{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012 Mr. Thomas P. Joyce President and Chief Nuclear officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012 Mr. Thomas P. Joyce President and Chief Nuclear officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038  


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
HOPE CREEK GENERATING STATION, UNIT NO. 1 (REPORT 05000354/2012006)
HOPE CREEK GENERATING STATION, UNIT NO. 1 (REPORT 05000354/2012006)  


==Dear Mr. Joyce:==
==Dear Mr. Joyce:==
On August 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Hope Creek Generating Station, Unit 1 (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.
On August 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Hope Creek Generating Station, Unit 1 (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.
The NRC determined the performance at Hope Creek during the most recent quarter was within the Degraded Cornerstone column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security cornerstone inputs as described in Inspection Report 05000354/2012201, dated December 19, 2011. The significance determination for these findings was finalized on March 20, 2012 (ML120670582)1. The 95002 supplemental inspection for these findings was completed the week of August 27, 2012, and the results will be communicated to you via separate correspondence. The objectives of that supplemental inspection were to provide assurance that: (1) the root and contributing causes for the risk-significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes. The inspection also included an independent NRC review of the extent of condition and extent of cause for the issues and an assessment of whether any safety culture component caused or significantly contributed to the greater-than-green Security cornerstone inputs.
The NRC determined the performance at Hope Creek during the most recent quarter was within the Degraded Cornerstone column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security cornerstone inputs as described in Inspection Report 05000354/2012201, dated December 19, 2011. The significance determination for these findings was finalized on March 20, 2012 (ML120670582)1. The 95002 supplemental inspection for these findings was completed the week of August 27, 2012, and the results will be communicated to you via separate correspondence. The objectives of that supplemental inspection were to provide assurance that: (1) the root and contributing causes for the risk-significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes. The inspection also included an independent NRC review of the extent of condition and extent of cause for the issues and an assessment of whether any safety culture component caused or significantly contributed to the greater-than-green Security cornerstone inputs.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. The NRC will also be conducting IP 60855.1, Operation of an ISFSI at 1
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. The NRC will also be conducting IP 60855.1, Operation of an ISFSI at 1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS.  
Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS.


T. Joyce                                           2 Operating Plants, which will review operations during the 2013 ISFSI loading campaign. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review.
T. Joyce 2
Operating Plants, which will review operations during the 2013 ISFSI loading campaign. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Art Burritt at 610-337-5069 with any questions you have regarding this letter.
Please contact Art Burritt at 610-337-5069 with any questions you have regarding this letter.
Sincerely,
Sincerely,  
                                                      /RA by David C. Lew acting for/
/RA by David C. Lew acting for/
William M. Dean Regional Administrator Docket Nos.: 50-354 License Nos.: NPF-57
William M. Dean Regional Administrator Docket Nos.: 50-354 License Nos.: NPF-57  


==Enclosure:==
==Enclosure:==
Hope Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ
Hope Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ  
 
ML12248A042 SUNSI Review Non-Sensitive Sensitive
 
Publicly Available
 
Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP RI/ORA NAME FBower/LC for LCline/LC ABurritt/LC for DRoberts/DJR WDean/DCL for DATE 08/27/12 08/27/12 08/27/12 08/30/12 09/04/12


ML12248A042 Non-Sensitive                                Publicly Available SUNSI Review Sensitive                                    Non-Publicly Available OFFICE  RI/DRP            RI/DRP                RI/DRP                RI/DRP              RI/ORA NAME    FBower/LC for    LCline/LC              ABurritt/LC for        DRoberts/DJR        WDean/DCL for DATE    08/27/12          08/27/12              08/27/12              08/30/12            09/04/12 Page 1 of 2                                                                               Hope Creek 08/21/2012     12:11:47                                                         Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit          Planned Dates                                                                                                                                    No. of Staff Number        Start      End      Inspection Activity                                                                Title                                        on Site HP           - RADIATION SAFETY INSPECTIONS                                                                                           1 1         07/23/2012  07/27/2012  IP 71124.05             Radiation Monitoring Instrumentation 1          07/23/2012   07/27/2012   IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          07/23/2012   07/27/2012   IP 71124.07            Radiological Environmental Monitoring Program TI 182        - DEGRADATION OF UNDERGROUND PIPING                                                                                      1 1          07/23/2012   07/27/2012   IP 2515/182            Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 7111121       - CDBI                                                                                                                   7 1         07/30/2012   08/03/2012   IP 7111121              Component Design Bases Inspection 1          08/13/2012   08/17/2012   IP 7111121              Component Design Bases Inspection 1          08/27/2012   08/31/2012   IP 7111121              Component Design Bases Inspection 7111111B     - REQUAL INSPECTION WITH P/F RESULTS                                                                                     2 1         10/08/2012   10/12/2012   IP 7111111B            Licensed Operator Requalification Program TI-187       - TI-187 - FLOODING WALKDOWNS                                                                                           2 1         09/01/2012  12/31/2012  IP 2515/187            Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns TI-188       - TI-188 - SEISMIC WALKDOWNS                                                                                             2 1         09/01/2012  12/31/2012  IP 2515/188            Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns HP           - RADIATION SAFETY INSPECTIONS                                                                                           1 1         09/10/2012  09/14/2012  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          09/10/2012   09/14/2012   IP 71124.04             Occupational Dose Assessment 1          09/10/2012   09/14/2012   IP 71124.05             Radiation Monitoring Instrumentation 1          09/10/2012   09/14/2012   IP 71151-PR01          RETS/ODCM Radiological Effluent PI&R         - PI&R                                                                                                                   4 1         01/28/2013   02/01/2013   IP 71152B              Problem Identification and Resolution 1          02/11/2013   02/15/2013   IP 71152B              Problem Identification and Resolution EP PROGR - EP PROGRAM INSPECTION                                                                                                       1 1         03/04/2013  03/08/2013  IP 7111402              Alert and Notification System Testing 1          03/04/2013   03/08/2013   IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          03/04/2013   03/08/2013   IP 7111404              Emergency Action Level and Emergency Plan Changes 1          03/04/2013   03/08/2013   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 60855         - ISFSI LOADING INSPECTION                                                                                               2 1         03/01/2013  06/30/2013  IP 60855                Operation Of An ISFSI 1          03/01/2013   06/30/2013   IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants TRI FI       - TRIENNIAL FIRE PROTECTION INSPECTION                                                                                   3 1         03/18/2013   03/22/2013   IP 7111105T            Fire Protection [Triennial]
Page 1 of 2 08/21/2012 12:11:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 07/01/2012 - 12/31/2013 HP
This report does not include INPO and OUTAGE activities.
- RADIATION SAFETY INSPECTIONS 1
1 IP Radiation Monitoring Instrumentation 71124.05 07/23/2012 07/27/2012 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/23/2012 07/27/2012 1
IP Radiological Environmental Monitoring Program 71124.07 07/23/2012 07/27/2012 TI 182
- DEGRADATION OF UNDERGROUND PIPING 1
1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 07/23/2012 07/27/2012 7111121
- CDBI 7
1 IP Component Design Bases Inspection 7111121 07/30/2012 08/03/2012 1
IP Component Design Bases Inspection 7111121 08/13/2012 08/17/2012 1
IP Component Design Bases Inspection 7111121 08/27/2012 08/31/2012 7111111B
- REQUAL INSPECTION WITH P/F RESULTS 2
1 IP Licensed Operator Requalification Program 7111111B 10/08/2012 10/12/2012 TI-187
- TI-187 - FLOODING WALKDOWNS 2
1 IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 09/01/2012 12/31/2012 TI-188
- TI-188 - SEISMIC WALKDOWNS 2
1 IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 09/01/2012 12/31/2012 HP
- RADIATION SAFETY INSPECTIONS 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/10/2012 09/14/2012 1
IP Occupational Dose Assessment 71124.04 09/10/2012 09/14/2012 1
IP Radiation Monitoring Instrumentation 71124.05 09/10/2012 09/14/2012 1
IP RETS/ODCM Radiological Effluent 71151-PR01 09/10/2012 09/14/2012 PI&R
- PI&R 4
1 IP Problem Identification and Resolution 71152B 01/28/2013 02/01/2013 1
IP Problem Identification and Resolution 71152B 02/11/2013 02/15/2013 EP PROGR
- EP PROGRAM INSPECTION 1
1 IP Alert and Notification System Testing 7111402 03/04/2013 03/08/2013 1
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/04/2013 03/08/2013 1
IP Emergency Action Level and Emergency Plan Changes 7111404 03/04/2013 03/08/2013 1
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/04/2013 03/08/2013 60855
- ISFSI LOADING INSPECTION 2
1 IP Operation Of An ISFSI 60855 03/01/2013 06/30/2013 1
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 03/01/2013 06/30/2013 TRI FI
- TRIENNIAL FIRE PROTECTION INSPECTION 3
1 IP Fire Protection [Triennial]
7111105T 03/18/2013 03/22/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2                                                                               Hope Creek 08/21/2012     12:11:47                                                         Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit          Planned Dates                                                                                                                                  No. of Staff Number        Start      End      Inspection Activity                                                              Title                                      on Site TRI FI       - TRIENNIAL FIRE PROTECTION INSPECTION                                                                               3 1         04/01/2013   04/05/2013   IP 7111105T            Fire Protection [Triennial]
Page 2 of 2 08/21/2012 12:11:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 07/01/2012 - 12/31/2013 TRI FI
8/19 EXM     - HOPE CREEK INITIAL EXAM                                                                                             4 1         07/22/2013   07/26/2013     U01872              FY13-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 1          08/19/2013   08/21/2013     U01872              FY13-HOPE CREEK INITIAL OPERATOR LICENSING EXAM HP           - RADIATION SAFETY INSPECTIONS                                                                                       1 1         05/13/2013  05/17/2013  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          05/13/2013   05/17/2013   IP 71124.05             Radiation Monitoring Instrumentation 1          05/13/2013   05/17/2013   IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment HP           - RADIATION SAFETY INSPECTIONS                                                                                       1 1         09/30/2013  10/04/2013  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          09/30/2013   10/04/2013   IP 71124.02            Occupational ALARA Planning and Controls 1          09/30/2013   10/04/2013   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          09/30/2013   10/04/2013   IP 71124.04             Occupational Dose Assessment 1          09/30/2013   10/04/2013   IP 71124.05             Radiation Monitoring Instrumentation 7111108G     - INSERVICE INSPECTION                                                                                               1 1         10/14/2013   10/18/2013   IP 7111108G            Inservice Inspection Activities - BWR HP           - RADIATION SAFETY INSPECTIONS                                                                                       1 1         10/21/2013  10/25/2013  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          10/21/2013   10/25/2013   IP 71124.02            Occupational ALARA Planning and Controls 1          10/21/2013   10/25/2013   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          10/21/2013   10/25/2013   IP 71124.04             Occupational Dose Assessment 1          10/21/2013   10/25/2013   IP 71124.05            Radiation Monitoring Instrumentation 71124.08      - RADWASTE                                                                                                            1 1          12/09/2013   12/13/2013   IP 71124.08             Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation This report does not include INPO and OUTAGE activities.
- TRIENNIAL FIRE PROTECTION INSPECTION 3
1 IP Fire Protection [Triennial]
7111105T 04/01/2013 04/05/2013 8/19 EXM
- HOPE CREEK INITIAL EXAM 4
1 FY13-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01872 07/22/2013 07/26/2013 1
FY13-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01872 08/19/2013 08/21/2013 HP
- RADIATION SAFETY INSPECTIONS 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/13/2013 05/17/2013 1
IP Radiation Monitoring Instrumentation 71124.05 05/13/2013 05/17/2013 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/13/2013 05/17/2013 HP
- RADIATION SAFETY INSPECTIONS 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/30/2013 10/04/2013 1
IP Occupational ALARA Planning and Controls 71124.02 09/30/2013 10/04/2013 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/30/2013 10/04/2013 1
IP Occupational Dose Assessment 71124.04 09/30/2013 10/04/2013 1
IP Radiation Monitoring Instrumentation 71124.05 09/30/2013 10/04/2013 7111108G
- INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - BWR 7111108G 10/14/2013 10/18/2013 HP
- RADIATION SAFETY INSPECTIONS 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/21/2013 10/25/2013 1
IP Occupational ALARA Planning and Controls 71124.02 10/21/2013 10/25/2013 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/21/2013 10/25/2013 1
IP Occupational Dose Assessment 71124.04 10/21/2013 10/25/2013 1
IP Radiation Monitoring Instrumentation 71124.05 10/21/2013 10/25/2013 71124.08
- RADWASTE 1
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/09/2013 12/13/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 22:43, 11 January 2025

Mid-Cycle Performance Review and Inspection Plan 2012 - Hope Creek Generating Station, Unit 1
ML12248A042
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/04/2012
From: Bill Dean
Region 1 Administrator
To: Joyce T
Public Service Enterprise Group
BURRITT, AL
References
IR-12-006
Download: ML12248A042 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012 Mr. Thomas P. Joyce President and Chief Nuclear officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

HOPE CREEK GENERATING STATION, UNIT NO. 1 (REPORT 05000354/2012006)

Dear Mr. Joyce:

On August 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Hope Creek Generating Station, Unit 1 (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment program governed by IMC 0305, Operating Reactor Assessment Program.

The NRC determined the performance at Hope Creek during the most recent quarter was within the Degraded Cornerstone column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security cornerstone inputs as described in Inspection Report 05000354/2012201, dated December 19, 2011. The significance determination for these findings was finalized on March 20, 2012 (ML120670582)1. The 95002 supplemental inspection for these findings was completed the week of August 27, 2012, and the results will be communicated to you via separate correspondence. The objectives of that supplemental inspection were to provide assurance that: (1) the root and contributing causes for the risk-significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes. The inspection also included an independent NRC review of the extent of condition and extent of cause for the issues and an assessment of whether any safety culture component caused or significantly contributed to the greater-than-green Security cornerstone inputs.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. The NRC will also be conducting IP 60855.1, Operation of an ISFSI at 1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS.

T. Joyce 2

Operating Plants, which will review operations during the 2013 ISFSI loading campaign. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Art Burritt at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA by David C. Lew acting for/

William M. Dean Regional Administrator Docket Nos.: 50-354 License Nos.: NPF-57

Enclosure:

Hope Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML12248A042 SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP RI/ORA NAME FBower/LC for LCline/LC ABurritt/LC for DRoberts/DJR WDean/DCL for DATE 08/27/12 08/27/12 08/27/12 08/30/12 09/04/12

Page 1 of 2 08/21/2012 12:11:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 07/01/2012 - 12/31/2013 HP

- RADIATION SAFETY INSPECTIONS 1

1 IP Radiation Monitoring Instrumentation 71124.05 07/23/2012 07/27/2012 1

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/23/2012 07/27/2012 1

IP Radiological Environmental Monitoring Program 71124.07 07/23/2012 07/27/2012 TI 182

- DEGRADATION OF UNDERGROUND PIPING 1

1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 07/23/2012 07/27/2012 7111121

- CDBI 7

1 IP Component Design Bases Inspection 7111121 07/30/2012 08/03/2012 1

IP Component Design Bases Inspection 7111121 08/13/2012 08/17/2012 1

IP Component Design Bases Inspection 7111121 08/27/2012 08/31/2012 7111111B

- REQUAL INSPECTION WITH P/F RESULTS 2

1 IP Licensed Operator Requalification Program 7111111B 10/08/2012 10/12/2012 TI-187

- TI-187 - FLOODING WALKDOWNS 2

1 IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 09/01/2012 12/31/2012 TI-188

- TI-188 - SEISMIC WALKDOWNS 2

1 IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 09/01/2012 12/31/2012 HP

- RADIATION SAFETY INSPECTIONS 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/10/2012 09/14/2012 1

IP Occupational Dose Assessment 71124.04 09/10/2012 09/14/2012 1

IP Radiation Monitoring Instrumentation 71124.05 09/10/2012 09/14/2012 1

IP RETS/ODCM Radiological Effluent 71151-PR01 09/10/2012 09/14/2012 PI&R

- PI&R 4

1 IP Problem Identification and Resolution 71152B 01/28/2013 02/01/2013 1

IP Problem Identification and Resolution 71152B 02/11/2013 02/15/2013 EP PROGR

- EP PROGRAM INSPECTION 1

1 IP Alert and Notification System Testing 7111402 03/04/2013 03/08/2013 1

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/04/2013 03/08/2013 1

IP Emergency Action Level and Emergency Plan Changes 7111404 03/04/2013 03/08/2013 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/04/2013 03/08/2013 60855

- ISFSI LOADING INSPECTION 2

1 IP Operation Of An ISFSI 60855 03/01/2013 06/30/2013 1

IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 03/01/2013 06/30/2013 TRI FI

- TRIENNIAL FIRE PROTECTION INSPECTION 3

1 IP Fire Protection [Triennial]

7111105T 03/18/2013 03/22/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/21/2012 12:11:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 07/01/2012 - 12/31/2013 TRI FI

- TRIENNIAL FIRE PROTECTION INSPECTION 3

1 IP Fire Protection [Triennial]

7111105T 04/01/2013 04/05/2013 8/19 EXM

- HOPE CREEK INITIAL EXAM 4

1 FY13-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01872 07/22/2013 07/26/2013 1

FY13-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01872 08/19/2013 08/21/2013 HP

- RADIATION SAFETY INSPECTIONS 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/13/2013 05/17/2013 1

IP Radiation Monitoring Instrumentation 71124.05 05/13/2013 05/17/2013 1

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/13/2013 05/17/2013 HP

- RADIATION SAFETY INSPECTIONS 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/30/2013 10/04/2013 1

IP Occupational ALARA Planning and Controls 71124.02 09/30/2013 10/04/2013 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/30/2013 10/04/2013 1

IP Occupational Dose Assessment 71124.04 09/30/2013 10/04/2013 1

IP Radiation Monitoring Instrumentation 71124.05 09/30/2013 10/04/2013 7111108G

- INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 10/14/2013 10/18/2013 HP

- RADIATION SAFETY INSPECTIONS 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/21/2013 10/25/2013 1

IP Occupational ALARA Planning and Controls 71124.02 10/21/2013 10/25/2013 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/21/2013 10/25/2013 1

IP Occupational Dose Assessment 71124.04 10/21/2013 10/25/2013 1

IP Radiation Monitoring Instrumentation 71124.05 10/21/2013 10/25/2013 71124.08

- RADWASTE 1

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/09/2013 12/13/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.