ML063400249: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML063400249
| number = ML063400249
| issue date = 10/23/2006
| issue date = 10/23/2006
| title = 2006/10/23-E-MAIL: (PD) Fwd: Power Point
| title = E-MAIL: (PD) Fwd: Power Point
| author name = Lund L
| author name = Lund L
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 18
| page count = 18
| project = TAC:8261
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:D.Asley- Fd: Power point___                                       Page From:           Louise Lund To:             D. Ashley Date:           10/23/2006 5:22:28 PM
{{#Wiki_filter:D.Asley-Fd: Power point___
Page From:
To:
Date:


==Subject:==
==Subject:==
Fwd: Power point
Louise Lund D. Ashley 10/23/2006 5:22:28 PM Fwd: Power point
          >>> <iohn.hufnael@exeloncorp.com> 10/23/2006 4:11 PM >>>
>>> <iohn.hufnael@exeloncorp.com> 10/23/2006 4:11 PM >>>


c:\temp\GW)00002.TMP                                                                                   Page'l 11 cAtemp\GW}00002.TMP                                                                                   Page 14 Mail Envelope Properties       (453D328E.90F : 10 :34922)
c:\\temp\\GW)00002.TMP Page'l 11 cAtemp\\GW}00002.TMP Page 14 Mail Envelope Properties (453D328E.90F : 10 :34922)


==Subject:==
==Subject:==
Fwd: Power point Creation Date           10/23/2006 5:22:22 PM From:                     Louise Lund Created By:             LXL@nrc.gov Recipients nrc.gov OWGWPOO1.HQGWDO01 DJA1 (D. Ashley)
Fwd: Power point Creation Date 10/23/2006 5:22:22 PM From:
Post Office                                                               Route OWGWPO01.HQGWDO01                                                       nrc.gov Files                             Size               Date & Time MESSAGE                           663               23 October, 2006 5:22:22 PM Comm Doc - Drywell Inspections 10-23-06 alex.ppt 348160                 23 October, 2006 5:22:12 PM Options Expiration Date:                 None Priority:                         Standard ReplyRequested:                   No Return Notification:             None Concealed  
Louise Lund Created By:
LXL@nrc.gov Recipients nrc.gov OWGWPOO1.HQGWDO01 DJA1 (D. Ashley)
Post Office Route OWGWPO01.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 663 23 October, 2006 5:22:22 PM Comm Doc - Drywell Inspections 10-23-06 alex.ppt 348160 23 October, 2006 5:22:12 PM Options Expiration Date:
None Priority:
Standard ReplyRequested:
No Return Notification:
None Concealed  


==Subject:==
==Subject:==
No Security:                         Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
No Security:
Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled


D. Ashley -   Doc - Drywell Inspections 10-23-06 alex.ppt D.Ashley Comm Doe :Drywell Inspections 10-23-06 alex.ppt
D. Ashley -
          -
Doc - Drywell Inspections 10-23-06 alex.ppt D. Ashley - Comm Doe :Drywell Inspections 10-23-06 alex.ppt Page 1 Oyster Creek 1R21 Outage Communication Package Related to Drywell Shell Inspections October 23, 2006
Page 1 Oyster Creek 1R21 Outage Communication Package Related to Drywell Shell Inspections October 23, 2006
<date>
                <date>                               PRELIMINARY I
PRELIMINARY I


D. As'&#xfd; 1e  C-o-mIm ID oc D ,ry,wellinspecItions 10,-23-06 alex.ppt                                         i D.Ashley Comm Doc Drywell Inspections 10-23-06 alex.ppt
D. As' &#xfd; 1 e C-o-m I m I D oc D, ry, wellinspec I tions 10, 06 alex.ppt i
          -              -
D. Ashley - Comm Doc - Drywell Inspections 10-23-06 alex.ppt Page 21 i
Page 21 i 1R21 Drywell Inspections
1R21 Drywell Inspections
* Reactor Cavity Trough Drain Line
* Reactor Cavity Trough Drain Line
* Sand Bed Region Poly Bottles
* Sand Bed Region Poly Bottles
                          "   Sand Bed Drain Lines
" Sand Bed Drain Lines
* Epoxy Coating on External Surface of Drywell Sandbed in all 10 Bays
* Epoxy Coating on External Surface of Drywell Sandbed in all 10 Bays
* Internal Drywell Shell in Sand Bed Region Above Floor Elevation
* Internal Drywell Shell in Sand Bed Region Above Floor Elevation
Line 49: Line 61:
* Plate Thickness Transitions at Two Elevations
* Plate Thickness Transitions at Two Elevations
* Internal Drywell Shell in Trenches (Bays 5 and 17)
* Internal Drywell Shell in Trenches (Bays 5 and 17)
                          <date>                                 PRELIMINARY                       2
<date>
PRELIMINARY 2


m Doc - Drvwe1rfhspe'ction's iO'-23-_O_6_'_a1'e'x.ppt D. Ashley---,CIom1,                                                                                        Pag~e 3 D. Ashley Comm Doc Drywell tnsDections 10-23-06 aIex.pi~t
D. Ashley ---, C I om 1, m Doc - Drvwe1rfhspe'ction's iO'-23-_O_6_'_a1'e'x.ppt Pag~e 3 D. Ashley - Comm Doc - Drywell tnsDections 10-23-06 aIex.pi~t Page 3 ~
          -            -                                                                                  Page 3 ~
Inspection Status (To Date)
Inspection Status (To Date)
* The reactor cavity trough drain line is not clogged and is successfully removing a small amount of water entering the trough. Daily water leakage monitoring continues (as planned, strippable coating was applied to reactor cavity-before flood-up).
* The reactor cavity trough drain line is not clogged and is successfully removing a small amount of water entering the trough. Daily water leakage monitoring continues (as planned, strippable coating was applied to reactor cavity-before flood-up).
                      " There has been no water observed in the Sand Bed Regions and no water coming down through the air gap.
" There has been no water observed in the Sand Bed Regions and no water coming down through the air gap.
                      " There has been no water leakage from the Sand Bed Regions confirmed by the absence of water in the poly bottles. Daily monitoring of the poly bottles continues.
" There has been no water leakage from the Sand Bed Regions confirmed by the absence of water in the poly bottles. Daily monitoring of the poly bottles continues.
                      " Two of the five Sand Bed drain lines were found to have some blockage and debris. These will be cleaned prior to restart.
Two of the five Sand Bed drain lines were found to have some blockage and debris. These will be cleaned prior to restart.
* The visual inspection of the epoxy coating on the external shell surface in the Sand Bed regions has been completed.
The visual inspection of the epoxy coating on the external shell surface in the Sand Bed regions has been completed.
* The seal at the junction of the drywell shell and the concrete floor in the Sand Bed region has been inspected.
The seal at the junction of the drywell shell and the concrete floor in the Sand Bed region has been inspected.
                      <date>                                       PRELIMINARY                           3
<date>
PRELIMINARY 3


D.shey omm Doc - Drywel Inspecions-1-230       -lep                                         Pagei Inspection Status (To Date) 0 The Ultrasonic Inspections of the Interior Surface of the Drywell in the Sand Bed regions have been completed.
D.shey omm Doc - Drywel Inspecions-1-230  
-lep Pagei Inspection Status (To Date) 0 The Ultrasonic Inspections of the Interior Surface of the Drywell in the Sand Bed regions have been completed.
* The Ultrasonic Inspections of the Interior Surface of the Drywell in the Upper regions are in progress.
* The Ultrasonic Inspections of the Interior Surface of the Drywell in the Upper regions are in progress.
0   The Ultrasonic Inspections of the Exterior Surface of the Drywell in the Sand Bed regions are completed.
0 The Ultrasonic Inspections of the Exterior Surface of the Drywell in the Sand Bed regions are completed.
* The Ultrasonic Inspections of the plate thickness transitions at two locations are in progress.
* The Ultrasonic Inspections of the plate thickness transitions at two locations are in progress.
* The Ultrasonic Inspections of the Interior Surface of the Drywell in the Trenches in Bays 5 & 17 have been completed.
* The Ultrasonic Inspections of the Interior Surface of the Drywell in the Trenches in Bays 5 & 17 have been completed.
              <date>                           PRELIMINARY                                 4
<date>
PRELIMINARY 4


Dm Doc - Drywel   Incs 10-23 Issues Identified
Dm Doc - Drywel Incs 10-23 Issues Identified
* Standing water was identified in the trench inside the Drywell at the Drywell floor level in Bay 5 when the foam fill was removed for planned inspections.
* Standing water was identified in the trench inside the Drywell at the Drywell floor level in Bay 5 when the foam fill was removed for planned inspections.
* Dampness was identified in the other trench in Bay 17; however, no standing water was present.
* Dampness was identified in the other trench in Bay 17; however, no standing water was present.
* The Drywell drain trough may be a contributor to water leakage into the trench in Bay 5.
* The Drywell drain trough may be a contributor to water leakage into the trench in Bay 5.
      <date>                       PRELIMINARY                     5
<date>
PRELIMINARY 5


D.Asle Do- DreIIsetos1-23-06 !Aiex.pp omm                                              Page 61 Water in Bay 5 Trench Description of Findings and Actions to Resolve this Issue
D.Asle omm Do-DreIIsetos1-23-06 !Aiex.pp Page 61 Water in Bay 5 Trench Description of Findings and Actions to Resolve this Issue
          <date>                 PRELIMINARY       6
<date>
PRELIMINARY 6


                        .....
Drvwell Inspections 10-23-06 alex.ppt
                          ....
'Paqe-71 D. Ashley - 06mm Doc - Drvwell InsDections 10-23-06 alex.ppt PaQe 7 ~
                          .
Drvwell Inspections 10-23-06 alex.ppt               'Paqe-71 D. Ashley 06mm Doc Drvwell InsDections 10-23-06 alex.ppt
        -        -                                                      PaQe 7 ~
Issue Description When performing planned Non Destructive Examinations of the Drywell Shell from inside the Drywell, water was found in a trench area below the floor elevation.
Issue Description When performing planned Non Destructive Examinations of the Drywell Shell from inside the Drywell, water was found in a trench area below the floor elevation.
                  " A similar condition was identified in the mid 1990s and documented in the corrective action process.
" A similar condition was identified in the mid 1990s and documented in the corrective action process.
                  " The source of this water needs to be understood and addressed, and any impact on the drywell shell or concrete evaluated and addressed.
" The source of this water needs to be understood and addressed, and any impact on the drywell shell or concrete evaluated and addressed.
                  <date>                               PRELIMINARY     7
<date>
PRELIMINARY 7


D.AIshl Iey - Comm Doe - Drye I spetio1 1 6 alex.ppt                 Page 8 1 Drywell Design and Layout
D. A Ishl Iey - Comm Doe - Drye I spetio1 1 6 alex.ppt Page 8 1 Drywell Design and Layout
* The Drywell floor drain sump is located within the under-vessel area room o A concrete trough encircles the under-vessel area to channel any leakage in the drywell to the drywell sump
* The Drywell floor drain sump is located within the under-vessel area room o A concrete trough encircles the under-vessel area to channel any leakage in the drywell to the drywell sump
                      <date>                       PRELIMINARY       8
<date>
PRELIMINARY 8


D.Ashley - CommDoc "-"Drwell InIsections 10-23-06 alexIDr     Paae 94 Sketch Showing Lower Drywell - Sandbed, Trench and Sump
D. Ashley - CommDoc "- "Drwell InIsections 10-23-06 alexIDr Paae 94 Sketch Showing Lower Drywell - Sandbed, Trench and Sump
                        ?--eL .i /
?--eL  
.i  
/


11InsDections 10-23-06                                                           I Pid6l,61
11 InsDections 10-23-06 I Pid6l,61
: 0. Ashley Comm Doc Drvwell InsDections 10-23-06 alex.pDt
: 0. Ashley - Comm Doc - Drvwell InsDections 10-23-06 alex.pDt Paae 1O~
        -        -                                                                                            Paae 1O~
Trench Detail Sketch LIGNT DEN9ITY SILICONE ELASTOMER BY PROMATEC.
Trench Detail Sketch LIGNT DEN9ITY SILICONE ELASTOMER BY PROMATEC. INC.
INC.
DRWYELL                      TEdLGUREB                                   U1 L     V1.0.       FLOOR EL. I0'-3'
TEdLGUREB U1 L
                                                    -,..~~ .-~-.__                             r.EL. VARIES RTV FOAM CROSS-SECTION AREA OF TRENCHES IN BAYS 5 & 17
V1.0.
FLOOR EL.
I0'-3'
-,..~~.-~-.__
r.EL. VARIES DRWYELL RTV FOAM CROSS-SECTION AREA OF TRENCHES IN BAYS 5 & 17


mm Doc - Dryweil Inspections 10-23-06 alex.ppt     Page 11
mm Doc - Dryweil Inspections 10-23-06 alex.ppt Page 11
: 0. Ashley Comm Doe Drywell Inspections 10-23-06 alex.ppt
: 0. Ashley - Comm Doe - Drywell Inspections 10-23-06 alex.ppt Page 11~
        -        -
Page 11~
Plan View of Trough and Trenches
Plan View of Trough and Trenches
                  <date>                                   I1I
<date>
I1I


hley- mn Doe - Drywell Inspections 10-23-06 Alex. ppt   Pa-ae'121 Page 12~
hley-mn Doe - Drywell Inspections 10-23-06 Alex. ppt Pa-ae'121 D. Ashley - Comm Doc-Drywell Inspections 10-23-06 atex.ppt Page 12~
D.Ashley Comm Doc- Drywell Inspections 10-23-06 atex.ppt
        -
Top View - Drywell Floor Sketch 12
Top View - Drywell Floor Sketch 12


D.Ashle*y*- Comm Doe -Drywe i   pections
D. Ashle*y*- Comm Doe -Drywe i  
                                    .In 10-23-06 alex.ppt     ..*3q                 Page I As Found Condition
.In pections 10-23-06 alex.ppt Page
*3q I
As Found Condition
* Surface of drywell shell visible from trenches in Bays 5 and 17 exhibited a surface layer of iron oxide
* Surface of drywell shell visible from trenches in Bays 5 and 17 exhibited a surface layer of iron oxide
* Approximately 5" of water found in bottom of trench in Bay # 5, and trench in Bay 17 had only dampness 0 Connection between under-vessel area trough and floor drain sump potentially allowing water leakage
* Approximately 5" of water found in bottom of trench in Bay # 5, and trench in Bay 17 had only dampness 0 Connection between under-vessel area trough and floor drain sump potentially allowing water leakage
* Trough located in the under-vessel area is not lined, potentially allowing water passage into the concrete slab
* Trough located in the under-vessel area is not lined, potentially allowing water passage into the concrete slab
                    <date>                             PRELIMINARY                 13
<date>
PRELIMINARY 13


D. Ashley -Comm Doc Drywell Inspections 10-23-06 alex.ppt               Page 14 L Investigative/Corrective Actions Completed
D. Ashley -Comm Doc Drywell Inspections 10-23-06 alex.ppt Page 14 L
Investigative/Corrective Actions Completed
* Visual inspections and pictures taken of sump, trough and trench areas
* Visual inspections and pictures taken of sump, trough and trench areas
* Visual and Ultrasonic examinations of drywell shell in trench areas (as originally planned)
* Visual and Ultrasonic examinations of drywell shell in trench areas (as originally planned)
* Chemical Analysis of water samples from trench, sump and other areas
* Chemical Analysis of water samples from trench, sump and other areas
* Correlation and evaluation of water levels in sump, trough and trench areas
* Correlation and evaluation of water levels in sump, trough and trench areas
                  <date>                             PRELIMINARY   14
<date>
PRELIMINARY 14


D.Ashley - Comm Doc- Drywell Inspections 10-30 alxp                                           Pge 15, Actions Planned/Pending 0 Visual Examination (VT-1) of floor drain sump liner to look for evidence of a leak path
D. Ashley - Comm Doc-Drywell Inspections 10-30 alxp Pge 15, Actions Planned/Pending 0 Visual Examination (VT-1) of floor drain sump liner to look for evidence of a leak path
* Tracer test aimed at determining whether under-vessel trough is in communication with trench in Bay 5
* Tracer test aimed at determining whether under-vessel trough is in communication with trench in Bay 5
* Development of contingency repair to trough to address likely water source into trench
* Development of contingency repair to trough to address likely water source into trench
Line 134: Line 158:
* Perform evaluation of the impact of water that may exist beneath concrete surface on drywell shell
* Perform evaluation of the impact of water that may exist beneath concrete surface on drywell shell
* Development of contingency repair to caulk intersection of Drywell Shell and concrete slab curb
* Development of contingency repair to caulk intersection of Drywell Shell and concrete slab curb
                  <date>                           PRELIMINARY                             15
<date>
PRELIMINARY 15


D. Ashley - Comm Doc - Drywel Inspections 10-23-06 alex.ppt                       Pae 6 Current Conclusions Preliminary Inspection Results indicate that the Drywell Shell
D. Ashley - Comm Doc - Drywel Inspections 10-23-06 alex.ppt Pae 6 Current Conclusions Preliminary Inspection Results indicate that the Drywell Shell
                          - Retains its structural integrity
- Retains its structural integrity
                          - Provides margin to design safety function
- Provides margin to design safety function
                          - Supports plant operation for the period of extended operation
- Supports plant operation for the period of extended operation
                    <date>                             PRELIMINARY             16}}
<date>
PRELIMINARY 16}}

Latest revision as of 04:54, 15 January 2025

E-MAIL: (PD) Fwd: Power Point
ML063400249
Person / Time
Site: Oyster Creek
Issue date: 10/23/2006
From: Louise Lund
Office of Nuclear Reactor Regulation
To: Ashley D
Office of Nuclear Reactor Regulation
References
%dam200701, TAC 8261
Download: ML063400249 (18)


Text

D.Asley-Fd: Power point___

Page From:

To:

Date:

Subject:

Louise Lund D. Ashley 10/23/2006 5:22:28 PM Fwd: Power point

>>> <iohn.hufnael@exeloncorp.com> 10/23/2006 4:11 PM >>>

c:\\temp\\GW)00002.TMP Page'l 11 cAtemp\\GW}00002.TMP Page 14 Mail Envelope Properties (453D328E.90F : 10 :34922)

Subject:

Fwd: Power point Creation Date 10/23/2006 5:22:22 PM From:

Louise Lund Created By:

LXL@nrc.gov Recipients nrc.gov OWGWPOO1.HQGWDO01 DJA1 (D. Ashley)

Post Office Route OWGWPO01.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 663 23 October, 2006 5:22:22 PM Comm Doc - Drywell Inspections 10-23-06 alex.ppt 348160 23 October, 2006 5:22:12 PM Options Expiration Date:

None Priority:

Standard ReplyRequested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

D. Ashley -

Doc - Drywell Inspections 10-23-06 alex.ppt D. Ashley - Comm Doe :Drywell Inspections 10-23-06 alex.ppt Page 1 Oyster Creek 1R21 Outage Communication Package Related to Drywell Shell Inspections October 23, 2006

<date>

PRELIMINARY I

D. As' ý 1 e C-o-m I m I D oc D, ry, wellinspec I tions 10, 06 alex.ppt i

D. Ashley - Comm Doc - Drywell Inspections 10-23-06 alex.ppt Page 21 i

1R21 Drywell Inspections

  • Reactor Cavity Trough Drain Line
  • Sand Bed Region Poly Bottles

" Sand Bed Drain Lines

  • Epoxy Coating on External Surface of Drywell Sandbed in all 10 Bays
  • Internal Drywell Shell in Sand Bed Region Above Floor Elevation
  • Internal Drywell Shell in Upper Regions
  • Seal at the junction between drywell shell and concrete floor in Sand Bed Region
  • External Drywell Shell in Sand Bed Region
  • Plate Thickness Transitions at Two Elevations
  • Internal Drywell Shell in Trenches (Bays 5 and 17)

<date>

PRELIMINARY 2

D. Ashley ---, C I om 1, m Doc - Drvwe1rfhspe'ction's iO'-23-_O_6_'_a1'e'x.ppt Pag~e 3 D. Ashley - Comm Doc - Drywell tnsDections 10-23-06 aIex.pi~t Page 3 ~

Inspection Status (To Date)

  • The reactor cavity trough drain line is not clogged and is successfully removing a small amount of water entering the trough. Daily water leakage monitoring continues (as planned, strippable coating was applied to reactor cavity-before flood-up).

" There has been no water observed in the Sand Bed Regions and no water coming down through the air gap.

" There has been no water leakage from the Sand Bed Regions confirmed by the absence of water in the poly bottles. Daily monitoring of the poly bottles continues.

Two of the five Sand Bed drain lines were found to have some blockage and debris. These will be cleaned prior to restart.

The visual inspection of the epoxy coating on the external shell surface in the Sand Bed regions has been completed.

The seal at the junction of the drywell shell and the concrete floor in the Sand Bed region has been inspected.

<date>

PRELIMINARY 3

D.shey omm Doc - Drywel Inspecions-1-230

-lep Pagei Inspection Status (To Date) 0 The Ultrasonic Inspections of the Interior Surface of the Drywell in the Sand Bed regions have been completed.

  • The Ultrasonic Inspections of the Interior Surface of the Drywell in the Upper regions are in progress.

0 The Ultrasonic Inspections of the Exterior Surface of the Drywell in the Sand Bed regions are completed.

  • The Ultrasonic Inspections of the plate thickness transitions at two locations are in progress.
  • The Ultrasonic Inspections of the Interior Surface of the Drywell in the Trenches in Bays 5 & 17 have been completed.

<date>

PRELIMINARY 4

Dm Doc - Drywel Incs 10-23 Issues Identified

  • Standing water was identified in the trench inside the Drywell at the Drywell floor level in Bay 5 when the foam fill was removed for planned inspections.
  • Dampness was identified in the other trench in Bay 17; however, no standing water was present.
  • The Drywell drain trough may be a contributor to water leakage into the trench in Bay 5.

<date>

PRELIMINARY 5

D.Asle omm Do-DreIIsetos1-23-06 !Aiex.pp Page 61 Water in Bay 5 Trench Description of Findings and Actions to Resolve this Issue

<date>

PRELIMINARY 6

Drvwell Inspections 10-23-06 alex.ppt

'Paqe-71 D. Ashley - 06mm Doc - Drvwell InsDections 10-23-06 alex.ppt PaQe 7 ~

Issue Description When performing planned Non Destructive Examinations of the Drywell Shell from inside the Drywell, water was found in a trench area below the floor elevation.

" A similar condition was identified in the mid 1990s and documented in the corrective action process.

" The source of this water needs to be understood and addressed, and any impact on the drywell shell or concrete evaluated and addressed.

<date>

PRELIMINARY 7

D. A Ishl Iey - Comm Doe - Drye I spetio1 1 6 alex.ppt Page 8 1 Drywell Design and Layout

  • The Drywell floor drain sump is located within the under-vessel area room o A concrete trough encircles the under-vessel area to channel any leakage in the drywell to the drywell sump

<date>

PRELIMINARY 8

D. Ashley - CommDoc "- "Drwell InIsections 10-23-06 alexIDr Paae 94 Sketch Showing Lower Drywell - Sandbed, Trench and Sump

?--eL

.i

/

11 InsDections 10-23-06 I Pid6l,61

0. Ashley - Comm Doc - Drvwell InsDections 10-23-06 alex.pDt Paae 1O~

Trench Detail Sketch LIGNT DEN9ITY SILICONE ELASTOMER BY PROMATEC.

INC.

TEdLGUREB U1 L

V1.0.

FLOOR EL.

I0'-3'

-,..~~.-~-.__

r.EL. VARIES DRWYELL RTV FOAM CROSS-SECTION AREA OF TRENCHES IN BAYS 5 & 17

mm Doc - Dryweil Inspections 10-23-06 alex.ppt Page 11

0. Ashley - Comm Doe - Drywell Inspections 10-23-06 alex.ppt Page 11~

Plan View of Trough and Trenches

<date>

I1I

hley-mn Doe - Drywell Inspections 10-23-06 Alex. ppt Pa-ae'121 D. Ashley - Comm Doc-Drywell Inspections 10-23-06 atex.ppt Page 12~

Top View - Drywell Floor Sketch 12

D. Ashle*y*- Comm Doe -Drywe i

.In pections 10-23-06 alex.ppt Page

  • 3q I

As Found Condition

  • Surface of drywell shell visible from trenches in Bays 5 and 17 exhibited a surface layer of iron oxide
  • Approximately 5" of water found in bottom of trench in Bay # 5, and trench in Bay 17 had only dampness 0 Connection between under-vessel area trough and floor drain sump potentially allowing water leakage
  • Trough located in the under-vessel area is not lined, potentially allowing water passage into the concrete slab

<date>

PRELIMINARY 13

D. Ashley -Comm Doc Drywell Inspections 10-23-06 alex.ppt Page 14 L

Investigative/Corrective Actions Completed

  • Visual inspections and pictures taken of sump, trough and trench areas
  • Visual and Ultrasonic examinations of drywell shell in trench areas (as originally planned)
  • Chemical Analysis of water samples from trench, sump and other areas
  • Correlation and evaluation of water levels in sump, trough and trench areas

<date>

PRELIMINARY 14

D. Ashley - Comm Doc-Drywell Inspections 10-30 alxp Pge 15, Actions Planned/Pending 0 Visual Examination (VT-1) of floor drain sump liner to look for evidence of a leak path

  • Tracer test aimed at determining whether under-vessel trough is in communication with trench in Bay 5
  • Development of contingency repair to trough to address likely water source into trench
  • Complete non destructive examination and analysis of Drywell shell in trench areas
  • Perform evaluation of the impact of water that may exist beneath concrete surface on drywell shell
  • Development of contingency repair to caulk intersection of Drywell Shell and concrete slab curb

<date>

PRELIMINARY 15

D. Ashley - Comm Doc - Drywel Inspections 10-23-06 alex.ppt Pae 6 Current Conclusions Preliminary Inspection Results indicate that the Drywell Shell

- Retains its structural integrity

- Provides margin to design safety function

- Supports plant operation for the period of extended operation

<date>

PRELIMINARY 16