ML080810005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:April 9, 2008  
{{#Wiki_filter:April 9, 2008 Mr. Robert Perry South Carolina Department of Natural Resources Office of Environmental Programs 1000 Assembly Street Room 310A, PO Box 167 Columbia, SC 29202  
 
Mr. Robert Perry  
 
South Carolina Department of Natural Resources  
 
Office of Environmental Programs  
 
1000 Assembly Street  
 
Room 310A, PO Box 167
 
Columbia, SC 29202  


==SUBJECT:==
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW  


==Dear Mr. Perry:==
==Dear Mr. Perry:==
 
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the operating license for Vogtle Electric Generating Plant, Units 1 and 2 (VEGP), which is located in Burke County, Georgia. VEGP is operated by Southern Nuclear Operating Company, Inc.
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the  
(SNC). As part of its review of the proposed action, the NRC staff has prepared a site-specific Supplemental Environmental Impact Statement (SEIS) to its AGeneric Environmental Impact Statement for License Renewal of Nuclear Plants@ (GEIS), NUREG-1437. The SEIS includes analyses of relevant environmental issues pertaining to extended operation and refurbishment activities associated with license renewal. In accordance with the Fisheries and Wildlife Coordination Act, a copy of the draft supplement is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
The NRC staff determined that the area of potential effect for a license renewal action is the area at the power plant site and its immediate environs that may be affected by post-license renewal land disturbing operation or projected refurbishment activities associated with the proposed action. Please note, there are no projected refurbishment activities associated with license renewal. In the context of the National Environmental Policy Act of 1969, under which the draft environmental impact statement was prepared, the NRC staff=s preliminary determination is that the impact of license renewal on examined resources is small.
operating license for Vogtle Electric Generating Plant, Units 1 and 2 (VEGP), which is located in  
Please note that the period for public comment expires on July 17, 2008. If your office requires additional time, or if there are any other questions regarding this correspondence, please have your representative contact the Environmental Project Manager, Mr. J.P. Leous, at 301-415-2864 or by e-mail at justin.leous@nrc.gov.
 
Burke County, Georgia. VEGP is operated by Southern Nuclear Operating Company, Inc. (SNC). As part of its review of the proposed action, the NRC staff has prepared a site-specific  
 
Supplemental Environmental Impact Statement (SEIS) to its A Generic Environmental Impact Statement for License Renewal of Nuclear Plants
@ (GEIS), NUREG-1437. The SEIS includes analyses of relevant environmental issues per taining to extended operation and refurbishment activities associated with license renewal. In accordance with the Fisheries and Wildlife  
 
Coordination Act, a copy of the draft supplement is enclosed. Pursuant to 36 CFR 800.8(c), we  
 
are requesting your comments on the draft supplement and on our preliminary conclusions.  
 
The NRC staff determined that the area of potential effect for a license renewal action is the  
 
area at the power plant site and its immediate environs that may be affected by post-license  
 
renewal land disturbing operation or projected refurbishment activities associated with the  
 
proposed action. Please note, there are no projected refurbishment activities associated with  
 
license renewal. In the context of the National Environmental Policy Act of 1969, under which  
 
the draft environmental impact statement was prepared, the NRC staff
=s preliminary determination is that the impact of license renewal on examined resources is small.  
 
Please note that the period for public comment expires on July 17, 2008. If your office requires  
 
additional time, or if there are any other questions regarding this correspondence, please have  
 
your representative contact the Environmental Project Manager, Mr. J.P. Leous, at
 
301-415-2864 or by e-mail at justin.leous@nrc.gov
.
Sincerely,  
Sincerely,  
      /RA Donnie Ashley for/
/RA Donnie Ashley for/
Louise Lund, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424, 50-425  
Louise Lund, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424, 50-425  


==Enclosures:==
==Enclosures:==
As stated


As stated 
cc w/encl: See next page  
 
cc w/encl: See next page April 9, 2008 Mr. Robert Perry
 
South Carolina Department of Natural Resources
 
Office of Environmental Programs
 
1000 Assembly Street
 
Room 310A, PO Box 167 


Columbia, SC 29202  
April 9, 2008 Mr. Robert Perry South Carolina Department of Natural Resources Office of Environmental Programs 1000 Assembly Street Room 310A, PO Box 167 Columbia, SC 29202  


==SUBJECT:==
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW  


==Dear Mr. Perry:==
==Dear Mr. Perry:==
 
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the operating license for Vogtle Electric Generating Plant, Units 1 and 2 (VEGP), which is located in Burke County, Georgia. VEGP is operated by Southern Nuclear Operating Company, Inc.
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the  
(SNC). As part of its review of the proposed action, the NRC staff has prepared a site-specific Supplemental Environmental Impact Statement (SEIS) to its AGeneric Environmental Impact Statement for License Renewal of Nuclear Plants@ (GEIS), NUREG-1437. The SEIS includes analyses of relevant environmental issues pertaining to extended operation and refurbishment activities associated with license renewal. In accordance with the Fisheries and Wildlife Coordination Act, a copy of the draft supplement is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
The NRC staff determined that the area of potential effect for a license renewal action is the area at the power plant site and its immediate environs that may be affected by post-license renewal land disturbing operation or projected refurbishment activities associated with the proposed action. Please note, there are no projected refurbishment activities associated with license renewal. In the context of the National Environmental Policy Act of 1969, under which the draft environmental impact statement was prepared, the NRC staff=s preliminary determination is that the impact of license renewal on examined resources is small.
operating license for Vogtle Electric Generating Plant, Units 1 and 2 (VEGP), which is located in  
Please note that the period for public comment expires on July 17, 2008. If your office requires additional time, or if there are any other questions regarding this correspondence, please have your representative contact the Environmental Project Manager, Mr. J.P. Leous, at 301-415-2864 or by e-mail at justin.leous@nrc.gov.
 
Sincerely,  
Burke County, Georgia. VEGP is operated by Southern Nuclear Operating Company, Inc. (SNC). As part of its review of the proposed action, the NRC staff has prepared a site-specific  
/RA Donnie Ashley for/
 
Louise Lund, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424, 50-425  
Supplemental Environmental Impact Statement (SEIS) to its A Generic Environmental Impact Statement for License Renewal of Nuclear Plants
@ (GEIS), NUREG-1437. The SEIS includes analyses of relevant environmental issues per taining to extended operation and refurbishment activities associated with license renewal. In accordance with the Fisheries and Wildlife  
 
Coordination Act, a copy of the draft supplement is enclosed. Pursuant to 36 CFR 800.8(c), we  
 
are requesting your comments on the draft supplement and on our preliminary conclusions.  
 
The NRC staff determined that the area of potential effect for a license renewal action is the  
 
area at the power plant site and its immediate environs that may be affected by post-license  
 
renewal land disturbing operation or projected refurbishment activities associated with the  
 
proposed action. Please note, there are no projected refurbishment activities associated with  
 
license renewal. In the context of the National Environmental Policy Act of 1969, under which  
 
the draft environmental impact  
 
statement was prepared, the NRC staff
=s preliminary determination is that the impact of license renewal on examined resources is small.  
 
Please note that the period for public comment expires on July 17, 2008. If your office requires  
 
additional time, or if there are any other questions regarding this correspondence, please have  
 
your representative contact the Environmental Project Manager, Mr. J.P. Leous, at
 
301-415-2864 or by e-mail at justin.leous@nrc.gov
.
Sincerely,       /RA Donnie Ashley for/ Louise Lund, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424, 50-425  


==Enclosures:==
==Enclosures:==
As stated cc w/encl: See next page  
As stated cc w/encl: See next page DISTRIBUTION: See next page ADAMS Accession Number: ML080810005 OFFICE LA:DLR PM:DLR:RPB1 DLR:RPB1 OGC BC:DLR:RPB1 NAME SFigueroa JPLeous SHernandez LSubin LLund (DAshley for)
 
DATE 04/9/08 03/21/08 03/24/08 04/1/08 04/9/08  
DISTRIBUTION: See next page ADAMS Accession Number:
ML080810005 OFFICE LA:DLR PM:DLR:RPB1 DLR:RPB1 OGC BC:DLR:RPB1  
 
NAME SFigueroa JPLeous SHernandez LSubin LLund (DAshley for)  
 
DATE 04/9/08 03/21/08 03/24/08 04/1/08   04/9/08 OFFICIAL RECORD COPY 


Letter to R. Perry from L. Lund, dated April 9, 2008
OFFICIAL RECORD COPY


DISTRIBUTION
Letter to R. Perry from L. Lund, dated April 9, 2008 DISTRIBUTION:  
:


==SUBJECT:==
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW  
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW HARD COPY:
 
DLR R/F E-MAIL:
HARD COPY: DLR R/F E-MAIL: S. Lee R. Franovich  
S. Lee R. Franovich L. Lund E. Benner J. Leous S. Hernandez Bobbie.hurley@earthtech.com D. Ashley S. Lingam G. McCoy S. Shaeffer RidsOGCMailRoom DLR/REBB DLR/REBA R. Hannah  
 
L. Lund E. Benner  
 
J. Leous S. Hernandez  
 
Bobbie.hurley@earthtech.com  
 
D. Ashley  
 
S. Lingam  
 
G. McCoy S. Shaeffer  
 
RidsOGCMailRoom  
 
DLR/REBB DLR/REBA R. Hannah Vogtle Electric Generating Plant, Units 1 and 2
 
cc:
 
Mr. Tom E. Tynan 
 
Vice President - Vogtle
 
Vogtle Electric Generating Plant       
 
7821 River Road
 
Waynesboro, GA  30830
 
Mr. N. J. Stringfellow
 
Manager, Licensing
 
Southern Nuclear Operating Company, Inc.
 
P.O. Box 1295
 
Birmingham, AL  35201-1295
 
Mr. Jeffrey T. Gasser
 
Executive Vice President
 
Southern Nuclear Operating Company, Inc.
 
P.O. Box 1295
 
Birmingham, AL  35201-1295
 
Mr. Steven M. Jackson
 
Senior Engineer - Power Supply
 
Municipal Electric Authority of Georgia
 
1470 Riveredge Parkway, NW
 
Atlanta, GA  30328-4684
 
Mr. Reece McAlister
 
Executive Secretary
 
Georgia Public Service Commission
 
244 Washington Street, SW
 
Atlanta, GA  30334
 
Mr. Harold Reheis, Director
 
Department of Natural Resources
 
205 Butler Street, SE, Suite 1252
 
Atlanta, GA  30334
 
Attorney General
 
Law Department
 
132 Judicial Building
 
Atlanta, GA  30334
 
Mr. Laurence Bergen
 
Oglethorpe Power Corporation
 
2100 East Exchange Place
 
P.O. Box 1349
 
Tucker, GA  30085-1349
 
Arthur H. Domby, Esquire
 
Troutman Sanders
 
Nations Bank Plaza
 
600 Peachtree Street, NE
 
Suite 5200
 
Atlanta, GA  30308-2216
 
Resident Inspector
 
Vogtle Plant
 
8805 River Road
 
Waynesboro, GA  30830
 
Office of the County Commissioner
 
Burke County Commission
 
Waynesboro, GA  30830
 
Mr. Stanford M. Blanton, Esq.
 
Balch & Bingham, LLP
 
P.O. Box 306
 
Birmingham, AL  35201
 
Ms. Monica M. Caston
 
Vice President and General Counsel
 
Southern Nuclear Operating Company, Inc.
 
40 Inverness Center Parkway
 
P.O. Box 1295
 
Birmingham, AL  35201-1295
 
Chalmer R. Myer
 
Southern Nuclear Operating Company, Inc.
 
40 Inverness Center Parkway
 
P.O. Box 1295


Birmingham, AL 35201-1295}}
Vogtle Electric Generating Plant, Units 1 and 2 cc:
Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA 30334 Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Arthur H. Domby, Esquire Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216 Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA 30830 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Mr. Stanford M. Blanton, Esq.
Balch & Bingham, LLP P.O. Box 306 Birmingham, AL 35201 Ms. Monica M. Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295 Chalmer R. Myer Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295}}

Latest revision as of 17:33, 14 January 2025

License Renewal Application Review
ML080810005
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/09/2008
From: Lund A
NRC/NRR/ADRO/DLR
To: Perry R
State of SC, Dept of Natural Resources
Leous, JP, DLR/REBB 301-415-2864
References
Download: ML080810005 (5)


Text

April 9, 2008 Mr. Robert Perry South Carolina Department of Natural Resources Office of Environmental Programs 1000 Assembly Street Room 310A, PO Box 167 Columbia, SC 29202

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

Dear Mr. Perry:

The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the operating license for Vogtle Electric Generating Plant, Units 1 and 2 (VEGP), which is located in Burke County, Georgia. VEGP is operated by Southern Nuclear Operating Company, Inc.

(SNC). As part of its review of the proposed action, the NRC staff has prepared a site-specific Supplemental Environmental Impact Statement (SEIS) to its AGeneric Environmental Impact Statement for License Renewal of Nuclear Plants@ (GEIS), NUREG-1437. The SEIS includes analyses of relevant environmental issues pertaining to extended operation and refurbishment activities associated with license renewal. In accordance with the Fisheries and Wildlife Coordination Act, a copy of the draft supplement is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.

The NRC staff determined that the area of potential effect for a license renewal action is the area at the power plant site and its immediate environs that may be affected by post-license renewal land disturbing operation or projected refurbishment activities associated with the proposed action. Please note, there are no projected refurbishment activities associated with license renewal. In the context of the National Environmental Policy Act of 1969, under which the draft environmental impact statement was prepared, the NRC staff=s preliminary determination is that the impact of license renewal on examined resources is small.

Please note that the period for public comment expires on July 17, 2008. If your office requires additional time, or if there are any other questions regarding this correspondence, please have your representative contact the Environmental Project Manager, Mr. J.P. Leous, at 301-415-2864 or by e-mail at justin.leous@nrc.gov.

Sincerely,

/RA Donnie Ashley for/

Louise Lund, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424, 50-425

Enclosures:

As stated

cc w/encl: See next page

April 9, 2008 Mr. Robert Perry South Carolina Department of Natural Resources Office of Environmental Programs 1000 Assembly Street Room 310A, PO Box 167 Columbia, SC 29202

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

Dear Mr. Perry:

The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the operating license for Vogtle Electric Generating Plant, Units 1 and 2 (VEGP), which is located in Burke County, Georgia. VEGP is operated by Southern Nuclear Operating Company, Inc.

(SNC). As part of its review of the proposed action, the NRC staff has prepared a site-specific Supplemental Environmental Impact Statement (SEIS) to its AGeneric Environmental Impact Statement for License Renewal of Nuclear Plants@ (GEIS), NUREG-1437. The SEIS includes analyses of relevant environmental issues pertaining to extended operation and refurbishment activities associated with license renewal. In accordance with the Fisheries and Wildlife Coordination Act, a copy of the draft supplement is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.

The NRC staff determined that the area of potential effect for a license renewal action is the area at the power plant site and its immediate environs that may be affected by post-license renewal land disturbing operation or projected refurbishment activities associated with the proposed action. Please note, there are no projected refurbishment activities associated with license renewal. In the context of the National Environmental Policy Act of 1969, under which the draft environmental impact statement was prepared, the NRC staff=s preliminary determination is that the impact of license renewal on examined resources is small.

Please note that the period for public comment expires on July 17, 2008. If your office requires additional time, or if there are any other questions regarding this correspondence, please have your representative contact the Environmental Project Manager, Mr. J.P. Leous, at 301-415-2864 or by e-mail at justin.leous@nrc.gov.

Sincerely,

/RA Donnie Ashley for/

Louise Lund, Branch Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424, 50-425

Enclosures:

As stated cc w/encl: See next page DISTRIBUTION: See next page ADAMS Accession Number: ML080810005 OFFICE LA:DLR PM:DLR:RPB1 DLR:RPB1 OGC BC:DLR:RPB1 NAME SFigueroa JPLeous SHernandez LSubin LLund (DAshley for)

DATE 04/9/08 03/21/08 03/24/08 04/1/08 04/9/08

OFFICIAL RECORD COPY

Letter to R. Perry from L. Lund, dated April 9, 2008 DISTRIBUTION:

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW HARD COPY:

DLR R/F E-MAIL:

S. Lee R. Franovich L. Lund E. Benner J. Leous S. Hernandez Bobbie.hurley@earthtech.com D. Ashley S. Lingam G. McCoy S. Shaeffer RidsOGCMailRoom DLR/REBB DLR/REBA R. Hannah

Vogtle Electric Generating Plant, Units 1 and 2 cc:

Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA 30334 Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Arthur H. Domby, Esquire Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216 Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA 30830 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Mr. Stanford M. Blanton, Esq.

Balch & Bingham, LLP P.O. Box 306 Birmingham, AL 35201 Ms. Monica M. Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295 Chalmer R. Myer Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295