| issue date = 05/27/2008
| issue date = 05/27/2008
| title = IR 05000030-08-001 (DNMS) and 05000185-08-001 (DNMS) - February 5-7, 2008, and May 15, 2008, Nasa Plum Brook Reactor Facility
| title = IR 05000030-08-001 (DNMS) and 05000185-08-001 (DNMS) - February 5-7, 2008, and May 15, 2008, Nasa Plum Brook Reactor Facility
| author name = Louden P L
| author name = Louden P
| author affiliation = NRC/RGN-III/DNMS/DB
| author affiliation = NRC/RGN-III/DNMS/DB
| addressee name = Whitlow W
| addressee name = Whitlow W
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:May 27, 2008
[[Issue date::May 27, 2008]]


Dr. Woodrow Whitlow, Jr., Director NASA Glenn Research Center at Lewis Field 21000 Brookpark Road M.S. 3-2 Cleveland, OH 44135
==SUBJECT:==
NRC INSPECTION REPORTS 050-00030/08-01(DNMS) AND


SUBJECT: NRC INSPECTION REPORTS 050-00030/08-01(DNMS) AND 050-00185/08-01(DNMS) - NASA PLUM BROOK REACTOR FACILITY
050-00185/08-01(DNMS) - NASA PLUM BROOK REACTOR FACILITY


==Dear Dr. Whitlow:==
==Dear Dr. Whitlow:==
On May 15, 2008, the NRC completed inspection activities at the NASA Plum Brook Reactor Facility. The purpose of the inspection was to determine whether the decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an onsite inspection on February 5-7, 2008, the inspector evaluated decommissioning performance and radiation survey activities. Accompanying the inspector during the inspection were personnel from the Oak Ridge Institute for Science and Education (ORISE), who performed confirmatory surveys of the Plum Brook Reactor facilities. At the conclusion of the on-site inspection on February 7, 2008, the inspectors discussed the inspection findings with members of your staff. A final report from ORISE of the results of their confirmatory surveys was provided to the NRC on May 13, 2008.
On May 15, 2008, the NRC completed inspection activities at the NASA Plum Brook Reactor Facility. The purpose of the inspection was to determine whether the decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an onsite inspection on February 5-7, 2008, the inspector evaluated decommissioning performance and radiation survey activities. Accompanying the inspector during the inspection were personnel from the Oak Ridge Institute for Science and Education (ORISE), who performed confirmatory surveys of the Plum Brook Reactor facilities. At the conclusion of the on-site inspection on February 7, 2008, the inspectors discussed the inspection findings with members of your staff. A final report from ORISE of the results of their confirmatory surveys was provided to the NRC on May 13, 2008.


This inspection consisted of an examination of decommissioning activities at the NASA Plum Brook Reactor Facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, and interviews with personnel.
This inspection consisted of an examination of decommissioning activities at the NASA Plum Brook Reactor Facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, and interviews with personnel.


Based on the results of this inspection, the NRC did not identify any violations.
Based on the results of this inspection, the NRC did not identify any violations.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRC's document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.


Sincerely,/RA/ Patrick L. Louden, Chief Decommissioning Branch Docket Nos.: 050-00030 and 050-00185 License Nos.: TR-3 and R-93
Sincerely,
/RA/  


===Enclosure:===
Patrick L. Louden, Chief Decommissioning Branch
NRC Inspection Reports 050-00030/08-01(DNMS) and 050-00185/08-01(DNMS)
 
cc w/encl: Radiation Health Program Director, Ohio Department of Health (ODH) S. Helmer, ODH M. Rubadue, ODH Ohio Environmental Protection Agency, Division of Planning K. Peecook, NASA, Plum Brook Station DISTRIBUTION w/encl:
Docket Nos.: 050-00030 and 050-00185 License Nos.: TR-3 and R-93
 
Enclosure:
NRC Inspection Reports 050-00030/08-01(DNMS)
and 050-00185/08-01(DNMS)  
 
cc w/encl:
Radiation Health Program Director, Ohio Department of Health (ODH)  
 
S. Helmer, ODH  
 
M. Rubadue, ODH  
 
Ohio Environmental Protection Agency, Division of Planning  
 
K. Peecook, NASA, Plum Brook Station  
 
DISTRIBUTION w/encl:
Docket File K. McConnell, FSME C. Glenn, FSME M. Satorius, RIII S. Reynolds, RIII RIII PRR ROPreports@nrc.gov  
Docket File K. McConnell, FSME C. Glenn, FSME M. Satorius, RIII S. Reynolds, RIII RIII PRR ROPreports@nrc.gov  


DOCUMENT NAME: G:\SEC\Work in progress\NASA 2008001.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME WGSnell:mb PLLouden DATE 05/27/08 05/27/08 OFFICIAL RECORD COPY
DOCUMENT NAME: G:\\SEC\\Work in progress\\NASA 2008001.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  
 
RIII  
 
RIII  
 
RIII  
 
NAME WGSnell:mb PLLouden  
 
DATE 05/27/08 05/27/08  
 
OFFICIAL RECORD COPY  
 
Enclosure
 
EXECUTIVE SUMMARY
 
NASA Plum Brook Reactor Facility Inspection Report Nos. 050-00030/08-01(DNMS) and 050-00185/08-01(DNMS)
 
This routine decommissioning inspection included a review of the licensees current performance related to decommissioning activities and in-process confirmatory survey activities.
 
Research and Test Reactor Decommissioning
 
In-process independent confirmatory surveys have validated the adequacy and accuracy of the licensees procedures and final status survey (FSS) results. Reviews of FSS records verified that residual contamination was less than the derived concentration guideline levels (DCGLs)
stated in the licensee=s final status survey plan.
 
Enclosure
 
Report Details1
 
1.0 Research and Test Reactor Decommissioning (69013)
 
1.1 Inspection Scope
 
In-process independent confirmatory surveys were conducted by personnel from the Oak Ridge Institute for Science and Education (ORISE) to assist the NRC in determining the adequacy and accuracy of the licensees procedures and final status survey (FSS)
results. Independent and side by side surveys were conducted in the Reactor Office and Laboratory Building (ROLB), the Sub-Pile Room and adjoining hallway within the Containment Vessel, and the Cold Pipe Tunnel within the Reactor Service Equipment Building. ORISE personnel also reviewed a number of licensee survey design/survey request packages, and the licensees survey methodology.


Enclosure 2 EXECUTIVE SUMMARY NASA Plum Brook Reactor Facility Inspection Report Nos. 050-00030/08-01(DNMS) and 050-00185/08-01(DNMS)
Under separate cover letters, the licensee has provided the NRC with survey unit release records for embedded and underground piping and for surface areas in various locations throughout the site. These final status survey (FSS) result documents have been scanned into the NRCs electronic data system, ADAMS. The date of the cover letter under which the survey records were sent to the NRC and the ADAMS accession numbers for the records are:


This routine decommissioning inspection included a review of the licensee's current performance related to decommissioning activities and in-process confirmatory survey activities.
October 23, 2007 (ML0080390430, ML0080390434, ML0080390437, ML0080390439, ML0080390445, ML0080390447, ML0080390455, ML0080390457, ML0080390458, ML0080390461, ML0080390469, ML0080390476);


Research and Test Reactor Decommissioning In-process independent confirmatory surveys have validated the adequacy and accuracy of the licensee's procedures and final status survey (FSS) results. Reviews of FSS records verified that residual contamination was less than the derived concentration guideline levels (DCGLs) stated in the licensee
November 12, 2007 (ML073170329, ML073170334, ML073170335, ML073170339, ML073170344, ML073170358, ML073170366, ML073170371, ML073170377, ML073170381, ML073170389, ML073170393, ML073170418, ML073170421, ML073170440, ML073170445, ML073170450);
=s final status survey plan.


Enclosure 3 Report Details 1 1.0 Research and Test Reactor Decommissioning (69013)
November 28, 2007 (ML073330379, ML073330402, ML073330420, ML073330429, ML073330448, ML073330464, ML073330476, ML073330598, ML073330612, ML073330627, ML073330636, ML073330641, ML073330644, ML073330652, ML073330661, ML073330670, ML073330684, ML073330698);
1.1 Inspection Scope In-process independent confirmatory surveys were conducted by personnel from the Oak Ridge Institute for Science and Education (ORISE) to assist the NRC in determining the adequacy and accuracy of the licensee's procedures and final status survey (FSS) results. Independent and side by side surveys were conducted in the Reactor Office and Laboratory Building (ROLB), the Sub-Pile Room and adjoining hallway within the Containment Vessel, and the Cold Pipe Tunnel within the Reactor Service Equipment Building. ORISE personnel also reviewed a number of licensee survey design/survey request packages, and the licensee's survey methodology.


Under separate cover letters, the licensee has provided the NRC with survey unit release records for embedded and underground piping and for surface areas in various locations throughout the site. These final status survey (FSS) result documents have been scanned into the NRC's electronic data system, ADAMS. The date of the cover letter under which the survey records were sent to the NRC and the ADAMS accession numbers for the records are:
December 4, 2007 (ML073400077, ML073400090, ML073400097, ML073400106, ML073400123, ML073400143, ML073400148, ML073400156, ML073400160, ML073400163, ML073400165, ML073400167, ML073400172, ML073400216);


October 23, 2007 (ML0080390430, ML0080390434, ML0080390437, ML0080390439, ML0080390445, ML0080390447, ML0080390455, ML0080390457, ML0080390458, ML0080390461, ML0080390469, ML0080390476);
November 12, 2007 (ML073170329, ML073170334, ML073170335, ML073170339, ML073170344, ML073170358, ML073170366, ML073170371, ML073170377, ML073170381, ML073170389, ML073170393, ML073170418, ML073170421, ML073170440, ML073170445, ML073170450);
November 28, 2007 (ML073330379, ML073330402, ML073330420, ML073330429, ML073330448, ML073330464, ML073330476, ML073330598, ML073330612, ML073330627, ML073330636, ML073330641, ML073330644, ML073330652, ML073330661, ML073330670, ML073330684, ML073330698);
December 4, 2007 (ML073400077, ML073400090, ML073400097, ML073400106, ML073400123, ML073400143, ML073400148, ML073400156, ML073400160, ML073400163, ML073400165, ML073400167, ML073400172, ML073400216);
December 20, 2007 (ML073610540, ML073610545, ML073610552, ML073610554, ML073610557, ML073610562, ML073610565, ML073610567, ML073610571, ML073610573, ML073610577, ML073610578, ML073610581, ML073610583, ML073610584, ML073610588);  
December 20, 2007 (ML073610540, ML073610545, ML073610552, ML073610554, ML073610557, ML073610562, ML073610565, ML073610567, ML073610571, ML073610573, ML073610577, ML073610578, ML073610581, ML073610583, ML073610584, ML073610588);  


Line 65: Line 113:
1 A List of acronyms used in the report is included at the end of the Report Details.
1 A List of acronyms used in the report is included at the end of the Report Details.


Enclosure 4March 7, 2008 (ML080670210, ML080670215, ML080670218, ML080670264, ML080670266, ML080670273, ML080670275, ML080670285, ML080670365, ML080670382);
Enclosure  
 
March 7, 2008 (ML080670210, ML080670215, ML080670218, ML080670264, ML080670266, ML080670273, ML080670275, ML080670285, ML080670365, ML080670382);  
 
March 19, 2008 (ML080800386, ML080800395);  
March 19, 2008 (ML080800386, ML080800395);  


April 7, 2008 (ML080990653, ML080990665, ML080990679, ML080990688, ML080990691, ML080990695, ML080990703, ML080990707, ML080990708); and May 2, 2008 (ML081270660, ML081270683, ML081270695, ML081270703).
April 7, 2008 (ML080990653, ML080990665, ML080990679, ML080990688, ML080990691, ML080990695, ML080990703, ML080990707, ML080990708); and  
 
May 2, 2008 (ML081270660, ML081270683, ML081270695, ML081270703).


The inspectors reviewed the above FSS records to verify that residual contamination was less than the derived concentration guideline levels (DCGLs) stated in the licensee=s final status survey plan.
The inspectors reviewed the above FSS records to verify that residual contamination was less than the derived concentration guideline levels (DCGLs) stated in the licensee=s final status survey plan.


1.2 Observations and Findings The Oak Ridge Institute for Science and Education provided the NRC with the results of their survey activities and review findings in the document, "Final Report-Independent Confirmatory Survey Summary and Results for the Plum Brook Reactor Facility, Sandusky, Ohio," dated May 6, 2008 (ML081480295). ORISE stated in the report that the FSS data packages reviewed accurately and adequately described the sequence of FSS activities and conditions at the site, and that all confirmatory measurement results were observed to be below the respective derived gross beta guideline levels for the radionuclides of concern.
1.2 Observations and Findings  
 
The Oak Ridge Institute for Science and Education provided the NRC with the results of their survey activities and review findings in the document, Final Report-Independent Confirmatory Survey Summary and Results for the Plum Brook Reactor Facility, Sandusky, Ohio, dated May 6, 2008 (ML081480295). ORISE stated in the report that the FSS data packages reviewed accurately and adequately described the sequence of FSS activities and conditions at the site, and that all confirmatory measurement results were observed to be below the respective derived gross beta guideline levels for the radionuclides of concern.
 
One concern was identified by ORISE in that the licensees floor monitor scan investigation levels were set to high. After reviewing the issue, the licensee concurred with the ORISE finding. The licensee took prompt corrective action: ceased all floor monitoring, developed lower scan investigation levels, and rescanned all areas previously scanned with the floor monitor. No anomalies were identified as a result of the rescans.
 
The inspectors review of FSS records for embedded and underground piping, and for surface areas identified no concerns. The survey results were determined to meet the DCGLs stated in the licensee=s final status survey plan.
 
1.3 Conclusion
 
In-process independent confirmatory surveys have validated the adequacy and accuracy of the licensees procedures and final status survey (FSS) results. Reviews of FSS records verified that residual contamination was less than the derived concentration guideline levels (DCGLs) stated in the licensee=s final status survey plan.
 
Enclosure
 
3.0 Exit Meeting Summary
 
The inspectors presented the inspection results to licensee management at the conclusion of the onsite inspection on February 7, 2008. A follow-up telephone exit was conducted with the Program Manager on May 15, 2008, following the receipt of the ORISE Final Report. The licensee acknowledged the findings presented.
 
ATTACHMENT: SUPPLEMENTAL INFORMATION


One concern was identified by ORISE in that the licensee's floor monitor scan investigation levels were set to high. After reviewing the issue, the licensee concurred with the ORISE finding. The licensee took prompt corrective action: ceased all floor monitoring, developed lower scan investigation levels, and rescanned all areas previously scanned with the floor monitor. No anomalies were identified as a result of the rescans.
Attachment


The inspector's review of FSS records for embedded and underground piping, and for surface areas identified no concerns. The survey results were determined to meet the DCGLs stated in the licensee
SUPPLEMENTAL INFORMATION
=s final status survey plan.


1.3 Conclusion In-process independent confirmatory surveys have validated the adequacy and accuracy of the licensee's procedures and final status survey (FSS) results. Reviews of FSS records verified that residual contamination was less than the derived concentration guideline levels (DCGLs) stated in the licensee
PARTIAL LIST OF PERSONS CONTACTED
=s final status survey plan.


Enclosure 5 3.0 Exit Meeting Summary The inspectors presented the inspection results to licensee management at the conclusion of the onsite inspection on February 7, 2008. A follow-up telephone exit was conducted with the Program Manager on May 15, 2008, following the receipt of the ORISE Final Report. The licensee acknowledged the findings presented.
Licensee
* K. Peecook, NASA Program Manager
*W. Stoner, Radiation Safety Officer
*R. Case, Assistant Project Radiation Safety Officer
*J. Thomas, Project QA & Licensing Manager
* Indicates presence at the exit meeting held on February 7, 2008.


ATTACHMENT: SUPPLEMENTAL INFORMATION Attachment SUPPLEMENTAL INFORMATION PARTIAL LIST OF PERSONS CONTACTED Licensee *K. Peecook, NASA Program Manager *W. Stoner, Radiation Safety Officer *R. Case, Assistant Project Radiation Safety Officer *J. Thomas, Project QA & Licensing Manager
INSPECTION PROCEDURES USED


*Indicates presence at the exit meeting held on February 7, 2008.
IP 69013 Research and Test Reactor Decommissioning


INSPECTION PROCEDURES USED IP 69013 Research and Test Reactor Decommissioning
ITEMS OPENED, CLOSED, AND DISCUSSED


ITEMS OPENED, CLOSED, AND DISCUSSED Opened None  
Opened None  


Closed None Discussed None  
Closed None  
 
Discussed None  


LIST OF ACRONYMS USED  
LIST OF ACRONYMS USED  


CFR Code of Federal Regulations DCGL Derived Concentration Guideline Level FSS Final Status Survey IP Inspection Procedure NASA National Aeronautics and Space Administration NRC Nuclear Regulatory Commission ORISE Oak Ridge Institute for Science and Education PBRF Plum Brook Reactor Facility ROLB Reactor Office and Laboratory Building DOCUMENTS REVIEWED Documents used during the inspection were specifically identified in the Report Details, above.
CFR  
 
Code of Federal Regulations DCGL Derived Concentration Guideline Level FSS  
 
Final Status Survey IP  
 
Inspection Procedure NASA National Aeronautics and Space Administration NRC  
 
Nuclear Regulatory Commission ORISE Oak Ridge Institute for Science and Education PBRF Plum Brook Reactor Facility ROLB Reactor Office and Laboratory Building  
 
DOCUMENTS REVIEWED  
 
Documents used during the inspection were specifically identified in the Report Details, above.
}}
}}

Latest revision as of 16:35, 14 January 2025

IR 05000030-08-001 (DNMS) and 05000185-08-001 (DNMS) - February 5-7, 2008, and May 15, 2008, Nasa Plum Brook Reactor Facility
ML081480522
Person / Time
Site: Plum Brook  File:National Aeronautics and Space Administration icon.png
Issue date: 05/27/2008
From: Louden P
NRC/RGN-III/DNMS/DB
To: Whitlow W
US National Aeronautics & Space Admin (NASA), John H. Glenn Research Ctr at Lewis Field
References
IR-08-001
Download: ML081480522 (8)


Text

May 27, 2008

SUBJECT:

NRC INSPECTION REPORTS 050-00030/08-01(DNMS) AND

050-00185/08-01(DNMS) - NASA PLUM BROOK REACTOR FACILITY

Dear Dr. Whitlow:

On May 15, 2008, the NRC completed inspection activities at the NASA Plum Brook Reactor Facility. The purpose of the inspection was to determine whether the decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during an onsite inspection on February 5-7, 2008, the inspector evaluated decommissioning performance and radiation survey activities. Accompanying the inspector during the inspection were personnel from the Oak Ridge Institute for Science and Education (ORISE), who performed confirmatory surveys of the Plum Brook Reactor facilities. At the conclusion of the on-site inspection on February 7, 2008, the inspectors discussed the inspection findings with members of your staff. A final report from ORISE of the results of their confirmatory surveys was provided to the NRC on May 13, 2008.

This inspection consisted of an examination of decommissioning activities at the NASA Plum Brook Reactor Facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, and interviews with personnel.

Based on the results of this inspection, the NRC did not identify any violations.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA/

Patrick L. Louden, Chief Decommissioning Branch

Docket Nos.: 050-00030 and 050-00185 License Nos.: TR-3 and R-93

Enclosure:

NRC Inspection Reports 050-00030/08-01(DNMS)

and 050-00185/08-01(DNMS)

cc w/encl:

Radiation Health Program Director, Ohio Department of Health (ODH)

S. Helmer, ODH

M. Rubadue, ODH

Ohio Environmental Protection Agency, Division of Planning

K. Peecook, NASA, Plum Brook Station

DISTRIBUTION w/encl:

Docket File K. McConnell, FSME C. Glenn, FSME M. Satorius, RIII S. Reynolds, RIII RIII PRR ROPreports@nrc.gov

DOCUMENT NAME: G:\\SEC\\Work in progress\\NASA 2008001.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII

RIII

RIII

RIII

NAME WGSnell:mb PLLouden

DATE 05/27/08 05/27/08

OFFICIAL RECORD COPY

Enclosure

EXECUTIVE SUMMARY

NASA Plum Brook Reactor Facility Inspection Report Nos. 050-00030/08-01(DNMS) and 050-00185/08-01(DNMS)

This routine decommissioning inspection included a review of the licensees current performance related to decommissioning activities and in-process confirmatory survey activities.

Research and Test Reactor Decommissioning

In-process independent confirmatory surveys have validated the adequacy and accuracy of the licensees procedures and final status survey (FSS) results. Reviews of FSS records verified that residual contamination was less than the derived concentration guideline levels (DCGLs)

stated in the licensee=s final status survey plan.

Enclosure

Report Details1

1.0 Research and Test Reactor Decommissioning (69013)

1.1 Inspection Scope

In-process independent confirmatory surveys were conducted by personnel from the Oak Ridge Institute for Science and Education (ORISE) to assist the NRC in determining the adequacy and accuracy of the licensees procedures and final status survey (FSS)

results. Independent and side by side surveys were conducted in the Reactor Office and Laboratory Building (ROLB), the Sub-Pile Room and adjoining hallway within the Containment Vessel, and the Cold Pipe Tunnel within the Reactor Service Equipment Building. ORISE personnel also reviewed a number of licensee survey design/survey request packages, and the licensees survey methodology.

Under separate cover letters, the licensee has provided the NRC with survey unit release records for embedded and underground piping and for surface areas in various locations throughout the site. These final status survey (FSS) result documents have been scanned into the NRCs electronic data system, ADAMS. The date of the cover letter under which the survey records were sent to the NRC and the ADAMS accession numbers for the records are:

October 23, 2007 (ML0080390430, ML0080390434, ML0080390437, ML0080390439, ML0080390445, ML0080390447, ML0080390455, ML0080390457, ML0080390458, ML0080390461, ML0080390469, ML0080390476);

November 12, 2007 (ML073170329, ML073170334, ML073170335, ML073170339, ML073170344, ML073170358, ML073170366, ML073170371, ML073170377, ML073170381, ML073170389, ML073170393, ML073170418, ML073170421, ML073170440, ML073170445, ML073170450);

November 28, 2007 (ML073330379, ML073330402, ML073330420, ML073330429, ML073330448, ML073330464, ML073330476, ML073330598, ML073330612, ML073330627, ML073330636, ML073330641, ML073330644, ML073330652, ML073330661, ML073330670, ML073330684, ML073330698);

December 4, 2007 (ML073400077, ML073400090, ML073400097, ML073400106, ML073400123, ML073400143, ML073400148, ML073400156, ML073400160, ML073400163, ML073400165, ML073400167, ML073400172, ML073400216);

December 20, 2007 (ML073610540, ML073610545, ML073610552, ML073610554, ML073610557, ML073610562, ML073610565, ML073610567, ML073610571, ML073610573, ML073610577, ML073610578, ML073610581, ML073610583, ML073610584, ML073610588);

February 27, 2008 (ML080590177, ML080590179, ML080590183, ML080590195, ML080590206, ML0805910247, ML080590254);

1 A List of acronyms used in the report is included at the end of the Report Details.

Enclosure

March 7, 2008 (ML080670210, ML080670215, ML080670218, ML080670264, ML080670266, ML080670273, ML080670275, ML080670285, ML080670365, ML080670382);

March 19, 2008 (ML080800386, ML080800395);

April 7, 2008 (ML080990653, ML080990665, ML080990679, ML080990688, ML080990691, ML080990695, ML080990703, ML080990707, ML080990708); and

May 2, 2008 (ML081270660, ML081270683, ML081270695, ML081270703).

The inspectors reviewed the above FSS records to verify that residual contamination was less than the derived concentration guideline levels (DCGLs) stated in the licensee=s final status survey plan.

1.2 Observations and Findings

The Oak Ridge Institute for Science and Education provided the NRC with the results of their survey activities and review findings in the document, Final Report-Independent Confirmatory Survey Summary and Results for the Plum Brook Reactor Facility, Sandusky, Ohio, dated May 6, 2008 (ML081480295). ORISE stated in the report that the FSS data packages reviewed accurately and adequately described the sequence of FSS activities and conditions at the site, and that all confirmatory measurement results were observed to be below the respective derived gross beta guideline levels for the radionuclides of concern.

One concern was identified by ORISE in that the licensees floor monitor scan investigation levels were set to high. After reviewing the issue, the licensee concurred with the ORISE finding. The licensee took prompt corrective action: ceased all floor monitoring, developed lower scan investigation levels, and rescanned all areas previously scanned with the floor monitor. No anomalies were identified as a result of the rescans.

The inspectors review of FSS records for embedded and underground piping, and for surface areas identified no concerns. The survey results were determined to meet the DCGLs stated in the licensee=s final status survey plan.

1.3 Conclusion

In-process independent confirmatory surveys have validated the adequacy and accuracy of the licensees procedures and final status survey (FSS) results. Reviews of FSS records verified that residual contamination was less than the derived concentration guideline levels (DCGLs) stated in the licensee=s final status survey plan.

Enclosure

3.0 Exit Meeting Summary

The inspectors presented the inspection results to licensee management at the conclusion of the onsite inspection on February 7, 2008. A follow-up telephone exit was conducted with the Program Manager on May 15, 2008, following the receipt of the ORISE Final Report. The licensee acknowledged the findings presented.

ATTACHMENT: SUPPLEMENTAL INFORMATION

Attachment

SUPPLEMENTAL INFORMATION

PARTIAL LIST OF PERSONS CONTACTED

Licensee

  • K. Peecook, NASA Program Manager
  • W. Stoner, Radiation Safety Officer
  • R. Case, Assistant Project Radiation Safety Officer
  • J. Thomas, Project QA & Licensing Manager
  • Indicates presence at the exit meeting held on February 7, 2008.

INSPECTION PROCEDURES USED

IP 69013 Research and Test Reactor Decommissioning

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened None

Closed None

Discussed None

LIST OF ACRONYMS USED

CFR

Code of Federal Regulations DCGL Derived Concentration Guideline Level FSS

Final Status Survey IP

Inspection Procedure NASA National Aeronautics and Space Administration NRC

Nuclear Regulatory Commission ORISE Oak Ridge Institute for Science and Education PBRF Plum Brook Reactor Facility ROLB Reactor Office and Laboratory Building

DOCUMENTS REVIEWED

Documents used during the inspection were specifically identified in the Report Details, above.