ML11235A654: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:U. S. NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Pedwire see attached Terms and Conditions. If paid by check,                     Invoice No.:          RL0123-11 make check payable to the NRC (reference Invoice no.) and mail to:
{{#Wiki_filter:U.
U.S. Nuclear Regulatory Commission                                     Invoice Date: 10/25/10 Accounts Receivable Team P.O. Box 979051 St. Louis, MO 63197-9000                                               Contact:      BILLY BLANEY Phone:        301/415-5092 TO:        PACIFIC GAS & ELECTRIC COMPANY ATTN: TOM BALDWIN MANAGER REGULATORY SERV.
S.
DCPP REGULATORY SERVICES AVILA BEACH,            CA 93424                                        Docket:       050-00275 050-00323 Period:       07/04/10       -  09/25/10 DIABLO CANYON 1 DIABLO CANYON 2 Review of Part 50 Application for Reactor License, Amendments, Exemptions, Reliefs, Performance Reviews, Assessments and Other Approvals 974.5 HRS @ $259.00                  $      252,395.50 2410.0 HRS @ $257.00                  $        619,370.00 Contract Costs:                      $        199,322.38 Project Manager:                      $        36,340.20 AMOUNT DUE          $    1,107,428.00 TERMS. Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately. However, interest will be waived if payment is received within 30 days from the invoice date. Penalty and administrative charges will be assessed on a delinquent invoice. Additional terms and conditions are attached, if applicable.
NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Pedwire see attached Terms and Conditions.
NOTES. If there are any questions about the existence or amount of the debt, contact the individual named above. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.
If paid by check, make check payable to the NRC (reference Invoice no.) and mail to:
U.S. Nuclear Regulatory Commission Accounts Receivable Team P.O. Box 979051 St. Louis, MO 63197-9000 Invoice No.: RL0123-11 Invoice Date: 10/25/10


07/19/11  15:14:35                                                                                                                                            Page Number:  1 Detail Line For Invoice RL0123-11 For the Period 07/04/10 - 09/25/10 Docket               Reg  NonReg                                      Contractual    Cost    Applicnt Number    TAC/B&R  Hours  Hours  Rate  Hourly Costs      PM Costs      Costs      Date      Date    Names/Remarks 050-00275   ME1644    18.0    0.0 257.00      4,626.00          0.00          0.00      /    07/03/09 DIABLO CANYON 1 - LAR for TS 3.4.15 RCS Leakage Detection 050-00275  ME1644      1.0    0.0 259.00          259.00        0.00          0.00      /    07/03/09 DIAPLO CANYON 1 - LAR for TS 3.4.15 RCS Leakage Detection 050-00275  ME2667      0.5    0.0 257.00          128.50        0.00          0.00      I    11/20/09 DIABLO CANYON 1 - Diablo Canyon Cyber Security LAR 050-00275  ME2825    87.6    3.8 257.00    23,489.80          0.00          0.00      /   11/23/09 DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV 050-00275  ME2825    42.0    0.8 259.00      1;os085.20        0.00          0.00      I    11/23/09 DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV 050-00275  ME2896    997.4    46.0 257.00  268,153.80            0.00          0.00      I    11/24/09 DIABLO CANYON 1 - License Renewal SAFETY Review 050-00275  ME2896    399.5    10.1 259.00  106,086.40            0.00          0.00      I    11/24/09 DIABLO CANYON 1 - License Renewal SAFETY Review 050-00275  ME2995    16.5    0.0 257.00      4,240.50          0.00          0.00      /    12/14/09 DIABLO CANYON 1 - LAR 09-06, Critical Damping Value for Cont 050-00275  ME3018    10.5    0.0 257.00      2,698.50          0.00          0.00      /    12/29/09 DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off 050-00275  ME3018    23.0    0.0 259.00      5,957.00          0.00          0.00      /    12/29/09 DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off 050-00275  ME3942      3.0    0.0 257.00        771.00          0.00          0.00      /    05/17/10 DIABLO CANYON 1 - ASME Relief Request NDE-RCS-SE-IR16 as Mod 050-00275  ME4056    67.0    1.3 257.00    17,553.10          0.00          0.00      /    06/14/10 DIABLO CANYON 1 - Diablo Canyon License Amendment Regarding 050-00275  M44056    25.1    1.3 259.00      6,837.60          0.00          0.00      /    06/14/10 DIABLO CANYON 1 - Diablo Canyon License Amendment Regarding 050-00275  ME4290      3.0    0.0 257.00        771.00          0.00          0.00      /    07/22/10 DIABLO CANYON 1 - Request for Approval of Diablo Canyon plan 050-00275    111104    4.0    0.0 259.00            0.00    1,036.00          0.00      /      /  /  PM - OTHER LICENSING TASKS - (H) 050-00275  111126A    4.5    0.0 257.00            0.00    1,156.50          0.00      I      /  /  PM - PM ACTIVITY/RESEARCH & TEST OPERATING RX 050-00275  122122F    38.5     0.0 257.00            0.00    9,894.50          0.00      /      /  /  PM - PM LICENSEES/REGIONAL/HQ STAFF INTERFACES 050-00275    122122F  20.0    0.0 259.00           0.00    5,180.00          0.00      /      / /    PM - PM LICENSEES/REGIONAL/HQ STAFF INTERFACES 050-00275    9A1E      0.6    0.0 257.00           0.00      154.20          0.00      /      / /    PM - STAFF DEVELOPMENT & PROFESSIONAL MEETINGS 050-00275  9AlN        0.6    0.0 257.00            0.00      154.20          0.00      /      / /    PM - FINANCIAL MANAGEMENT 050-00275    9AlN      0.3    0.0 259.00            0.00        77.70          0.00            / /    PM - FINANCIAL MANAGEMENT
==Contact:==
                                                                                                    /
BILLY BLANEY Phone:
J4152  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00          65.00 2010/07    / /    DIABLO CANYON 1 - License Renewal SAFETY Review J4152  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00        746.00 2010/06    / /    DIABLO CANYON 1 - License Renewal SAFETY Review J4244  050-00275  ME2825      0.0    0.0  0.00            0.00        0.00      -675.00  2010/06    /  /  DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV J4244  050-00275  ME2825      0.0    0.0  0.00            0.00        0.00    -1,203.00  2010/08    /  /  DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV J4244  050-00275  ME2825      0.0    0.0  0.00            0.00        0.00      1,264.00  2010/07    / /    DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV J4287  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00      7,058.50             /  /  DIABLO CANYON 1 - License Renewal SAFETY Review 2010/06 J4287  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00      1,902.50  2010/08    /  /  DIABLO CANYON 1 - License Renewal SAFETY Review J4287  050-00275  M32896      0.0    0.0  0.00            0.00         0.00        494.50 2010/07    /  /  DIABLO CANYON 1 - License Renewal SAFETY Review J4288  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00      1,591.00  2010/08    / /    DIABLO CANYON 1 - License Renewal SAFETY Review J4288  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00      2,653.00  2010/07    / /    DIABLO CANYON 1 - License Renewal SAFETY Review J4288  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00      8,851.00  2010/06    / /    DIABLO CANYON 1 - License Renewal SAFETY Review J4382  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00      6,344.29  2010/07    / /    DIABLO CANYON 1 - License Renewal SAFETY Review J4382  050-00275  142896      0.0    0.0  0.00           0.00        0.00      6,130.01  2010/08    / /    DIABLO CANYON 1 - License Renewal SAFETY Review J4382  050-00275  ME2896      0.0    0.0  0.00            0.00        0.00    18,738.56              /  /  DIABLO CANYON 1 - License Renewal SAFETY Review 2010/06 J4386  050-00275  1E2825      0.0    0.0  0.00            0.00        0.00    -1,163.00  2010/08    /  /  DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV J4386  050-00275  ME2825      0.0    0.0  0.00            0.00        0.00      9,288.00  2010/07    /  /  DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV J4386  050-00275  ME2825      0.0    0.0  0.00            0.00        0.00    18,997.00              /  /  DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV 2010/06 J4480  050-00275  ME2825      0.0    0.0  0.00            0.00        0.00    17,240.00  2010/08    /  /  DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV 050-00323  ME1645    18.0    0.0 257.00      4,626.00          0.00          0.00      /    07/03/09 DIABLO CANYON 2 - LAR for TS 3.4.15 RCS Leakage Detection 050-00323  ME1645      1.0    0.0 259.00        259.00          0.00          0.00      /    07/03/09 DIABLO CANYON 2 - LAR for TS 3.4.15 RCS Leakage Detection 050-00323  M32668      1.5    0.0 257.00        385.50          0.00          0.00      /    11/20/09 DIABLO CANYON 2 - Diablo Canyon Cyber Security LAR
301/415-5092 Docket: 050-00275 050-00323 TO:
PACIFIC GAS & ELECTRIC COMPANY ATTN: TOM BALDWIN MANAGER REGULATORY SERV.
DCPP REGULATORY SERVICES AVILA BEACH, CA 93424 Period: 07/04/10 -
09/25/10 DIABLO CANYON 1 DIABLO CANYON 2 Review of Part 50 Application for Reactor License, Amendments, Exemptions, Reliefs, Performance Reviews, Assessments and Other Approvals 974.5 HRS @ $259.00 2410.0 HRS @ $257.00 Contract Costs:
Project Manager:
252,395.50 619,370.00 199,322.38 36,340.20 AMOUNT DUE 1,107,428.00 TERMS.
Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately.
However, interest will be waived if payment is received within 30 days from the invoice date.
Penalty and administrative charges will be assessed on a delinquent invoice.
Additional terms and conditions are attached, if applicable.
NOTES.
If there are any questions about the existence or amount of the debt, contact the individual named above.
For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.


07/19/11   15:14:35                                                                                                                                                   Page Number:' 2 Detail Line For Invoice RL0123-ll For the Period 07/04/10 - 09/25/10 Docket                     Reg  NonReg                                  Contractual    Cost    Applicnt Number     TAC/B&R        Hours  Hours  Rate  Hourly Costs  PH Costs      Costs      Date      Date      Names/Remarks 050-00323  M12826          83.1    3.7 257.00    22,307.60        0.00          0.00      /    11/23/09    DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV 050-00323  ME2826          38.9    1.7 259.00    10,515.40        0.00          0.00      /    11/23/09    DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV 050-00323  ME2897        877.2    46.9 257.00    237,493.70        0.00          0.00      /    11/24/09    DIABLO CANYON 2 - License Renewal SAFETY Review 050-00323  M32897        363.3    12.2 259.00    97,254.50        0.00          0.00      /    11/24/09    DIABLO CANYON 2 - License Renewal SAFETY Review 050-00323  ME2996          16.0    0.0 257.00      4,112.00        0.00          0.00      /    12/14/09    DIABLO CANYON 2 - LAR 09-06, Critical Damping Value for Cont 050-00323  M33019          13.5    0.0 257.00      3,469.50        0.00          0.00      /    12/29/09    DIABLO CANYON 2 - Diablo Canyon LAR 09-07 Delayed Access Off 050-00323   ME3019          5.0    0.0 259.00      1,295.00       0.00          0.00      /    12/29/09    DIABLO CANYON 2 - Diablo Canyon LAR 09-07 Delayed Access Off 050-00323  ME3995          22.3    0.0 257.00      5,731.10       0.00           0.00      /    05/05/10    DIABLO CANYON 2 - Diablo Canyon RFO 15 SG 180 Day Report 050-00323  Mn3995          20.5    0.0 259.00      5,309.50        0.00          0.00      /    05/05/10    DIABLO CANYON 2 - Diablo Canyon RFO 15 SG 180 Day Report 050-00323  MR4057          69.0     1.2 257.00    18,041.40        0.00          0.00      /    06/14/10    DIABLO CANYON 2 - Diablo Canyon License Amendment Regarding 050-00323  ME4057          22.9    1.2 259.00      6,241.90        0.00          0.00      /    06/14/10    DIABLO CANYON 2 - Diablo Canyon License Amendment Regarding 050-00323  ME4291          3.0     0.0 257.00        771.00        0.00          0.00      /    07/22/10    DIABLO CANYON 2 - Request for Approval of Diablo Canyon plan 050-00323  ME4577          5.0     0.0 259.00      1,295.00        0.00           0.00      /    08/12/10    DIABLO CANYON 2 - RR NDE-RCS-SE-2RI6 CC N-695 050-00323  111104          1.0     0.0 257.00          0.00      257.00          0.00      /        /      / PH - OTHER LICENSING TASKS - (H) 050-00323  111104          7.0     0.0 259.00         0.00    1,813.00          0.00      /        /      / PH - OTHER LICENSING TASKS - (H) 050-00323  111126A          4.5    0.0 257.00         0.00    1,156.50          0.00      /        / /      PH - P1 ACTIVITY/RESEARCH & TEST OPERATING RX 050-00323  122122F        38.5    0.0 257.00          0.00    9,894.50          0.00     /        / /      PH - PH LICENSEE S/REGIONAL/HQ STAFF INTERFACES 050-00323  122122F        20.0    0.0 259.00          0.00    5,180.00          0.00      /        / /      PH - PH LICENSEE S/REGIONAL/HQ STAFF INTERFACES 050-00323  9Al1            0.6    0.0 257.00          0.00      154.20          0.00     /        / /      P1 - STAFF DEVEL,OPMENT & PROFESSIONAL MEETINGS 050-00323  9AlN            0.6    0.0 257.00         0.00     154.20          0.00     /        / /      PH - FINANCIAL 14ANAGEMENT 050-00323  9AlN            0.3    0.0 259.00         0.00       77.70          0.00     /        /      / PH - FINANCIAL 34ANAGEMENT J4152  050-00323  M32897          0.0    0.0  0.00         0.00       0.00         65.00 20 10/07      /      / DIABLO CANYON 2 - License Renewal SAFETY Review J4152  050-00323  ME2897          0.0     0.0   0.00         0.00       0.00         746.00 2010/06      /      / DIABLO CANYON 2 - License Renewal SAFETY Review J4244  050-00323  M32826          0.0     0.0   0.00         0.00       0.00       -675.00 2010/06      / /      DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV J4244  050-00323  ME2826          0.0    0.0  0.00         0.00       0.00     1,264.00  2010/07      /      / DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV J4244  050-00323  ME2826          0.0    0.0.00         0.00       0.00     -1,203.00 2010/08        1//    DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV J4287  050-00323  M12897          0.0    0.0.00         0.00       0.00     7,058.50  2010/06      /      / DIABLO CANYON 2 - License Renewal SAFETY Review J4287  050-00323  ME2897          0.0     0.0   0.00         0.00       0.00     1,902.50  2010/08      / /      DIABLO CANYON 2 - License Renewal SAFETY Review J4287  050-00323  M12897          0.0     0.0   0.00         0.00       0.00         494.50 2010/07      /      / DIABLO CANYON 2 - License Renewal SAFETY Review J4288  050-00323  ME2897          0.0     0.0   0.00         0.00       0.00     1,590.00 2010/08      /      / DIABLO CANYON 2 - License Renewal SAFETY Review J4288  050-00323  M32897          0.0    0.0.00         0.00       0.00     8,851.00 2010/06      /      / DIABLO CANYON 2 - License Renewal SAFETY Review J4288  050-00323  ME2897          0.0    0.0  0.00         0.00        0.00     2,652.00 2010/07      / /      DIABLO CANYON 2 - License Renewal SAFETY Review J4382  050-00323  ME2897          0.0     0.0   0.00         0.00       0.00     18,738.56  2010/06      / /      DIABLO CANYON 2 - License Renewal SAFETY Review J4382  050-00323  ME2897          0.0     0.0   0.00         0.00       0.00     6,344.29  2010/07      / /      DIABLO CANYON 2 - License Renewal SAFETY Review J4382  050-00323  ME2897          0.0     0.0   0.00         0.00       0.00     6,130.00 2010/08        1//    DIABLO CANYON 2 - License Renewal SAFETY Review J4386  050-00323  M12826          0.0     0.0   0.00         0.00       0.00     18,997.00 2010/06      /      /  DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV J4386  050-00323  M12826          0.0     0.0.00         0.00       0.00     9,287.00 2010/07      / /      DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV J4386  050-00323  ME2826          0.0    0.0  0.00          0.00       0.00     -1,163.00 2010/08      /      / DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV J4389  050-00323  ME2897          0.0    0.0.00         0.00       0.00     1,654.83  2010/06      /     / DIABLO CANYON 2 - License Renewal SAFETY Review J4389  050-00323  ME2897          0.0    0.0  0.00          0.00        0.00        437.12 2010/07      /     / DIABLO CANYON 2 - License Renewal SAFETY Review J4389  050-00323  ME2897          0.0    0.0  0.00          0.00        0.00        588.72 2010/08      /     / DIABLO CANYON 2 - License Renewal SAFETY Review J4480  050-00323  M12826          0.0    0.0  0.00          0.00        0.00    17,240.00  2010/08     /     / DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV 3,395.3   130.2         871,765.50   36,340.20     199,322.38 Total Invoice Cost:     1,107,428.00
07/19/11 15:14:35 Page Number:
1 Detail Line For Invoice RL0123-11 For the Period 07/04/10 -
09/25/10 Docket Number 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00323 050-00323 050-00323 Reg NonReg TAC/B&R Hours Hours Rate Hourly Costs PM Costs Contractual Costs Cost Applicnt Date Date Names/Remarks ME1644 ME1644 ME2667 ME2825 ME2825 ME2896 ME2896 ME2995 ME3018 ME3018 ME3942 ME4056 M44056 ME4290 111104 111126A 122122F 122122F 9A1E 9AlN 9AlN ME2896 ME2896 ME2825 ME2825 ME2825 ME2896 ME2896 M32896 ME2896 ME2896 ME2896 ME2896 142896 ME2896 1E2825 ME2825 ME2825 ME2825 ME1645 ME1645 M32668 18.0 1.0 0.5 87.6 42.0 997.4 399.5 16.5 10.5 23.0 3.0 67.0 25.1 3.0 4.0 4.5 38.5 20.0 0.6 0.6 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.0 1.0 1.5 0.0 0.0 0.0 3.8 0.8 46.0 10.1 0.0 0.0 0.0 0.0 1.3 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 257.00 259.00 257.00 257.00 259.00 257.00 259.00 257.00 257.00 259.00 257.00 257.00 259.00 257.00 259.00 257.00 257.00 259.00 257.00 257.00 259.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 257.00 259.00 257.00 4,626.00 259.00 128.50 23,489.80 1;os085.20 268,153.80 106,086.40 4,240.50 2,698.50 5,957.00 771.00 17,553.10 6,837.60 771.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,626.00 259.00 385.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,036.00 1,156.50 9,894.50 5,180.00 154.20 154.20 77.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.00 746.00
-675.00
-1,203.00 1,264.00 7,058.50 1,902.50 494.50 1,591.00 2,653.00 8,851.00 6,344.29 6,130.01 18,738.56
-1,163.00 9,288.00 18,997.00 17,240.00 0.00 0.00 0.00
/
/
I
/
I I
I
/
/
/
/
/
/
/
/
I
/
/
/
/
/
2010/07 2010/06 2010/06 2010/08 2010/07 2010/06 2010/08 2010/07 2010/08 2010/07 2010/06 2010/07 2010/08 2010/06 2010/08 2010/07 2010/06 2010/08
/
/
/
07/03/09 07/03/09 11/20/09 11/23/09 11/23/09 11/24/09 11/24/09 12/14/09 12/29/09 12/29/09 05/17/10 06/14/10 06/14/10 07/22/10
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
07/03/09 07/03/09 11/20/09 DIABLO CANYON 1 -
LAR for TS 3.4.15 RCS Leakage Detection DIAPLO CANYON 1 -
LAR for TS 3.4.15 RCS Leakage Detection DIABLO CANYON 1 - Diablo Canyon Cyber Security LAR DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV DIABLO CANYON 1 - License Renewal SAFETY Review DIABLO CANYON 1 - License Renewal SAFETY Review DIABLO CANYON 1 -
LAR 09-06, Critical Damping Value for Cont DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off DIABLO CANYON 1 -
ASME Relief Request NDE-RCS-SE-IR16 as Mod DIABLO CANYON 1 - Diablo Canyon License Amendment Regarding DIABLO CANYON 1 - Diablo Canyon License Amendment Regarding DIABLO CANYON 1 - Request for Approval of Diablo Canyon plan PM -
OTHER LICENSING TASKS -
(H)
PM -
PM ACTIVITY/RESEARCH
& TEST OPERATING RX PM -
PM LICENSEES/REGIONAL/HQ STAFF INTERFACES PM -
PM LICENSEES/REGIONAL/HQ STAFF INTERFACES PM -
STAFF DEVELOPMENT & PROFESSIONAL MEETINGS PM -
FINANCIAL MANAGEMENT PM -
FINANCIAL MANAGEMENT J4152 J4152 J4244 J4244 J4244 J4287 J4287 J4287 J4288 J4288 J4288 J4382 J4382 J4382 J4386 J4386 J4386 J4480 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- Diablo Canyon, Unit 1, License Renewal ENV
- Diablo Canyon, Unit 1, License Renewal ENV
- Diablo Canyon, Unit 1, License Renewal ENV
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- Diablo Canyon, Unit 1, License Renewal ENV
- Diablo Canyon, Unit 1, License Renewal ENV
- Diablo Canyon, Unit 1, License Renewal ENV
- Diablo Canyon, Unit 1, License Renewal ENV LAR for TS 3.4.15 RCS Leakage Detection LAR for TS 3.4.15 RCS Leakage Detection
- Diablo Canyon Cyber Security LAR
 
Page Number:'
2 07/19/11 15:14:35 Detail Line For Invoice RL0123-ll For the Period 07/04/10 - 09/25/10 Docket Number TAC/B&R Reg NonReg Hours Hours Rate Hourly Costs PH Costs Contractual Costs Cost Applicnt Date Date 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 M12826 ME2826 ME2897 M32897 ME2996 M33019 ME3019 ME3995 Mn3995 MR4057 ME4057 ME4291 ME4577 111104 111104 111126A 122122F 122122F 9Al1 9AlN 9AlN M32897 ME2897 M32826 ME2826 ME2826 M12897 ME2897 M12897 ME2897 M32897 ME2897 ME2897 ME2897 ME2897 M12826 M12826 ME2826 ME2897 ME2897 ME2897 M12826 83.1 38.9 877.2 363.3 16.0 13.5 5.0 22.3 20.5 69.0 22.9 3.0 5.0 1.0 7.0 4.5 38.5 20.0 0.6 0.6 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.7 1.7 46.9 12.2 0.0 0.0 0.0 0.0 0.0 1.2 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 257.00 259.00 257.00 259.00 257.00 257.00 259.00 257.00 259.00 257.00 259.00 257.00 259.00 257.00 259.00 257.00 257.00 259.00 257.00 257.00 259.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22,307.60 10,515.40 237,493.70 97,254.50 4,112.00 3,469.50 1,295.00 5,731.10 5,309.50 18,041.40 6,241.90 771.00 1,295.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 257.00 1,813.00 1,156.50 9,894.50 5,180.00 154.20 154.20 77.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.00 746.00
-675.00 1,264.00
-1,203.00 7,058.50 1,902.50 494.50 1,590.00 8,851.00 2,652.00 18,738.56 6,344.29 6,130.00 18,997.00 9,287.00
-1,163.00 1,654.83 437.12 588.72 17,240.00
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
20 10/07 2010/06 2010/06 2010/07 2010/08 2010/06 2010/08 2010/07 2010/08 2010/06 2010/07 2010/06 2010/07 2010/08 2010/06 2010/07 2010/08 2010/06 2010/07 2010/08 2010/08 11/23/09 11/23/09 11/24/09 11/24/09 12/14/09 12/29/09 12/29/09 05/05/10 05/05/10 06/14/10 06/14/10 07/22/10 08/12/10
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
1//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
1//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Names/Remarks DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 PH -
OTHER LICEN PH -
OTHER LICEN PH -
P1 ACTIVITY PH -
PH LICENSEE PH -
PH LICENSEE P1 -
STAFF DEVEL PH -
FINANCIAL 14 PH -
FINANCIAL 34 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2
- Diablo Canyon, Unit 2, License Renewal ENV
- Diablo Canyon, Unit 2, License Renewal ENV
- License Renewal SAFETY Review
- License Renewal SAFETY Review LAR 09-06, Critical Damping Value for Cont
- Diablo Canyon LAR 09-07 Delayed Access Off
- Diablo Canyon LAR 09-07 Delayed Access Off
- Diablo Canyon RFO 15 SG 180 Day Report
- Diablo Canyon RFO 15 SG 180 Day Report
- Diablo Canyon License Amendment Regarding
- Diablo Canyon License Amendment Regarding
- Request for Approval of Diablo Canyon plan RR NDE-RCS-SE-2RI6 CC N-695 SING TASKS -
(H)
SING TASKS -
(H)
/RESEARCH
& TEST OPERATING RX S/REGIONAL/HQ STAFF INTERFACES S/REGIONAL/HQ STAFF INTERFACES
,OPMENT & PROFESSIONAL MEETINGS ANAGEMENT ANAGEMENT License Renewal SAFETY Review
- License Renewal SAFETY Review
- Diablo Canyon, Unit 2, License Renewal ENV
- Diablo Canyon, Unit 2, License Renewal ENV
- Diablo Canyon, Unit 2, License Renewal ENV
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- Diablo Canyon, Unit 2, License Renewal ENV
- Diablo Canyon, Unit 2, License Renewal ENV
- Diablo Canyon, Unit 2, License Renewal ENV
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- License Renewal SAFETY Review
- Diablo Canyon, Unit 2, License Renewal ENV J4152 J4152 J4244 J4244 J4244 J4287 J4287 J4287 J4288 J4288 J4288 J4382 J4382 J4382 J4386 J4386 J4386 J4389 J4389 J4389 J4480 3,395.3 130.2 871,765.50 36,340.20 199,322.38 Total Invoice Cost:
1,107,428.00


1~4.
1~4.
f     -~
f  
U. S. NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Fedwire see attached Terms and Conditions. If paid by check,                   Invoice No.:          RS0062-11 make check payable to the NRC (reference Invoice no.)   and mail to:
-~
U.S. Nuclear Regulatory Commission                                             Invoice Date:          10./25/10 Accounts Receivable Team P.O. Box 979051                                                               Docket No:        050-00323 St. Louis, MO 63197-9000 License No:         DPR-82 TO:           PACIFIC GAS & ELECTRIC COMPANY                                      Contact:      BILLY BLANEY FAC: DIABLO CANYON 2 ATTN:MANAGER          - REGULATORY          SERVICES                Phone:      301-415-5092 P.O. BOX 56 AVILA BEACH,          CA 93424 Period:        07/04/10        -  09/25/10 Part 50 Routine/Reactive                  Inspections,          Investigations Routine Manpower Fees:                 $      948,749.90 Non-Routine Manpower Fees:                                7,536.10 Resident Inspector Fees:                            27,523.50 Subtotal Staff Hour Fees: $                          983,809.50 Contract Costs: $                            0.00 Common Costs:          $                0.00 Total Billed Amount:               $      983,810.00 REVENUE        CODE:                                                            AMOUNT DUE              $        983,810.00 TERMS. Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately. However, interest will be waived if payment is received within 30 days from the invoice date. Penalty and administrative charges will be assessed on a delinquent invoice. Additional terms and conditions are attached, if applicable.
U.
NOTES. If there are any questions about the existence or amount of the debt, contact the individual named above. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.
S.
NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Fedwire see attached Terms and Conditions.
If paid by check, make check payable to the NRC (reference Invoice no.) and mail to:
U.S. Nuclear Regulatory Commission Accounts Receivable Team P.O.
Box 979051 St. Louis, MO 63197-9000 Invoice No.: RS0062-11 Invoice Date: 10./25/10 Docket No: 050-00323 License No:
DPR-82


A 07/19/11  10:52:16                                                                                                                                                Page Number:   1 Report Line  Items For Hours Included on Invoice RS0062-11 For the Period 07/04/10 - 09/25/10 Docket  No:  050-00323 Total            Routine               NonRtine  Total            NonRoutine                              Total          Resident Report    Report  Routine Non-Reg Routine   Hourly  Fees     NonRtine Non-Reg    NonRtine  Hourly    Fees         Insp Regular  Non-Reg  Resident          Fees Number    Sent    Hours  Hours    Hours    Rate  Amount      Hours      Hours    Hours    Rate    Amount    Site Init  Hours    Hours    Hours    Rate  Amount      Totals 2009004  08/20/10    250.9    13.7    264.6 238.00  62974.80        0.0        0.0        0.0 238.00      0.00                                                          62974.80 2009004  08/20/10    269.9    10.3    280.2 257.00  72011.40        0.0        0.0        0.0 257.00      0.00                                                          72011.40 2010003  08/20/10    424.0    18.3    442.3 257.00  113671.10        0.0        0.0        0.0 257.00      0.00                                                          113671.10 2010004 08/20/10    169.7      4.0    173.7 257.00  44640.90        0.0        0.0        0.0 257.00      0.00                                                          44640.90 2010004 08/20/10      95.4      6.2    101.6 259.00  26314.40        0.0        0.0        0.0 259.00      0.00                                                          26314.40 2010006 08/20/10    458.9    76.3    535.2 257.00  137546.40        0.0        0.0        0.0 257.00      0.00                                                          137546.40 2010006 08/20/10      6.0      1.0      7.0 259.00    1813.00        0.0        0.0        0.0 259.00      0.00                                                            1813.00 2010007 08/20/10     523.6    85.6    609.2 257.00  156564.40        0.0        0.0        0.0 257.00      0.00                                                         156564.40 2010008 08/20/10    225.5      6.5    232.0 257.00   59624.00       0.0        0.0        0.0 257.00      0.00                                                          59624.00 2010008 08/20/10    133.5    10.2    143.7 259.00  37218.30       0.0        0.0        0.0 259.00      0.00                                                          37218.30 2010201  08/20/10    567.1    161.2    728.3  257.00 187173.10        2.0        0.0        2.0 257.00    514.00                                                          187687.10 2010201  08/20/10    17.0      0.0    17.0  259.00  4403.00        0.0        0.0        0.0 259.00      0.00                                                            4403.00 2010401  08/20/10      2.0      0.0      2.0  257.00    514.00        0.0        0.0        0.0 257.00      0.00                                                              514.00 2010403  08/20/10    75.8      5.0    80.8  257.00  20765.60        0.0        0.0        0.0 257.00      0.00                                                          20765.60 2010501  08/20/10    51.3      7.0    58.3  257.00  14983.10      23.6        0.7      24.3  257.00    6245.10                                                          21228.20 2010501  08/20/10      0.0      0.0      0.0  259.00      0.00        2.8        0.2        3.0 259.00    777.00                                                              777.00 2011001  08/20/10    30.7      1.0    31.7  257.00  8146.90        0.0        0.0        0.0 257.00      0.00                                                            8146.90 2011401  08/20/10      1.5      0.0      1.5  257.00    385.50        0.0        0.0        0.0 257.00      0.00                                                              385.50 DIAB MH8      30.0      0.0    30.0 257.00  7710.00    7710.00 DIAB MH8      74.5      2.0    76.5 259.00  19813.50    19813.50 3302  8  406 3  3709  1        948749.90      28.4       0.9      29.3            7536.10             104.5      2.0    106.5        27523.50  983809.50
==Contact:==
BILLY BLANEY Phone:
301-415-5092 TO:
PACIFIC GAS & ELECTRIC COMPANY FAC: DIABLO CANYON 2 ATTN:MANAGER REGULATORY SERVICES P.O.
BOX 56 AVILA BEACH, CA 93424 Period: 07/04/10 -
09/25/10 Part 50 Routine/Reactive Inspections, Investigations Routine Manpower Fees: $
Non-Routine Manpower Fees:
Resident Inspector Fees:
Subtotal Staff Hour Fees: $
Contract Costs: $
948,749.90 7,536.10 27,523.50 983,809.50 0.00 0.00 Common Costs:
Total Billed Amount: $
983,810.00 REVENUE CODE:
AMOUNT DUE 983,810.00 TERMS.
Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately.
: However, interest will be waived if payment is received within 30 days from the invoice date.
Penalty and administrative charges will be assessed on a delinquent invoice.
Additional terms and conditions are attached, if applicable.
NOTES.
If there are any questions about the existence or amount of the debt, contact the individual named above.
For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.


U. S. NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Fedwire see attached Terms and Conditions. If paid by check,                  Invoice No.:          RS0036-11 make check payable to the NRC (reference Invoice no.) and mail to:
A 07/19/11 10:52:16 Page Number:
U.S. Nuclear Regulatory Commission                                            Invoice Date:          10/25/10 Accounts Receivable Team P.O. Box 979051                                                              Docket No:         050-00275 St. Louis, MO 63197-9000 License No:          DPR-80 TO:          PACIFIC GAS & ELECTRIC COMPANY                                      Contact:        BILLY BLANEY FAC: DIABLO CANYON 1 ATTN:TOM BALDWIN                                                    Phone:      301-415-5092 MANAGER REGULATORY SERV.
1 Report Line Items For Hours Included on Invoice RS0062-11 For the Period 07/04/10 09/25/10 Docket No:
DCPP REGULATORY SERVICES AVILA BEACH,          CA 93424 Period:      07/04/10       -  09/25/10 Part 50 Routine/Reactive                  Inspections,          Investigations Routine Manpower Fees:                $      967,303.30 Non-Routine Manpower Fees:                              8,307.70 Resident Inspector Fees:                            18,343.90 Subtotal Staff Hour Fees: $                        993,954.90 Contract Costs: $                            0.00 Common Costs: $                          0.00 Total Billed Amount: $                    993,955.00 REVENUE CODE:                                                                  AMOUNT DUE              $        993,955.00 TERMS. Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately. However, interest will be waived if payment is received within 30 days from the invoice date. Penalty and administrative charges will be assessed on a delinquent invoice. Additional terms and conditions are attached, if applicable.
050-00323 Total Routine NonRtine Total NonRoutine Total Resident Report Report Routine Non-Reg Routine Hourly Fees NonRtine Non-Reg NonRtine Hourly Fees Insp Regular Non-Reg Resident Fees Number Sent Hours Hours Hours Rate Amount Hours Hours Hours Rate Amount Site Init Hours Hours Hours Rate Amount Totals 2009004 08/20/10 250.9 13.7 264.6 238.00 62974.80 0.0 0.0 0.0 238.00 0.00 62974.80 2009004 08/20/10 269.9 10.3 280.2 257.00 72011.40 0.0 0.0 0.0 257.00 0.00 72011.40 2010003 08/20/10 424.0 18.3 442.3 257.00 113671.10 0.0 0.0 0.0 257.00 0.00 113671.10 2010004 08/20/10 169.7 4.0 173.7 257.00 44640.90 0.0 0.0 0.0 257.00 0.00 44640.90 2010004 08/20/10 95.4 6.2 101.6 259.00 26314.40 0.0 0.0 0.0 259.00 0.00 26314.40 2010006 08/20/10 458.9 76.3 535.2 257.00 137546.40 0.0 0.0 0.0 257.00 0.00 137546.40 2010006 08/20/10 6.0 1.0 7.0 259.00 1813.00 0.0 0.0 0.0 259.00 0.00 1813.00 2010007 08/20/10 523.6 85.6 609.2 257.00 156564.40 0.0 0.0 0.0 257.00 0.00 156564.40 2010008 08/20/10 225.5 6.5 232.0 257.00 59624.00 0.0 0.0 0.0 257.00 0.00 59624.00 2010008 08/20/10 133.5 10.2 143.7 259.00 37218.30 0.0 0.0 0.0 259.00 0.00 37218.30 2010201 08/20/10 567.1 161.2 728.3 257.00 187173.10 2.0 0.0 2.0 257.00 514.00 187687.10 2010201 08/20/10 17.0 0.0 17.0 259.00 4403.00 0.0 0.0 0.0 259.00 0.00 4403.00 2010401 08/20/10 2.0 0.0 2.0 257.00 514.00 0.0 0.0 0.0 257.00 0.00 514.00 2010403 08/20/10 75.8 5.0 80.8 257.00 20765.60 0.0 0.0 0.0 257.00 0.00 20765.60 2010501 08/20/10 51.3 7.0 58.3 257.00 14983.10 23.6 0.7 24.3 257.00 6245.10 21228.20 2010501 08/20/10 0.0 0.0 0.0 259.00 0.00 2.8 0.2 3.0 259.00 777.00 777.00 2011001 08/20/10 30.7 1.0 31.7 257.00 8146.90 0.0 0.0 0.0 257.00 0.00 8146.90 2011401 08/20/10 1.5 0.0 1.5 257.00 385.50 0.0 0.0 0.0 257.00 0.00 385.50 DIAB MH8 30.0 0.0 30.0 257.00 7710.00 7710.00 DIAB MH8 74.5 2.0 76.5 259.00 19813.50 19813.50 3302 8 406 3 3709 1 948749.90 28.4 0.9 29.3 7536.10 104.5 2.0 106.5 27523.50 983809.50
NOTES. If there are any questions about the existence or amount of the debt, contact the individual named above. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.


P Page  Number: ',
U.
07/13/11 09:56:09 Report Line Items For Hours Included on Invoice RS0036-11 For the Period 07/04/10 - 09/25/10 Docket No:   050-00275 Total           Routine               NonRtine   Total           NonRoutine                             Total         Resident Report   Report   Routine Non-Reg Routine   Hourly   Fees     NonRtine Non-Reg     NonRtine Hourly     Fees         Insp Regular Non-Reg Resident         Fees Number   Sent     Hours   Hours   Hours     Rate   Amount       Hours     Hours     Hours   Rate     Amount   Site Init Hours   Hours   Hours   Rate   Amount       Totals 2010003 08/20/10   469.8     18.5   488.3 257.00 125493.10         0.0       0.0       0.0 257.00       0.00                                                           125493.10 2010004 08/20/10   214.8     6.0   220.8 257.00   56745.60         0.0       0.0       0.0 257.00       0.00                                                           56745.60 2010004 08/20/10   130.6     5.3   135.9 259.00 35198.10         0.0       0.0       0.0 259.00       0.00                                                           35198.10 2010005 08/20/10     8.0     0.0     8.0 257.00   2056.00         0.0       0.0       0.0 257.00       0.00                                                             2056.00 2010005 08/20/10     14.0     0.0     14.0 259.00   3626.00         0.0       0.0       0.0 259.00       0.00                                                             3626.00 2010006 08/20/10   471.9     73.7   545.6 257.00 140219.20         0.0       0.0       0.0 257.00       0.00                                                           140219.20 2010006 08/20/10     6.0     1.0     7.0 259.00   1813.00         0.0       0.0       0.0 259.00       0.00                                                             1813.00 2010007 08/20/10   676.8     93.9   770.7 257.00 198069.90         0.0       0.0       0.0 257.00       0.00                                                           198069.90 2010008 08/20/10   245.5     7.5   253.0 257.00   65021.00         0.0       0.0       0.0 257.00       0.00                                                           65021.00 2010008 08/20/10   214.0     11.3   225.3 259.00   58352.70         0.0       0.0       0.0 259.00       0.00                                                           58352.70 2010201 08/20/10   670.4   203.5   873.9 257.00 224592.30         2.0       0.0       2.0 257.00     514.00                                                           225106.30 2010201 08/20/10     18.0     0.0     18.0 259.00   4662.00         0.0       0.0       0.0 259.00       0.00                                                             4662.00 2010401 08/20/10     3.5     0.5     4.0 257.00   1028.00         0.0       0.0       0.0 257.00       0.00                                                             1028.00 2010403 08/20/10     73.5     11.3     84.8 257.00 21793.60         0.0       0.0       0.0 257.00       0.00                                                           21793.60 2010501 08/20/10     54.8     8.3     63.1 257.00 16216.70       26.2       0.8     27.0 257.00   6939.00                                                           23155.70 2010501 08/20/10     0.0     0.0     0.0 259.00     0.00         3.0       0.3       3.3 259.00     854.70                                                               854.70 2011001 08/20/10     40.3     2.0     42.3 257.00 10871.10         0.0       0.0       0.0 257.00       0.00                                                           10871.10 2011401 08/20/10     4.5     0.0     4.5 257.00   1156.50         0.0       0.0       0.0 257.00       0.00                                                             1156.50 2011401 08/20/10     1.5     0.0       1.5 259.00   388.50         0.0       0.0       0.0 259.00       0.00                                                               388.50 DIAB MS2     34.5     1.0     35.5 257.00   9123.50       9123.50 DIAB MS2     32.8     2.8     35.6 259.00   9220.40       9220.40 3317 09     2 8   3760 773               3         1 2       1 1     32 3           8307.70               C7.3     3.8     71.1         18343.90   993954.90
S.
NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Fedwire see attached Terms and Conditions.
If paid by check, make check payable to the NRC (reference Invoice no.) and mail to:
U.S. Nuclear Regulatory Commission Accounts Receivable Team P.O.
Box 979051 St. Louis, MO 63197-9000 Invoice No.: RS0036-11 Invoice Date: 10/25/10 Docket No: 050-00275 License No:
DPR-80
 
==Contact:==
BILLY BLANEY Phone:
301-415-5092 TO:
PACIFIC GAS & ELECTRIC COMPANY FAC: DIABLO CANYON 1 ATTN:TOM BALDWIN MANAGER REGULATORY SERV.
DCPP REGULATORY SERVICES AVILA BEACH, CA 93424 Period: 07/04/10 -
09/25/10 Part 50 Routine/Reactive Inspections, Investigations Routine Manpower Fees: $
967,303.30 Non-Routine Manpower Fees:
8,307.70 Resident Inspector Fees:
18,343.90 Subtotal Staff Hour Fees: $
993,954.90 Contract Costs: $
0.00 Common Costs: $
0.00 Total Billed Amount: $
993,955.00 REVENUE CODE:
AMOUNT DUE 993,955.00 TERMS.
Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately.
: However, interest will be waived if payment is received within 30 days from the invoice date.
Penalty and administrative charges will be assessed on a delinquent invoice.
Additional terms and conditions are attached, if applicable.
NOTES.
If there are any questions about the existence or amount of the debt, contact the individual named above.
For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.
 
07/13/11 09:56:09 P
Page Number: ',
Report Line Items For Hours Included on Invoice RS0036-11 For the Period 07/04/10 -
09/25/10 Docket No:
050-00275 Total Routine NonRtine Total NonRoutine Total Resident Report Report Routine Non-Reg Routine Hourly Fees NonRtine Non-Reg NonRtine Hourly Fees Insp Regular Non-Reg Resident Fees Number Sent Hours Hours Hours Rate Amount Hours Hours Hours Rate Amount Site Init Hours Hours Hours Rate Amount Totals 2010003 08/20/10 469.8 18.5 488.3 257.00 125493.10 0.0 0.0 0.0 257.00 0.00 125493.10 2010004 08/20/10 214.8 6.0 220.8 257.00 56745.60 0.0 0.0 0.0 257.00 0.00 56745.60 2010004 08/20/10 130.6 5.3 135.9 259.00 35198.10 0.0 0.0 0.0 259.00 0.00 35198.10 2010005 08/20/10 8.0 0.0 8.0 257.00 2056.00 0.0 0.0 0.0 257.00 0.00 2056.00 2010005 08/20/10 14.0 0.0 14.0 259.00 3626.00 0.0 0.0 0.0 259.00 0.00 3626.00 2010006 08/20/10 471.9 73.7 545.6 257.00 140219.20 0.0 0.0 0.0 257.00 0.00 140219.20 2010006 08/20/10 6.0 1.0 7.0 259.00 1813.00 0.0 0.0 0.0 259.00 0.00 1813.00 2010007 08/20/10 676.8 93.9 770.7 257.00 198069.90 0.0 0.0 0.0 257.00 0.00 198069.90 2010008 08/20/10 245.5 7.5 253.0 257.00 65021.00 0.0 0.0 0.0 257.00 0.00 65021.00 2010008 08/20/10 214.0 11.3 225.3 259.00 58352.70 0.0 0.0 0.0 259.00 0.00 58352.70 2010201 08/20/10 670.4 203.5 873.9 257.00 224592.30 2.0 0.0 2.0 257.00 514.00 225106.30 2010201 08/20/10 18.0 0.0 18.0 259.00 4662.00 0.0 0.0 0.0 259.00 0.00 4662.00 2010401 08/20/10 3.5 0.5 4.0 257.00 1028.00 0.0 0.0 0.0 257.00 0.00 1028.00 2010403 08/20/10 73.5 11.3 84.8 257.00 21793.60 0.0 0.0 0.0 257.00 0.00 21793.60 2010501 08/20/10 54.8 8.3 63.1 257.00 16216.70 26.2 0.8 27.0 257.00 6939.00 23155.70 2010501 08/20/10 0.0 0.0 0.0 259.00 0.00 3.0 0.3 3.3 259.00 854.70 854.70 2011001 08/20/10 40.3 2.0 42.3 257.00 10871.10 0.0 0.0 0.0 257.00 0.00 10871.10 2011401 08/20/10 4.5 0.0 4.5 257.00 1156.50 0.0 0.0 0.0 257.00 0.00 1156.50 2011401 08/20/10 1.5 0.0 1.5 259.00 388.50 0.0 0.0 0.0 259.00 0.00 388.50 DIAB MS2 34.5 1.0 35.5 257.00 9123.50 9123.50 DIAB MS2 32.8 2.8 35.6 259.00 9220.40 9220.40 3317 09 2 8 3760 773 3
1 2
1 1 32 3 8307.70 C7.3 3.8 71.1 18343.90 993954.90


t.
t.
U.SNRC:
U.SNRC:
Un~ite&d Suares Nudc~ar lkcguhacorý             Ztimi.~n ProtectiWg People and the Environment Quarter Period:                                                           10/01/2010 - 09/30/2011 Cost Accumulated through:                                                                12/18/2010 Vendor:                                                                              Remit To:
Un~ite&d Suares Nudc~ar lkcguhacorý Ztimi.~n ProtectiWg People and the Environment Vendor:
Pacific Gas & Electric Co.                                                        Office of the Chief Financial Officer ATTN: DCPP REGULATORY SERVICES                                                    U.S. Nuclear Regulatory Commission P.O. Box 979051 MANAGER - REGULATORY SERVICES St. Louis, MO 63197 P.O. BOX 56 AVILA BEACH, CA 93424 Bills for Period:
Quarter Period:
BD Number                         Date                              Due Date                    Amount                                Docket LFB 11-1787                       Feb 11, 2011                       Mar 13, 2011               $560,369.81                           05000275 LFB 11-1814                      Feb 11, 2011                      Mar 13, 2011                $389,212.25                           05000323 Collections and Adjustments:
Cost Accumulated through:
CR Number                   Bill Number                 Date                          Line Type              Amount                        Docket CL 11-0040                 CL RS0062-11               Nov 5, 2010                  NR                      $983,810.00 CR ACH110114               CR 11-0260                 Jan 14, 2011                  NR                      $1,159,000.00                  05000323 CR ACH110114               CR 11-0260                 Jan 14, 2011                  NR                      $37,000.00                    05000323 CL 11-1215                 CL 11-1160                 Feb 22, 2011                  NR                      $1,159,000.00                  05000275 CL 11-1215                 CL 11-1160                 Feb 22, 2011                  NR                      $37,000.00                    05000275 CL 11-1216                 CL 11-1190                 Feb 22, 2011                 NR                     $1,159,000.00                 05000323 CL 11-1216                  CL 11-1190                  Feb 22, 2011                  NR                      $37,000.00                     05000323 33 of 1130
Pacific Gas & Electric Co.
ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Remit To:
10/01/2010 - 09/30/2011 12/18/2010 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:
BD Number LFB 11-1787 LFB 11-1814 Date Feb 11, 2011 Feb 11, 2011 Due Date Mar 13, 2011 Mar 13, 2011 Amount
$560,369.81
$389,212.25 Docket 05000275 05000323 Collections and Adjustments:
CR Number Bill Number CL 11-0040 CL RS0062-11 CR ACH110114 CR 11-0260 CR ACH110114 CR 11-0260 CL 11-1215 CL 11-1160 CL 11-1215 CL 11-1160 CL 11-1216 CL 11-1190 CL 11-1216 CL 11-1190 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Line Type NR NR NR NR NR NR NR 33 of 1130 Amount
$983,810.00
$1,159,000.00
$37,000.00
$1,159,000.00
$37,000.00
$1,159,000.00
$37,000.00 Docket 05000323 05000323 05000275 05000275 05000323 05000323


Collections and Adjustments:
Collections and Adjustments:
CR Number                       Bill Number                 Date                           Line Type                     Amount                         Docket If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
CR Number Bill Number Date Line Type Amount Docket If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Additional terms and conditions are attached.
Additional terms and conditions are attached.
Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.
Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.
34 of 1130
34 of 1130


Billing Details:
Billing Details:
Docket #:      05000275                    License #:      DPR-80 PART 170:
PART 170:
TAC/IR Number           TAC/IR Name             Payment Period Regular   Non-         Hour Rate   Hourly Costs Contract Costs   Total Costs End Date      Hours      Regular Hours TAC Details ME2896                   DIABLO CANYON 1 -       Dec 4, 2010    609.75      26.25        $259.00    $164,724.00          $0.00  $164,724.00 License Renewal SAFETY Review ME3018                  DIABLO CANYON 1 -       Dec 18, 2010  20.0        0.0            $259.00      $5,180.00          $0.00    $5,180.00 Diablo Canyon LAR 09-07 Delayed Access Off ME5033                  DIABLO CANYON 1 - Pre- Dec 4, 2010    16.5        2.25          $259.00      $4,856.25          $0.00    $4,856.25 Application Meeting for Seismic Licens ME4290                  DIABLO CANYON 1 -       Oct 23, 2010  1.5        0.0            $259.00        $388.50          $0.00      $388.50 Request for Approval of Diablo Canyon plan ME2825                  DIABLO CANYON 1 -       Dec 18, 2010  170.75      6.0            $259.00    $45,778.25          $0.00    $45,778.25 Diablo Canyon, Unit 1, License Renewal ENV ME1644                  DIABLO CANYON 1 - LAR   Dec 18, 2010   10.5       0.0           $259.00     $2,719.50          $0.00     $2,719.50 forTS 3.4.15 RCS Leakage Detection MD7094                  DIABLO CANYON 1 - Plant  Dec 18, 2010  99.75      8.0            $259.00     $27,907.25           $0.00  $27,907.25 Project Manager (10CFR170)
TAC/IR Number Docket #:
X02471                  INITIAL EXAM - UNIT 1 -  Dec 18, 2010  1.0         0.0           $259.00       $259.00           $0.00       $259.00 DC (07/2011)
TAC/IR Name 05000275 Payment Period End Date License #:
ME4924                  DIABLO CANYON 1 -        Nov 20, 2010  22.5        0.0            $259.00     $5,827.50           $0.00     $5,827.50 Reactor Vessel Material Surveillance Capsu Adjustments No Adjustments Found Total TAC Due for Docket:                                       952.25     42.5                     $257,640.25           $0.00 $257,640.25 35 of 1130
Regular Non-Hours Regular Hours DPR-80 Hour Rate Hourly Costs Contract Costs Total Costs TAC Details ME2896 ME3018 ME5033 ME4290 ME2825 ME1644 MD7094 X02471 ME4924 DIABLO CANYON 1 -
License Renewal SAFETY Review DIABLO CANYON 1 -
Diablo Canyon LAR 09-07 Delayed Access Off DIABLO CANYON 1 - Pre-Application Meeting for Seismic Licens DIABLO CANYON 1 -
Request for Approval of Diablo Canyon plan DIABLO CANYON 1 -
Diablo Canyon, Unit 1, License Renewal ENV DIABLO CANYON 1 - LAR forTS 3.4.15 RCS Leakage Detection DIABLO CANYON 1 - Plant Project Manager (10CFR170)
INITIAL EXAM - UNIT 1 -
DC (07/2011)
DIABLO CANYON 1 -
Reactor Vessel Material Surveillance Capsu Dec 4, 2010 Dec 18, 2010 Dec 4, 2010 Oct 23, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 Nov 20, 2010 609.75 20.0 16.5 1.5 170.75 10.5 99.75 1.0 22.5 26.25 0.0 2.25 0.0 6.0 0.0 8.0 0.0 0.0
$259.00
$259.00
$259.00
$259.00
$259.00
$259.00
$259.00
$259.00
$259.00
$164,724.00
$5,180.00
$4,856.25
$388.50
$45,778.25
$2,719.50
$27,907.25
$259.00
$5,827.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$164,724.00
$5,180.00
$4,856.25
$388.50
$45,778.25
$2,719.50
$27,907.25
$259.00
$5,827.50 Adjustments No Adjustments Found Total TAC Due for Docket:
952.25 42.5 35 of 1130
$257,640.25
$0.00
$257,640.25


Billing Details:
Billing Details:
Inspection Report Details 2010004/05000275         2010004/05000275 Oct 23, 2010 21.25       0.0   $259.00    $5,503.75  $0.00      $5,503.75 2011001/05000275        2011001/05000275 Nov 20, 2010 1.0         0.$259.00     $259.00 $0.00       $259.00 2010005/05000275        2010005/05000275 Dec 4, 2010  920.25      115.0 $259.00 $268,129.75 $0.00   $268,129.75 2010008/05000275        2010008/05000275 Nov 20, 2010 62.0       3.5   $259.00   $16,964.50  $0.00    $16,964.50 Adjustments No Adjustments Found Total IR Due for Docket:                               1004.5     118.5         $290,857.00 $0.00    $290,857.00 PM / SRI Allocated Overhead Hours:
Inspection Report Details 2010004/05000275 2010004/05000275 2011001/05000275 2011001/05000275 2010005/05000275 2010005/05000275 2010008/05000275 2010008/05000275 Oct 23, 2010 Nov 20, 2010 Dec 4, 2010 Nov 20, 2010 21.25 1.0 920.25 62.0 0.0 0.0 115.0 3.5
Dec 18, 2010 44.84       1.0   $259.00   $11,872.56           $11,872.56 Total for PM / SRI Due for Docket:                                                                      $11,872.56 TOTAL PART 170:                                                                                        $560,369.81 Total for License/Docket:                                                                           $560,369.81 36 of 1130
$259.00
$259.00
$259.00
$259.00
$5,503.75
$259.00
$268,129.75
$16,964.50
$0.00
$0.00
$0.00
$0.00
$5,503.75
$259.00
$268,129.75
$16,964.50 Adjustments No Adjustments Found Total IR Due for Docket:
1004.5 118.5
$290,857.00
$0.00 PM / SRI Allocated Overhead Hours:
Total for PM / SRI Due for Docket:
Dec 18, 2010 44.84 1.0
$259.00
$11,872.56
$290,857.00
$11,872.56
$11,872.56
$560,369.81
$560,369.81 TOTAL PART 170:
Total for License/Docket:
36 of 1130


Billing Details:
Billing Details:
Docket #:    05000323                    License #:      DPR-82 PART 170:
PART 170:
TAC/IR Number   TAC/IR Name             Payment Period Regular    Non-          Hour Rate  Hourly Costs Contract Costs Total Costs End Date      Hours      Regular Hours TAC Details ME3019          DIABLO CANYON 2 -       Dec 18, 2010  19.5        0.5            $259.00    $5,180.00          $0.00  $5,180.00 Diablo Canyon LAR 09-07 Delayed Access Off ME4291          DIABLO CANYON 2 -       Oct 23, 2010  1.5        0.0            $259.00      $388.50          $0.00    $388.50 Request for Approval of Diablo Canyon plan ME4577          DIABLO CANYON 2 - RR   Dec 18, 2010  32.0        1.5            $259.00    $8,676.50          $0.00  $8,676.50 NDE-RCS-SE-2R16 CC N-695 ME1645          DIABLO CANYON 2 - LAR   Dec 18, 2010  10.5        0.0            $259.00    $2,719.50          $0.00  $2,719.50 for TS 3.4.15 RCS Leakage Detection ME3995          DIABLO CANYON 2 -       Nov 20, 2010   8.0         0.0             $259.00   $2,072.00           $0.00  $2,072.00 Diablo Canyon RFO 15 SG 180 Day Report MD7095          DIABLO CANYON 2 - Plant Dec 18, 2010  99.5       7.5           $259.00   $27,713.00           $0.00 $27,713.00 Project Manager (10CFR170)
TAC/IR Number TAC Details ME3019 ME4291 ME4577 ME1645 ME3995 MD7095 ME2826 ME2897 X02472 ME5034 Docket #:
ME2826          DIABLO CANYON 2 -      Dec 18, 2010  165.0      8.5            $259.00    $44,936.50          $0.00 $44,936.50 Diablo Canyon, Unit 2, License Renewal ENV ME2897          DIABLO CANYON 2 -      Dec 18, 2010  586.75      31.0          $259.00   $159,997.25           $0.00 $159,997.25 License Renewal SAFETY Review X02472          INITIAL EXAM - UNIT 2 - Dec 18, 2010  1.0         0.0           $259.00       $259.00           $0.00     $259.00 DC (07/2011)
TAC/IR Name DIABLO CANYON 2 -
ME5034          DIABLO CANYON 2 - Pre-  Dec 18, 2010  16.5        2.25          $259.00     $4,856.25           $0.00   $4,856.25 Application Meeting for Seismic Licens Adjustments 37 of 1130
Diablo Canyon LAR 09-07 Delayed Access Off DIABLO CANYON 2 -
Request for Approval of Diablo Canyon plan DIABLO CANYON 2 - RR NDE-RCS-SE-2R16 CC N-695 DIABLO CANYON 2 - LAR for TS 3.4.15 RCS Leakage Detection DIABLO CANYON 2 -
Diablo Canyon RFO 15 SG 180 Day Report DIABLO CANYON 2 - Plant Project Manager (10CFR170)
DIABLO CANYON 2 -
Diablo Canyon, Unit 2, License Renewal ENV DIABLO CANYON 2 -
License Renewal SAFETY Review INITIAL EXAM - UNIT 2 -
DC (07/2011)
DIABLO CANYON 2 - Pre-Application Meeting for Seismic Licens 05000323 Payment Period End Date Dec 18, 2010 Oct 23, 2010 Dec 18, 2010 Dec 18, 2010 Nov 20, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 License #:
DPR-82 Regular Non-Hour Rate Hours Regular Hours 19.5 0.5
$259.00 1.5 0.0  
$259.00 32.0 1.5
$259.00 10.5 0.0
$259.00 8.0 0.0
$259.00 99.5 7.5  
$259.00 165.0 8.5
$259.00 586.75 31.0
$259.00 1.0 0.0
$259.00 16.5 2.25
$259.00 Hourly Costs
$5,180.00
$388.50
$8,676.50
$2,719.50
$2,072.00
$27,713.00
$44,936.50
$159,997.25
$259.00
$4,856.25 Contract Costs
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 Total Costs
$5,180.00
$388.50
$8,676.50
$2,719.50
$2,072.00
$27,713.00
$44,936.50
$159,997.25
$259.00
$4,856.25 Adjustments 37 of 1130


Billing Details:
Billing Details:
Adjustments ME2897                   DIABLO CANYON 2 -     Sep 25, 2010 0.0         -0.75 $259.00   ($194.25)             ($194.25)
Adjustments ME2897 DIABLO CANYON 2 -
License Renewal SAFETY Review No Adjustments Found Total TAC Due for Docket:                                     940.25       50.5         $256,604.25 $0.00   $256,604.25 Inspection Report Details 2010008/05000323         2010008/05000323       Nov 20, 2010 66.0       1.0   $259.00   $17,353.00 $0.00     $17,353.00 2010005/05000323        2010005/05000323        Dec 18, 2010 414.25      8.75  $259.00  $109,557.00 $0.00    $109,557.00 2011001/05000323        2011001/05000323        Nov 20, 2010 0.5        0.0   $259.00     $129.50  $0.00       $129.50 2010004/05000323        2010004/05000323        Oct 23, 2010 19.5        2.0    $259.00   $5,568.50  $0.00      $5,568.50 Adjustments No Adjustments Found Total IR Due for Docket:                                     500.25       11.75         $132,608.00 $0.00   $132,608.00 TOTAL PART 170:                                                                                                $389,212.25 Total for License/Docket:                                                                                   $389,212.25 38 of 1130
License Renewal SAFETY Review Sep 25, 2010 0.0
-0.75
$259.00
($194.25)
($194.25)
No Adjustments Found Total TAC Due for Docket:
940.25 50.5
$256,604.25
$0.00 Inspection Report Details 2010008/05000323 2010008/05000323 2010005/05000323 2010005/05000323 2011001/05000323 2011001/05000323 2010004/05000323 2010004/05000323 Nov 20, 2010 Dec 18, 2010 Nov 20, 2010 Oct 23, 2010 66.0 414.25 0.5 19.5 1.0 8.75 0.0 2.0
$259.00
$259.00
$259.00
$259.00
$17,353.00
$109,557.00
$129.50
$5,568.50
$0.00
$0.00
$0.00
$0.00
$256,604.25
$17,353.00
$109,557.00
$129.50
$5,568.50 Adjustments No Adjustments Found Total IR Due for Docket:
500.25 11.75
$132,608.00
$0.00 TOTAL PART 170:
$132,608.00
$389,212.25
$389,212.25 Total for License/Docket:
38 of 1130


Remittance Information:
Remittance Information:
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number                             Due Date     Amount               Docket   Total Due LFB 11-1787                           Mar 13, 2011 $560,369.81         05000275 LFB 11-1814                           Mar 13, 2011 $389,212.25         05000323
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-1787 Mar 13, 2011  
                                                                                  $949,582.06 39 of 1130
$560,369.81 05000275 LFB 11-1814 Mar 13, 2011  
$389,212.25 05000323
$949,582.06 39 of 1130


I - .-.
I -
Uniced Suares Nucicar Reguiacory Cormmi,ssion ProtectingPeople and the Enwvironmenzt Quarter Period:                                                         10/01/2010 - 09/30/2011 Cost Accumulated through:                                                              03/26/2011 Vendor:                                                                            Remit To:
Uniced Suares Nucicar Reguiacory Cormmi, ssion Protecting People and the Enwvironmenzt Vendor:
Pacific Gas & Electric Co.                                                    Office of the Chief Financial Officer ATTN: DCPP REGULATORY SERVICES                                                U.S. Nuclear Regulatory Commission P.O. Box 979051 MANAGER - REGULATORY SERVICES St. Louis, MO 63197 P.O. BOX 56 AVILA BEACH, CA 93424 Bills for Period:
Quarter Period:
BD Number                         Date                            Due Date                  Amount                                Docket LFB 11-3915                       May 23, 2011                   Jun 22, 2011               $497,515.69                           05000275 LFB 11-3943                        May 23, 2011                    Jun 22, 2011              $484,200.50                           05000323 Collections and Adjustments:
Cost Accumulated through:
CR Number                  Bill Number               Date                        Line Type              Amount                        Docket CL 11-0040                  CL RS0062-11               Nov 5, 2010                 NR                     $983,810.00 CR ACH110114                CR 11-0260                Jan 14, 2011                NR                    $1,159,000.00                 05000323 CR ACH110114                CR 11-0260                Jan 14, 2011                NR                    $37,000.00                     05000323 CL 11-1215                  CL 11-1160                Feb 22, 2011                NR                    $1,159,000.00                 05000275 CL 11-1215                  CL 11-1160                Feb 22, 2011                NR                    $37,000.00                     05000275 CL 11-1216                  CL 11-1190                Feb 22, 2011                NR                    $1,159,000.00                 05000323 CL 11-1216                  CL 11-1190                Feb 22, 2011                NR                    $37,000.00                     05000323 25 of 898
Pacific Gas & Electric Co.
ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Remit To:
10/01/2010 - 09/30/2011 03/26/2011 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:
BD Number LFB 11-3915 LFB 11-3943 Date May 23, 2011 May 23, 2011 Due Date Jun 22, 2011 Jun 22, 2011 Amount
$497,515.69
$484,200.50 Docket 05000275 05000323 Collections CR Number CL 11-0040 CR ACH110114 CR ACH110114 CL 11-1215 CL 11-1215 CL 11-1216 CL 11-1216 and Adjustments:
Bill Number CL RS0062-11 CR 11-0260 CR 11-0260 CL 11-1160 CL 11-1160 CL 11-1190 CL 11-1190 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Line Type NR NR NR NR NR NR NR Amount
$983,810.00
$1,159,000.00
$37,000.00
$1,159,000.00
$37,000.00
$1,159,000.00
$37,000.00 Docket 05000323 05000323 05000275 05000275 05000323 05000323 25 of 898


Collections and Adjustments:
Collections and Adjustments:
CR Number                       Bill Number                 Date                            Line Type                    Amount                        Docket CL 11-1693                     CL 11-1814                 Mar 22, 2011                    NR                            $389,212.25                    05000323 CL 11-2319                     CL 11-1787                 May 3, 2011                    NR                            $559,895.83                    05000275 CR 11-0543                     CR 11-2925                 May 17, 2011                    WO                            $0.00                          05000275 CR 11-0543                     CR 11-2925                 May 17, 2011                    WO                            $0.00                          05000275 CR 11-0545                     CR 11-2955                 May 17, 2011                    WO                            $0.00                          05000323 CR 11-0545                     CR 11-2955                 May 17, 2011                    WO                            $0.00                          05000323 CL 11-2372                                                 May 19, 2011                    Al                            $69,370.56                    05000275 CL 11-2372                     CL 11-2925                 May 19, 2011                    NR                            $37,000.00                    05000275.
CR Number Bill Number CL 11-1693 CL 11-1814 CL 11-2319 CL 11-1787 CR 11-0543 CR 11-2925 CR 11-0543 CR 11-2925 CR 11-0545 CR 11-2955 CR 11-0545 CR 11-2955 CL 11-2372 CL 11-2372 CL 11-2925 CL 11-2372 CL 11-2925 CL 11-2374 CL 11-2374 CL 11-2955 CL 11-2374 CL 11-2955 Date Mar 22, 2011 May 3, 2011 May 17, 2011 May 17, 2011 May 17, 2011 May 17, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 Line Type NR NR WO WO WO WO Al NR NR AI NR NR Amount
CL 11-2372                     CL 11-2925                 May 19, 2011                   NR                             $1,159,000.00                 05000275 CL 11-2374                                                  May 19, 2011                    AI                            $54,454.75                     05000323 CL 11-2374                      CL 11-2955                  May 19, 2011                    NR                            $1,159,000.00                 05000323 CL 11-2374                      CL 11-2955                  May 19, 2011                    NR                            $37,000.00                     05000323 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
$389,212.25
$559,895.83
$0.00
$0.00
$0.00
$0.00
$69,370.56
$37,000.00
$1,159,000.00
$54,454.75
$1,159,000.00
$37,000.00 Docket 05000323 05000275 05000275 05000275 05000323 05000323 05000275 05000275.
05000275 05000323 05000323 05000323 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Additional terms and conditions are attached.
Additional terms and conditions are attached.
Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.
Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.
26   of 898
26 of 898


Docket:         (Multiple Items) Hourly Rate: $259 TAC/IR Number TAC/IR Name         Payperiod End Date Regular/ Non- Total Total Costs Reaular Hours Hours 2010005/05000275 2010005/05000275 01-JAN-11         NONREG       6     $1,554.00 REG           62.5   $16,187.50 15-JAN-11         REG           17     $4,403.00 29-JAN-11         REG           1     $259.00 2010005/05000323 2010005/05000323 01-JAN-11         NONREG       1     $259.00 REG           44.75 $11,590.25 15-JAN-1l1         REG           15     $3,885.00 29-JAN-11         REG           1     $259.00 2010501/05000275 2010501/05000275 01-JAN-11         REG           0.25   $64.75 2011001/05000275 2011001/05000275 12-FEB-1l1         REG           4.75   $1,230.25 15-JAN-1 1         REG           28     $7,252.00 26-FEB-11         REG           0.5   $129.50 29-JAN-1 1         REG           7.75   $2,007.25 2011001/05000323 2011001/05000323 12-FEB-1 1         REG           4.75   $1,230.25 15-JAN-11         REG           25.25 $6,539.75 26-FEB-11         REG           0.5   $129.50 29-JAN-11         REG           7.75   $2,007.25 2011002/05000275 2011002/05000275 12-FEB-11         NONREG       2.5   $647.50 REG           111.5 $28,878.50 12-MAR-11         NONREG       4.5   $1,165.50 REG           93.5   $24,216.50 15-JAN-11         NONREG       2.5   $647.50 REG           59.75 $15,475.25 26-FEB-1I         NONREG       1.5   $388.50 REG           85.25 $22,079.75 26-MAR-1I         NONREG       3.5   $906.50 REG           91.75 $23,763.25 29-JAN-11         NONREG       9.5   $2,460.50 REG           86.25 $22,338.75 2011002/05000323 2011002/05000323 12-FEB-11         NONREG       2.25   $582.75 REG           100.75 $26,094.25 12-MAR-11         NONREG       4.75   $1,230.25 REG           95     $24,605.00 15-JAN-11         NONREG       4.5   $1,165.50 REG           54.5   $14,115.50 26-FEB-11         NONREG       1.5   $388.50 REG           69.5   $18,000.50 26-MAR-11         NONREG       3.5   $906.50 REG           96     $24,864.00 29-JAN-11         NONREG       7.5   $1,942.50 REG           88.75 $22,986.25 2011003/0500027512011003/05000275 29-JAN-1I         NONREG       1     $259.00 2011201/0500027512011201/05000275 12-FEB-1I         REG           4.5   $1,165.50 12-MAR-11         NO)NRF(*     *1 7R .*R ?*23 9R OREG         314175 $236,1325 REG           141.75 $36,713.25
Docket:
(Multiple Items)
Hourly Rate: $259 TAC/IR Number TAC/IR Name Payperiod End Date Regular/ Non-Total Total Costs Reaular Hours Hours 2010005/05000275 2010005/05000275 01-JAN-11 NONREG 6  
$1,554.00 REG 62.5  
$16,187.50 15-JAN-11 REG 17  
$4,403.00 29-JAN-11 REG 1  
$259.00 2010005/05000323 2010005/05000323 01-JAN-11 NONREG 1  
$259.00 REG 44.75  
$11,590.25 15-JAN-1l1 REG 15  
$3,885.00 29-JAN-11 REG 1  
$259.00 2010501/05000275 2010501/05000275 01-JAN-11 REG 0.25  
$64.75 2011001/05000275 2011001/05000275 12-FEB-1l1 REG 4.75  
$1,230.25 15-JAN-1 1 REG 28  
$7,252.00 26-FEB-11 REG 0.5  
$129.50 29-JAN-1 1 REG 7.75  
$2,007.25 2011001/05000323 2011001/05000323 12-FEB-1 1 REG 4.75  
$1,230.25 15-JAN-11 REG 25.25  
$6,539.75 26-FEB-11 REG 0.5  
$129.50 29-JAN-11 REG 7.75  
$2,007.25 2011002/05000275 2011002/05000275 12-FEB-11 NONREG 2.5  
$647.50 REG 111.5  
$28,878.50 12-MAR-11 NONREG 4.5  
$1,165.50 REG 93.5  
$24,216.50 15-JAN-11 NONREG 2.5  
$647.50 REG 59.75  
$15,475.25 26-FEB-1I NONREG 1.5  
$388.50 REG 85.25  
$22,079.75 26-MAR-1I NONREG 3.5  
$906.50 REG 91.75  
$23,763.25 29-JAN-11 NONREG 9.5  
$2,460.50 REG 86.25  
$22,338.75 2011002/05000323 2011002/05000323 12-FEB-11 NONREG 2.25  
$582.75 REG 100.75 $26,094.25 12-MAR-11 NONREG 4.75  
$1,230.25 REG 95  
$24,605.00 15-JAN-11 NONREG 4.5  
$1,165.50 REG 54.5  
$14,115.50 26-FEB-11 NONREG 1.5  
$388.50 REG 69.5  
$18,000.50 26-MAR-11 NONREG 3.5  
$906.50 REG 96  
$24,864.00 29-JAN-11 NONREG 7.5  
$1,942.50 REG 88.75  
$22,986.25 2011003/0500027512011003/05000275 29-JAN-1I NONREG 1  
$259.00 2011201/0500027512011201/05000275 12-FEB-1I REG 4.5  
$1,165.50 12-MAR-11 NO)NRF(*
*1 7R  
.*R ?*23 9R OREG 314175  
$236,1325 REG 141.75 $36,713.25


2011201/05000275 2011201/05000275                                     26-FEB-11   REG   12.5   $3,237.50 26-MAR-11   REG   33.5   $8,676.50 2011201/05000323 2011201/05000323                                     12-FEB-11   REG   4.25   $1,100.75 12-MAR-11   NONREG 32.25 $8,352.75 REG   140.25 $36,324.75 26-FEB-11   REG   12.5   $3,237.50 26-MAR-11   REG   33.5   $8,676.50 2011401/05000275 2011401/05000275                                     26-MAR-11   REG   2     $518.00 2011401/05000323 2011401/05000323                                     26-MAR-11   REG   2     $518.00 2011402/05000275 2011402/05000275                                     12-MAR-11   NONREG 18.5   $4,791.50 REG   64.5   $16,705.50 26-FEB-11   REG   21.75 $5,633.25 26-MAR-11   REG   13.5   $3,496.50 2011402/05000323 2011402/05000323                                     12-MAR-11   NONREG 18.5   $4,791.50 REG   60.5   $15,669.50 26-FEB-11   REG   18.5   $4,791.50 26-MAR-11   REG   13.5   $3,496.50 2011404/05000275 2011404/05000275                                     12-MAR-11   REG   4     $1,036.00 2011404/05000323 2011404/05000323                                     12-MAR-11   REG   2     $518.00 2011405/05000275 2011405/05000275                                     12-FEB-11   REG   6.5   $1,683.50 12-MAR-11   REG   11.5   $2,978.50 26-FEB-1I   REG   21.5   $5,568.50 26-MAR-11   REG   19.5   $5,050.50 2011405/05000323 2011405/05000323                                     12-MAR-11   REG   11.5   $2,978.50, 26-MAR-11   REG   6     $1,554.00 2011501/05000275 2011501/05000275                                     12-FEB-11   REG   0.25   $64.75 12-MAR-11   NONREG 1.25   $323.75 REG   7.5   $1,942.50 29-JAN-11   REG   4     $1,036.00 2011501/05000323 2011501/05000323                                     12-MAR-11   NONREG 1.25   $323.75 REG   7.25   $1,877.75 29-JAN-11   REG   4     $1,036.00 D92375           DIABLO CANYON UNIT 2 REQUEST FOR EXEMPTION 10CFR73.5 26-MAR-1I   REG   2     $518.00 D92376           DIABLO CANYON UNIT 1 REQUEST FOR EXEMPTION-10CFR73.5 26-MAR- 1   REG   2     $518.00 MD7094           DIABLO CANYON 1 - Plant Project Manager (10CFR170)   01-JAN-11   REG   5.25   $1,359.75 12-FEB-11   REG   10.25 $2,654.75 12-MAR-1 1   REG   10     $2,590.00 15-JAN-1I   REG   10.75 $2,784.25 26-FEB-11   REG   7.75   $2,007.25 26-MAR-11   NONREG 3.75   $971.25 REG   13.75 $3,561.25 29-JAN-11   NONREG 0.25   $64.75
2011201/05000275 2011201/05000275 26-FEB-11 REG 12.5  
_    _  _ REG   7     $1,813.00 MD7095           DIABLO CANYON 2 - Plant Project Manager (10CFR170)   01-JAN-11   REG   5.25   $1.359.75 12-FEB-1i1   REG   10.25 $2,654.75 12-MAR-1l1   REG   10     $2,590.00 15-JAN-1l1   REG   10.75 $2,784.25 26-FEB-1 1   REG   7.75   $2,007.25
$3,237.50 26-MAR-11 REG 33.5  
$8,676.50 2011201/05000323 2011201/05000323 12-FEB-11 REG 4.25  
$1,100.75 12-MAR-11 NONREG 32.25  
$8,352.75 REG 140.25 $36,324.75 26-FEB-11 REG 12.5  
$3,237.50 26-MAR-11 REG 33.5  
$8,676.50 2011401/05000275 2011401/05000275 26-MAR-11 REG 2  
$518.00 2011401/05000323 2011401/05000323 26-MAR-11 REG 2  
$518.00 2011402/05000275 2011402/05000275 12-MAR-11 NONREG 18.5  
$4,791.50 REG 64.5  
$16,705.50 26-FEB-11 REG 21.75  
$5,633.25 26-MAR-11 REG 13.5  
$3,496.50 2011402/05000323 2011402/05000323 12-MAR-11 NONREG 18.5  
$4,791.50 REG 60.5  
$15,669.50 26-FEB-11 REG 18.5  
$4,791.50 26-MAR-11 REG 13.5  
$3,496.50 2011404/05000275 2011404/05000275 12-MAR-11 REG 4  
$1,036.00 2011404/05000323 2011404/05000323 12-MAR-11 REG 2  
$518.00 2011405/05000275 2011405/05000275 12-FEB-11 REG 6.5  
$1,683.50 12-MAR-11 REG 11.5  
$2,978.50 26-FEB-1I REG 21.5  
$5,568.50 26-MAR-11 REG 19.5  
$5,050.50 2011405/05000323 2011405/05000323 12-MAR-11 REG 11.5  
$2,978.50, 26-MAR-11 REG 6  
$1,554.00 2011501/05000275 2011501/05000275 12-FEB-11 REG 0.25  
$64.75 12-MAR-11 NONREG 1.25  
$323.75 REG 7.5  
$1,942.50 29-JAN-11 REG 4  
$1,036.00 2011501/05000323 2011501/05000323 12-MAR-11 NONREG 1.25  
$323.75 REG 7.25  
$1,877.75 29-JAN-11 REG 4  
$1,036.00 D92375 DIABLO CANYON UNIT 2 REQUEST FOR EXEMPTION 10CFR73.5 26-MAR-1I REG 2  
$518.00 D92376 DIABLO CANYON UNIT 1 REQUEST FOR EXEMPTION-10CFR73.5 26-MAR-1 REG 2  
$518.00 MD7094 DIABLO CANYON 1 - Plant Project Manager (10CFR170) 01-JAN-11 REG 5.25  
$1,359.75 12-FEB-11 REG 10.25  
$2,654.75 12-MAR-1 1 REG 10  
$2,590.00 15-JAN-1I REG 10.75  
$2,784.25 26-FEB-11 REG 7.75  
$2,007.25 26-MAR-11 NONREG 3.75  
$971.25 REG 13.75  
$3,561.25 29-JAN-11 NONREG 0.25  
$64.75 REG 7  
$1,813.00 MD7095 DIABLO CANYON 2 - Plant Project Manager (10CFR170) 01-JAN-11 REG 5.25  
$1.359.75 12-FEB-1i1 REG 10.25  
$2,654.75 12-MAR-1l1 REG 10  
$2,590.00 15-JAN-1l1 REG 10.75  
$2,784.25 26-FEB-1 1 REG 7.75  
$2,007.25


MD7095 DIABLO CANYON 2 - Plant Project Manager (10CFR170)           26-MAR-11 NONREG 3.5   $906.50 REG   14.25 $3,690.75 29-JAN-11 NONREG 0.25 $64.75 REG   7     $1,813.00 ME1644 DIABLO CANYON 1 - LAR for TS 3.4.15 RCS Leakage Detection   01-JAN-11 REG   2     $518.00 15-JAN-11 REG   3.75 $971.25 29-JAN-11 REG   3     $777.00 ME1645 DIABLO CANYON 2 - LAR for TS 3.4.15 RCS Leakage Detection   01-JAN-11 REG   2     $518.00 15-JAN-11 REG   3.75 $971.25 29-JAN-11 REG   3     $777.00 ME2825 DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV 01-JAN-11 REG   21.5 $5,568.50 12-FEB-11 NONREG 1     $259.00 REG   27.75 $7,187.25 12-MAR-11 NONREG 0.75 $194.25 REG   21.25 $5,503.75 15-JAN-11 NONREG 1     $259.00
MD7095 DIABLO CANYON 2 - Plant Project Manager (10CFR170) 26-MAR-11 NONREG 3.5  
_REG    20.25 $5,244.75 26-FEB-11 NONREG 0.5   $129.50 REG   36   $9,324.00 26-MAR-11 NONREG 3.5   $906.50 REG   41.25 $10,683.75 29-JAN-11 NONREG 5     $1,295.00 REG   29   $7,511.00 ME2826 DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV 01-JAN-11 REG   22   $5,698.00 12-FEB-11 NONREG 1     $259.00 REG   27.5 $7,122.50 12-MAR-11 NONREG 0.75 $194.25 REG   21.25 $5,503.75 15-JAN-11 NONREG 1     $259.00 REG   20   $5,180.00 26-FEB-11 REG   35.75 $9,259.25 26-MAR-11 NONREG 3.5   $906.50 REG   41   $10,619.00 29-JAN-11 NONREG 5.25 $1,359.75 REG   29   $7,511.00 ME2896 DIABLO CANYON 1 - License Renewal SAFETY Review             01-JAN-11 NONREG 8.75 $2,266.25 REG   72   $18,648.00 12-FEB-11 NONREG 2.75 $712.25 REG   193.5 $50,116.50 12-MAR-11 REG   67.25 $17,417.75 15-JAN-11 NONREG 13.25 $3,431.75 REG   63.5 $16,446.50 18-DEC-10 REG   2     $518.00 26-FEB-1I REG   45.25 $11,719.75 26-MAR-11 REG   48.5 $12,561.50 29-JAN-11 REG   53.25 $13,791.75 ME2897 DIABLO CANYON 2 - License Renewal SAFETY Review             01-JAN-11 NONREG 10.25 $2.654.75
$906.50 REG 14.25  
                                                                                            $17,547.25 67.75 REG   67.75 $17,547.25
$3,690.75 29-JAN-11 NONREG 0.25  
$64.75 REG 7  
$1,813.00 ME1644 DIABLO CANYON 1 - LAR for TS 3.4.15 RCS Leakage Detection 01-JAN-11 REG 2  
$518.00 15-JAN-11 REG 3.75  
$971.25 29-JAN-11 REG 3  
$777.00 ME1645 DIABLO CANYON 2 - LAR for TS 3.4.15 RCS Leakage Detection 01-JAN-11 REG 2  
$518.00 15-JAN-11 REG 3.75  
$971.25 29-JAN-11 REG 3  
$777.00 ME2825 DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV 01-JAN-11 REG 21.5  
$5,568.50 12-FEB-11 NONREG 1  
$259.00 REG 27.75  
$7,187.25 12-MAR-11 NONREG 0.75  
$194.25 REG 21.25  
$5,503.75 15-JAN-11 NONREG 1  
$259.00
_ REG 20.25  
$5,244.75 26-FEB-11 NONREG 0.5  
$129.50 REG 36  
$9,324.00 26-MAR-11 NONREG 3.5  
$906.50 REG 41.25  
$10,683.75 29-JAN-11 NONREG 5  
$1,295.00 REG 29  
$7,511.00 ME2826 DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV 01-JAN-11 REG 22  
$5,698.00 12-FEB-11 NONREG 1  
$259.00 REG 27.5  
$7,122.50 12-MAR-11 NONREG 0.75  
$194.25 REG 21.25  
$5,503.75 15-JAN-11 NONREG 1  
$259.00 REG 20  
$5,180.00 26-FEB-11 REG 35.75  
$9,259.25 26-MAR-11 NONREG 3.5  
$906.50 REG 41  
$10,619.00 29-JAN-11 NONREG 5.25  
$1,359.75 REG 29  
$7,511.00 ME2896 DIABLO CANYON 1 - License Renewal SAFETY Review 01-JAN-11 NONREG 8.75  
$2,266.25 REG 72  
$18,648.00 12-FEB-11 NONREG 2.75  
$712.25 REG 193.5  
$50,116.50 12-MAR-11 REG 67.25  
$17,417.75 15-JAN-11 NONREG 13.25  
$3,431.75 REG 63.5  
$16,446.50 18-DEC-10 REG 2  
$518.00 26-FEB-1I REG 45.25  
$11,719.75 26-MAR-11 REG 48.5  
$12,561.50 29-JAN-11 REG 53.25  
$13,791.75 ME2897 DIABLO CANYON 2 - License Renewal SAFETY Review 01-JAN-11 NONREG 10.25  
$2.654.75 REG 67.75  
$17,547.25 REG 67.75  
$17,547.25


ME2897 DIABLO CANYON 2 - License Renewal SAFETY Review               12-FEB-11 NONREG 3     $777.00 REG     202   $52,318.00 12-MAR-11 REG     67   $17,353.00 15-JAN-11 NONREG 12.25 $3,172.75 REG     70.75 $18,324.25 18-DEC-10 REG     2     $518.00 26-FEB-11 REG     46.25 $11,978.75 26-MAR-11 REG     48.5 $12,561.50 29-JAN-11 REG     58   $15,022.00 ME3018 DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off 01-JAN-11 REG     1.5   $388.50 12-FEB-11 REG     1     $259.00 12-MAR-11 REG     25.25 $6,539.75 15-JAN-11 REG     5.25 $1,359.75 26-FEB-11 REG     2.75 $712.25 26-MAR-11 NONREG 1     $259.00 REG     3     $777.00 29-JAN-11 REG     1     $259.00 ME3019 DIABLO CANYON 2 - Diablo Canyon LAR 09-07 Delayed Access Off 01-JAN-11 REG     2     $518.00 12-FEB-11 REG     1     $259.00 12-MAR-11 REG     7.25 $1,877.75 15-JAN-11 REG     5.25 $1,359.75 26-FEB-11 REG     2.75 $712.25 26-MAR-11 NONREG 1     $259.00 REG     3     $777.00 29-JAN-11 REG     1     $259.00 ME3995 DIABLO CANYON 2 - Diablo Canyon RFO 15 SG 180 Day Report     12-FEB-11 REG     1     $259.00 12-MAR-11 REG     3.25 $841.75 ME4290 DIABLO CANYON 1 - Request for Approval of Diablo Canyon plan 01-JAN-11 REG     0.5   $129.50 12-MAR-11 REG     1     $259.00 15-JAN-1i1 REG     1.5   $388.50 29-JAN-1i1 REG     0.5   $129.50 ME4291 DIABLO CANYON 2 - Request for Approval of Diablo Canyon plan 01-JAN-11 REG     0.5   $129.50 12-MAR-11 REG     1     $259.00 15-JAN-11 REG     1.5   $388.50 29-JAN-11 REG     0.5   $129.50 ME4577 DIABLO CANYON 2 - RR NDE-RCS-SE-2R16 CC N-695                 12-FEB-11 REG     5     $1,295.00 12-MAR-1I NONREG 0.5   $129.50 REG     5.5   $1,424.50 15-JAN-11 REG     4     $1,036.00 26-FEB-11 NONREG 0.5   $129.50 REG     3     $777.00 26-MAR-11 REG     1     $259.00 129-JAN-11 REG     1     $259.00 ME5033 DIABLO CANYON 1 - Pre-Application Meeting for Seismic Licens 01-JAN-11 NONREG 0.25 S64175 REG     2.25 $582.75 12-FEB-1i1 NONREG 11.5   $388.50 REG     2.5   $647.50 12-MAR-1 1 REG     2.5   $647.50
ME2897 DIABLO CANYON 2 - License Renewal SAFETY Review 12-FEB-11 NONREG 3  
$777.00 REG 202  
$52,318.00 12-MAR-11 REG 67  
$17,353.00 15-JAN-11 NONREG 12.25  
$3,172.75 REG 70.75  
$18,324.25 18-DEC-10 REG 2  
$518.00 26-FEB-11 REG 46.25  
$11,978.75 26-MAR-11 REG 48.5  
$12,561.50 29-JAN-11 REG 58  
$15,022.00 ME3018 DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off 01-JAN-11 REG 1.5  
$388.50 12-FEB-11 REG 1  
$259.00 12-MAR-11 REG 25.25  
$6,539.75 15-JAN-11 REG 5.25  
$1,359.75 26-FEB-11 REG 2.75  
$712.25 26-MAR-11 NONREG 1  
$259.00 REG 3  
$777.00 29-JAN-11 REG 1  
$259.00 ME3019 DIABLO CANYON 2 - Diablo Canyon LAR 09-07 Delayed Access Off 01-JAN-11 REG 2  
$518.00 12-FEB-11 REG 1  
$259.00 12-MAR-11 REG 7.25  
$1,877.75 15-JAN-11 REG 5.25  
$1,359.75 26-FEB-11 REG 2.75  
$712.25 26-MAR-11 NONREG 1  
$259.00 REG 3  
$777.00 29-JAN-11 REG 1  
$259.00 ME3995 DIABLO CANYON 2 - Diablo Canyon RFO 15 SG 180 Day Report 12-FEB-11 REG 1  
$259.00 12-MAR-11 REG 3.25  
$841.75 ME4290 DIABLO CANYON 1 - Request for Approval of Diablo Canyon plan 01-JAN-11 REG 0.5  
$129.50 12-MAR-11 REG 1  
$259.00 15-JAN-1i1 REG 1.5  
$388.50 29-JAN-1i1 REG 0.5  
$129.50 ME4291 DIABLO CANYON 2 - Request for Approval of Diablo Canyon plan 01-JAN-11 REG 0.5  
$129.50 12-MAR-11 REG 1  
$259.00 15-JAN-11 REG 1.5  
$388.50 29-JAN-11 REG 0.5  
$129.50 ME4577 DIABLO CANYON 2 - RR NDE-RCS-SE-2R16 CC N-695 12-FEB-11 REG 5  
$1,295.00 12-MAR-1I NONREG 0.5  
$129.50 REG 5.5  
$1,424.50 15-JAN-11 REG 4  
$1,036.00 26-FEB-11 NONREG 0.5  
$129.50 REG 3  
$777.00 26-MAR-11 REG 1  
$259.00 129-JAN-11 REG 1  
$259.00 ME5033 DIABLO CANYON 1 - Pre-Application Meeting for Seismic Licens 01-JAN-11 NONREG 0.25 S64175 REG 2.25  
$582.75 12-FEB-1i1 NONREG 11.5  
$388.50 REG 2.5  
$647.50 12-MAR-1 1 REG 2.5  
$647.50


ME5033 DIABLO CANYON 1 - Pre-Application Meeting for Seismic Licens       15-JAN-11   REG   5.5 $1,424.50 26-FEB-11   NONREG 1.5 $388.50 REG   3.5 $906.50 26-MAR-1i1   NONREG 1   $259.00 REG   3   $777.00 29-JAN-1I   NONREG 0.5 $129.50 REG   9   $2,331.00 ME5034 DIABLO CANYON 2 - Pre-Application Meeting for Seismic Licens       01-JAN-11   NONREG 0.25 $64.75 REG   2.25 $582.75 12-FEB-11   NONREG 1.5 $388.50 REG   2.5 $647.50 12-MAR-11   REG   2.5 $647.50 15-JAN-11   REG   5.5 $1,424.50 26-FEB-11   NONREG 2   $518.00
ME5033 DIABLO CANYON 1 - Pre-Application Meeting for Seismic Licens 15-JAN-11 REG 5.5  
_REG   3.5 $906.50 26-MAR-11   NONREG 1   $259.00 REG   3   $777.00 29-JAN-11   NONREG 0.75 $194.25 REG   8.5 $2,201.50 ME5352 DIABLO CANYON 1 - Pre-application for Review of Physical Sec       12-FEB-11   REG   1.5 $388.50 26-FEB-11   REG   1   $259.00 26-MAR-11   REG   1   $259.00 ME5353 DIABLO CANYON 2 - Pre-application for Review of Physical Sec       12-FEB-11   REG   1.5 $388.50 26-FEB-11   REG   1   $259.00 26-MAR-11   REG   1   $259.00 ME5713 DIABLO CANYON 1 - TS 3.7.1 MSSV License Amendment Request           12-MAR-11   REG   1.75 $453.25 26-FEB-11   REG   1.5 $388.50 26-MAR-1I   NONREG 1.5 $388.50 REG   8   $2,072.00 ME5714 DIABLO CANYON 2 - TS 3.7.1 MSSV License Amendment Request           12-MAR-11   REG   1.75 $453.25 26-FEB-11   REG   1.5 $388.50 26-MAR-11   REG   4   $1,036.00 ME5894 DIABLO CANYON 1 - Request for Exemption from Specific 10 CFR       26-MAR-11   REG   0.5 $129.50 ME5895 DIABLO CANYON 2 - Request for Exemption from Specific 10 CFR       26-MAR-11   REG   0.5 $129.50 S00285 DIABLO CANYON UNIT 1 LICENSE RENEWAL (DOCKET NO. 05000275)         12-FEB-11   REG   32.5 $8,417.50 12-MAR-11   REG   18   $4,662.00 15-JAN-11   REG   9.5 $2,460.50 26-FEB-11   REG   4   $1,036.00 26-MAR-11   REG   14.5 $3,755.50 29-JAN-11   REG   21.5 $5,568.50 S00286 DIABLO CANYON UNIT 2 LICENSE RENEWAL         (DOCKET NO. 05000323) 12-FEB-11   REG   32.5 $8,417.50 12-MAR-11   REG   18   $4,662.00 15-JAN-11   REG   9.5 $2,460.50 26-FEB-11   REG   4   $1,036.00 26-MAR-11   REG   14.5 $3,755.50 29-JAN-11   REG   22   $5,698.00 X02471 INITIAL EXAM - UNIT 1 - DC (07/2011)                               I19-FFR-11I RFC,   1   5T29!* fl
$1,424.50 26-FEB-11 NONREG 1.5  
                                                                                                    $1-259.00 12-MAR-il11 REG     0.
$388.50 REG 3.5  
12-MAR-1     REG   0.5 $129.50
$906.50 26-MAR-1i1 NONREG 1  
$259.00 REG 3  
$777.00 29-JAN-1I NONREG 0.5  
$129.50 REG 9  
$2,331.00 ME5034 DIABLO CANYON 2 - Pre-Application Meeting for Seismic Licens 01-JAN-11 NONREG 0.25  
$64.75 REG 2.25  
$582.75 12-FEB-11 NONREG 1.5  
$388.50 REG 2.5  
$647.50 12-MAR-11 REG 2.5  
$647.50 15-JAN-11 REG 5.5  
$1,424.50 26-FEB-11 NONREG 2  
$518.00
_REG 3.5  
$906.50 26-MAR-11 NONREG 1  
$259.00 REG 3  
$777.00 29-JAN-11 NONREG 0.75  
$194.25 REG 8.5  
$2,201.50 ME5352 DIABLO CANYON 1 - Pre-application for Review of Physical Sec 12-FEB-11 REG 1.5  
$388.50 26-FEB-11 REG 1  
$259.00 26-MAR-11 REG 1  
$259.00 ME5353 DIABLO CANYON 2 - Pre-application for Review of Physical Sec 12-FEB-11 REG 1.5  
$388.50 26-FEB-11 REG 1  
$259.00 26-MAR-11 REG 1  
$259.00 ME5713 DIABLO CANYON 1 - TS 3.7.1 MSSV License Amendment Request 12-MAR-11 REG 1.75  
$453.25 26-FEB-11 REG 1.5  
$388.50 26-MAR-1I NONREG 1.5  
$388.50 REG 8  
$2,072.00 ME5714 DIABLO CANYON 2 - TS 3.7.1 MSSV License Amendment Request 12-MAR-11 REG 1.75  
$453.25 26-FEB-11 REG 1.5  
$388.50 26-MAR-11 REG 4  
$1,036.00 ME5894 DIABLO CANYON 1 - Request for Exemption from Specific 10 CFR 26-MAR-11 REG 0.5  
$129.50 ME5895 DIABLO CANYON 2 - Request for Exemption from Specific 10 CFR 26-MAR-11 REG 0.5  
$129.50 S00285 DIABLO CANYON UNIT 1 LICENSE RENEWAL (DOCKET NO. 05000275) 12-FEB-11 REG 32.5  
$8,417.50 12-MAR-11 REG 18  
$4,662.00 15-JAN-11 REG 9.5  
$2,460.50 26-FEB-11 REG 4  
$1,036.00 26-MAR-11 REG 14.5  
$3,755.50 29-JAN-11 REG 21.5  
$5,568.50 S00286 DIABLO CANYON UNIT 2 LICENSE RENEWAL (DOCKET NO. 05000323) 12-FEB-11 REG 32.5  
$8,417.50 12-MAR-11 REG 18  
$4,662.00 15-JAN-11 REG 9.5  
$2,460.50 26-FEB-11 REG 4  
$1,036.00 26-MAR-11 REG 14.5  
$3,755.50 29-JAN-11 REG 22  
$5,698.00 X02471 INITIAL EXAM - UNIT 1 - DC (07/2011)
I19-FFR-11I
: RFC, 1
5T29!* fl 12-MAR-il1 REG
: 0.  
$1-259.00 12-MAR-1 1 REG 0.5  
$129.50


X02471     INITIAL EXAM - UNIT 1 - DC (07/2011) 15-JAN-11 REG     9.5   $2,460.50 26-FEB-11 REG     1     $259.00 26-MAR-11 REG     1     $259.00 X02472     INITIAL EXAM - UNIT 2 - DC (07/2011) 12-FEB-11 REG     2.5   $647.50 12-MAR-11 REG     0.5   $129.50 15-JAN-11 REG     7.5   $1,942.50
X02471 INITIAL EXAM - UNIT 1 - DC (07/2011) 15-JAN-11 REG 9.5  
_26-MAR-11 REG     1     $259.00 (blank)     ADVANCE PAYMENT                     (blank)   (blank)       ($123,825.31)
$2,460.50 26-FEB-11 REG 1  
PM / SRI   Allocated Overhead Hours             01-JAN-11 REG     1.25   $323.75 12-FEB-11 REG     0.25   $64.75 12-MAR-11 REG     4.5   $1,165.50 15-JAN-11 REG     1.5   $388.50 26-FEB-11 REG     0.25   $64.75 26-MAR-11 REG     10.5   $2,719.50 29-JAN-11 REG     4.25   $1,100.75 Grand Total                                                         4268.5 $981,716.19
$259.00 26-MAR-11 REG 1  
$259.00 X02472 INITIAL EXAM - UNIT 2 - DC (07/2011) 12-FEB-11 REG 2.5  
$647.50 12-MAR-11 REG 0.5  
$129.50 15-JAN-11 REG 7.5  
$1,942.50
_26-MAR-11 REG 1  
$259.00 (blank)
ADVANCE PAYMENT (blank)
(blank)
($123,825.31)
PM / SRI Allocated Overhead Hours 01-JAN-11 REG 1.25  
$323.75 12-FEB-11 REG 0.25  
$64.75 12-MAR-11 REG 4.5  
$1,165.50 15-JAN-11 REG 1.5  
$388.50 26-FEB-11 REG 0.25  
$64.75 26-MAR-11 REG 10.5  
$2,719.50 29-JAN-11 REG 4.25  
$1,100.75 Grand Total 4268.5 $981,716.19


7.,
7.,
Remittance Information:
Remittance Information:
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number                             Due Date   Amount             Docket   Total Due LFB 11-3915                           Jun 22, 2011 $497,515.69         05000275 LFB 11-3943                           Jun 22, 2011 $484,200.50         05000323
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-3915 Jun 22, 2011  
                                                                                $981,716.19 29 of 898
$497,515.69 05000275 LFB 11-3943 Jun 22, 2011  
$484,200.50 05000323
$981,716.19 29 of 898


                                                        <       U.S.NRC Uni Led States Nuclear Regulacory Conmrnksiori.
< U.S.NRC Uni Led States Nuclear Regulacory Conmrnksiori.
ProtectingPeople and the Environment Quarter Period:                                                           10/01/2010 - 09/30/2011 Cost Accumulated through:                                                                06/04/2011 Vendor:                                                                                Remit To:
Protecting People and the Environment Quarter Period:
Pacific Gas & Electric Co.                                                        Office of the Chief Financial Officer C/O PG&E CORPORATION                                                              U.S. Nuclear Regulatory Commission ATTN: DIRECTOR, INSURANCE                                                        P.O. Box 979051 ONE MARKET, SPEAR TOWER, SUITE 2400                                               St. Louis, MO 63197 SAN FRANCISCO, CA 94105 Bills for Period:
Cost Accumulated through:
BD Number                         Date                              Due Date                    Amount                                Docket LFB 11-4424                       Jun 21, 2011                     Jul 21, 2011                 $2,654.52                             05000275 LFB 11-4431                      Jun 21, 2011                      Jul 21, 2011                $2,565.99                             05000323 Collections and Adjustments:
Vendor:
CR Number                   Bill Number               Date                          Line Type              Amount                        Docket CL 11-0040                 CL RS0062-11               Nov 5, 2010                    NR                      $983,810.00 CR ACH110114               CR 11-0260                 Jan 14, 2011                  NR                      $1,159,000.00                  05000323 CR ACH110114               CR 11-0260                 Jan 14, 2011                  NR                      $37,000.00                    05000323 CL 11-1215                 CL 11-1160                 Feb 22, 2011                  NR                      $1,159,000.00                  05000275 CL 11-1215                 CL 11-1160                 Feb 22, 2011                  NR                      $37,000.00                    05000275 CL 11-1216                 CL 11-1190                 Feb 22, 2011                   NR                     $1,159,000.00                 05000323 CL 11-1216                  CL 11-1190                Feb 22, 2011                  NR                      $37,000.00                     05000323 9 of 235
Remit To:
10/01/2010 - 09/30/2011 06/04/2011 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Pacific Gas & Electric Co.
C/O PG&E CORPORATION ATTN: DIRECTOR, INSURANCE ONE MARKET, SPEAR TOWER, SUITE 2400 SAN FRANCISCO, CA 94105 Bills for Period:
BD Number LFB 11-4424 LFB 11-4431 Date Jun 21, 2011 Jun 21, 2011 Due Date Jul 21, 2011 Jul 21, 2011 Amount
$2,654.52
$2,565.99 Docket 05000275 05000323 Collections and Adjustments:
CR Number Bill Number CL 11-0040 CL RS0062-11 CR ACH110114 CR 11-0260 CR ACH110114 CR 11-0260 CL 11-1215 CL 11-1160 CL 11-1215 CL 11-1160 CL 11-1216 CL 11-1190 CL 11-1216 CL 11-1190 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Line Type NR NR NR NR NR NR NR Amount
$983,810.00
$1,159,000.00
$37,000.00
$1,159,000.00
$37,000.00
$1,159,000.00
$37,000.00 Docket 05000323 05000323 05000275 05000275 05000323 05000323 9
of 235


Collections and Adjustments:
Collections and Adjustments:
CR Number                       Bill Number                 Date                            Line Type                      Amount                        Docket CL 11-1693                     CL 11-1814                 Mar 22, 2011                    NR                            $389,212.25                  05000323 CR 11-0543                     CR 11-2925                 May 17, 2011                    WO                            $0.00                        05000275 CR 11-0543                     CR 11-2925                 May 17, 2011                    WO                            $0.00                        05000275 CR 11-0545                     CR 11-2955                 May 17, 2011                    WO                            $0.00                        05000323 CR 11-0545                     CR 11-2955                 May 17, 2011                    WO                            $0.00                        05000323 CL 11-2372                                                 May 19, 2011                    Al                            $69,370.56                    05000275 CL 11-2372                     CL 11-2925                 May 19, 2011                    NR                            $37,000.00                    05000275 CL 11-2372                     CL 11-2925                 May 19, 2011                    NR                            $1,159,000.00                05000275 CL 11-2374                                                 May 19, 2011                    Al                            $54,454.75                    05000323 CL 11-2374                     CL 11-2955                 May 19, 2011                    NR                            $1,159,000.00                05000323 CL 11-2374                     CL 11-2955                 May 19, 2011                    NR                            $37,000.00                    05000323 CR 11-0769                     CR 11-1787                 Jun 6, 2011                    WO                            $0.00                        05000275 CL 11-2319                     CL 11-1787                 Jun 6, 2011                     NR                             $560,369.81                   05000275 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
CR Number Bill Number CL 11-1693 CL 11-1814 CR 11-0543 CR 11-2925 CR 11-0543 CR 11-2925 CR 11-0545 CR 11-2955 CR 11-0545 CR 11-2955 CL 11-2372 CL 11-2372 CL 11-2925 CL 11-2372 CL 11-2925 CL 11-2374 CL 11-2374 CL 11-2955 CL 11-2374 CL 11-2955 CR 11-0769 CR 11-1787 CL 11-2319 CL 11-1787 Date Mar 22, 2011 May 17, 2011 May 17, 2011 May 17, 2011 May 17, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 Jun 6, 2011 Jun 6, 2011 Line Type NR WO WO WO WO Al NR NR Al NR NR WO NR Amount
$389,212.25
$0.00
$0.00
$0.00
$0.00
$69,370.56
$37,000.00
$1,159,000.00
$54,454.75
$1,159,000.00
$37,000.00
$0.00
$560,369.81 Docket 05000323 05000275 05000275 05000323 05000323 05000275 05000275 05000275 05000323 05000323 05000323 05000275 05000275 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Additional terms and conditions are attached.
Additional terms and conditions are attached.
Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.
Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.
10 of 235
10 of 235


DOCKET                 (Multiple Items)
DOCKET (Multiple Items)
PART 170 Contract Costs TAC IR                 TAC/IR Name                                                       Payment Period End Date     Total ME2897-               DIABLO CANYON 2 - License Renewal SAFETY Review                                   01/10/20111       $57.97 ME2896           ;    DIABLO CANYON I - License Renewal SAFETY Review                                   01/18/2011 $25
PART 170 Contract Costs TAC IR TAC/IR Name Payment Period End Date Total ME2897-DIABLO CANYON 2 - License Renewal SAFETY Review 01/10/20111  
* ____ ___                            -  ~04/13/20111                         _$59.01 ME2896 *!.*  *.      .iDIABLO
$57.97 ME2896 DIABLO CANYON I - License Renewal SAFETY Review 01/18/2011  
                        .......
$25
                            ...  ..........
~04/13/20111
CANYON .....
_$59.01
                            ...............
.i.......
                                        ......... ........
                                                    .........
I ..........
                                            - License ...
                                                      ..
Renewal SAFETY Review      ......
                                                        ............................................
I.......................I..................
I.......................I..................
                                                                            ..........
ME2896 DIABLO CANYON I - License Renewal SAFETY Review 11/05/2010 $2,458.34 01/10/2011  
                                                                                . .........
$57.97 ME2897&#xfd; DIABLO CANYON 2 - License Renewal SAFETY Review 05/11/20111  
                                                                                    .........
$49.68 ME2~897~
                                                                                        ..
DIABLO CANYON 2 - License Renewal SAFETY Review 11/05/20101 $2,458.34 FGrand Total 1 $5,220.51.I
                                                                                          ..........                  ..
                                                                                            ..........................
                                                                                                              ...
                                                                                                                ..............
11/05/2010   ..
                                                                                                                        ............
                                                                                                                              ...-.
                                                                                                                      $2,458.34 ....
                                                                                                                                  .
01/10/2011       $57.97 ME2897&#xfd;                 DIABLO CANYON 2 - License Renewal SAFETY Review                                   05/11/20111     $49.68 ME2~897~               DIABLO CANYON 2 - License Renewal SAFETY Review                                   11/05/20101 $2,458.34 FGrand Total                                                                                                         1$5,220.51.I


Remittance Information:
Remittance Information:
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number                             Due Date     Amount             Docket   Total Due LFB 11-4424                           Jul 21, 2011 $2,654.52           05000275 LFB 11-4431                           Jul 21, 2011 $2,565.99           05000323
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-4424 Jul 21, 2011  
                                                                                $5,220.51 13 of 235
$2,654.52 05000275 LFB 11-4431 Jul 21, 2011  
$2,565.99 05000323
$5,220.51 13 of 235


TU.S.NR C
TU.S.NR C
:Unic~ed States Nuclear R*,gu Iawcry C;omm .ssion ProtectingPeople and the Environment Quarter Period:                                                                     10/01/2010 - 09/30/2011 Cost Accumulated through:                                                                          12/31/2010 Vendor:                                                                                    Remit To:
:Unic~ed States Nuclear R*,gu Iawcry C;omm.ssion Protecting People and the Environment Vendor:
Pacific Gas & Electric Co.                                                                  Office of the Chief Financial Officer ATTN: DCPP REGULATORY SERVICES                                                              U.S. Nuclear Regulatory Commission P.O. Box 979051 MANAGER - REGULATORY SERVICES St. Louis, MO 63197 P.O. BOX 56 AVILA BEACH, CA 93424 Bills for Period:
Quarter Period:
BD Number                             Date                                Due Date                            Amount                                Docket LFB 11-0232                           Dec 23, 2010                       Jan 22, 2011                         $1,196,000.00                         05000275 Collections and Adjustments:
Cost Accumulated through:
CR Number                       Bill Number                Date                            Line Type                      Amount                        Docket CL 11-0039                     CL RS0036-11               Nov 5, 2010                     NR                             $993,955.00 CR 11-0122                      CR RL0123-11                Nov 10, 2010                    NR                              $1,107,428.00 If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Pacific Gas & Electric Co.
ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Remit To:
10/01/2010 - 09/30/2011 12/31/2010 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:
BD Number LFB 11-0232 Date Dec 23, 2010 Due Date Jan 22, 2011 Amount
$1,196,000.00 Docket 05000275 Collections and Adjustments:
CR Number CL 11-0039 CR 11-0122 Bill Number CL RS0036-11 CR RL0123-11 Date Nov 5, 2010 Nov 10, 2010 Line Type NR NR Amount
$993,955.00
$1,107,428.00 Docket If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Additional terms and conditions are attached.
Additional terms and conditions are attached.
Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please remember to reference the invoice number on the remittance.
Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please remember to reference the invoice number on the remittance.
29 of 1062
29 of 1062


Billing Details:
Billing Details:
Docket #:   05000275                 License #: DPR-80 PART 170:
Docket #:
05000275 License #:
DPR-80 PART 170:
Part 171:
Part 171:
Annual Fees:             LFB 11-0232         Jan 22, 2011               SPRD         $37,000.00 LFB 11-0232          Jan 22, 2011                OPWR      $1,159,000.00 Annual Fees:
Annual Fees:
TOTAL PART 171:                                                                  $1,196,000.00 Total for License/Docket:                                                        $1,196,000.00 30 of 1062
Annual Fees:
TOTAL PART 171:
LFB 11-0232 LFB 11-0232 Jan 22, 2011 Jan 22, 2011 SPRD OPWR
$37,000.00
$1,159,000.00
$1,196,000.00
$1,196,000.00 Total for License/Docket:
30 of 1062


Remittance Information:
Remittance Information:
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number                             Due Date   Amount               Docket   Total Due LFB 11-0232                           Jan 22, 2011 $1,196,000.00         05000275
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-0232 Jan 22, 2011  
                                                                                  $1,196,000.00 31 of 1062
$1,196,000.00 05000275
 
$1,196,000.00 31 of 1062
                                                                  *U.SNRC United States Nuclear Regulac.ory Cornmis lssior ProtectingPeople and the Environment Quarter Period:                                                                       10/01/2010 - 09/30/2011 Cost Accumulated through:                                                                            12/31/2010 Vendor:                                                                                      Remit To:
* U.SNRC United States Nuclear Regulac.ory Cornmis lssior Protecting People and the Environment Vendor:
Pacific Gas & Electric Co.                                                                  Office of the Chief Financial Officer ATTN: DCPP REGULATORY SERVICES                                                              U.S. Nuclear Regulatory Commission P.O. Box 979051 MANAGER - REGULATORY SERVICES St. Louis, MO 63197 P.O. BOX 56 AVILA BEACH, CA 93424 Bills for Period:
Quarter Period:
BD Number                             Date                                Due Date                            Amount                                Docket LFB 11-0260                           Dec 23, 2010                       Jan 22, 2011                         $1,196,000.00                         05000323 Collections and Adiustments:
Cost Accumulated through:
CR Number                       Bill Number                 Date                            Line Type                      Amount                        Docket CL 11-0040                     CL RS0062-11                 Nov 5, 2010                     NR                             $983,810.00 If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Pacific Gas & Electric Co.
ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Remit To:
10/01/2010 - 09/30/2011 12/31/2010 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:
BD Number LFB 11-0260 Date Dec 23, 2010 Due Date Jan 22, 2011 Amount
$1,196,000.00 Docket 05000323 Collections and Adiustments:
CR Number Bill Number CL 11-0040 CL RS0062-11 Date Nov 5, 2010 Line Type NR Amount
$983,810.00 Docket If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Additional terms and conditions are attached.
Additional terms and conditions are attached.
Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please remember to reference the invoice number on the remittance.
Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please remember to reference the invoice number on the remittance.
22 of 1062
22 of 1062


Billing Details:
Billing Details:
Docket #:   05000323                 License #: DPR-82 PART 170:
Docket #:
05000323 License #:
DPR-82 PART 170:
Part 171:
Part 171:
Annual Fees:             LFB 11-0260         Jan 22, 2011               SPRD         $37,000.00 Annual Fees:              LFB 11-0260          Jan 22, 2011                OPWR      $1,159,000.00 TOTAL PART 171:                                                                  $1,196,000.00 Total for License/Docket:                                                        $1,196,000.00 23 of 1062
Annual Fees:
Annual Fees:
TOTAL PART 171:
LFB 11-0260 LFB 11-0260 Jan 22, 2011 Jan 22, 2011 SPRD OPWR
$37,000.00
$1,159,000.00
$1,196,000.00
$1,196,000.00 Total for License/Docket:
23 of 1062


Remittance Information:
Remittance Information:
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number                             Due Date   Amount               Docket   Total Due LFB 11-0260                           Jan 22, 2011 $1,196,000.00         05000323
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-0260 Jan 22, 2011  
                                                                                  $1,196,000.00 24 of 1062
$1,196,000.00 05000323
$1,196,000.00 24 of 1062


VI U.S.NRC VUni ted Stres Nuclear Regul arory Cont miLSsion ProtectingPeople and the Environment Quarter Period:                                                                     10/01/2010 - 09/30/2011 Cost Accumulated through:                                                                          03/31/2011 Vendor:                                                                                    Remit To:
VI U.S.NRC VUni ted Stres Nuclear Regul arory Cont miLSsion Protecting People and the Environment Quarter Period:
Pacific Gas & Electric Co.                                                                  Office of the Chief Financial Officer ATTN: DCPP REGULATORY SERVICES                                                              U.S. Nuclear Regulatory Commission P.O. Box 979051 MANAGER - REGULATORY SERVICES St. Louis, MO 63197 P.O. BOX 56 AVILA BEACH, CA 93424 Bills for Period:
Cost Accumulated through:
BD Number                             Date                              Due Date                            Amount                                Docket LFB 11-1160                           Jan 27, 2011                       Feb 26, 2011                         $1,196,000.00                         05000275 LFB 11-1190                            Jan 27, 2011                      Feb 26, 2011                        $1,196,000.00                         05000323 Collections and Adjustments:
Vendor:
CR Number                       Bill Number                 Date                          Line Type                      Amount                        Docket CL 11-0040                     CL RS0062-11                 Nov 5, 2010                   NR                             $983,810.00 CR ACH110114                    CR 11-0260                  Jan 14, 2011                  NR                              $1,159,000.00                 05000323 CR ACH110114                    CR 11-0260                  Jan 14, 2011                  NR                              $37,000.00                     05000323 If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Remit To:
10/01/2010 - 09/30/2011 03/31/2011 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Pacific Gas & Electric Co.
ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Bills for Period:
BD Number LFB 11-1160 LFB 11-1190 Date Jan 27, 2011 Jan 27, 2011 Due Date Feb 26, 2011 Feb 26, 2011 Amount
$1,196,000.00
$1,196,000.00 Docket 05000275 05000323 Collections and Adjustments:
CR Number Bill Number CL 11-0040 CL RS0062-11 CR ACH110114 CR 11-0260 CR ACH110114 CR 11-0260 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Line Type NR NR NR Amount
$983,810.00
$1,159,000.00
$37,000.00 Docket 05000323 05000323 If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Additional terms and conditions are attached.
Additional terms and conditions are attached.
Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please 16 of 981
Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please 16 of 981


remember to reference the invoice number on the remittance.
remember to reference the invoice number on the remittance.
Line 211: Line 1,036:


Billing Details:
Billing Details:
Docket #:   05000275                 License #: DPR-80 PART 170:
Docket #:
05000275 License #:
DPR-80 PART 170:
Part 171:
Part 171:
Annual Fees:             LFB 11-1160         Feb 26, 2011               OPWR       $1,159,000.00 Annual Fees:              LFB 11-1160          Feb 26, 2011                SPRD          $37,000.00 TOTAL PART 171:                                                                  $1,196,000.00 Total for License/Docket:                                                        $1,207,872.56 18 of 981
Annual Fees:
Annual Fees:
TOTAL PART 171:
LFB 11-1160 LFB 11-1160 Feb 26, 2011 Feb 26, 2011 OPWR SPRD
$1,159,000.00
$37,000.00
$1,196,000.00
$1,207,872.56 Total for License/Docket:
18 of 981


Billing Details:
Billing Details:
Docket #:   05000323                 License #: DPR-82 PART 170:
Docket #:
05000323 License #:
DPR-82 PART 170:
Part 171:
Part 171:
Annual Fees:             LFB 11-1190         Feb 26, 2011               OPWR       $1,159,000.00 Annual Fees:              LFB 11-1190          Feb 26, 2011                SPRD          $37,000.00 TOTAL PART 171:                                                                  $1,196,000.00 Total for License/Docket:                                                        $1,196,000.00 19 of 981
Annual Fees:
Annual Fees:
TOTAL PART 171:
LFB 11-1190 LFB 11-1190 Feb 26, 2011 Feb 26, 2011 OPWR SPRD
$1,159,000.00
$37,000.00
$1,196,000.00
$1,196,000.00 Total for License/Docket:
19 of 981


Remittance Information:
Remittance Information:
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number                             Due Date     Amount               Docket   Total Due LFB 11-1160                           Feb 26, 2011 $1,196,000.00       05000275 LFB 11-1190                           Feb 26, 2011 $1,196,000.00       05000323
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-1160 Feb 26, 2011  
                                                                                $2,392,000.00 20 of 981
$1,196,000.00 05000275 LFB 11-1190 Feb 26, 2011  
$1,196,000.00 05000323
$2,392,000.00 20 of 981


I.....S.NRCC Uniced States Nu.clear Regulacory Com.rinssiou0.
I.....S.NRCC Uniced States Nu.clear Regulacory Com.rinssiou0.
ProtectingPeople and the Environment Quarter Period:                                                           10101/2010     - 09/30/2011 Cost Accumulated through:                                                                09/30/2011 Vendor:                                                                              Remit To:
Protecting People and the Environment Vendor:
Pacific Gas & Electric Co.                                                      Office of the Chief Financial Officer ATTN: DCPP REGULATORY SERVICES                                                  U.S. Nuclear Regulatory Commission P.O. Box 979051 MANAGER - REGULATORY SERVICES St. Louis, MO 63197 P.O. BOX 56 AVILA BEACH, CA 93424 Bills for Period:
Quarter Period:
BD Number                         Date                              Due Date                    Amount                                Docket LFB 11-2925                       Apr 5, 2011                       May 4, 2011                 $1,196,000.00                         05000275 LFB 11-2955                      Apr 5, 2011                      May 4, 2011                $1,196,000.00                         05000323 Collections and Adjustments:
Cost Accumulated through:
CR Number                   Bill Number               Date                          Line Type              Amount                        Docket CL 11-0040                  CL RS0062-11               Nov 5, 2010                   NR                     $983,810.00 CR ACH110114                CR 11-0260                Jan 14, 2011                  NR                      $1,159,000.00                 05000323 CR ACH110114                CR 11-0260                Jan 14, 2011                  NR                      $37,000.00                     05000323 CL 11-1215                  CL 11-1160                Feb 22, 2011                  NR                      $1,159,000.00                 05000275 CL 11-1215                  CL 11-1160                Feb 22, 2011                  NR                      $37,000.00                     05000275 CL 11-1216                  CL 11-1190                Feb 22, 2011                  NR                      $1,159,000.00                 05000323 CL 11-1216                  CL 11-1190                Feb 22, 2011                  NR                      $37,000.00                     05000323 19 of 1170
Pacific Gas & Electric Co.
ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 10101/2010 - 09/30/2011 09/30/2011 Remit To:
Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:
BD Number LFB 11-2925 LFB 11-2955 Date Apr 5, 2011 Apr 5, 2011 Due Date May 4, 2011 May 4, 2011 Amount
$1,196,000.00
$1,196,000.00 Docket 05000275 05000323 Collections and Adjustments:
CR Number CL 11-0040 CR ACH110114 CR ACH110114 CL 11-1215 CL 11-1215 CL 11-1216 CL 11-1216 Bill Number CL RS0062-11 CR 11-0260 CR 11-0260 CL 11-1160 CL 11-1160 CL 11-1190 CL 11-1190 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Line Type NR NR NR NR NR NR NR 19 of 1170 Amount
$983,810.00
$1,159,000.00
$37,000.00
$1,159,000.00
$37,000.00
$1,159,000.00
$37,000.00 Docket 05000323 05000323 05000275 05000275 05000323 05000323


Collections and Adjustments:
Collections and Adjustments:
CR Number                     Bill Number                 Date                           Line Type                     Amount                       Docket CL 11-1693                     CL 11-1814                   Mar 22, 2011                   NR                             $389,212.25                   05000323 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
CR Number Bill Number Date Line Type Amount Docket CL 11-1693 CL 11-1814 Mar 22, 2011 NR  
$389,212.25 05000323 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.
Additional terms and conditions are attached.
Additional terms and conditions are attached.
Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.
Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.
20   of 1170
20 of 1170


Billing Details:
Billing Details:
Docket #:   05000275                 License #: DPR-80 PART 170:
Docket #:
05000275 License #:
DPR-80 PART 170:
Part 171:
Part 171:
May 4, 2011                SPRD          $37,000.00 Annual Fees:             LFB 11-2925 May 4, 2011                 0PWR       $1,159,000.00 Annual Fees:              LFB 11-2925 TOTAL PART 171:                                                                  $1,196,000.00
Annual Fees:
                                                                                  $1,265,370.56 Total for License/Docket:
Annual Fees:
TOTAL PART 171:
LFB 11-2925 LFB 11-2925 May 4, 2011 May 4, 2011 SPRD 0PWR
$37,000.00
$1,159,000.00
$1,196,000.00
$1,265,370.56 Total for License/Docket:
21 of 1170
21 of 1170


Billing Details:
Billing Details:
Docket #:   05000323                 License #: DPR-82 PART 170:
Docket #:
05000323 License #:
DPR-82 PART 170:
Part 171:
Part 171:
Annual Fees:             LFB 11-2955         May 4, 2011                 SPRD         $37,000.00 Annual Fees:              LFB 11-2955          May 4, 2011                OPWR      $1,159,000.00 TOTAL PART 171:                                                                  $1,196,000.00 Total for License/Docket:                                                        $1,250,454.75 22 of 1170
Annual Fees:
Annual Fees:
TOTAL PART 171:
LFB 11-2955 LFB 11-2955 May 4, 2011 May 4, 2011 SPRD OPWR
$37,000.00
$1,159,000.00
$1,196,000.00
$1,250,454.75 Total for License/Docket:
22 of 1170


-  p0 Remittance Information:
p 0
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number                             Due Date   Amount               Docket   Total Due LFB 11-2925                           May 4, 2011 $1,196,000.00         05000275 LFB 11-2955                           May 4, 2011 $1,196,000.00         05000323
Remittance Information:
                                                                                    $2,392,000.00 23 of 1170}}
Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-2925 May 4, 2011  
$1,196,000.00 05000275 LFB 11-2955 May 4, 2011  
$1,196,000.00 05000323
$2,392,000.00 23 of 1170}}

Latest revision as of 04:26, 13 January 2025

U.S. NRC Invoices to Pacific Gas & Electric Company Diablo Canyon 1 & 2
ML11235A654
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/30/2011
From: William Blaney
NRC/OCFO
To: Baldwin T
Pacific Gas & Electric Co
References
FOIA/PA-2011-0288
Download: ML11235A654 (43)


Text

U.

S.

NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Pedwire see attached Terms and Conditions.

If paid by check, make check payable to the NRC (reference Invoice no.) and mail to:

U.S. Nuclear Regulatory Commission Accounts Receivable Team P.O. Box 979051 St. Louis, MO 63197-9000 Invoice No.: RL0123-11 Invoice Date: 10/25/10

Contact:

BILLY BLANEY Phone:

301/415-5092 Docket: 050-00275 050-00323 TO:

PACIFIC GAS & ELECTRIC COMPANY ATTN: TOM BALDWIN MANAGER REGULATORY SERV.

DCPP REGULATORY SERVICES AVILA BEACH, CA 93424 Period: 07/04/10 -

09/25/10 DIABLO CANYON 1 DIABLO CANYON 2 Review of Part 50 Application for Reactor License, Amendments, Exemptions, Reliefs, Performance Reviews, Assessments and Other Approvals 974.5 HRS @ $259.00 2410.0 HRS @ $257.00 Contract Costs:

Project Manager:

252,395.50 619,370.00 199,322.38 36,340.20 AMOUNT DUE 1,107,428.00 TERMS.

Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately.

However, interest will be waived if payment is received within 30 days from the invoice date.

Penalty and administrative charges will be assessed on a delinquent invoice.

Additional terms and conditions are attached, if applicable.

NOTES.

If there are any questions about the existence or amount of the debt, contact the individual named above.

For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.

07/19/11 15:14:35 Page Number:

1 Detail Line For Invoice RL0123-11 For the Period 07/04/10 -

09/25/10 Docket Number 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00275 050-00323 050-00323 050-00323 Reg NonReg TAC/B&R Hours Hours Rate Hourly Costs PM Costs Contractual Costs Cost Applicnt Date Date Names/Remarks ME1644 ME1644 ME2667 ME2825 ME2825 ME2896 ME2896 ME2995 ME3018 ME3018 ME3942 ME4056 M44056 ME4290 111104 111126A 122122F 122122F 9A1E 9AlN 9AlN ME2896 ME2896 ME2825 ME2825 ME2825 ME2896 ME2896 M32896 ME2896 ME2896 ME2896 ME2896 142896 ME2896 1E2825 ME2825 ME2825 ME2825 ME1645 ME1645 M32668 18.0 1.0 0.5 87.6 42.0 997.4 399.5 16.5 10.5 23.0 3.0 67.0 25.1 3.0 4.0 4.5 38.5 20.0 0.6 0.6 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.0 1.0 1.5 0.0 0.0 0.0 3.8 0.8 46.0 10.1 0.0 0.0 0.0 0.0 1.3 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 257.00 259.00 257.00 257.00 259.00 257.00 259.00 257.00 257.00 259.00 257.00 257.00 259.00 257.00 259.00 257.00 257.00 259.00 257.00 257.00 259.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 257.00 259.00 257.00 4,626.00 259.00 128.50 23,489.80 1;os085.20 268,153.80 106,086.40 4,240.50 2,698.50 5,957.00 771.00 17,553.10 6,837.60 771.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,626.00 259.00 385.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,036.00 1,156.50 9,894.50 5,180.00 154.20 154.20 77.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.00 746.00

-675.00

-1,203.00 1,264.00 7,058.50 1,902.50 494.50 1,591.00 2,653.00 8,851.00 6,344.29 6,130.01 18,738.56

-1,163.00 9,288.00 18,997.00 17,240.00 0.00 0.00 0.00

/

/

I

/

I I

I

/

/

/

/

/

/

/

/

I

/

/

/

/

/

2010/07 2010/06 2010/06 2010/08 2010/07 2010/06 2010/08 2010/07 2010/08 2010/07 2010/06 2010/07 2010/08 2010/06 2010/08 2010/07 2010/06 2010/08

/

/

/

07/03/09 07/03/09 11/20/09 11/23/09 11/23/09 11/24/09 11/24/09 12/14/09 12/29/09 12/29/09 05/17/10 06/14/10 06/14/10 07/22/10

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

07/03/09 07/03/09 11/20/09 DIABLO CANYON 1 -

LAR for TS 3.4.15 RCS Leakage Detection DIAPLO CANYON 1 -

LAR for TS 3.4.15 RCS Leakage Detection DIABLO CANYON 1 - Diablo Canyon Cyber Security LAR DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV DIABLO CANYON 1 - License Renewal SAFETY Review DIABLO CANYON 1 - License Renewal SAFETY Review DIABLO CANYON 1 -

LAR 09-06, Critical Damping Value for Cont DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off DIABLO CANYON 1 -

ASME Relief Request NDE-RCS-SE-IR16 as Mod DIABLO CANYON 1 - Diablo Canyon License Amendment Regarding DIABLO CANYON 1 - Diablo Canyon License Amendment Regarding DIABLO CANYON 1 - Request for Approval of Diablo Canyon plan PM -

OTHER LICENSING TASKS -

(H)

PM -

PM ACTIVITY/RESEARCH

& TEST OPERATING RX PM -

PM LICENSEES/REGIONAL/HQ STAFF INTERFACES PM -

PM LICENSEES/REGIONAL/HQ STAFF INTERFACES PM -

STAFF DEVELOPMENT & PROFESSIONAL MEETINGS PM -

FINANCIAL MANAGEMENT PM -

FINANCIAL MANAGEMENT J4152 J4152 J4244 J4244 J4244 J4287 J4287 J4287 J4288 J4288 J4288 J4382 J4382 J4382 J4386 J4386 J4386 J4480 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 1 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- Diablo Canyon, Unit 1, License Renewal ENV

- Diablo Canyon, Unit 1, License Renewal ENV

- Diablo Canyon, Unit 1, License Renewal ENV

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- Diablo Canyon, Unit 1, License Renewal ENV

- Diablo Canyon, Unit 1, License Renewal ENV

- Diablo Canyon, Unit 1, License Renewal ENV

- Diablo Canyon, Unit 1, License Renewal ENV LAR for TS 3.4.15 RCS Leakage Detection LAR for TS 3.4.15 RCS Leakage Detection

- Diablo Canyon Cyber Security LAR

Page Number:'

2 07/19/11 15:14:35 Detail Line For Invoice RL0123-ll For the Period 07/04/10 - 09/25/10 Docket Number TAC/B&R Reg NonReg Hours Hours Rate Hourly Costs PH Costs Contractual Costs Cost Applicnt Date Date 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 050-00323 M12826 ME2826 ME2897 M32897 ME2996 M33019 ME3019 ME3995 Mn3995 MR4057 ME4057 ME4291 ME4577 111104 111104 111126A 122122F 122122F 9Al1 9AlN 9AlN M32897 ME2897 M32826 ME2826 ME2826 M12897 ME2897 M12897 ME2897 M32897 ME2897 ME2897 ME2897 ME2897 M12826 M12826 ME2826 ME2897 ME2897 ME2897 M12826 83.1 38.9 877.2 363.3 16.0 13.5 5.0 22.3 20.5 69.0 22.9 3.0 5.0 1.0 7.0 4.5 38.5 20.0 0.6 0.6 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.7 1.7 46.9 12.2 0.0 0.0 0.0 0.0 0.0 1.2 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 257.00 259.00 257.00 259.00 257.00 257.00 259.00 257.00 259.00 257.00 259.00 257.00 259.00 257.00 259.00 257.00 257.00 259.00 257.00 257.00 259.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22,307.60 10,515.40 237,493.70 97,254.50 4,112.00 3,469.50 1,295.00 5,731.10 5,309.50 18,041.40 6,241.90 771.00 1,295.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 257.00 1,813.00 1,156.50 9,894.50 5,180.00 154.20 154.20 77.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.00 746.00

-675.00 1,264.00

-1,203.00 7,058.50 1,902.50 494.50 1,590.00 8,851.00 2,652.00 18,738.56 6,344.29 6,130.00 18,997.00 9,287.00

-1,163.00 1,654.83 437.12 588.72 17,240.00

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

20 10/07 2010/06 2010/06 2010/07 2010/08 2010/06 2010/08 2010/07 2010/08 2010/06 2010/07 2010/06 2010/07 2010/08 2010/06 2010/07 2010/08 2010/06 2010/07 2010/08 2010/08 11/23/09 11/23/09 11/24/09 11/24/09 12/14/09 12/29/09 12/29/09 05/05/10 05/05/10 06/14/10 06/14/10 07/22/10 08/12/10

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

1//

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

1//

/

/

/

/

/

/

/

/

/

/

/

/

/

/

Names/Remarks DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 PH -

OTHER LICEN PH -

OTHER LICEN PH -

P1 ACTIVITY PH -

PH LICENSEE PH -

PH LICENSEE P1 -

STAFF DEVEL PH -

FINANCIAL 14 PH -

FINANCIAL 34 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2 DIABLO CANYON 2

- Diablo Canyon, Unit 2, License Renewal ENV

- Diablo Canyon, Unit 2, License Renewal ENV

- License Renewal SAFETY Review

- License Renewal SAFETY Review LAR 09-06, Critical Damping Value for Cont

- Diablo Canyon LAR 09-07 Delayed Access Off

- Diablo Canyon LAR 09-07 Delayed Access Off

- Diablo Canyon RFO 15 SG 180 Day Report

- Diablo Canyon RFO 15 SG 180 Day Report

- Diablo Canyon License Amendment Regarding

- Diablo Canyon License Amendment Regarding

- Request for Approval of Diablo Canyon plan RR NDE-RCS-SE-2RI6 CC N-695 SING TASKS -

(H)

SING TASKS -

(H)

/RESEARCH

& TEST OPERATING RX S/REGIONAL/HQ STAFF INTERFACES S/REGIONAL/HQ STAFF INTERFACES

,OPMENT & PROFESSIONAL MEETINGS ANAGEMENT ANAGEMENT License Renewal SAFETY Review

- License Renewal SAFETY Review

- Diablo Canyon, Unit 2, License Renewal ENV

- Diablo Canyon, Unit 2, License Renewal ENV

- Diablo Canyon, Unit 2, License Renewal ENV

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- Diablo Canyon, Unit 2, License Renewal ENV

- Diablo Canyon, Unit 2, License Renewal ENV

- Diablo Canyon, Unit 2, License Renewal ENV

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- License Renewal SAFETY Review

- Diablo Canyon, Unit 2, License Renewal ENV J4152 J4152 J4244 J4244 J4244 J4287 J4287 J4287 J4288 J4288 J4288 J4382 J4382 J4382 J4386 J4386 J4386 J4389 J4389 J4389 J4480 3,395.3 130.2 871,765.50 36,340.20 199,322.38 Total Invoice Cost:

1,107,428.00

1~4.

f

-~

U.

S.

NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Fedwire see attached Terms and Conditions.

If paid by check, make check payable to the NRC (reference Invoice no.) and mail to:

U.S. Nuclear Regulatory Commission Accounts Receivable Team P.O.

Box 979051 St. Louis, MO 63197-9000 Invoice No.: RS0062-11 Invoice Date: 10./25/10 Docket No: 050-00323 License No:

DPR-82

Contact:

BILLY BLANEY Phone:

301-415-5092 TO:

PACIFIC GAS & ELECTRIC COMPANY FAC: DIABLO CANYON 2 ATTN:MANAGER REGULATORY SERVICES P.O.

BOX 56 AVILA BEACH, CA 93424 Period: 07/04/10 -

09/25/10 Part 50 Routine/Reactive Inspections, Investigations Routine Manpower Fees: $

Non-Routine Manpower Fees:

Resident Inspector Fees:

Subtotal Staff Hour Fees: $

Contract Costs: $

948,749.90 7,536.10 27,523.50 983,809.50 0.00 0.00 Common Costs:

Total Billed Amount: $

983,810.00 REVENUE CODE:

AMOUNT DUE 983,810.00 TERMS.

Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately.

However, interest will be waived if payment is received within 30 days from the invoice date.

Penalty and administrative charges will be assessed on a delinquent invoice.

Additional terms and conditions are attached, if applicable.

NOTES.

If there are any questions about the existence or amount of the debt, contact the individual named above.

For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.

A 07/19/11 10:52:16 Page Number:

1 Report Line Items For Hours Included on Invoice RS0062-11 For the Period 07/04/10 09/25/10 Docket No:

050-00323 Total Routine NonRtine Total NonRoutine Total Resident Report Report Routine Non-Reg Routine Hourly Fees NonRtine Non-Reg NonRtine Hourly Fees Insp Regular Non-Reg Resident Fees Number Sent Hours Hours Hours Rate Amount Hours Hours Hours Rate Amount Site Init Hours Hours Hours Rate Amount Totals 2009004 08/20/10 250.9 13.7 264.6 238.00 62974.80 0.0 0.0 0.0 238.00 0.00 62974.80 2009004 08/20/10 269.9 10.3 280.2 257.00 72011.40 0.0 0.0 0.0 257.00 0.00 72011.40 2010003 08/20/10 424.0 18.3 442.3 257.00 113671.10 0.0 0.0 0.0 257.00 0.00 113671.10 2010004 08/20/10 169.7 4.0 173.7 257.00 44640.90 0.0 0.0 0.0 257.00 0.00 44640.90 2010004 08/20/10 95.4 6.2 101.6 259.00 26314.40 0.0 0.0 0.0 259.00 0.00 26314.40 2010006 08/20/10 458.9 76.3 535.2 257.00 137546.40 0.0 0.0 0.0 257.00 0.00 137546.40 2010006 08/20/10 6.0 1.0 7.0 259.00 1813.00 0.0 0.0 0.0 259.00 0.00 1813.00 2010007 08/20/10 523.6 85.6 609.2 257.00 156564.40 0.0 0.0 0.0 257.00 0.00 156564.40 2010008 08/20/10 225.5 6.5 232.0 257.00 59624.00 0.0 0.0 0.0 257.00 0.00 59624.00 2010008 08/20/10 133.5 10.2 143.7 259.00 37218.30 0.0 0.0 0.0 259.00 0.00 37218.30 2010201 08/20/10 567.1 161.2 728.3 257.00 187173.10 2.0 0.0 2.0 257.00 514.00 187687.10 2010201 08/20/10 17.0 0.0 17.0 259.00 4403.00 0.0 0.0 0.0 259.00 0.00 4403.00 2010401 08/20/10 2.0 0.0 2.0 257.00 514.00 0.0 0.0 0.0 257.00 0.00 514.00 2010403 08/20/10 75.8 5.0 80.8 257.00 20765.60 0.0 0.0 0.0 257.00 0.00 20765.60 2010501 08/20/10 51.3 7.0 58.3 257.00 14983.10 23.6 0.7 24.3 257.00 6245.10 21228.20 2010501 08/20/10 0.0 0.0 0.0 259.00 0.00 2.8 0.2 3.0 259.00 777.00 777.00 2011001 08/20/10 30.7 1.0 31.7 257.00 8146.90 0.0 0.0 0.0 257.00 0.00 8146.90 2011401 08/20/10 1.5 0.0 1.5 257.00 385.50 0.0 0.0 0.0 257.00 0.00 385.50 DIAB MH8 30.0 0.0 30.0 257.00 7710.00 7710.00 DIAB MH8 74.5 2.0 76.5 259.00 19813.50 19813.50 3302 8 406 3 3709 1 948749.90 28.4 0.9 29.3 7536.10 104.5 2.0 106.5 27523.50 983809.50

U.

S.

NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 If paid by Fedwire see attached Terms and Conditions.

If paid by check, make check payable to the NRC (reference Invoice no.) and mail to:

U.S. Nuclear Regulatory Commission Accounts Receivable Team P.O.

Box 979051 St. Louis, MO 63197-9000 Invoice No.: RS0036-11 Invoice Date: 10/25/10 Docket No: 050-00275 License No:

DPR-80

Contact:

BILLY BLANEY Phone:

301-415-5092 TO:

PACIFIC GAS & ELECTRIC COMPANY FAC: DIABLO CANYON 1 ATTN:TOM BALDWIN MANAGER REGULATORY SERV.

DCPP REGULATORY SERVICES AVILA BEACH, CA 93424 Period: 07/04/10 -

09/25/10 Part 50 Routine/Reactive Inspections, Investigations Routine Manpower Fees: $

967,303.30 Non-Routine Manpower Fees:

8,307.70 Resident Inspector Fees:

18,343.90 Subtotal Staff Hour Fees: $

993,954.90 Contract Costs: $

0.00 Common Costs: $

0.00 Total Billed Amount: $

993,955.00 REVENUE CODE:

AMOUNT DUE 993,955.00 TERMS.

Interest will accrue from the invoice date at the annual rate of 1.000 %. Payment is due immediately.

However, interest will be waived if payment is received within 30 days from the invoice date.

Penalty and administrative charges will be assessed on a delinquent invoice.

Additional terms and conditions are attached, if applicable.

NOTES.

If there are any questions about the existence or amount of the debt, contact the individual named above.

For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CFR 15.

07/13/11 09:56:09 P

Page Number: ',

Report Line Items For Hours Included on Invoice RS0036-11 For the Period 07/04/10 -

09/25/10 Docket No:

050-00275 Total Routine NonRtine Total NonRoutine Total Resident Report Report Routine Non-Reg Routine Hourly Fees NonRtine Non-Reg NonRtine Hourly Fees Insp Regular Non-Reg Resident Fees Number Sent Hours Hours Hours Rate Amount Hours Hours Hours Rate Amount Site Init Hours Hours Hours Rate Amount Totals 2010003 08/20/10 469.8 18.5 488.3 257.00 125493.10 0.0 0.0 0.0 257.00 0.00 125493.10 2010004 08/20/10 214.8 6.0 220.8 257.00 56745.60 0.0 0.0 0.0 257.00 0.00 56745.60 2010004 08/20/10 130.6 5.3 135.9 259.00 35198.10 0.0 0.0 0.0 259.00 0.00 35198.10 2010005 08/20/10 8.0 0.0 8.0 257.00 2056.00 0.0 0.0 0.0 257.00 0.00 2056.00 2010005 08/20/10 14.0 0.0 14.0 259.00 3626.00 0.0 0.0 0.0 259.00 0.00 3626.00 2010006 08/20/10 471.9 73.7 545.6 257.00 140219.20 0.0 0.0 0.0 257.00 0.00 140219.20 2010006 08/20/10 6.0 1.0 7.0 259.00 1813.00 0.0 0.0 0.0 259.00 0.00 1813.00 2010007 08/20/10 676.8 93.9 770.7 257.00 198069.90 0.0 0.0 0.0 257.00 0.00 198069.90 2010008 08/20/10 245.5 7.5 253.0 257.00 65021.00 0.0 0.0 0.0 257.00 0.00 65021.00 2010008 08/20/10 214.0 11.3 225.3 259.00 58352.70 0.0 0.0 0.0 259.00 0.00 58352.70 2010201 08/20/10 670.4 203.5 873.9 257.00 224592.30 2.0 0.0 2.0 257.00 514.00 225106.30 2010201 08/20/10 18.0 0.0 18.0 259.00 4662.00 0.0 0.0 0.0 259.00 0.00 4662.00 2010401 08/20/10 3.5 0.5 4.0 257.00 1028.00 0.0 0.0 0.0 257.00 0.00 1028.00 2010403 08/20/10 73.5 11.3 84.8 257.00 21793.60 0.0 0.0 0.0 257.00 0.00 21793.60 2010501 08/20/10 54.8 8.3 63.1 257.00 16216.70 26.2 0.8 27.0 257.00 6939.00 23155.70 2010501 08/20/10 0.0 0.0 0.0 259.00 0.00 3.0 0.3 3.3 259.00 854.70 854.70 2011001 08/20/10 40.3 2.0 42.3 257.00 10871.10 0.0 0.0 0.0 257.00 0.00 10871.10 2011401 08/20/10 4.5 0.0 4.5 257.00 1156.50 0.0 0.0 0.0 257.00 0.00 1156.50 2011401 08/20/10 1.5 0.0 1.5 259.00 388.50 0.0 0.0 0.0 259.00 0.00 388.50 DIAB MS2 34.5 1.0 35.5 257.00 9123.50 9123.50 DIAB MS2 32.8 2.8 35.6 259.00 9220.40 9220.40 3317 09 2 8 3760 773 3

1 2

1 1 32 3 8307.70 C7.3 3.8 71.1 18343.90 993954.90

t.

U.SNRC:

Un~ite&d Suares Nudc~ar lkcguhacorý Ztimi.~n ProtectiWg People and the Environment Vendor:

Quarter Period:

Cost Accumulated through:

Pacific Gas & Electric Co.

ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Remit To:

10/01/2010 - 09/30/2011 12/18/2010 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:

BD Number LFB 11-1787 LFB 11-1814 Date Feb 11, 2011 Feb 11, 2011 Due Date Mar 13, 2011 Mar 13, 2011 Amount

$560,369.81

$389,212.25 Docket 05000275 05000323 Collections and Adjustments:

CR Number Bill Number CL 11-0040 CL RS0062-11 CR ACH110114 CR 11-0260 CR ACH110114 CR 11-0260 CL 11-1215 CL 11-1160 CL 11-1215 CL 11-1160 CL 11-1216 CL 11-1190 CL 11-1216 CL 11-1190 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Line Type NR NR NR NR NR NR NR 33 of 1130 Amount

$983,810.00

$1,159,000.00

$37,000.00

$1,159,000.00

$37,000.00

$1,159,000.00

$37,000.00 Docket 05000323 05000323 05000275 05000275 05000323 05000323

Collections and Adjustments:

CR Number Bill Number Date Line Type Amount Docket If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.

Additional terms and conditions are attached.

Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.

34 of 1130

Billing Details:

PART 170:

TAC/IR Number Docket #:

TAC/IR Name 05000275 Payment Period End Date License #:

Regular Non-Hours Regular Hours DPR-80 Hour Rate Hourly Costs Contract Costs Total Costs TAC Details ME2896 ME3018 ME5033 ME4290 ME2825 ME1644 MD7094 X02471 ME4924 DIABLO CANYON 1 -

License Renewal SAFETY Review DIABLO CANYON 1 -

Diablo Canyon LAR 09-07 Delayed Access Off DIABLO CANYON 1 - Pre-Application Meeting for Seismic Licens DIABLO CANYON 1 -

Request for Approval of Diablo Canyon plan DIABLO CANYON 1 -

Diablo Canyon, Unit 1, License Renewal ENV DIABLO CANYON 1 - LAR forTS 3.4.15 RCS Leakage Detection DIABLO CANYON 1 - Plant Project Manager (10CFR170)

INITIAL EXAM - UNIT 1 -

DC (07/2011)

DIABLO CANYON 1 -

Reactor Vessel Material Surveillance Capsu Dec 4, 2010 Dec 18, 2010 Dec 4, 2010 Oct 23, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 Nov 20, 2010 609.75 20.0 16.5 1.5 170.75 10.5 99.75 1.0 22.5 26.25 0.0 2.25 0.0 6.0 0.0 8.0 0.0 0.0

$259.00

$259.00

$259.00

$259.00

$259.00

$259.00

$259.00

$259.00

$259.00

$164,724.00

$5,180.00

$4,856.25

$388.50

$45,778.25

$2,719.50

$27,907.25

$259.00

$5,827.50

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$164,724.00

$5,180.00

$4,856.25

$388.50

$45,778.25

$2,719.50

$27,907.25

$259.00

$5,827.50 Adjustments No Adjustments Found Total TAC Due for Docket:

952.25 42.5 35 of 1130

$257,640.25

$0.00

$257,640.25

Billing Details:

Inspection Report Details 2010004/05000275 2010004/05000275 2011001/05000275 2011001/05000275 2010005/05000275 2010005/05000275 2010008/05000275 2010008/05000275 Oct 23, 2010 Nov 20, 2010 Dec 4, 2010 Nov 20, 2010 21.25 1.0 920.25 62.0 0.0 0.0 115.0 3.5

$259.00

$259.00

$259.00

$259.00

$5,503.75

$259.00

$268,129.75

$16,964.50

$0.00

$0.00

$0.00

$0.00

$5,503.75

$259.00

$268,129.75

$16,964.50 Adjustments No Adjustments Found Total IR Due for Docket:

1004.5 118.5

$290,857.00

$0.00 PM / SRI Allocated Overhead Hours:

Total for PM / SRI Due for Docket:

Dec 18, 2010 44.84 1.0

$259.00

$11,872.56

$290,857.00

$11,872.56

$11,872.56

$560,369.81

$560,369.81 TOTAL PART 170:

Total for License/Docket:

36 of 1130

Billing Details:

PART 170:

TAC/IR Number TAC Details ME3019 ME4291 ME4577 ME1645 ME3995 MD7095 ME2826 ME2897 X02472 ME5034 Docket #:

TAC/IR Name DIABLO CANYON 2 -

Diablo Canyon LAR 09-07 Delayed Access Off DIABLO CANYON 2 -

Request for Approval of Diablo Canyon plan DIABLO CANYON 2 - RR NDE-RCS-SE-2R16 CC N-695 DIABLO CANYON 2 - LAR for TS 3.4.15 RCS Leakage Detection DIABLO CANYON 2 -

Diablo Canyon RFO 15 SG 180 Day Report DIABLO CANYON 2 - Plant Project Manager (10CFR170)

DIABLO CANYON 2 -

Diablo Canyon, Unit 2, License Renewal ENV DIABLO CANYON 2 -

License Renewal SAFETY Review INITIAL EXAM - UNIT 2 -

DC (07/2011)

DIABLO CANYON 2 - Pre-Application Meeting for Seismic Licens 05000323 Payment Period End Date Dec 18, 2010 Oct 23, 2010 Dec 18, 2010 Dec 18, 2010 Nov 20, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 Dec 18, 2010 License #:

DPR-82 Regular Non-Hour Rate Hours Regular Hours 19.5 0.5

$259.00 1.5 0.0

$259.00 32.0 1.5

$259.00 10.5 0.0

$259.00 8.0 0.0

$259.00 99.5 7.5

$259.00 165.0 8.5

$259.00 586.75 31.0

$259.00 1.0 0.0

$259.00 16.5 2.25

$259.00 Hourly Costs

$5,180.00

$388.50

$8,676.50

$2,719.50

$2,072.00

$27,713.00

$44,936.50

$159,997.25

$259.00

$4,856.25 Contract Costs

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00 Total Costs

$5,180.00

$388.50

$8,676.50

$2,719.50

$2,072.00

$27,713.00

$44,936.50

$159,997.25

$259.00

$4,856.25 Adjustments 37 of 1130

Billing Details:

Adjustments ME2897 DIABLO CANYON 2 -

License Renewal SAFETY Review Sep 25, 2010 0.0

-0.75

$259.00

($194.25)

($194.25)

No Adjustments Found Total TAC Due for Docket:

940.25 50.5

$256,604.25

$0.00 Inspection Report Details 2010008/05000323 2010008/05000323 2010005/05000323 2010005/05000323 2011001/05000323 2011001/05000323 2010004/05000323 2010004/05000323 Nov 20, 2010 Dec 18, 2010 Nov 20, 2010 Oct 23, 2010 66.0 414.25 0.5 19.5 1.0 8.75 0.0 2.0

$259.00

$259.00

$259.00

$259.00

$17,353.00

$109,557.00

$129.50

$5,568.50

$0.00

$0.00

$0.00

$0.00

$256,604.25

$17,353.00

$109,557.00

$129.50

$5,568.50 Adjustments No Adjustments Found Total IR Due for Docket:

500.25 11.75

$132,608.00

$0.00 TOTAL PART 170:

$132,608.00

$389,212.25

$389,212.25 Total for License/Docket:

38 of 1130

Remittance Information:

Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-1787 Mar 13, 2011

$560,369.81 05000275 LFB 11-1814 Mar 13, 2011

$389,212.25 05000323

$949,582.06 39 of 1130

I -

Uniced Suares Nucicar Reguiacory Cormmi, ssion Protecting People and the Enwvironmenzt Vendor:

Quarter Period:

Cost Accumulated through:

Pacific Gas & Electric Co.

ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Remit To:

10/01/2010 - 09/30/2011 03/26/2011 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:

BD Number LFB 11-3915 LFB 11-3943 Date May 23, 2011 May 23, 2011 Due Date Jun 22, 2011 Jun 22, 2011 Amount

$497,515.69

$484,200.50 Docket 05000275 05000323 Collections CR Number CL 11-0040 CR ACH110114 CR ACH110114 CL 11-1215 CL 11-1215 CL 11-1216 CL 11-1216 and Adjustments:

Bill Number CL RS0062-11 CR 11-0260 CR 11-0260 CL 11-1160 CL 11-1160 CL 11-1190 CL 11-1190 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Line Type NR NR NR NR NR NR NR Amount

$983,810.00

$1,159,000.00

$37,000.00

$1,159,000.00

$37,000.00

$1,159,000.00

$37,000.00 Docket 05000323 05000323 05000275 05000275 05000323 05000323 25 of 898

Collections and Adjustments:

CR Number Bill Number CL 11-1693 CL 11-1814 CL 11-2319 CL 11-1787 CR 11-0543 CR 11-2925 CR 11-0543 CR 11-2925 CR 11-0545 CR 11-2955 CR 11-0545 CR 11-2955 CL 11-2372 CL 11-2372 CL 11-2925 CL 11-2372 CL 11-2925 CL 11-2374 CL 11-2374 CL 11-2955 CL 11-2374 CL 11-2955 Date Mar 22, 2011 May 3, 2011 May 17, 2011 May 17, 2011 May 17, 2011 May 17, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 Line Type NR NR WO WO WO WO Al NR NR AI NR NR Amount

$389,212.25

$559,895.83

$0.00

$0.00

$0.00

$0.00

$69,370.56

$37,000.00

$1,159,000.00

$54,454.75

$1,159,000.00

$37,000.00 Docket 05000323 05000275 05000275 05000275 05000323 05000323 05000275 05000275.

05000275 05000323 05000323 05000323 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.

Additional terms and conditions are attached.

Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.

26 of 898

Docket:

(Multiple Items)

Hourly Rate: $259 TAC/IR Number TAC/IR Name Payperiod End Date Regular/ Non-Total Total Costs Reaular Hours Hours 2010005/05000275 2010005/05000275 01-JAN-11 NONREG 6

$1,554.00 REG 62.5

$16,187.50 15-JAN-11 REG 17

$4,403.00 29-JAN-11 REG 1

$259.00 2010005/05000323 2010005/05000323 01-JAN-11 NONREG 1

$259.00 REG 44.75

$11,590.25 15-JAN-1l1 REG 15

$3,885.00 29-JAN-11 REG 1

$259.00 2010501/05000275 2010501/05000275 01-JAN-11 REG 0.25

$64.75 2011001/05000275 2011001/05000275 12-FEB-1l1 REG 4.75

$1,230.25 15-JAN-1 1 REG 28

$7,252.00 26-FEB-11 REG 0.5

$129.50 29-JAN-1 1 REG 7.75

$2,007.25 2011001/05000323 2011001/05000323 12-FEB-1 1 REG 4.75

$1,230.25 15-JAN-11 REG 25.25

$6,539.75 26-FEB-11 REG 0.5

$129.50 29-JAN-11 REG 7.75

$2,007.25 2011002/05000275 2011002/05000275 12-FEB-11 NONREG 2.5

$647.50 REG 111.5

$28,878.50 12-MAR-11 NONREG 4.5

$1,165.50 REG 93.5

$24,216.50 15-JAN-11 NONREG 2.5

$647.50 REG 59.75

$15,475.25 26-FEB-1I NONREG 1.5

$388.50 REG 85.25

$22,079.75 26-MAR-1I NONREG 3.5

$906.50 REG 91.75

$23,763.25 29-JAN-11 NONREG 9.5

$2,460.50 REG 86.25

$22,338.75 2011002/05000323 2011002/05000323 12-FEB-11 NONREG 2.25

$582.75 REG 100.75 $26,094.25 12-MAR-11 NONREG 4.75

$1,230.25 REG 95

$24,605.00 15-JAN-11 NONREG 4.5

$1,165.50 REG 54.5

$14,115.50 26-FEB-11 NONREG 1.5

$388.50 REG 69.5

$18,000.50 26-MAR-11 NONREG 3.5

$906.50 REG 96

$24,864.00 29-JAN-11 NONREG 7.5

$1,942.50 REG 88.75

$22,986.25 2011003/0500027512011003/05000275 29-JAN-1I NONREG 1

$259.00 2011201/0500027512011201/05000275 12-FEB-1I REG 4.5

$1,165.50 12-MAR-11 NO)NRF(*

  • 1 7R

.*R ?*23 9R OREG 314175

$236,1325 REG 141.75 $36,713.25

2011201/05000275 2011201/05000275 26-FEB-11 REG 12.5

$3,237.50 26-MAR-11 REG 33.5

$8,676.50 2011201/05000323 2011201/05000323 12-FEB-11 REG 4.25

$1,100.75 12-MAR-11 NONREG 32.25

$8,352.75 REG 140.25 $36,324.75 26-FEB-11 REG 12.5

$3,237.50 26-MAR-11 REG 33.5

$8,676.50 2011401/05000275 2011401/05000275 26-MAR-11 REG 2

$518.00 2011401/05000323 2011401/05000323 26-MAR-11 REG 2

$518.00 2011402/05000275 2011402/05000275 12-MAR-11 NONREG 18.5

$4,791.50 REG 64.5

$16,705.50 26-FEB-11 REG 21.75

$5,633.25 26-MAR-11 REG 13.5

$3,496.50 2011402/05000323 2011402/05000323 12-MAR-11 NONREG 18.5

$4,791.50 REG 60.5

$15,669.50 26-FEB-11 REG 18.5

$4,791.50 26-MAR-11 REG 13.5

$3,496.50 2011404/05000275 2011404/05000275 12-MAR-11 REG 4

$1,036.00 2011404/05000323 2011404/05000323 12-MAR-11 REG 2

$518.00 2011405/05000275 2011405/05000275 12-FEB-11 REG 6.5

$1,683.50 12-MAR-11 REG 11.5

$2,978.50 26-FEB-1I REG 21.5

$5,568.50 26-MAR-11 REG 19.5

$5,050.50 2011405/05000323 2011405/05000323 12-MAR-11 REG 11.5

$2,978.50, 26-MAR-11 REG 6

$1,554.00 2011501/05000275 2011501/05000275 12-FEB-11 REG 0.25

$64.75 12-MAR-11 NONREG 1.25

$323.75 REG 7.5

$1,942.50 29-JAN-11 REG 4

$1,036.00 2011501/05000323 2011501/05000323 12-MAR-11 NONREG 1.25

$323.75 REG 7.25

$1,877.75 29-JAN-11 REG 4

$1,036.00 D92375 DIABLO CANYON UNIT 2 REQUEST FOR EXEMPTION 10CFR73.5 26-MAR-1I REG 2

$518.00 D92376 DIABLO CANYON UNIT 1 REQUEST FOR EXEMPTION-10CFR73.5 26-MAR-1 REG 2

$518.00 MD7094 DIABLO CANYON 1 - Plant Project Manager (10CFR170) 01-JAN-11 REG 5.25

$1,359.75 12-FEB-11 REG 10.25

$2,654.75 12-MAR-1 1 REG 10

$2,590.00 15-JAN-1I REG 10.75

$2,784.25 26-FEB-11 REG 7.75

$2,007.25 26-MAR-11 NONREG 3.75

$971.25 REG 13.75

$3,561.25 29-JAN-11 NONREG 0.25

$64.75 REG 7

$1,813.00 MD7095 DIABLO CANYON 2 - Plant Project Manager (10CFR170) 01-JAN-11 REG 5.25

$1.359.75 12-FEB-1i1 REG 10.25

$2,654.75 12-MAR-1l1 REG 10

$2,590.00 15-JAN-1l1 REG 10.75

$2,784.25 26-FEB-1 1 REG 7.75

$2,007.25

MD7095 DIABLO CANYON 2 - Plant Project Manager (10CFR170) 26-MAR-11 NONREG 3.5

$906.50 REG 14.25

$3,690.75 29-JAN-11 NONREG 0.25

$64.75 REG 7

$1,813.00 ME1644 DIABLO CANYON 1 - LAR for TS 3.4.15 RCS Leakage Detection 01-JAN-11 REG 2

$518.00 15-JAN-11 REG 3.75

$971.25 29-JAN-11 REG 3

$777.00 ME1645 DIABLO CANYON 2 - LAR for TS 3.4.15 RCS Leakage Detection 01-JAN-11 REG 2

$518.00 15-JAN-11 REG 3.75

$971.25 29-JAN-11 REG 3

$777.00 ME2825 DIABLO CANYON 1 - Diablo Canyon, Unit 1, License Renewal ENV 01-JAN-11 REG 21.5

$5,568.50 12-FEB-11 NONREG 1

$259.00 REG 27.75

$7,187.25 12-MAR-11 NONREG 0.75

$194.25 REG 21.25

$5,503.75 15-JAN-11 NONREG 1

$259.00

_ REG 20.25

$5,244.75 26-FEB-11 NONREG 0.5

$129.50 REG 36

$9,324.00 26-MAR-11 NONREG 3.5

$906.50 REG 41.25

$10,683.75 29-JAN-11 NONREG 5

$1,295.00 REG 29

$7,511.00 ME2826 DIABLO CANYON 2 - Diablo Canyon, Unit 2, License Renewal ENV 01-JAN-11 REG 22

$5,698.00 12-FEB-11 NONREG 1

$259.00 REG 27.5

$7,122.50 12-MAR-11 NONREG 0.75

$194.25 REG 21.25

$5,503.75 15-JAN-11 NONREG 1

$259.00 REG 20

$5,180.00 26-FEB-11 REG 35.75

$9,259.25 26-MAR-11 NONREG 3.5

$906.50 REG 41

$10,619.00 29-JAN-11 NONREG 5.25

$1,359.75 REG 29

$7,511.00 ME2896 DIABLO CANYON 1 - License Renewal SAFETY Review 01-JAN-11 NONREG 8.75

$2,266.25 REG 72

$18,648.00 12-FEB-11 NONREG 2.75

$712.25 REG 193.5

$50,116.50 12-MAR-11 REG 67.25

$17,417.75 15-JAN-11 NONREG 13.25

$3,431.75 REG 63.5

$16,446.50 18-DEC-10 REG 2

$518.00 26-FEB-1I REG 45.25

$11,719.75 26-MAR-11 REG 48.5

$12,561.50 29-JAN-11 REG 53.25

$13,791.75 ME2897 DIABLO CANYON 2 - License Renewal SAFETY Review 01-JAN-11 NONREG 10.25

$2.654.75 REG 67.75

$17,547.25 REG 67.75

$17,547.25

ME2897 DIABLO CANYON 2 - License Renewal SAFETY Review 12-FEB-11 NONREG 3

$777.00 REG 202

$52,318.00 12-MAR-11 REG 67

$17,353.00 15-JAN-11 NONREG 12.25

$3,172.75 REG 70.75

$18,324.25 18-DEC-10 REG 2

$518.00 26-FEB-11 REG 46.25

$11,978.75 26-MAR-11 REG 48.5

$12,561.50 29-JAN-11 REG 58

$15,022.00 ME3018 DIABLO CANYON 1 - Diablo Canyon LAR 09-07 Delayed Access Off 01-JAN-11 REG 1.5

$388.50 12-FEB-11 REG 1

$259.00 12-MAR-11 REG 25.25

$6,539.75 15-JAN-11 REG 5.25

$1,359.75 26-FEB-11 REG 2.75

$712.25 26-MAR-11 NONREG 1

$259.00 REG 3

$777.00 29-JAN-11 REG 1

$259.00 ME3019 DIABLO CANYON 2 - Diablo Canyon LAR 09-07 Delayed Access Off 01-JAN-11 REG 2

$518.00 12-FEB-11 REG 1

$259.00 12-MAR-11 REG 7.25

$1,877.75 15-JAN-11 REG 5.25

$1,359.75 26-FEB-11 REG 2.75

$712.25 26-MAR-11 NONREG 1

$259.00 REG 3

$777.00 29-JAN-11 REG 1

$259.00 ME3995 DIABLO CANYON 2 - Diablo Canyon RFO 15 SG 180 Day Report 12-FEB-11 REG 1

$259.00 12-MAR-11 REG 3.25

$841.75 ME4290 DIABLO CANYON 1 - Request for Approval of Diablo Canyon plan 01-JAN-11 REG 0.5

$129.50 12-MAR-11 REG 1

$259.00 15-JAN-1i1 REG 1.5

$388.50 29-JAN-1i1 REG 0.5

$129.50 ME4291 DIABLO CANYON 2 - Request for Approval of Diablo Canyon plan 01-JAN-11 REG 0.5

$129.50 12-MAR-11 REG 1

$259.00 15-JAN-11 REG 1.5

$388.50 29-JAN-11 REG 0.5

$129.50 ME4577 DIABLO CANYON 2 - RR NDE-RCS-SE-2R16 CC N-695 12-FEB-11 REG 5

$1,295.00 12-MAR-1I NONREG 0.5

$129.50 REG 5.5

$1,424.50 15-JAN-11 REG 4

$1,036.00 26-FEB-11 NONREG 0.5

$129.50 REG 3

$777.00 26-MAR-11 REG 1

$259.00 129-JAN-11 REG 1

$259.00 ME5033 DIABLO CANYON 1 - Pre-Application Meeting for Seismic Licens 01-JAN-11 NONREG 0.25 S64175 REG 2.25

$582.75 12-FEB-1i1 NONREG 11.5

$388.50 REG 2.5

$647.50 12-MAR-1 1 REG 2.5

$647.50

ME5033 DIABLO CANYON 1 - Pre-Application Meeting for Seismic Licens 15-JAN-11 REG 5.5

$1,424.50 26-FEB-11 NONREG 1.5

$388.50 REG 3.5

$906.50 26-MAR-1i1 NONREG 1

$259.00 REG 3

$777.00 29-JAN-1I NONREG 0.5

$129.50 REG 9

$2,331.00 ME5034 DIABLO CANYON 2 - Pre-Application Meeting for Seismic Licens 01-JAN-11 NONREG 0.25

$64.75 REG 2.25

$582.75 12-FEB-11 NONREG 1.5

$388.50 REG 2.5

$647.50 12-MAR-11 REG 2.5

$647.50 15-JAN-11 REG 5.5

$1,424.50 26-FEB-11 NONREG 2

$518.00

_REG 3.5

$906.50 26-MAR-11 NONREG 1

$259.00 REG 3

$777.00 29-JAN-11 NONREG 0.75

$194.25 REG 8.5

$2,201.50 ME5352 DIABLO CANYON 1 - Pre-application for Review of Physical Sec 12-FEB-11 REG 1.5

$388.50 26-FEB-11 REG 1

$259.00 26-MAR-11 REG 1

$259.00 ME5353 DIABLO CANYON 2 - Pre-application for Review of Physical Sec 12-FEB-11 REG 1.5

$388.50 26-FEB-11 REG 1

$259.00 26-MAR-11 REG 1

$259.00 ME5713 DIABLO CANYON 1 - TS 3.7.1 MSSV License Amendment Request 12-MAR-11 REG 1.75

$453.25 26-FEB-11 REG 1.5

$388.50 26-MAR-1I NONREG 1.5

$388.50 REG 8

$2,072.00 ME5714 DIABLO CANYON 2 - TS 3.7.1 MSSV License Amendment Request 12-MAR-11 REG 1.75

$453.25 26-FEB-11 REG 1.5

$388.50 26-MAR-11 REG 4

$1,036.00 ME5894 DIABLO CANYON 1 - Request for Exemption from Specific 10 CFR 26-MAR-11 REG 0.5

$129.50 ME5895 DIABLO CANYON 2 - Request for Exemption from Specific 10 CFR 26-MAR-11 REG 0.5

$129.50 S00285 DIABLO CANYON UNIT 1 LICENSE RENEWAL (DOCKET NO. 05000275) 12-FEB-11 REG 32.5

$8,417.50 12-MAR-11 REG 18

$4,662.00 15-JAN-11 REG 9.5

$2,460.50 26-FEB-11 REG 4

$1,036.00 26-MAR-11 REG 14.5

$3,755.50 29-JAN-11 REG 21.5

$5,568.50 S00286 DIABLO CANYON UNIT 2 LICENSE RENEWAL (DOCKET NO. 05000323) 12-FEB-11 REG 32.5

$8,417.50 12-MAR-11 REG 18

$4,662.00 15-JAN-11 REG 9.5

$2,460.50 26-FEB-11 REG 4

$1,036.00 26-MAR-11 REG 14.5

$3,755.50 29-JAN-11 REG 22

$5,698.00 X02471 INITIAL EXAM - UNIT 1 - DC (07/2011)

I19-FFR-11I

RFC, 1

5T29!* fl 12-MAR-il1 REG

0.

$1-259.00 12-MAR-1 1 REG 0.5

$129.50

X02471 INITIAL EXAM - UNIT 1 - DC (07/2011) 15-JAN-11 REG 9.5

$2,460.50 26-FEB-11 REG 1

$259.00 26-MAR-11 REG 1

$259.00 X02472 INITIAL EXAM - UNIT 2 - DC (07/2011) 12-FEB-11 REG 2.5

$647.50 12-MAR-11 REG 0.5

$129.50 15-JAN-11 REG 7.5

$1,942.50

_26-MAR-11 REG 1

$259.00 (blank)

ADVANCE PAYMENT (blank)

(blank)

($123,825.31)

PM / SRI Allocated Overhead Hours 01-JAN-11 REG 1.25

$323.75 12-FEB-11 REG 0.25

$64.75 12-MAR-11 REG 4.5

$1,165.50 15-JAN-11 REG 1.5

$388.50 26-FEB-11 REG 0.25

$64.75 26-MAR-11 REG 10.5

$2,719.50 29-JAN-11 REG 4.25

$1,100.75 Grand Total 4268.5 $981,716.19

7.,

Remittance Information:

Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-3915 Jun 22, 2011

$497,515.69 05000275 LFB 11-3943 Jun 22, 2011

$484,200.50 05000323

$981,716.19 29 of 898

< U.S.NRC Uni Led States Nuclear Regulacory Conmrnksiori.

Protecting People and the Environment Quarter Period:

Cost Accumulated through:

Vendor:

Remit To:

10/01/2010 - 09/30/2011 06/04/2011 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Pacific Gas & Electric Co.

C/O PG&E CORPORATION ATTN: DIRECTOR, INSURANCE ONE MARKET, SPEAR TOWER, SUITE 2400 SAN FRANCISCO, CA 94105 Bills for Period:

BD Number LFB 11-4424 LFB 11-4431 Date Jun 21, 2011 Jun 21, 2011 Due Date Jul 21, 2011 Jul 21, 2011 Amount

$2,654.52

$2,565.99 Docket 05000275 05000323 Collections and Adjustments:

CR Number Bill Number CL 11-0040 CL RS0062-11 CR ACH110114 CR 11-0260 CR ACH110114 CR 11-0260 CL 11-1215 CL 11-1160 CL 11-1215 CL 11-1160 CL 11-1216 CL 11-1190 CL 11-1216 CL 11-1190 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Line Type NR NR NR NR NR NR NR Amount

$983,810.00

$1,159,000.00

$37,000.00

$1,159,000.00

$37,000.00

$1,159,000.00

$37,000.00 Docket 05000323 05000323 05000275 05000275 05000323 05000323 9

of 235

Collections and Adjustments:

CR Number Bill Number CL 11-1693 CL 11-1814 CR 11-0543 CR 11-2925 CR 11-0543 CR 11-2925 CR 11-0545 CR 11-2955 CR 11-0545 CR 11-2955 CL 11-2372 CL 11-2372 CL 11-2925 CL 11-2372 CL 11-2925 CL 11-2374 CL 11-2374 CL 11-2955 CL 11-2374 CL 11-2955 CR 11-0769 CR 11-1787 CL 11-2319 CL 11-1787 Date Mar 22, 2011 May 17, 2011 May 17, 2011 May 17, 2011 May 17, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 May 19, 2011 Jun 6, 2011 Jun 6, 2011 Line Type NR WO WO WO WO Al NR NR Al NR NR WO NR Amount

$389,212.25

$0.00

$0.00

$0.00

$0.00

$69,370.56

$37,000.00

$1,159,000.00

$54,454.75

$1,159,000.00

$37,000.00

$0.00

$560,369.81 Docket 05000323 05000275 05000275 05000323 05000323 05000275 05000275 05000275 05000323 05000323 05000323 05000275 05000275 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.

Additional terms and conditions are attached.

Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.

10 of 235

DOCKET (Multiple Items)

PART 170 Contract Costs TAC IR TAC/IR Name Payment Period End Date Total ME2897-DIABLO CANYON 2 - License Renewal SAFETY Review 01/10/20111

$57.97 ME2896 DIABLO CANYON I - License Renewal SAFETY Review 01/18/2011

$25

~04/13/20111

_$59.01

.i.......

I.......................I..................

ME2896 DIABLO CANYON I - License Renewal SAFETY Review 11/05/2010 $2,458.34 01/10/2011

$57.97 ME2897ý DIABLO CANYON 2 - License Renewal SAFETY Review 05/11/20111

$49.68 ME2~897~

DIABLO CANYON 2 - License Renewal SAFETY Review 11/05/20101 $2,458.34 FGrand Total 1 $5,220.51.I

Remittance Information:

Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-4424 Jul 21, 2011

$2,654.52 05000275 LFB 11-4431 Jul 21, 2011

$2,565.99 05000323

$5,220.51 13 of 235

TU.S.NR C

Unic~ed States Nuclear R*,gu Iawcry C;omm.ssion Protecting People and the Environment Vendor:

Quarter Period:

Cost Accumulated through:

Pacific Gas & Electric Co.

ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Remit To:

10/01/2010 - 09/30/2011 12/31/2010 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:

BD Number LFB 11-0232 Date Dec 23, 2010 Due Date Jan 22, 2011 Amount

$1,196,000.00 Docket 05000275 Collections and Adjustments:

CR Number CL 11-0039 CR 11-0122 Bill Number CL RS0036-11 CR RL0123-11 Date Nov 5, 2010 Nov 10, 2010 Line Type NR NR Amount

$993,955.00

$1,107,428.00 Docket If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.

Additional terms and conditions are attached.

Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please remember to reference the invoice number on the remittance.

29 of 1062

Billing Details:

Docket #:

05000275 License #:

DPR-80 PART 170:

Part 171:

Annual Fees:

Annual Fees:

TOTAL PART 171:

LFB 11-0232 LFB 11-0232 Jan 22, 2011 Jan 22, 2011 SPRD OPWR

$37,000.00

$1,159,000.00

$1,196,000.00

$1,196,000.00 Total for License/Docket:

30 of 1062

Remittance Information:

Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-0232 Jan 22, 2011

$1,196,000.00 05000275

$1,196,000.00 31 of 1062

  • U.SNRC United States Nuclear Regulac.ory Cornmis lssior Protecting People and the Environment Vendor:

Quarter Period:

Cost Accumulated through:

Pacific Gas & Electric Co.

ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Remit To:

10/01/2010 - 09/30/2011 12/31/2010 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:

BD Number LFB 11-0260 Date Dec 23, 2010 Due Date Jan 22, 2011 Amount

$1,196,000.00 Docket 05000323 Collections and Adiustments:

CR Number Bill Number CL 11-0040 CL RS0062-11 Date Nov 5, 2010 Line Type NR Amount

$983,810.00 Docket If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.

Additional terms and conditions are attached.

Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please remember to reference the invoice number on the remittance.

22 of 1062

Billing Details:

Docket #:

05000323 License #:

DPR-82 PART 170:

Part 171:

Annual Fees:

Annual Fees:

TOTAL PART 171:

LFB 11-0260 LFB 11-0260 Jan 22, 2011 Jan 22, 2011 SPRD OPWR

$37,000.00

$1,159,000.00

$1,196,000.00

$1,196,000.00 Total for License/Docket:

23 of 1062

Remittance Information:

Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-0260 Jan 22, 2011

$1,196,000.00 05000323

$1,196,000.00 24 of 1062

VI U.S.NRC VUni ted Stres Nuclear Regul arory Cont miLSsion Protecting People and the Environment Quarter Period:

Cost Accumulated through:

Vendor:

Remit To:

10/01/2010 - 09/30/2011 03/31/2011 Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Pacific Gas & Electric Co.

ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 Bills for Period:

BD Number LFB 11-1160 LFB 11-1190 Date Jan 27, 2011 Jan 27, 2011 Due Date Feb 26, 2011 Feb 26, 2011 Amount

$1,196,000.00

$1,196,000.00 Docket 05000275 05000323 Collections and Adjustments:

CR Number Bill Number CL 11-0040 CL RS0062-11 CR ACH110114 CR 11-0260 CR ACH110114 CR 11-0260 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Line Type NR NR NR Amount

$983,810.00

$1,159,000.00

$37,000.00 Docket 05000323 05000323 If there are any questions, contact (301) 415-7338. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.

Additional terms and conditions are attached.

Payment is due immediately. Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual percentage rate of 1%. Please 16 of 981

remember to reference the invoice number on the remittance.

17 of 981

Billing Details:

Docket #:

05000275 License #:

DPR-80 PART 170:

Part 171:

Annual Fees:

Annual Fees:

TOTAL PART 171:

LFB 11-1160 LFB 11-1160 Feb 26, 2011 Feb 26, 2011 OPWR SPRD

$1,159,000.00

$37,000.00

$1,196,000.00

$1,207,872.56 Total for License/Docket:

18 of 981

Billing Details:

Docket #:

05000323 License #:

DPR-82 PART 170:

Part 171:

Annual Fees:

Annual Fees:

TOTAL PART 171:

LFB 11-1190 LFB 11-1190 Feb 26, 2011 Feb 26, 2011 OPWR SPRD

$1,159,000.00

$37,000.00

$1,196,000.00

$1,196,000.00 Total for License/Docket:

19 of 981

Remittance Information:

Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-1160 Feb 26, 2011

$1,196,000.00 05000275 LFB 11-1190 Feb 26, 2011

$1,196,000.00 05000323

$2,392,000.00 20 of 981

I.....S.NRCC Uniced States Nu.clear Regulacory Com.rinssiou0.

Protecting People and the Environment Vendor:

Quarter Period:

Cost Accumulated through:

Pacific Gas & Electric Co.

ATTN: DCPP REGULATORY SERVICES MANAGER - REGULATORY SERVICES P.O. BOX 56 AVILA BEACH, CA 93424 10101/2010 - 09/30/2011 09/30/2011 Remit To:

Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 Bills for Period:

BD Number LFB 11-2925 LFB 11-2955 Date Apr 5, 2011 Apr 5, 2011 Due Date May 4, 2011 May 4, 2011 Amount

$1,196,000.00

$1,196,000.00 Docket 05000275 05000323 Collections and Adjustments:

CR Number CL 11-0040 CR ACH110114 CR ACH110114 CL 11-1215 CL 11-1215 CL 11-1216 CL 11-1216 Bill Number CL RS0062-11 CR 11-0260 CR 11-0260 CL 11-1160 CL 11-1160 CL 11-1190 CL 11-1190 Date Nov 5, 2010 Jan 14, 2011 Jan 14, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Feb 22, 2011 Line Type NR NR NR NR NR NR NR 19 of 1170 Amount

$983,810.00

$1,159,000.00

$37,000.00

$1,159,000.00

$37,000.00

$1,159,000.00

$37,000.00 Docket 05000323 05000323 05000275 05000275 05000323 05000323

Collections and Adjustments:

CR Number Bill Number Date Line Type Amount Docket CL 11-1693 CL 11-1814 Mar 22, 2011 NR

$389,212.25 05000323 If there are any questions, contact (301) 415-7554. For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101-105, AND 10 CFR 15.

Additional terms and conditions are attached.

Make checks payable to The U.S. Nuclear Regulatory Commission. Interest will accrue from the invoice date at an annual rate of 1%. Interest will be waived if payment is received by the due date. Please reference the invoice number on the remittance.

20 of 1170

Billing Details:

Docket #:

05000275 License #:

DPR-80 PART 170:

Part 171:

Annual Fees:

Annual Fees:

TOTAL PART 171:

LFB 11-2925 LFB 11-2925 May 4, 2011 May 4, 2011 SPRD 0PWR

$37,000.00

$1,159,000.00

$1,196,000.00

$1,265,370.56 Total for License/Docket:

21 of 1170

Billing Details:

Docket #:

05000323 License #:

DPR-82 PART 170:

Part 171:

Annual Fees:

Annual Fees:

TOTAL PART 171:

LFB 11-2955 LFB 11-2955 May 4, 2011 May 4, 2011 SPRD OPWR

$37,000.00

$1,159,000.00

$1,196,000.00

$1,250,454.75 Total for License/Docket:

22 of 1170

p 0

Remittance Information:

Remit To: Office of the Chief Financial Officer U.S. Nuclear Regulatory Commission P.O. Box 979051 St. Louis, MO 63197 BD Number Due Date Amount Docket Total Due LFB 11-2925 May 4, 2011

$1,196,000.00 05000275 LFB 11-2955 May 4, 2011

$1,196,000.00 05000323

$2,392,000.00 23 of 1170