ML112440099: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML112440099
| number = ML112440099
| issue date = 09/01/2011
| issue date = 09/01/2011
| title = North Anna - Report 22, Inspection/Activity Plan
| title = Report 22, Inspection/Activity Plan
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2011 06:26:25 Report 22 09/01/2011
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2011 06:26:25 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna DRP/RPB5
-12/31/2012 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site North Anna DRP/RPB5-AUGUMENTED INSPECTION TEAM 6 1, 2   IP A ugmented Inspection Team 93800 08/29/2011 10/07/2011 EB3 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2   IP Inservice Inspection Activities - PWR 7111108P 10/03/2011 10/07/2011 EB3SGISI-UNIT 2 SG INSERVICE INSPECTION 2 2   IP Inservice Inspection Activities - PWR 7111108P 10/10/2011 10/14/2011 EB3 HS-HEAT SINK 1 1, 2   IP Heat Sink Performance 7111107T 11/14/2011 11/18/2011 OL-RQ-REQUAL INSPECTION 2 1, 2   IP Licensed Operator Requalification Program 7111111B 01/09/2012 01/13/2012 PSB1-RP-OCCUPATIONAL RP BASELINE WK1 3 1, 2   IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 1, 2   IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 1, 2   IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/12/2012 03/16/2012 1, 2   IP Occupational Dose Assessment 71124.04 03/12/2012 03/16/2012 1, 2   IP Radiation Monitoring Instrumentation 71124.05 03/12/2012 03/16/2012 1, 2   IP Performance Indicator Verification 71151 03/12/2012 03/16/2012 EB3 ISI-UNIT 1 INSERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR 7111108P 03/19/2012 03/23/2012 7111108-NORTH ANNA 1 SGISI 1 1     IP Inservice Inspection Activities - PWR 7111108P 03/26/2012 03/30/2012 PSB1-RP-OCCUPATIONAL RP BASELINE WK2 3 1, 2   IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2012 03/30/2012 1, 2   IP Occupational ALARA Planning and Controls 71124.02 03/26/2012 03/30/2012 1, 2   IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/26/2012 03/30/2012 1, 2   IP Occupational Dose Assessment 71124.04 03/26/2012 03/30/2012 1, 2   IP Radiation Monitoring Instrumentation 71124.05 03/26/2012 03/30/2012 1, 2   IP Performance Indicator Verification 71151 03/26/2012 03/30/2012 CDBI-COMPONENT DESIGN BASES INSPECTION 6 1, 2   IP Component Design Bases Inspection 7111121 04/23/2012 04/27/2012 1, 2   IP Component Design Bases Inspection 7111121 05/21/2012 05/25/2012 1, 2   IP Component Design Bases Inspection 7111121 06/04/2012 06/08/2012 1, 2   IP Component Design Bases Inspection 7111121 06/18/2012 06/22/2012 OL EXAM-INITIAL EXAM PREP 3 1     NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 05/21/2012 05/25/2012 This report does not include INPO and OUTAGE activities.
- AUGUMENTED INSPECTION TEAM 6
1, 2 IP Augmented Inspection Team 93800 08/29/2011 10/07/2011 EB3 ISI
- UNIT 2 IN-SERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 10/03/2011 10/07/2011 EB3SGISI
- UNIT 2 SG INSERVICE INSPECTION 2
2 IP Inservice Inspection Activities - PWR 7111108P 10/10/2011 10/14/2011 EB3 HS
- HEAT SINK 1
1, 2 IP Heat Sink Performance 7111107T 11/14/2011 11/18/2011 OL-RQ
- REQUAL INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 01/09/2012 01/13/2012 PSB1-RP
- OCCUPATIONAL RP BASELINE WK1 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/12/2012 03/16/2012 1, 2 IP Occupational Dose Assessment 71124.04 03/12/2012 03/16/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/12/2012 03/16/2012 1, 2 IP Performance Indicator Verification 71151 03/12/2012 03/16/2012 EB3 ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 03/19/2012 03/23/2012 7111108
- NORTH ANNA 1 SGISI 1
1 IP Inservice Inspection Activities - PWR 7111108P 03/26/2012 03/30/2012 PSB1-RP
- OCCUPATIONAL RP BASELINE WK2 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2012 03/30/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/26/2012 03/30/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/26/2012 03/30/2012 1, 2 IP Occupational Dose Assessment 71124.04 03/26/2012 03/30/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/26/2012 03/30/2012 1, 2 IP Performance Indicator Verification 71151 03/26/2012 03/30/2012 CDBI
- COMPONENT DESIGN BASES INSPECTION 6
1, 2 IP Component Design Bases Inspection 7111121 04/23/2012 04/27/2012 1, 2 IP Component Design Bases Inspection 7111121 05/21/2012 05/25/2012 1, 2 IP Component Design Bases Inspection 7111121 06/04/2012 06/08/2012 1, 2 IP Component Design Bases Inspection 7111121 06/18/2012 06/22/2012 OL EXAM
- INITIAL EXAM PREP 3
1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 05/21/2012 05/25/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 09/01/2011 06:26:25 Report 22 09/01/2011
 
-12/31/2012 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site North Anna OL EXAM-INITIAL EXAM - WEEK 1 3 1     NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 06/11/2012 06/15/2012 OL EXAM-INITIAL EXAM - WEEK 2 3 1     NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 06/18/2012 06/22/2012 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1, 2   IP Exercise Evaluation 7111401 07/23/2012 07/27/2012 1, 2   IP Emergency Action Level and Emergency Plan Changes 7111404 07/23/2012 07/27/2012 1, 2   IP Performance Indicator Verification 71151 07/23/2012 07/27/2012 TI-177-TI-177 3 1, 2   IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/22/2012 10/26/2012 This report does not include INPO and OUTAGE activities.
Inspection / Activity Plan Page 2 of 2 09/01/2011 06:26:25 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna OL EXAM
- INITIAL EXAM - WEEK 1 3
1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 06/11/2012 06/15/2012 OL EXAM
- INITIAL EXAM - WEEK 2 3
1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 06/18/2012 06/22/2012 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1, 2 IP Exercise Evaluation 7111401 07/23/2012 07/27/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/23/2012 07/27/2012 1, 2 IP Performance Indicator Verification 71151 07/23/2012 07/27/2012 TI-177
- TI-177 3
1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/22/2012 10/26/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 02:16, 13 January 2025

Report 22, Inspection/Activity Plan
ML112440099
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/01/2011
From:
NRC/RGN-II/DRP/RPB5
To:
Shared Package
ML112440087 List:
References
IR-11-006
Download: ML112440099 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2011 06:26:25 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna DRP/RPB5

- AUGUMENTED INSPECTION TEAM 6

1, 2 IP Augmented Inspection Team 93800 08/29/2011 10/07/2011 EB3 ISI

- UNIT 2 IN-SERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 10/03/2011 10/07/2011 EB3SGISI

- UNIT 2 SG INSERVICE INSPECTION 2

2 IP Inservice Inspection Activities - PWR 7111108P 10/10/2011 10/14/2011 EB3 HS

- HEAT SINK 1

1, 2 IP Heat Sink Performance 7111107T 11/14/2011 11/18/2011 OL-RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 01/09/2012 01/13/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 3

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/12/2012 03/16/2012 1, 2 IP Occupational Dose Assessment 71124.04 03/12/2012 03/16/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/12/2012 03/16/2012 1, 2 IP Performance Indicator Verification 71151 03/12/2012 03/16/2012 EB3 ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 03/19/2012 03/23/2012 7111108

- NORTH ANNA 1 SGISI 1

1 IP Inservice Inspection Activities - PWR 7111108P 03/26/2012 03/30/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK2 3

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2012 03/30/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/26/2012 03/30/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/26/2012 03/30/2012 1, 2 IP Occupational Dose Assessment 71124.04 03/26/2012 03/30/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/26/2012 03/30/2012 1, 2 IP Performance Indicator Verification 71151 03/26/2012 03/30/2012 CDBI

- COMPONENT DESIGN BASES INSPECTION 6

1, 2 IP Component Design Bases Inspection 7111121 04/23/2012 04/27/2012 1, 2 IP Component Design Bases Inspection 7111121 05/21/2012 05/25/2012 1, 2 IP Component Design Bases Inspection 7111121 06/04/2012 06/08/2012 1, 2 IP Component Design Bases Inspection 7111121 06/18/2012 06/22/2012 OL EXAM

- INITIAL EXAM PREP 3

1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 05/21/2012 05/25/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 09/01/2011 06:26:25 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna OL EXAM

- INITIAL EXAM - WEEK 1 3

1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 06/11/2012 06/15/2012 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 06/18/2012 06/22/2012 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 07/23/2012 07/27/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/23/2012 07/27/2012 1, 2 IP Performance Indicator Verification 71151 07/23/2012 07/27/2012 TI-177

- TI-177 3

1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/22/2012 10/26/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.