ML111570491: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML111570491
| number = ML111570491
| issue date = 06/02/2011
| issue date = 06/02/2011
| title = 05/11/2011 Meeting Summary for Public Meeting with Arizona Public Service to Discuss the Performance Results for Palo Verde, Units 1, 2 and 3 for the Period of January 1 Through December 31, 2010
| title = Meeting Summary for Public Meeting with Arizona Public Service to Discuss the Performance Results for Palo Verde, Units 1, 2 and 3 for the Period of January 1 Through December 31, 2010
| author name = Lantz R E
| author name = Lantz R
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:June 2, 2011 Mr. Randall K. Edington, Executive Vice President, Nuclear and Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072
{{#Wiki_filter:June 2, 2011 Mr. Randall K. Edington, Executive Vice President, Nuclear and Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034  
-2034


==SUBJECT:==
==SUBJECT:==
Line 22: Line 21:


==SUMMARY==
==SUMMARY==
FOR PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE
FOR PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE  


==Dear Mr. Edington:==
==Dear Mr. Edington:==
On May 11, 20 1 1, representatives of Arizona Public Service and NRC personnel met at the Palo Verde Energy Education Center in Buckeye, AZ. This open house meeting was held to allow members of the public an opportunity to discuss the performance results for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 for the period of January 1 through December 31, 2010, as well as ask NRC personnel general questions about our regulatory process or other issues of concern. The meeting attendance list is enclosed. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRC's public web site at www.nrc.gov/reading
On May 11, 2011, representatives of Arizona Public Service and NRC personnel met at the Palo Verde Energy Education Center in Buckeye, AZ. This open house meeting was held to allow members of the public an opportunity to discuss the performance results for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 for the period of January 1 through December 31, 2010, as well as ask NRC personnel general questions about our regulatory process or other issues of concern. The meeting attendance list is enclosed.
-rm/adams.html
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at www.nrc.gov/reading-rm/adams.html.
.          Sincerely,       /RA/       Ryan E. Lantz, Chief       Project Branch D       Division of Reactor Projects Docket Nos.
Sincerely,  
50-528, 50-529, 50-530 License Nos.
/RA/
NPF-41 , NPF-51 , NPF-74
Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74  


==Enclosure:==
==Enclosure:==
: 1. Meeting Attendance List U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V 6 1 1 R Y A N P L A Z A D R I V E , S U I T E 4 0 0 A R L I N G T O N , T E X A S 7 6 0 1 1-4005 Southern California Edison cc: Distribution via ListServ  
: 1. Meeting Attendance List UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005
 
Southern California Edison cc: Distribution via ListServ  


Southern California Edison Electronic distribution by RIV:
Southern California Edison Electronic distribution by RIV:
Line 40: Line 41:
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
Senior Resident Inspector (Tony.Brown@nrc.gov) Resident Inspector (Joseph.Bashore@nrc.gov
Senior Resident Inspector (Tony.Brown@nrc.gov)
) Resident Inspector (Mica.Baquera@nrc.gov)
Resident Inspector (Joseph.Bashore@nrc.gov)
Resident Inspector (Mica.Baquera@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov) SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)
Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Lauren.Gibson@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
Project Manager (Lauren.Gibson@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource R:\_REACTORS\EOC 2010\PV EOC2010 MS05112011.docx ADAMS:   No       Yes SUNSI Review Complete Reviewer Initials:
OEMail Resource R:\\_REACTORS\\EOC 2010\\PV EOC2010 MS05112011.docx ADAMS: No Yes SUNSI Review Complete Reviewer Initials:
Publicly Available Non-Sensitive   Non-publicly Available Sensitive RIV/SPE:DRP/D C:DRP/D   DALLEN RLANTZ   /RA/R.Lantz for
Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV/SPE:DRP/D C:DRP/D DALLEN RLANTZ  
/RA/   6/2/11 6/2/11   OFFICIAL RECORD COPY                                         T=Telephone           E=E
/RA/R.Lantz for  
-mail       F=Fax}}
/RA/
6/2/11 6/2/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax}}

Latest revision as of 05:58, 13 January 2025

Meeting Summary for Public Meeting with Arizona Public Service to Discuss the Performance Results for Palo Verde, Units 1, 2 and 3 for the Period of January 1 Through December 31, 2010
ML111570491
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/02/2011
From: Ryan Lantz
NRC/RGN-IV/DRP/RPB-D
To: Edington R
Arizona Public Service Co
References
Download: ML111570491 (6)


Text

June 2, 2011 Mr. Randall K. Edington, Executive Vice President, Nuclear and Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE

Dear Mr. Edington:

On May 11, 2011, representatives of Arizona Public Service and NRC personnel met at the Palo Verde Energy Education Center in Buckeye, AZ. This open house meeting was held to allow members of the public an opportunity to discuss the performance results for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 for the period of January 1 through December 31, 2010, as well as ask NRC personnel general questions about our regulatory process or other issues of concern. The meeting attendance list is enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

1. Meeting Attendance List UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005

Southern California Edison cc: Distribution via ListServ

Southern California Edison Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Senior Resident Inspector (Tony.Brown@nrc.gov)

Resident Inspector (Joseph.Bashore@nrc.gov)

Resident Inspector (Mica.Baquera@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)

Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Lauren.Gibson@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource R:\\_REACTORS\\EOC 2010\\PV EOC2010 MS05112011.docx ADAMS: No Yes SUNSI Review Complete Reviewer Initials:

Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV/SPE:DRP/D C:DRP/D DALLEN RLANTZ

/RA/R.Lantz for

/RA/

6/2/11 6/2/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax