I Survey Unit Release Record I
Design #
Survey Unit #(s)
Description
- 2) EP Rx 11 1 is a Class 1, Group 2 survey unit as per the PBRF F i Status Survey Plan (FSSP) and Technical Basis Document (TBD)-06-004.
EP-Rx 1 1 1
- 3) Surveys in EP Rx 11 1 were performed using a scintillation detector optimized to measure gamma energies representative of '20-60. Sample #EP 2-2 from Survey Request (SR)-13 was referenced for this decision.
- 4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (IAW) the Babcock Services Incorporated (BSI)/LVS-002, Rx 111 I) Embedded Pipe (EP) Survey Unit Rx 1 1 1 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF).
Revision #
Work Execution Package (WEP)05-006. Survey instructions described in this document constitute "Special Methods" and the survey design used in the acquisition of survey measurements.
- 5) htmment efficiency determinations are developed in accordance with the BSVLVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.
Original Approval Signatures 1
nste.
I Page 1 of 3 FSSCharacterization Engineer FSS/Characterization Manager
FSS Design # EP Rx 111 Revision # Original Page 2 of 3 Survey Unit: Rx 111 1.0 History/Description 1.1 The subject pipe system is a 12 drain line located in the Room 22 trench on the -27 el. of the Rx building.
1.2 EP Rx 111 consists of 12 diameter piping that is approximately 1 foot in length.
2.0 Survey Design Information 2.1 EP Rx 111 was surveyed IAW Procedure #BSI/LVS-002.
2.2 100% of the 12 ID pipe was accessible for survey. The accessible 12 ID pipe was surveyed by static measurement at one foot increments. Since the piping section was approximately one foot in length, only one measurement was performed.
2.3 Surface area for the 12 ID piping is 2,919 cm2 (0.3 m2) for the entire length of (approximately 1) of 12 piping.
3.0 Survey Unit Measurement Locations/Data 3.1 Pipe interior radiological survey forms are provided in Attachment 2 of this release record.
4.0 Survey Unit Investigations/Results 4.1 None 5.0 Data Assessment Results 5.1 Data assessment results are provided in the EP/Buried Pipe (BP) Survey Report provided in Attachment 1.
5.2 All measurement results are less than the Derived Concentration Guideline Level (DCGL) for radionuclide specific EP that corresponds to the 1 mrem/yr dose goal established in Table 3-3 of the FSSP.
5.3 When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction (NF), provided in TBD-06-004, the survey unit that is constituted by EP Rx 111 passes FSS.
5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this survey unit.
5.5 At the request of the FSS/Characterization Manager, additional characterization data were collected and analyzed. These results support the conclusion that the any remaining residual activity is well below the release limits. A summary of these results are included as Attachment 4.
FSS Design # EP Rx 111 Revision # Original Page 3 of 3 Survey Unit: Rx 111 5.6 Statistical Summary Table Statistical Parameter 12 Pipe Total Number of Survey Measurements 1
Number of Measurements >MDC 1
Number of Measurements Above 50% of DCGL 0
Number of Measurements Above DCGL 0
Mean 0.0556 Median 0.0556 Standard Deviation N/A Maximum 0.0556 Minimum 0.0556 6.0 Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mrem/yr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregate of the total dose for both structural scenarios and soils.
6.1 A review of the survey results has shown that the dose contribution for EP Rx 111 to be less than 1 mrem/yr. The dose contribution is estimated to be 0.056 mrem/yr based on the average of the actual gross counts measured.
7.0 Attachments - BSI EP/BP Survey Report - Pipe Interior Radiological Survey Form - DQA Worksheet - Additional Characterization radiological data summary -Disc containing RR for EP Rx 111 & Spreadsheet
SECTION '7 ATTACHMENT 1 2
PAGE(S)
BSI EPlBP SURVEY REPORT DetectorSled #
G3 # B 5 W 1 0 8 ACTIVITY VALUES NOT BACKGROUND CORRECTED RP Engineer I Date
EP Rx 111 12" Pipe TBD 06-004 Group 2 Measurement #
gcpm ncpm Co-60 activity (total dpm)
Co-60 activity (dpm/100cm2)
Cs-137 activity (dpm/100cm2)
Eu-152 activity (dpm/100cm2)
Eu-154 activity (dpm/100cm2)
Nb-94 activity (dpm/100cm2)
Ag-108m activity (dpm/100cm2)
Unity 1
1534 1534 374,146 12,819 6,647 106 75 6
369 0.056 MEAN 0.056 MEDIAN 0.056 STD DEV N/A MAX 0.056 MIN 0.056 1 of 1
SECTION 7 ATTACHMENT 2 I
PAGE(S)
BSI/LVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date:
3/6 //57 Time:
0 ~ 3 7 pipe ID#:
11 1 Pipe Diameter:
2" Access Point Area: & 2 L Ti2-g Building:
R(
Elevation:
!2 7' System:
haw II) 5 0 m P Type of Survey Investigation Characterization Final Survey,
Other Gross C06O J
Cs d
Detector ID# I Sled ID#
4 3 fi 566 &
1 l o g Detector Cal Date:
1/11 /O 7 Detector Cal Due Date:
/ /, / / o Y Instrument:
2.3 y0-1 Instrument ID #:
/gq 09 f-Instrument Cal Date:
I 11 4 7 Instrument Cal Due Date:
/ / 1 1 /OF I
From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 7 7,8 cpm MDCRstmc 3 3 t 4 cpm Efficiency Factor for Pipe Diameter 0.0 04 I
(from detector efficiency determination)
- MDcs, 34 Q d p d 100 cmZ Is the MDcseac acceptable?
NO
( ~ f no, adjust sample count time and recalculate MDCF&=)
Comments: 0 L -0 EF I
OF IcT Technician Signature Pipe Interior Radiological Survey REFERENCECOP Package Page 1 of, Page 1
SECTION 7 ATTACHMENT 3 I
PAGE(!$)
Page 1 of 1
SECTION 7 ATTACHMENT 4 3
PAGE(S)
BSI EPlBP SURVEY REPORT Detector-Sled #
44-116 1973121no sled LUES NOT BACKGROUND CORRECTED
EP Rx 111 12" Pipe TBD 06-004 Group 2 Characterization Data (FOR INFOMATION ONLY)
Measurement #
gcpm ncpm Cs-137 activity (total dpm)
Cs-137 activity (dpm/100cm2)
Co-60 activity (dpm/100cm2)
Eu-152 activity (dpm/100cm2)
Eu-154 activity (dpm/100cm2)
Nb-94 activity (dpm/100cm2)
Ag-108m activity (dpm/100cm2)
Unity 1
4996 4502 29,815 29,815 57,498 477 337 28 1,655 0.249 2
706 499 3,305 3,305 6,373 53 37 3
183 0.028 3
311 107 709 709 1,367 11 8
1 39 0.006 4
333 129 854 854 1,648 14 10 1
47 0.007 MEAN 0.072 MEDIAN 0.017 STD DEV 0.118 MAX 0.249 MIN 0.000 1 of 1
d RADIATION PROTECTION SURVEY FORM Page of I Dose rates in prkr unless otherwise noted OCATCD / d THC WALL 7IfTNA-T S ' O ~ T L L
-fl+E 5"p? P T O P Aud TBL - z S / FLOOR, P,PQ AX - / I /
I&
Id A f @ ~ E T 6 &
4 d A 1 / L ' ' L ~ N G.
L 1
1 1 5 v U O k A 6 u - L C L O N ~ / Z ~, kg0 P & ~ ~ S I I P M WAS O A T f l ~ c ~
70 C I O " ~
P ~ J. ~ ~
7 A ~
~ L C F O K W ?*IS SOQVLY.
SECTION 7 ATTACHMENT 5 1 DISC