ML112440099
| ML112440099 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 09/01/2011 |
| From: | NRC/RGN-II/DRP/RPB5 |
| To: | |
| Shared Package | |
| ML112440087 | List: |
| References | |
| IR-11-006 | |
| Download: ML112440099 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 09/01/2011 06:26:25 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna DRP/RPB5
- AUGUMENTED INSPECTION TEAM 6
1, 2 IP Augmented Inspection Team 93800 08/29/2011 10/07/2011 EB3 ISI
- UNIT 2 IN-SERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 10/03/2011 10/07/2011 EB3SGISI
- UNIT 2 SG INSERVICE INSPECTION 2
2 IP Inservice Inspection Activities - PWR 7111108P 10/10/2011 10/14/2011 EB3 HS
- HEAT SINK 1
1, 2 IP Heat Sink Performance 7111107T 11/14/2011 11/18/2011 OL-RQ
- REQUAL INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 01/09/2012 01/13/2012 PSB1-RP
- OCCUPATIONAL RP BASELINE WK1 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/12/2012 03/16/2012 1, 2 IP Occupational Dose Assessment 71124.04 03/12/2012 03/16/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/12/2012 03/16/2012 1, 2 IP Performance Indicator Verification 71151 03/12/2012 03/16/2012 EB3 ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 03/19/2012 03/23/2012 7111108
- NORTH ANNA 1 SGISI 1
1 IP Inservice Inspection Activities - PWR 7111108P 03/26/2012 03/30/2012 PSB1-RP
- OCCUPATIONAL RP BASELINE WK2 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2012 03/30/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/26/2012 03/30/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/26/2012 03/30/2012 1, 2 IP Occupational Dose Assessment 71124.04 03/26/2012 03/30/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/26/2012 03/30/2012 1, 2 IP Performance Indicator Verification 71151 03/26/2012 03/30/2012 CDBI
- COMPONENT DESIGN BASES INSPECTION 6
1, 2 IP Component Design Bases Inspection 7111121 04/23/2012 04/27/2012 1, 2 IP Component Design Bases Inspection 7111121 05/21/2012 05/25/2012 1, 2 IP Component Design Bases Inspection 7111121 06/04/2012 06/08/2012 1, 2 IP Component Design Bases Inspection 7111121 06/18/2012 06/22/2012 OL EXAM
- INITIAL EXAM PREP 3
1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 05/21/2012 05/25/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 09/01/2011 06:26:25 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna OL EXAM
- INITIAL EXAM - WEEK 1 3
1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 06/11/2012 06/15/2012 OL EXAM
- INITIAL EXAM - WEEK 2 3
1 NORTH ANNA / JUNE 2012 EXAM AT POWER FACILITIES V23372 06/18/2012 06/22/2012 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1, 2 IP Exercise Evaluation 7111401 07/23/2012 07/27/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/23/2012 07/27/2012 1, 2 IP Performance Indicator Verification 71151 07/23/2012 07/27/2012 TI-177
- TI-177 3
1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/22/2012 10/26/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.