveys indicate increased letdown activity and confirmed RCS Samples indicating DEQ 1-131 activity greater than or equal to 275 pCi/mL.
SITE AREA EMERGENCY Fuel element failure with in2ehinIIate core cooling
: 1. RCS DEQ 1-131 activity greater than or equal to 275 pCi/mL.
AND
: 2.
Highest CET per core quadrant indicates greater than 1 0&deg;F superheat or 700&deg;F.
GENERAL EMERGENCY A release has occurred or is in Progress resulting in:
: 1. Containment High Range Radiation monitor greater than 1.46 X 10' R/hr (If CHRRM inoperable, Post-LOCA monitors greater than 1000 mR/hr).
OR
: 2. Performance of EPIP-09 (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile) exposure levels have been exceeded as indicated by either A, B, C or D below:
A. 1000 mrem/hr (total dose rate)
A. 1000 mrem/hr (total dose rate)
NOTE                                    NOTE If analysis is not available within        If analysis is not available                                              B. 1000 mrem (total dose - TEDE) one hour and it is expected that          within one hour and it is activity is greater than Tech              expected that RCS activity for                                          C. 5000 mrem/hr (thyroid dose Spec limit, classify as                    DEQ 1-131 is greater than 275                                                rate)
B. 1000 mrem (total dose - TEDE)
UNUSUAL EVENT.                            pCi/mL, classify as an ALERT.
C. 5000 mrem/hr (thyroid dose rate)
D. 5000 mrem (thyroid dose -
D. 5000 mrem (thyroid dose -
CDE) 4.A   FUEL ELEMENT FAILURE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
CDE)
NOTE If analysis is not available within one hour and it is expected that RCS activity for DEQ 1-131 is greater than 275 pCi/mL, classify as an ALERT.
4.A FUEL ELEMENT FAILURE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:       PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                                         23 of 32 EPIP-01                                               ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 11 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
EVENTICLASS           UNUSUAL EVENT                      ALERT                        SITE AREA EMERGENCY            GENERAL EMERGENCY 4.B. FUEL HANDLING                           Fuel handling accident which results &sect;z Major damage to irradiated fuel in ACCIDENT                                in the release of radioactivity to      Containment or Fuel Handling Containment or Fuel Handling           Building Buildingq:
23 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 11 of 20)
: 1. Affected area radiation monitor
EVENTICLASS 4.B. FUEL HANDLING ACCIDENT UNUSUAL EVENT ALERT Fuel handling accident which results in the release of radioactivity to Containment or Fuel Handling Buildingq:
: 1. SM/EC determines that an                greater than 1000 mrem/hr.
: 1. SM/EC determines that an irradiated fuel assembly may have been damaged.
irradiated fuel assembly may                        AND have been damaged.                2. Damage to more than one AND                    irradiated fuel assembly.
AND
: 2. Associated area or process                            OR radiation monitors are in alarm.      Major damage resulting from uncovering of one or more irradiated fuel assemblies in the Spent Fuel Pool.
: 2. Associated area or process radiation monitors are in alarm.
4.8. FUEL HANDLING ACCIDENT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
SITE AREA EMERGENCY
&sect;z Major damage to irradiated fuel in Containment or Fuel Handling Building
: 1. Affected area radiation monitor greater than 1000 mrem/hr.
AND
: 2. Damage to more than one irradiated fuel assembly.
OR Major damage resulting from uncovering of one or more irradiated fuel assemblies in the Spent Fuel Pool.
GENERAL EMERGENCY 4.8. FUEL HANDLING ACCIDENT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:       PROCEDURE TITLE:                                                                                                                                       PAGE:
REVISION NO.:
8                                                 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                                                                                   24 of 32 EPIP-01                                                                   ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 12 of 20)
PROCEDURE TITLE:
EVENT/CLASS                 UNUSUAL EVENT                                  ALERT                          SITE AREA EMERGENCY                      GENERAL EMERGENCY 5.A EARTHQUAKE     &sect;2 A confirmed earthquake has occurred &sect;2 A confirmed earthquake has occurred.       A confirmed earthquake has occurred.
PAGE:
                                                                                                            &sect;2                                                              NOTE Refer to Potential Core Melt Event /
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
: 1. A confirmed earthquake has been      1. A confirmed earthquake has             1. A confirmed earthquake has               Class 6.A.
24 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 12 of 20)
experienced within the Owner             occurred which registered                  occurred which registered Controlled Area.                         GREATER THAN 0.05g within the             GREATER THAN 0.1g within the OR                        Owner Controlled Area.                    Owner Controlled Area and the plant
EVENT/CLASS 5.A EARTHQUAKE UNUSUAL EVENT
: 2. &#xb6;4 An earthquake is detected by                            OR                        not in Cold Shutdown.
&sect;2 A confirmed earthquake has occurred
plant seismic monitor            2. A confirmed earthquake has                                OR instruments or other means.          occurred that could or has caused      2. A confirmed earthquake has trip of the turbine generator or          occurred that has caused loss of any reactor.                                  safety system function (e.g., both trains inoperable).
: 1. A confirmed earthquake has been experienced within the Owner Controlled Area.
5.B. HURRICANE          Hurricane Warning                        Hurricane warning with winds near          Hurricane warning with winds                                NOTE design basis                              GREATER THAN design basis                 Refer to Potential Core Melt Event /
OR
: 2. &#xb6;4 An earthquake is detected by plant seismic monitor instruments or other means.
ALERT SITE AREA EMERGENCY GENERAL EMERGENCY
&sect;2 A confirmed earthquake has occurred.  
&sect;2 A confirmed earthquake has occurred.
NOTE Refer to Potential Core Melt Event /
Class 6.A.
5.B. HURRICANE Hurricane Warning
: 1. Confirmed hurricane warning is in effect.
: 1.
A confirmed earthquake has occurred which registered GREATER THAN 0.05g within the Owner Controlled Area.
OR
: 2.
A confirmed earthquake has occurred that could or has caused trip of the turbine generator or reactor.
Hurricane warning with winds near design basis
: 1.
Confirmed hurricane warning is in effect and winds are expected to exceed 175 mph within the Owner Controlled Area.
NOTE At FPL's request, NOAA will provide an accurate projection of wind speeds onsite 24 hours prior to the onset of hurricane force winds. If that projection is not available within 12 hours of entering into the warning, classify the event using current track and wind speeds to project onsite conditions. For example, projected onsite wind speed would be less than maximum hurricane wind speed if the track is away from PSL.
: 1. A confirmed earthquake has occurred which registered GREATER THAN 0.1g within the Owner Controlled Area and the plant not in Cold Shutdown.
OR
: 2. A confirmed earthquake has occurred that has caused loss of any safety system function (e.g., both trains inoperable).
Hurricane warning with winds GREATER THAN design basis
: 1. Plant not at cold shutdown.
AND
: 2. Confirmed hurricane warning is in effect and winds are expected to exceed 194 mph within the Owner Controlled Area.
NOTE Refer to Potential Core Melt Event /
Class 6.A.
Class 6.A.
: 1. Confirmed hurricane warning is in    1. Confirmed hurricane warning is in      1. Plant not at cold shutdown.
NOTE At FPL's request, NOAA will provide an accurate projection of wind speeds onsite 24 hours prior to the onset of hurricane force winds. If that projection is not available within 12 hours of entering into the warning, classify the event using current track and wind speeds to project onsite conditions. For example, projected onsite wind speed would be less than maximum hurricane wind speed if the track is away from PSL 5.A EARTHQUAKE 5.B. HURRICANE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
effect.                                  effect and winds are expected to                          AND exceed 175 mph within the Owner        2. Confirmed hurricane warning is in Controlled Area.                          effect and winds are expected to exceed 194 mph within the Owner Controlled Area.
NOTE                                        NOTE At FPL's request, NOAA will provide an         At FPL's request, NOAA will provide an accurate projection of wind speeds onsite    accurate projection of wind speeds onsite 24 hours prior to the onset of hurricane     24 hours prior to the onset of hurricane force winds. If that projection is not        force winds. If that projection is not available within 12 hours of entering into    available within 12 hours of entering into the warning, classify the event using          the warning, classify the event using current track and wind speeds to project      current track and wind speeds to project onsite conditions. For example, projected     onsite conditions. For example, projected onsite wind speed would be less than          onsite wind speed would be less than maximum hurricane wind speed if the track     maximum hurricane wind speed ifthe track is away from PSL.                              is away from PSL 5.A   EARTHQUAKE 5.B. HURRICANE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:         PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                                   CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
25 of 32 EPIP-01                                                               ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 13 of 20)
25 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 13 of 20)
EVENT/CLASS                 UNUSUAL EVENT                                ALERT                        SITE AREA EMERGENCY                  GENERAL EMERGENCY 5.C. TORNADO           Notification of a tornado sighted in     &sect;2 Any tornado striking the Power                                                         NOTE the Owner Controlled Area                    Block.                                                                 Refer to Potential Core Melt Event /
EVENT/CLASS 5.C. TORNADO 5.D. ABNORMAL WATER LEVEL UNUSUAL EVENT Notification of a tornado sighted in the Owner Controlled Area Abnormal water level conditions are expected or occurring
: 1. Low intake canal level of -10.5 ft.
MLW for 1 hour or more.
OR
: 2. Visual sightings by station personnel that water levels are approaching storm drain system capacity.
ALERT
&sect;2 Any tornado striking the Power Block.
Flood, low water, hurricane surge or other abnormal water level conditions
: 1. The storm drain capacity is exceeded during hurricane surge or known flood conditions.
OR
: 2. Low intake canal level of -10.5 ft.
MLW for 1 hour or more with emergency barrier valves open.
SITE AREA EMERGENCY GENERAL EMERGENCY NOTE Refer to Potential Core Melt Event /
Class 6.A.
Class 6.A.
5.D. ABNORMAL WATER    Abnormal water level conditions are      Flood, low water, hurricane surge or   Flood, low water, hurricane surge or LEVEL            expected or occurring                    other abnormal water level            other abnormal water level conditions                            conditions causing failure of vital
Flood, low water, hurricane surge or other abnormal water level conditions causing failure of vital equipment
: 1. Low intake canal level of -10.5 ft.                                          equipment MLW for 1 hour or more.              1. The storm drain capacity is OR                      exceeded during hurricane surge    1. Flood/surge water level reaching
: 1. Flood/surge water level reaching elevation +19.5 ft. (turbine building / RAB ground floor).
: 2. Visual sightings by station              or known flood conditions.              elevation +19.5 ft. (turbine personnel that water levels are                        OR                        building / RAB ground floor).
OR
approaching storm drain system        2. Low intake canal level of -10.5 ft.                  OR capacity.                                MLW for 1 hour or more with        2. Low intake canal level has emergency barrier valves open.          caused the loss of all ICW flow.
: 2.
Low intake canal level has caused the loss of all ICW flow.
5.C. TORNADO 5.D. ABNORMAL WATER LEVEL AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
5.C. TORNADO 5.D. ABNORMAL WATER LEVEL AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:                 PROCEDURE TITLE:
REVISION NO.:
PROCEDURE TITLE:
PAGE:
PAGE:
8                                                                 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:                                                                                                                                                                                                 26 of 32 EPIP-01                                                                                 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 14 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
IAtyNOTE
26 of 32 EPIP-01 ST. LUCIE PLANT EVENT/CLASS 6.A.
INCREASED AWARENESS OR POTENTIAL CORE MEL (Page 1 of 2)
ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 14 of 20)
I AtyNOTE
[Activation of the Emergency Response Facilities does not require claration of an emergency or entry into a specific emergency classification.
[Activation of the Emergency Response Facilities does not require claration of an emergency or entry into a specific emergency classification.
EVENT/CLASS                            UNUSUAL EVENT                                       ALERT                               SITE AREA EMERGENCY                               GENERAL EMERGENCY 6.A. INCREASED                    Emergency Coordinators judgement that       &sect;2 Emergency Coordinator's udgement that plant conditions exist which warrant                                                      &sect;2 Emergency Coordinator's judgement that       &sect;2   Emergency Coordinator's judgement that AWARENESS OR                                                                plant conditions exist which have a           plant conditions exist which are                 plant conditions exist that make release of POTENTIAL CORE MELLT          increased awareness on the part of the         potential todegrade the level of safety at operating staff and/or local authorities                                                      significantly degrading in an uncontrollable     large amounts of radioactivity in a short (Page 1 of 2)                                                                the plant,                                     manner,                                         period appear possible or likely. (Any core
UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY Emergency Coordinators judgement that  
: 1. The plant is shutdown under abnormal                                                                                                       melt situation.)
&sect;2 Emergency Coordinator's udgement that  
conditions (e.g., exceeding cooldown rates or primary system pipe cracks are                                                                                                    1. LOCA with failure of ECCS leading to found during operation),                                                                                                                        severe core degradation or melt.
&sect;2 Emergency Coordinator's judgement that  
OR                                                                                                                                               OR
&sect;2 Emergency Coordinator's judgement that plant conditions exist which warrant plant conditions exist which have a plant conditions exist which are plant conditions exist that make release of LT increased awareness on the part of the potential to degrade the level of safety at significantly degrading in an uncontrollable large amounts of radioactivity in a short operating staff and/or local authorities the plant,
: 2. Any plant shutdown required by                                                                                                             2. LOCA with initially successful ECCS Technical Specifications in which the                                                                                                           and subsequent failure of containment required shutdown is not reached                                                                                                                heat removal systems for greater than within action limits.                                                                                                                           2 hours.            OR OR
: manner, period appear possible or likely. (Any core melt situation.)
: 1. The plant is shutdown under abnormal conditions (e.g., exceeding cooldown
: 1. LOCA with failure of ECCS leading to rates or primary system pipe cracks are severe core degradation or melt.
found during operation),
OR OR
: 2. LOCA with initially successful ECCS
: 2. Any plant shutdown required by and subsequent failure of containment Technical Specifications in which the heat removal systems for greater than required shutdown is not reached 2 hours.
within action limits.
OR OR
: 3. Total loss of feedwater followed by failure of once-through-cooling (ECCS) to adequately cool the core.
: 3. Total loss of feedwater followed by failure of once-through-cooling (ECCS) to adequately cool the core.
OR
OR
Line 1,378: Line 2,479:
OR
OR
: 6. Any major internal or external event (e.g., fire, earthquake or tornado substantially beyond design basis) which in the ECs opinion has or could cause massive damage to plant systems resulting in any of the above.
: 6. Any major internal or external event (e.g., fire, earthquake or tornado substantially beyond design basis) which in the ECs opinion has or could cause massive damage to plant systems resulting in any of the above.
6.A. INCREASED AWARENES                                                                                                                                                                       (continued on next page)
(continued on next page) 6.A.
      %J*ru I ILN I IALCORE MELT AFTER     CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
INCREASED AWARENES
%J* ru I ILN I IAL CORE MELT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:       PROCEDURE TITLE:                                                                         PAGE:
REVISION NO.:
8                                 CLASSIFICATION OF EMERGENCIES                                         27of32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                       ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 15 of 20)
PAGE:
EVENTICLASS           UNUSUAL EVENT             ALERT             SITE AREA EMERGENCY     GENERAL EMERGENCY 6.A. INCREASED                                                                                              NOTES AWARENESS OR                                                                            1. Most likely containment failure POTENTIAL CORE                                                                              mode is melt-through with MELT                                                                                        release of gases only.
8 CLASSIFICATION OF EMERGENCIES 27of32 PROCEDURE NO.:
(Page 2 of 2)                                                                              Quicker releases are expected for failure of containment isolation system.
EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 15 of 20)
EVENTICLASS 6.A. INCREASED AWARENESS OR POTENTIAL CORE MELT (Page 2 of 2) 6.A. INCREASED AWARENESS OR POTENTIAL CORE MELT UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY NOTES
: 1. Most likely containment failure mode is melt-through with release of gases only.
Quicker releases are expected for failure of containment isolation system.
: 2. General Emergency must be declared for the above listed events. The likelihood of corrective action (repair of AFW pump, etc.) should not be considered.
: 2. General Emergency must be declared for the above listed events. The likelihood of corrective action (repair of AFW pump, etc.) should not be considered.
6.A. INCREASED AWARENESS OR POTENTIAL CORE MELT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


(
(
REVISION NO.:       PROCEDURE TITLE:                                                                                                                         PAGE:
REVISION NO.:
8                                                   CLASSIFICATION OF EMERGENCIES                                                                       28Aof 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                                                 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 16 of 20)
PAGE:
EVENT/CLASS               UNUSUAL EVENT                                    ALERT                        SITE AREA EMERGENCY                GENERAL EMERGENCY 7.A. LOSS OF POWER   Loss of off-site power or loss of all   &sect;z Station Blackout (Total Loss of AC) &sect;2 Station Blackout (Total Loss of AC)                 NOTE on-site AC power capability.                                                      for GREATER THAN 15 minutes            Refer to Potential Core Melt
8 CLASSIFICATION OF EMERGENCIES 28Aof 32 PROCEDURE NO.:
: 1. Loss of off-site AC power.                                                  Event / Class 6.A.
EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 16 of 20)
: 1. Loss of off-site AC power.                               AND                 1. Loss of offsite AC power.
EVENT/CLASS 7.A. LOSS OF POWER UNUSUAL EVENT Loss of off-site power or loss of all on-site AC power capability.
OR                      2. Failure of both emergency diesel                       AND
: 1. Loss of off-site AC power.
: 2. Loss of capability to power at least        generators to start or load.      2. Sustained failure of both one vital 4.16 kv bus from any                                                    emergency diesel generators to available emergency diesel                                                        start or load.
OR
generator.                                                                                        AND Loss of all on-site DC power          3. Failure to restore AC power to at least one vital 4.16 kv bus within
: 2. Loss of capability to power at least one vital 4.16 kv bus from any available emergency diesel generator.
: 1. Drop in A and B DC bus voltages        15 minutes.
ALERT SITE AREA EMERGENCY
to less than 70 VDC.
&sect;z Station Blackout (Total Loss of AC)  
Loss of all vital on-site DC fororeater than 15 minutes
&sect;2 Station Blackout (Total Loss of AC)
GENERAL EMERGENCY NOTE Refer to Potential Core Melt Event / Class 6.A.
for GREATER THAN 15 minutes
: 1. Loss of off-site AC power.
AND
: 2. Failure of both emergency diesel generators to start or load.
Loss of all on-site DC power
: 1. Drop in A and B DC bus voltages to less than 70 VDC.
1.
2.
Loss of offsite AC power.
AND Sustained failure of both emergency diesel generators to start or load.
AND
: 3. Failure to restore AC power to at least one vital 4.16 kv bus within 15 minutes.
Loss of all vital on-site DC for oreater than 15 minutes
: 1. Sustained drop in A and B DC bus voltages to 70 VDC for greater than 15 minutes.
: 1. Sustained drop in A and B DC bus voltages to 70 VDC for greater than 15 minutes.
7.A. LOSS OF POWER AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
7.A. LOSS OF POWER AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:           PROCEDURE TITLE:                                                                                                             PAGE:
REVISION NO.:
8                                   CLASSIFICATION OF EMERGENCIES                                                                               29Aof 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                                   ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 17 of 20)
PAGE:
EVENTICLASS               UNUSUAL EVENT                      ALERT                          SITE AREA EMERGENCY                    GENERAL EMERGENCY 8.A. LOSS OF PLANT                               Loss of Plant Control Functions          Critical Loss of Plant Control Functions                 NOTE CONTROL FUNCTIONS                                                                                                                Refer to Potential Core Melt Event
8 CLASSIFICATION OF EMERGENCIES 29Aof 32 PROCEDURE NO.:
: 1. Complete loss of any function         1. Loss of any function or system          Class 6A.
EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 17 of 20)
needed for plant cold shutdown.           which, in the opinion of the OR                       Emergency Coordinator, precludes
EVENTICLASS 8.A. LOSS OF PLANT CONTROL FUNCTIONS UNUSUAL EVENT ALERT Loss of Plant Control Functions
: 2. Failure of the Reactor Protection         placing the plant in Hot Shutdown.
: 1. Complete loss of any function needed for plant cold shutdown.
System to bring the reactor                                 OR subcritical when needed.               2. Failure of the RPS to trip the reactor OR                       when needed and operator actions
OR
: 3. Control Room is evacuated (for other       fail to bring the reactor subcritical.
: 2. Failure of the Reactor Protection System to bring the reactor subcritical when needed.
than drill purposes) with control                           OR established locally at the Hot        3. Control Room is evacuated (for Shutdown Control Panel.                    other than drill purposes) and control cannot be established locally at the Hot Shutdown Control Panel within 15 minutes.
OR
: 3. Control Room is evacuated (for other than drill purposes) with control established locally at the Hot Shutdown Control Panel.
Loss of Shutdown Coolino
Loss of Shutdown Coolino
: 1. Complete loss of functions needed to maintain cold shutdown.
: 1. Complete loss of functions needed to maintain cold shutdown.
A. Failure of shutdown cooling systems, resulting in loss of cold shutdown conditions.
A. Failure of shutdown cooling systems, resulting in loss of cold shutdown conditions.
AND B RCS subcooling can NOT be maintained greater than 0&deg;F.
AND B RCS subcooling can NOT be maintained greater than 0&deg;F.
SITE AREA EMERGENCY Critical Loss of Plant Control Functions
: 1. Loss of any function or system which, in the opinion of the Emergency Coordinator, precludes placing the plant in Hot Shutdown.
OR
: 2. Failure of the RPS to trip the reactor when needed and operator actions fail to bring the reactor subcritical.
OR
: 3. Control Room is evacuated (for other than drill purposes) and control cannot be established locally at the Hot Shutdown Control Panel within 15 minutes.
GENERAL EMERGENCY NOTE Refer to Potential Core Melt Event Class 6A.
8.A LOSS OF PLANT CONTROL FUNCTIONS AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
8.A LOSS OF PLANT CONTROL FUNCTIONS AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:           PROCEDURE TITLE:
REVISION NO.:
8                                                     CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                                                   ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 18 of 20)
8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:
ALERT                    SITE AREA EMERGENCY              GENERAL EMERGENCY EVENT/CLASS                 UNUSUAL EVENT Loss of alarms                    Loss of alarms/monitoring 8.B. LOSS OF ALARMS I   &sect;2 Significant loss of effluent monitoring &sect;2 COMMUNICATION /      capability, communications,
EPIP-01 ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 18 of 20)
: 1. Unplanned loss of most (greater 1. Inability to monitor* a significant MONITORING          indication and alarm panels, etc.,
EVENT/CLASS 8.B. LOSS OF ALARMS I COMMUNICATION /
which impairs ability to perform               than 75%) or all safety system    transient in progress.
MONITORING UNUSUAL EVENT
accident or emergency assessment.              annunciators.
&sect;2 Significant loss of effluent monitoring capability, communications, indication and alarm panels, etc.,
AND
which impairs ability to perform accident or emergency assessment.
: 1. Loss of effluent or radiological       2. Plant transient in progress.
: 1. Loss of effluent or radiological monitoring capability requiring plant shutdown.
monitoring capability requiring plant shutdown.
OR
OR
: 2. Loss of all primary and backup communication capability with offsite locations.
: 2. Loss of all primary and backup communication capability with offsite locations.
OR
OR
: 3. Unplanned loss of most (greater than 75%) or all Safety System annunciators for greater than 15 minutes.
: 3. Unplanned loss of most (greater than 75%) or all Safety System annunciators for greater than 15 minutes.
                                                                                                          *Monitoring means loss of ERDADS, QSPDS and/or the inability to determine any one of the following:
ALERT
&sect;2 Loss of alarms
: 1. Unplanned loss of most (greater than 75%) or all safety system annunciators.
AND
: 2. Plant transient in progress.
SITE AREA EMERGENCY Loss of alarms/monitoring
: 1. Inability to monitor* a significant transient in progress.
GENERAL EMERGENCY
*Monitoring means loss of ERDADS, QSPDS and/or the inability to determine any one of the following:
reactivity control, core cooling, RCS status or containment integrity.
reactivity control, core cooling, RCS status or containment integrity.
8.B. LOSS OF ALARMS /
8.B. LOSS OF ALARMS /
Line 1,441: Line 2,575:
MONITORING AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
MONITORING AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:           PROCEDURE TITLE:                                                                                                                   PAGE:
REVISION NO.:
8                                                       CLASSIFICATION OF EMERGENCIES                                                                 3: of 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                                                     ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 19 of 20)
PAGE:
EVENTICLASS                     UNUSUAL EVENT                                    ALERT                            SITE AREA EMERGENCY          GENERAL EMERGENCY 9.A. AIRCRAFT / MISSILE   Unusual aircraft activity               &sect;2 Aircraft/missile impact                 &sect;2 Damage to vital systems from aircraft/missiles
8 CLASSIFICATION OF EMERGENCIES 3: of 32 PROCEDURE NO.:
: 1. Aircraft crash in the Owner            1. Aircraft crash into the Power Block.
EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 19 of 20)
Controlled Area or unusual aircraft                        OR                     1. Aircraft crash into the Power activity over facility that in the      2. Visual or audible indication of             Block damaging vital plant opinion of the SM/EC, could                missile impact on the Power Block.         systems.
EVENTICLASS 9.A. AIRCRAFT / MISSILE UNUSUAL EVENT Unusual aircraft activity
threaten the safety of the plant or                                                                  OR personnel.                                                                        2. Damage resulting in loss of safe shutdown equipment from any missile.
: 1. Aircraft crash in the Owner Controlled Area or unusual aircraft activity over facility that in the opinion of the SM/EC, could threaten the safety of the plant or personnel.
9.B. TURBINE FAILURE       Turbine rotating component failure        Visual indication that the turbine causing rapid plant shutdown.              casing has been penetrated by blading.
Turbine rotating component failure causing rapid plant shutdown.
9.C. TOXIC OR             Unplanned/uncontrolled toxic or            Entry of toxic or flammable aas into      Toxic or flammable gas has diffused
Unplanned/uncontrolled toxic or flammable gas release in the Owner ALERT
                                                                                                                &sect;2 FLAMMABLE GAS        flammable gas release in the Owner        areas potentially affecting plant          into vital areas compromising the Controlled Area that could affect          operation.                                function of safety related equipment plant/personnel safety.                                                              (e.g., both trains rendered inoperable).
&sect;2 Aircraft/missile impact
: 1. Aircraft crash into the Power Block.
OR
: 2. Visual or audible indication of missile impact on the Power Block.
Visual indication that the turbine casing has been penetrated by blading.
Entry of toxic or flammable aas into SITE AREA EMERGENCY
&sect;2 Damage to vital systems from aircraft/missiles
: 1. Aircraft crash into the Power Block damaging vital plant systems.
OR
: 2. Damage resulting in loss of safe shutdown equipment from any missile.
GENERAL EMERGENCY 9.B. TURBINE FAILURE 9.C. TOXIC OR FLAMMABLE GAS Controlled Area that could affect plant/personnel safety.
areas potentially affecting plant operation.
&sect;2 Toxic or flammable gas has diffused into vital areas compromising the function of safety related equipment (e.g., both trains rendered inoperable).
9.A. AIRCRAFT/MISSILE 9.B. TURBINE FAILURE 9.C. TOXIC OR FLAMMABLE GAS AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR
9.A. AIRCRAFT/MISSILE 9.B. TURBINE FAILURE 9.C. TOXIC OR FLAMMABLE GAS AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR


REVISION NO.:         PROCEDURE TITLE:                                                                                                                       PAGE:
REVISION NO.:
8                                                 CLASSIFICATION OF EMERGENCIES                                                                         3: of 32 PROCEDURE NO.:
PROCEDURE TITLE:
EPIP-01                                                             ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 20 of 20)
PAGE:
EVENTICLASS                 UNUSUAL EVENT                              ALERT                      SITE AREA EMERGENCY                    GENERAL EMERGENCY
8 CLASSIFICATION OF EMERGENCIES 3: of 32 PROCEDURE NO.:
: 10. SECURITY THREAT   A SECURITY ALERT has been             A SECURITY EMERGENCY has            A SECURITY EMERGENCY                  A successful takeover of the plant called by the Security Force in       been called by the Security Force as involving imminent occupancy of the   including the Control Room or any response to one or more of the items  defined in the Safeguards            control room or other area(s) vital to other area(s) vital to the operation of listed below.                          Contingency Plan.                    the operation of the reactor as        the reactor as defined in the defined in the Safeguards              Safeguards Contingency Plan.
EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 20 of 20)
: 1. Bomb threat                                                           Contingency Plan.
EVENTICLASS
: 2. Attack threat LandNehicle Waterborne Airborne Insider
: 10. SECURITY THREAT UNUSUAL EVENT A SECURITY ALERT has been called by the Security Force in response to one or more of the items ALERT A SECURITY EMERGENCY has been called by the Security Force as defined in the Safeguards Contingency Plan.
: 3. Security Threat
SITE AREA EMERGENCY A SECURITY EMERGENCY involving imminent occupancy of the control room or other area(s) vital to the operation of the reactor as defined in the Safeguards Contingency Plan.
: 4. Protected Area intrusion attempt or breach
GENERAL EMERGENCY A successful takeover of the plant including the Control Room or any other area(s) vital to the operation of the reactor as defined in the Safeguards Contingency Plan.
: 5. Sabotage attempt
listed below.
: 6. Internal disturbance
: 1.
: 7. Civil disturbance
Bomb threat
: 8. Vital Area intrusion
: 2.
: 9. Security Force strike
Attack threat LandNehicle Waterborne Airborne Insider
: 3.
Security Threat
: 4.
Protected Area intrusion attempt or breach
: 5.
Sabotage attempt
: 6.
Internal disturbance
: 7.
Civil disturbance
: 8.
Vital Area intrusion
: 9.
Security Force strike
: 10. Credible site-specific Security Threat notification
: 10. Credible site-specific Security Threat notification
: 11. Extortion/Coercion/Hostage Threat against plant
: 11. Extortion/Coercion/Hostage Threat against plant
Line 1,473: Line 2,633:


Procedure No.
Procedure No.
ST. LUCIE PLANT                                         EPIP-08 Current Revision No.
ST. LUCIE PLANT EPIP-08 EMERGENCY PLAN Current Revision No.
EMERGENCY PLAN 6A IMPLEMENTING PROCEDURE Effective Date SAFETY RELATED                                 01/08104
IMPLEMENTING PROCEDURE 6A Effective Date SAFETY RELATED 01/08104


==Title:==
==Title:==
PROTECTIVE OFF-SITE NOTIFICATIONS AND ACTION RECOMMENDATIONS PLANNING Responsible Department: EMERGENCY REVISION  
OFF-SITE NOTIFICATIONS AND PROTECTIVE ACTION RECOMMENDATIONS Responsible Department: EMERGENCY PLANNING REVISION  


==SUMMARY==
==SUMMARY==
(M.
Revision 6A - Incorporated PCR 03-3535 to put Attachment 2 in forms database. (M.
to put Attachment 2 in forms database.
Cooper, 12/10/03)
Revision 6A - Incorporated PCR 03-3535 Cooper, 12/10/03) form.
Revision 6 - Incorporated PCR 03-2272 for CR 03-2568 to revise State Notification form.
for CR 03-2568 to revise State Notification Revision 6 - Incorporated PCR 03-2272                                            form. Improve instructions for completing State Delete supplemental data sheet. Revise 2003-12). (J.R. Walker, 08/29/03) guidance relative to changing PARs (RIS        AND to incorporate shift communicator position.
Delete supplemental data sheet. Revise instructions for completing State form. Improve guidance relative to changing PARs (RIS 2003-12). (J.R. Walker, 08/29/03)
Incorporated PCR 03-1637 for MA 03-04-082 (A. Terezakis, 08/06/03) local
AND Incorporated PCR 03-1637 for MA 03-04-082 to incorporate shift communicator position.
                                                  / administrative changes and removed Revision 5 - Clarified duties, made editorial government radio. (J. R. Walker, 07/26/02)
(A. Terezakis, 08/06/03)
Clarified notification of rapidly degrading events.
Revision 5 - Clarified duties, made editorial / administrative changes and removed local government radio. (J. R. Walker, 07/26/02)
Revision 4 - Clarified instructions regarding                changes. (J.R. Walker,     10/11/01) stability class instructions. Made administrative/editorial Approval Date            SOPS FRG Review Date         Approved By Revision                                                        05/31/00        DATE 05130/00             R. G. West 0                                                                          DOCT      PROCEDURE Plant General Manager Approval Date       DOCN       EPIP-08 FRG Review Date          Approved By Revision                                                        08/29/03        SYS 08/28/03             R.E. Rose 6A                                                                            COM      COMPLETED Plant General Manager                                         6A ITM N/A Designated Approver D. Calabrese               12/10/03 Designated Approver (Minor Correction)
Revision 4 - Clarified instructions regarding notification of rapidly degrading events. Clarified stability class instructions. Made administrative/editorial changes. (J.R. Walker, 10/11/01)
Revision FRG Review Date Approved By Approval Date SOPS 0
05130/00 R. G. West 05/31/00 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN EPIP-08 6A 08/28/03 R.E. Rose 08/29/03 SYS Plant General Manager COM COMPLETED N/A ITM 6A Designated Approver D. Calabrese 12/10/03 Designated Approver (Minor Correction)


REVISION NO.:             PROCEDURE TITLE:                                                                               PAGE:
REVISION NO.:
6A                 OFF-SITE NOTIFICATIONS AND PROTECTIVE                                                             2 of 49 PROCEDURE NO.:                             ACTION RECOMMENDATIONS EPIP-08                                         ST. LUCIE PLANT TABLE OF CONTENTS SECTION                                                                                                                     PAGE 1.0     P UR P O S E .......................................................................................................               3
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 2 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT TABLE OF CONTENTS SECTION PAGE 1.0 P U R P O S E.......................................................................................................
3


==2.0     REFERENCES==
==2.0 REFERENCES==
  / RECORDS REQUIRED / COMMITMENT DOCUMENTS ........... 8 3.0     R E S P O NS IBILIT IES ...........................................................................................                 9 4 .0   D E F INIT IO NS ..................................................................................................           . . 11 5 .0   INS T R UC T IO NS ................................................................................................               13 5.1     State and County Notification ................................................................                             13 5.2     Nuclear Regulatory Commission (NRC) Notification ..............................                                           16 5.3     E rroneous Inform ation .............................................................................                     17 APPENDICES APPENDIX A           NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM ......                                                                   18 APPENDIX B           NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (T S C ) ............................................................................................         . . . 22 APPENDIX C           NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FA C ILIT Y (E O F) ...............................................................................                   27 ATTACHMENTS ATTACHMENT 1               FLORIDA NUCLE AR PL ANT FI:IPr=IKPIrv                                           MK'TIn'Ii       TIr' I FO R M .....................................................................................               . . 33 ATTACHMENT 1A              DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM ........................ 34 ATTACHMENT 2              DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs) ...............................................                                         41 ATTACHMENT 3              NRC REACTOR PLANT EVENT NOTIFICATION WO R KS HE ET ...........................................................................                       46 ATTACHMENT 3A            DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET ....................... 48
  / RECORDS REQUIRED / COMMITMENT DOCUMENTS........... 8 3.0 R E S P O N S IB ILIT IE S...........................................................................................
9 4.0 D E F IN IT IO N S..................................................................................................  
.. 11 5.0 IN S T R U C T IO N S................................................................................................
13 5.1 State and County Notification................................................................
13 5.2 Nuclear Regulatory Commission (NRC) Notification.............................. 16 5.3 E rroneous Inform ation.............................................................................
17 APPENDICES APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM......
18 APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (T S C )............................................................................................  
... 2 2 APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FA C ILIT Y (E O F)...............................................................................
27 ATTACHMENTS ATTACHMENT 1 FLORIDA NUCLE AR PL ANT FI:IPr=IKPIrv MK'TIn'Ii TIr' I ATTACHMENT 1A ATTACHMENT 2 ATTACHMENT 3 ATTACHMENT 3A F O R M.....................................................................................  
.. 3 3 DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM........................ 34 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)...............................................
41 NRC REACTOR PLANT EVENT NOTIFICATION W O R K S H E ET...........................................................................
46 DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET....................... 48


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                       3 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT 1.0     PURPOSE 1.1     Discussion
PROCEDURE TITLE:
: 1. This procedure provides information and instructions for undertaking notifications of the State Warning Point (SWP) and the Nuclear Regulatory Commission (NRC) and for determination of Protective Action Recommendations (PARS).
PAGE:
: 2. This procedure is for use in the Control Room, Technical Support Center (TSC) and Emergency Operations Facility (EOF).
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 3 of 49 PROCEDURE NO.:
: 3. Upon declaration of an emergency classification the Nuclear Plant Supervisor (NPS) assumes the duties of the Emergency Coordinator (EC).
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.0 PURPOSE 1.1 Discussion
: 1.
This procedure provides information and instructions for undertaking notifications of the State Warning Point (SWP) and the Nuclear Regulatory Commission (NRC) and for determination of Protective Action Recommendations (PARS).
: 2.
This procedure is for use in the Control Room, Technical Support Center (TSC) and Emergency Operations Facility (EOF).
: 3.
Upon declaration of an emergency classification the Nuclear Plant Supervisor (NPS) assumes the duties of the Emergency Coordinator (EC).
The EC has initial responsibility for off-site notifications and PARs.
The EC has initial responsibility for off-site notifications and PARs.
: 4. Once the EOF is operational and proper turnover has been conducted, the Recovery Manager (RM) assumes responsibility for off-site notifications and PARs from the EC.
: 4.
: 5. At an Alert or higher level emergency, communications with the NRC transition to an open phone line from the TSC and the EOF (at a Site Area Emergency of higher level emergency).
Once the EOF is operational and proper turnover has been conducted, the Recovery Manager (RM) assumes responsibility for off-site notifications and PARs from the EC.
: 6. The following table illustrates which facility has a responsibility for Classification, Notification or PARs.
: 5.
Control Room                 TSC                     EOF (X until EC     (X when operational)       (X when operational) function transfers to the TSC)
At an Alert or higher level emergency, communications with the NRC transition to an open phone line from the TSC and the EOF (at a Site Area Emergency of higher level emergency).
Classifications       X transfers --       X Notifications         X transfers --       X transfers --           X PARs                 X transfers--         X transfers--             X
: 6.
: 7. Off-site Notification A.     Purpose of Off-Site Notifications FPL is required to notify off-site agencies in the event of any emergency that could threaten the health and safety of the public.
The following table illustrates which facility has a responsibility for Classification, Notification or PARs.
Control Room TSC EOF (X until EC (X when operational)
(X when operational) function transfers to the TSC)
Classifications X transfers --
X Notifications X transfers --
X transfers --
X PARs X transfers--
X transfers--
X
: 7.
Off-site Notification A.
Purpose of Off-Site Notifications FPL is required to notify off-site agencies in the event of any emergency that could threaten the health and safety of the public.
These notifications provide an early warning to agencies responsible for public protection.
These notifications provide an early warning to agencies responsible for public protection.


PROCEDURE TITLE:                                          PAGE:
REVISION NO.:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                       4 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT 1.1     Discussion (continued)
PROCEDURE TITLE:
: 7.     (continued)
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 4 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.1 Discussion (continued)
: 7.
(continued)
NOTE The State Department of Health (Bureau of Radiation Control) may not have their office staffed on a 24-hour basis. In the event that they do not answer the Hot Ring Down (HRD) telephone, the State Warning Point (SWP) assumes responsibility for notifying their duty officer.
NOTE The State Department of Health (Bureau of Radiation Control) may not have their office staffed on a 24-hour basis. In the event that they do not answer the Hot Ring Down (HRD) telephone, the State Warning Point (SWP) assumes responsibility for notifying their duty officer.
B.       Who Shall Be Notified
B.
* State Division of Emergency Management 0     State Department of Health (Bureau of Radiation Control)
Who Shall Be Notified State Division of Emergency Management 0
* St. Lucie County Emergency Operations Center
State Department of Health (Bureau of Radiation Control)
* Martin County Emergency Operations Center 0       NRC
St. Lucie County Emergency Operations Center Martin County Emergency Operations Center 0
: 1.     State and County Notification
NRC
: a. State and local agencies are notified by using the Hot Ring Down (HRD) telephone. The HRD rings the State Warning Point (SWP). The SWP puts the other agencies on line and reduces the need for individual calls.
: 1.
: b.     $4     After the State Coordinating Officer (SCO) arrives in the EOF, he / she can transfer "NET Control" to the EOF. When this occurs, the Recovery Manager's PAR Briefing becomes the primary notification method for the State and Counties. The Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) shall still be completed and provided to the SCO or his / her designee in the EOF. The EOP HRD Communicator should no longer contact the State Warning Point (SWP).
State and County Notification
: a.
State and local agencies are notified by using the Hot Ring Down (HRD) telephone. The HRD rings the State Warning Point (SWP). The SWP puts the other agencies on line and reduces the need for individual calls.
: b.  
$4 After the State Coordinating Officer (SCO) arrives in the EOF, he / she can transfer "NET Control" to the EOF. When this occurs, the Recovery Manager's PAR Briefing becomes the primary notification method for the State and Counties. The Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) shall still be completed and provided to the SCO or his / her designee in the EOF. The EOP HRD Communicator should no longer contact the State Warning Point (SWP).


REVISION NO.:         PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A           OFF-SITE NOTIFICATIONS AND PROTECTIVE                       5 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT 1.1     Discussion (continued)
PROCEDURE TITLE:
: 7. B.   (continued)
PAGE:
: 2.       NRC Notification
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 5 of 49 PROCEDURE NO.:
: a.     The NRC is notified using the Emergency Notification System (ENS) telephone.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.1 Discussion (continued)
: b.     NRC notifications occur through an open line of communication in the TSC and, when operational, the EOF.
: 7.
C. Emergency Follow-up Information Requests from State and local agencies.
B.
: 1.     Incoming calls should come via the SWP over the HRD phone.
(continued)
: 2.
NRC Notification
: a.
The NRC is notified using the Emergency Notification System (ENS) telephone.
: b.
NRC notifications occur through an open line of communication in the TSC and, when operational, the EOF.
C.
Emergency Follow-up Information Requests from State and local agencies.
: 1.
Incoming calls should come via the SWP over the HRD phone.
If the HRD is inoperable, the SWP may use commercial telephone or ESATCOM (emergency satellite phone). If an off-site authority contacts the plant without going through the SWP, request that they contact the SWP. SWP shall verify that the agency calling is a risk county or the Department of Health (DOH) and shall notify other county and state agencies of the updated information, thus reducing the number of calls that may be directed to the plant.
If the HRD is inoperable, the SWP may use commercial telephone or ESATCOM (emergency satellite phone). If an off-site authority contacts the plant without going through the SWP, request that they contact the SWP. SWP shall verify that the agency calling is a risk county or the Department of Health (DOH) and shall notify other county and state agencies of the updated information, thus reducing the number of calls that may be directed to the plant.
: 2.     Long, detailed explanations of plant systems or reactor theory should be avoided. If prompted for this kind of information by the State Duty Officer, he / she should be referred to the Nuclear Division Duty Officer (NDDO).
: 2.
: 3. If the State or one of the Counties provides either the TSC or EOF with new or pertinent information, Then bring that information to the attention of the EC or EC Assistant /
Long, detailed explanations of plant systems or reactor theory should be avoided. If prompted for this kind of information by the State Duty Officer, he / she should be referred to the Nuclear Division Duty Officer (NDDO).
: 3.
If the State or one of the Counties provides either the TSC or EOF with new or pertinent information, Then bring that information to the attention of the EC or EC Assistant /
Logkeeper in the TSC or the RM or the RM OPS Advisor I Logkeeper in the EOF.
Logkeeper in the TSC or the RM or the RM OPS Advisor I Logkeeper in the EOF.


REVISION NO.:         PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                         6 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT 1.1     Discussion (continued)
PROCEDURE TITLE:
: 8. Protective Action Recommendations A. Protective actions for the general public are ordinarily NOT required prior to declaration of a General Emergency. It is possible however, that due to unusually stable and constant meteorological conditions, protective actions could be recommended at a Site Area Emergency based on projected doses. This is the exception rather than the rule.
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 6 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.1 Discussion (continued)
: 8.
Protective Action Recommendations A.
Protective actions for the general public are ordinarily NOT required prior to declaration of a General Emergency. It is possible however, that due to unusually stable and constant meteorological conditions, protective actions could be recommended at a Site Area Emergency based on projected doses. This is the exception rather than the rule.
Protective actions for the general public are required to be recommended if a General Emergency is declared. Initial Protective Action Recommendations (PARs) are normally based on plant conditions. This would NOT be true if the General Emergency was declared based on off-site dose (either measured or projected) or a Security Emergency (per the Security Plan). The predetermined minimum PARs (based on plant conditions) are as given below.
Protective actions for the general public are required to be recommended if a General Emergency is declared. Initial Protective Action Recommendations (PARs) are normally based on plant conditions. This would NOT be true if the General Emergency was declared based on off-site dose (either measured or projected) or a Security Emergency (per the Security Plan). The predetermined minimum PARs (based on plant conditions) are as given below.
B. General Emergency - Minimum PARs
B.
: 1.       In any case where a GENERAL EMERGENCY has been declared, the minimum PAR shall be:
General Emergency - Minimum PARs
: 1.
In any case where a GENERAL EMERGENCY has been declared, the minimum PAR shall be:
Shelter all people within a 2-mile radius and out to 5 miles in the sectors affected. The sectors affected are at least three, the downwind sector plus the two adjacent sectors.
Shelter all people within a 2-mile radius and out to 5 miles in the sectors affected. The sectors affected are at least three, the downwind sector plus the two adjacent sectors.
: 2.       If a GENERAL EMERGENCY has been declared due to actual or projected severe core damage, the minimum PAR shall be:
: 2.
If a GENERAL EMERGENCY has been declared due to actual or projected severe core damage, the minimum PAR shall be:
Evacuate all people within a 2-mile radius from the plant and out to 5 miles in the sectors affected. Shelter all people in the remaining sectors from 2 to 5 miles and from 5 to 10 miles from the plant.
Evacuate all people within a 2-mile radius from the plant and out to 5 miles in the sectors affected. Shelter all people in the remaining sectors from 2 to 5 miles and from 5 to 10 miles from the plant.
: 3.       If a GENERAL EMERGENCY has been declared due to loss of physical control of the plant to intruders, including the Control Room or any other area(s) vital to the operation of the reactor system (as defined in the Security Plan), the minimum PAR shall be:
: 3.
If a GENERAL EMERGENCY has been declared due to loss of physical control of the plant to intruders, including the Control Room or any other area(s) vital to the operation of the reactor system (as defined in the Security Plan), the minimum PAR shall be:
Evacuate all people within a 2-mile radius from the plant and out to 5 miles in the sectors affected. Shelter all people in the remaining sectors from 2 to 5 miles and from 5 to 10 miles from the plant.
Evacuate all people within a 2-mile radius from the plant and out to 5 miles in the sectors affected. Shelter all people in the remaining sectors from 2 to 5 miles and from 5 to 10 miles from the plant.


REVISION NO.:         PROCEDURE TITLE:                                               PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                           7 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT 1.1     Discussion (continued)
PROCEDURE TITLE:
: 8.     (continued)
PAGE:
C. Once a release of radioactive material occurs, dose assessment should be utilized when evaluating PARs. The final determination of the PAR should consider all available information including off-site dose projections, plant conditions and field monitoring data. The most conservative recommendation shall be made.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 7 of 49 PROCEDURE NO.:
D. If it is anticipated that a PAR threshold will be exceeded, DO NOT wait until the threshold is exceeded to make that PAR.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.1 Discussion (continued)
E.     %12       Conditions (plant information, dose projections and field monitoring results) are to be continually assessed and PARs expanded, as necessary, to ensure that adequate (most conservative) PARs are issued.
: 8.
F.     &#xb6;12       Previously issued PARs, unless found to be less conservative, are to remain in effect until the threat is fully under control and the event is being de-escalated.
(continued)
G.     112     Only State and County officials can implement, change and/or terminate protective actions.
C.
Once a release of radioactive material occurs, dose assessment should be utilized when evaluating PARs. The final determination of the PAR should consider all available information including off-site dose projections, plant conditions and field monitoring data. The most conservative recommendation shall be made.
D.
If it is anticipated that a PAR threshold will be exceeded, DO NOT wait until the threshold is exceeded to make that PAR.
E.  
%12 Conditions (plant information, dose projections and field monitoring results) are to be continually assessed and PARs expanded, as necessary, to ensure that adequate (most conservative) PARs are issued.
F.  
&#xb6;12 Previously issued PARs, unless found to be less conservative, are to remain in effect until the threat is fully under control and the event is being de-escalated.
G.
112 Only State and County officials can implement, change and/or terminate protective actions.


REVISION NO.:           PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                 8 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 8 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT


==2.0       REFERENCES==
==2.0 REFERENCES==
  / RECORDS REQUIRED / COMMITMENT DOCUMENTS NOTE One or more of the following symbols may be used in this procedure:
  / RECORDS REQUIRED / COMMITMENT DOCUMENTS NOTE One or more of the following symbols may be used in this procedure:
          &sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
&sect; Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
          &#xb6; Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
&#xb6; Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
P Indicates a step that requires a sign off on a data sheet.
P Indicates a step that requires a sign off on a data sheet.
2.1     References
2.1 References
: 1.     St. Lucie Plant Updated Final Safety Analysis Report (UFSAR) Unit 1 and Unit 2
: 1.
: 2.     St. Lucie Plant Technical Specifications Unit 1 and Unit 2
St. Lucie Plant Updated Final Safety Analysis Report (UFSAR) Unit 1 and Unit 2
: 3.     &sect;1   St. Lucie Plant Radiological Emergency Plan (E-Plan)
: 2.
: 4.     E-Plan Implementing Procedures (EPIP 00 - 13)
St. Lucie Plant Technical Specifications Unit 1 and Unit 2
: 5.     St. Lucie Plant Emergency Response Directory (ERD)
: 3.  
: 6.     QI-1 7-PSL-1, Quality Assurance Records 2.2     Records Required
&sect;1 St. Lucie Plant Radiological Emergency Plan (E-Plan)
: 1.     All PAR worksheets and notifications forms (all attachments) shall be maintained in plant files in accordance with QI-1 7-PSL-1.
: 4.
2.3     Commitment Documents
E-Plan Implementing Procedures (EPIP 00 - 13)
: 1.     &#xb6;J   PMAI PM96-04-165, "ITR 96-006" (Unusual Event Declared Due to Dropped Rod)
: 5.
: 2.     &#xb6;2   PMAI PM96-09-185, Condition Report CR-96-1750 (Off-site Notification Using Commercial Phone)
St. Lucie Plant Emergency Response Directory (ERD)
: 3.     &#xb6;3     NRC Inspection Report 91-01, Closure of IFIs 89-31-03 and 89-31-01
: 6.
: 4.     &#xb6;4     Condition Report CR-00-0428 (Evaluated Exercise Critique)
QI-1 7-PSL-1, Quality Assurance Records 2.2 Records Required
: 1.
All PAR worksheets and notifications forms (all attachments) shall be maintained in plant files in accordance with QI-1 7-PSL-1.
2.3 Commitment Documents
: 1.  
&#xb6;J PMAI PM96-04-165, "ITR 96-006" (Unusual Event Declared Due to Dropped Rod)
: 2.  
&#xb6;2 PMAI PM96-09-185, Condition Report CR-96-1750 (Off-site Notification Using Commercial Phone)
: 3.  
&#xb6;3 NRC Inspection Report 91-01, Closure of IFIs 89-31-03 and 89-31-01
: 4.  
&#xb6;4 Condition Report CR-00-0428 (Evaluated Exercise Critique)


REVISION NO.:           PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                   9 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT 2.3     Commitment Documents (continued)
PROCEDURE TITLE:
: 5.     16   PMAI PM96-05-233 (Off-site Notification Process)
PAGE:
: 6.     %7   PMAI PM99-09-016 (PARs Based on FMT Data, Completion of NRC Notification Form)
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 9 of 49 PROCEDURE NO.:
: 7.     18   NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and 50.73, Section 4.2.4, ENS Event Notification Worksheet (NRC Form 361).
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 2.3 Commitment Documents (continued)
: 8.     19   Condition Reports CR-01-0726 and CR-01 -0742 (NOUEs Associated with SDC During SL1-17 Outage)
: 5.
: 9. T1o   Condition Report CR-01-0389 (Alternate Met Data Source)
16 PMAI PM96-05-233 (Off-site Notification Process)
: 10. T11   Condition Report CR-02-0333 (Role of Duty Call Supervisor)
: 6.  
: 11.   &#xb6;12   Condition Report CR-03-2568 (Response to RIS 2003-12 Regarding PARs) 3.0     RESPONSIBILITIES 3.1     Emergency Coordinator - Responsible for classifications, notifications and PARs.
%7 PMAI PM99-09-016 (PARs Based on FMT Data, Completion of NRC Notification Form)
3.2     Recovery Manager - Responsible for notifications and PARs.
: 7.
3.3     &#xb6;ii   Duty Call Supervisor- Assists the EC as a phonetalker.
18 NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and 50.73, Section 4.2.4, ENS Event Notification Worksheet (NRC Form 361).
3.4     TSC EC Assistant / Logkeeper or TSC OPS Coordinator - Prepares notification forms (Attachment 1, Florida Nuclear Plant Emergency Notification Form, and if necessary, Attachment 3, NRC Reactor Plant Event Notification Worksheets) for EC approval when the TSC is operational.
: 8.
3.5     EOF RM OPS Advisor / Logkeeper - Prepares notification forms (Attachment 1 and if necessary, Attachment 3) for RM approval when the EOF is operational.
19 Condition Reports CR-01-0726 and CR-01 -0742 (NOUEs Associated with SDC During SL1-17 Outage)
3.6     TSC HRD Communicator - Assists the TSC EC Assistant / Logkeeper or TSC OPS Coordinator with notification form preparation and makes calls to complete notifications to the SWP.
: 9.
3.7     EOF HRD Communicator - Assists the EOF RM OPS Advisor with form preparation and makes calls to complete notifications to the SWP and the SCO following transfer of Net Control by the Division of Emergency Management (DEM).
T1o Condition Report CR-01-0389 (Alternate Met Data Source)
: 10.
T11 Condition Report CR-02-0333 (Role of Duty Call Supervisor)
: 11.  
&#xb6;12 Condition Report CR-03-2568 (Response to RIS 2003-12 Regarding PARs) 3.0 RESPONSIBILITIES 3.1 Emergency Coordinator - Responsible for classifications, notifications and PARs.
3.2 Recovery Manager - Responsible for notifications and PARs.
3.3  
&#xb6;ii Duty Call Supervisor-Assists the EC as a phonetalker.
3.4 TSC EC Assistant / Logkeeper or TSC OPS Coordinator - Prepares notification forms (Attachment 1, Florida Nuclear Plant Emergency Notification Form, and if necessary, Attachment 3, NRC Reactor Plant Event Notification Worksheets) for EC approval when the TSC is operational.
3.5 EOF RM OPS Advisor / Logkeeper - Prepares notification forms (Attachment 1 and if necessary, Attachment 3) for RM approval when the EOF is operational.
3.6 TSC HRD Communicator - Assists the TSC EC Assistant / Logkeeper or TSC OPS Coordinator with notification form preparation and makes calls to complete notifications to the SWP.
3.7 EOF HRD Communicator - Assists the EOF RM OPS Advisor with form preparation and makes calls to complete notifications to the SWP and the SCO following transfer of Net Control by the Division of Emergency Management (DEM).


REVISION NO-:           PROCEDURE TITLE:                                     PAGE:
REVISION NO-:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                 10 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT 3.8     TSC Chemistry Supervisor (in his absence, TSC Dose Assessor) - Assists the EC with radiological dose assessment data and PARS.
PROCEDURE TITLE:
3.9     EOF HP Manager (in his absence, EOF Dose Assessor) - Assists the RM with radiological dose assessment data and PARS.
PAGE:
3.10   TSC Supervisor - Oversees communications performed by the TSC Communicators (HRD, ENS, Health Physics Network (HPN), Sound-Powered Phonetalker, EOF and Field Monitoring Team).
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 10 of 49 PROCEDURE NO.:
3.11   EOF Nuclear Licensing Manager - Oversees EOF communications performed by the EOF Communicators (HRD, ENS, HPN and TSC).
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 3.8 TSC Chemistry Supervisor (in his absence, TSC Dose Assessor) - Assists the EC with radiological dose assessment data and PARS.
3.12   Information Services - Maintains user copies, in the Unit 1 and Unit 2 Control Rooms, of the following checklist and supporting attachments for making notifications and developing Protective Action Recommendations:
3.9 EOF HP Manager (in his absence, EOF Dose Assessor) - Assists the RM with radiological dose assessment data and PARS.
* Appendix A, Notifications from the Affected Control Room
3.10 TSC Supervisor - Oversees communications performed by the TSC Communicators (HRD, ENS, Health Physics Network (HPN), Sound-Powered Phonetalker, EOF and Field Monitoring Team).
* Attachment 1 - Florida Nuclear Plant Emergency Notification Form
3.11 EOF Nuclear Licensing Manager - Oversees EOF communications performed by the EOF Communicators (HRD, ENS, HPN and TSC).
* Attachment 1A - Directions for Completing the Florida Nuclear Plant Emergency Notification Form 0       Attachment 2 - Determination of Protective Action Recommendations (PARs)
3.12 Information Services - Maintains user copies, in the Unit 1 and Unit 2 Control Rooms, of the following checklist and supporting attachments for making notifications and developing Protective Action Recommendations:
* Attachment 3 - NRC Reactor Plant Event Notification Worksheet
Appendix A, Notifications from the Affected Control Room
* Attachment 3A - Directions for Completing the NRC Reactor Plant Event Notification Worksheet 3.13   Shift Communicator- Assists the Nuclear Plant Supervisor/Emergency Coordinator in making emergency off-site notifications and performing other activities, as directed.
* - Florida Nuclear Plant Emergency Notification Form
* A - Directions for Completing the Florida Nuclear Plant Emergency Notification Form 0 - Determination of Protective Action Recommendations (PARs)
* - NRC Reactor Plant Event Notification Worksheet
* A - Directions for Completing the NRC Reactor Plant Event Notification Worksheet 3.13 Shift Communicator-Assists the Nuclear Plant Supervisor/Emergency Coordinator in making emergency off-site notifications and performing other activities, as directed.


REVISION NO.:         PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                       11 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT 4.0     DEFINITIONS 4.1     Conservative - Means more extensive or comprehensive action under a given set of circumstances to provide a greater measure of safety. For example, evacuation is more conservative than sheltering.
PROCEDURE TITLE:
4.2     Emergency - Any off-normal event or condition which is classified into one of the four emergency classes (Unusual Event, Alert, Site Area Emergency, or General Emergency) by the NPS in accordance with EPIP-01, Classification of Emergencies.
PAGE:
4.3     Emergency Coordinator (EC) - The title initially assumed by the NPS, until relieved by plant management through proper turnover, in the event of plant conditions that trigger implementation of the Emergency Plan. The EC is responsible for notifying off-site authorities, emergency responders both inside and outside the company and has full authority and responsibility for on-site emergency response actions. The EC is also responsible for Protective Action Recommendations during the initial stages of an emergency.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 11 of 49 PROCEDURE NO.:
4.4     Florida Nuclear Plant Emergency Notification Form - A predetermined format used by nuclear power plants throughout the State for notification and local authorities.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 4.0 DEFINITIONS 4.1 Conservative - Means more extensive or comprehensive action under a given set of circumstances to provide a greater measure of safety. For example, evacuation is more conservative than sheltering.
4.5     Operational (status for an emergency facility) - The mandatory minimum staff is present and the facility has taken responsibility for its procedurally assigned functions.
4.2 Emergency - Any off-normal event or condition which is classified into one of the four emergency classes (Unusual Event, Alert, Site Area Emergency, or General Emergency) by the NPS in accordance with EPIP-01, Classification of Emergencies.
4.6     Protective Action Recommendations (PARs) - Recommendations, for action instructions to protect the public, made by the Emergency Coordinator or Recovery Manager to State and County officials. FPL may recommend No Action, Sheltering or Evacuation.
4.3 Emergency Coordinator (EC) - The title initially assumed by the NPS, until relieved by plant management through proper turnover, in the event of plant conditions that trigger implementation of the Emergency Plan. The EC is responsible for notifying off-site authorities, emergency responders both inside and outside the company and has full authority and responsibility for on-site emergency response actions. The EC is also responsible for Protective Action Recommendations during the initial stages of an emergency.
4.7     Recovery Manager (RM) - A designated company officer or senior manager, who will have responsibility for the direction and control of the EOF. He / she has the authority to establish policy and to expend funds necessary to cope with emergency situations that trigger the implementation of the Emergency Plan.
4.4 Florida Nuclear Plant Emergency Notification Form - A predetermined format used by nuclear power plants throughout the State for notification and local authorities.
4.8     Release (during any declared emergency)
4.5 Operational (status for an emergency facility) - The mandatory minimum staff is present and the facility has taken responsibility for its procedurally assigned functions.
: 1.     Any effluent monitor increase of (approximately) 10 times or one decade above pre-transient values.
4.6 Protective Action Recommendations (PARs) - Recommendations, for action instructions to protect the public, made by the Emergency Coordinator or Recovery Manager to State and County officials. FPL may recommend No Action, Sheltering or Evacuation.
4.7 Recovery Manager (RM) - A designated company officer or senior manager, who will have responsibility for the direction and control of the EOF. He / she has the authority to establish policy and to expend funds necessary to cope with emergency situations that trigger the implementation of the Emergency Plan.
4.8 Release (during any declared emergency)
: 1.
Any effluent monitor increase of (approximately) 10 times or one decade above pre-transient values.
OR
OR
: 2.     Health Physics detecting airborne radioactivity levels in excess of 25%
: 2.
Health Physics detecting airborne radioactivity levels in excess of 25%
derived air concentration (DAC) outside of plant buildings due to failure of equipment associated with the declared emergency.
derived air concentration (DAC) outside of plant buildings due to failure of equipment associated with the declared emergency.


REVISION NO.:           PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                   12 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT 4.9     Shift Communicator - A specific shiftly designated individual trained and qualified to assist the Nuclear Plant Supervisor/Emergency Coordinator in the control room in making emergency off-site notifications, and performing other activities as directed.
PROCEDURE TITLE:
4.10   State Notification Form (SNF) - Less formal, more concise expression used in lieu of Florida Nuclear plant Emergency Notification Form.
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 12 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 4.9 Shift Communicator - A specific shiftly designated individual trained and qualified to assist the Nuclear Plant Supervisor/Emergency Coordinator in the control room in making emergency off-site notifications, and performing other activities as directed.
4.10 State Notification Form (SNF) - Less formal, more concise expression used in lieu of Florida Nuclear plant Emergency Notification Form.


REVISION NO.:       PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
6A           OFF-SITE NOTIFICATIONS AND PROTECTIVE                         13 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT 5.0     INSTRUCTIONS 5.1     State and County Notification
PROCEDURE TITLE:
: 1. Time Limits A. Notification shall be initiated within 15 minutes of any of the following:
PAGE:
: 1.     Recognition of entry into the Emergency Plan.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 13 of 49 PROCEDURE NO.:
: 2.     Escalation in Emergency Class.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.0 INSTRUCTIONS 5.1 State and County Notification
: 3.     De-escalation of the Emergency Class.
: 1.
: 4.     Protective Action Recommendation.
Time Limits A.
: 5.     Change in Protective Action Recommendation.
Notification shall be initiated within 15 minutes of any of the following:
B. Notification shall be initiated within 60 minutes of any of the following:
: 1.
: 1. At an Alert or higher Emergency Class, the time of the last update (unless a different frequency has been agreed to by the off-site agencies as during a hurricane).
Recognition of entry into the Emergency Plan.
: 2. A radiological release has been initiated.
: 2.
: 3. A radiological release has been terminated.
Escalation in Emergency Class.
: 4. A significant change in plant conditions has occurred (e.g., loss or restoration of off-site power or major plant equipment).
: 3.
: 5. Termination of the emergency.
De-escalation of the Emergency Class.
: 4.
Protective Action Recommendation.
: 5.
Change in Protective Action Recommendation.
B.
Notification shall be initiated within 60 minutes of any of the following:
: 1.
At an Alert or higher Emergency Class, the time of the last update (unless a different frequency has been agreed to by the off-site agencies as during a hurricane).
: 2.
A radiological release has been initiated.
: 3.
A radiological release has been terminated.
: 4.
A significant change in plant conditions has occurred (e.g., loss or restoration of off-site power or major plant equipment).
: 5.
Termination of the emergency.


r mI- Vl0lUN Nu.:           P-ROCEURE TITLE:
r mI-Vl0lUN Nu.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:                         ACTION RECOMMENDATIONS EPIP-08                               ST. LUCIE PLANT 5.1       State and County Notification (continued)
P-ROCEURE TITLE:
: 2. Forms Required for Notifications CAUTION Notifications require the use of a form similar to Attachment 1, Florida NuearPlant Emergency Notification Form.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:
A.     Notifications with 15 minute time limits shall be made using a form similar to Attachment 1, Florida Nuclear Plant Emergency Notification Form.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.1 State and County Notification (continued)
B.     Notifications with 60 minute time limits shall be made using a form similar to Attachment 1, Florida Nuclear Plant Emergency Notification Form.
: 2.
: 3.     Special instructions due to extraordinary circumstances.
Forms Required for Notifications CAUTION Notifications require the use of a form similar to Attachment 1, Florida NuearPlant Emergency Notification Form.
A.     If Emergency Class escalation is necessary due to rapidly degrading conditions, Then provide the State and County authorities with the initial notification information by transmitting lines 1-6, at a minimum, of the SNF and terminate the phone call by stating that a new notification form will be provided within 15 minutes.
A.
CAUTION There can not be two concurrent declared emergency classes under the St. Lucie Plant Radiological Emergency Plan.                                         I B.     If one Unit is in a classified event and the same or the other Unit enters into an event where the same or lesser Emergency Class would apply, Then a new classification should NOT be declared. The event should be documented on a SNF as "Additional Information or Update" and issued as soon as practicable.
Notifications with 15 minute time limits shall be made using a form similar to Attachment 1, Florida Nuclear Plant Emergency Notification Form.
C.     If one Unit is in a classified event and the other Unit enters into a more severe event in which a higher Emergency Class would apply, Then the new classification shall be declared and promptly, within the regulatory time limits, issued to the State, Counties and the NRC.
B.
Notifications with 60 minute time limits shall be made using a form similar to Attachment 1, Florida Nuclear Plant Emergency Notification Form.
: 3.
Special instructions due to extraordinary circumstances.
A.
If Emergency Class escalation is necessary due to rapidly degrading conditions, Then provide the State and County authorities with the initial notification information by transmitting lines 1-6, at a minimum, of the SNF and terminate the phone call by stating that a new notification form will be provided within 15 minutes.
CAUTION There can not be two concurrent declared emergency classes under the St. Lucie Plant Radiological Emergency Plan.
I B.
If one Unit is in a classified event and the same or the other Unit enters into an event where the same or lesser Emergency Class would apply, Then a new classification should NOT be declared. The event should be documented on a SNF as "Additional Information or Update" and issued as soon as practicable.
C.
If one Unit is in a classified event and the other Unit enters into a more severe event in which a higher Emergency Class would apply, Then the new classification shall be declared and promptly, within the regulatory time limits, issued to the State, Counties and the NRC.


REVISION NO.:       PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
6A           OFF-SITE NOTIFICATIONS AND PROTECTIVE                   15 of 49 PROCEDURE NO.:                 ACTION RECOMMENDATIONS EPIP-08                         ST. LUCIE PLANT 5.1     State and County Notification (continued)
PROCEDURE TITLE:
: 4.     ]4 Transfer of NET Control A. The State Coordinating Officer (SCO) can transfer the control of Hot Ring Down (HRD) NET from the State Warning Point (SWP) to the EOF. When this occurs;
PAGE:
: 1. The RM shall do face to face communication to satisfy off-site notification requirements for the State and Counties. Calls to the SWP are no longer necessary.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 15 of 49 PROCEDURE NO.:
: 2. The Florida Nuclear Plant Emergency Notification Form (Attachment 1) shall continue to be filled out.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.1 State and County Notification (continued)
: 3. Completed notification forms are to be provided to the SCO or his / her designee in the EOF.
: 4.  
]4 Transfer of NET Control A.
The State Coordinating Officer (SCO) can transfer the control of Hot Ring Down (HRD) NET from the State Warning Point (SWP) to the EOF. When this occurs;
: 1.
The RM shall do face to face communication to satisfy off-site notification requirements for the State and Counties. Calls to the SWP are no longer necessary.
: 2.
The Florida Nuclear Plant Emergency Notification Form (Attachment 1) shall continue to be filled out.
: 3.
Completed notification forms are to be provided to the SCO or his / her designee in the EOF.
END OF SECTION 5.1
END OF SECTION 5.1


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                     16 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                               ST. LUCIE PLANT 5.2     Nuclear Regulatory Commission (NRC) Notification
PROCEDURE TITLE:
: 1. Time Limits NOTE Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.
PAGE:
A.     The licensee shall notify the NRC immediately after notification of the appropriate State or local agencies and not later than one hour after the time the licensee declares one of the Emergency Classes (10 CFR 50.72 (a)(3)).
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 16 of 49 PROCEDURE NO.:
: 2. Special Instructions A.     Initial notification to the NRC using the Emergency Notification System (ENS) (usually done from the Control Room) should use Attachment 3, NRC Reactor Plant Event Notification Worksheet.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.2 Nuclear Regulatory Commission (NRC) Notification
B. At an Alert or higher emergency class, the NRC will want to establish an open line of communication with the Control Room, utilizing an ENS conference bridge tying in the licensee with NRC Headquarters and region personnel. Once the Technical Support Center (TSC) is operational, the Control Room should transfer responsibility for NRC communications to the TSC.
: 1.
C. The Emergency Operations Facility (EOF) should join the TSC on the ENS conference bridge and take the lead for NRC communications.
Time Limits NOTE Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.
D. The TSC and EOF should also utilize the Health Physics Network (HPN) line in a manner similar to the ENS (i.e., establish a conference bridge with the NRC).
A.
E. Both the ENS and HPN Communicators in both facilities should keep logs of information transmitted and received from the NRC in accordance with procedures.
The licensee shall notify the NRC immediately after notification of the appropriate State or local agencies and not later than one hour after the time the licensee declares one of the Emergency Classes (10 CFR 50.72 (a)(3)).
: 2.
Special Instructions A.
Initial notification to the NRC using the Emergency Notification System (ENS) (usually done from the Control Room) should use, NRC Reactor Plant Event Notification Worksheet.
B.
At an Alert or higher emergency class, the NRC will want to establish an open line of communication with the Control Room, utilizing an ENS conference bridge tying in the licensee with NRC Headquarters and region personnel. Once the Technical Support Center (TSC) is operational, the Control Room should transfer responsibility for NRC communications to the TSC.
C.
The Emergency Operations Facility (EOF) should join the TSC on the ENS conference bridge and take the lead for NRC communications.
D.
The TSC and EOF should also utilize the Health Physics Network (HPN) line in a manner similar to the ENS (i.e., establish a conference bridge with the NRC).
E.
Both the ENS and HPN Communicators in both facilities should keep logs of information transmitted and received from the NRC in accordance with procedures.
END OF SECTION 5.2
END OF SECTION 5.2


REVISION NO.:         PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                     17 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT 5.3     &#xb6;T   Erroneous Information
PROCEDURE TITLE:
: 1. If erroneous information is transmitted to off-site agencies and the error is discovered prior to event termination, a correction should be provided in an update. The need for and urgency of providing the update is dependent upon the importance of the error.
PAGE:
: 2. If erroneous information is transmitted to off-site agencies and the error is discovered after event termination, the Licensing Department should be consulted to determine the need and method for contacting the off-site agencies with corrected information.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 17 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.3  
&#xb6;T Erroneous Information
: 1.
If erroneous information is transmitted to off-site agencies and the error is discovered prior to event termination, a correction should be provided in an update. The need for and urgency of providing the update is dependent upon the importance of the error.
: 2.
If erroneous information is transmitted to off-site agencies and the error is discovered after event termination, the Licensing Department should be consulted to determine the need and method for contacting the off-site agencies with corrected information.
END OF SECTION 5.3
END OF SECTION 5.3


REVISION NO.:             PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
6A                 OFF-SITE NOTIFICATIONS AND PROTECTIVE                 18 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                               ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 1 of 4)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 18 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 1 of 4)
INITIAL CAUTION
INITIAL CAUTION
        *  &sect;1 Notification of State and local agencies shall be made as soon as practicable within 15 minutes of declaration of an Emergency Class.
&sect;1 Notification of State and local agencies shall be made as soon as practicable within 15 minutes of declaration of an Emergency Class.
        * &#xb6;3 A new Florida Nuclear Plant Emergency Notification Form shall be completed for all updates.
* &#xb6;3 A new Florida Nuclear Plant Emergency Notification Form shall be completed for all updates.
NOTE
NOTE
        &#xb6;9   1. Completion of this checklist requires the following Attachments (all from EPIP-08):
&#xb6;9
Attachment 1 - Florida Nuclear Plant Emergency Notification Form Attachment 1A - Directions for Completing the Florida Nuclear Plant Emergency Notification Form Attachment 2 - Determination of Protective Action Recommendations (PARs)
: 1.
Attachment 3 - NRC Reactor Plant Event Notification Worksheet Attachment 3A - Directions for Completing the NRC Reactor Plant Event Notification Worksheet
Completion of this checklist requires the following Attachments (all from EPIP-08): - Florida Nuclear Plant Emergency Notification Form A - Directions for Completing the Florida Nuclear Plant Emergency Notification Form - Determination of Protective Action Recommendations (PARs) - NRC Reactor Plant Event Notification Worksheet A - Directions for Completing the NRC Reactor Plant Event Notification Worksheet
: 2. Checklist Part 1 is for State Warning Point notification.
: 2.
: 3. Checklist Part 2 is for NRC notification.
Checklist Part 1 is for State Warning Point notification.
: 1.     State Warning Point Notification A.       Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
: 3.
B.       Emergency Coordinator (EC) approval.
Checklist Part 2 is for NRC notification.
: 1.
State Warning Point Notification A.
Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
B.
Emergency Coordinator (EC) approval.


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                     19 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 2 of 4)
PROCEDURE TITLE:
: 1.     (continued)                                                                     INITIAL NOTE
PAGE:
: 1. Primary notification method to the State Warning Point (SWP) is to use the Hot Ring Down (HRD) phone.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 19 of 49 PROCEDURE NO.:
: 2. If the HRD is out-of-service, alternate notification methods are provided in Section E, below.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 2 of 4)
C.       Using the State HOT RING DOWN (HRD) Phone, dial 100.
: 1.
D.       Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.
(continued)
When the State Duty Officer answers, announce "This is St. Lucie Nuclear Plant [as applicable (Unit 1, 2)] with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact St. Lucie County, Martin County and the Bureau of Radiation Control prior to transmitting the information from the notification form. When the parties are on line, provide the information slowly (e.g., in three word intervals) and deliberately, providing time for the information to be written 0) down.
INITIAL NOTE
E.     Alternate Notification Methods (in order of priority)
: 1.
Primary notification method to the State Warning Point (SWP) is to use the Hot Ring Down (HRD) phone.
: 2.
If the HRD is out-of-service, alternate notification methods are provided in Section E, below.
C.
Using the State HOT RING DOWN (HRD) Phone, dial 100.
D.
Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.
When the State Duty Officer answers, announce "This is St. Lucie Nuclear Plant [as applicable (Unit 1, 2)] with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact St. Lucie County, Martin County and the Bureau of Radiation Control prior to transmitting the information from the notification form. When the parties are on line, provide the information slowly (e.g., in three word intervals) and deliberately, providing time for the information to be written down.
E.
Alternate Notification Methods (in order of priority) 0)
NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).
NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).
: 1.     Alternate 1 - Commercial Phone
: 1.
: a. Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] with an emergency declaration. My callback number is
Alternate 1 - Commercial Phone
: a.
Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] with an emergency declaration. My callback number is


REVISION NO.:         PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
6A           OFF-SITE NOTIFICATIONS AND PROTECTIVE                       20 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 3 of 4)
PROCEDURE TITLE:
: 1.     E.     1.   (continued)                                                       INITIAL
PAGE:
: b.     Hang up the phone and standby for the callback.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 20 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 3 of 4)
: 1.
E.
: 1.
(continued)
INITIAL
: b.
Hang up the phone and standby for the callback.
When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
: c.     &#xb6;12   Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.
: c.  
: 2. Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.
&#xb6;12 Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.
: a.     Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.
: 2.
: b. Announce "State Warning Point, this is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] with an emergency declaration." Then release the "push-to-talk" button in order to listen.
Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.
: c. When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] declaring a
: a.
                            / an (classification), repeat (classification). I am standing by to transmit Florida Nuclear Plant Emergency Notification Form information when you are ready to copy. When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.
: d. Announce "St. Lucie clear' at the end of the conversation.
: b.
Announce "State Warning Point, this is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] with an emergency declaration." Then release the "push-to-talk" button in order to listen.
: c.
When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] declaring a
/ an (classification), repeat (classification). I am standing by to transmit Florida Nuclear Plant Emergency Notification Form information when you are ready to copy. When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
: d.
Announce "St. Lucie clear' at the end of the conversation.


REVISION NO.:             PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                   21 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 4 of 4)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 21 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 4 of 4)
INITIAL CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.
INITIAL CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.
: 2.     &sect;1   NRC Notification A.       Prepare the NRC Reactor Plant Event Notification Worksheet (form similar to Attachment 3) in accordance with Attachment 3A, Directions for Completing the NRC Reactor Plant Event Notification Worksheet.
: 2.  
B.       EC approval.
&sect;1 NRC Notification A.
Prepare the NRC Reactor Plant Event Notification Worksheet (form similar to Attachment 3) in accordance with Attachment 3A, Directions for Completing the NRC Reactor Plant Event Notification Worksheet.
B.
EC approval.
NOTE
NOTE
: 1. Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.
: 1.
: 2. If the ENS is out-of-service an alternate notification method is provided in Section D, below.
Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.
C.       Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD).
: 2.
D.       Alternate Notification Method
If the ENS is out-of-service an alternate notification method is provided in Section D, below.
: 1.     If the ENS is out-of-service, Then use a commercial phone to accomplish the above.
C.
Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD).
D.
Alternate Notification Method
: 1.
If the ENS is out-of-service, Then use a commercial phone to accomplish the above.
END OF APPENDIX A
END OF APPENDIX A


PROCEDURE TITLE:                                        PE:
REVISION NO.:
REVISION NO.:
OFF-SITE NOTIFICATIONS AND PROTECTIVE                   22 of 49 6A PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT APPENDIX B SUPPORT CENTER (TSC)
PROCEDURE TITLE:
NOTIFICATIONS FROM THE TECHNICAL (Page 1 of 5)                                       I INITIAL CAUTION as soon as
PE:
              &sect;1 Notification of State and local agencies shall be made           Class.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 22 of 49 PROCEDURE NO.:
practicable within 15 minutes of declaration of an Emergency Form shall be
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT I
              &#xb6;3 A new Florida Nuclear Plant Emergency Notification completed for all updates.
APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
NOTE for HRD Communications.
(Page 1 of 5)
ECheckklist   Part 1 2 is is for ENS Communications.
INITIAL CAUTION
Checklist I D      State Warning Point Notification Form A.       Prepare the Florida Nuclear Plant Emergency Notification       1A, (form similar to Attachment 1) in accordance with Attachment Emergency Directions for Completing the Florida Nuclear Plant Notification Form.
&sect;1 Notification of State and local agencies shall be made as soon as practicable within 15 minutes of declaration of an Emergency Class.
B.       Verify the Emergency Coordinator (EC) approval.
&#xb6;3 A new Florida Nuclear Plant Emergency Notification Form shall be completed for all updates.
NOTE (SWP) is to use
D NOTE Checklist Part 1 is for HRD Communications.
: 1. Primary notification method to the State Warning Point the Hot Ring Down (HRD) phone.
ECheckklist Part 2 is for ENS Communications.
: 2. If the HRD is out-of-service, alternate notification methods are provided in Section E, below.
State Warning Point Notification A.
C.       Using the State HOT RING DOWN (HRD) Phone, dial 100.
Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
B.
Verify the Emergency Coordinator (EC) approval.
NOTE
: 1.
Primary notification method to the State Warning Point (SWP) is to use the Hot Ring Down (HRD) phone.
: 2.
If the HRD is out-of-service, alternate notification methods are provided in Section E, below.
I C.
Using the State HOT RING DOWN (HRD) Phone, dial 100.


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                     23 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                               ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 23 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
(Page 2 of 5)
(Page 2 of 5)
: 1.     (continued)                                                                     INITIAL D. Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.
: 1.
(continued)
INITIAL D.
Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.
When the State Duty Officer answers, announce "This is St. Lucie Nuclear Plant Technical Support Center with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact St. Lucie County, Martin County and the Bureau of Radiation Control prior to transmitting the information from the notification forms. When the parties are on line, provide the information slowly (e.g., in three word intervals) and deliberately, providing time for the information to be written down.
When the State Duty Officer answers, announce "This is St. Lucie Nuclear Plant Technical Support Center with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact St. Lucie County, Martin County and the Bureau of Radiation Control prior to transmitting the information from the notification forms. When the parties are on line, provide the information slowly (e.g., in three word intervals) and deliberately, providing time for the information to be written down.
E.     Alternate Notification Methods (in order of priority)
E.
Alternate Notification Methods (in order of priority)
NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).
NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).
: 1.     Alternate 1 - Commercial Phone
: 1.
: a.     Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant Technical Support Center with an emergency declaration. My callback number is
Alternate 1 - Commercial Phone
: b.     Hang up the phone and standby for the callback.
: a.
Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant Technical Support Center with an emergency declaration. My callback number is
: b.
Hang up the phone and standby for the callback.
When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
: c.     &#xb6;12   Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.
: c.  
&#xb6;12 Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.


REVISION NO.:         PROCEDURE TITLE:                                             PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                         24 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 24 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
(Page 3 of 5)
(Page 3 of 5)
: 1.     E.     (continued)                                                               INITIAL
: 1.
: 2. Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.
E.
: a. Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.
(continued)
: b. Announce "State Warning Point, this is St. Lucie Nuclear Plant Technical Support Center with an emergency declaration." Then release the "push-to-talk" button in order to listen.
INITIAL
: c. When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant Technical Support Center declaring a / an (classification), repeat (classification). I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy. When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
: 2.
: d. Announce "St. Lucie clear" at the end of the conversation.
Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.
: a.
Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.
: b.
Announce "State Warning Point, this is St. Lucie Nuclear Plant Technical Support Center with an emergency declaration." Then release the "push-to-talk" button in order to listen.
: c.
When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant Technical Support Center declaring a / an (classification), repeat (classification). I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy. When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
: d.
Announce "St. Lucie clear" at the end of the conversation.


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                 25 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 25 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
(Page 4 of 5)
(Page 4 of 5)
INITIAL CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.
INITIAL CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.
NOTE
NOTE
: 1. Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.
: 1.
: 2. If the ENS is out-of-service, an alternate notification method is provided in Section B, below.
Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.
: 2.     &sect;1   NRC Notification A.       Choose and complete the appropriate steps, below:
: 2.
: 1.     If the NRC Reactor Plant Event Notification Worksheet has NOT previously been transmitted from the Control Room, Then request that the EC Assistant / Logkeeper prepare the form.
If the ENS is out-of-service, an alternate notification method is provided in Section B, below.
: 2. Verify EC approval.
: 2.  
: 3. Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD),
&sect;1 NRC Notification A.
Choose and complete the appropriate steps, below:
: 1.
If the NRC Reactor Plant Event Notification Worksheet has NOT previously been transmitted from the Control Room, Then request that the EC Assistant / Logkeeper prepare the form.
: 2.
Verify EC approval.
: 3.
Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD),
then GO TO the next step to establish an open line of communication with the NRC.
then GO TO the next step to establish an open line of communication with the NRC.
OR
OR
: 4.     If the NRC Reactor Plant Event Notification Worksheet has previously been transmitted by the Control Room, Then initiate an open line of communication with the NRC by dialing one of the numbers shown on the phone or in the ERD and request to be placed on the Conference Bridge with the NRC.
: 4.
: 5.     As requested, provide information to the NRC.
If the NRC Reactor Plant Event Notification Worksheet has previously been transmitted by the Control Room, Then initiate an open line of communication with the NRC by dialing one of the numbers shown on the phone or in the ERD and request to be placed on the Conference Bridge with the NRC.
: 5.
As requested, provide information to the NRC.


REVISION NO.:         PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                 26 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 26 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)
(Page 5 of 5)
(Page 5 of 5)
: 2.     (continued)                                                               INITIAL B. Alternate Notification Method
: 2.
: 1. If the ENS is out-of-service, Then use a commercial phone to accomplish the above.
(continued)
INITIAL B.
Alternate Notification Method
: 1.
If the ENS is out-of-service, Then use a commercial phone to accomplish the above.
END OF APPENDIX B
END OF APPENDIX B


REVISION NO.:           PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                 27 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 27 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
(Page 1 of 6)
(Page 1 of 6)
INITIAL CAUTION
INITIAL CAUTION
        *  &sect;1 Notification of State and local agencies shall be made as soon as practicable within 15 minutes of declaration of Emergency Class or change in Protective Action Recommendation (PAR).
&sect;1 Notification of State and local agencies shall be made as soon as practicable within 15 minutes of declaration of Emergency Class or change in Protective Action Recommendation (PAR).
            &#xb6;3 A new Florida Nuclear Plant Emergency Notification Form shall be completed for all updates.
&#xb6;3 A new Florida Nuclear Plant Emergency Notification Form shall be completed for all updates.
NOTE
NOTE Checklist Part 1 is for HRD Communications.
* Checklist Part 1 is for HRD Communications.
* Checklist Part 2 is for ENS Communications.
* Checklist Part 2 is for ENS Communications.
: 1.     State Warning Point Notification A.     Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
: 1.
B.     Verify the Recovery Manager (RM) approval.
State Warning Point Notification A.
Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
B.
Verify the Recovery Manager (RM) approval.


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                   28 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 28 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
(Page 2 of 6)
(Page 2 of 6)
: 1.     (continued)                                                                   INITIAL NOTE
: 1.
: 1. Primary notification method to the State Warning Point (SWP) is to use the Hot Ring Down (HRD) phone.
(continued)
: 2. Ifthe HRD is out-of-service, alternate notification methods are provided in Section D, below.
INITIAL NOTE
: 3. State and County representatives means Florida Division of Emergency Management (DEM), Florida Department of Health (DOH),
: 1.
Primary notification method to the State Warning Point (SWP) is to use the Hot Ring Down (HRD) phone.
: 2.
If the HRD is out-of-service, alternate notification methods are provided in Section D, below.
: 3.
State and County representatives means Florida Division of Emergency Management (DEM), Florida Department of Health (DOH),
St. Lucie County Department of Public Safety (DPS) and Martin County Department of Emergency Services (DES).
St. Lucie County Department of Public Safety (DPS) and Martin County Department of Emergency Services (DES).
: 4. Notification forms means the Florida Nuclear Plant Emergency Notification Form.                                                               0)
: 4.
C.       Choose and complete the appropriate step below:
Notification forms means the Florida Nuclear Plant Emergency Notification Form.
: 1. If State and County representatives are NOT co-located with the FPL Emergency Response Organization (ERO) in the EOF, Then call the SWP and transmit the notification forms. To contact the SWP, dial 100. Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.
C.
Choose and complete the appropriate step below:
: 1.
If State and County representatives are NOT co-located with the FPL Emergency Response Organization (ERO) in the EOF, Then call the SWP and transmit the notification forms. To contact the SWP, dial 100. Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.
When the State Duty Officer answers, announce "this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact the Bureau of Radiation Control, St. Lucie County DPS and Martin County DES prior to transmitting the information from the notification forms. When the parties are on line, transmit the information slowly, (e.g., in three word intervals) and deliberately, providing time for the information to be written down.
When the State Duty Officer answers, announce "this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact the Bureau of Radiation Control, St. Lucie County DPS and Martin County DES prior to transmitting the information from the notification forms. When the parties are on line, transmit the information slowly, (e.g., in three word intervals) and deliberately, providing time for the information to be written down.
0)
OR
OR


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                     29 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 29 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
(Page 3 of 6)
(Page 3 of 6)
: 1.     C.       (continued)                                                             INITIAL
: 1.
: 2.       If State and County representatives are co-located with the FPL ERO in the EOF and the State Coordinating Officer (SCO) has NOT assumed Net Control, Then call the SWP and transmit the notification forms - "Time of Contact" corresponds to the start time of the Recovery Manager's Protective Action Recommendation (PAR) Briefing. To contact the SWP, dial 100. Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen. When the State Duty Officer answers, announce "this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact the Bureau of Radiation Control, St. Lucie County DPS and Martin County DES prior to transmitting the information from the notification forms. When the parties are on line, transmit the information slowly, (e.g., in three word intervals) and deliberately, providing time for the information to be written down.
C.
(continued)
INITIAL
: 2.
If State and County representatives are co-located with the FPL ERO in the EOF and the State Coordinating Officer (SCO) has NOT assumed Net Control, Then call the SWP and transmit the notification forms - "Time of Contact" corresponds to the start time of the Recovery Manager's Protective Action Recommendation (PAR) Briefing. To contact the SWP, dial 100. Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen. When the State Duty Officer answers, announce "this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact the Bureau of Radiation Control, St. Lucie County DPS and Martin County DES prior to transmitting the information from the notification forms. When the parties are on line, transmit the information slowly, (e.g., in three word intervals) and deliberately, providing time for the information to be written down.
OR
OR
: 3.     If State and County representatives are co-located with the FPL ERO in the EOF and the SCO has transferred Net Control to the EOF, Then the SWP is not called (completed notification forms are given to the SCO - may be accomplished by the RM or RM OPS Advisor / Logkeeper).
: 3.
D.     Alternate Notification Methods (in order of priority)
If State and County representatives are co-located with the FPL ERO in the EOF and the SCO has transferred Net Control to the EOF, Then the SWP is not called (completed notification forms are given to the SCO - may be accomplished by the RM or RM OPS Advisor / Logkeeper).
D.
Alternate Notification Methods (in order of priority)
NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).
NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).
: 1. Alternate 1 - Commercial Phone
: 1.
Alternate 1 - Commercial Phone


REVISION NO.:       PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
6A           OFF-SITE NOTIFICATIONS AND PROTECTIVE                       30 of 49 PROCEDURE NO.:                 ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
PROCEDURE TITLE:
(Page 4 of 6) 1       D. 1. (continued)                                                       INITIAL
PAGE:
: a.     Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency declaration. My callback number is
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 30 of 49 PROCEDURE NO.:
: b.     Hang up the phone and standby for the callback.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
(Page 4 of 6) 1 D.
: 1.
(continued)
INITIAL
: a.
Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency declaration. My callback number is
: b.
Hang up the phone and standby for the callback.
When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
: c.     &#xb6;12   Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.
: c.  
: 2. Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.
&#xb6;12 Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.
: a.     Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.
: 2.
: b.     Announce "State Warning Point, this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency declaration." Then release the "push-to-talk" button in order to listen.
Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.
: c. When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant Emergency Operations Facility declaring a / an (classification), repeat (classification).
: a.
Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.
: b.
Announce "State Warning Point, this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency declaration." Then release the "push-to-talk" button in order to listen.
: c.
When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant Emergency Operations Facility declaring a / an (classification), repeat (classification).
I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.
I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A                 OFF-SITE NOTIFICATIONS AND PROTECTIVE                     31 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 31 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
(Page 5 of 6)
(Page 5 of 6)
: 1.     D.       2.     (continued)                                                     INITIAL
: 1.
: d. Announce "St. Lucie clear" at the end of the conversation.
D.
CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local a2gencies is delayed or prolonged.
: 2.
: 2.     &sect;1   NRC Notification NOTE
(continued)
: 1. Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.
: d.
: 2. If the ENS is out-of-service, an alternate notification method is provided in Section B, below.
Announce "St. Lucie clear" at the end of the conversation.
A.       Choose and complete the appropriate steps, below:
INITIAL CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local a2gencies is delayed or prolonged.
: 1. If the NRC Reactor Plant Event Notification Worksheet has NOT previously been transmitted from either the Control Room or Technical Support Center (TSC), Then request that the RM OPS Advisor prepare the form.
: 2.  
: 2. Verify RM approval.
&sect;1 NRC Notification NOTE
: 3. Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD),
: 1.
Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.
: 2.
If the ENS is out-of-service, an alternate notification method is provided in Section B, below.
A.
Choose and complete the appropriate steps, below:
: 1.
If the NRC Reactor Plant Event Notification Worksheet has NOT previously been transmitted from either the Control Room or Technical Support Center (TSC), Then request that the RM OPS Advisor prepare the form.
: 2.
Verify RM approval.
: 3.
Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD),
then GO TO the next step to establish an open line of communication with the NRC.
then GO TO the next step to establish an open line of communication with the NRC.
OR
OR
: 4. If the NRC Reactor Plant Event Notification Worksheet has previously been transmitted by either the Control Room or the TSC, Then initiate an open line of communication with the NRC by dialing one of the numbers shown on the phone or in the ERD and request to be placed on the Conference Bridge with the NRC and the St. Lucie TSC.
: 4.
If the NRC Reactor Plant Event Notification Worksheet has previously been transmitted by either the Control Room or the TSC, Then initiate an open line of communication with the NRC by dialing one of the numbers shown on the phone or in the ERD and request to be placed on the Conference Bridge with the NRC and the St. Lucie TSC.


REVISION NO.:         PROCEDURE TITLE:                                     PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                 32 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                           ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 32 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)
(Page 6 of 6)
(Page 6 of 6)
: 2.     A.     (continued)                                                         INITIAL
: 2.
: 5. Take the lead in providing information to the NRC.
A.
B. Alternate Notification Method
(continued)
: 1. If the ENS is out-of-service, Then use a commercial phone to accomplish the above.
INITIAL
: 5.
Take the lead in providing information to the NRC.
B.
Alternate Notification Method
: 1.
If the ENS is out-of-service, Then use a commercial phone to accomplish the above.
END OF APPENDIX C
END OF APPENDIX C


REVISION NO.:                         PROCEDURE TITLE:                                                                                         PAGE:
REVISION NO.:
6A                         OFF-SITE NOTIFICATIONS AND PROTECTIVE                                                                   33 of 49 PROCEDURE NO.:                                             ACTION RECOMMENDATIONS EPIP-08                                                           ST. LUCIE PLANT ATTACHMENT 1 FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 1)
PROCEDURE TITLE:
On-line Verification:             C1 SWP/DEM                     [] St. Lucie County                 C] Martin County
PAGE:
: 1. A. C3 THISI S A DRILL                                  B. 0l THIS IS AN EMERGENCY
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 33 of 49 PROCEDURE NO.:
: 2. A. Date:     /    /                    B. Contact Time: __                           C. Reported by: (Name)
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1 FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 1)
D. Message Number. __                                  E. Reported from: [] Control Room El TSC El EOF
On-line Verification:
: 3. Site:      A. El Crystal River Unit 3                      B. 0l St. Lucie Unit 1                       C. 0l St. Lucie Unit 2 D. El Turkey Point Unit 3                      E. [I Turkey Point Unit 4
: 1.
: 4. Emergency Classification:            A. El Notification of Unusual Event               C. [I Site Area Emergency B. o  Alert                                        D. [I General Emergency
A.
: 5. A. El Emergency Declaration:                        B. El Emeroency Termination:                Date:     /   /         Time:
C3 THISI C1 SWP/DEM
: 6. Reason for Emergency Declaration:'                  A. El EAL Number           OR       B.   []
[] St. Lucie County C] Martin County S A DRILL
: 2.
A.
Date:
/
/
D.
Message Number. __
: 3.
Site:
A. El Crystal River Unit 3 D. El Turkey Point Unit 3
: 4.
Emergency Classification:
A.
B.
: 5.
A. El Emergency Declaration:
: 6.
Reason for Emergency Declaration:'
B. 0l THIS IS AN EMERGENCY B. Contact Time: __
C. Reported by: (Name)
E.
Reported from: [] Control Room El TSC El EOF B. 0l St. Lucie Unit 1 C. 0l St. Lucie Unit 2 E. [I Turkey Point Unit 4 El Notification of Unusual Event o Alert B.
El Emeroency Termination:
C. [I Site Area Emergency D. [I General Emergency Date:  
/  
/
Time:
A.
El EAL Number OR B. []


== Description:==
== Description:==
: 7. Additional Information or Update:                   A. E] None         OR     B. El
: 7.
: 8. Weather Data:       A. Wind direction from __           degrees       B. Downwind Sectors Affected:
Additional Information or Update:
: 9. Release Status:     A. 0l None (Go to Item 11)                 B. El Is occurrng                     C. 0    Has occurred, but stopped
A.
: 10. Release   Sionificance Categorv (at the Site Boundary):
E] None OR B. El 8.
A. 0l   Information not available at this time.
9.
B. 0l   Release within normal operating limits (!5 3.5 E-1 Ci/sec noble gas,
10.
Weather Data:
A. Wind direction from __
degrees B. Downwind Sectors Affected:
Release Status:
A. 0l None (Go to Item 11)
B. El Is occurrng C.
Release Sionificance Categorv (at the Site Boundary):
0 Has occurred, but stopped A.
0l Information not available at this time.
B.
0l Release within normal operating limits (!5 3.5 E-1 Ci/sec noble gas,
* 4.6 E-5 Ci/sec iodine)
* 4.6 E-5 Ci/sec iodine)
C. 0l   Non-Significant Fraction of PAG Range (release is> normal limits and 500 mrem TEDE and 1000 mrem CDE)
C.
D. 0l   PAG Range (>_500 mrem TEDE or&#x17d;_ 1000 mrem CDE)
0l Non-Significant Fraction of PAG Range (release is> normal limits and 500 mrem TEDE and 1000 mrem CDE)
: 11. Utility Recommended Protective Actions:
D.
A. El No recommended actions at this time.
0l PAG Range (>_500 mrem TEDE or&#x17d;_ 1000 mrem CDE)
B. El The utility recommends the following protective actions:
: 11.
El Miles         No Action Sectors       Evacuate Sectors         Shelter Sectors 0-2 2-5 5-   10 OR Shelter Zones / Areas:
Utility Recommended Protective Actions:
A.
El No recommended actions at this time.
B.
El The utility recommends the following protective actions:
El Miles No Action Sectors Evacuate Sectors Shelter Sectors 0-2 2-5 5-10 OR Shelter Zones / Areas:
Evacuate Zones / Areas:
Evacuate Zones / Areas:
C. Consider Issuance of KI:     El Yes [] No if form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, continue with item 12.
C.
: 12. Plant Conditions:       A. Reactor Shutdown? 0l Yes           [I No     B. Core Adequately Cooled? El Yes [] No C. Containment Intact? El Yes         El No     0. Core Condition: 0l Stable         0l Degrading
Consider Issuance of KI:
: 13. Weather Data:           A. Wind Speed __           mph       B. Stability Class
El Yes [] No if form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, continue with item 12.
: 14. Additional Release Information: 0l N/A OR A. El Noble Gases __             Curies per second           B. El todines __       Cunes per second C. Airbome: Date Started           /     I       Time Started -                   Date Stopped         1 /             lime Stopped --  _
: 12.
D. Liquid:       Date Started     /     I       Time Started       __            Date Stopped       /     /         Time Stopped __
Plant Conditions:
Distance                               Proiected Thyroid Dose (CDEt for 1 Hour             Proiected Total Dos e (TEDE) for 1 Hour 1 Mile (Site Boundary)                 E.                                   mrem           F.                                 mrem 2 Miles                               G.                                   mram           H.                                 mrem 5 Miles                               I.                                   mrem           J.                                 mrem 10 Miles                               K.                                   mrem           L.                                 mrem EC or RM Approval Signature:                                                               Date:     I   /           Time: __
A. Reactor Shutdown? 0l Yes [I No B. Core Adequately Cooled? El Yes [] No C. Containment Intact? El Yes El No
: 15. Message Received By: Name:                                                                  Date:    /    /            Time:
: 0. Core Condition: 0l Stable 0l Degrading 13.
14.
Weather Data:
A. Wind Speed __
mph B. Stability Class Additional Release Information: 0l N/A OR A. El Noble Gases __
Curies per second B. El todines __
Cunes per second C. Airbome: Date Started  
/
I Time Started -
Date Stopped 1  
/
D. Liquid:
Date Started  
/
I Time Started Date Stopped  
/  
/
Distance Proiected Thyroid Dose (CDEt for 1 Hour Proiected Total Dos 1 Mile (Site Boundary)
E.
mrem F.
2 Miles G.
mram H.
5 Miles I.
mrem J.
10 Miles K.
mrem L.
lime Stopped --
Time Stopped __
e (TEDE) for 1 Hour mrem mrem mrem mrem EC or RM Approval Signature:
Date:
I  
/
Date:
/
/
Time: __
Time:
: 15.
Message Received By: Name:
If emergency class escalation is known to be necessary and a new notification form will be transmitted within 15 minutes, then you may go to line 15.
If emergency class escalation is known to be necessary and a new notification form will be transmitted within 15 minutes, then you may go to line 15.
PSL-F070                                                                                                                           Effective Date: 08/29/03 END OF ATTACHMENT 1
PSL-F070 Effective Date: 08/29/03 END OF ATTACHMENT 1


REVISION NO.:             PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
6A                 OFF-SITE NOTIFICATIONS AND PROTECTIVE                     34 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT
PROCEDURE TITLE:
                                        &#xb6;6 ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 7)
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 34 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT
&#xb6;6 ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 7)
ITEM ENTRY On-line Verification - Check the appropriate boxes as the State Warning Point (Florida Division of Emergency Management) requests that St. Lucie County Department of Public Safety and the Martin County Division of Emergency Management get on the line, prior to initiating the notification. All three agencies must be notified through the SWP or alternate means.
ITEM ENTRY On-line Verification - Check the appropriate boxes as the State Warning Point (Florida Division of Emergency Management) requests that St. Lucie County Department of Public Safety and the Martin County Division of Emergency Management get on the line, prior to initiating the notification. All three agencies must be notified through the SWP or alternate means.
: 1.     Check appropriate box for drill or actual emergency as the case may be. During exercises, drills, or tests, each message shall be checked THIS IS A DRILL.
: 1.
2A.     Enter today's date.
Check appropriate box for drill or actual emergency as the case may be. During exercises, drills, or tests, each message shall be checked THIS IS A DRILL.
2B.     Enter the time (using the official time, normally synchronized with ERDADS) when contact is made with the State Warning Point or the start time of the RM PAR Briefing. For initial notification of classification, this shall be within 15 minutes of the "Emergency Declaration" time in item 5.
2A.
2C. Enter the name of the person making the notification call.
Enter today's date.
2D. Enter the message number beginning with #1 and following sequentially in all facilities (e.g., if the Control Room transmitted two messages the TSC would start with #3).
2B.
2E. Check the box for the facility from which the notification is being made.
Enter the time (using the official time, normally synchronized with ERDADS) when contact is made with the State Warning Point or the start time of the RM PAR Briefing. For initial notification of classification, this shall be within 15 minutes of the "Emergency Declaration" time in item 5.
: 3.     Site Check the box for the appropriate plant site for the emergency declaration (both St Lucie boxes might need to be checked for dual unit events such as approach of a hurricane).
2C.
: 4.     Emergency Classification Check the box corresponding to current accident classification declared.
Enter the name of the person making the notification call.
: 5.     Emergency Declaration or Emergency Termination Enter the date and time when the current emergency classification was declared (A) or (B) when the emergency was terminated.
2D.
Enter the message number beginning with #1 and following sequentially in all facilities (e.g., if the Control Room transmitted two messages the TSC would start with #3).
2E.
Check the box for the facility from which the notification is being made.
: 3.
Site Check the box for the appropriate plant site for the emergency declaration (both St Lucie boxes might need to be checked for dual unit events such as approach of a hurricane).
: 4.
Emergency Classification Check the box corresponding to current accident classification declared.
: 5.
Emergency Declaration or Emergency Termination Enter the date and time when the current emergency classification was declared (A) or (B) when the emergency was terminated.


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                     35 of 49 PROCEDURE NO.:                   ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 2 of 7)
PROCEDURE TITLE:
: 6.     Reason for Emerqency Declaration Enter the Emergency Action Level (EAL) number (A) (This option is currently not being used at Plant St. Lucie) or (B) enter wording like that found in the EAL information in EPIP-01, Classification Of Emergencies. Wording should be brief yet descriptive enough for the off-site agencies to gain an understanding of the event. It should be clear from the incident description which EAL has necessitated the emergency declaration. Wording should be as non-technical as possible with no acronyms or abbreviations. This information should remain the same throughout update messages, unless there is a classification change.
PAGE:
        "*"asterisk and instruction provided at the bottom of form - If Emergency Class escalation is necessary due to rapidly degrading conditions, Then provide the State and County authorities with the initial notification information by transmitting lines 1-6, at a minimum, on the State Notification Form (SNF) and terminate the call by stating that a new notification form will be provided within 15 minutes.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 35 of 49 PROCEDURE NO.:
: 7.     Additional Information or Update Check "None" (A) or (B) Description and enter additional information, if necessary, or reason for update here. For example:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 2 of 7)
* Protective Action Recommendations (PARs) change
: 6.
* An occurrence that would otherwise result in a lower emergency classification, on other unit
Reason for Emerqency Declaration Enter the Emergency Action Level (EAL) number (A) (This option is currently not being used at Plant St. Lucie) or (B) enter wording like that found in the EAL information in EPIP-01, Classification Of Emergencies. Wording should be brief yet descriptive enough for the off-site agencies to gain an understanding of the event. It should be clear from the incident description which EAL has necessitated the emergency declaration. Wording should be as non-technical as possible with no acronyms or abbreviations. This information should remain the same throughout update messages, unless there is a classification change.
* Weather changes affecting public safety Radiation level changes
"*" asterisk and instruction provided at the bottom of form - If Emergency Class escalation is necessary due to rapidly degrading conditions, Then provide the State and County authorities with the initial notification information by transmitting lines 1-6, at a minimum, on the State Notification Form (SNF) and terminate the call by stating that a new notification form will be provided within 15 minutes.
* Loss of off-site power, etc.
: 7.
Additional Information or Update Check "None" (A) or (B) Description and enter additional information, if necessary, or reason for update here. For example:
Protective Action Recommendations (PARs) change An occurrence that would otherwise result in a lower emergency classification, on other unit Weather changes affecting public safety Radiation level changes Loss of off-site power, etc.


REVISION NO.:           PROCEDURE TITLE:                                           PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                       36 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 3 of 7)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 36 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 3 of 7)
NOTE If the Class A Model (dose projection model) is being used, a 'State Notification Form Summary Sheet' is available which provides information for items 8-11, 13 and 14. The information is in a format similar to that found on the Florida Nuclear Plant Emergency Notification Form.
NOTE If the Class A Model (dose projection model) is being used, a 'State Notification Form Summary Sheet' is available which provides information for items 8-11, 13 and 14. The information is in a format similar to that found on the Florida Nuclear Plant Emergency Notification Form.
: 8.     Weather Data NOTE 10 meter data should be used.
: 8.
A.       &#xb6;10 Wind direction can be obtained from ERDADS by depressing the "EPIP" key, on the top row of the keyboard. The Met Tower Indicator Panel in the Unit 1 Control Room is an alternate source. If these two sources are not available, refer to Attachment 1, Meteorological Data, in EPIP-09, Off-Site Dose Calculations.
Weather Data NOTE 10 meter data should be used.
B.       If the wind direction is greater than 3600 the wind direction is determined by subtracting 360' from the indicated number. Wind direction should be rounded to the nearest whole number.
A.  
C.     Wind direction is always given as "wind from" (an easterly wind, or wind direction 90', means that the wind is blowing from east to west).
&#xb6;10 Wind direction can be obtained from ERDADS by depressing the "EPIP" key, on the top row of the keyboard. The Met Tower Indicator Panel in the Unit 1 Control Room is an alternate source. If these two sources are not available, refer to Attachment 1, Meteorological Data, in EPIP-09, Off-Site Dose Calculations.
D.     When determining the sectors affected, the adjacent sectors on both sides of the actual downwind sector are included. Three sectors will typically be listed.
B.
E.     If the wind is located on the edge of a sector (i.e., 11 0, 330, etc.) an additional (fourth) sector should be added.
If the wind direction is greater than 3600 the wind direction is determined by subtracting 360' from the indicated number. Wind direction should be rounded to the nearest whole number.
F.     Enter the wind direction (wind from) in degrees in item "A."
C.
Wind direction is always given as "wind from" (an easterly wind, or wind direction 90', means that the wind is blowing from east to west).
D.
When determining the sectors affected, the adjacent sectors on both sides of the actual downwind sector are included. Three sectors will typically be listed.
E.
If the wind is located on the edge of a sector (i.e., 11 0, 330, etc.) an additional (fourth) sector should be added.
F.
Enter the wind direction (wind from) in degrees in item "A."


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                     37 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                               ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 4 of 7)
PROCEDURE TITLE:
B.     (continued)
PAGE:
G.     Enter the downwind sectors in item "B."
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 37 of 49 PROCEDURE NO.:
Wind             Sectors         Wind           Sectors       Wind           Sectors From             Affected       From           Affected       From           Affected 348-11           HJK             123-146       PQR           236-258         CDE 11-33           JKL             146-168       QRA           258-281         DEF 33-56           KLM             168-191       RAB           281-303         EFG 56-78           LMN             191-213       ABC           303-326         FGH 78-101           MNP             213-236       BCD           326-348         GHJ 101-123         NPQ             There is no "0"sector         There is no "I"sector
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 4 of 7)
: 9.     Release Status A.       If there are no indications of a release of radioactive material, check box "A" and go to item 11.                                                           0)
B.
(continued)
G.
Enter the downwind sectors in item "B."
Wind Sectors Wind Sectors Wind Sectors From Affected From Affected From Affected 348-11 HJK 123-146 PQR 236-258 CDE 11-33 JKL 146-168 QRA 258-281 DEF 33-56 KLM 168-191 RAB 281-303 EFG 56-78 LMN 191-213 ABC 303-326 FGH 78-101 MNP 213-236 BCD 326-348 GHJ 101-123 NPQ There is no "0" sector There is no "I" sector
: 9.
Release Status A.
If there are no indications of a release of radioactive material, check box "A" and go to item 11.
A release of radioactive material (during any declared emergency) is defined as:
A release of radioactive material (during any declared emergency) is defined as:
Any effluent monitor increase of (approximately) 10 times or one decade above pre-transient values OR Health Physics detecting airborne radioactivity levels in excess of 25% derived air concentration (DAC) outside of plant buildings due to failure of equipment associated with the declared emergency.
Any effluent monitor increase of (approximately) 10 times or one decade above pre-transient values OR Health Physics detecting airborne radioactivity levels in excess of 25% derived air concentration (DAC) outside of plant buildings due to failure of equipment associated with the declared emergency.
B.     If a release of radioactive material is occurring, even though it may be less than normal operating limits, check box "B."
B.
C. If a release has occurred but stopped, check box "C."
If a release of radioactive material is occurring, even though it may be less than normal operating limits, check box "B."
C.
If a release has occurred but stopped, check box "C."
Dose Assessment personnel in the TSC or EOF will have this information.
Dose Assessment personnel in the TSC or EOF will have this information.
The TSC Chemistry Supervisor, TSC HP Supervisor or EOF HP Manager should be contacted for the data.
The TSC Chemistry Supervisor, TSC HP Supervisor or EOF HP Manager should be contacted for the data.
0)


REVISION NO.:             PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A                 OFF-SITE NOTIFICATIONS AND PROTECTIVE                     38 of 49 PROCEDURE NO.:                       ACTION RECOMMENDATIONS EPIP-08                               ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 5 of 7)
PROCEDURE TITLE:
: 10. Release Significance Category Do Not Check Any Box in Item 10 if you Checked Box 9 "A" No Release A.       If a release is occurring or has occurred and dose information is not available at the time of notification, check box "A" and follow up as soon as information becomes available.
PAGE:
B.     Check box "B" if both noble gas and iodine release rates are less than or equal to the following:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 38 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 5 of 7)
: 10.
Release Significance Category Do Not Check Any Box in Item 10 if you Checked Box 9 "A" No Release A.
If a release is occurring or has occurred and dose information is not available at the time of notification, check box "A" and follow up as soon as information becomes available.
B.
Check box "B" if both noble gas and iodine release rates are less than or equal to the following:
Noble Gas release < 3.5 E+5 pCi/sec (3.5 E-1 Ci/sec)
Noble Gas release < 3.5 E+5 pCi/sec (3.5 E-1 Ci/sec)
Iodine release < 4.6 E+1 pCi/sec (4.6 E-5 Ci/sec)
Iodine release < 4.6 E+1 pCi/sec (4.6 E-5 Ci/sec)
C.     Check box "C" if either noble gas or iodine release rates exceed the values in "B" (above) but forecasted 1 mile doses are less than either 500 mrem TEDE or 1000 mrem Thyroid CDE. These doses are less than the state's Protective Action Guide (PAG) levels.
C.
D.     Check box "D" if forecasted 1 mile doses are greater than or equal to either 500 mrem TEDE or 1000 mrem Thyroid CDE. These PAG levels require state and county action.
Check box "C" if either noble gas or iodine release rates exceed the values in "B" (above) but forecasted 1 mile doses are less than either 500 mrem TEDE or 1000 mrem Thyroid CDE. These doses are less than the state's Protective Action Guide (PAG) levels.
: 11. Utility Recommended Protective Actions A.       If there are no Protective Action Recommendations (PARs), check Box "A."
D.
B.     If PARs are necessary, check Box "B". Two formats are provided to record PARs. Use the "sector" format and determine appropriate PARs using the guidance in Attachment 2 to this procedure. Copy the PARs into item 11 "C."
Check box "D" if forecasted 1 mile doses are greater than or equal to either 500 mrem TEDE or 1000 mrem Thyroid CDE. These PAG levels require state and county action.
: 11.
Utility Recommended Protective Actions A.
If there are no Protective Action Recommendations (PARs), check Box "A."
B.
If PARs are necessary, check Box "B". Two formats are provided to record PARs. Use the "sector" format and determine appropriate PARs using the guidance in Attachment 2 to this procedure. Copy the PARs into item 11 "C."
Indicate PARs using only the words NONE, ALL, ALL REMAINING or by listing the letters of the sectors affected. Protective Action Recommendations shall be approved by the Emergency Coordinator (EC) or the Recovery Manager (RM). The "zone" format is for Crystal River Unit 3 use only.
Indicate PARs using only the words NONE, ALL, ALL REMAINING or by listing the letters of the sectors affected. Protective Action Recommendations shall be approved by the Emergency Coordinator (EC) or the Recovery Manager (RM). The "zone" format is for Crystal River Unit 3 use only.
C.     Check the "Yes" box (to consider issuance of potassium iodide (KI) only if:
C.
(1)     A General Emergency has been declared AND (2)     A release of radioactive material is occurring.
Check the "Yes" box (to consider issuance of potassium iodide (KI) only if:
(1)
A General Emergency has been declared AND (2)
A release of radioactive material is occurring.


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                   39 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 6 of 7)
PROCEDURE TITLE:
: 12. Plant Conditions Answer the three questions "Yes" or "No" by checking the appropriate box.
PAGE:
A. Is the reactor shut down?
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 39 of 49 PROCEDURE NO.:
B. Is the core adequately cooled?
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 6 of 7)
C. Is the containment intact?
: 12.
Plant Conditions Answer the three questions "Yes" or "No" by checking the appropriate box.
A.
Is the reactor shut down?
B.
Is the core adequately cooled?
C.
Is the containment intact?
Answer the question regarding the condition of the core as either stable or degrading.
Answer the question regarding the condition of the core as either stable or degrading.
: 13. Weather Data NOTE 10 meter data should be used.
: 13.
A.     &#xb6;10 Temperature, wind speed and wind direction can be obtained from ERDADS by depressing the "EPIP" key, on the top row of the keyboard. The Met Tower Indicator Panel in the Unit 1 Control Room is an alternate source. If these two sources are not available, refer to Attachment 7, Meteorological Data, in EPIP-09, Off-site Dose Calculations.
Weather Data NOTE 10 meter data should be used.
B. Enter wind speed in Miles Per Hour (MPH) in item "A".
A.  
C.     Stability Class - Enter the stability class as determined by using the figure below. The figure shows the relationship between the Delta T displayed by ERDADS and the stability class.
&#xb6;10 Temperature, wind speed and wind direction can be obtained from ERDADS by depressing the "EPIP" key, on the top row of the keyboard. The Met Tower Indicator Panel in the Unit 1 Control Room is an alternate source. If these two sources are not available, refer to, Meteorological Data, in EPIP-09, Off-site Dose Calculations.
If Delta-T is                 Then Stability Class is Less than or equal to -1.7                       A
B.
                          -1.6 to -1.5                             B
Enter wind speed in Miles Per Hour (MPH) in item "A".
                              -1.4                                 C
C.
                          -1.3 to -0.5                             D
Stability Class - Enter the stability class as determined by using the figure below. The figure shows the relationship between the Delta T displayed by ERDADS and the stability class.
                          -0.4 to +1.4                             E
If Delta-T is Then Stability Class is Less than or equal to -1.7 A
                        +1.5 to +3.6                             F Greater than +3.6                           G
-1.6 to -1.5 B
-1.4 C
-1.3 to -0.5 D
-0.4 to +1.4 E
+1.5 to +3.6 F
Greater than +3.6 G


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE                   40 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 7 of 7)
PROCEDURE TITLE:
: 14. Additional Release Information This section requires that a release be in progress and completed results of dose assessment be available. Check the "N/A" box if no release is occurring and/or if dose information is not available. Otherwise, provide all information that applies.
PAGE:
A.     Enter the noble gas release rate in curies per second.
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 40 of 49 PROCEDURE NO.:
B.     Enter the iodine release rate in curies per second.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 7 of 7)
C. For an airborne release, enter the date and time started and when terminated, the date and stopped.
: 14.
D. For a liquid release, enter the date and time started and when terminated, the date and time stopped.
Additional Release Information This section requires that a release be in progress and completed results of dose assessment be available. Check the "N/A" box if no release is occurring and/or if dose information is not available. Otherwise, provide all information that applies.
A.
Enter the noble gas release rate in curies per second.
B.
Enter the iodine release rate in curies per second.
C.
For an airborne release, enter the date and time started and when terminated, the date and stopped.
D.
For a liquid release, enter the date and time started and when terminated, the date and time stopped.
Projected Dose Information - Enter the projected Thyroid Dose (CDE) in mrem for 1 hour (EPIP-09, Manual Dose Calculation Worksheet, Line 5) and the projected Total Dose (TEDE) in mrem for 1 hour (EPIP-09, Manual Dose Calculation Worksheet, Line 16) for the site boundary 2, 5 and 10 miles.
Projected Dose Information - Enter the projected Thyroid Dose (CDE) in mrem for 1 hour (EPIP-09, Manual Dose Calculation Worksheet, Line 5) and the projected Total Dose (TEDE) in mrem for 1 hour (EPIP-09, Manual Dose Calculation Worksheet, Line 16) for the site boundary 2, 5 and 10 miles.
: 15. Message Received By Enter the name of the State Warning Point Duty Officer or the individual that receives the notification. Enter the time at the State Warning Point (request it from the Duty Officer) and indicate the date the call is completed.
: 15.
Message Received By Enter the name of the State Warning Point Duty Officer or the individual that receives the notification. Enter the time at the State Warning Point (request it from the Duty Officer) and indicate the date the call is completed.
END OF ATTACHMENT 1A
END OF ATTACHMENT 1A


REVISION NO.:               PROCEDURE TITLE:                                                               PAGE:
REVISION NO.:
6A                   OFF-SITE NOTIFICATIONS AND PROTECTIVE                                           41 of 49 PROCEDURE NO.:                               ACTION RECOMMENDATIONS EPIP-08                                             ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 41 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
(Page 1 of 5)
(Page 1 of 5)
NOTE
NOTE Initial notification from the Control Room may utilize PARs based on plant conditions.
            "    Initial notification from the Control Room may utilize PARs based on plant conditions.
" Once dose assessment begins, PARs should be made utilizing all available data including off-site dose projections, plant conditions and field monitoring data.
            "   Once dose assessment begins, PARs should be made utilizing all available data including off-site dose projections, plant conditions and field monitoring data.
" Both plant conditions and off-site doses shall be considered for PARs.
            "   Both plant conditions and off-site doses shall be considered for PARs.
" The most conservative recommendations should be made.
            " The most conservative recommendations should be made.
If it is anticipated that a threshold for a PAR will be exceeded, it is neither necessary nor desirable to wait until the threshold is exceeded to make that PAR.
* If it is anticipated that a threshold for a PAR will be exceeded, it is neither necessary nor desirable to wait until the threshold is exceeded to make that PAR.
&#xb6;12 Conditions (plant information, dose projections and field monitoring results) are to be continually assessed and PARs expanded, as necessary, to ensure that adequate (most conservative) PARs are issued.
            *  &#xb6;12     Conditions (plant information, dose projections and field monitoring results) are to be continually assessed and PARs expanded, as necessary, to ensure that adequate (most conservative) PARs are issued.
112 Previously issued PARs, unless found to be less conservative, are to remain in effect until the threat is fully under control and the event is being de-escalated.
* 112     Previously issued PARs, unless found to be less conservative, are to remain in effect until the threat is fully under control and the event is being de-escalated.
&#xb6;12 Only State and County officials can implement, change and/or terminate protective actions.
            *  &#xb6;12     Only State and County officials can implement, change and/or terminate protective actions.
: 1.
: 1. PAR Flowchart A.       PARs Based on Plant Conditions
PAR Flowchart A.
: 1.     Begin in the upper left hand corner of the chart by answering the General Emergency (GE) question.
PARs Based on Plant Conditions
: 2.     Correctly answer the questions until you reach one of the boxes that provides PAR information based on plant conditions.
: 1.
: 3.     If there is no release, Then go to the PAR Worksheet and fill-in the PARs based on plant conditions. The sectors affected can be determined by referring to number 8, Weather Data, in Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
Begin in the upper left hand corner of the chart by answering the General Emergency (GE) question.
: 4.       If a release is involved, Then go to Section B, PARs Based on Off-site Dose, below.
: 2.
Form #PSL-F156             EPIP-08, Off-Site Notifications and Protective Action Recommendations Effective Date 12/10/03
Correctly answer the questions until you reach one of the boxes that provides PAR information based on plant conditions.
: 3.
If there is no release, Then go to the PAR Worksheet and fill-in the PARs based on plant conditions. The sectors affected can be determined by referring to number 8, Weather Data, in Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
: 4.
If a release is involved, Then go to Section B, PARs Based on Off-site Dose, below.
Form #PSL-F156 EPIP-08, Off-Site Notifications and Protective Action Recommendations Effective Date 12/10/03


REVISION NO.:             PROCEDURE TITLE:                                                                   PAGE:
REVISION NO.:
6A                 OFF-SITE NOTIFICATIONS AND PROTECTIVE                                               42 of 49 PROCEDURE NO.:                             ACTION RECOMMENDATIONS EPIP-08                                           ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 42 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
(Page 2 of 5)
(Page 2 of 5)
: 1.     (continued)
: 1.
(continued)
NOTE
NOTE
* If the Class A Model printout, State Notification Form Summary Sheet is available, it should be used to compare dose-based PARs against PARs based on plant conditions.
* If the Class A Model printout, State Notification Form Summary Sheet is available, it should be used to compare dose-based PARs against PARs based on plant conditions.
              " Calculated off-site doses should be compared to field monitoring data when determining PARs.
" Calculated off-site doses should be compared to field monitoring data when determining PARs.
B.     PARs Based on Off-site Dose
B.
: 1. PARs are based on the Total Effective Dose Equivalent (TEDE or total dose) and / or the Committed Dose Equivalent (CDE, thyroid dose). Do NOT use dose rate values.
PARs Based on Off-site Dose
: 2. If using the Class A Model, Then in Forecast Mode, print the State Notification Form Summary for computer generated PARs.
: 1.
: a.       Go to Section C, PAR Worksheet
PARs are based on the Total Effective Dose Equivalent (TEDE or total dose) and / or the Committed Dose Equivalent (CDE, thyroid dose). Do NOT use dose rate values.
: 3. If using EPIP-09, Off-site Dose Calculations, Then calculate TEDE and CDE in accordance with the procedure.
: 2.
: a.       Compare the TEDE dose at 1 mile with the values on the Flowchart. Enter the chart at the appropriate dose level by determining ifthe dose is between 500 and 999 mrem or between 1000 and 4999 mrem or 5000 mrem or greater.
If using the Class A Model, Then in Forecast Mode, print the State Notification Form Summary for computer generated PARs.
: b.       From the selected dose level, move to the right on the chart to the first column, 0-2 miles. The PAR provided corresponds to the calculated TEDE at 1 mile.
: a.
: c.       Enter the PAR in the 0-2 miles block on the TEDE DOSE table below the PAR Flowchart. The sectors affected can be determined by referring to number 8, Weather Data, in Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
Go to Section C, PAR Worksheet
: d.       Continue to determine the corresponding PAR at 2-5 miles using the calculated 2 mile TEDE, at 5-10 miles using the calculated 5 mile TEDE and the 10 miles plus (To Be Determined (TBD) distance) using the calculated 10 mile TEDE, as necessary.
: 3.
: e.       Enter the PAR information In the appropriate blocks of the TEDE DOSE table.
If using EPIP-09, Off-site Dose Calculations, Then calculate TEDE and CDE in accordance with the procedure.
Form #PSL-F 156         EPIP-08, Off-Site Notifications and ProtocUve AcIjon Rtconwodaltons Effective Date 12/10/03
: a.
Compare the TEDE dose at 1 mile with the values on the Flowchart. Enter the chart at the appropriate dose level by determining if the dose is between 500 and 999 mrem or between 1000 and 4999 mrem or 5000 mrem or greater.
: b.
From the selected dose level, move to the right on the chart to the first column, 0-2 miles. The PAR provided corresponds to the calculated TEDE at 1 mile.
: c.
Enter the PAR in the 0-2 miles block on the TEDE DOSE table below the PAR Flowchart. The sectors affected can be determined by referring to number 8, Weather Data, in A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.
: d.
Continue to determine the corresponding PAR at 2-5 miles using the calculated 2 mile TEDE, at 5-10 miles using the calculated 5 mile TEDE and the 10 miles plus (To Be Determined (TBD) distance) using the calculated 10 mile TEDE, as necessary.
: e.
Enter the PAR information In the appropriate blocks of the TEDE DOSE table.
Form #PSL-F 156 EPIP-08, Off-Site Notifications and ProtocUve AcIjon Rtconwodaltons Effective Date 12/10/03


REVISION NO.:           PROCEDURE TITLE:                                                                 PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                                           43 of 49 PROCEDURE NO.:                           ACTION RECOMMENDATIONS EPIP-08                                       ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 43 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
(Page 3 of 5)
(Page 3 of 5)
: 1.     B.     3.   (continued)
: 1.
: f.       Follow the same methodology for determining the PARs corresponding to the calculated CDE values beginning with the calculated value at 1 mile.
B.
: g.       Enter each of the determined PARs in the CDE (Thyroid) DOSE table below the PAR Flowchart.
: 3.
: h.       Go to Section C, PAR Worksheet.
(continued)
C.     PAR Worksheet
: f.
: 1. Fill-in the time / date and emergency class.
Follow the same methodology for determining the PARs corresponding to the calculated CDE values beginning with the calculated value at 1 mile.
: 2. In Part A, determine the most conservative PARs by comparing the PARs based on plant conditions against those based on off-site dose. It is important to compare PARs at each distance (0-2, 2-5, 5-10) because the basis of the most conservative PAR could be different at different distances.
: g.
: 3. Enter the most conservative PARs into the table in Part B, Protective Actions Recommended by FPL. Use the word(s) NONE, ALL, ALL REMAINING or list the individual affected sectors by letter.
Enter each of the determined PARs in the CDE (Thyroid) DOSE table below the PAR Flowchart.
: 4. Obtain review and approval.
: h.
: 5. Transfer the approved PARs to the Florida Nuclear Plant Emergency Notification Form.
Go to Section C, PAR Worksheet.
Form #PSL-F 156         EPIP-08, Off-Site Notifications and Protective Action Recommendations Effective Date 12/10/03
C.
PAR Worksheet
: 1.
Fill-in the time / date and emergency class.
: 2.
In Part A, determine the most conservative PARs by comparing the PARs based on plant conditions against those based on off-site dose. It is important to compare PARs at each distance (0-2, 2-5, 5-10) because the basis of the most conservative PAR could be different at different distances.
: 3.
Enter the most conservative PARs into the table in Part B, Protective Actions Recommended by FPL. Use the word(s) NONE, ALL, ALL REMAINING or list the individual affected sectors by letter.
: 4.
Obtain review and approval.
: 5.
Transfer the approved PARs to the Florida Nuclear Plant Emergency Notification Form.
Form #PSL-F 156 EPIP-08, Off-Site Notifications and Protective Action Recommendations Effective Date 12/10/03


REVISION NO.:                         PROCEDURE TITLE:                                                                                                                 PAGE:
REVISION NO.:
6A                               OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:                                             ACTION RECOMMENDATIONS EPIP-08                                                               ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
(Page 4 of 5)
(Page 4 of 5)
Y.
Y.
MILES             MILE '
MILE Note MILES NO ACTION EVACUATE SHELTER
NO ACTION           EVACUATE               '
: 1. Sewsrq i=e ored i wc W
SHELTER             Note
-Los of cleciil furidiori req~ired for =*~ prolieclio (e.g., ion of injection with LOCA) OR 0-2 None All None oghco.
: 1. Sewsrq                 i wc          W .
p*r.
i=e ored                                                     OR
(oalid CET geater Vin 7Wo F) OR 2-5 None (Sectors Affected) All Remaining CHRRM reading greamtw gon 42 E4 "Air.
                                                                                          -Los of cleciil furidiori req~ired for =*~ prolieclio (e.g., ion of injectionwith LOCA) 0-2             None               All               None                 .      oghco.
5-10 None None All
                                                                                                -      p*r.       (oalid CET geater Vin 7Wo F) OR 2-5             None       (Sectors Affected) AllRemaining                  CHRRM reading greamtw     gon 42 E4 "Air.
: 2. Lin of phy-wrs of Comlr Roourm oW redo op.mlg wrow to ar.
5-10           None             None                 All           2. Lin of phy-       wrs     of Comlr   RoourmoW redo op.mlg wrow to ar.
PARs Based on Off-Site Dose (For use with manual dose calculation only. Not to be completed when Class A Model is used)
PARs Based                                 on         Off-Site Dose (For use with manual dose calculation only. Not to be completed when Class A Model is used)
CDE C,-.- &#xfd;. o0 TEDE (Thyroid)
CDE                                                                                     C,-.- &#xfd;.           o0 TEDE                   (Thyroid)                                                                               I DOSE DOSE                   DOSEs DOSEj             I Use 1     mile value 1      2-5Miles Use 2 mile valu.
I DOSE DOSEs 1
r      5-10OMiles              1 Use 5 mile value TEDE                 F CDE                                                           Shelter                          Shelter 500--999               11000-4999         -          Shelter A mrem                       re                                               (Sectors Affected)                 (Sectors Affected)
2-5Miles r
            'Ds-   t0i ow t-is     r-,Iuke NO ACTION Evacuate                          Evacuate TEDE                       CDE                                                (Sectors Affected)                  (Sectors Affected) 1000-4999                 5000-24999               Evacuate All mrem                       mrem                                                      Shelter                          Shelter All Remaining                     All Remaining Evacuate TEDE                      COE 25000 mrem                                                   Evacuate All                   (Sectors+Affected) 5000 mrem or                                        -  Evacuate All or                                                                                          Shelter IGreater                      Greater                                                                                  All Remaining Use the following terms in this table: NONE, ALL, ALL REMAINING TEDE DOSE                                            or fill in the letters of the sectors affected.
5-10OMiles 1
Miles                     NO ACTION                           EVACUATE                                       SHELTER 0-2 2-5 5-10
DOSE DOSEj I Use 1 mile value Use 2 mile valu.
                >.10 Use the following terms inthis table: NONE, ALL, ALL REMAINING CDE (Thyroid) DOSE                                   or fill inthe letters of the sectors affected.
Use 5 mile value TEDE F
Miles                     NO ACTION                           EVACUATE                                       SHELTER 0-2                                                                                                                                     ....
CDE 500--999 11000-4999 Shelter A Shelter Shelter mrem re (Sectors Affected)
2-5 5-10
(Sectors Affected)
                > 10 (PEPIEPIP-OMAPP       C-RI)
'Ds-t0i ow t-is r -,Iuke NO ACTION TEDE 1000-4999 mrem TEDE 5000 mrem or IGreater CDE 5000-24999 Evacuate All mrem Evacuate (Sectors Affected)
Form #PSL-F 156                         EPIP-08, Oft-Site Notifications and Protective Action Recommend, ations                                        Effective Date 12/10/03
Shelter All Remaining Evacuate (Sectors Affected)
Shelter All Remaining COE 25000 mrem or Greater Evacuate
- Evacuate All Evacuate All (Sectors+Affected)
Shelter All Remaining Use the following terms in this table: NONE, ALL, ALL REMAINING or fill in the letters of the sectors affected.
TEDE DOSE Miles NO ACTION EVACUATE SHELTER 0-2 2-5 5-10
>.10 Use the following terms in this table: NONE, ALL, ALL REMAINING CDE (Thyroid) DOSE or fill in the letters of the sectors affected.
Miles NO ACTION EVACUATE SHELTER 0-2 2-5 5-10
> 10 (PEPIEPIP-OMAPP C-RI) ations Effective Date 12/10/03 Form #PSL-F 156 EPIP-08, Oft-Site Notifications and Protective Action Recommend,


REVISION NO.:           PROCEDURE TITLE:                                                                     PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:                             ACTION RECOMMENDATIONS EPIP-08                                         ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
PROCEDURE TITLE:
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)
(Page 5 of 5)
(Page 5 of 5)
PAR WORKSHEET Time / Date                                                 Emergency Class:         0 SAE     0 GE A.       PAR Comparison After comparing the possible recommendations from the PARs flowchart, the most conservative PARs are based on: (check one) 0] PLANT CONDITIONS                           0 OFF-SITE DOSE B.     Protective Actions Recommended by FPL:
PAR WORKSHEET Time / Date Emergency Class: 0 SAE 0 GE A.
PAR Comparison After comparing the possible recommendations from the PARs flowchart, the most conservative PARs are based on: (check one) 0] PLANT CONDITIONS 0 OFF-SITE DOSE B.
Protective Actions Recommended by FPL:
Use the following terms in this table: NONE, ALL, ALL REMAINING Or fill in the letters of the sectors affected.
Use the following terms in this table: NONE, ALL, ALL REMAINING Or fill in the letters of the sectors affected.
NO ACTION SECTORS                     EVACUATE SECTORS SHELTER SECTORS 0-2 miles 2-5 miles 5-10 miles 10-TBD miles*
NO ACTION SECTORS EVACUATE SECTORS SHELTER SECTORS 0-2 miles 2-5 miles 5-10 miles 10-TBD miles*
    *If necessary, add to State Notification Form.
*If necessary, add to State Notification Form.
Control Room Signature Emergency Coordinator Technical Support Center Signature TSC EC Assistant / Logkeeper                     TSC HP Supervisor or TSC Chemistry Supervisor Emergency Operations Facility Signature EOF RM OPS Advisor / Logkeeper                                       EOF HP Manager Form #PSL-F 156         EPIP-08, Off-Site Notifications and Protective Action Recommendations   Effective Date 12/10(03 END OF ATTACHMENT 2
Control Room Signature Emergency Coordinator Technical Support Center Signature TSC EC Assistant / Logkeeper TSC HP Supervisor or TSC Chemistry Supervisor Emergency Operations Facility Signature EOF RM OPS Advisor / Logkeeper EOF HP Manager Form #PSL-F 156 EPIP-08, Off-Site Notifications and Protective Action Recommendations Effective Date 12/10(03 END OF ATTACHMENT 2


REVISION NO.:                     PROCEDURE TITLE:                                                                                     PAGE:
REVISION NO.:
6A                       OFF-SITE NOTIFICATIONS AND PROTECTIVE                                                                 46 of 49 PROCEDURE NO.:                                         ACTION RECOMMENDATIONS EPIP-08                                                   ST. LUCIE PLANT ATTACHMENT 3
PROCEDURE TITLE:
                  &#xb6;8     NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 1 of 2)
PAGE:
NRC FORM 361                                                                                                 U.S. NUCLEAR REGULATORY COMMISSION (12-2000)                                             REACTOR PLANT                                                       OPERATIONS CENTER EVENT NOTIFICATION WORKSHEET                                                       EN #
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 46 of 49 PROCEDURE NO.:
NOTIFICATION TIME           FACILITY OR ORGANIZATION                     IjUNIT     I NAME OF CALLER                             TCILL   BACK 0 EVENT TIME &ZONE           EVENT DATE                         IPOWERMODE BEFORE                               POWERMODE AFTER EVENT CLASSIFICATIONS                           1-Hr. Non-Emergency 10 CFR 60.72(b)()             -(v)(A)     Safe S/D Capability         AINA GENERAL EMERGENCY                         GEN/AAEC                 TS Deviation                   ADEV       (vXB)   RHR Capability             AINB SITE AREA EMERGENCY                         SIT/AAEC     4-Hr. Non-Emergency 10 CFR 60.72(b)(2)               (v)(C)   Control of Red Release     AINC ALERT                                       ALE/AAEC       W       TS Required S/D                 ASHU       (v)(D)   Accident Mitigation         AIND UNUSUAL EVENT                             UNU/AAEC         (iv)(A) ECCS Discharge to RCS           ACCS   -xii)       Offite Medical             AMED 50.72 NON-EMERGENCY               (see next columns)       (iv)(B) RPS Actuation (scram)           ARPS       J*xiii   Loss CommlAsmt/Resp       ACOM PHYSICAL SECURITY (73.71)                       DDDD       (xi)   Offsite Notification           APRE         60-Day Optional 10 CFR 60.73(a)(1)
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 3
MATERIAL/EXPOSURE                               B??.     -Hr. Non-Emergency 10 CFR 60.72(b)(2L               J'nvalid Specified System Actuation   AINA FITNESS FOR DUTY                                 HFIT       (ii)(A) Degraded Condition             ADEG     Other Unspecified Requirement (Identify)
&#xb6;8 NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 1 of 2)
OTHER UNSPECIFIED REOMT.           (see last column)       (ii)(B) Unanalyzed Condition           AUNA                                           NONR INFORMATION ONLY                                 NNF       (iv)(A) Specified System Actuation     AESF                                           NONR DESCRIPTION Include: Systems affected, actuations and their initiating signals, causes, effect of event on plant, actions taken or planned, etc. (Continue on back)
NRC FORM 361 U.S. NUCLEAR REGULATORY COMMISSION (12-2000)
NOTIFICATIONS         YES   NO     WI.L   B.E ANYTHING UNUSUAL OR NRC RESIDENT                                           NOT UNDERSTOOD?                         YES   xplainebove)         0]NO STATE(s)                             -    I             DID ALL SYSTEMS FUNCTION AS REQUIRED?                 0 YES                         0 NO (Explain above)
REACTOR PLANT OPERATIONS CENTER EVENT NOTIFICATION WORKSHEET EN #
LOCAL OTHER GOV AGENCIES         I     I         _I   _IMODE       OF OPERATION                 ESTIMATED                     ADDITIONAL INFO ON BACK MEDIA/PRESS RELEASE                                     UNTIL CORRECTED:                   IRESTART DATE:                 10   YES             0 NO Form # PSL-F080                 EPIP-08, Off-Site Notifications and Protective Action Recommendations,                               Effective Date: 08/29/03 and AP 0010721, NRC Required Non-Routine Notifications and Reports
NOTIFICATION TIME FACILITY OR ORGANIZATION IjUNIT I NAME OF CALLER TCILL BACK 0 EVENT TIME & ZONE EVENT DATE IPOWERMODE BEFORE POWERMODE AFTER EVENT CLASSIFICATIONS 1-Hr. Non-Emergency 10 CFR 60.72(b)()  
-(v)(A)
Safe S/D Capability AINA GENERAL EMERGENCY GEN/AAEC TS Deviation ADEV (vXB)
RHR Capability AINB SITE AREA EMERGENCY SIT/AAEC 4-Hr. Non-Emergency 10 CFR 60.72(b)(2)
(v)(C)
Control of Red Release AINC ALERT ALE/AAEC W
TS Required S/D ASHU (v)(D)
Accident Mitigation AIND UNUSUAL EVENT UNU/AAEC (iv)(A) ECCS Discharge to RCS ACCS  
-xii)
Offite Medical AMED 50.72 NON-EMERGENCY (see next columns)
(iv)(B) RPS Actuation (scram)
ARPS J*xiii Loss CommlAsmt/Resp ACOM PHYSICAL SECURITY (73.71)
DDDD (xi)
Offsite Notification APRE 60-Day Optional 10 CFR 60.73(a)(1)
MATERIAL/EXPOSURE B??.  
-Hr. Non-Emergency 10 CFR 60.72(b)(2L J'nvalid Specified System Actuation AINA FITNESS FOR DUTY HFIT (ii)(A)
Degraded Condition ADEG Other Unspecified Requirement (Identify)
OTHER UNSPECIFIED REOMT.
(see last column)
(ii)(B)
Unanalyzed Condition AUNA NONR INFORMATION ONLY NNF (iv)(A) Specified System Actuation AESF NONR DESCRIPTION Include: Systems affected, actuations and their initiating signals, causes, effect of event on plant, actions taken or planned, etc. (Continue on back)
NOTIFICATIONS YES NO WI.L B.E ANYTHING UNUSUAL OR NRC RESIDENT NOT UNDERSTOOD?
YES xplainebove) 0]NO STATE(s)
I DID ALL SYSTEMS LOCAL FUNCTION AS REQUIRED?
0 YES 0 NO (Explain above)
OTHER GOV AGENCIES I I
_I
_IMODE OF OPERATION ESTIMATED ADDITIONAL INFO ON BACK MEDIA/PRESS RELEASE UNTIL CORRECTED:
IRESTART DATE:
10 YES 0 NO Form # PSL-F080 EPIP-08, Off-Site Notifications and Protective Action Recommendations, Effective Date: 08/29/03 and AP 0010721, NRC Required Non-Routine Notifications and Reports


REVISION NO.:                     PROCEDURE TITLE:                                                                             PAGE:
REVISION NO.:
6A                     OFF-SITE NOTIFICATIONS AND PROTECTIVE                                                         47 of 49 PROCEDURE NO.:                                   ACTION RECOMMENDATIONS EPIP-08                                             ST. LUCIE PLANT ATTACHMENT 3
PROCEDURE TITLE:
                    %8     NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 2 of 2)
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 47 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 3
%8 NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 2 of 2)
RADIOLOGICAL RELEASES: CHECK OR FILL IN APPLICABLE ITEMS (specific detalslexplanations should be covered in event description)
RADIOLOGICAL RELEASES: CHECK OR FILL IN APPLICABLE ITEMS (specific detalslexplanations should be covered in event description)
JMONITORED ILIQUID RELEASE I IlARFO1 iRFIFASF I IINP ANNn R*PEA,*E I PLA IMur ori Ca=c I Ir*_*,_
ILIQUID RELEASE I IlARFO1 iRFIFASF I IINP ANNn R*PEA,*E I PLA IMur ori Ca=c I Ir*_*,_
I UNMONITORED PERSONNEL EXPOSED OR CONTAMINATED I I OFFSITE RELEASE Release Rate (IsecL I T.S. EXCEEDED             I RM ALARMSI II h-ro,,a.JU IOFSITE PROTECTIVE ACTIONS RECOMMENDEDI I*State release path in escription
I h-ro,,a.J I
                                                          % T.S. LIMIT       HOO GUIDE         Total Activity (CI)
U JMONITORED I
AREAS EVACUATED-
UNMONITORED I OFFSITE RELEASE I
                                                                                                                        % T.S. LIMIT       HOO GUIDE Noble Gas                                                                   0.1 Ci/sec                                                   1000 Ci Iodine                                                                     10 uCi/sec                                                   0.01 Ci Particulate                                                                 1 uCi/sec                                                     1 mCi Liquid (excluding tritium and                                               10 uCimin dissolved noble   gases)                                                   10 u   min   1__                                            0.1 Ci Liquid (tritlum)                                                             0.2 Ci/min                                                   5 Ci Total Activity
T.S. EXCEEDED I
____________            PLANT STACK       CONDENSERJAIR EJECTOR               MAIN STEAM LINE           SG BLOWDOWN             OTHER RAD MONITOR READINGS ALARM SETPOINTS
RM ALARMSI AREAS EVACUATED-PERSONNEL EXPOSED OR CONTAMINATED I IOFSITE PROTECTIVE ACTIONS RECOMMENDEDI I*State release path in escription Release Rate (IsecL
% T.S. LIMIT (if applicable)
% T.S. LIMIT HOO GUIDE Total Activity (CI)  
% T.S. LIMIT HOO GUIDE Noble Gas 0.1 Ci/sec 1000 Ci Iodine 10 uCi/sec 0.01 Ci Particulate 1 uCi/sec 1 mCi Liquid (excluding tritium and 10 uCimin dissolved noble gases) 10 u 1__
min 0.1 Ci Liquid (tritlum) 0.2 Ci/min 5 Ci Total Activity PLANT STACK CONDENSERJAIR EJECTOR MAIN STEAM LINE SG BLOWDOWN OTHER RAD MONITOR READINGS ALARM SETPOINTS
% T.S. LIMIT (if applicable)
RCS OR SG TUBE LEAKS: CHECK OR FILL IN APPLICABLE ITEMS: (specific details/explanations should be covered In event description)
RCS OR SG TUBE LEAKS: CHECK OR FILL IN APPLICABLE ITEMS: (specific details/explanations should be covered In event description)
LOCATION OF THE LEAK (e.g., SG #, valve, pipe, etc.)
LOCATION OF THE LEAK (e.g., SG #, valve, pipe, etc.)
LEAK RATE                               UNITS: gpm/gpd         T.S. LIMITS               jSUDDEN OR LONG-TERM DEVELOPMENT LEAK START DATE                         TIME                   COOLANT ACTIVITY             PRIMARY                       SECONDARY AND UNITS:
LEAK RATE UNITS: gpm/gpd T.S. LIMITS jSUDDEN OR LONG-TERM DEVELOPMENT LEAK START DATE TIME COOLANT ACTIVITY PRIMARY SECONDARY AND UNITS:
LIST OF SAFETY RELATED EQUIPMENT NOT OPERATIONAL EVENT DESCRIPTION (Continued from front)
LIST OF SAFETY RELATED EQUIPMENT NOT OPERATIONAL EVENT DESCRIPTION (Continued from front)
Form # PSL-F080                 EPIP-08, Off-Site Notifications and Protective Action Recommendations,                     Effective Date: 08/29/03 and AP 0010721, NRC Required Non-Routine Notifications and Reports END OF ATTACHMENT 3
Form # PSL-F080 EPIP-08, Off-Site Notifications and Protective Action Recommendations, Effective Date: 08/29/03 and AP 0010721, NRC Required Non-Routine Notifications and Reports END OF ATTACHMENT 3


REVISION NO.:           PROCEDURE TITLE:                                         PAGE:
REVISION NO.:
6A             OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT
PROCEDURE TITLE:
                                        &#xb6;7 ATTACHMENT 3A DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 1 of 2)
PAGE:
A.       Contact information - to be completed following contact
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:
: 1. Name of the person contacting the NRC or other designated FPL contact.
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT
: 2. NRC Contacts Name - will be provided upon contact. Also obtain the event number and notification time as received from the HOO should be recorded on the top of the worksheet.
&#xb6;7 ATTACHMENT 3A DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 1 of 2)
B.       Reactor Plant Event Notification Worksheet, Page 1 NOTE The "EN #" is provided by the NRC.
A.
: 1.     Notification Time - enter the time contact is made.
Contact information - to be completed following contact
: 2.     Unit - enter the appropriate unit number: Enter "0" for a classification common to both units.
: 1.
: 3. Callers Name - enter the name of the person making the call.
Name of the person contacting the NRC or other designated FPL contact.
: 4. Call back # - enter the number of the ENS phone that you are calling from and the commercial phone number at which you can be reached.
: 2.
: 5. Event time and Zone - enter the military time, the zone will be "EST" for Easter Standard Time or "EDT" for Eastern Daylight-savings Time.
NRC Contacts Name - will be provided upon contact. Also obtain the event number and notification time as received from the HOO should be recorded on the top of the worksheet.
: 6.     Event Date - enter the date the event is occurring.
B.
: 7.     Power / Mode Before & Power / Mode After - enter the power in percent and the mode number (1-6) before and after the event.
Reactor Plant Event Notification Worksheet, Page 1 NOTE The "EN #" is provided by the NRC.
: 1.
Notification Time - enter the time contact is made.
: 2.
Unit - enter the appropriate unit number: Enter "0" for a classification common to both units.
: 3.
Callers Name - enter the name of the person making the call.
: 4.
Call back # - enter the number of the ENS phone that you are calling from and the commercial phone number at which you can be reached.
: 5.
Event time and Zone - enter the military time, the zone will be "EST" for Easter Standard Time or "EDT" for Eastern Daylight-savings Time.
: 6.
Event Date - enter the date the event is occurring.
: 7.
Power / Mode Before & Power / Mode After - enter the power in percent and the mode number (1-6) before and after the event.
NOTE Abbreviations / acronyms (e.g., UNU / AAEC, SIT / AAEC, etc.) are for NRC use only.
NOTE Abbreviations / acronyms (e.g., UNU / AAEC, SIT / AAEC, etc.) are for NRC use only.
: 8.     Event Classifications - check one of the four blocks for General Emergency, Site Area Emergency, Alert, or Notification of Unusual Event.
: 8.
Event Classifications - check one of the four blocks for General Emergency, Site Area Emergency, Alert, or Notification of Unusual Event.


REVISION NO.:           PROCEDURE TITLE:                                       PAGE:
REVISION NO.:
6A               OFF-SITE NOTIFICATIONS AND PROTECTIVE                   49 of 49 PROCEDURE NO.:                     ACTION RECOMMENDATIONS EPIP-08                             ST. LUCIE PLANT T7 ATTACHMENT 3A DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 2 of 2)
PROCEDURE TITLE:
B.     (continued)
PAGE:
6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 49 of 49 PROCEDURE NO.:
ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT T7 ATTACHMENT 3A DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 2 of 2)
B.
(continued)
NOTE No other blocks in the upper half of the form are required.
NOTE No other blocks in the upper half of the form are required.
: 9.     Description - provide a written description of the event.
: 9.
Description - provide a written description of the event.
NOTE Check the blocks in the lower portion of the form based on current conditions.
NOTE Check the blocks in the lower portion of the form based on current conditions.
: 10. Mode of operation until corrected - provided if known.
: 10.
: 11. Estimate for restart date - enter "unknown".
Mode of operation until corrected - provided if known.
: 12. Additional info on Page 2 - enter yes or no.
: 11.
C.     Reactor Plant Event Notification Worksheet, Page 2
Estimate for restart date - enter "unknown".
: 1.     Fill in as much of the information on the form as is immediately available -
: 12.
Additional info on Page 2 - enter yes or no.
C.
Reactor Plant Event Notification Worksheet, Page 2
: 1.
Fill in as much of the information on the form as is immediately available -
do not create undue delay in making the notification. This information can be gained once the open line of communication is established.
do not create undue delay in making the notification. This information can be gained once the open line of communication is established.
D. Approval
D.
: 1. Information entered on the worksheet shall be reviewed and approved by the EC or RM (if used in the EOF), prior to transmission.
Approval
: 2.     The EC / RM may initial on the worksheet to indicate approval. There is no formal sign-off location on the worksheet.
: 1.
Information entered on the worksheet shall be reviewed and approved by the EC or RM (if used in the EOF), prior to transmission.
: 2.
The EC / RM may initial on the worksheet to indicate approval. There is no formal sign-off location on the worksheet.
END OF ATTACHMENT 3A}}
END OF ATTACHMENT 3A}}

Latest revision as of 08:28, 15 January 2025

Administrative Documents
ML061660368
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/21/2004
From:
NRC/RGN-II
To:
References
50-335/04-302, 50-389/04-302
Download: ML061660368 (180)


Text

Final Submittal (Blue Paper)

ST. LUCIE RETAKE EXAM 05000335/2004302 & 05000389/2004302 DECEMBER 21, 2004 FINAL JPMS & OUTLINE

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility:

Date of Examination:

Item Task Description Initials a

b-c#

1.
a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.

VIA

,/0, W

R

b. Assess whether the outline was systematically and randomly prepared in accordance with I

Section D.1 of ES-401 and whether all K/A categories are appropriately sampled.

TT

c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

N

d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.
2.
a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S

and major transients.

M

b. Assess whether there are enough scenario sets (and spares) to test the projected number U

and mix of applicants in accordance with the expected crew composition and rotation schedule L

without compromising exam integrity, and ensure that each applicant can be tested using A

at least one new or significantly modified scenario, that no scenarios are duplicated T

from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days.

O0

c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R

and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

3.
a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks W

distributed among the safety functions as specified on the form

/

(2) task repetition from the last two NRC examinations is within the limits specified on the form T

(3) no tasks are duplicated from the applicants' audit test(s)

Olf, N

lo (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.

b Verify that the administrative outline meets the criteria specified on Form ES-301-1:

1) the tasks are distributed among the topics as specified on the form.-J 6I2) at least one task is new or significantly modified %'

(3) no more than one task is repeated from the last two NRC licensing examinations /

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
4.
a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.

G

b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.

i_

?

N

c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.

E

d. Check for duplication and overlap among exam sections.

NA A

e. Check the entire exam for balance of coverage.
f. Assess whether the exam fits the appropriate job level (RO or SRO).

,,Printe Narge/Si reDate

a. Author sl S.1.

Lo,7IAv*ev

JLA,

/ *

.Dt

b. Facility Reviewer(*)

t 14 u t,

/0

c. NRC Chief Examiner(#)

Ae. //

,o

/

d. NRC Supervisor

//

/

CV.

Note:

  1. Independent NRC reviewer initial items in Column 'c"; chief examiner concurrence required.
  • _,/.-

(f

/Wlin7

/

CVVJ AJ-i)C Cl-/Vf~ly /

1,Al C,01 r

ES-201, Page 25 of 27

ý_'L,)

a j OV

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Saint Lucie Date of Examination: 12-21-04 Examination Level (circle one): RO(SR_

Operating Test Number:

Administrative Topic Type Describe activity to be performed-(see Note)

Code*

Conduct of Operations FCV-26-2 Fails Open, apply Tech Specs 2.1.12 N

Conduct of Operations N

Use Control Wiring Diagrams 2.1.24 Equipment Control N

2.2.26 Refueling Administrative Requirements Radiation Control N

Release 1 B Waste Monitor Tank 2.3.6 Emergency Plan N

Loss of Control Room Annunicators 2.4.32 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria:

(C)ontrol room (D)irect from bank (.L 3 for ROs; <4 for SROs & RO retakes)

(N)ew or (M)odified form bank L> 1)

(P)revious 2 exams L< 1; randomly selected)

(S)imulator ES-301, Page 22 of 27

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility:

I"'

L F,

oL Date of Examination: !a1/j.5-d-/4 rating TestNumber:

Initials

a.

General Criteria b-c#

a.

The operating test conforms with the previously approved outline; changes are consistent with

_W 11 sampling requirements (e.g., 10 CFR 55.45, operational im ortance, safet function distribution).

b.

There is no day-to-day repetition between this and other operating tests to be administered N

'/"

T durinn this examination.

C.

The operating test shall not duplicate items from the applicants' audit testis). (see Section D.1.a.)

d.

Overlap with the written examination and between different parts of the operating test is within W/A -4 acceptable limits.I

ý

e.

It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.

2. Walk-Through Criteria
a.

Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable

b.

Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance A.,

criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.

3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with j4 4 Form ES-301-4 and a copy is attached.

Printed Name I Signature Date

a.

Author ROXAl*

T-

!_Wve /-

JW N

7_1 -

b.

Facility Reviewer()

-/

14(Z.

/Z O_

c.

NRC Chief Examiner (#)

ý"2"Lj-C

d.

NRC Supervisor

_z 1 4V NOTE:

The facility signature is not applicable for NRC-developed tests.

Independent NRC reviewer initial items in Column 'c"; chief examiner concurrence required.

ES-301, Page 24 of 27

REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM APPLY APPLICABLE TECH SPECS - UNIT 1 CANDIDATE EXAMINER

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM APPLY APPLICABLE TECHNICAL SPECIFICATIONS UNIT 1 KA Statement:

Ability to apply technical specifications for a system.

KA #:

2.1.12 (2.9 / 4.0)

References:

OP-1-0010125A, Surveillance Data Sheets OPS-503, Operations Department Policy, Tech Spec Guidance ADM-68.01, Containment Leakage Rate Testing Program U2 FSAR Table 6.3-52 and Design Bases Unit 1 Technical Specifications Candidate:

Name Time Start Time Finish Performance Rating:

Sat Unsat Validation Time 15 minutes Examiner:

Comments Signature:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 2

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM APPLY APPLICABLE TECHNICAL SPECIFICATIONS UNIT I Directions to the candidate for Administrative JPMS:

I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.

Initial Conditions Unit 1 is at approximately 100% power. While stroke testing was being performed it is determined that FCV-26-5, Isolation Valve (Penetration P-25C) for Containment Air Radiation Monitor Common Return, will not close. E/M has determined that the valve will take at least 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to repair.

Initiating Cue You are the Unit Supervisor. You are tasked to determine which Technical Specifications are applicable.

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 3

START TIME:

Consult OPS-503, Operations Department Policy, Technical Specification Guidance 3 /

4.6.3 Containment Isolation Valves.

1. Any valve on a line that penetrates the containment may be a containment isolation valve.

STEP 1:

A. To determine if it is a containment isolation valve reference ADM-68.01, Containment Leakage Rate Testing Program, Unit #1 UFSAR table 6.2-16 and Unit #2 tables 6.2-52 & 53.

SAT UNSAT STANDARD:

DETERMINE FCV-26-5 is listed in Table 1 Unit 1 Containment Isolation Valves.

COMMENTS:

V6565 isolates return flow from the Containment Air Monitoring System back to Containment. (Drawing 8770-G-092)

.4 STEP 2: If the valve in question is listed in ADM-68.01, then apply Tech Spec 3.6.3.1.

STANDARD:

APPLY Tech Spec 3.6.3.1 COMMENTS:

SAT UNSAT I ______________________

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 4

T STEP 3: 3.6.3.1 The containment isolation valves shall be OPERABLE:

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With one or more of the isolation valve(s) inoperable, either:

a. Restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or
b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation position, or
c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve or blind flange; or
d. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

CRITICAL STEP SAT UNSAT STANDARD:

ACTION

b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation position.

(Remove power to FCV-26-6 solenoid, preferred) or

c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve or blind flange.

COMMENTS:

4 Consult OPS-503, Operations Department Policy, Technical Specification Guidance 3 /

4.6.3 Containment Isolation Valves.

1. Any valve on a line that penetrates the containment may be a containment isolation valve.

STEP 4: G. For any inoperable containment isolation valve, consider any system Tech Specs that may apply.

SAT UNSAT STANDARD:

COMMENTS:

DETERMINE atmosphere radioactivity monitor is INOPERABLE Per T.S. 3.4.6.1 The following RCS leakage detection systems will be OPERABLE V6565 isolates return flow from the Containment Air Monitoring System back to Containment. (Drawing 8770-G-092)

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 5

T RCS Leakage Detection T.S. 3.4.6.1.b STEP 5:

With the required radioactivity monitor inoperable, analyze grab samples of the containment atmosphere or perform a RCS water inventory balance at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and restore the required radioactivity monitor to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

STANDARD:

DETERMINE that an RCS inventory balance (DS #1) or grab samples need to be performed every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and restore the radioactivity monitor within 30 days.

EVALUATOR NOTE:

(Data Sheet #30, Unscheduled Surveillance and Evolutions Tracking would be filled out to track this)

CRITICAL STEP SAT UNSAT COMMENTS:

STEP (done):

Inform Candidate JPM is complete.

STANDARD:

SAT EXAMINER'S CUE:

THIS JPM IS COMPLETE.

COMMENTS:

UNSAT END OF TASK STOP TIME:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 6

CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)

Initial Conditions Unit I is at approximately 100% power. While stroke testing was being performed it is determined that FCV-26-5, Isolation Valve (Penetration P-25C) for Containment Air Radiation Monitor Common Return, will not close. E/M has determined that the valve will take at least 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to repair.

Initiating Cue You are the Unit Supervisor. You are tasked to determine which Technical Specifications are applicable.

ST. LUCIE PLANT OPS-503 OPERATIONS DEPARTMENT POLICY Rev.

10 Date 06/30/04 TECHNICAL SPECIFICATION GUIDANCE OPERATIONS DEPARTMENT Page 10 of 19 Operational Guidance for Section 3 / 4.6 3 /4.6.6.1 Shield Building Ventilation System When complying with action statement for Technical Specification 3.6.6.1 c the Spent Fuel Handling Machine is considered to have no load when no load is attached to the grapple.

With no load attached to the grapple the Spent Fuel Handling Machine May be operated over the Spent Fuel Pool.

3 / 4.6.3 Containment Isolation Valves NOTE The inoperable containment isolation valve may be used to provide containment isolation in order to comply with Tech Spec 3.6.3.1.

Containment penetration check valves are typically not found in the DBD.

Tech Spec 3.6.3.1 applies to all containment isolation check valves.

1.

Any valve on a line that penetrates the containment may be a containment isolation valve.

A.

To determine if it is a containment isolation valve reference ADM-68.01, Containment Leakage Rate Testing Program, Unit #1 UFSAR table 6.2-16 and Unit #2 tables 6.2-52 & 53.

B.

If the valve in question is listed in ADM-68.01, then apply Tech Spec 3.6.3.1.

C.

If the valve in question is determined to be a containment isolation valve, but not listed in ADM 68.01, then consult the DBD (Design Basis Documents) to determine its safety related function(s).

D.

If any one of the DBD safety related functions require the valve to be closed, then apply Tech Spec 3.6.3.1 Containment Isolation Valves.

E.

If all of the DBD safety related function(s) require the valve to be open, (for example: FCV-07-1A), then Tech Specs 3.6.1.1 and 3.6.3.1 are not applicable.

F.

If the valve is required to be closed by the DBD and/or Tech Spec 3.6.3.1 and needs to be opened for any reason, then apply Tech Spec 3.6.1.1 Containment Vessel Integrity and refer to ADM-25.04 Technical Specification Bases for required contingency actions.

G.

For any inoperable containment isolation valve, consider any system specific Tech Specs that may apply.

SCcL*

ST. LUCIE PLANT OPS-503 OPERATIONS DEPARTMENT POLICY Rev.

10 Date 06/30/04 TECHNICAL SPECIFICATION GUIDANCE OPE ATIONS rEPA NTMEr Page 11 of 19 Operational Guidance for Section 3 / 4.6 (continued) 3 / 4.6.3 Containment Isolation Valves (continued)

2.

If DC power is lost to SE-07-5A / B / C or D, Containment Pressure Transmitter Isolation Valves, the associated valve will fail open and can NOT be operated by the operator. Loss of power does not negatively impact the ability to maintain an intact containment pressure boundary. Therefore, these valves are not considered out of service.

3 / 4.6.5 Vacuum Relief Valves

1.

The Primary Containment Vessel to Annulus Vacuum Relief Valves are OPERABLE when the actuation setpoint is between 9.5 to 10.2 inches of water gauge differential. Activation within the setpoint range ensures both containment relief and containment isolation functions of these valves.

2.

If a primary containment vessel to annulus vacuum relief valve is inoperable, then Tech. Spec. 3.6.3 for one isolation valve inoperable and Tech. Spec. 3.6.5 for one primary containment vessel to annulus vacuum relief valve shall be entered simultaneously.

3.

Quarterly stroke testing of the Vacuum Relief valves in accordance with plant procedures does not render the valves inoperable. The open signal is momentary and does not prevent the vacuum reliefs from performing their design function.

3 /4.6.6.2 Shield Building Integrity

1.

Maintenance Hatch Seals A.

With one of the two hatch seals inoperable, the operability of the shield building can be maintained by closure of the manual isolation valve on the functioning seal.

B.

Closure of the manual isolation valve (V1 8263 / V1 8248) directly upstream of the supply check valve precludes an active failure of the check valve, but must be performed in accordance with AP 1/2-0010123, Administrative Control of Valves, Locks and Switches.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8A CONTAINMENT LEAKAGE RATE TESTING 22 of 32 PROCEDURE NO.:

PROGRAM ADM-68.01 ST. LUCIE PLANT TABLE 1 UNIT 1 CONTAINMENT ISOLATION VALVES (Page 2 of 2)

Valve Tag Number Penetration Function Testable Isolation Number During Time Plant (Sec)

Operation B. Manual or Remote Manual

1. V18794 8

Station air supply, Manual Yes NA V1 8796

2.

V-25-11,12 56 Hydrogen purge outside air make-up, Manual Yes NA (NC)

3.

V-25-13,14,15,16 57 & 58 Hydrogen purge exhaust, Manual (NC)

Yes NA

4.

V3463 41 Safety injection tank test line, Manual (NC)

Yes NA*

5.

V07009 41 Safety injection tank test line, Manual (NC)

Yes NA*

6.

V07206, V07189 46 Refueling cavity purification flow inlet, Manual Yes NA (NC)

7.

V07170, V07188 47 Refueling cavity purification flow outlet, Manual Yes NA (NC)

8.

FSE-27-1,2,3,4,8,11 48a & 48c Hydrogen sampling line, Remote manual Yes NA*

9.

FSE-27-5,6,7,9,10 51a & 51c Hydrogen sampling line, Remote manual Yes NA*

10. FCV-26-1 & 2 52a Radiation monitoring Yes NA
11. FCV-26-3 & 4 52b Radiation monitoring Yes NA
12. FCV-26-5 & 6 52c Radiation monitoring, return Yes NA
13. V00140 52d ILRT test tap Yes NA V00143
14. V00139 52e ILRT test tap Yes NA V00144
15. V00101 54 ILRT pressure connection Yes NA
16. FCV-03-1E & 1F 28 SI Tank Sample Yes NA**

NA-Manual Valve-Isolation time not applicable.

May be opened on an intermittent basis under administrative control.

Normally closed valves - Isolation time not applicable.

END OF TABLE 1

CONTAINMENT SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1 The containment isolation valves shall be OPERABLE:

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With one or more of the isolation valve(s) inoperable, either:

a.

Restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or

b.

Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation position, or

c.

Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve or blind flange; or

d.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.3.1.1 The isolation valves shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair or replacement work is performed on the valve or its associated actuator, control or power circuit by performance of the cycling test, and verification of isolation time.

ST. LUCIE - UNIT 1 3/4 6-18 Amendment No. 90, 149

TABLE 3.3-6 RADIATION MONITORING INSTRUMENTATION MINIMUM CHANNELS INSTRUMENT OPERABLE

1.

AREA MONITORS APPLICABLE MODES ALARM SETPOINT

< 15 mR/hr

< 90 mR/hr

a. Fuel Storage Pool Area
b. Containment (CIS) 1 3

MEASUREMENT RANGE 10

- 104 mR/hr 1-105 mR/hr 1 - 107 R/hr ACTION 6

13 16 15

c. Containment Area - Hi Range
2.

PROCESS MONITORS

a. Containment
i. Gaseous Activity RCS Leakage Detection ii. Particulate Activity RCS Leakage Detection
b. Fuel Storage Pool Area Ventilation System
i.

Gaseous Activity ii. Particulate Activity 1

1,2,3, & 4

< 10 R/hr 1

1 1,2,3&4 1,2,3 &4 Not Applicable Not Applicable 10 -106 cpm 10-106 cpm 14 14 1

1

    • t 10 105 pCi/cc 1 - 106 cpm 12 12 With fuel in the storage pool or building.

With irradiated fuel in the storage pool or whenever there is fuel movement within the pool or crane operation with loads over the storage pool.

The Alarm Setpoints are determined and set in accordance with requirements of the Offsite Dose Calculation Manual.

ST. LUCIE - UNIT 1 3/4 3-22 Amendment No. 59, Q-3,134

TABLE 3.3-6 (Continued)

TABLE NOTATION ACTION 12 -

ACTION 13 -

ACTION 14 -

ACTION 15 -

With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.12.

With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.4.6.1.

With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, either restore the inoperable Channel(s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:

1)

Initiate the preplanned alternate method of monitoring the appropriate parameter(s), and

2)

Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirements, comply with the ACTION requirements of Specification 3.9.9.

ACTION 16 -

ST. LUCIE - UNIT 1 3/4 3-23 Amendment No. 59

REACTOR COOLANT SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following RCS leakage detection systems will be OPERABLE:

a.

The reactor cavity sump inlet flow monitoring system; and

b.

One containment atmosphere radioactivity monitor (gaseous or particulate).

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a.

With the required reactor cavity sump inlet flow monitoring system inoperable, perform a RCS water inventory balance at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and restore the sump inlet flow monitoring system to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With the required radioactivity monitor inoperable, analyze grab samples of the containment atmosphere or perform a RCS water inventory balance at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and restore the required radioactivity monitor to OPERABLE status within 30 days; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c.

With all required monitors inoperable, enter LCO 3.0.3 immediately.

d.

The provisions of Specification 3.0.4 are not applicable if at least one of the required monitors is OPERABLE.

SURVEILLANCE REQUIREMENTS 4.4.6.1 The RCS leakage detection instruments shall be demonstrated OPERABLE by:

a.

Performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, and CHANNEL CALIBRATION of the required containment atmosphere radioactivity monitor at the frequencies specified in Table 4.3-3.

b.

Performance of the CHANNEL CALIBRATION of the required reactor cavity sump inlet flow monitoring system at least once per 18 months.

ST. LUCIE - UNIT 1 3/4 4-12 Amendment No. 144

REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM REFUELING ADMINISTRATIVE REQUIREMENTS CANDIDATE EXAMINER

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM REFUELING ADMINISTRATIVE REQUIREMENTS UNIT 1 KA Statement:

Knowledge of refueling administrative requirements.

KA#:

2.2.26 (2.5 / 3.7)

References:

- Plant Physics Curve Figure D.3

- AP 1-0010250, Guidelines for use of the Unit 1 High Density Spent Fuel Racks Candidate:

Name Time Start Time Finish Performance Rating:

Sat Unsat Validation Time 15 minutes Examiner:

Signature:

Comments ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 2

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM REFUELING ADMINISTRATIVE REQUIREMENTS UNIT I Directions to the candidate for Administrative JPMS:

I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.

Initial Conditions Reactor Engineering has provided a Recommended Move List to move 2 fuel assemblies in the Unit 1 Spent Fuel Pool. All equipment to perform fuel movement in the Spent Fuel Pool is operable. All funnels have been verified in the correct positions and Nuclear Fuels has verified fuel burnup history is correct for fuel storage requirements.

Initiating Cue You are the Unit 1 Refueling Supervisor. Given the following Recommended Moves, determine if the moves are allowable.

RECOMMENDED MOVE LIST From To Step Assembly Insert Orient Core Bridge Trolley SFP NFS Upndr Core Bridge Trolly SFP 1

U48 I I

  • I-I I

I I*-'--'i I

I R5 12 I

R53 205 FI nR I

I I

I I

I'~LI3I ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 3

START TIME:

STEP 1:

STANDARD:

Retrieves a controlled copy of Plant Physics Curve 0.3 Spent Fuel Map Retrieves a controlled copy of Plant Physics Curve D.3 Spent Fuel Map (Present Configuration) from the Control Room OBTAINS copy of Plant Physics Curve D.3.

SAT UNSAT EXAMINER'S NOTE: HAND STUDENT Plant Physics Curve D.3 Spent Fuel Map (Present Configuration) Page 1 of 2 COMMENTS:

STEP 2:

Obtains current revision of AP 1-0010250, Guidelines for use of the Unit 1 High Density Spent Fuel Racks STANDARD:

OBTAINS and VERIFIES current copy of procedure.

EXAMINER'S NOTE: HAND STUDENT AP 1-0010250, Guidelines for use of the Unit I High Density Spent Fuel Racks COMMENTS:

STEP 3:

Reviews Step 8.2 Rack Loading Restrictions STANDARD:

DETERMINES for move to R5, does meet >75% load restrictions and MOVE IS ALLOWABLE.

(60 non-restricted / 79 total assemblies = 75.9%)

COMMENTS:

SAT UNSAT CRITICAL STEP SAT

_UNSAT ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 4

STEP 4:

STANDARD:

Reviews Step 8.2 Rack Loading Restrictions DETERMINES for move to Q13, does NOT meet >75% load restrictions and MOVE IS NOT ALLOWABLE.

CRITICAL STEP SAT (45 non-restricted / 61 total assemblies = 73.8%)

UNSAT COMMENTS:

STEP (done):

Inform Candidate JPM is complete.

STANDARD:

SAT EXAMINER'S CUE:

THIS JPM IS COMPLETE.

COMMENTS:

UNSAT END OF TASK STOP TIME:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 5

CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)

Initial Conditions Reactor Engineering has provided a Recommended Move List to move 2 fuel assemblies in the Unit 1 Spent Fuel Pool. All equipment to perform fuel movement in the Spent Fuel Pool is operable. All funnels have been verified in the correct positions and Nuclear Fuels has verified fuel burnup history is correct for fuel storage requirements.

Initiating Cue You are the Unit 1 Refueling Supervisor. Given the following Recommended Moves, determine if the moves are allowable.

RECOMMENDED MOVE LIST From To Assembly Insert Orient Core Bridge Trolley SFP NFS Upndr Core Bridge Trolly SFP U48 L33 R5 2

R53 205 D28 Q13

Procedure No.

ST. LUCIE UNIT 1 1-0010250 ADMINISTRATIVE PROCEDURE Current Revision No.

5C F PL Effective Date SAFETY RELATED 10/26/04

Title:

GUIDELINES FOR USE OF THE UNIT I HIGH DENSITY SPENT FUEL RACKS Responsible Department: REACTOR ENGINEERING REVISION

SUMMARY

Revision 5C - Incorporated PCR 04-2964 to convert di Microsoft Word. (Helga Baranowsky, 10/18/04)

Revision 5B - Incorporated PCR 03-1056 to change A Revision 5A - Changed Fuel Resources to Nuclear Fu ocument from Word Perfect DOS 5.1 to F17 to AG17. (W. Mead, 04/16/03) els in Step 5.3. (Ray Klein, 05/07/99)

_________________________________ 4 Revision FRG Review Date Approved By Approval Date S 1 OPS 0

11/29/88 G. J. Boissy 01/30/89 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN 1-0010250 5C 02/24, 03/26/97 J. Scarola 03/26/97 SYS Plant General Manager COM COMPLETED N/A ITM 5C Designated Approver T. L. Patterson 10/18/04 Designated Approver (Minor Correction)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 2 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION PAGE 1.0 T IT L E......................................................................................................................

3 2.0 R EV IEW A N D A PPRO VA L.................................................................................

3 3.0 S C O P E...................................................................................................................

3 4.0 P R E C A U T IO N S..................................................................................................

5 5.0 R E S P O N S IB ILIT IE S............................................................................................

6 6.0 R E FE R E N C E S................................................................................................. 6 7.0 RECORDS AND NOTIFICATIONS.....................................................................

7 8.0 IN S T R U C T IO N S................................................................................................

8 8.1 F ue l F un ne ls..........................................................................................

.. 8 8.2 Rack Loading Restrictions.......................................................................

9 8.3 R ack Indexing System.............................................................................

10 8.4 Spent Fuel Pool Underwater Lighting...................................................... 11 8.5 Spent Fuel Funnel Handling Tool............................................................ 12 8.6 Boraflex Coupon Surveillance Program..................................................

13 FIGURES FIGURE 1 UNIT 1 HIGH DENSITY SPENT FUEL RACKS..................................... 14 FIGURE 2 INITIAL ENRICHMENT VS BURNUP REQUIREMENTS FOR REGION 2 SPENT FUEL STO RAG E.....................................................................

15 FIG U R E 3 R EG IO N 1 FU NN EL...............................................................................

16 FIG U R E 4 R EG IO N 2 FU NN EL...............................................................................

17 FIGURE 5 FUNNEL HANDLING TOOL GENERAL ARRANGEMENT DRAWING...... 18 FIGURE 6 BORAFLEX SURVEILLANCE COUPON AND COUPON ASSEMBLY...... 19 FIGURE 7 T-BAR LIGHT AND LOCATION OF T-BAR LIGHT HANGERS................. 20 FIGURE 8 TOP VIEW SHOWING ADJACENT CELLS BLOCKED BY FUNNELS...... 21 FIG U R E 9 IN D EX ING SYSTEM...............................................................................

22 FIGURE 10 FUNNEL HANDLING TOOL ALIGNMENT PLATE (CORRECT PO SITIO N O N FU NN EL)......................................................................

23 FIGURE 11 FUNNEL FULLY SEATED IN SPENT FUEL STORAGE RACK............. 24

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 3 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 1.0 TITLE GUIDELINES FOR USE OF THE UNIT 1 HIGH DENSITY SPENT FUEL RACKS 2.0 REVIEW AND APPROVAL See cover page.

3.0 SCOPE 3.1 Purpose

1.

This procedure provides guidelines for use of the Unit 1 high density spent fuel racks and associated components and tools.

3.2 Discussion

1.

To ensure that sufficient spent fuel storage continues to exist at St. Lucie Unit 1, new high density storage racks have been installed. Each cell of the new spent fuel storage racks has an 8.65 inch (nominal) square cross-section, which will accommodate a single Combustion Engineering, Advanced Nuclear Fuels or equivalent fuel assembly, from either St. Lucie Unit 1 or Unit 2. A total of 1706 cells are arranged in seventeen distinct modules of various sizes and divided into two regions.

2.

The new position rack design allows for increased storage density of spent fuel.

3.

This procedure will provide guidelines for use of the racks and its associated components.

3.3 Authority

1.

This procedure implements plant guidelines intended to aid Operations in the use of the high density spent fuel racks and related components.

Operations will utilize this procedure with Reactor Engineering guidance.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 4of24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 3.4 Definitions

1.

REGION 1 - Designed to store fuel assemblies with enrichments up to 4.5 wt. % U235 with no minimum burnup restrictions. Region 1 consists of racks Al, A2, B1 and B2. Region 1 contains 342 cells with a nominal center to center pitch of 10.12 inches. Figure 1 shows a plan view of Region 1.

2.

REGION 2 - Designed to store spent fuel assemblies with various initial enrichments which have accumulated the minimum acceptable burnups as required by Tech. Spec. Figure 5.6-1 (Figure 2 of this OP). Region 2 consists of racks C1, C2, C3, C4, D1, D2, D3, El, E2, F1, G1, G2 and H1 asshown in Figure 1. Region 2 contains 1364 cells with a nominal center to center spacing of 8.86 inches.

NOTE Region 1 funnels are not interchangeable with Region 2 funnels.

3.

REGION 1 FUNNEL - Provides lead-in guidance during insertion of a fuel assembly into a storage cell. The funnels are a duplex design as shown in Figure 3. Assemblies may be withdrawn through the duplex funnels without first removing the funnel. There are two variants of the Region 1 funnel.

Funnels for cells on the interior of a rack are identified by a solid square tab.

Funnels for cells on the periphery of a rack have a hole drilled through the square tab.

4.

REGION 2 FUNNEL - Provides lead-in guidance during insertion of a fuel assembly into a storage cell. The funnels are a duplex design as shown in Figure 4. Assemblies may be withdrawn through the duplex funnels without first removing the funnel.

5.

FUNNEL HANDLING TOOLS - The funnel handling tool is used to install and remove individual funnels. Region 1 and Region 2 have the specific funnel handling tools differing only in dimension (due to cell pitch difference between Region 1 and Region 2). The otherwise identical funnel handling tools are mechanically actuated, lightweight aluminum hand held tools designed for use by one individual from the spent fuel machine bridge (see Figure 5).

6.

BORAFLEX - Boraflex is a brand name silicone based polymer containing fine particles of boron carbide in homogeneous, stable matrix and is an integral part of every cell wall.

7.

POISON RACK DESIGN - Boraflex strips are sandwiched into the rack walls between the stainless steel plates to ensure K-effective remains below 0.95 in case flooding of the Spent Fuel Pool with pure unborated water occurs.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 5 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 3.4 Definitions (continued)

8.

SURVEILLANCE COUPON - 5 x 15 inch boraflex coupons attached to support assemblies (see Figure 6) and placed in rack cell locations as designated by separate procedure to track possible boraflex degradation.

9.

UNDERWATER LIGHTS - Moveable lights with handles which fit into corresponding hangers on the side of the spent fuel pool walls (see Figure 7).

4.0 PRECAUTIONS GENERAL NOTE Rack locations marked with an X on Figure 1 of this procedure shall be used to store Unit 1 fuel only until dispositioned by FPL Engineering to accept Unit 2 fuel or consolidation canisters. Rack locations AG17, AH17 marked with an * (asterisk) shall receive no fuel.

4.1 Prior to inserting a fuel assembly into a rack location, verification of the correct rack location via the rack indexing system, as well as the presence of a funnel (required on Region 2), shall be obtained by the spent fuel machine operator.

4.2 Fuel assemblies shall be inserted into Region 2 only into rack locations that have funnels in place. Fuel assemblies may be placed into Region 1 without funnels if the Region 1 funnels or tool is inoperable.

STORAGE REQUIREMENTS 4.3 Region 1 of the spent fuel storage racks can be used to store fuel which has a U-235 enrichment less than or equal to 4.5 weight percent. Region 2 can be used to store fuel which has achieved sufficient burnup such that storage in Region 1 is not required. The initial enrichment versus burnup requirements of Figure 5.6-1 of the Tech. Specs. and Figure 2 of this Administrative Procedure shall be met prior to storage of fuel assemblies in Region 2.

FUEL FUNNELS 4.4 Prior to fuel movement within the spent fuel pool, funnel placement needs shall be determined and satisfied.

4.5 The Region 1 and Region 2 funnels are not interchangeable. For details on funnel design and purpose see definitions 3.4.3 and 3.4.4.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 6of24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 4.6 Funnels effectively block all cells adjacent to the locations for which they provide lead-in surfaces (see Figure 8). Fuel funnels cannot be placed side by side. A minimum clearance of one rack cell location is required between lead-in funnels.

5.0 RESPONSIBILITIES 5.1 The Operations Department is responsible for the administration and execution of this procedure.

5.2 Reactor Engineering is responsible for the determination of individual funnel locations prior to fuel movement in the spent fuel pool.

5.3 Nuclear Fuels will provide the burnup histories of spent fuel to determine the spent fuel storage requirements.

6.0 REFERENCES

NOTE One or more of the following symbols may be used in this procedure:

§ Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.

T Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.

T Indicates a step that requires a sign off on an attachment.

6.1 Technical Specifications Section 5.6 - Fuel Storage 6.2 Updated Final Safety Analysis Report (UFSAR)

Section 9.1.2.2.3 6.3 Procedures POP 3200090, Unit 1 Refueling Operation QI-5-PSL-1, Preparation, Revision, Review / Approval of Procedures 6.4 PCM-18-186, Spent Fuel Rerack

REVISION NO.:

5C PROCEDURE NO.:

1-0010250 PROCEDURE TITLE:

GUIDELINES FOR USE OF THE UNIT 1 HIGH DENSITY SPENT FUEL RACKS ST. LUCIE UNIT 1 6.5 6.6 6.7 6.8 PCM-142-186, Modifications to Support Rerack 1-LOI-RE-09, Unit 1 Boraflex Blackness Testing Technical Manual, HPS-1000/Q Lighting System Remote Ocean Systems, Inc JPN-PSL-SEFT-93-014, St. Lucie Unit 1 Safety Evaluation of Spent Fuel Pool (SFP) Coupon Surveillance Program 7.0 RECORDS AND NOTIFICATIONS 7.1 None

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 8of24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.0 INSTRUCTIONS CAUTION Prior to fuel movement, obtain the following information from Reactor Engineering:

A) Procedure Data Sheet(s) outlining desired fuel movement B) Region burnup requirements C) Individual funnel placements needed 8.1 Fuel Funnels

1.

Prior to inserting a fuel assembly into a rack cell location, visually verify that a lead-in funnel is in proper position over that location.

NOTE Fuel may be inserted into Region 1 rack cell locations without funnels since slight lead-in surfaces are built into the racks.

2.

Movement of individual funnels should be accomplished using the hand held tools described in Section 8.5.

NOTE For Region 1 there are two types of lead-in funnels. One type for interior cells of individual racks, the other for peripheral cells of individual racks.

Peripheral cell funnels have a hole drilled through the square identification tab.

3.

Fuel may be withdrawn through lead-in funnels, therefore funnels can be used as inspection funnels.

END OF SECTION 8.1

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 9 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.2 Rack Loading Restrictions

1.

Loading racks El, E2 and G1 shall be accomplished as outlined below:

A.

Rack locations 17A through 17M, 18A through 18M of rack G1 and locations Q1 through Q16, R1 through R16, S1 through S16 of racks El and E2 are subject to the loading restrictions given below.

1.

Restricted locations of racks El, E2 and G1 shall not be filled unless 75% of the total fuel assemblies loaded into each individual rack are placed into the non-restricted locations first.

In support of this, loading rack G1 west to east and racks El and E2 south to north is recommended.

2.

No fuel shall be placed in locations AG17, AHl7.

  • END OF SECTION 8.2

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 10 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.3 Rack Indexing System NOTE The indexing system in a approximate indication of rack storage cell location. Final adjustments in fuel assembly position should be made by the SFM operator, if required, to ensure smooth fuel assembly insertion into the rack.

1.

Region 1 and Region 2 have separate indexing systems (see Figure 9).

Region 1 index numbers and letters are red on white and are pre-fixed by an X. Region 2 index numbers and letters are black on white.

END OF SECTION 8.3

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.4 Spent Fuel Pool Underwater Lighting

1.

The underwater lighting for the Unit 1 high density racks consists of hangers mounted to the spent fuel pool walls from which moveable underwater lights are hung. See Figure 7 for details on the hangers and underwater lights.

2.

Each light assembly consists of a single positionable reflector light and weighs approximately 70 lbs.

3.

Moving the underwater lights will be accomplished in the following manner:

A.

Notify Health Physics for support if pulling lights out of pool.

B.

Disconnect electrical cord from outlet.

C.

Lift the light up and out from hanger and move light to desired hanger.

D.

Re-connect electrical cord to closest outlet.

END OF SECTION 8.4

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 12 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.5 Spent Fuel Funnel Handling Tool

1.

The funnel handling tools are designed for one man operation and is mechanically actuated. (See Figure 5, showing funnel handling tool design). Tool weighs about 45 lbs. Funnels weigh about 20 lbs. (Weights given are dry weights.)

2.

Funnels are moved in the following manner:

A.

Insert funnel tool into center plug on the duplex funnel. Ensure the tool alignment plate is positioned as shown in Figure 10.

B.

When the tool latches, a positive click will be felt as the tool seats.

C.

Pull up on the tool, observing the funnel to determine if the funnel is moving squarely out of its rack cell location. If not properly latched the funnel will tilt over to one side. To recover push down on the tool to latch both sides. Attempt to move the funnel again.

D.

Move funnel to its new location.

E.

Insert center plug into rack cell. Some side to side movement of the funnel may be necessary to get the chamfered plug to start into a cell. Insert funnel until fully seated as shown in side view, Figure 11.

F.

Pull up on the release bar and remove tool. Repeat Steps A to F for each desired funnel move.

END OF SECTION 8.5

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 13 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 8.6 Boraflex Coupon Surveillance Program

1.

The inservice Boraflex Surveillance Program is part of FPL's commitment to the NRC to allow the reracking of the Unit 1 spent fuel pool. The Surveillance Program is intended to track and verify the integrity of the boraflex neutron absorber contained in the Region 1 and Region 2 high density racks. The Boraflex Surveillance Program consists of gamma dose determination to the boraflex and periodic blackness testing which replaced the Inservice Accelerated and Longterm Coupon Testing Program. Refer to reference 6.8.

END OF SECTION 8.6

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 15 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 2 VS BURNUP REQUIREMENTS INITIAL ENRICHMENT FOR REGION 2 SPENT FUEL STORAGE (Page 1 of 1) 40 35 0

a-z Lu Lu Cd, 30 25 20 15 ACCEPrABLE/

BURNUP DOMAIN

/

/

UNACCEPTABLE BURNUP DOMAIN

//

//

~w I'l 10 5

n, U

1.5 2.0 2.5 3.0 3.5 4.0 4.5 INITIAL ENRICHMENT, WT % U-235 (P/AP/1-0010250IF2-RO)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 16 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 3 REGION 1 FUNNEL (Page 1 of 1)

Region 1 I.D. Tab

[f i

Hole in Identification Tab Peripheral Funnels Only Lead in Surface

\\

/

,,I I

Flush with Rack Surface Tension Center Springs Plug Plug Chamfer (PIAP/1-0010250/F3-RO)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 17 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 4 REGION 2 FUNNEL (Page 1 of 1)

Center Plug Lead in Surface

  • I

[IllI Tension Springs i LI with urface F

FFlush Rack S Plug Chamfer (P/AP/1-0010250/F4-RO)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 18 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 5 FUNNEL HANDLING TOOL GENERAL ARRANGEMENT DRAWING (Page 1 of 1)

FUNNEL FUNNEL ALIGNMENT PLATE \\

COMPRESSION SPRINGS FLAPPER Z STOP PLATE CENTER PLUG LEAD IN (PIAP/1-0010250/F5-RO)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 19 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 6 BORAFLEX SURVEILLANCE COUPON AND COUPON ASSEMBLY (Page 1 of 1) 3/8 INCH HOLE 7/16 INCH TO CENTER t

5 X 15 TYP. POISON COUPON (P/API1-00 10250IF6-RO)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 20 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 7 LOCATION OF T-BAR LIGHT HANGERS T-BAR LIGHT AND (Page 1 of 1) 120 VAC CONNECTOR STAINLESS STEEL LIFT BAIL WITH STOP COLLAR TO PREVENT SLIPPING HP LIGHT-ING rj WET MATEABLE CONNECTORS WITH STAINLESS STEEL LOCKING RING WET MATEABLE CONNECTORS WITH STAINLESS STEEL LOCKING RING SYSTEM 7-BALLAST POWER SUPPLY IN SEALED STAINLESS STEEL HOUSING LOWER POLE MODULE REMOVEABLE LOW PRO OLLE F:

LIGT E

WET MATEABLE--

CONNECTORRELCO I

ADJUSTMENT T-BAR LIGHT HIGH PRESSURE HANGER DETAIL SODIUM LAMP I

pJ* 7-QUICK RELEASE ELECTRO-POLISHED K> 7 ~

REFLECTOR SIDE VIE W FRONT VIEW

,) K~'~

(P/A P/1-0010250/F7-RO)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT I HIGH 21 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 8 TOP VIEW SHOWING ADJACENT CELLS BLOCKED BY FUNNELS (Page 1 of 1)

Rack Cell Location Adjacent cell blocked by funnel lead-in surfaces (P/AP/1-0010250/F8-RO)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 22 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 9 INDEXING SYSTEM (Page 1 of 1)

...1...

re -' -x RPdr e q c--I 1

L e2*-t u 1 1-i *7 N uzn e 1 i -iy L -

-e t

1nc, Number ring W

i--e b3a c k - r Zn ytLI e t 7 ie A

3 L

ID 4

3 4

43 41 4 2 5

2F dXiXl Cl U-'

(1

(-

(PIAP/1-OO10250./F9-RO)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH 23 of 24 PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 10 FUNNEL HANDLING TOOL ALIGNMENT PLATE (CORRECT POSITION ON FUNNEL)

(.Page 1 of 1 )

Duplex funnel Funnel Handling Tool Alignment Plate (PIAP/I-0010250iF1O-RO)

TOP VIEW

REVISION NO.:

PROCEDURE TITLE:

PAGE:

5C GUIDELINES FOR USE OF THE UNIT 1 HIGH PROCEDURE NO.:

DENSITY SPENT FUEL RACKS 1-0010250 ST. LUCIE UNIT 1 FIGURE 11 FUNNEL FULLY SEATED IN SPENT FUEL STORAGE RACK (Page 1 of 1)

Duplex Funnel Rack

REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM USE CONTROL WIRING DIAGRAMS - UNIT 1 CANDIDATE EXAMINER

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM USE CONTROL WIRING DIAGRAMS UNIT I KA Statement:

KA #:

References:

Ability to obtain and interpret station electrical and mechanical drawings.

2.1.24 (2.8 / 3.1)

Control Wiring Diagram 8770-B-327 Sheet 564 Control Wiring Diagram 8770-B-327 Sheet 501 Control Wiring Diagram 8770-B-327 Sheet 502 Control Wiring Diagram 8770-B-327 Sheet 645 Candidate:

Name Time Start Time Finish Performance Rating:

Sat Unsat Validation Time 15 minutes Examiner:

Signature:

Comments ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 2

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM USE CONTROL WIRING DIAGRAMS UNIT 1 Directions to the candidate for Administrative JPMS:

I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.

Initial Conditions I&C would like to inspect the solenoid for Waste Gas Stop Valve V6565 on Unit 1. This will require the solenoid to be de-energized.

Initiating Cue You are the Unit 1 Unit Supervisor. Independently verify the components that need to be operated to de-energize the solenoid for Waste Gas Stop Valve V6565.

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 3

START TIME:

STEP 1:

STANDARD:

COMMENTS:

Determines from one of the following which CWD shows the solenoid of V6565:

Control Wiring Diagram (CWD) Index 8770-B-327 Sheet 1 Lotus Notes on a PC FPL Mainframe on a PC DETERMINES solenoid of V6565 is on 8770-B-327 Sheet 564.

CRITICAL STEP SAT UNSAT Answer Key Attachment 1 i

STEP 2:

STANDARD:

8770-B-327 Sheet 564 Identifies the other CWD that are connected to the solenoid of V6565 is powered from.

DETERMINES solenoid of V6565 is on 8770-B-327 Sheet 564 is connected to the following CWDs:

SH 645: P15B and N15B, 125VDC SH 501: DDD 87 & 88 SH 502: CC 38 & 39 CRITICAL STEP SAT UNSAT COMMENTS:

Answer Key Attachment 1 8770-B-327 Sheet 501 STEP 3:

Determines from where the solenoid of V6565 is powered from:

STANDARD:

DETERMINES Sheet 501 does not provide power to V6565.

SAT COMMENTS:

Answer Key Attachment 2 IUNSAT ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 4

8770-B-327 Sheet 502 STEP 4:

Determines from where the solenoid of V6565 is powered from:

STANDARD:

DETERMINES Sheet 502 does not provide power to V6565.

SAT COMMENTS:

Answer Key Attachment 3 UNSAT 8770-B-327 Sheet 645 CRITICAL STEP 5:

Determines from CWD where on RTGB the solenoid of V6565 is powered STEP from.

STANDARD:

DETERMINES from Sheet 645 to remove fuses in RTGB-105, EE F47 &

SAT F48 125VDC.

_UNSAT COMMENTS:

Answer Key Attachment 4 STEP (done):

Inform Candidate JPM is complete.

STANDARD:

SAT EXAMINER'S CUE:

THIS JPM IS COMPLETE.

COMMENTS:

UNSAT END OF TASK STOP TIME:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 5

CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)

Initial Conditions I&C would like to inspect the solenoid for Waste Gas Stop Valve V6565 on Unit 1. This will require the solenoid to be de-energized.

Initiating Cue You are the Unit 1 Unit Supervisor. Independently verify the components that need to be operated to de-energize the solenoid for Waste Gas Stop Valve V6565.

REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS CANDIDATE EXAMINER

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS UNIT I KA Statement:

KA #:

References:

Knowledge of the requirements for reviewing and approving release permits.

2.3.6 (2.1 / 3.1) NOP-06.01, Controlled Liquid Release to Circulating Water Discharge Chemistry Pre-Release Calculations C-200, Offsite Dose Calculation Manual Candidate:

Name Time Start Time Finish Performance Rating:

Validation Time Sat Unsat 10 minutes Examiner:

Comments Signature:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 2

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LIQUID RELEASE REQUIREMENTS UNIT 1 Directions to the candidate for Administrative JPMS:

I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.

Initial Conditions Unit 1 is at 100% power. Chemistry has requested a release of the 1 B WMT per LRP Permit # 1-04-55. All equipment is operable with the exception of Liquid Waste Monitor R-6627 which is out of service.

Initiating Cue You are the Unit 1 Unit Supervisor. Process the Liquid Release Permit # 1-04-55 for this release.

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 3

START TIME:

1 -NOP-06.01, Controlled Liquid Release to Circulating Water Discharge STEP 1:

ENSURE Section 3.0, Prerequisites, completed.

STANDARD:

INITIAL Electrical power available and step after reviewing Section 3.0 EVALUATOR NOTE: All equipment is operable per initial conditions COMMENTS:

SAT UNSAT STEP 2:

ENSURE Section 4.0, Prerequisites, completed.

STANDARD:

INITIAL after reviewing Section 4.0 SAT COMMENTS:

UNSAT STEP 3:

REVIEW the Liquid Release Permit for appropriate signatures under AUTHORIZATION.

SAT STANDARD:

VERIFIES signatures and ENTERs 1-04-55 for Permit Number and UNSAT ENTERs 1 B WMT for Tank releasing COMMENTS:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 4

STEP 4:

REVIEW the Equipment Out of Service Log and determine if Channel R-6627, Liquid Waste Monitor has been declared Out of Service.

STANDARD:

DETERMINES R-6627 is Out of Service EVALUATOR NOTE: R-6627 is not operable per initial conditions COMMENTS:

SAT UNSAT If Channel R-6627 is Out of Service, Then PERFORM the following:

STEP 5:

Has Chemistry attached two independent Radioactivity analysis of the tank to the Release Permit?

STANDARD:

CHECK No COMMENTS:

SAT UNSAT If Channel R-6627 is Out of Service, Then PERFORM the following:

STEP 6:

Has Chemistry attached two independent Release Rate Calculations for the tank on the Release Permit?

STANDARD:

CHECK No COMMENTS:

SAT UNSAT ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 5

If Channel R-6627 is Out of Service, Then PERFORM the following:

STEP 7:

Have you arranged for independent verification of the discharge valve alignment?

SAT STANDARD:

COMMENTS:

CHECK No Unit Supervisor is the person who would arrange to this step done UNSAT STEP 8:

If the answer to any of the above questions is "No", Then STOP, do not CRITCAL STEP approve the Liquid Release Permit.

STANDARD:

STOPS, does not approve the Liquid Release Permit.

SAT COMMENTS:

UNSAT STEP (done):

Inform Candidate JPM is complete.

STANDARD:

SAT EXAMINER'S CUE:

THIS JPM IS COMPLETE.

COMMENTS:

UNSAT END OF TASK STOP TIME:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 6

UNIT 1 LIOUID RELEASE PERMIT TANK DATA A. LRP Permit #

B. Date and Time C. Tank Name D. Discharge Volume (Gallons) 1-04-55 21-DEC-2004 03:45 1B WMT 4.0000E+04 lI PRERELEASE DATA (jiCi/ml = micro curies per milliliter)

A. Total Concentration Of Solids 3.574E+06 ttCi/ml B. Total Activity Of Solids 5.411 E+02 zCi C. Tank Recirced As Per COP-01.05 X

Initials D. Minimum Pumps During Release 3

CWP'-

E. Maximum Release Rate During Re],--

),,

"E+02 GPM F. Fraction Of 10 CFR 20 Limits At C "3 v,,

,-02 Fl Canal (Solids) (Admin Limit <0.8)

',(S

.t.j.

G. Total Noble Gas Activity After Dilu

-0 Fg (Gases) (Admin Limit < 1.60E-04) e C

H. Liquid Radwaste Monitor Settings A

L-'*

A Alert Setting 4.500E-03 ACi/ml C

c I Have Verified These Settings Are En z,,, f Monitors Control Module In The Conti Initials I. Liquid Rad Waste Monitor Source Chec 6

Initials J. LRP LIMS Number 234878 Monitor II.

AUTHORIZATION A. Permit Preparer Verifies Release Will.

Signature B. Release Approved By Permit Preparer I Signature C. Release Approved By Chemistry Supr. 1

-= 25000 tzCi N/A Signature D. Release Conditions Approved By ANPS Signature IV.

ACTUAL RELEASE DATA A. Number Of Pumps Running CWP's ICWP's B. Tank Level At Start Of Release C. Date and Time At Start Of Release D. Date and Time At End Of Release E. Tank Level At End Of Release F. Reviewed By ANPS Signature V.

POST RELEASE DATA A. Total Volume This Release Gallons B. Total Activity Of Solids Released

_Ci C. Release Conditions Approved By ANPS Signature

FLORIDA POWER & LIGHT CO.

ST.

LUCIE PLANT CHEMISTRY DEPARTMENT LIQUID RELEASE PERMIT 1 55 FINAL ACTIVITY REPORT FOR PRE-RELEASE CALCULATIONS SAMPLE I.D.

SAMOPLE TIME GEOMETRY FILE:

COUNT TIME SAMPLE VOLUME:

lB WMT 12-21-2004 @ 8:10 3GT67.CLB 1.0000E+03 SEC 1.0000E+03 mls.

FILE: LRP.DAT RELEASE VOLUME:

RELEASE RATE DILUTION PUMPS:

DILUTION RATE SAMPLE #

36 4.0000E+04 gal.

1.7000E+02 GPM 1 ICWP 3

CWP 3.7750E+05 GPM NUCLIDE SYMBOL SB-125 C0-60 H-3 C

FE-55 C

SR-89 C

Y-90 C

Y-90 C

TOTALS SAMPLE UCI/ML

5. 583E-07
1. 783E-06 5.520E-02 9.880E-06 2.400E-08
5. 000E-09
5. 000E-09
2. 342E-06 LRP II.A.

LRP PROGRAM Q.C.

O.K.

E.C.L.

E.C.L.

TANK UCI TANK UCI NUCLIDE UCI/ML FRACTION PRERELEAS POSTRELEA SYMBOL 3.E-05 8.381E-06 8.453E+01 SB-125 3.E-06 2.677E-04 2.700E+02

-60 1.E-03 2.486E-02 1.E-04 4.449E-05 8.E-06 1.351E-06 5.E-07 4.503E-06 7.E-06 3.217E-07 2.519E-02 3.545E+02 F SUB L LRP II.B.

C -

denotes composite -

only used for F SUB L NUCLIDE SYMBOL TOTALS SAMPLE UCI/ML

0. O00E+00 DIL.

CONC TANK UCI TANK UCI NUCLIDE

@ CANAL PRERELEAS POSTRELEA SYMBOL 0.000E+00 0.000E+00 F SUB G

CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)

Initial Conditions Unit 1 is at 100% power. Chemistry has requested a release of the 1 B WMT per LRP Permit # 1-04-55. All equipment is operable with the exception of Liquid Waste Monitor R-6627 which is out of service.

Initiating Cue You are the Unit 1 Unit Supervisor. Process the Liquid Release Permit # 1-04-55 for this release.

Procedure No.

ST. LUCIE UNIT 1 1-NOP-06.01 NORMAL OPERATING Current Revision No.

PROCEDURE 7A FPL Effective Date SAFETY RELATED 10/11104

Title:

CONTROLLED LIQUID RELEASE TO THE CIRCULATING WATER DISCHARGE Responsible Department: OPERATIONS REVISION

SUMMARY

Revision 7A - Incorporated PCR 04-2909 to delete step F. of Page 13 of 15 as it is redundant to Step G. (Clyde Price, 10/06/04)

Revision 7 - Incorporated PCR 04-0105 for CR 03-4573, PM03-12-154 to correct switch positions and modify steps 6.3.11 and 6.3.13. (David Albritton, 01/21/04)

AND Incorporated PCR 04-0079 to renumber steps, reword steps, add steps and renumber accordingly. (Winston Ryley, 01/14/04)

Revision 6 - Incorporated TC 03-083 to adjust FIC-6627 to minimum setting and adjust flow.

(Bill Green, 10/30/03)

Revision 5A - Incorporated PCR #03-0353 to add appropriate missing lines. (Clyde Price, 02/14/03)

REVISION 5 - Added note regarding low WMT level and guidance to adjust recirc to maintain flow. (William Green, 08/13/02)

REVISION 4 - Removed 14-day requirement for restoration of rad monitor per change in ODCM (C-200). (Kelly Korth, 05/14/02)

Revision FRG Review Date Approved By Approval Date S 1 OPS 0

09/21/99 R. G. West 09/21/99 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN 1-NOP-06.01 7A N/A SYS Plant General Manager COM COMPLETED J. R. Martin 01/21/04 ITM 7A Designated Approver J. R. Martin 10/06/04 Designated Approver (Minor Correction)

REVISION NO.:

PROCEDURE TITLEK'.

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 2 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION PAGE 1.0 PURPO SE.................................................................................................

3

2.0 REFERENCES

3 3.0 PREREQ UISITES......................................................................................

4 4.0 PRECAUTIO NS / LIM ITATIONS...............................................................

4 5.0 RECO RDS REQ UIRED.............................................................................

5 6.0 INSTRUCTIO NS........................................................................................

6 6.1 Initial Conditions.............................................................................

6 6.2 Valve Alignm ent.............................................................................

7 6.3 Starting the Liquid Release..........................................................

10 6.4 Com pleting the Liquid Release...................................................... 14 FIGURES FIG URE 1 LIQ UID RELEASE PERM IT - UNIT 1...........................................

15

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 3 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 1.0 PURPOSE 1.1 This procedure provides instructions for the controlled release of liquid from the Waste Monitor Tanks (WMT).

2.0 REFERENCES

NOTE One or more of the following symbols may be used in this procedure:

§ Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.

¶ Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.

T Indicates a step that requires a sign off on an attachment.

2.1 Technical Specifications Appendix B part 2 Technical Requirements Manual 2.2 Updated Final Safety Analysis Report (UFSAR) 0 Section 11.2.2.2 2.3 Management Directives and Regulatory Commitments 0

¶j CR-1045 2.4 Procedures Chemistry Procedure C-200, Offsite Dose Calculation Manual (ODCM)

Radiation Protection Manual COP-01.05, Processing Aerated Liquid Waste 2.5 Miscellaneous Documents P&ID 8770-G-078, Sheets 161, 162, 164, 165

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 4 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 3.0 PREREQUISITES INITIAL 3.1 Electrical power is available to the following pumps:

1.

1A Waste Monitor Pump Bkr. 1-40948

2.

1B Waste Monitor Pump Bkr. 1-41756

3.

Liquid Waste Control Panel (LWCP) PP-109, Ckt. 18 4.0 PRECAUTIONS / LIMITATIONS 4.1 Prior to release, the tank contents shall be sampled, analyzed and a Liquid Release Permit (LRP) prepared and approved. Once a sample has been drawn for release purposes, radioactive waste shall NOT be added to the tank.

4.2 The Operator shall perform a release only after receipt of an approved Liquid Release Permit. Form similar to Figure 1.

4.3 The Liquid Waste Monitor shall be in service during a release and frequently observed to assure that the count rate is below the trip point settings as noted on the Release Permit. If the Liquid Waste Monitor is determined to be inoperable, refer to C-200, Offsite Dose Calculation Manual (ODCM), Section 3.3.3.9 for required actions and provisions to proceed with the release.

4.4 If activity reaches the high rate trip setpoint as indicated on the Release Permit, an alarm is activated in the Control Room and Flow Control Valve FCV-6627X trips closed. FCV-6627X may be closed from RTGB-105 to terminate the release at the Operator's discretion. Do not re-initiate a liquid release that has been terminated by a monitor alarm until authorized by the Chemistry Department.

4.5 The minimum number of circulating water (CWP) and/or Intake Cooling Water Pumps (ICWP) should be in service during a release as specified by the Liquid Release Permit. Even though not desirable, a release may be made with only ICW pumps for dilution if administrative limits are not exceeded.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 5

PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 4.6 The ODCM limits for liquid releases are the following:

1.

The concentration of radioactive material released from the site shall be limited to the concentrations specified in 10 CFR Part 20, Appendix B, Table 2, Column 2 for radionuclides other than dissolved or entrained noble gases. For dissolved or entrained noble gases, the concentration shall be limited to 2 x 10.4 microcuries / ml total activity.

2.

To ensure that the sum of radioactive releases from multiple release points on site do not exceed the site limits:

A.

No more than one batch release shall be made on site at the same time.

B.

Administrative limits of 80% of the site limits shall be used for a batch release liquid release permit.

C.

Chemistry Department shall ensure as per COP-01.05 that the sum of all continuous and any batch release shall not exceed the site limit.

A continuous release is Steam Generator Blowdown to the discharge canal with primary-to-secondary leakage. A batch release is from a tank identified in the respective reactor unit's operating procedure for controlled liquid release to the circulating water discharge i.e. this procedure.

4.7 Applicable radiation protection, precautions and procedures shall be observed.

5.0 RECORDS REQUIRED 5.1 A completed Liquid Release Permit with the final activity page attachment and this procedure with signed off steps shall be maintained in the plant files in accordance with QI-1 7-PSL-1, Quality Assurance Records.

5.2 Normal Log Entries

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 6 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.0 INSTRUCTIONS INITIAL 6.1 Initial Conditions

1.

ENSURE Section 3.0, Prerequisites, completed.

2.

REVIEW Section 4.0, Precautions /Limitations.

3.

REVIEW the Liquid Release Permit for appropriate signatures under AUTHORIZATION.

Permit Number Tank releasing CAUTION If the Liquid Waste Monitor is Out of Service, C-200, ODCM Control 3.3.3.9 requires two independent tank sample / analysis and two independent valve alignments to verify the discharge line valving.

4.

¶j REVIEW the Equipment Out of Service Log and determine if Channel R-6627, Liquid Waste Monitor has been declared Out of Service.

5.

If Channel R-6627 is Out of Service, Then PERFORM the following:

YES NO A.

Has Chemistry attached two independent Radioactivity analysis of the tank to the Release Permit?

B.

Has Chemistry attached two independent Release Rate Calculations for the tank on the Release Permit?

C.

Have you arranged for independent verification of the discharge valve alignment?

If the answer to any of the above questions is "No", Then STOP, do not approve the Liquid Release Permit.

END OF SECTION 6.1

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 7 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.2 Valve Alignment CAUTION If the Liquid Waste Monitor is Out of Service, two independent valve alignments shall be performed to verify the discharge line valving.

I

, a

  • I
1.

PERFORM the following valve alignment.

AT CCW PLATFORM VALVE NUMBER DESCRIPTION POSITION INITIAL Waste Monitor Pumps Disch to Disch LOCKED Canal Isol CLOSED V06247 Waste Monitor Tanks Inlet Isol OPEN V06238 Waste Monitor Pumps Discharge Recirc CLOSED Isol V06239 RE-6627 Upstrm Root OPEN V06240 RE-6627 Dwnstrm Root OPEN V06241 FE-6627 Upstrm Root OPEN V06242 FE-6627 Dwnstrm Root OPEN V38175 RE-6627 Demineralized Water Flush CLOSED AT WASTE MONITOR PUMPS VALVE NUMBER DESCRIPTION POSITION INITIAL V06221 1A/1 B Waste Monitor Tank Outlet CLOSED Crossover Isol V06222 1A/1 B Waste Monitor Pump Recirc CLOSED Crossover Isol CLOSED

2.

PERFORM the following valve alignment for the appropriate tank to be discharged: Valve alignment for the non-discharged tank is not necessary.

(Check appropriate tank.)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 8 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.2 Valve Alignment (continued)

2.

(continued)

A.

If 1A Waste Monitor Tank is being discharged with the 1A Waste Monitor Pump, Then PERFORM the following alignment:

VALVE NUMBE DESCRIPTION POSITION INITIAL NUMBER V06231 1 B Waste Monitor Pump Disch Isol CLOSED V06207 1A Waste Monitor Tank Outlet Isol OPEN V06208 1A Waste Monitor Pump Suct Isol OPEN V06215 1A Waste Monitor Pump Disch Isol CLOSED V06220 1A Waste Monitor Pump Disch Recirc Isol OPEN Selected to HCV-06-6 Waste Monitor Tanks Inlet 1

to 1 BWMT B.

If 1 B Waste Monitor Tank is being discharged with the 1 B Waste Monitor Pump, Then PERFORM the following alignment:

VALVE NUMBE DESCRIPTION POSITION INITIAL NUMBER V06215 1A Waste Monitor Pump Discharge Isol CLOSED V06223 1 B Waste Monitor Tank Outlet Isol OPEN V06224 1 B Waste Monitor Pump Suct Isol OPEN V06231 1 B Waste Monitor Pump Discharge Isol CLOSED V06235 1 B Waste Monitor Pump Disch Recirc Isol OPEN Selected to HCV-06-6 Waste Monitor Tanks Inlet SAlWMt to 1A WMT

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 9 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.2 Valve Alignment (continued)

2.

(continued)

C.

If 1A Waste Monitor Tank is being discharged with the 1 B waste monitor pump, Then PERFORM the following alignment:

VALVE NUMBE DESCRIPTION POSITION INITIAL

-NUMBER V06215 1A Waste Monitor Pump Disch Isol CLOSED V06223 1 B Waste Monitor Tank Outlet Isol CLOSED V06224 1 B Waste Monitor Pump Suct Isol OPEN V06231 1 B Waste Monitor Pump Disch Isol CLOSED V06235 1 B Waste Monitor Pump Disch Recirc Isol CLOSED Selected to HCV-06-6 Waste Monitor Tanks Inlet 1

t 1 BWMT V06221 1A/1 B Waste Monitor Tank Outlet OPEN Crossover Isol V06207 1A Waste Monitor Tank Outlet Isol OPEN V06222 1A/1B Waste Monitor Pump Recirc OPEN Crossover Isol V06220 1A Waste Monitor Pump Disch Recirc Isol OPEN D.

If I B Waste Monitor Tank is being discharged with the 1A waste monitor pump, Then PERFORM the following alignment:

VALVE NUMBE DESCRIPTION POSITION INITIAL NUMBER V06231 1 B Waste Monitor Pump Disch Isol CLOSED V06207 1A Waste Monitor Tank Outlet Isol CLOSED V06208 1A Waste Monitor Pump Suct Isol OPEN V06215 1A Waste Monitor Pump Disch Isol CLOSED V06220 1A Waste Monitor Pump Disch Recirc Isol CLOSED HCV-06-6 Waste Monitor Tanks Inlet Selected to 1A WMT V06221 1A/1 B Waste Monitor Tank Outlet OPEN Crossover Isol V06223 1 B Waste Monitor Tank Outlet Isol OPEN V06222 1A/1 B Waste Monitor Pump Recirc OPEN Crossover Isol V06235 1 B Waste Monitor Pump Disch Recirc Isol OPEN END OF SECTION 6.2

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.3 Starting the Liquid Release NOTE Low WMT level may cause the flow switch for RE-6627 to actuate.

1.

VERIFY that the minimum number of CW or ICW Pumps required by Liquid Release Permit is in service.

2.

ENTER the pumps in operation in section IV of permit.

3.

ENSURE FIC-6627 Manual Control Knob is FULL counterclockwise.

4.

ENSURE FIC-6627 is in MANUAL.

5.

PLACE Liquid Waste Flow Valve Selector to FCV-6627X position.

6.

OPEN FCV-6627X using FIC-6627 Manual Control Knob.

7.

If Waste Monitor Pump 1A is to be used, Then PERFORM the following:

A.

START 1A Waste Monitor Pump

1.

If releasing the 1A Waste Monitor Tank, Then THROTTLE CLOSE V06220, 1A Waste Monitor Pump Discharge Recirc Isol, to attain 20 to 25 psig on PI-06-47A, 1A Waste Monitor Pump Press.

2.

If releasing the 1 B Waste Monitor Tank, Then THROTTLE CLOSED V06235, 1 B Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47A, 1A Waste Monitor Pump Pressure.

B.

OPEN V06215, 1A Waste Monitor Pump Discharge Isol.

C.

If pump discharge pressure does not return to approximately 20 to 25 psig after the discharge valve is opened, Then PERFORM the following:

1.

CLOSE V06215, 1A Waste Monitor Pump Discharge Isolation.

2.

STOP 1A Waste Monitor Pump.

3.

VERIFY correct valve lineup before continuing.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 11 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.3 Starting the Liquid Release (continue)

8.

If Waste Monitor Pump 1 B is to be used, Then PERFORM the following:

A.

START 1 B Waste Monitor Pump.

1.

If releasing I B Waste Monitor Tank, Then THROTTLE CLOSED V06235, 1 B Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47B, 1B Waste Monitor Pump Press.

2.

If releasing 1A Waste Monitor Tank, Then THROTTLE CLOSED V06220, 1A Waste Monitor Pump Discharge Recirc Isolation, to attain 20 to 25 psig on PI-06-47B, 1 B Waste Monitor Pump Pressure.

B.

OPEN V06231, 1 B Waste Monitor Pump Discharge Isolation.

C.

If pump discharge pressure does not return to approximately 20 to 25 psig after the discharge valve is opened, Then PERFORM the following:

1.

CLOSE V06231, 1 B Waste Monitor Pump Disch Isol.

2.

STOP 1 B Waste Monitor Pump.

3.

VERIFY correct valve lineup before continuing.

9.

RECORD the following liquid release data in Section IV of LRP:

A.

Start date and time B.

Starting tank level.

10.

LOCK OPEN V21462, Waste Monitor Pumps Disch to Disch Canal Isol

11.

MONITOR FR-6627 and ADJUST FIC-6627 to maintain release flow:

A.

If releasing 1 B Waste Monitor Tank, Then THROTTLE FCV-6627X by adjusting FIC-6627 Manual Control Knob, to attain no greater than 50 gpm on FR-6627.

B.

If releasing 1A Waste Monitor Tank, Then THROTTLE FCV-6627X by adjusting FIC-6627 Manual Control Knob, to attain no greater than 50 gpm on FR-6627.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.3 Starting the Liquid Release (continue)

12.

MONITOR liquid radwaste effluent radiation monitor activity (uCi/ml) to ensure rate below those specified on the LRP, for the first few minutes of the release.

13.

MONITOR the Liquid Waste Control Panel for the following:

A.

Local Alarm B.

ENSURE the Waste Monitor pump stops at Lo-Level setpoint.

NOTE If the liquid waste monitor is out of service the release may continue until the Unit Supervisor determines that the release is complete.

C.

When the liquid waste monitor, R-6627, alarms on low sample flow (annunciator X-5), Then PERFORM the following:

1.

If the 1A Waste Monitor Pump is being used for liquid release, Then CLOSE V06215, 1A Waste Monitor Pump Discharge Isolation.

OR If the 1 B Waste Monitor Pump is being used for liquid release, Then CLOSE V06231, 1B Waste Monitor Pump Discharge Isolation.

D.

If the Liquid Release Permit requests a RE-6627 Demin Flush, Then PERFORM the following:

1.

PLACE V06239, RE-6627 Upstrm Root, in the CLOSED position.

2.

NOTIFY the Control Room that Channel RE-6627 is OOS.

3.

PLACE V38175, DMW to RE-6627 Isol, in the OPEN (or throttled OPEN as needed) position.

4.

FLUSH RE-6627 with Demineralized Water for approximately 4 minutes.

5.

PLACE V38175, DMW to RE-6627 Isol, in the CLOSED position.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 13 of 15 PROCEDURE NO-:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 6.3 Starting the

13.

D.

E.

F.

G.

Liquid Release (continue)

INITIAL /IV (continued)

6.

PLACE V06239, RE-6627 Upstrm Root, in the OPEN position.

/

7.

NOTIFY the Control Room that Channel RE-6627 is back in service.

PLACE FCV-6627X Selector switch to the CLOSED position.

PLACE FIC-6627 Manual Control Knob full counter clockwise.

OPEN the Waste Monitor Pump Discharge Isolation:

V06215, 1A Waste Monitor Pump Discharge Isolation OR V06231, 1 B Waste Monitor Pump Discharge Isolation END OF SECTION 6.3

-J

REVISION NO.:

7A PROCEDURE NO.:

1-NOP-06.01 I

IPROCEDURE TITLE:

CONTROLLED LIQUID RELEASE TO THE CIRCULATING WATER DISCHARGE ST. LUCIE UNIT 1 6.4 Completing the Liquid Release

1.

If the Liquid release is complete, Then RECORD the following data in Section IV on Release Permit:

A.

Release stop date and time B.

Monitor Tank ending level

2.

If the Liquid release is complete, Then PERFORM the following valve alignment:

VALVE NUMBER DESCRIPTION POSITION INITIAL V06207 1 A Waste Monitor Tank Outlet Isol OPEN V06208 1A Waste Monitor Pump Suct Isol OPEN V06215 1A Waste Monitor Pump Disch Isol CLOSED V06220 1A Waste Monitor Pump Disch Recirc Isol OPEN V21462 V06221 Waste Monitor Pumps Disch to Disch Canal Isol 1A/1 B Waste Monitor Tank Outlet Crossover Isol LOCKED CLOSED

--- 4 CLOSED V06222 1A/1B Waste Monitor Pump Recirc CLOSED 0C rossover Isol C O E V06223 1 B Waste Monitor Tank Outlet Isol OPEN V06224 1 B Waste Monitor Pump Suct Isol OPEN V06231 1B Waste Monitor Pump Disch Isol CLOSED V06235 1 B Waste Monitor Pump Disch Recirc Isol{

OPEN

3.

ROUTE completed release package to Nuclear Plant Supervisor / Assistant Nuclear Plant Supervisor for review.

END OF SECTION 6.4

REVISION NO.:

PROCEDURE TITLE:

PAGE:

7A CONTROLLED LIQUID RELEASE TO THE 15 of 15 PROCEDURE NO.:

CIRCULATING WATER DISCHARGE 1-NOP-06.01 ST. LUCIE UNIT 1 FIGURE 1 LIQUID RELEASE PERMIT - UNIT 1 (Page 1 of 1)

I. TANK DATA A. IRP Permit #

B. Date and Time C. Tank Name D. Discharge Volume (Gallons)

II. PRE-RELEASE DATA (pCi/ml = micro curies per milliliter)

A.

Total Concentration Of Solids pCi/ml B.

Total Activity Of Solids IpCi C.

Tank Recirced As Per COP-01.05 Initials D.

Minimum Pumps During Release CWPs ICWPs E.

Maximum Release Rate During Release GPM F.

Fraction Of 10 CFR 20 Limits At Canal FI Canal (Solids) (Admin Limit < 0.8)

G.

Total Noble Gas Activity After Dilution Fg (Gases) (Admin Limit < 1.60E-04)

H.

Liquid Radwaste Monitor Settings Alert Setting pCi/ml High Setting pCi/ml I Have Verified These Settings Are Entered On The Monitors Control Module In The Control Room.

Initials I.

Liquid Rad Waste Monitor Source Check Performed By:

Initials J.

LRP LIMS Number Monitor Source Check LIMS Number Ill. AUTHORIZATION A.

Permit Preparer Verifies Release Will Not Exceed Admin Limits Signature B.

Release Approved By Permit Preparer If II.B Is. 25000 pCi Signature C.

Release Approved By Chemistry Supv If 11.1 Is > 25000 pCi Signature D.

Release Conditions Approved by ANPS:

Signature IV. ACTUAL RELEASE DATA A.

Number Of Pumps Running CWPs ICWPs B.

Tank Level At Start Of Release C.

Date And Time At Start Of Release D.

Date And Time At End Of Release E.

Tank Level At End Of Release F.

Reviewed By ANPS Signature V.

POST RELEASE DATA A.

Total Volume This Release Gallons B.

Total Activity Of Solids Released pCi C.

Post Release Reviewed By Chemistry Supervisor Signature SOPS DATE DOCT DOCN_

SYS COMP ITM_

Page 18 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)

INSTRUMENTATION RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION CONTROLS 3.3.3.9 In accordance with St. Lucie Plant TS 6.8.4.f.1), the radioactive liquid effluent monitoring instrumentation channels shown in Table 3.3-12 shall be OPERABLE with their Alarm/Trip Setpoints set to ensure that the limits of Control 3.11.1.1 are not exceeded. The Alarm/Trip Setpoints of these channels shall be determined and adjusted in accordance with the methodology and parameters in the OFFSITE DOSE CALCULATION MANUAL (ODCM).

APPLICABILITY:

At all times.

ACTION:

a.

With a radioactive liquid effluent monitoring instrumentation channel Alarm/Trip Setpoint less conservative than required by the above control, immediately suspend the release of radioactive liquid effluents monitored by the affected channel or declare the channel inoperable or change the setpoint so it is acceptably conservative.

b.

With less than the minimum number of radioactive liquid effluent monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3-12.

Restore the inoperable instrumentation to OPERABLE status within 30 days and, if unsuccessful, explain in the next Annual Radioactive Effluent Release Report why this inoperability was not corrected in a timely manner.

c.

Report all deviations in the Annual Radioactive Effluent Release Report.

SURVEILLANCE REQUIREMENTS 4.3.3.9 Each radioactive liquid effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST at the frequencies shown in Table 4.3-8.

St. Lucie Plant ODCM Controls

Page 19 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)

TABLE 3.3-12 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION MINIMUM CHANNELS INSTRUMENT OPERABLE ACTION

1. Radioactivity Monitors Providing Alarm and Automatic Termination of Release a)

Liquid Radwaste Effluent Line 1

35 b)

Steam Generator Blowdown 1/SG 36, 37 Effluent Line

2. Flow Rate Measurement Devices a)

Liquid Radwaste Effluent Line N.A.

38 b)

Discharge Canal N.A.

38 c)

Steam Generator Blowdown N.A.

38 Effluent Lines SG - Denotes Steam Generator St. Lucie Plant ODCM Controls

Page 20 of 230 ST. LUCIE PLANT CHEMISTRY OPERATING PROCEDURE NO. C-200, REVISION 25 OFFSITE DOSE CALCULATION MANUAL (ODCM)

TABLE 3.3-12 (Continued)

ACTION STATEMENTS ACTION 35 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases may continue provided that prior to initiating a release:

/R25

a.

At least two independent samples are analyzed in accordance with the Surveillance Requirement for concentration limit of Control 4.11.1.1.1. and

b.

At least two technically qualified members of the Facility Staff independently verify the release rate calculations and discharge line valving.

Otherwise, suspend release of radioactive effluents via this pathway.

ACTION 36 - With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue for up to 30 days provided grab samples are analyzed for gross radioactivity (beta or gamma) at a limit of detection of at least 2.E-07 micro-Curie/ml:

a.

At least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />(1) when the specific activity of the secondary coolant is greater than 0.01 micro-Curies/gram DOSE EQUIVALENT 1-131 or

b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />(') when the specific activity of the secondary coolant is less than or equal to 0.01 micro-Curies/gram DOSE EQUIVALENT 1-131.

St. Lucie Plant ODCM Controls

REGION II ST. LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LOSS OF CONTROL ROOM ANNUNICATORS UNIT 1 CANDIDATE EXAMINER

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LOSS OF CONTROL ROOM ANNUNICATORS UNIT 1 KA Statement:

Knowledge of operator response to loss of all annunciators.

KA#:

2.4.32 (3.3 / 3.5)

References:

ONP 2-100.03, Partial or Complete Loss of Annunicators EPIP-01, Classification of Emergencies EPIP-08, Off-Site Notifications and Protective Action Recommendations Candidate:

Name Time Start Time Finish Performance Rating:

Validation Time Sat Unsat 30 minutes (Time Critical)

Examiner:

Signature:

Comments ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 2

REGION II ST LUCIE NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADMINISTRATIVE JPM LOSS OF CONTROL ROOM ANNUNICATORS UNIT 1 Directions to the candidate for Administrative JPMS:

I will explain the initial conditions and state the task to be performed. You will be allowed to use any reference normally available in the Control Room to complete the task. Ensure you indicate to me when you finish your assigned task by returning the material needed for the task that I provided to you.

Initial Conditions Unit 1 is at 90% power performing a downpower to 45% due to electrical bus problems.

The Reactor Operator has just reported that numerous annunicators are not working.

Initiating Cue You are the Shift Manager. Unit 1 has just tested all annunicators and determined that the annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning. 10 Meter wind speed is 12 mph and direction is 90. Complete the appropriate procedures as necessary. This is a time-critical JPM.

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 3

START TIME:

ONP 2-100.03, Partial or Complete Loss of Annunicators":

STEP 1:

RECORD the time that annunciators were lost.

SAT STANDARD:

RECORD current time.

UNSAT COMMENTS:

STEP 2:

TEST all Control Room alarm panels to determine the extent of any malfunction.

SAT STANDARD:

DETERMINE annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning.

UNSAT COMMENTS:

STEP 3:

DETERMINE the affected annunciator panels (A, B, C, LR, etc.).

SAT STANDARD:

DETERMINE annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning..

_UNSAT COMMENTS:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 4

STEP 4:

From the table below, DETERMINE the percentage of Safety System Annunciators that are lost by adding the percent of total for each affected panel.

CRITICAL STEP STANDARD:

DETERMINE the percentage > 75%

SAT A

8.6%

B 8.6%

C 0.8%

D 0.0%

K 4.8%

L 6.3%

M 6.3%

N 4.2%

P 6.7%

Q 10.3%

R 10.9%

S 10.3%

TOTAL 77.9%

UNSAT COMMENTS:

CRTIA STEP 5:

STANDARD:

If the percentage of safety system annunciators exceeds 50%, Then EVALUATE and IMPLEMENT the E-Plan as required in EPIP-01, Classification of Emergencies.

IMPLEMENT EPIP-01, Classification of Emergencies 8.B. LOSS OF ALARMS / COMMUNICATION /MONITORING CRITICAL STEP SAT UNSAT COMMENTS:

J ____________________

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 5

EPIP-01 Attachment 1 Step 8.B Loss of Alarms/Communication/Monitoring CRITICAL STEP STEP 6:

Classifies EAL ALERT per EPIP-01 STANDARD:

CLASSIFIES ALERT due to Unplanned loss of most (greater than 75%) or all safety system annunicators and Plant transient in progress.

SAT UNSAT EXAMINER'S NOTE:

Record the time initial event Declaration is made This must be within 15 of JPM Start Time Your task is to now complete a FLORIDA NUCLEAR PLANT NOTIFICATION FORM using EPIP-08.

HAND STUDENT EPIP-08 EXAMINER'S CUE:

EXAMINER'S NOTE:

COMMENTS:

EPIP-08 Attachment 1 Step 1A STEP 7:

Check appropriate box for drill or actual emergency as the case may be.

During exercises, drills, or tests, each message shall be checked THIS IS A DRILL.

CRITICAL STEP SAT UNSAT STANDARD:

CHECK THIS IS A DRILL COMMENTS:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 6

I EPIP-08 Attachment 1 Step 2A Enter today's date.

STEP 8:

CRITICAL STEP SAT UNSAT STANDARD:

ENTER the current date.

EVALUATOR'S NOTE: 2B is completed when contact with State Warning Point is made COMMENTS:

EPIP-08 Attachment 1 Step 2C Enter the name of the person making the notification call.

I STEP 9:

CRITICAL STEP SAT UNSAT STANDARD:

ENTER Candidates name.

COMMENTS:

EPIP-08 Attachment 1 Step 2D Enter the message number.

STEP 10:

CRITICAL STEP SAT UNSAT STANDARD:

ENTER 1 COMMENTS:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 7

EPIP-08 Attachment 1 Step 2E Check where notification is being made from.

STEP 11:

STANDARD:

CHECK Control Room COMMENTS:

CRITICAL STEP SAT UNSAT STEP 12:

EPIP-08 Attachment 1 Step 3B Check the box for the facility from which the notification is being made.

CRITICAL STEP SAT UNSAT STANDARD:

CHECK St. Lucie Unit 1 COMMENTS:

I1 EPIP-08 Attachment 1 Step 4A Check the box corresponding to current accident classification declared.

STEP 13:

CRITICAL STEP SAT UNSAT STANDARD:

CHECK Alert COMMENTS:

L _____________________

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 8

EPIP-08 Attachment 1 Step 5A STEP 14:

Check the box for the appropriate plant site for the emergency declaration.

CRITICAL STEP SAT UNSAT STANDARD:

CHECK Emergency Declaration.

COMMENTS:

ti-R-uJ Attachment 1 Sitep 5 STEP 15:

Enter the date and time when the current emergency classification was declared CRITICAL STEP SAT UNSAT STANDARD:

ENTER Date and Time EXAMINER'S NOTE: Should be same time as Step 1 of JPM COMMENTS:

I__

EIPhI-U8 Attachment 1 Step 6B STEP 16:

Reason for Emergency Declaration STANDARD:

CHECK "B" Description ENTER Unplanned loss of most (greater than 75%) or all safety system annunicators and plant transient in progress.

CRITICAL STEP SAT UNSAT COMMENTS:

I I

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 9

EPIP-08 Attachment 1 Step 7A Additional Information or Update STEP 17:

STANDARD:

CHECK "A" None COMMENTS:

SAT UNSAT EPIP-08 Attachment 1 Step 8 Weather Data.

STEP 18:

CRITICAL STEP SAT UNSAT STANDARD:

A. Wind direction 900 B. Downwind Sectors Affected M, N, P COMMENTS:

EPIP-08 Attachment 1 Step 9A Release Status STEP 19:

CRITICAL STEP SAT UNSAT STANDARD:

CHECK "A" None (Go To Item 11)

COMMENTS:

I.________________________

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 10

STEP 20:

STANDARD:

EPIP-08 Attachment 1 Step 10 Release Significance Category Do Not Check Any Box in Item 10 SAT UNSAT COMMENTS:

STEP 21:

STANDARD:

EPIP-08 Attachment 1 Step 1 1A Determination of Protective Actions Recommendations (PARs)

CHECK "A" No recommended Actions at this time i

CRITICAL STEP SAT UNSAT COMMENTS:

STEP 22:

STANDARD:

EPIP-08 Attachment 1 Step 11 B Utility Recommended Protective Actions Leave "B" blank CRITICAL STEP SAT UNSAT COMMENTS:

I _______________________

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 11

EPIP-08 Attachment 1 Step 11 C Consideration Issuance of KI:

STEP 23:

CRITICAL STEP SAT STANDARD:

CHECK NO UNSAT COMMENTS:

Requires G.E. and Release in Progress to check YES I. ___________________________

EIP'IP-08 Attachment 1 Step 12 STEP 24:

Plant Conditions STANDARD:

Leave Blank COMMENTS:

SAT

_UNSAT STEP 25:

EC or RM Approval CRITICAL STEP STANDARD:

Sign, Date and Time on EC Approval Signature SAT UNSAT EXAMINER'S NOTE:

RECORD THE TIME TASK IS COMPLETE, COLLECT THE STATE NOTIFICATION FORM.

  • MUST BE < 15 MINUTES FROM STEP 6 CLASSIFICATION TIME.

COMMENTS:

END OF TASK I ________________________________

STOP TIME:

ST. LUCIE TRAINING DEPT.

ADMINISTRATIVE JPM PAGE 12

A T T A C H M E N T 1 I

FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 1)

On-line Verification:

El SWP/DEM El St. Lucie County

[-

Martin County

1.

A. ID THIS IS A DRILL

2.

A.

Date: D/AT/E D.

Message Number:

1

3.

Site:

A. E] Crystal River Unit 3 D. El Turkey Point Unit 3

4.

Emergency Classification:

A B

5.

A. 0 Emergency Declaration:

B. El THIS IS AN EMERGENCY B. Contact Time:

C. Reported by: (Name) Candidate E. Reported from: 0 Control Room El TSC El EOF B. Z St. Lucie Unit 1 E. El Turkey Point Unit 4 C. El St. Lucie Unit 2 C. El Site Area Emergency D. El General Emergency E Notification of Unusual Event 0 Alert B.

El Emergency Termination:

Date: D/AT/E Time:

TIME

6.

Reason for Emergency Declaration:*

A.

El EAL Number OR B. 0

==

Description:==

Unplanned loss of most (greater than 75%) or all safety system annunicators and Plant transient 7.

-in proaress.

Additional Informnation or Update:

A.

0l None OR B. El

8.

Weather Data:

A. Wind direction from 90 degrees

9.

Release Status:

A. 0 None (Go to Item 11)

10.

Release Significance Category (at the Site Boundary):

B. Downwind Sectors Affected:

M

_N.,

NP B. El Is occurring C. El Has occurred, but stopped A.

B.

C.

D.

El Information not available at this time.

El Release within normal operating limits (< 3.5 E-1 Ci/sec noble gas, _* 4.6 E-5 Ci/sec iodine)

E]

Non-Significant Fraction of PAG Range (release is > normal limits and < 500 mrem TEDE and 1000 mrem CDE)

El PAG Range (_> 500 mrem TEDE or _ 1000 mrem CDE)

11.

Utility Recommended Protective Actions:

A.

0D No recommended actions at this time.

B.

El The utility recommends the following protective actions:

El Miles No Action Sectors Evacuate Sectors Shelter Sectors 0-2 2-5 5-10 OR Shelter Zones / Areas:

Evacuate Zones / Areas:

C.

Consider Issuance of KI:

El Yes 0 No If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, continue with item 12.

12.

Plant Conditions:

13.

Weather Data:

A. Reactor Shutdown? [] Yes E] No C. Containment Intact? El Yes El No B. Core Adequately Cooled?

E] Yes E] No D. Core Condition: [] Stable

[E Degrading A. Wind Speed __

mph B. Stability Class __

14.

Additional Release Information:

El N/A OR A. El Noble Gases Curies per second B. El lodines Curies per second C. Airborne:

Date Started

/

/

Time Started Date Stopped

/

/

D. Liquid:

Date Started

/

/

Time Started Date Stopped

/

/

Time Stopped __

Time Stopped __

Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for 1 Hour E.

mrem G.

mrem I.

mrem K.

mrem Prniontprd Tntni fnn-q (TEDEF) for 1 Hnujr F.

mrem H.

mrem J.

mrem L.

mrem VVOI oiyr OLUIC.

~.bO, J*I.JOLC Date: D / AT / E Date:

/

/

Time:

Time Time: __

15.

Message Received By: Name:

If emergency class escalation is known to be necessary and a new notification form will be transmitted within 15 minutes, then you may go to line 15.

1 '

ý t\\, 'E (2 -

V E--

PSL-F070 EPIP-08, Off-Site Notifications and Protective Action Recommendations Effec' Form tive Date: 08/29/03

CANDIDATE COPY (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF ANSWER)

Initial Conditions Unit 1 is at 90% power performing a downpower to 45% due to electrical bus problems.

The Reactor Operator has just reported that numerous annunicators are not working.

Initiating Cue You are the Shift Manager. Unit 1 has just tested all annunicators and determined that the annunicators A, B, C, D, K, L, M, N, P, Q, R & S are not functioning. 10 Meter wind speed is 12 mph and direction is 90. Complete the appropriate procedures as necessary. This is a time-critical JPM.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

1B PARTIAL OR COMPLETE LOSS 2 of 6 PROCEDURE NO.:

OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 TABLE OF CONTENTS SECTION PAGE 1.0 P U R P O S E................................................................................................

.. 3

2.0 REFERENCES

3 3.0 RECORDS REQUIRED.............................................................................

3 4.0 ENTRY CONDITIONS...............................................................................

3 5.0 EXIT CONDITIONS...................................................................................

3 6.0 OPERATOR ACTIONS................................................................................

4 APPENDICES APPENDIX A SAFETY SYSTEM ANNUNCIATORS................................... 5 APPENDIX B POW ER SUPPLIES.............................................................. 6

REVISION NO.:

PROCEDURE TITLE:

PAGE:

1B PARTIAL OR COMPLETE LOSS 3 of 6 PROCEDURE NO.:

OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 1.0 PURPOSE 1.1 This procedure provides guidance for resolving conditions resulting from the loss of Control Room annunciators. The actions listed are intended to be a guide in responding to the loss of annunciators and are NOT intended to be a substitute for good judgement based on plant conditions.

2.0 REFERENCES

NOTE One or more of the following symbols may be used in this procedure:

§ Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.

¶ Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.

T Indicates a step that requires a sign off on an attachment.

2.1 UFSAR Section 7.5.1.6.3 2.2

§1 EPIP-01, Classification of Emergencies.

2.3 CWD 8770-B-327.

2.4 Annunciator Response Procedures 3.0 RECORDS REQUIRED 3.1 RCO Chronological log.

4.0 ENTRY CONDITIONS 4.1 Plant parameters exceed alarm setpoints without annunciation.

4.2 Annunciator check indicates a complete or partial loss of annunciation.

5.0 EXIT CONDITIONS 5.1 All annunciators have been returned to operation and are functioning properly.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

1B PARTIAL OR COMPLETE LOSS 4 of 6 PROCEDURE NO.:

OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 6.0 OPERATOR ACTIONS INSTRUCTIONS CONTINGENCY ACTIONS

1. RECORD the time that annunciators were lost.
2. TEST all Control Room alarm panels to determine the extent of any malfunction.
3.

§1 IMPLEMENT Appendix A.

4.

PERFORM the following:

  • INCREASE the frequency of monitoring RTGB and local indications for plant equipment affected.

" Periodically EXAMINE available reflash panels on the affected annunciator panels.

5.

CHECK the annunciator power supplies in accordance with Appendix B.

6.

CONTACT I&C for trouble-shooting and repair.

END OF SECTION 6.0

REVISION NO.:

PROCEDURE TITLE:

PAGE:

1B PARTIAL OR COMPLETE LOSS 5 of 6 PROCEDURE NO.:

OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 APPENDIX A SAFETY SYSTEM ANNUNCIATORS (Page 1 of 1)

NOTE The total below assumes a complete loss of an annunciator panel(s) resulting in the loss of all the safety system annunciators associated with that panel.

1. DETERMINE the affected annunciator panels (A, B, C, LR, etc.).
2. From the table below, DETERMINE the percentage of Safety System Annunciators that are lost by adding the percent of total for each affected panel.
3. If the percentage of safety system annunciators exceeds 50%, Then EVALUATE and IMPLEMENT the E-Plan as required in EPIP-01, Classification of Emergencies.

PERCENTAGE OF SAFETY SYSTEM ANNUNICATORS PER PANEL PANEL

% OF TOTAL A

8.6%

B 8.6%

C 0.8%

D 0.0%

E 2.3%

F 2.7%

G 3.4%

H 5.5%

J 1.3%

K 4.8%

L 6.3%

PANEL

% OF TOTAL M

6.3%

N 4.2%

P 6.7%

Q 10.3%

R 10.9%

S 10.3%

LR 0.8%

X 2.3%

Y 3.1%

z 0.8%

END OF APPENDIX A

REVISION NO.:

PROCEDURE TITLE:

PAGE:

1BI PARTIAL OR COMPLETE LOSS 6 of 6 PROCEDURE NO.:

OF ANNUNCIATORS 1-ONP-100.03 ST. LUCIE UNIT 1 APPENDIX B POWER SUPPLIES (Page 1 of 1)

NOTE The neon light on the back of RTGB alarm panels indicates the DC converter is operating. After power is removed from the panel, it may be necessa to remove and replace the fuse to restart the converter.

1. VERIFY the following power supplies to the affected Control Room annunciators and reset as required.

RTGB ANN. PAN.

POWER SUPPLY GROUND DET.

101 A, B, C, D RTGB 101 KKK F-4, F-12 lAB DC CKT 6 GD-1 102 E,F,G RTGB 101 KKK F-3, F-11 lAB DC CKT6 GD-2 103 H, J RTGB 101 KKK F-5, F-13 lAB DC CKT 3 GD-3 104 K, L RTGB 101 KKK F-6, F-14 lAB DC CKT 3 GD-4 105 M, N RTGB 101 KKK F-8, F-16 lAB DC CKT 3 GD-5 106 P, Q, R, S RTGB 101 KKK F-7, F-15 lAB DC CKT 3 GD-6 NOTE Power supply RTGB 101 KKK F-7, F-15 lAB DC Ckt. 3 also supplies seismic monitoring.

CRAC Panel Y CRAC Panel Z Rad. Monitor Fuses 11F5, 11F7 Fuses 11F10, 11F12 F-10 in Rad. Mon. Cabinet 1 B DC CKT 25 1B DC CKT 25 DC PP 119 CKT 1

2. TEST all the Control Room annunciator panels from the Control Room test panels.
3. TEST all the reflash modules feeding annunciators on the affected panels.

NOTE I&C Department assistance may be required.

4. SELECT an annunciator on each affected panel and functionally CHECK by generating the annunciator from the field.
5. CONTACT I&C Department to investigate and troubleshoot the problem.

END OF APPENDIX B

Procedure No.

ST. LUCIE PLANT EPIP-01 EMERGENCY PLAN Current Revision No.

IMPLEMENTING PROCEDURE 8

FPL Effective Date SAFETY RELATED 10/29/04

Title:

CLASSIFICATION OF EMERGENCIES Responsible Department: EMERGENCY PLANNING REVISION

SUMMARY

Revision 8 - Incorporated PCR 04-3018 to revise classification table to incorporate changes resulting from the New Safeguards Contingency Plan. (J. R. Walker, 10/27/04)

Revision 7 - Incorporated PCR #04-2011 to incorporate instructions from NRC Safe Guards Advisory for Operating Power Reactors, SA-04-07. (J. R. Walker, 06/28/04)

Revision 6 - Incorporated PCR #03-0403 to delete wording regarding technical specification limits and correctly place symbols. (J. R. Walker, 02/21/03)

Revision 5 - Clarified EALs under alert. (J. R. Walker, 07/25/02)

Revision 4 - Revised lAW revision to E-Plan (R40). Revised initiating condition for RCS leakage. Added EALs under security threat initiating condition. Added definitions for EAL and IC. Added guidance for multiple and dual unit events. Made editorial and administrative changes. (J.R. Walker, 05/23/02)

Revision 3 - Added PMAI references, added definitions for OCA, PA and power block, clarified classification guidance and made editorial/administrative changes.

(J. R. Walker, 02/09/01)

Revision 2 - Clarified initiating conditions and emergency action levels to correspond to changes in the PSL emergency plan in accordance with PMAI PM99-09-154, defined classification table and made editorial changes. (J. R. Walker, 10/13/00)

Revision FRG Review Date Approved By Approval Date S

OPS 0

12/15/97 J. Scarola 12/15/97 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN EPIP-01 8

10/27/04 G. L. Johnston 10/27/04 SYS Plant General Manager COM COMPLETED N/A ITM 8

Designated Approver N/A Designated Approver (Minor Correction)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 2 of 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT TABLE OF CONTENTS SECTION PAGE 1.0 P U R P O S E.................................................................................................

.. 3

2.0 REFERENCES

/ RECORDS REQUIRED / COMMITMENT DOCUMENTS.. 3 3.0 R ES PO N S IB ILIT IE S.................................................................................

4 4.0 D E F IN IT IO N S..........................................................................................

.. 5 5.0 IN S T R U C T IO N S.......................................................................................

9 ATTACHMENTS ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE............................. 13

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 3 of 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT 1.0 PURPOSE This procedure provides instructions on the classification of emergencies at St.

Lucie Plant.

Emergency classifications in order of increasing seriousness are:

Unusual Event Alert Site Area Emergency General Emergency Specific criteria are provided to assure proper escalation and de-escalation between emergency classification levels.

2.0 REFERENCES

/ RECORDS REQUIRED / COMMITMENT DOCUMENTS NOTE One or more of the following symbols may be used in this procedure:

§ Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.

¶1 Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.

T Indicates a step that requires a sign off on an attachment.

2.1 References

1.

St. Lucie Plant Radiological Emergency Plan (E-Plan)

2.

E-Plan Implementing Procedures (EPIP 00-13)

3.

C-200, Offsite Dose Calculation Manual (ODCM)

4.

AP 0010502, Oil and Hazardous Material Emergency Response Plan

5.

$1 NUREG-1022, Section 3.1.1

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 4 of 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT 2.1 References (continued)

6.

¶12 NRC IEN No. 85-80, Timely Declaration of an Emergency Class, Implementation of an Emergency Plan, and Emergency Notifications, October 15, 1985

7.

¶3 NRC EPPOS No. 2, Emergency Preparedness Position (EPPOS) on Timeliness of Classification of Emergency Conditions, August, 1995

8.

¶4 PMAI PM98-01-017, Loss of Seismic Monitoring Capability 2.2 Records Required The basis for classifying an emergency condition shall be recorded in appropriate emergency logs.

2.3 Commitment Documents

§1 CR 00-0614 (RCS leakage during shutdown cooling)

§2 PMAI PM99-09-154 (IC and EAL changes submitted under FPL letter L-98-2000)

T ¶5 NRC Safeguards Advisory for Operating Power Reactors, SA-04-07 3.0 RESPONSIBILITIES 3.1 Shift Manager (SM)

1.

The Shift Manager is responsible to promptly classify abnormal situations into one of the four defined categories.

2.

If an emergency has been declared, the Shift Manager is responsible for assuming the position of Emergency Coordinator and retaining this position until relieved.

3.2 Emergency Coordinator (EC)

The Emergency Coordinator is responsible to continually evaluate changes in plant conditions against the classification table in this procedure.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 5 of 32 PROCEDURE NO.:

5 EPIP-01 ST. LUCIE PLANT 4.0 DEFINITIONS 4.1 Emergency Action Level (EAL)

1.

A pre-determined, site-specific, observable threshold for a plant Initiating Condition that places the plant in a given emergency class. An EAL can be:

an instrument reading; an equipment status indicator; a measurable parameter (on-site or off-site); a discrete, observable event; results of analyses; entry into specific emergency operating procedures; or another phenomenon which, if it occurs, indicates entry into a particular emergency class.

4.2 Emergency Classes

1.

Unusual Event This classification is represented by off-normal events or conditions at the plant for which no significant degradation of the level of safety of the plant has occurred or is expected. Any releases of radioactive material which may have occurred or which may be expected are minor and constitute no appreciable health hazard.

2.

Alert This classification is represented by events which involve an actual or potential substantial degradation of the level of safety of the plant combined with a potential for limited uncontrolled releases of radioactivity from the plant.

3.

Site Area Emergency This classification is composed of events which involve actual or likely major failures of plant functions needed for protection of the public combined with a potential for significant uncontrolled releases of radioactivity from the plant.

4.

General Emergency This classification is composed of events which involve actual or imminent substantial core degradation and potential loss of containment integrity combined with a likelihood of significant uncontrolled releases of radioactivity from the plant.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 6 of 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT 4.3 Classification Table A composite of Initiating Conditions (ICs) and their Emergency Action Levels (EALs) used to evaluate off normal/emergency conditions resulting in declaration of one of the four Emergency Classes, as appropriate. The Table is arranged in the following categories:

1.

Events Affecting Primary Pressure A.

Abnormal Primary Leak Rate B.

Abnormal Primary/Secondary Leak Rate C.

Loss of Secondary Coolant

2.

Abnormal Radiation, Contamination and Effluent Releases A.

Uncontrolled Effluent Release B.

High Radiation Levels in Plant

3.

Fires, Explosions

4.

Accident Involving Fuel A.

Fuel Element Failure B.

Fuel Handling

5.

Natural Emergencies A.

Earthquake B.

Hurricane C.

Tornado D.

Abnormal Water Level

6.

Miscellaneous Events A.

Increased Awareness or Potential Core Melt

7.

Electrical Malfunctions A.

Loss of Power

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 7 of 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT 4.3 Classification Table (continued)

8.

Degradation of Control Capabilities A.

Loss of Plant Control Functions B.

Loss of Alarms, Communications, Monitoring

9.

Hazards to Station Operation A.

Aircraft, Missile B.

Turbine Failure C.

Toxic or Flammable Gas

10.

Security Threat 4.4 Initiating Condition (IC)

1.

One of a predetermined subset of nuclear power plant conditions where either the potential exists for a radiological emergency, or such an emergency has occurred.

4.5 Plant - The St. Lucie Plant, Unit 1 and Unit 2 4.6 Site - A general term referring to the location of the St. Lucie Nuclear Power Plant.

Other terms related to the site are given below:

1.

Owner Controlled Area - That portion of FPL property surrounding and including the St. Lucie Nuclear Power Plant which is subject to limited access and control as deemed appropriate by FPL.

2.

Protected Area - The area (within the Owner Controlled Area) occupied by the nuclear units and associated equipment and facilities enclosed with the security perimeter fence. The area within which accountability of personnel is maintained in an emergency.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

8 of 32 EPIP-01 ST. LUCIE PLANT 4.6 Site (continued)

3.

§2 Power Block - Structures, systems or components in the areas listed below that support the production of power. This includes any equipment needed for the direct generation of power or necessary for safe operation and/or shutdown of one or both of the reactors.

A.

Reactor Containment and Shield Buildings B.

Reactor Auxiliary Buildings including the following areas:

1.

Refueling Water Tank (RWT)

2.

Component Cooling Water (CCW) platform area

3.

Diesel Generator Buildings and Fuel Oil Storage Tanks

4.

Fuel Handling Building

5.

Primary Water Tank and Pumps C.

Intake Area D.

Discharge Canal & Headwall E.

Ultimate Heat Sink Structure F.

Fire Protection System including the fire pumps and the City Water Storage Tanks (CWST), but not including parts of the system associated with the North or South Service Buildings or other outlying facilities.

G.

Turbine Buildings (all levels)

H.

Condensate Storage Tanks (CST)

I.

Main, Auxiliary and Startup Transformers J.

Steam Trestles K.

Turbine Lube Oil Storage Tanks L.

Gas House

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 9 of 32 PROCEDURE NO.:

9 EPIP-01 ST. LUCIE PLANT 5.0 INSTRUCTIONS 5.1 Direct Initial Investigative and Mitigating Actions to Address the Event

1.

If the event involves entry into the Off-Normal Operating Procedures (ONOPs) or Emergency Operating Procedures (EOPs), Then perform steps per ONOPs or EOPs until appropriate or directed to classify event.

2.

If the event involves a release of hazardous materials to the environment, Then respond per AP 0010502, Oil and Hazardous Material Emergency Response Plan.

3.

If the event involves a release of radioactive material to the environment, Then direct Chemistry personnel to implement EPIP-09, Off-site Dose Calculations.

END OF SECTION 5.1

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 10 of 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT NOTE Initiating Conditions / Emergency Action Levels are applicable to all modes unless otherwise indicated.

5.2 Classifying the Event

1.

¶13 A goal of fifteen (15) minutes should be used for assessing and classifying an emergency once indications (Emergency Action Levels (EALs)) are available to Control Room Operators that an Initiating Condition (IC) has been met and/or exceeded.

A.

This goal should allow time for determination of indications (leak rate, etc.) and detailed review of Attachment 1, Emergency Classification Table.

2.

Use the best information available when working through the Emergency Classification Table. When confronted with conflicting information for which resolution is not apparent, classify the condition at the highest appropriate emergency class.

3.

If, in the judgement of the Shift Manager (SM) /Emergency Coordinator (EC), a situation is more serious than indicated by instrument readings or other parameters, Then classify the emergency condition at the more serious level (i.e., at the highest appropriate emergency class).

4.

¶5 Security Event If the Control Room is contacted by any of the following: Security, NRC, FBI or NORAD that a terrorist attack on the plant site is imminent or is occurring, Then perform the actions in the applicable Appendix to Security Force Instruction (SFI) #4, Appendix C, Unit 1 Operations Department Recommended Defensive Strategy or Appendix D, Unit 2 Operations Department Recommended Defensive Strategy.

5.

Multiple and Dual Unit Events CAUTION There can not be two concurrent declared emergency classes under the St. Lucie Plant Radiological Emergency Plan.

I A.

If one Unit is in a classified event and the same or the other Unit enters into an event where the same or lesser Emergency Class would apply, Then a new classification should NOT be declared. The event should be documented on a SNF as "Additional Information or Update" and issued as soon as practicable.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES I

PROCEDURE NO.:

1 EPIP-01 ST. LUCIE PLANT 5.2 Classifying the Event (continued)

5.

(continued)

B.

If one Unit is in a classified event and the other Unit enters into a more severe event in which a higher Emergency Class would apply, Then the new classification shall be declared and promptly, within the regulatory time limits, issued to the State, Counties and the NRC.

6.

¶2 If an EAL was met and the condition completely cleared prior to an emergency classification being declared, Then:

A.

Classify the event in accordance with Attachment 1.

B.

Termination of the event

1.

An event classified as an Unusual Event or Alert may be terminated at the time of declaration by the EC.

2.

An event classified as a Site Area Emergency or General Emergency may only be downgraded and/or terminated by the Recovery Manager (RM).

END OF SECTION 5.2

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 12 of 32 PROCEDURE NO.:

1 EPIP-01 ST. LUCIE PLANT 5.3

§, T, Classification of An Event Based On Subsequent Information

1.

If subsequent information of a more detailed nature (e.g., sampling results) becomes available after the initial classification has been made, Then reclassify as appropriate.

2.

If results of a protracted review (i.e., Engineering Evaluation, CR disposition, etc.) of an event indicate that conditions were met for an Emergency Classification, and the condition has completely cleared prior to recognition of possible classification, Then notify NRC within one hour of discovery of the undeclared event.

A.

Contact Emergency Preparedness for briefing of state and local agencies.

END OF SECTION 5.3

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

1[ 3 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 1 of 20)

CAUTION

§2 Section 1.A should not be used for a steam generator tube leak / rupture.

EVENT/CLASS 1.A.

ABNORMAL PRIMARY LEAK RATE (Page 1 of 2)

UNUSUAL EVENT Reactor Coolant System (RCS) Leakage

1. RCS leakage GREATER THAN 10 gpm as indicated by:

A.

Control Room observation QR B. Inventory balance calculation OR C.

Field observation OR

0. Emergency Coordinator judgement OQR
2. Indication of leaking RCS safety or relief valve which causes RCS pressure to drop below setpoints:

Unit 1 - 1600 psia Unit 2 - 1736 psia ALERT

§1 RCS Leakage GREATER THAN 50,pm

1. Unisolable RCS leakage as indicated by Charging/letdown mismatch greater than 50 gpm but less than available charging pump capacity.

OR

2. Unisolable measured RCS leakage indicating greater than 50 gpm but less than available charging pump capacity.

SITE AREA EMERGENCY LOCA GREATER THAN capacity of charging pumps

1. RCS leakage greater than available charging pump capacity occurring with RCS pressure above HPSI shutoff head.

OR

2.

RCS leakage greater than available makeup occurring with RCS pressure below HPSI shutoff head.

OR

3.

Loss of RCS subcooled margin due to RCS leakage (saturated conditions).

OR

4. Containment High Range Radiation Monitors indicate 7.3 X 103 R/hr (If CHRRM inoperable, Post-LOCA monitors indicate between 100 and 1000 mR/hr).

GENERAL EMERGENCY A release has occurred or is in progress resulting in:

1. Containment High Range Radiation monitor greater than 1.46 X 10' R/hr (If CHRRM inoperable, Post-LOCA monitors greater than 1000 m R/hr).

OR

2. Performance of EPIP-09 (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile) exposure levels have been exceeded as indicated by either A, B, C or D below:

A.

1000 mrem/hr (total dose rate)

B.

1000 mrem (total dose - TEDE)

C.

5000 mrem/hr (thyroid dose rate)

D.

5000 mrem (thyroid dose - CDE)

(continued on next page) 1.A.

ABNORMAL PRIMARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

14 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 2 of 20)

EVENT/CLASS 1.A. ABNORMAL PRIMARY LEAK RATE (Page 2 of 2)

UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY Loss of 2 of the 3 fission product barriers with imminent loss of the third (any two of the following exit and the third is imminent).

1. Fuel element failure (confirmed DEQ 1-131 activity greater than 275 pCi/mL).

AND

2. LOCA or Tube rupture on unisolable steam generator.

AND

3. Containment Integrity Breached.

NOTE Also refer to Potential Core Melt Event / Class 6.A.

1.A. ABNORMAL PRIMARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 3 of 20)

EVENT/CLASS

1. B.

ABNORMAL PRIMARY TO SECONDARY LEAK RATE (Page 1 of 2)

UNUSUAL EVENT RCS PRI/SEC Leakage

1. Measured RCS to secondary leakage exceeds Tech. Spec.

limits.

AND

2. Secondary plant activity is detected.

ALERT Rapid gross failure of one steam generator tube (WITHIN charging pump capacity) with loss of offsite power

1. Measured RCS to secondary leakage greater than Tech. Spec.

Limits and within charging pump capacity.

AND

2. Secondary plant activity is detected.

AND

3. Loss of both Non-Vital 4.16 KV buses.

(continued on next page)

SITE AREA EMERGENCY Rapid gross failure of steam generator tubes (GREATER THAN charging pump capacity) with a loss of offsite power

1. Measured RCS to secondary leakage is greater than charging pump capacity.

AND

2. Secondary plant activity is detected.

AND

3. Loss of both Non-Vital 4.16 KV buses.

(continued on next page)

GENERAL EMERGENCY Loss of 2 of the 3 fission product barriers with imminent loss of the third (any two of the following exist and the third is imminent).

1. Fuel element failure (confirmed DEQ 1-131 activity greater than 275 pCi/mL).

AND

2.

LOCA or Tube rupture on unisolable steam generator.

AND

3.

Containment integrity breached.

NOTE Also refer to Potential Core Melt Event/Class 6.A.

1.B.

ABNORMAL PRIMARY TO SECONDARY LEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

16 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 4 of 20)

EVENTICLASS 1.B. ABNORMAL PRIMARY TO SECONDARY LEAK RATE (Page 2 of 2)

UNUSUAL EVENT ALERT Rapid failure of steam generator tubes (GREATER THAN charging pump capacity)

1. Measured RCS to secondary leakage greater than charging pump capacity.

AND

2. Secondary plant activity is detected.

SITE AREA EMERGENCY

§2 Rapid failure of steam generator tube(s) (GREATER THAN charging pump capacity) with steam release in progress

1.

Measured RCS to secondary leakage greater than charging pump capacity.

AND

2.

Secondary plant activity is detected.

AND

3.

Secondary steam release in progress from affected generator (i.e., ADVs, stuck steam safety(s) or unisolable leak.)

GENERAL EMERGENCY 1.B.

ABNORMAL PRIMARY TO SECONDARYLEAK RATE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 17of32 PROCEDURE NO.:

I EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 5 of 20)

EVENT/CLASS 1.C. LOSS OF SECONDARY COOLANT (Page 1 of 2)

UNUSUAL EVENT Rapid depressurization of secondary Diant

1. Rapid drop in either steam generator pressure to less than 600 psia.

ALERT Maior steam leak with GREATER THAN 10 qpm primary/secondary leakage

1. Rapid drop in either steam generator pressure to less than 600 psia.

AND

2. Known pri/sec leak of greater than 10 gpm.

AND

3. Secondary plant activity is detected.

Total loss of feedwater

1. No main or auxiliary feedwater flow available for greater than 15 minutes when required for heat removal.

AND

2. Steam Generator levels are less than 40% wide range.

SITE AREA EMERGENCY Major steam leak with GREATER THAN 50 qpm primary/secondary leakage and fuel damage indicated

1. Rapid drop in either steam generator pressure to less than 600 psia.

AND

2. Known pri/sec leak of greater than 50 gpm.

AND

3. Secondary plant activity is detected.

AND

4. Fuel element damage is indicated (Refer to Fuel Element Failure Event/Class 4.A).

GENERAL EMERGENCY A release has occurred or is in proaress resulting in:

1. Containment High Range Radiation monitor greater than 1.46 X 10' R/hr (If CHRRM inoperable, Post-LOCA monitors greater than 1000 mR/hr).

OR

2.

Performance of EPIP-09 (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile) exposure levels have been exceeded as indicated by either A, B, C or D below:.

A. 1000 mrem/hr (total dose rate)

B. 1000 mrem (total dose -

TEDE)

C. 5000 mrem/hr (thyroid dose rate)

D. 5000 mrem (thyroid dose-CDE)

(continued on next page)

TLOF with once-through cooling initiated

1. No main or auxiliary feedwater flow available.

AND

2. PORV(s) have been opened to facilitate core heat removal.

1.C. LOSS OF SECONDARY COOLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO-:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

18 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 6 of 20)

EVENT/CLASS 1.C. LOSS OF SECONDARY COOLANT (Page 2 of 2)

UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY Loss of 2 of the 3 fission product barriers with imminent loss of the third (any two of the following exis and the third is imminent).

1. Fuel element failure (confirmed DEQ 1-131 activity greater than 275 pCi/mL).

AND

2.

LOCA or Tube rupture on unisolable steam generator.

AND

3.

Containment Integrity Breached.

NOTE Also refer to Potential Core Melt Event/Class 6.A.

1.C. LOSS OF SECONDARY COOLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

19 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 7 of 20)

EVENT/CLASS 2.A.

UNCONTROLLED EFFLUENT RELEASE UNUSUAL EVENT Radiological effluent limits exceeded

1. Plant effluent monitor(s) exceed alarm setpoint(s).

AND

2.

Confirmed analysis results for gaseous or liquid release which exceeds ODCM limits.

NOTE If analysis is not available within one hour and it is expected that release is greater than ODCM limit, classify as UNUSUAl EVENT.

ALERT A release has occurred or is in progress that is 10 times the effluent limit

1. Plant effluent monitor(s) significantly exceed alarm setpoints.

AND

2.

Confirmed analysis results for gaseous or liquid release which exceeds 10 times ODCM limits.

NOTE If analysis is not available within one hour and it is expected that release is equal to or greater than 10 times ODCM limit, classify as ALERT.

SITE AREA EMERGENCY

§2 A release has occurred or is in progress resulting in:

1. Containment High Range Radiation Monitor greater than 7.3 X 103 R/hr (Post-LOCA monitors indicate between 100 and 1000 mR/hr, if CHRRM inoperable).

OR

2.

Measured Dose Rates or Offsite Dose Calculation (EPIP-09) worksheet values at one mile in excess of:

A. 50 mrem/hr (total dose rate) or 250 mrem/hr (thyroid dose rate) for 1/2 hour.

OR B. 500 mrem/hr (total dose rate) or 2500 mrem/hr (thyroid dose rate) for two minutes at one mile.

GENERAL EMERGENCY A release has occurred or is in progress resulting in:

1. Containment High Range Radiation monitor greater than 1.46 X 10' R/hr (If CHRRM inoperable, Post-LOCA monitors greater than 1000 mR/hr).

OR

2. Performance of EPIP-09 (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile) exposure levels have been exceeded as indicated by either A, B, C or D below A. 1000 mrem/hr (total dose rate)

B. 1000 mrem (total dose - TEDE)

C. 5000 mrem/hr (thyroid dose rate)

D. 5000 mrem (thyroid dose-CDE)

ODCM - refers to Chemistry Procedure C-200, Offsite Dose Calculation Manual (ODCM) 2.A.

UNCONTROLLED EFFLUENT RELEASE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

20 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 8 of 20)

EVENT/CLASS 2.B. HIGH RADIATION LEVELS IN PLANT UNUSUAL EVENT ALERT High radiation levels or high airborne contamination which indicates a severe degradation in the control of radioactive materials

1. Any valid area monitor alarm from an unplanned source with meter near or greater than full scale deflection (10' mR/hr).

OR

2. Unexpected plant iodine or particulate airborne concentration of 1000 DAC as seen in routine surveying or sampling.

OR

3. Unexpected direct radiation dose rate reading or unexpected airborne radioactivity concentration from an unplanned source in excess of 1000 times normal levels.

SITE AREA EMERGENCY GENERAL EMERGENCY 2.B. HIGH RADIATION LEVELS IN PLANT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

21 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 9 of 20)

EVENTICLASS

3.

FIRE EXPLOSION UNUSUAL EVENT

§z Uncontrolled fire within the Power Block lasting more than 10 minutes.

ALERT Uncontrolled fire

1. Potentially affecting safety systems.

AND

2. Requiring off-site support in the opinion of the SM/EC.

SITE AREA EMERGENCY

§2 Fire compromising the function of safety systems (e.g.. both trains rendered inoperable).

GENERAL EMERGENCY NOTE Refer to Potential Core Melt Event/Class 6.A.

SNOTE I

§2 Ex losion is defined as a rapid chemical reaction resulting in noise, heat and rapid expansion of aas.

Occurrence of an explosion within the Owner Controlled Area.

§2 Damage to structures/components in

§2 Severe damage to safe shutdown the Protected Area by explosion equipment from explosion (e.g., both which affects plant operation, trains rendered inoperable.

3.

FIRE EXPLOSION AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO,:

22 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 10 of 20)

EVENT/CLASS 4.A. FUEL ELEMENT FAILURE UNUSUAL EVENT Fuel element damage

1. Process monitors or area radiation surveys indicate increased letdown activity AND
2. Confirmed RCS sample indicating:

A. Coolant activity greater than the Tech Spec limit for iodine spike (Tech Spec Figure 3.4-1.).

OR B. Coolant activity greater than 100/E pCi/gram specific activity.

NOTE If analysis is not available within one hour and it is expected that activity is greater than Tech Spec limit, classify as UNUSUAL EVENT.

ALERT Fuel element failure

1. Process monitors or area radiation surveys indicate increased letdown activity and confirmed RCS Samples indicating DEQ 1-131 activity greater than or equal to 275 pCi/mL.

SITE AREA EMERGENCY Fuel element failure with in2ehinIIate core cooling

1. RCS DEQ 1-131 activity greater than or equal to 275 pCi/mL.

AND

2.

Highest CET per core quadrant indicates greater than 1 0°F superheat or 700°F.

GENERAL EMERGENCY A release has occurred or is in Progress resulting in:

1. Containment High Range Radiation monitor greater than 1.46 X 10' R/hr (If CHRRM inoperable, Post-LOCA monitors greater than 1000 mR/hr).

OR

2. Performance of EPIP-09 (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile) exposure levels have been exceeded as indicated by either A, B, C or D below:

A. 1000 mrem/hr (total dose rate)

B. 1000 mrem (total dose - TEDE)

C. 5000 mrem/hr (thyroid dose rate)

D. 5000 mrem (thyroid dose -

CDE)

NOTE If analysis is not available within one hour and it is expected that RCS activity for DEQ 1-131 is greater than 275 pCi/mL, classify as an ALERT.

4.A FUEL ELEMENT FAILURE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

23 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 11 of 20)

EVENTICLASS 4.B. FUEL HANDLING ACCIDENT UNUSUAL EVENT ALERT Fuel handling accident which results in the release of radioactivity to Containment or Fuel Handling Buildingq:

1. SM/EC determines that an irradiated fuel assembly may have been damaged.

AND

2. Associated area or process radiation monitors are in alarm.

SITE AREA EMERGENCY

§z Major damage to irradiated fuel in Containment or Fuel Handling Building

1. Affected area radiation monitor greater than 1000 mrem/hr.

AND

2. Damage to more than one irradiated fuel assembly.

OR Major damage resulting from uncovering of one or more irradiated fuel assemblies in the Spent Fuel Pool.

GENERAL EMERGENCY 4.8. FUEL HANDLING ACCIDENT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

24 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 12 of 20)

EVENT/CLASS 5.A EARTHQUAKE UNUSUAL EVENT

§2 A confirmed earthquake has occurred

1. A confirmed earthquake has been experienced within the Owner Controlled Area.

OR

2. ¶4 An earthquake is detected by plant seismic monitor instruments or other means.

ALERT SITE AREA EMERGENCY GENERAL EMERGENCY

§2 A confirmed earthquake has occurred.

§2 A confirmed earthquake has occurred.

NOTE Refer to Potential Core Melt Event /

Class 6.A.

5.B. HURRICANE Hurricane Warning

1. Confirmed hurricane warning is in effect.
1.

A confirmed earthquake has occurred which registered GREATER THAN 0.05g within the Owner Controlled Area.

OR

2.

A confirmed earthquake has occurred that could or has caused trip of the turbine generator or reactor.

Hurricane warning with winds near design basis

1.

Confirmed hurricane warning is in effect and winds are expected to exceed 175 mph within the Owner Controlled Area.

NOTE At FPL's request, NOAA will provide an accurate projection of wind speeds onsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the onset of hurricane force winds. If that projection is not available within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of entering into the warning, classify the event using current track and wind speeds to project onsite conditions. For example, projected onsite wind speed would be less than maximum hurricane wind speed if the track is away from PSL.

1. A confirmed earthquake has occurred which registered GREATER THAN 0.1g within the Owner Controlled Area and the plant not in Cold Shutdown.

OR

2. A confirmed earthquake has occurred that has caused loss of any safety system function (e.g., both trains inoperable).

Hurricane warning with winds GREATER THAN design basis

1. Plant not at cold shutdown.

AND

2. Confirmed hurricane warning is in effect and winds are expected to exceed 194 mph within the Owner Controlled Area.

NOTE Refer to Potential Core Melt Event /

Class 6.A.

NOTE At FPL's request, NOAA will provide an accurate projection of wind speeds onsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the onset of hurricane force winds. If that projection is not available within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of entering into the warning, classify the event using current track and wind speeds to project onsite conditions. For example, projected onsite wind speed would be less than maximum hurricane wind speed if the track is away from PSL 5.A EARTHQUAKE 5.B. HURRICANE AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

25 of 32 EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 13 of 20)

EVENT/CLASS 5.C. TORNADO 5.D. ABNORMAL WATER LEVEL UNUSUAL EVENT Notification of a tornado sighted in the Owner Controlled Area Abnormal water level conditions are expected or occurring

1. Low intake canal level of -10.5 ft.

MLW for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or more.

OR

2. Visual sightings by station personnel that water levels are approaching storm drain system capacity.

ALERT

§2 Any tornado striking the Power Block.

Flood, low water, hurricane surge or other abnormal water level conditions

1. The storm drain capacity is exceeded during hurricane surge or known flood conditions.

OR

2. Low intake canal level of -10.5 ft.

MLW for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or more with emergency barrier valves open.

SITE AREA EMERGENCY GENERAL EMERGENCY NOTE Refer to Potential Core Melt Event /

Class 6.A.

Flood, low water, hurricane surge or other abnormal water level conditions causing failure of vital equipment

1. Flood/surge water level reaching elevation +19.5 ft. (turbine building / RAB ground floor).

OR

2.

Low intake canal level has caused the loss of all ICW flow.

5.C. TORNADO 5.D. ABNORMAL WATER LEVEL AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

26 of 32 EPIP-01 ST. LUCIE PLANT EVENT/CLASS 6.A.

INCREASED AWARENESS OR POTENTIAL CORE MEL (Page 1 of 2)

ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 14 of 20)

I AtyNOTE

[Activation of the Emergency Response Facilities does not require claration of an emergency or entry into a specific emergency classification.

UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY Emergency Coordinators judgement that

§2 Emergency Coordinator's udgement that

§2 Emergency Coordinator's judgement that

§2 Emergency Coordinator's judgement that plant conditions exist which warrant plant conditions exist which have a plant conditions exist which are plant conditions exist that make release of LT increased awareness on the part of the potential to degrade the level of safety at significantly degrading in an uncontrollable large amounts of radioactivity in a short operating staff and/or local authorities the plant,

manner, period appear possible or likely. (Any core melt situation.)
1. The plant is shutdown under abnormal conditions (e.g., exceeding cooldown
1. LOCA with failure of ECCS leading to rates or primary system pipe cracks are severe core degradation or melt.

found during operation),

OR OR

2. LOCA with initially successful ECCS
2. Any plant shutdown required by and subsequent failure of containment Technical Specifications in which the heat removal systems for greater than required shutdown is not reached 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

within action limits.

OR OR

3. Total loss of feedwater followed by failure of once-through-cooling (ECCS) to adequately cool the core.

OR

4. Failure of off-site and on-site power along with total loss of feedwater makeup capability for greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

OR

5. ATWS occurs which results in core damage or causes failure of core cooling and make-up systems.

OR

6. Any major internal or external event (e.g., fire, earthquake or tornado substantially beyond design basis) which in the ECs opinion has or could cause massive damage to plant systems resulting in any of the above.

(continued on next page) 6.A.

INCREASED AWARENES

%J* ru I ILN I IAL CORE MELT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 27of32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 15 of 20)

EVENTICLASS 6.A. INCREASED AWARENESS OR POTENTIAL CORE MELT (Page 2 of 2) 6.A. INCREASED AWARENESS OR POTENTIAL CORE MELT UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY NOTES

1. Most likely containment failure mode is melt-through with release of gases only.

Quicker releases are expected for failure of containment isolation system.

2. General Emergency must be declared for the above listed events. The likelihood of corrective action (repair of AFW pump, etc.) should not be considered.

AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

(

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 28Aof 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 16 of 20)

EVENT/CLASS 7.A. LOSS OF POWER UNUSUAL EVENT Loss of off-site power or loss of all on-site AC power capability.

1. Loss of off-site AC power.

OR

2. Loss of capability to power at least one vital 4.16 kv bus from any available emergency diesel generator.

ALERT SITE AREA EMERGENCY

§z Station Blackout (Total Loss of AC)

§2 Station Blackout (Total Loss of AC)

GENERAL EMERGENCY NOTE Refer to Potential Core Melt Event / Class 6.A.

for GREATER THAN 15 minutes

1. Loss of off-site AC power.

AND

2. Failure of both emergency diesel generators to start or load.

Loss of all on-site DC power

1. Drop in A and B DC bus voltages to less than 70 VDC.

1.

2.

Loss of offsite AC power.

AND Sustained failure of both emergency diesel generators to start or load.

AND

3. Failure to restore AC power to at least one vital 4.16 kv bus within 15 minutes.

Loss of all vital on-site DC for oreater than 15 minutes

1. Sustained drop in A and B DC bus voltages to 70 VDC for greater than 15 minutes.

7.A. LOSS OF POWER AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 29Aof 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 17 of 20)

EVENTICLASS 8.A. LOSS OF PLANT CONTROL FUNCTIONS UNUSUAL EVENT ALERT Loss of Plant Control Functions

1. Complete loss of any function needed for plant cold shutdown.

OR

2. Failure of the Reactor Protection System to bring the reactor subcritical when needed.

OR

3. Control Room is evacuated (for other than drill purposes) with control established locally at the Hot Shutdown Control Panel.

Loss of Shutdown Coolino

1. Complete loss of functions needed to maintain cold shutdown.

A. Failure of shutdown cooling systems, resulting in loss of cold shutdown conditions.

AND B RCS subcooling can NOT be maintained greater than 0°F.

SITE AREA EMERGENCY Critical Loss of Plant Control Functions

1. Loss of any function or system which, in the opinion of the Emergency Coordinator, precludes placing the plant in Hot Shutdown.

OR

2. Failure of the RPS to trip the reactor when needed and operator actions fail to bring the reactor subcritical.

OR

3. Control Room is evacuated (for other than drill purposes) and control cannot be established locally at the Hot Shutdown Control Panel within 15 minutes.

GENERAL EMERGENCY NOTE Refer to Potential Core Melt Event Class 6A.

8.A LOSS OF PLANT CONTROL FUNCTIONS AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

8 CLASSIFICATION OF EMERGENCIES PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT ATTACHMENT I EMERGENCY CLASSIFICATION TABLE (Page 18 of 20)

EVENT/CLASS 8.B. LOSS OF ALARMS I COMMUNICATION /

MONITORING UNUSUAL EVENT

§2 Significant loss of effluent monitoring capability, communications, indication and alarm panels, etc.,

which impairs ability to perform accident or emergency assessment.

1. Loss of effluent or radiological monitoring capability requiring plant shutdown.

OR

2. Loss of all primary and backup communication capability with offsite locations.

OR

3. Unplanned loss of most (greater than 75%) or all Safety System annunciators for greater than 15 minutes.

ALERT

§2 Loss of alarms

1. Unplanned loss of most (greater than 75%) or all safety system annunciators.

AND

2. Plant transient in progress.

SITE AREA EMERGENCY Loss of alarms/monitoring

1. Inability to monitor* a significant transient in progress.

GENERAL EMERGENCY

  • Monitoring means loss of ERDADS, QSPDS and/or the inability to determine any one of the following:

reactivity control, core cooling, RCS status or containment integrity.

8.B. LOSS OF ALARMS /

COMMUNICATION /

MONITORING AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 3: of 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 19 of 20)

EVENTICLASS 9.A. AIRCRAFT / MISSILE UNUSUAL EVENT Unusual aircraft activity

1. Aircraft crash in the Owner Controlled Area or unusual aircraft activity over facility that in the opinion of the SM/EC, could threaten the safety of the plant or personnel.

Turbine rotating component failure causing rapid plant shutdown.

Unplanned/uncontrolled toxic or flammable gas release in the Owner ALERT

§2 Aircraft/missile impact

1. Aircraft crash into the Power Block.

OR

2. Visual or audible indication of missile impact on the Power Block.

Visual indication that the turbine casing has been penetrated by blading.

Entry of toxic or flammable aas into SITE AREA EMERGENCY

§2 Damage to vital systems from aircraft/missiles

1. Aircraft crash into the Power Block damaging vital plant systems.

OR

2. Damage resulting in loss of safe shutdown equipment from any missile.

GENERAL EMERGENCY 9.B. TURBINE FAILURE 9.C. TOXIC OR FLAMMABLE GAS Controlled Area that could affect plant/personnel safety.

areas potentially affecting plant operation.

§2 Toxic or flammable gas has diffused into vital areas compromising the function of safety related equipment (e.g., both trains rendered inoperable).

9.A. AIRCRAFT/MISSILE 9.B. TURBINE FAILURE 9.C. TOXIC OR FLAMMABLE GAS AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

8 CLASSIFICATION OF EMERGENCIES 3: of 32 PROCEDURE NO.:

EPIP-01 ST. LUCIE PLANT ATTACHMENT 1 EMERGENCY CLASSIFICATION TABLE (Page 20 of 20)

EVENTICLASS

10. SECURITY THREAT UNUSUAL EVENT A SECURITY ALERT has been called by the Security Force in response to one or more of the items ALERT A SECURITY EMERGENCY has been called by the Security Force as defined in the Safeguards Contingency Plan.

SITE AREA EMERGENCY A SECURITY EMERGENCY involving imminent occupancy of the control room or other area(s) vital to the operation of the reactor as defined in the Safeguards Contingency Plan.

GENERAL EMERGENCY A successful takeover of the plant including the Control Room or any other area(s) vital to the operation of the reactor as defined in the Safeguards Contingency Plan.

listed below.

1.

Bomb threat

2.

Attack threat LandNehicle Waterborne Airborne Insider

3.

Security Threat

4.

Protected Area intrusion attempt or breach

5.

Sabotage attempt

6.

Internal disturbance

7.

Civil disturbance

8.

Vital Area intrusion

9.

Security Force strike

10. Credible site-specific Security Threat notification
11. Extortion/Coercion/Hostage Threat against plant
12. Sniper attack
10. SECURITY THREAT AFTER CLASSIFYING, GO TO EPIP-02, DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR

Procedure No.

ST. LUCIE PLANT EPIP-08 EMERGENCY PLAN Current Revision No.

IMPLEMENTING PROCEDURE 6A Effective Date SAFETY RELATED 01/08104

Title:

OFF-SITE NOTIFICATIONS AND PROTECTIVE ACTION RECOMMENDATIONS Responsible Department: EMERGENCY PLANNING REVISION

SUMMARY

Revision 6A - Incorporated PCR 03-3535 to put Attachment 2 in forms database. (M.

Cooper, 12/10/03)

Revision 6 - Incorporated PCR 03-2272 for CR 03-2568 to revise State Notification form.

Delete supplemental data sheet. Revise instructions for completing State form. Improve guidance relative to changing PARs (RIS 2003-12). (J.R. Walker, 08/29/03)

AND Incorporated PCR 03-1637 for MA 03-04-082 to incorporate shift communicator position.

(A. Terezakis, 08/06/03)

Revision 5 - Clarified duties, made editorial / administrative changes and removed local government radio. (J. R. Walker, 07/26/02)

Revision 4 - Clarified instructions regarding notification of rapidly degrading events. Clarified stability class instructions. Made administrative/editorial changes. (J.R. Walker, 10/11/01)

Revision FRG Review Date Approved By Approval Date SOPS 0

05130/00 R. G. West 05/31/00 DATE Plant General Manager DOCT PROCEDURE Revision FRG Review Date Approved By Approval Date DOCN EPIP-08 6A 08/28/03 R.E. Rose 08/29/03 SYS Plant General Manager COM COMPLETED N/A ITM 6A Designated Approver D. Calabrese 12/10/03 Designated Approver (Minor Correction)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 2 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT TABLE OF CONTENTS SECTION PAGE 1.0 P U R P O S E.......................................................................................................

3

2.0 REFERENCES

/ RECORDS REQUIRED / COMMITMENT DOCUMENTS........... 8 3.0 R E S P O N S IB ILIT IE S...........................................................................................

9 4.0 D E F IN IT IO N S..................................................................................................

.. 11 5.0 IN S T R U C T IO N S................................................................................................

13 5.1 State and County Notification................................................................

13 5.2 Nuclear Regulatory Commission (NRC) Notification.............................. 16 5.3 E rroneous Inform ation.............................................................................

17 APPENDICES APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM......

18 APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (T S C )............................................................................................

... 2 2 APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FA C ILIT Y (E O F)...............................................................................

27 ATTACHMENTS ATTACHMENT 1 FLORIDA NUCLE AR PL ANT FI:IPr=IKPIrv MK'TIn'Ii TIr' I ATTACHMENT 1A ATTACHMENT 2 ATTACHMENT 3 ATTACHMENT 3A F O R M.....................................................................................

.. 3 3 DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM........................ 34 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)...............................................

41 NRC REACTOR PLANT EVENT NOTIFICATION W O R K S H E ET...........................................................................

46 DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET....................... 48

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 3 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.0 PURPOSE 1.1 Discussion

1.

This procedure provides information and instructions for undertaking notifications of the State Warning Point (SWP) and the Nuclear Regulatory Commission (NRC) and for determination of Protective Action Recommendations (PARS).

2.

This procedure is for use in the Control Room, Technical Support Center (TSC) and Emergency Operations Facility (EOF).

3.

Upon declaration of an emergency classification the Nuclear Plant Supervisor (NPS) assumes the duties of the Emergency Coordinator (EC).

The EC has initial responsibility for off-site notifications and PARs.

4.

Once the EOF is operational and proper turnover has been conducted, the Recovery Manager (RM) assumes responsibility for off-site notifications and PARs from the EC.

5.

At an Alert or higher level emergency, communications with the NRC transition to an open phone line from the TSC and the EOF (at a Site Area Emergency of higher level emergency).

6.

The following table illustrates which facility has a responsibility for Classification, Notification or PARs.

Control Room TSC EOF (X until EC (X when operational)

(X when operational) function transfers to the TSC)

Classifications X transfers --

X Notifications X transfers --

X transfers --

X PARs X transfers--

X transfers--

X

7.

Off-site Notification A.

Purpose of Off-Site Notifications FPL is required to notify off-site agencies in the event of any emergency that could threaten the health and safety of the public.

These notifications provide an early warning to agencies responsible for public protection.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 4 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.1 Discussion (continued)

7.

(continued)

NOTE The State Department of Health (Bureau of Radiation Control) may not have their office staffed on a 24-hour basis. In the event that they do not answer the Hot Ring Down (HRD) telephone, the State Warning Point (SWP) assumes responsibility for notifying their duty officer.

B.

Who Shall Be Notified State Division of Emergency Management 0

State Department of Health (Bureau of Radiation Control)

St. Lucie County Emergency Operations Center Martin County Emergency Operations Center 0

NRC

1.

State and County Notification

a.

State and local agencies are notified by using the Hot Ring Down (HRD) telephone. The HRD rings the State Warning Point (SWP). The SWP puts the other agencies on line and reduces the need for individual calls.

b.

$4 After the State Coordinating Officer (SCO) arrives in the EOF, he / she can transfer "NET Control" to the EOF. When this occurs, the Recovery Manager's PAR Briefing becomes the primary notification method for the State and Counties. The Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) shall still be completed and provided to the SCO or his / her designee in the EOF. The EOP HRD Communicator should no longer contact the State Warning Point (SWP).

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 5 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.1 Discussion (continued)

7.

B.

(continued)

2.

NRC Notification

a.

The NRC is notified using the Emergency Notification System (ENS) telephone.

b.

NRC notifications occur through an open line of communication in the TSC and, when operational, the EOF.

C.

Emergency Follow-up Information Requests from State and local agencies.

1.

Incoming calls should come via the SWP over the HRD phone.

If the HRD is inoperable, the SWP may use commercial telephone or ESATCOM (emergency satellite phone). If an off-site authority contacts the plant without going through the SWP, request that they contact the SWP. SWP shall verify that the agency calling is a risk county or the Department of Health (DOH) and shall notify other county and state agencies of the updated information, thus reducing the number of calls that may be directed to the plant.

2.

Long, detailed explanations of plant systems or reactor theory should be avoided. If prompted for this kind of information by the State Duty Officer, he / she should be referred to the Nuclear Division Duty Officer (NDDO).

3.

If the State or one of the Counties provides either the TSC or EOF with new or pertinent information, Then bring that information to the attention of the EC or EC Assistant /

Logkeeper in the TSC or the RM or the RM OPS Advisor I Logkeeper in the EOF.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 6 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.1 Discussion (continued)

8.

Protective Action Recommendations A.

Protective actions for the general public are ordinarily NOT required prior to declaration of a General Emergency. It is possible however, that due to unusually stable and constant meteorological conditions, protective actions could be recommended at a Site Area Emergency based on projected doses. This is the exception rather than the rule.

Protective actions for the general public are required to be recommended if a General Emergency is declared. Initial Protective Action Recommendations (PARs) are normally based on plant conditions. This would NOT be true if the General Emergency was declared based on off-site dose (either measured or projected) or a Security Emergency (per the Security Plan). The predetermined minimum PARs (based on plant conditions) are as given below.

B.

General Emergency - Minimum PARs

1.

In any case where a GENERAL EMERGENCY has been declared, the minimum PAR shall be:

Shelter all people within a 2-mile radius and out to 5 miles in the sectors affected. The sectors affected are at least three, the downwind sector plus the two adjacent sectors.

2.

If a GENERAL EMERGENCY has been declared due to actual or projected severe core damage, the minimum PAR shall be:

Evacuate all people within a 2-mile radius from the plant and out to 5 miles in the sectors affected. Shelter all people in the remaining sectors from 2 to 5 miles and from 5 to 10 miles from the plant.

3.

If a GENERAL EMERGENCY has been declared due to loss of physical control of the plant to intruders, including the Control Room or any other area(s) vital to the operation of the reactor system (as defined in the Security Plan), the minimum PAR shall be:

Evacuate all people within a 2-mile radius from the plant and out to 5 miles in the sectors affected. Shelter all people in the remaining sectors from 2 to 5 miles and from 5 to 10 miles from the plant.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 7 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 1.1 Discussion (continued)

8.

(continued)

C.

Once a release of radioactive material occurs, dose assessment should be utilized when evaluating PARs. The final determination of the PAR should consider all available information including off-site dose projections, plant conditions and field monitoring data. The most conservative recommendation shall be made.

D.

If it is anticipated that a PAR threshold will be exceeded, DO NOT wait until the threshold is exceeded to make that PAR.

E.

%12 Conditions (plant information, dose projections and field monitoring results) are to be continually assessed and PARs expanded, as necessary, to ensure that adequate (most conservative) PARs are issued.

F.

¶12 Previously issued PARs, unless found to be less conservative, are to remain in effect until the threat is fully under control and the event is being de-escalated.

G.

112 Only State and County officials can implement, change and/or terminate protective actions.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 8 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT

2.0 REFERENCES

/ RECORDS REQUIRED / COMMITMENT DOCUMENTS NOTE One or more of the following symbols may be used in this procedure:

§ Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.

¶ Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.

P Indicates a step that requires a sign off on a data sheet.

2.1 References

1.

St. Lucie Plant Updated Final Safety Analysis Report (UFSAR) Unit 1 and Unit 2

2.

St. Lucie Plant Technical Specifications Unit 1 and Unit 2

3.

§1 St. Lucie Plant Radiological Emergency Plan (E-Plan)

4.

E-Plan Implementing Procedures (EPIP 00 - 13)

5.

St. Lucie Plant Emergency Response Directory (ERD)

6.

QI-1 7-PSL-1, Quality Assurance Records 2.2 Records Required

1.

All PAR worksheets and notifications forms (all attachments) shall be maintained in plant files in accordance with QI-1 7-PSL-1.

2.3 Commitment Documents

1.

¶J PMAI PM96-04-165, "ITR 96-006" (Unusual Event Declared Due to Dropped Rod)

2.

¶2 PMAI PM96-09-185, Condition Report CR-96-1750 (Off-site Notification Using Commercial Phone)

3.

¶3 NRC Inspection Report 91-01, Closure of IFIs 89-31-03 and 89-31-01

4.

¶4 Condition Report CR-00-0428 (Evaluated Exercise Critique)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 9 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 2.3 Commitment Documents (continued)

5.

16 PMAI PM96-05-233 (Off-site Notification Process)

6.

%7 PMAI PM99-09-016 (PARs Based on FMT Data, Completion of NRC Notification Form)

7.

18 NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and 50.73, Section 4.2.4, ENS Event Notification Worksheet (NRC Form 361).

8.

19 Condition Reports CR-01-0726 and CR-01 -0742 (NOUEs Associated with SDC During SL1-17 Outage)

9.

T1o Condition Report CR-01-0389 (Alternate Met Data Source)

10.

T11 Condition Report CR-02-0333 (Role of Duty Call Supervisor)

11.

¶12 Condition Report CR-03-2568 (Response to RIS 2003-12 Regarding PARs) 3.0 RESPONSIBILITIES 3.1 Emergency Coordinator - Responsible for classifications, notifications and PARs.

3.2 Recovery Manager - Responsible for notifications and PARs.

3.3

¶ii Duty Call Supervisor-Assists the EC as a phonetalker.

3.4 TSC EC Assistant / Logkeeper or TSC OPS Coordinator - Prepares notification forms (Attachment 1, Florida Nuclear Plant Emergency Notification Form, and if necessary, Attachment 3, NRC Reactor Plant Event Notification Worksheets) for EC approval when the TSC is operational.

3.5 EOF RM OPS Advisor / Logkeeper - Prepares notification forms (Attachment 1 and if necessary, Attachment 3) for RM approval when the EOF is operational.

3.6 TSC HRD Communicator - Assists the TSC EC Assistant / Logkeeper or TSC OPS Coordinator with notification form preparation and makes calls to complete notifications to the SWP.

3.7 EOF HRD Communicator - Assists the EOF RM OPS Advisor with form preparation and makes calls to complete notifications to the SWP and the SCO following transfer of Net Control by the Division of Emergency Management (DEM).

REVISION NO-:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 10 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 3.8 TSC Chemistry Supervisor (in his absence, TSC Dose Assessor) - Assists the EC with radiological dose assessment data and PARS.

3.9 EOF HP Manager (in his absence, EOF Dose Assessor) - Assists the RM with radiological dose assessment data and PARS.

3.10 TSC Supervisor - Oversees communications performed by the TSC Communicators (HRD, ENS, Health Physics Network (HPN), Sound-Powered Phonetalker, EOF and Field Monitoring Team).

3.11 EOF Nuclear Licensing Manager - Oversees EOF communications performed by the EOF Communicators (HRD, ENS, HPN and TSC).

3.12 Information Services - Maintains user copies, in the Unit 1 and Unit 2 Control Rooms, of the following checklist and supporting attachments for making notifications and developing Protective Action Recommendations:

Appendix A, Notifications from the Affected Control Room

  • - Florida Nuclear Plant Emergency Notification Form
  • A - Directions for Completing the Florida Nuclear Plant Emergency Notification Form 0 - Determination of Protective Action Recommendations (PARs)
  • - NRC Reactor Plant Event Notification Worksheet
  • A - Directions for Completing the NRC Reactor Plant Event Notification Worksheet 3.13 Shift Communicator-Assists the Nuclear Plant Supervisor/Emergency Coordinator in making emergency off-site notifications and performing other activities, as directed.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 11 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 4.0 DEFINITIONS 4.1 Conservative - Means more extensive or comprehensive action under a given set of circumstances to provide a greater measure of safety. For example, evacuation is more conservative than sheltering.

4.2 Emergency - Any off-normal event or condition which is classified into one of the four emergency classes (Unusual Event, Alert, Site Area Emergency, or General Emergency) by the NPS in accordance with EPIP-01, Classification of Emergencies.

4.3 Emergency Coordinator (EC) - The title initially assumed by the NPS, until relieved by plant management through proper turnover, in the event of plant conditions that trigger implementation of the Emergency Plan. The EC is responsible for notifying off-site authorities, emergency responders both inside and outside the company and has full authority and responsibility for on-site emergency response actions. The EC is also responsible for Protective Action Recommendations during the initial stages of an emergency.

4.4 Florida Nuclear Plant Emergency Notification Form - A predetermined format used by nuclear power plants throughout the State for notification and local authorities.

4.5 Operational (status for an emergency facility) - The mandatory minimum staff is present and the facility has taken responsibility for its procedurally assigned functions.

4.6 Protective Action Recommendations (PARs) - Recommendations, for action instructions to protect the public, made by the Emergency Coordinator or Recovery Manager to State and County officials. FPL may recommend No Action, Sheltering or Evacuation.

4.7 Recovery Manager (RM) - A designated company officer or senior manager, who will have responsibility for the direction and control of the EOF. He / she has the authority to establish policy and to expend funds necessary to cope with emergency situations that trigger the implementation of the Emergency Plan.

4.8 Release (during any declared emergency)

1.

Any effluent monitor increase of (approximately) 10 times or one decade above pre-transient values.

OR

2.

Health Physics detecting airborne radioactivity levels in excess of 25%

derived air concentration (DAC) outside of plant buildings due to failure of equipment associated with the declared emergency.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 12 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 4.9 Shift Communicator - A specific shiftly designated individual trained and qualified to assist the Nuclear Plant Supervisor/Emergency Coordinator in the control room in making emergency off-site notifications, and performing other activities as directed.

4.10 State Notification Form (SNF) - Less formal, more concise expression used in lieu of Florida Nuclear plant Emergency Notification Form.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 13 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.0 INSTRUCTIONS 5.1 State and County Notification

1.

Time Limits A.

Notification shall be initiated within 15 minutes of any of the following:

1.

Recognition of entry into the Emergency Plan.

2.

Escalation in Emergency Class.

3.

De-escalation of the Emergency Class.

4.

Protective Action Recommendation.

5.

Change in Protective Action Recommendation.

B.

Notification shall be initiated within 60 minutes of any of the following:

1.

At an Alert or higher Emergency Class, the time of the last update (unless a different frequency has been agreed to by the off-site agencies as during a hurricane).

2.

A radiological release has been initiated.

3.

A radiological release has been terminated.

4.

A significant change in plant conditions has occurred (e.g., loss or restoration of off-site power or major plant equipment).

5.

Termination of the emergency.

r mI-Vl0lUN Nu.:

P-ROCEURE TITLE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.1 State and County Notification (continued)

2.

Forms Required for Notifications CAUTION Notifications require the use of a form similar to Attachment 1, Florida NuearPlant Emergency Notification Form.

A.

Notifications with 15 minute time limits shall be made using a form similar to Attachment 1, Florida Nuclear Plant Emergency Notification Form.

B.

Notifications with 60 minute time limits shall be made using a form similar to Attachment 1, Florida Nuclear Plant Emergency Notification Form.

3.

Special instructions due to extraordinary circumstances.

A.

If Emergency Class escalation is necessary due to rapidly degrading conditions, Then provide the State and County authorities with the initial notification information by transmitting lines 1-6, at a minimum, of the SNF and terminate the phone call by stating that a new notification form will be provided within 15 minutes.

CAUTION There can not be two concurrent declared emergency classes under the St. Lucie Plant Radiological Emergency Plan.

I B.

If one Unit is in a classified event and the same or the other Unit enters into an event where the same or lesser Emergency Class would apply, Then a new classification should NOT be declared. The event should be documented on a SNF as "Additional Information or Update" and issued as soon as practicable.

C.

If one Unit is in a classified event and the other Unit enters into a more severe event in which a higher Emergency Class would apply, Then the new classification shall be declared and promptly, within the regulatory time limits, issued to the State, Counties and the NRC.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 15 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.1 State and County Notification (continued)

4.

]4 Transfer of NET Control A.

The State Coordinating Officer (SCO) can transfer the control of Hot Ring Down (HRD) NET from the State Warning Point (SWP) to the EOF. When this occurs;

1.

The RM shall do face to face communication to satisfy off-site notification requirements for the State and Counties. Calls to the SWP are no longer necessary.

2.

The Florida Nuclear Plant Emergency Notification Form (Attachment 1) shall continue to be filled out.

3.

Completed notification forms are to be provided to the SCO or his / her designee in the EOF.

END OF SECTION 5.1

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 16 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.2 Nuclear Regulatory Commission (NRC) Notification

1.

Time Limits NOTE Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.

A.

The licensee shall notify the NRC immediately after notification of the appropriate State or local agencies and not later than one hour after the time the licensee declares one of the Emergency Classes (10 CFR 50.72 (a)(3)).

2.

Special Instructions A.

Initial notification to the NRC using the Emergency Notification System (ENS) (usually done from the Control Room) should use, NRC Reactor Plant Event Notification Worksheet.

B.

At an Alert or higher emergency class, the NRC will want to establish an open line of communication with the Control Room, utilizing an ENS conference bridge tying in the licensee with NRC Headquarters and region personnel. Once the Technical Support Center (TSC) is operational, the Control Room should transfer responsibility for NRC communications to the TSC.

C.

The Emergency Operations Facility (EOF) should join the TSC on the ENS conference bridge and take the lead for NRC communications.

D.

The TSC and EOF should also utilize the Health Physics Network (HPN) line in a manner similar to the ENS (i.e., establish a conference bridge with the NRC).

E.

Both the ENS and HPN Communicators in both facilities should keep logs of information transmitted and received from the NRC in accordance with procedures.

END OF SECTION 5.2

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 17 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT 5.3

¶T Erroneous Information

1.

If erroneous information is transmitted to off-site agencies and the error is discovered prior to event termination, a correction should be provided in an update. The need for and urgency of providing the update is dependent upon the importance of the error.

2.

If erroneous information is transmitted to off-site agencies and the error is discovered after event termination, the Licensing Department should be consulted to determine the need and method for contacting the off-site agencies with corrected information.

END OF SECTION 5.3

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 18 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 1 of 4)

INITIAL CAUTION

§1 Notification of State and local agencies shall be made as soon as practicable within 15 minutes of declaration of an Emergency Class.

  • ¶3 A new Florida Nuclear Plant Emergency Notification Form shall be completed for all updates.

NOTE

¶9

1.

Completion of this checklist requires the following Attachments (all from EPIP-08): - Florida Nuclear Plant Emergency Notification Form A - Directions for Completing the Florida Nuclear Plant Emergency Notification Form - Determination of Protective Action Recommendations (PARs) - NRC Reactor Plant Event Notification Worksheet A - Directions for Completing the NRC Reactor Plant Event Notification Worksheet

2.

Checklist Part 1 is for State Warning Point notification.

3.

Checklist Part 2 is for NRC notification.

1.

State Warning Point Notification A.

Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.

B.

Emergency Coordinator (EC) approval.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 19 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 2 of 4)

1.

(continued)

INITIAL NOTE

1.

Primary notification method to the State Warning Point (SWP) is to use the Hot Ring Down (HRD) phone.

2.

If the HRD is out-of-service, alternate notification methods are provided in Section E, below.

C.

Using the State HOT RING DOWN (HRD) Phone, dial 100.

D.

Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.

When the State Duty Officer answers, announce "This is St. Lucie Nuclear Plant [as applicable (Unit 1, 2)] with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact St. Lucie County, Martin County and the Bureau of Radiation Control prior to transmitting the information from the notification form. When the parties are on line, provide the information slowly (e.g., in three word intervals) and deliberately, providing time for the information to be written down.

E.

Alternate Notification Methods (in order of priority) 0)

NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).

1.

Alternate 1 - Commercial Phone

a.

Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] with an emergency declaration. My callback number is

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 20 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 3 of 4)

1.

E.

1.

(continued)

INITIAL

b.

Hang up the phone and standby for the callback.

When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.

c.

¶12 Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.

2.

Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.

a.

Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.

b.

Announce "State Warning Point, this is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] with an emergency declaration." Then release the "push-to-talk" button in order to listen.

c.

When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant [as applicable (Unit 1 / 2)] declaring a

/ an (classification), repeat (classification). I am standing by to transmit Florida Nuclear Plant Emergency Notification Form information when you are ready to copy. When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.

d.

Announce "St. Lucie clear' at the end of the conversation.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 21 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX A NOTIFICATIONS FROM THE AFFECTED CONTROL ROOM (Page 4 of 4)

INITIAL CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.

2.

§1 NRC Notification A.

Prepare the NRC Reactor Plant Event Notification Worksheet (form similar to Attachment 3) in accordance with Attachment 3A, Directions for Completing the NRC Reactor Plant Event Notification Worksheet.

B.

EC approval.

NOTE

1.

Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.

2.

If the ENS is out-of-service an alternate notification method is provided in Section D, below.

C.

Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD).

D.

Alternate Notification Method

1.

If the ENS is out-of-service, Then use a commercial phone to accomplish the above.

END OF APPENDIX A

REVISION NO.:

PROCEDURE TITLE:

PE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 22 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT I

APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)

(Page 1 of 5)

INITIAL CAUTION

§1 Notification of State and local agencies shall be made as soon as practicable within 15 minutes of declaration of an Emergency Class.

¶3 A new Florida Nuclear Plant Emergency Notification Form shall be completed for all updates.

D NOTE Checklist Part 1 is for HRD Communications.

ECheckklist Part 2 is for ENS Communications.

State Warning Point Notification A.

Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.

B.

Verify the Emergency Coordinator (EC) approval.

NOTE

1.

Primary notification method to the State Warning Point (SWP) is to use the Hot Ring Down (HRD) phone.

2.

If the HRD is out-of-service, alternate notification methods are provided in Section E, below.

I C.

Using the State HOT RING DOWN (HRD) Phone, dial 100.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 23 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)

(Page 2 of 5)

1.

(continued)

INITIAL D.

Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.

When the State Duty Officer answers, announce "This is St. Lucie Nuclear Plant Technical Support Center with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact St. Lucie County, Martin County and the Bureau of Radiation Control prior to transmitting the information from the notification forms. When the parties are on line, provide the information slowly (e.g., in three word intervals) and deliberately, providing time for the information to be written down.

E.

Alternate Notification Methods (in order of priority)

NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).

1.

Alternate 1 - Commercial Phone

a.

Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant Technical Support Center with an emergency declaration. My callback number is

b.

Hang up the phone and standby for the callback.

When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.

c.

¶12 Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 24 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)

(Page 3 of 5)

1.

E.

(continued)

INITIAL

2.

Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.

a.

Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.

b.

Announce "State Warning Point, this is St. Lucie Nuclear Plant Technical Support Center with an emergency declaration." Then release the "push-to-talk" button in order to listen.

c.

When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant Technical Support Center declaring a / an (classification), repeat (classification). I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy. When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.

d.

Announce "St. Lucie clear" at the end of the conversation.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 25 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)

(Page 4 of 5)

INITIAL CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local agencies is delayed or prolonged.

NOTE

1.

Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.

2.

If the ENS is out-of-service, an alternate notification method is provided in Section B, below.

2.

§1 NRC Notification A.

Choose and complete the appropriate steps, below:

1.

If the NRC Reactor Plant Event Notification Worksheet has NOT previously been transmitted from the Control Room, Then request that the EC Assistant / Logkeeper prepare the form.

2.

Verify EC approval.

3.

Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD),

then GO TO the next step to establish an open line of communication with the NRC.

OR

4.

If the NRC Reactor Plant Event Notification Worksheet has previously been transmitted by the Control Room, Then initiate an open line of communication with the NRC by dialing one of the numbers shown on the phone or in the ERD and request to be placed on the Conference Bridge with the NRC.

5.

As requested, provide information to the NRC.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 26 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX B NOTIFICATIONS FROM THE TECHNICAL SUPPORT CENTER (TSC)

(Page 5 of 5)

2.

(continued)

INITIAL B.

Alternate Notification Method

1.

If the ENS is out-of-service, Then use a commercial phone to accomplish the above.

END OF APPENDIX B

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 27 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)

(Page 1 of 6)

INITIAL CAUTION

§1 Notification of State and local agencies shall be made as soon as practicable within 15 minutes of declaration of Emergency Class or change in Protective Action Recommendation (PAR).

¶3 A new Florida Nuclear Plant Emergency Notification Form shall be completed for all updates.

NOTE Checklist Part 1 is for HRD Communications.

  • Checklist Part 2 is for ENS Communications.
1.

State Warning Point Notification A.

Prepare the Florida Nuclear Plant Emergency Notification Form (form similar to Attachment 1) in accordance with Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.

B.

Verify the Recovery Manager (RM) approval.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 28 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)

(Page 2 of 6)

1.

(continued)

INITIAL NOTE

1.

Primary notification method to the State Warning Point (SWP) is to use the Hot Ring Down (HRD) phone.

2.

If the HRD is out-of-service, alternate notification methods are provided in Section D, below.

3.

State and County representatives means Florida Division of Emergency Management (DEM), Florida Department of Health (DOH),

St. Lucie County Department of Public Safety (DPS) and Martin County Department of Emergency Services (DES).

4.

Notification forms means the Florida Nuclear Plant Emergency Notification Form.

C.

Choose and complete the appropriate step below:

1.

If State and County representatives are NOT co-located with the FPL Emergency Response Organization (ERO) in the EOF, Then call the SWP and transmit the notification forms. To contact the SWP, dial 100. Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen.

When the State Duty Officer answers, announce "this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact the Bureau of Radiation Control, St. Lucie County DPS and Martin County DES prior to transmitting the information from the notification forms. When the parties are on line, transmit the information slowly, (e.g., in three word intervals) and deliberately, providing time for the information to be written down.

0)

OR

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 29 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)

(Page 3 of 6)

1.

C.

(continued)

INITIAL

2.

If State and County representatives are co-located with the FPL ERO in the EOF and the State Coordinating Officer (SCO) has NOT assumed Net Control, Then call the SWP and transmit the notification forms - "Time of Contact" corresponds to the start time of the Recovery Manager's Protective Action Recommendation (PAR) Briefing. To contact the SWP, dial 100. Hold down the button on the handset while talking. This must be done each time you talk. Release the button in order to listen. When the State Duty Officer answers, announce "this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency message. I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." Allow the Duty Officer to contact the Bureau of Radiation Control, St. Lucie County DPS and Martin County DES prior to transmitting the information from the notification forms. When the parties are on line, transmit the information slowly, (e.g., in three word intervals) and deliberately, providing time for the information to be written down.

OR

3.

If State and County representatives are co-located with the FPL ERO in the EOF and the SCO has transferred Net Control to the EOF, Then the SWP is not called (completed notification forms are given to the SCO - may be accomplished by the RM or RM OPS Advisor / Logkeeper).

D.

Alternate Notification Methods (in order of priority)

NOTE Use of the commercial telephone as an alternate notification method requires callback verification from the State Warning Point. Use of ESATCOM as an alternate notification method should include a callback verification number if available (e.g., cellular phone).

1.

Alternate 1 - Commercial Phone

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 30 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)

(Page 4 of 6) 1 D.

1.

(continued)

INITIAL

a.

Call the State Warning Point using the phone number in the St. Lucie Plant Emergency Response Directory (ERD). Announce "This is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency declaration. My callback number is

b.

Hang up the phone and standby for the callback.

When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.

c.

¶12 Request callback from the State Warning Point to verify that they notified St. Lucie County, Martin County and the Bureau of Radiation Control.

2.

Alternate 2 - ESATCOM NOTE Use ESATCOM only if Alternate 1 - commercial phone is not available.

a.

Hold down the "push-to-talk" button on the handset and wait 3-5 seconds to hear a beep before you start talking. This must be done each time you talk.

b.

Announce "State Warning Point, this is St. Lucie Nuclear Plant Emergency Operations Facility with an emergency declaration." Then release the "push-to-talk" button in order to listen.

c.

When the State Warning Point acknowledges, announce "State Warning Point, this is St. Lucie Nuclear Plant Emergency Operations Facility declaring a / an (classification), repeat (classification).

I am standing by to transmit the Florida Nuclear Plant Emergency Notification Form when you are ready to copy." When the State Warning Point gives the go-ahead, provide the information from the Florida Nuclear Plant Emergency Notification Form.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 31 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)

(Page 5 of 6)

1.

D.

2.

(continued)

d.

Announce "St. Lucie clear" at the end of the conversation.

INITIAL CAUTION Notification of the NRC is expected immediately after notification of State and local agencies. The one-hour time limit in 10 CFR 50.72 (a)(3) is to ensure timely NRC notification in cases where notification of State and local a2gencies is delayed or prolonged.

2.

§1 NRC Notification NOTE

1.

Primary notification method to the NRC is to use the Emergency Notification System (ENS) phone.

2.

If the ENS is out-of-service, an alternate notification method is provided in Section B, below.

A.

Choose and complete the appropriate steps, below:

1.

If the NRC Reactor Plant Event Notification Worksheet has NOT previously been transmitted from either the Control Room or Technical Support Center (TSC), Then request that the RM OPS Advisor prepare the form.

2.

Verify RM approval.

3.

Transmit the form by dialing one of the numbers shown on the phone or in the Emergency Response Directory (ERD),

then GO TO the next step to establish an open line of communication with the NRC.

OR

4.

If the NRC Reactor Plant Event Notification Worksheet has previously been transmitted by either the Control Room or the TSC, Then initiate an open line of communication with the NRC by dialing one of the numbers shown on the phone or in the ERD and request to be placed on the Conference Bridge with the NRC and the St. Lucie TSC.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 32 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT APPENDIX C NOTIFICATIONS FROM THE EMERGENCY OPERATIONS FACILITY (EOF)

(Page 6 of 6)

2.

A.

(continued)

INITIAL

5.

Take the lead in providing information to the NRC.

B.

Alternate Notification Method

1.

If the ENS is out-of-service, Then use a commercial phone to accomplish the above.

END OF APPENDIX C

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 33 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1 FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 1)

On-line Verification:

1.

A.

C3 THISI C1 SWP/DEM

[] St. Lucie County C] Martin County S A DRILL

2.

A.

Date:

/

/

D.

Message Number. __

3.

Site:

A. El Crystal River Unit 3 D. El Turkey Point Unit 3

4.

Emergency Classification:

A.

B.

5.

A. El Emergency Declaration:

6.

Reason for Emergency Declaration:'

B. 0l THIS IS AN EMERGENCY B. Contact Time: __

C. Reported by: (Name)

E.

Reported from: [] Control Room El TSC El EOF B. 0l St. Lucie Unit 1 C. 0l St. Lucie Unit 2 E. [I Turkey Point Unit 4 El Notification of Unusual Event o Alert B.

El Emeroency Termination:

C. [I Site Area Emergency D. [I General Emergency Date:

/

/

Time:

A.

El EAL Number OR B. []

Description:

7.

Additional Information or Update:

A.

E] None OR B. El 8.

9.

10.

Weather Data:

A. Wind direction from __

degrees B. Downwind Sectors Affected:

Release Status:

A. 0l None (Go to Item 11)

B. El Is occurrng C.

Release Sionificance Categorv (at the Site Boundary):

0 Has occurred, but stopped A.

0l Information not available at this time.

B.

0l Release within normal operating limits (!5 3.5 E-1 Ci/sec noble gas,

C.

0l Non-Significant Fraction of PAG Range (release is> normal limits and 500 mrem TEDE and 1000 mrem CDE)

D.

0l PAG Range (>_500 mrem TEDE orŽ_ 1000 mrem CDE)

11.

Utility Recommended Protective Actions:

A.

El No recommended actions at this time.

B.

El The utility recommends the following protective actions:

El Miles No Action Sectors Evacuate Sectors Shelter Sectors 0-2 2-5 5-10 OR Shelter Zones / Areas:

Evacuate Zones / Areas:

C.

Consider Issuance of KI:

El Yes [] No if form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, continue with item 12.

12.

Plant Conditions:

A. Reactor Shutdown? 0l Yes [I No B. Core Adequately Cooled? El Yes [] No C. Containment Intact? El Yes El No

0. Core Condition: 0l Stable 0l Degrading 13.

14.

Weather Data:

A. Wind Speed __

mph B. Stability Class Additional Release Information: 0l N/A OR A. El Noble Gases __

Curies per second B. El todines __

Cunes per second C. Airbome: Date Started

/

I Time Started -

Date Stopped 1

/

D. Liquid:

Date Started

/

I Time Started Date Stopped

/

/

Distance Proiected Thyroid Dose (CDEt for 1 Hour Proiected Total Dos 1 Mile (Site Boundary)

E.

mrem F.

2 Miles G.

mram H.

5 Miles I.

mrem J.

10 Miles K.

mrem L.

lime Stopped --

Time Stopped __

e (TEDE) for 1 Hour mrem mrem mrem mrem EC or RM Approval Signature:

Date:

I

/

Date:

/

/

Time: __

Time:

15.

Message Received By: Name:

If emergency class escalation is known to be necessary and a new notification form will be transmitted within 15 minutes, then you may go to line 15.

PSL-F070 Effective Date: 08/29/03 END OF ATTACHMENT 1

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 34 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT

¶6 ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 1 of 7)

ITEM ENTRY On-line Verification - Check the appropriate boxes as the State Warning Point (Florida Division of Emergency Management) requests that St. Lucie County Department of Public Safety and the Martin County Division of Emergency Management get on the line, prior to initiating the notification. All three agencies must be notified through the SWP or alternate means.

1.

Check appropriate box for drill or actual emergency as the case may be. During exercises, drills, or tests, each message shall be checked THIS IS A DRILL.

2A.

Enter today's date.

2B.

Enter the time (using the official time, normally synchronized with ERDADS) when contact is made with the State Warning Point or the start time of the RM PAR Briefing. For initial notification of classification, this shall be within 15 minutes of the "Emergency Declaration" time in item 5.

2C.

Enter the name of the person making the notification call.

2D.

Enter the message number beginning with #1 and following sequentially in all facilities (e.g., if the Control Room transmitted two messages the TSC would start with #3).

2E.

Check the box for the facility from which the notification is being made.

3.

Site Check the box for the appropriate plant site for the emergency declaration (both St Lucie boxes might need to be checked for dual unit events such as approach of a hurricane).

4.

Emergency Classification Check the box corresponding to current accident classification declared.

5.

Emergency Declaration or Emergency Termination Enter the date and time when the current emergency classification was declared (A) or (B) when the emergency was terminated.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 35 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 2 of 7)

6.

Reason for Emerqency Declaration Enter the Emergency Action Level (EAL) number (A) (This option is currently not being used at Plant St. Lucie) or (B) enter wording like that found in the EAL information in EPIP-01, Classification Of Emergencies. Wording should be brief yet descriptive enough for the off-site agencies to gain an understanding of the event. It should be clear from the incident description which EAL has necessitated the emergency declaration. Wording should be as non-technical as possible with no acronyms or abbreviations. This information should remain the same throughout update messages, unless there is a classification change.

"*" asterisk and instruction provided at the bottom of form - If Emergency Class escalation is necessary due to rapidly degrading conditions, Then provide the State and County authorities with the initial notification information by transmitting lines 1-6, at a minimum, on the State Notification Form (SNF) and terminate the call by stating that a new notification form will be provided within 15 minutes.

7.

Additional Information or Update Check "None" (A) or (B) Description and enter additional information, if necessary, or reason for update here. For example:

Protective Action Recommendations (PARs) change An occurrence that would otherwise result in a lower emergency classification, on other unit Weather changes affecting public safety Radiation level changes Loss of off-site power, etc.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 36 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 3 of 7)

NOTE If the Class A Model (dose projection model) is being used, a 'State Notification Form Summary Sheet' is available which provides information for items 8-11, 13 and 14. The information is in a format similar to that found on the Florida Nuclear Plant Emergency Notification Form.

8.

Weather Data NOTE 10 meter data should be used.

A.

¶10 Wind direction can be obtained from ERDADS by depressing the "EPIP" key, on the top row of the keyboard. The Met Tower Indicator Panel in the Unit 1 Control Room is an alternate source. If these two sources are not available, refer to Attachment 1, Meteorological Data, in EPIP-09, Off-Site Dose Calculations.

B.

If the wind direction is greater than 3600 the wind direction is determined by subtracting 360' from the indicated number. Wind direction should be rounded to the nearest whole number.

C.

Wind direction is always given as "wind from" (an easterly wind, or wind direction 90', means that the wind is blowing from east to west).

D.

When determining the sectors affected, the adjacent sectors on both sides of the actual downwind sector are included. Three sectors will typically be listed.

E.

If the wind is located on the edge of a sector (i.e., 11 0, 330, etc.) an additional (fourth) sector should be added.

F.

Enter the wind direction (wind from) in degrees in item "A."

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 37 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 4 of 7)

B.

(continued)

G.

Enter the downwind sectors in item "B."

Wind Sectors Wind Sectors Wind Sectors From Affected From Affected From Affected 348-11 HJK 123-146 PQR 236-258 CDE 11-33 JKL 146-168 QRA 258-281 DEF 33-56 KLM 168-191 RAB 281-303 EFG 56-78 LMN 191-213 ABC 303-326 FGH 78-101 MNP 213-236 BCD 326-348 GHJ 101-123 NPQ There is no "0" sector There is no "I" sector

9.

Release Status A.

If there are no indications of a release of radioactive material, check box "A" and go to item 11.

A release of radioactive material (during any declared emergency) is defined as:

Any effluent monitor increase of (approximately) 10 times or one decade above pre-transient values OR Health Physics detecting airborne radioactivity levels in excess of 25% derived air concentration (DAC) outside of plant buildings due to failure of equipment associated with the declared emergency.

B.

If a release of radioactive material is occurring, even though it may be less than normal operating limits, check box "B."

C.

If a release has occurred but stopped, check box "C."

Dose Assessment personnel in the TSC or EOF will have this information.

The TSC Chemistry Supervisor, TSC HP Supervisor or EOF HP Manager should be contacted for the data.

0)

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 38 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 5 of 7)

10.

Release Significance Category Do Not Check Any Box in Item 10 if you Checked Box 9 "A" No Release A.

If a release is occurring or has occurred and dose information is not available at the time of notification, check box "A" and follow up as soon as information becomes available.

B.

Check box "B" if both noble gas and iodine release rates are less than or equal to the following:

Noble Gas release < 3.5 E+5 pCi/sec (3.5 E-1 Ci/sec)

Iodine release < 4.6 E+1 pCi/sec (4.6 E-5 Ci/sec)

C.

Check box "C" if either noble gas or iodine release rates exceed the values in "B" (above) but forecasted 1 mile doses are less than either 500 mrem TEDE or 1000 mrem Thyroid CDE. These doses are less than the state's Protective Action Guide (PAG) levels.

D.

Check box "D" if forecasted 1 mile doses are greater than or equal to either 500 mrem TEDE or 1000 mrem Thyroid CDE. These PAG levels require state and county action.

11.

Utility Recommended Protective Actions A.

If there are no Protective Action Recommendations (PARs), check Box "A."

B.

If PARs are necessary, check Box "B". Two formats are provided to record PARs. Use the "sector" format and determine appropriate PARs using the guidance in Attachment 2 to this procedure. Copy the PARs into item 11 "C."

Indicate PARs using only the words NONE, ALL, ALL REMAINING or by listing the letters of the sectors affected. Protective Action Recommendations shall be approved by the Emergency Coordinator (EC) or the Recovery Manager (RM). The "zone" format is for Crystal River Unit 3 use only.

C.

Check the "Yes" box (to consider issuance of potassium iodide (KI) only if:

(1)

A General Emergency has been declared AND (2)

A release of radioactive material is occurring.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 39 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 6 of 7)

12.

Plant Conditions Answer the three questions "Yes" or "No" by checking the appropriate box.

A.

Is the reactor shut down?

B.

Is the core adequately cooled?

C.

Is the containment intact?

Answer the question regarding the condition of the core as either stable or degrading.

13.

Weather Data NOTE 10 meter data should be used.

A.

¶10 Temperature, wind speed and wind direction can be obtained from ERDADS by depressing the "EPIP" key, on the top row of the keyboard. The Met Tower Indicator Panel in the Unit 1 Control Room is an alternate source. If these two sources are not available, refer to, Meteorological Data, in EPIP-09, Off-site Dose Calculations.

B.

Enter wind speed in Miles Per Hour (MPH) in item "A".

C.

Stability Class - Enter the stability class as determined by using the figure below. The figure shows the relationship between the Delta T displayed by ERDADS and the stability class.

If Delta-T is Then Stability Class is Less than or equal to -1.7 A

-1.6 to -1.5 B

-1.4 C

-1.3 to -0.5 D

-0.4 to +1.4 E

+1.5 to +3.6 F

Greater than +3.6 G

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 40 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 1A DIRECTIONS FOR COMPLETING THE FLORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM (Page 7 of 7)

14.

Additional Release Information This section requires that a release be in progress and completed results of dose assessment be available. Check the "N/A" box if no release is occurring and/or if dose information is not available. Otherwise, provide all information that applies.

A.

Enter the noble gas release rate in curies per second.

B.

Enter the iodine release rate in curies per second.

C.

For an airborne release, enter the date and time started and when terminated, the date and stopped.

D.

For a liquid release, enter the date and time started and when terminated, the date and time stopped.

Projected Dose Information - Enter the projected Thyroid Dose (CDE) in mrem for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (EPIP-09, Manual Dose Calculation Worksheet, Line 5) and the projected Total Dose (TEDE) in mrem for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (EPIP-09, Manual Dose Calculation Worksheet, Line 16) for the site boundary 2, 5 and 10 miles.

15.

Message Received By Enter the name of the State Warning Point Duty Officer or the individual that receives the notification. Enter the time at the State Warning Point (request it from the Duty Officer) and indicate the date the call is completed.

END OF ATTACHMENT 1A

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 41 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)

(Page 1 of 5)

NOTE Initial notification from the Control Room may utilize PARs based on plant conditions.

" Once dose assessment begins, PARs should be made utilizing all available data including off-site dose projections, plant conditions and field monitoring data.

" Both plant conditions and off-site doses shall be considered for PARs.

" The most conservative recommendations should be made.

If it is anticipated that a threshold for a PAR will be exceeded, it is neither necessary nor desirable to wait until the threshold is exceeded to make that PAR.

¶12 Conditions (plant information, dose projections and field monitoring results) are to be continually assessed and PARs expanded, as necessary, to ensure that adequate (most conservative) PARs are issued.

112 Previously issued PARs, unless found to be less conservative, are to remain in effect until the threat is fully under control and the event is being de-escalated.

¶12 Only State and County officials can implement, change and/or terminate protective actions.

1.

PAR Flowchart A.

PARs Based on Plant Conditions

1.

Begin in the upper left hand corner of the chart by answering the General Emergency (GE) question.

2.

Correctly answer the questions until you reach one of the boxes that provides PAR information based on plant conditions.

3.

If there is no release, Then go to the PAR Worksheet and fill-in the PARs based on plant conditions. The sectors affected can be determined by referring to number 8, Weather Data, in Attachment 1A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.

4.

If a release is involved, Then go to Section B, PARs Based on Off-site Dose, below.

Form #PSL-F156 EPIP-08, Off-Site Notifications and Protective Action Recommendations Effective Date 12/10/03

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 42 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)

(Page 2 of 5)

1.

(continued)

NOTE

  • If the Class A Model printout, State Notification Form Summary Sheet is available, it should be used to compare dose-based PARs against PARs based on plant conditions.

" Calculated off-site doses should be compared to field monitoring data when determining PARs.

B.

PARs Based on Off-site Dose

1.

PARs are based on the Total Effective Dose Equivalent (TEDE or total dose) and / or the Committed Dose Equivalent (CDE, thyroid dose). Do NOT use dose rate values.

2.

If using the Class A Model, Then in Forecast Mode, print the State Notification Form Summary for computer generated PARs.

a.

Go to Section C, PAR Worksheet

3.

If using EPIP-09, Off-site Dose Calculations, Then calculate TEDE and CDE in accordance with the procedure.

a.

Compare the TEDE dose at 1 mile with the values on the Flowchart. Enter the chart at the appropriate dose level by determining if the dose is between 500 and 999 mrem or between 1000 and 4999 mrem or 5000 mrem or greater.

b.

From the selected dose level, move to the right on the chart to the first column, 0-2 miles. The PAR provided corresponds to the calculated TEDE at 1 mile.

c.

Enter the PAR in the 0-2 miles block on the TEDE DOSE table below the PAR Flowchart. The sectors affected can be determined by referring to number 8, Weather Data, in A, Directions for Completing the Florida Nuclear Plant Emergency Notification Form.

d.

Continue to determine the corresponding PAR at 2-5 miles using the calculated 2 mile TEDE, at 5-10 miles using the calculated 5 mile TEDE and the 10 miles plus (To Be Determined (TBD) distance) using the calculated 10 mile TEDE, as necessary.

e.

Enter the PAR information In the appropriate blocks of the TEDE DOSE table.

Form #PSL-F 156 EPIP-08, Off-Site Notifications and ProtocUve AcIjon Rtconwodaltons Effective Date 12/10/03

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 43 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)

(Page 3 of 5)

1.

B.

3.

(continued)

f.

Follow the same methodology for determining the PARs corresponding to the calculated CDE values beginning with the calculated value at 1 mile.

g.

Enter each of the determined PARs in the CDE (Thyroid) DOSE table below the PAR Flowchart.

h.

Go to Section C, PAR Worksheet.

C.

PAR Worksheet

1.

Fill-in the time / date and emergency class.

2.

In Part A, determine the most conservative PARs by comparing the PARs based on plant conditions against those based on off-site dose. It is important to compare PARs at each distance (0-2, 2-5, 5-10) because the basis of the most conservative PAR could be different at different distances.

3.

Enter the most conservative PARs into the table in Part B, Protective Actions Recommended by FPL. Use the word(s) NONE, ALL, ALL REMAINING or list the individual affected sectors by letter.

4.

Obtain review and approval.

5.

Transfer the approved PARs to the Florida Nuclear Plant Emergency Notification Form.

Form #PSL-F 156 EPIP-08, Off-Site Notifications and Protective Action Recommendations Effective Date 12/10/03

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)

(Page 4 of 5)

Y.

MILE Note MILES NO ACTION EVACUATE SHELTER

1. Sewsrq i=e ored i wc W

-Los of cleciil furidiori req~ired for =*~ prolieclio (e.g., ion of injection with LOCA) OR 0-2 None All None oghco.

p*r.

(oalid CET geater Vin 7Wo F) OR 2-5 None (Sectors Affected) All Remaining CHRRM reading greamtw gon 42 E4 "Air.

5-10 None None All

2. Lin of phy-wrs of Comlr Roourm oW redo op.mlg wrow to ar.

PARs Based on Off-Site Dose (For use with manual dose calculation only. Not to be completed when Class A Model is used)

CDE C,-.- ý. o0 TEDE (Thyroid)

I DOSE DOSEs 1

2-5Miles r

5-10OMiles 1

DOSE DOSEj I Use 1 mile value Use 2 mile valu.

Use 5 mile value TEDE F

CDE 500--999 11000-4999 Shelter A Shelter Shelter mrem re (Sectors Affected)

(Sectors Affected)

'Ds-t0i ow t-is r -,Iuke NO ACTION TEDE 1000-4999 mrem TEDE 5000 mrem or IGreater CDE 5000-24999 Evacuate All mrem Evacuate (Sectors Affected)

Shelter All Remaining Evacuate (Sectors Affected)

Shelter All Remaining COE 25000 mrem or Greater Evacuate

- Evacuate All Evacuate All (Sectors+Affected)

Shelter All Remaining Use the following terms in this table: NONE, ALL, ALL REMAINING or fill in the letters of the sectors affected.

TEDE DOSE Miles NO ACTION EVACUATE SHELTER 0-2 2-5 5-10

>.10 Use the following terms in this table: NONE, ALL, ALL REMAINING CDE (Thyroid) DOSE or fill in the letters of the sectors affected.

Miles NO ACTION EVACUATE SHELTER 0-2 2-5 5-10

> 10 (PEPIEPIP-OMAPP C-RI) ations Effective Date 12/10/03 Form #PSL-F 156 EPIP-08, Oft-Site Notifications and Protective Action Recommend,

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 2 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARs)

(Page 5 of 5)

PAR WORKSHEET Time / Date Emergency Class: 0 SAE 0 GE A.

PAR Comparison After comparing the possible recommendations from the PARs flowchart, the most conservative PARs are based on: (check one) 0] PLANT CONDITIONS 0 OFF-SITE DOSE B.

Protective Actions Recommended by FPL:

Use the following terms in this table: NONE, ALL, ALL REMAINING Or fill in the letters of the sectors affected.

NO ACTION SECTORS EVACUATE SECTORS SHELTER SECTORS 0-2 miles 2-5 miles 5-10 miles 10-TBD miles*

  • If necessary, add to State Notification Form.

Control Room Signature Emergency Coordinator Technical Support Center Signature TSC EC Assistant / Logkeeper TSC HP Supervisor or TSC Chemistry Supervisor Emergency Operations Facility Signature EOF RM OPS Advisor / Logkeeper EOF HP Manager Form #PSL-F 156 EPIP-08, Off-Site Notifications and Protective Action Recommendations Effective Date 12/10(03 END OF ATTACHMENT 2

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 46 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 3

¶8 NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 1 of 2)

NRC FORM 361 U.S. NUCLEAR REGULATORY COMMISSION (12-2000)

REACTOR PLANT OPERATIONS CENTER EVENT NOTIFICATION WORKSHEET EN #

NOTIFICATION TIME FACILITY OR ORGANIZATION IjUNIT I NAME OF CALLER TCILL BACK 0 EVENT TIME & ZONE EVENT DATE IPOWERMODE BEFORE POWERMODE AFTER EVENT CLASSIFICATIONS 1-Hr. Non-Emergency 10 CFR 60.72(b)()

-(v)(A)

Safe S/D Capability AINA GENERAL EMERGENCY GEN/AAEC TS Deviation ADEV (vXB)

RHR Capability AINB SITE AREA EMERGENCY SIT/AAEC 4-Hr. Non-Emergency 10 CFR 60.72(b)(2)

(v)(C)

Control of Red Release AINC ALERT ALE/AAEC W

TS Required S/D ASHU (v)(D)

Accident Mitigation AIND UNUSUAL EVENT UNU/AAEC (iv)(A) ECCS Discharge to RCS ACCS

-xii)

Offite Medical AMED 50.72 NON-EMERGENCY (see next columns)

(iv)(B) RPS Actuation (scram)

ARPS J*xiii Loss CommlAsmt/Resp ACOM PHYSICAL SECURITY (73.71)

DDDD (xi)

Offsite Notification APRE 60-Day Optional 10 CFR 60.73(a)(1)

MATERIAL/EXPOSURE B??.

-Hr. Non-Emergency 10 CFR 60.72(b)(2L J'nvalid Specified System Actuation AINA FITNESS FOR DUTY HFIT (ii)(A)

Degraded Condition ADEG Other Unspecified Requirement (Identify)

OTHER UNSPECIFIED REOMT.

(see last column)

(ii)(B)

Unanalyzed Condition AUNA NONR INFORMATION ONLY NNF (iv)(A) Specified System Actuation AESF NONR DESCRIPTION Include: Systems affected, actuations and their initiating signals, causes, effect of event on plant, actions taken or planned, etc. (Continue on back)

NOTIFICATIONS YES NO WI.L B.E ANYTHING UNUSUAL OR NRC RESIDENT NOT UNDERSTOOD?

YES xplainebove) 0]NO STATE(s)

I DID ALL SYSTEMS LOCAL FUNCTION AS REQUIRED?

0 YES 0 NO (Explain above)

OTHER GOV AGENCIES I I

_I

_IMODE OF OPERATION ESTIMATED ADDITIONAL INFO ON BACK MEDIA/PRESS RELEASE UNTIL CORRECTED:

IRESTART DATE:

10 YES 0 NO Form # PSL-F080 EPIP-08, Off-Site Notifications and Protective Action Recommendations, Effective Date: 08/29/03 and AP 0010721, NRC Required Non-Routine Notifications and Reports

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 47 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT ATTACHMENT 3

%8 NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 2 of 2)

RADIOLOGICAL RELEASES: CHECK OR FILL IN APPLICABLE ITEMS (specific detalslexplanations should be covered in event description)

ILIQUID RELEASE I IlARFO1 iRFIFASF I IINP ANNn R*PEA,*E I PLA IMur ori Ca=c I Ir*_*,_

I h-ro,,a.J I

U JMONITORED I

UNMONITORED I OFFSITE RELEASE I

T.S. EXCEEDED I

RM ALARMSI AREAS EVACUATED-PERSONNEL EXPOSED OR CONTAMINATED I IOFSITE PROTECTIVE ACTIONS RECOMMENDEDI I*State release path in escription Release Rate (IsecL

% T.S. LIMIT HOO GUIDE Total Activity (CI)

% T.S. LIMIT HOO GUIDE Noble Gas 0.1 Ci/sec 1000 Ci Iodine 10 uCi/sec 0.01 Ci Particulate 1 uCi/sec 1 mCi Liquid (excluding tritium and 10 uCimin dissolved noble gases) 10 u 1__

min 0.1 Ci Liquid (tritlum) 0.2 Ci/min 5 Ci Total Activity PLANT STACK CONDENSERJAIR EJECTOR MAIN STEAM LINE SG BLOWDOWN OTHER RAD MONITOR READINGS ALARM SETPOINTS

% T.S. LIMIT (if applicable)

RCS OR SG TUBE LEAKS: CHECK OR FILL IN APPLICABLE ITEMS: (specific details/explanations should be covered In event description)

LOCATION OF THE LEAK (e.g., SG #, valve, pipe, etc.)

LEAK RATE UNITS: gpm/gpd T.S. LIMITS jSUDDEN OR LONG-TERM DEVELOPMENT LEAK START DATE TIME COOLANT ACTIVITY PRIMARY SECONDARY AND UNITS:

LIST OF SAFETY RELATED EQUIPMENT NOT OPERATIONAL EVENT DESCRIPTION (Continued from front)

Form # PSL-F080 EPIP-08, Off-Site Notifications and Protective Action Recommendations, Effective Date: 08/29/03 and AP 0010721, NRC Required Non-Routine Notifications and Reports END OF ATTACHMENT 3

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT

¶7 ATTACHMENT 3A DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 1 of 2)

A.

Contact information - to be completed following contact

1.

Name of the person contacting the NRC or other designated FPL contact.

2.

NRC Contacts Name - will be provided upon contact. Also obtain the event number and notification time as received from the HOO should be recorded on the top of the worksheet.

B.

Reactor Plant Event Notification Worksheet, Page 1 NOTE The "EN #" is provided by the NRC.

1.

Notification Time - enter the time contact is made.

2.

Unit - enter the appropriate unit number: Enter "0" for a classification common to both units.

3.

Callers Name - enter the name of the person making the call.

4.

Call back # - enter the number of the ENS phone that you are calling from and the commercial phone number at which you can be reached.

5.

Event time and Zone - enter the military time, the zone will be "EST" for Easter Standard Time or "EDT" for Eastern Daylight-savings Time.

6.

Event Date - enter the date the event is occurring.

7.

Power / Mode Before & Power / Mode After - enter the power in percent and the mode number (1-6) before and after the event.

NOTE Abbreviations / acronyms (e.g., UNU / AAEC, SIT / AAEC, etc.) are for NRC use only.

8.

Event Classifications - check one of the four blocks for General Emergency, Site Area Emergency, Alert, or Notification of Unusual Event.

REVISION NO.:

PROCEDURE TITLE:

PAGE:

6A OFF-SITE NOTIFICATIONS AND PROTECTIVE 49 of 49 PROCEDURE NO.:

ACTION RECOMMENDATIONS EPIP-08 ST. LUCIE PLANT T7 ATTACHMENT 3A DIRECTIONS FOR COMPLETING THE NRC REACTOR PLANT EVENT NOTIFICATION WORKSHEET (Page 2 of 2)

B.

(continued)

NOTE No other blocks in the upper half of the form are required.

9.

Description - provide a written description of the event.

NOTE Check the blocks in the lower portion of the form based on current conditions.

10.

Mode of operation until corrected - provided if known.

11.

Estimate for restart date - enter "unknown".

12.

Additional info on Page 2 - enter yes or no.

C.

Reactor Plant Event Notification Worksheet, Page 2

1.

Fill in as much of the information on the form as is immediately available -

do not create undue delay in making the notification. This information can be gained once the open line of communication is established.

D.

Approval

1.

Information entered on the worksheet shall be reviewed and approved by the EC or RM (if used in the EOF), prior to transmission.

2.

The EC / RM may initial on the worksheet to indicate approval. There is no formal sign-off location on the worksheet.

END OF ATTACHMENT 3A