IR 05000280/2008001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:rch 3, 2008
{{#Wiki_filter:March 3, 2008


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:


==Dear Mr. Christian:==
==Dear Mr. Christian:==
On February 6, 2008, the NRC staff completed its performance review of the Surry Power  
On February 6, 2008, the NRC staff completed its performance review of the Surry Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.


This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.


Overall, Surry Power Station Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC
Overall, Surry Power Station Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include: TI 2515/166, Pressurized Water Reactor Containment Sump Blockage; TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies; and TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.
=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include: TI 2515/166, "Pressurized Water Reactor Containment Sump Blockage;" TI 2515/171, "Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies;" and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds."


The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
Line 37: Line 34:
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.


VEPCO 2In accordance with 10 CFR 2.390 of the NRC
VEPCO  
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.


Sincerely,
Sincerely,
/RA/ Eugene Guthrie, Chief Reactor Projects Branch 5  
/RA/  
 
Eugene Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects


Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37  
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37  


Enclosure: Surry Inspection/Activity Plan (03/01/08 - 06/30/09)  
Enclosure:
Surry Inspection/Activity Plan (03/01/08 - 06/30/09)  


cc w/encl.: (See page 3)  
cc w/encl.:  
(See page 3)  


_________________________ OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/ NAME JDodson DArnett LGarner EGuthrie DATE 2/28/08 2/27/08 3/3/08 3/3/08 3/ /2008 3/ /2008 3/ /2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 3 cc w/encl.:
_________________________
Chris L. Funderburk
OFFICE RII:DRP RII:DRP RII:DRP RII:DRP  


Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail Distribution
SIGNATURE
/RA/
/RA/
/RA/
/RA/


Donald E. Jernigan
NAME JDodson DArnett LGarner EGuthrie


Site Vice President Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution
DATE 2/28/08 2/27/08 3/3/08 3/3/08 3/ /2008 3/ /2008 3/ /2008 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO


Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197
VEPCO


Richmond, VA 23209  
cc w/encl.:
Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail Distribution
 
Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution
 
Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209  


Lillian M. Cuoco, Esq.
Lillian M. Cuoco, Esq.
Line 70: Line 82:
Millstone Power Station Electronic Mail Distribution  
Millstone Power Station Electronic Mail Distribution  


VEPCO 4Letter to Jeffrey B. Archie from Eugene F. Guthrie dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - SURRY POWER STATION NRC INSPECTION REPORT 05000280/2008001 AND 05000281/2008001 Distribution w/encl.:
VEPCO  
C. Evans, RII EICS (Part 72 Only)


Letter to Jeffrey B. Archie from Eugene F. Guthrie dated March 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - SURRY POWER STATION NRC INSPECTION REPORT 05000280/2008001 AND 05000281/2008001
Distribution w/encl.:
C. Evans, RII EICS (Part 72 Only)
L. Slack, RII EICS OE Mail (email address if applicable)
L. Slack, RII EICS OE Mail (email address if applicable)
S. P. Lingam, NRR Richard Jervey, NRR RIDSNRRDIRS  
S. P. Lingam, NRR Richard Jervey, NRR RIDSNRRDIRS PUBLIC
 
Surry Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 08:13:27 Report 22
 
OL EXAM
- INITIAL EXAM Not Applicable SURRY/MARCH 2008 EXAM AT POWER FACILITIES 03/17/2008 03/28/2008
 
V23279
 
EB1-SUMP
- TI 2515/166 CONTAINMENT SUMP INSPECTION Safety Issues Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
05/05/2008 05/09/2008
 
2515/166 IP
 
EB3-ISI
- UNIT 2 - ISI Baseline Inspections Inservice Inspection Activities - PWR 05/05/2008 05/09/2008
 
7111108P IP
 
EB3TI172
- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 05/05/2008 05/09/2008 1, 2 2515/172 IP
 
EB3SGISI
- U2 SG ISI Baseline Inspections Inservice Inspection Activities - PWR 05/12/2008 05/16/2008
 
7111108P IP
 
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 06/23/2008 06/25/2008 1, 2 7112101 IP
 
EB3-HS
- HEAT SINK Baseline Inspections Heat Sink Performance 06/23/2008 06/27/2008 1, 2 7111107B IP
 
PSB1-EP
- EP INSP EP Baseline Inspection Alert and Notification System Testing 07/14/2008 07/18/2008 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 07/14/2008 07/18/2008 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 07/14/2008 07/18/2008 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 07/14/2008 07/18/2008 1, 2 7111405 IP Baseline Inspections Drill/Exercise Performance 07/14/2008 07/18/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 07/14/2008 07/18/2008 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 07/14/2008 07/18/2008 1, 2 71151-EP03 IP
 
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Access Control to Radiologically Significant Areas 07/28/2008 08/01/2008 1, 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 07/28/2008 08/01/2008 1, 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/28/2008 08/01/2008 1, 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/28/2008 08/01/2008 1, 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 07/28/2008 08/01/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 07/28/2008 08/01/2008 1, 2 71151-PR01 IP
 
TI-171
- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/04/2008 08/08/2008 1, 2 2515/171 IP
 
OL RQ
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 04/06/2009 04/10/2009 1, 2 7111111B IP
 
EB3ISI
- UNIT 1 ISI Baseline Inspections Inservice Inspection Activities - PWR 04/27/2009 05/01/2009
 
7111108P IP This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.


PUBLIC
Surry Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 08:13:27 Report 22


SurryInspection / Activity Plan03/01/2008-06/30/2009InspectionTypeInspection ActivityPlanned DatesStart EndNo. of Staffon SiteTitleUnitNumberPage 1 of 203/03/200808:13:27Report 22 4OL EXAM-INITIAL EXAMNot ApplicableSURRY/MARCH 2008 EXAM AT POWER FACILITIES03/17/200803/28/20081 V23279 1EB1-SUMP-TI 2515/166 CONTAINMENT SUMP INSPECTIONSafety IssuesPressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]05/05/200805/09/20082 2515/166IP 2EB3-ISI-UNIT 2 - ISIBaseline InspectionsInservice Inspection Activities - PWR05/05/200805/09/20082 7111108PIP 2EB3TI172-TI-172Generic Safety InspectionReactor Coolant System Dissimiliar Metal Butt Welds05/05/200805/09/20081, 2 2515/172IP 1EB3SGISI-U2 SG ISIBaseline InspectionsInservice Inspection Activities - PWR05/12/200805/16/20082 7111108PIP 1PSB1-RP-RADIATION PROTECTION PREINSPECTION VISITBaseline InspectionsAccess Control to Radiologically Significant Areas06/23/200806/25/20081, 2 7112101IP 1EB3-HS-HEAT SINKBaseline InspectionsHeat Sink Performance06/23/200806/27/20081, 2 7111107BIP 1PSB1-EP-EP INSPEP Baseline InspectionAlert and Notification System Testing07/14/200807/18/20081, 2 7111402IPEP Baseline InspectionEmergency Response Organization Augmentation Testing07/14/200807/18/20081, 2 7111403IPEP Baseline InspectionEmergency Action Level and Emergency Plan Changes07/14/200807/18/20081, 2 7111404IPEP Baseline InspectionCorrection of Emergency Preparedness Weaknesses and Deficiencies07/14/200807/18/20081, 2 7111405IPBaseline InspectionsDrill/Exercise Performance07/14/200807/18/20081, 2 71151-EP01IPBaseline InspectionsERO Drill Participation07/14/200807/18/20081, 2 71151-EP02IPBaseline InspectionsAlert & Notification System07/14/200807/18/20081, 2 71151-EP03IP 4PSB1-RP-RADIATION PROTECTION PUBLIC BASELINEBaseline InspectionsAccess Control to Radiologically Significant Areas07/28/200808/01/20081, 2 7112101IPBaseline InspectionsRadiation Monitoring Instrumentation and Protective Equipment07/28/200808/01/20081, 2 7112103IPBaseline InspectionsRadioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems07/28/200808/01/20081, 2 7112201IPBaseline InspectionsRadiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program07/28/200808/01/20081, 2 7112203IPBaseline InspectionsOccupational Exposure Control Effectiveness07/28/200808/01/20081, 2 71151-OR01IPBaseline InspectionsRETS/ODCM Radiological Effluent07/28/200808/01/20081, 2 71151-PR01IP 3TI-171-B.5.B PHASE 2&3Generic Safety InspectionVerification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies08/04/200808/08/20081, 2 2515/171IP 2OL RQ-REQUAL INSPECTIONBaseline InspectionsLicensed Operator Requalification Program04/06/200904/10/20091, 2 7111111BIP 1EB3ISI-UNIT 1 ISIBaseline InspectionsInservice Inspection Activities - PWR04/27/200905/01/20091 7111108PIPThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
TFPI
- TFPI Baseline Inspections Fire Protection [Triennial]
06/08/2009 06/12/2009 1, 2 7111105T IP Baseline Inspections Fire Protection [Triennial]
06/22/2009 06/26/2009 1, 2 7111105T IP This report does not include INPO and OUTAGE activities.


SurryInspection / Activity Plan03/01/2008-06/30/2009InspectionTypeInspection ActivityPlanned DatesStart EndNo. of Staffon SiteTitleUnitNumberPage 2 of 203/03/200808:13:27Report 22 6TFPI-TFPIBaseline InspectionsFire Protection [Triennial]06/08/200906/12/20091, 2 7111105TIPBaseline InspectionsFire Protection [Triennial]06/22/200906/26/20091, 2 7111105TIPThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 17:53, 14 January 2025

Annual Assessment Letter (NRC Inspection Report 05000280/2008001 and 05000281/2008001)
ML080630294
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/03/2008
From: Eugene Guthrie
NRC/RGN-II/DRP/RPB5
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-001
Download: ML080630294 (7)


Text

March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - SURRY POWER STATION (NRC INSPECTION REPORT 05000280/2008001 AND 05000281/2008001)

Dear Mr. Christian:

On February 6, 2008, the NRC staff completed its performance review of the Surry Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Surry Power Station Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include: TI 2515/166, Pressurized Water Reactor Containment Sump Blockage; TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies; and TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

VEPCO

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eugene Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects

Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure:

Surry Inspection/Activity Plan (03/01/08 - 06/30/09)

cc w/encl.:

(See page 3)

_________________________

OFFICE RII:DRP RII:DRP RII:DRP RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

/RA/

NAME JDodson DArnett LGarner EGuthrie

DATE 2/28/08 2/27/08 3/3/08 3/3/08 3/ /2008 3/ /2008 3/ /2008 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

VEPCO

cc w/encl.:

Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail Distribution

Donald E. Jernigan Site Vice President Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution

Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209

Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Millstone Power Station Electronic Mail Distribution

VEPCO

Letter to Jeffrey B. Archie from Eugene F. Guthrie dated March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - SURRY POWER STATION NRC INSPECTION REPORT 05000280/2008001 AND 05000281/2008001

Distribution w/encl.:

C. Evans, RII EICS (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

S. P. Lingam, NRR Richard Jervey, NRR RIDSNRRDIRS PUBLIC

Surry Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 08:13:27 Report 22

OL EXAM

- INITIAL EXAM Not Applicable SURRY/MARCH 2008 EXAM AT POWER FACILITIES 03/17/2008 03/28/2008

V23279

EB1-SUMP

- TI 2515/166 CONTAINMENT SUMP INSPECTION Safety Issues Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

05/05/2008 05/09/2008

2515/166 IP

EB3-ISI

- UNIT 2 - ISI Baseline Inspections Inservice Inspection Activities - PWR 05/05/2008 05/09/2008

7111108P IP

EB3TI172

- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 05/05/2008 05/09/2008 1, 2 2515/172 IP

EB3SGISI

- U2 SG ISI Baseline Inspections Inservice Inspection Activities - PWR 05/12/2008 05/16/2008

7111108P IP

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 06/23/2008 06/25/2008 1, 2 7112101 IP

EB3-HS

- HEAT SINK Baseline Inspections Heat Sink Performance 06/23/2008 06/27/2008 1, 2 7111107B IP

PSB1-EP

- EP INSP EP Baseline Inspection Alert and Notification System Testing 07/14/2008 07/18/2008 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 07/14/2008 07/18/2008 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 07/14/2008 07/18/2008 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 07/14/2008 07/18/2008 1, 2 7111405 IP Baseline Inspections Drill/Exercise Performance 07/14/2008 07/18/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 07/14/2008 07/18/2008 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 07/14/2008 07/18/2008 1, 2 71151-EP03 IP

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Access Control to Radiologically Significant Areas 07/28/2008 08/01/2008 1, 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 07/28/2008 08/01/2008 1, 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/28/2008 08/01/2008 1, 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/28/2008 08/01/2008 1, 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 07/28/2008 08/01/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 07/28/2008 08/01/2008 1, 2 71151-PR01 IP

TI-171

- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/04/2008 08/08/2008 1, 2 2515/171 IP

OL RQ

- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 04/06/2009 04/10/2009 1, 2 7111111B IP

EB3ISI

- UNIT 1 ISI Baseline Inspections Inservice Inspection Activities - PWR 04/27/2009 05/01/2009

7111108P IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Surry Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 08:13:27 Report 22

TFPI

- TFPI Baseline Inspections Fire Protection [Triennial]

06/08/2009 06/12/2009 1, 2 7111105T IP Baseline Inspections Fire Protection [Triennial]

06/22/2009 06/26/2009 1, 2 7111105T IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.