ML062500239: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 09/07/2006 | | issue date = 09/07/2006 | ||
| title = E-mail, Miller, NRR, to Loomis, Exelon, Oyster Creek Relief Request, Use of Code Case N-730 | | title = E-mail, Miller, NRR, to Loomis, Exelon, Oyster Creek Relief Request, Use of Code Case N-730 | ||
| author name = Miller G | | author name = Miller G | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLB | | author affiliation = NRC/NRR/ADRO/DORL/LPLB | ||
| addressee name = Loomis T | | addressee name = Loomis T | ||
| Line 14: | Line 14: | ||
| page count = 2 | | page count = 2 | ||
| project = TAC:MD1070 | | project = TAC:MD1070 | ||
| stage = | | stage = Approval | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: Ed | {{#Wiki_filter:From: | ||
Ed Miller To: | |||
Thomas.loomis@exeloncorp.com Date: | |||
09/07/2006 9:07:50 AM | |||
==Subject:== | ==Subject:== | ||
Roll | Roll Repair | ||
: Tom, After talking with Simon, he communicated that for future inservice inspection for repaired CRD housing penetrations 42-43 and 46-39, your response dated June 23, 2006, to NRCs request for additional information needs clarification. Please confirm whether you agree with the following (underlined): | |||
NDE During Roll Repair of Table 1: | |||
Appendix I (of code case N-730) refers to procedure demonstration utilizing, in part, ASME Section XI, Appendix VIII, Supplement 2. Supplement 2 was not implemented at the time of the original repair. A plant specific mockup will be available for future inservice inspection of CRD housing penetrations 42-43 and 46-39 and in the event that additional roll repairs are necessary that will comply with the Appendix I requirements. As discussed in the proposed relief request, an ultrasonic exam of the inside diameter of CRD housing 46-39 was performed in the R20 outage (Fall 2004). No indications were identified.... | |||
Ed Miller 415-2481 | |||
Mail Envelope Properties (450019A6.EDB : 9 : 35080) | |||
==Subject:== | ==Subject:== | ||
Roll | Roll Repair Creation Date 09/07/2006 9:07:50 AM From: | ||
Ed Miller Created By: | |||
AM thomas.loomis (Thomas.loomis@exeloncorp.com)Post Office | GXM@nrc.gov Recipients Action Date & Time exeloncorp.com Transferred 09/07/2006 9:08:03 AM thomas.loomis (Thomas.loomis@exeloncorp.com) | ||
No Expiration Date:None Notify Recipients:Yes Priority:Standard ReplyRequested: | Post Office Delivered Route exeloncorp.com Files Size Date & Time MESSAGE 1529 09/07/2006 9:07:50 AM TEXT.htm 1419 Options Auto Delete: | ||
No Return Notification:None Concealed | No Expiration Date: | ||
None Notify Recipients: | |||
Yes Priority: | |||
Standard ReplyRequested: | |||
No Return Notification: | |||
None Concealed | |||
==Subject:== | ==Subject:== | ||
No Security: | |||
No Security:Standard To Be Delivered:Immediate Status Tracking:Delivered & Opened}} | Standard To Be Delivered: | ||
Immediate Status Tracking: | |||
Delivered & Opened}} | |||
Latest revision as of 06:54, 15 January 2025
| ML062500239 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 09/07/2006 |
| From: | Geoffrey Miller NRC/NRR/ADRO/DORL/LPLB |
| To: | Tom Loomis Exelon Corp |
| Miller, G. Edward, 415-2481 | |
| References | |
| TAC MD1070 | |
| Download: ML062500239 (2) | |
Text
From:
Ed Miller To:
Thomas.loomis@exeloncorp.com Date:
09/07/2006 9:07:50 AM
Subject:
Roll Repair
- Tom, After talking with Simon, he communicated that for future inservice inspection for repaired CRD housing penetrations 42-43 and 46-39, your response dated June 23, 2006, to NRCs request for additional information needs clarification. Please confirm whether you agree with the following (underlined):
NDE During Roll Repair of Table 1:
Appendix I (of code case N-730) refers to procedure demonstration utilizing, in part, ASME Section XI, Appendix VIII, Supplement 2. Supplement 2 was not implemented at the time of the original repair. A plant specific mockup will be available for future inservice inspection of CRD housing penetrations 42-43 and 46-39 and in the event that additional roll repairs are necessary that will comply with the Appendix I requirements. As discussed in the proposed relief request, an ultrasonic exam of the inside diameter of CRD housing 46-39 was performed in the R20 outage (Fall 2004). No indications were identified....
Ed Miller 415-2481
Mail Envelope Properties (450019A6.EDB : 9 : 35080)
Subject:
Roll Repair Creation Date 09/07/2006 9:07:50 AM From:
Ed Miller Created By:
GXM@nrc.gov Recipients Action Date & Time exeloncorp.com Transferred 09/07/2006 9:08:03 AM thomas.loomis (Thomas.loomis@exeloncorp.com)
Post Office Delivered Route exeloncorp.com Files Size Date & Time MESSAGE 1529 09/07/2006 9:07:50 AM TEXT.htm 1419 Options Auto Delete:
No Expiration Date:
None Notify Recipients:
Yes Priority:
Standard ReplyRequested:
No Return Notification:
None Concealed
Subject:
No Security:
Standard To Be Delivered:
Immediate Status Tracking:
Delivered & Opened