ML062500239: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| page count = 2
| page count = 2
| project = TAC:MD1070
| project = TAC:MD1070
| stage = Other
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:From: Ed MillerTo:Thomas.loomis@exeloncorp.comDate: 09/07/2006 9:07:50 AM
{{#Wiki_filter:From:
Ed Miller To:
Thomas.loomis@exeloncorp.com Date:
09/07/2006 9:07:50 AM


==Subject:==
==Subject:==
Roll RepairTom, After talking with Simon, he communicated that for future inservice inspection for repaired
Roll Repair
: Tom, After talking with Simon, he communicated that for future inservice inspection for repaired CRD housing penetrations 42-43 and 46-39, your response dated June 23, 2006, to NRCs request for additional information needs clarification. Please confirm whether you agree with the following (underlined):
NDE During Roll Repair of Table 1:
Appendix I (of code case N-730) refers to procedure demonstration utilizing, in part, ASME Section XI, Appendix VIII, Supplement 2. Supplement 2 was not implemented at the time of the original repair. A plant specific mockup will be available for future inservice inspection of CRD housing penetrations 42-43 and 46-39 and in the event that additional roll repairs are necessary that will comply with the Appendix I requirements. As discussed in the proposed relief request, an ultrasonic exam of the inside diameter of CRD housing 46-39 was performed in the R20 outage (Fall 2004). No indications were identified....
Ed Miller 415-2481


CRD housing penetrations 42-43 and 46-39, your response dated June 23, 2006, to NRC'srequest for additional information needs clarification. Please confirm whether you agree with the following (underlined):
Mail Envelope Properties (450019A6.EDB : 9 : 35080)
 
"NDE During Roll Repair" of Table 1: 
 
Appendix I (of code case N-730) refers to procedure demonstration utilizing, in part, ASMESection XI, Appendix VIII, Supplement 2. Supplement 2 was not implemented at the time of theoriginal repair. A plant specific mockup will be available for future inservice inspection of CRDhousing penetrations 42-43 and 46-39 and in the event that additional roll repairs are necessarythat will comply with the Appendix I requirements. As discussed in the proposed relief request,an ultrasonic exam of the inside diameter of CRD housing 46-39 was performed in the R20outage (Fall 2004). No indications were identified....
 
Ed Miller 415-2481 Mail Envelope Properties(450019A6.EDB : 9 : 35080)


==Subject:==
==Subject:==
Roll RepairCreation Date 09/07/2006 9:07:50 AMFrom: Ed MillerCreated By:GXM@nrc.govRecipientsActionDate & Timeexeloncorp.comTransferred09/07/2006 9:08:03
Roll Repair Creation Date 09/07/2006 9:07:50 AM From:
 
Ed Miller Created By:
AM thomas.loomis (Thomas.loomis@exeloncorp.com)Post Office DeliveredRouteexeloncorp.comFilesSizeDate & Time MESSAGE152909/07/2006 9:07:50 AM TEXT.htm1419Options Auto Delete:
GXM@nrc.gov Recipients Action Date & Time exeloncorp.com Transferred 09/07/2006 9:08:03 AM thomas.loomis (Thomas.loomis@exeloncorp.com)
No Expiration Date:None Notify Recipients:Yes Priority:Standard ReplyRequested:
Post Office Delivered Route exeloncorp.com Files Size Date & Time MESSAGE 1529 09/07/2006 9:07:50 AM TEXT.htm 1419 Options Auto Delete:
No Return Notification:None Concealed  
No Expiration Date:
None Notify Recipients:
Yes Priority:
Standard ReplyRequested:
No Return Notification:
None Concealed  


==Subject:==
==Subject:==
 
No Security:
No Security:Standard To Be Delivered:Immediate Status Tracking:Delivered & Opened}}
Standard To Be Delivered:
Immediate Status Tracking:
Delivered & Opened}}

Latest revision as of 06:54, 15 January 2025

E-mail, Miller, NRR, to Loomis, Exelon, Oyster Creek Relief Request, Use of Code Case N-730
ML062500239
Person / Time
Site: Oyster Creek
Issue date: 09/07/2006
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLB
To: Tom Loomis
Exelon Corp
Miller, G. Edward, 415-2481
References
TAC MD1070
Download: ML062500239 (2)


Text

From:

Ed Miller To:

Thomas.loomis@exeloncorp.com Date:

09/07/2006 9:07:50 AM

Subject:

Roll Repair

Tom, After talking with Simon, he communicated that for future inservice inspection for repaired CRD housing penetrations 42-43 and 46-39, your response dated June 23, 2006, to NRCs request for additional information needs clarification. Please confirm whether you agree with the following (underlined):

NDE During Roll Repair of Table 1:

Appendix I (of code case N-730) refers to procedure demonstration utilizing, in part, ASME Section XI, Appendix VIII, Supplement 2. Supplement 2 was not implemented at the time of the original repair. A plant specific mockup will be available for future inservice inspection of CRD housing penetrations 42-43 and 46-39 and in the event that additional roll repairs are necessary that will comply with the Appendix I requirements. As discussed in the proposed relief request, an ultrasonic exam of the inside diameter of CRD housing 46-39 was performed in the R20 outage (Fall 2004). No indications were identified....

Ed Miller 415-2481

Mail Envelope Properties (450019A6.EDB : 9 : 35080)

Subject:

Roll Repair Creation Date 09/07/2006 9:07:50 AM From:

Ed Miller Created By:

GXM@nrc.gov Recipients Action Date & Time exeloncorp.com Transferred 09/07/2006 9:08:03 AM thomas.loomis (Thomas.loomis@exeloncorp.com)

Post Office Delivered Route exeloncorp.com Files Size Date & Time MESSAGE 1529 09/07/2006 9:07:50 AM TEXT.htm 1419 Options Auto Delete:

No Expiration Date:

None Notify Recipients:

Yes Priority:

Standard ReplyRequested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard To Be Delivered:

Immediate Status Tracking:

Delivered & Opened