ML12265A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12265A077
| number = ML12265A077
| issue date = 09/11/2012
| issue date = 09/11/2012
| title = McGuire, Units 1 and 2, Selected License Commitments Manual Update
| title = Selected License Commitments Manual Update
| author name = Beaver B C, Capps S D
| author name = Beaver B, Capps S
| author affiliation = Duke Energy Carolinas, LLC
| author affiliation = Duke Energy Carolinas, LLC
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 15
| page count = 15
}}
}}
=Text=
{{#Wiki_filter:PRIORITY Normal DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW 1) 2)
3) 4)
5) 6)
7) 8)
9) 10) 02546 WC LIBRARY - MG01WC 03044 MCG DOC CNTRL MISC MAN MG05DM 03379 D E CALDWELL MG01MM 03447 HARRY J SLOAN MG01RP 03614 MCG OPS PROCEDURE GP MG01OP 03744 OPS TRNG MGR. MG03OT 03759 U S NUC REG WASHINGTON, DC 04809 MCG PLANT ENG. LIBR. MG05SE 09460 W C SPENCER MG01RP 09665 JON H THOMPSON, USNRC Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION RECORD RETENTION: 581188 SELECTED LICENSEE COMMITMENTS MANUAL --- (SLC)
Page 2 of 2 Date:
09/11112 Document Transmittal #:
DUK122550021 QA CONDITION E] Yes
* No OTHER ACKNOWLEDGEMENT REQUIRED
* Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C.
28078 Rec'd By Date DOCUMENT NO LOES 2 PAGES SLC 16.9.6 11 PAGES QACOND REV #/ DATE DISTR CODE I
2 3
4 5
6 7
8 9
10 11 12 13 14 15 TOTAL NA NA 111 05/16/12 130 09/05/12 MADM-03A V1 x
V1 V1 V1 V2 vi V1 V1 V1 24 REMARKS: PLEASE UPDATE ACCORDINGLY.
S D CAPPS REMARKS: PLEASE UPDATE ACCORDINGLY.
S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:
BC BEAVER MG01RC BCB/TLC
PRIORITY Normal DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW Date:
09/11/12 Document Transmittal #:
DUK122550021
: 1) 00003 NRI&IA MGR EC050
: 2) 00070 VICKIE BREWER - MG03OT
: 3) 00200 M E CARROLL EC08H
: 4) 00297 V M MCCREE REG ATL, GA
: 5) 00422 MCG BONNIE C BEAVER - MG01RC
: 6) 00485 OPS TEST GROUP - MG01OP
: 7) 00692 MCG OPS STAFF MGR MG01OP
: 8) 00707 SERV BLDG FILE ROOM - MG01S1
: 9) 00841 OPS HUMAN PERFORMANCE-MG01OP
: 10) 01202 K L CRANE - MG01RC
: 11) 01492 BLUE DOT LIBRARY MG02MO
: 12) 01503 VICKIE L MC GINNIS - MG03OT
: 13) 01623 G L MONTGOMERY MG01WC
: 14) 02467 ELECT. LICENSING LIBRARY EC050
: 15) 02532 RESIDENT NRC INSPECT MG01NRC Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION RECORD RETENTION: 581188 SELECTED LICENSEE COMMITMENTS MANUAL -- (SLC)
Page 1 of 2 QA CONDITION D
Yes E
No OTHER ACKNOWLEDGEMENT REQUIRED
* Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C.
28078 Rec'd By Date r
-r
-r
-r*1
-r---r r
r r
r F
F t
DOCUMENT NO QA COND REV #/DATE DISTR CODE 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 TOTAL 4
A
+/-
-I----+/----
+/--+--+
F F
F F
F
-F LOES 2 PAGES SLC 16.9.6 11 PAGES NA NA 111 05/16/12 130 09/05/12 MADM-03A V1 T1 V1 vi v1 vi V1 V1 24 REMARKS: PLEASE UPDATE ACCORDINGLY.
S D CAPPS REMARKS: PLEASE UPDATE ACCORDINGLY.
S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:
B C BEAVER MGO1RC BCB/TLC
SELECTED LICENSEE COMMITMENTS (SLC)
LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 REVISION 115 0308/10 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 DELETED - REVISION 120 12/30/10 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED - REVISION 43 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 121 12/30/10 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 130 5/16/12 16.9.7 REVISION 122 1/14/11 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 DELETED - REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 McGuire Units 1 and 2 I
Revision 111
SELECTED LICENSEE COMMITMENTS (SLC)
LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.13 DELETED - REVISION 13
... 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 116 4/7/10 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 DELETED - REVISION 74 6/27/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 118 10/19/10 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 DELETED - REVISION 75 7/20/05 16.13.3 DELETED - REVISION 75 7/20/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2
Revision 111
Fire Detection Instrumentation 16.9.6 16.9 AUXILIARY SYSTEMS 16.9.6 Fire Detection Instrumentation COMMITMENT APPLICABILITY The fire detection instrumentation for each fire detection zone shown in Table 16.9.6-1 shall be OPERABLE.
Whenever equipment protected by fire detection instrument is required to be OPERABLE.
REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more, but not A.1 Restore the inoperable 14 days more than half, of the instrument(s) to Function A fire detectors OPERABLE status.
in any zone inoperable.
B.
More than half of the B.1 Establish fire watch patrol 1 hour Function A fire detectors to inspect zones outside AND in any zone inoperable, containment with inoperable instruments.
Once per hour thereafter OR AND One or more Function B B.2.1 Establish a fire watch patrol 1 hour fire detectors inoperable, to inspect zones inside AND containment with OR inoperable instruments.
Once per 8 hours thereafter Two or more adjacent OR fire detectors inoperable.
B.2.2 Monitor containment air Once per hour OR temperature at the locations given in ITS Required Action and 3.6.5.1 or 3.6.5.2.
associated Completion Time of Condition A not met.
(continued)
McGuire Units 1 and 2 16.9.6-1 Revision 130
Fire Detection Instrumentation 16.9.6 REMEDIAL ACTIONS (continued CONDITION REQUIRED ACTION COMPLETION TIME C.
One or more annulus fire C.1 Perform a fire watch patrol 1 hour detectors inoperable, of the annulus.
AND C.2.1 Verify at least one adjacent Once per hour annulus fire detector zone thereafter is OPERABLE.
OR C.2.2 Perform a fire watch patrol Once per 8 hours of the annulus if no thereafter adjacent zone is OPERABLE.
TESTING REQUIREMENTS TEST FREQUENCY TR 16.9.6.1 Verify the non-supervised circuits associated with 31 days detector alarms between the instrument and the control room are OPERABLE.
TR 16.9.6.2 Verify the NFPA Standard 72D supervised circuits 6 months supervision associated with detector alarms are OPERABLE.
TR 16.9.6.3 Perform a TADOT on fire detectors which are accessible 6 months during plant operation.
(continued)
McGuire Units 1 and 2 16.9.6-2 Revision 130
Fire Detection Instrumentation 16.9.6 TESTING REQUIREMENTS (continued)
TEST FREQUENCY
_TR_ 16.9.6A _ Perform a TADOT on fire detectors which_ are not-Prior to entering accessible during plant operation.
MODE 4 when the unit has been in MODE 5 for 24 hours or more, if testing has not been performed in previous 6 months TR 16.9.6.5
-------------------- NOTE-----------------
Different detectors shall be selected for each test.
Perform a TADOT on at least one detector on each 6 months signal initiating circuit for fixed temperature/rate of rise restorable spot type heat detectors which are accessible during plant operation.
TR 16.9.6.6 Perform a TADOT on fixed temperature/rate of rise Prior to entering restorable spot type heat detectors which are not MODE 4 when the accessible during plant operation.
unit has been in MODE 5 for 24 hours or more, if testing has not been performed in previous 6 months TR 16.9.6.7
-------------------- NOTES-----------------
: 1. For each failure that occurs, two additional detectors shall be removed and tested.
: 2. Replacement of all fixed temperature/rate of rise non-restorable spot type heat detectors within population satisfies testing requirement.
Perform a functional test on at least 2% of the fixed 5 years temperature/rate of rise non-restorable spot type heat detectors.
TR 16.9.6.8 Replace all fixed temperature/rate of rise non-restorable 15 years spot type heat detectors.
McGuire Units 1 and 2 16.9.6-3 Revision 130
Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector Description Location Zone 1
2 3
4 5
6 7
8 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45A 45B 45C 45D 45G Reactor Coolant Pump 1A Reactor Coolant Pump 1 B Reactor Coolant Pump 1C Reactor Coolant Pump 1 D Reactor Coolant Pump 2A Reactor Coolant Pump 2B Reactor Coolant Pump 2C Reactor Coolant Pump 2D Aux. Bldg. Vent Filter Elec. Pen. Rm.
Elec. Pen. Rm.
Elec. Pen. Rm.
Unit 2 Aux. Bldg. Vent. Filter Unit 2 Elec. Penetration Room Unit 2 Elec. Penetration Room Unit 2 Elec. Penetration Room Diesel Gen. 1A Diesel Gen. 2A Cable Room Control Room Swgr. Rm. IETA Swgr. Rm. IETB SWG. Room 2ETA SWG. Room 2ETB Battery Room EVCA Battery Room EVCB Battery Room EVCC Battery Room EVCD Battery Chg. Equip. & Pnl EVCA, EVCC RCP-1A RCP-1B RCP-1C RCP-1 D RCP-2A RCP-2B RCP-2C RCP-2D KK52-53 EL. 767 CC-51 EL. 767 CC-51 EL. 750 CC-51 EL. 733 KK-59/60 EL. 767 CC-61 EL. 767 CC-61 EL. 750 CC-61 EL. 733 CC-43 EL. 733 CC-69 EL. 733 CC-55 EL. 750 CC-56 EL. 767 AA-49 EL. 750 AA-49 EL. 733 AA-62 EL. 750 AA-62 EL. 733 CC-54 EL. 733 CC-55 EL. 733 CC-56 EL. 733 CC-57 EL. 733 CC-56 EL. 733 Number of Smoke Detectors 0
0 0
0 0
0 0
0 2
9 10(5) 1 (5) 2 9
10(5) 11(5) 0(0) 0(0) 24 9(5) 10(5) 9(5) 10(5) 2(5) 2(5) 2 (5) 2 (5) 13(5)
Number of Heat Detectors 0
1 I
0 0
1 1
1 0
0 0
0 0
0 0
0 0
0 8(4) 0 19 0
0 0
00 0
0 0
0 Function(z)
A A
A A
A A
A A
A A
A A
A A
A A
A(B)
A(B)
A A
A A
A A
A A
A A
A Revision 130 McGuire Units 1 and 2 16.9.6-4
0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector Description Location Zone 45H 50 51 52 61 62 63 64 66 67 68 69 70 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 Battery Chg. Equip. & PnI EVCB, EVCD Diesel Gen. 1 B Diesel Gen. 2B Unit 2 Cable Room Cont. Spray Pump 1A/Corridor Cont. Spray Pump 1B/Cooridor RHR Pump 1B RHR Pump 1A Cont. Spray Pump 2B/Corridor Cont. Spray Pump 2A/Cooridor RHR Pump 2A RHR Pump 2B Aux. FW Pumps Mech. Pen. Rm./Cables Corridor/Cables Sample Panel/Cables Cent. Chg. Pump 1B Cent. Chg. Pump 1A PD Pump #1 Safety Injection Pump 1A Safety Injection Pump 1 B Aisle/Cables Aisle/Cables Cent. Chg. Pump 2B Cent. Chg. Pump 2A PD Pump #2 Safety Injection Pump 2A Safety Injection Pump 2B Aux. FW Pumps BB-56 EL. 733 BB-43 EL. 733 BB-69 EL. 733 CC-57 EL. 750 GG-55 EL. 695 GG-56 EL. 695 FF-54 EL. 695 GG-54 EL. 695 GG-56 EL. 695 GG-57 EL. 695 GG-58 EL. 695 FF-58 EL. 695 BB-51 EL. 716 JJ-51 EL. 716 HH-53 EL. 716 EE-55 EL. 716 JJ-55 EL. 716 JJ-55 EL. 716 JJ-54 EL. 716 HH-54 EL. 716 GG-54 EL. 716 GG-55 EL. 716 GG-57 EL. 716 JJ-57 EL. 716 JJ-57 EL. 716 JJ-58 EL. 716 HH-58 EL. 716 GG-58 EL. 716 CC-60 EL. 716 Number of Smoke Detectors 12(b) 0(0) 0(0) 11I(5) 2(5) 2 (5) 1 (5) 1 (5) 2 (5) 2 (5) 1 (5) 1 (5) 10(0o 5 6 (5) 5 (5) 2 (5) 2 (5) 2 (5) 2 (5) 2(5) 13(s) 11 (5) 2 (5) 2(5) 2 (5) 2 (5) 2(5) 10(0) (5)
Number of Heat Detectors 0
8(4) 8(4) 0 0
0 0
0 0
0 0
0 0(1) 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0(1)
Function"'
A A(B)
A(B)
A A
A A
A A
A A
A A(B)
A A
A A
A A
A A
A A
A A
A A
A A(B)
Revision 130 McGuire Units I and 2 16.9.6-5
0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector Zone 88 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 106 107 108 109 110 111 112 113 114 115 116 120 122 Description Location Mech. Penetration Room/Cables Corridor/Cables Corridor/Cables Corridor/Cables Corridor/Cables Aisle/Cables 600V MCC 1EMXB - 1 EMXB3 Cable Tray Access Cable Tray Access 600V MCC 2EMXB - 2EMXB3 Aisle/Cables Corridor/Cables Corridor/Cables Corridor/Cables Corridor/Cables Hatch Area Cables 600V MCC 1 EMXA 600V MCC 2EMXA Aisle/Cables Hatch Area Cables Corridor/Cables Corridor/Cables Aisle/Cables HVAC Equipment Area/Cables Respiratory Equipment Room Corridor/Cables HVAC Equipment Area/Cables Environmental Lab HVAC Equipment Area JJ-61 EL. 716 NN-59 EL. 716 EE-53 EL. 733 JJ-51 EL. 733 NN-52 EL. 733 JJ-55 EL. 733 FF-55 EL. 733 EE-55 EL. 733 EE-57 EL. 733 FF-57 EL. 733 JJ-57 EL. 733 NN-58 EL. 733 JJ-61 EL. 733 EE-59 EL. 733 MM-51 EL. 750 LL-53 EL. 750 FF-54 EL. 750 FF-57 EL. 750 JJ-55 EL. 750 PP-57 EL. 750 PP-60 EL. 750 LL-59 EL. 750 JJ-57 EL. 750 FF-56 EL. 767 GG-54 EL. 767 JJ-54 EL. 767 NN-52 EL. 767 PP-55 EL. 767 NN-59 EL. 767 Number of Smoke Detectors 4(5) 5(5) 4 6(5) 12 (5) 9(5) 1 (5) 2 (5) 2(5) 1 (5) 9(5) 12 (5) 6 (5) 4 7(5) 4(5) 5(5) 14 (5) 15 (5) 8 (5) 6 (5) 13(5) 11 (5) 1 (5) 16(5) 8(5) 1 (5) 10(5)
Number of Heat Detectors 0
0 4
0 0
0 0
0 0
0 0
0 0
4 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Function(2 )
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A A
A Revision 130 McGuire Units 1 and 2 16.9.6-6
Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1' Detector Description Location Zone Detector Description Location Zone 123 125 127 128 129 130 131 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153A 153B 153C Corridor/Cables Fuel Pool Area Fuel Pool Area Aisle/Cable 600V MCC 2EMXH Cables/KF Pumps Respiratory RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit I RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit I RB Below Oper, Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Annulus - Unit 1 RB Annulus - Unit 1 RB Annulus - Unit 1 JJ-57 EL. 767 NN-62 EL. 778+10 NN-50 EL. 731+ 6 EE-57 EL. 716 KK-56 EL. 733 PP-52 EL. 750 HH-56 EL. 767 2150 -2700 2700- 3150 3150 -0O 00 _ 440 440 - 900 90 - 1260 1260- 1730 3290 - 3490 130 - 290 340 - 510 510- 1240 1240 - 1430 1430- 1670 RCP - 1A Motor RCP - 1 B Motor RCP - 1C Motor RCP - 1D Motor Purge Filter Bed 1700-1900, R20'-R35' 00-3600 EL. 745 00-3600 EL. 765 00-3600 EL. 785 Number of Smoke Detectors 1V8)
Note 4 Note 4 5(5) 4 (5) 4(5) 6 (5) 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Number of Heat Detectors 0
Note 4 Note 4 0
0 0
0 5
5 6
4 4
4 7
7 4
3 13 3
8 5
2 4
5 2
2 Note 3 Note 3 Note 3 Function (2 McGuire Units 1 and 2 16.9.6-7 Revision 130
Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector Zone 153D 153E 153F 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182A 182B 182C 182D 182E 182F Description Location RB Annulus - Unit 1 RB Annulus - Unit 1 RB Annulus - Unit 1 Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor RB Annulus - Unit 2 RB Annulus - Unit 2 RB Annulus - Unit 2 RB Annulus - Unit 2 RB Annulus - Unit 2 RB Annulus - Unit 2 0o-3600 EL. 805 0o-3600 EL. 820 0o-3600 EL. 835 2150 -2700 2700- 3150 315°.00 00 440 440 - 900 900-1260 1260 -1730 3290 - 3470 130 - 290 340 510 510 - 1240 1240 -1430 1430- 1670 RCP - 2A Motor RCP - 2B Motor RCP - 2C Motor RCP - 2D Motor Purge Filter Bed 1700-1900, R20'-R35' 00-3600 EL. 745 00-3600 EL. 765 00-3600 EL. 785 00-3600 EL. 805 00-3600 EL. 820 0o-3600 EL. 835 Number of Smoke Detectors 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 Number of Heat Detectors Note 3 Note 3 Note 3 4
5 6
4 4
4 7
7 4
3 13 3
8 4
3 3
5 2
2 Note 3 Note 3 Note 3 Note 3 Note 3 Note 3 Function (2 )
McGuire Units 1 and 2 16.9.6-8 Revision 130
S Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '
Detector Description Location Number of Number of Function(2)
Zone Smoke Detectors Heat Detectors 197 Mech. Pen. Rm./UHI Valves JJ-52 EL. 750 5(t) 0 A
198 Mech. Pen. Rm./UHI Valves JJ-60 EL. 750 5(5) 0 A
206 Control Room Control Board AA-56 EL. 767 20 5
A NOTES:
: 1.
The fire detection instruments located within containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests.
: 2.
Function A: Early warning fire detection and notification only.
Function B: Actuation of fire suppression system and early warning and notification.
: 3.
The fire detection instruments located in the RB Annulus are restorable, cable-type sensors which cover the entire 360 degrees of the annulus at each subzone elevation.
: 4.
Upon implementation of MD501276 / EC95846, detection in each Spent Fuel Pool areas (Unit 1, Fire Zone 127 and Unit 2, Fire Zone 125) will consist of 4 video-based (camera) flame and smoke detectors (2 mounted above the Bypass Leakage Enclosure directed North and 2 mounted above the New Fuel Vault directed South), 1 linear heat detection circuit in the uppermost cable tray bordering the pool, 6 multimode heat/smoke detectors in the overhead of the Decon and vestibule areas adjacent to the containment, and 4 multimode heat/smoke detectors in the New Fuel Vault. A camera failure should be treated as any other single detector failure when determining remedial actions.
: 5.
Upon implementation of EC95846, EC95847, and subsequent modifications, the separate smoke and heat detectors are replaced with single multi-sensor detectors.
McGuire Units 1 and 2 16.9.6-9 Revision 130
Fire Detection Instrumentation 16.9.6 BASES Fire detection instrumentation is required to be operable at all times unless a complete evaluation has been made of the area protected by any particular instrument and all equipment in that area has been identified and determined not to be required operable.
This evaluation would have to consider not only mechanical equipment in the area but all piping, tubing, and cables that transit through the area.
OPERABILITY of the detection instrumentation ensures that both adequate warning capability is available for prompt detection of fires and that fire suppression systems, that are actuated by fire detectors, will discharge the extinguishing agent in a timely manner.
Prompt detection and suppression of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.
An inoperable detector is defined as: a) a fire alarm with no actual fire or b) a trouble alarm.
Fire detectors that are used to actuate Fire Suppression Systems represent a more critically important component of a plant's fire protection program than detectors that are installed solely for early fire warning and notification. Consequently, the minimum number of OPERABLE fire detectors must be greater.
The loss of detection capability for the Fire Suppression Systems, actuated by fire detectors, represents a significant degradation of fire protection for any area. The establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABLE status. If fire detection capability is monitored by a local or remote panel, the fire watch patrol needs only check the panel to verify no loss in fire detection capability. Note that Fire Alarm Control Panels (FACP) 1 and 9 monitor all areas that the Fireworks Operator Interface Computer monitors and both FACP 1 and 9 activate control room annunciator 1AD13.E-3. Therefore loss of the Fireworks Operator Interface Computer does not constitute a loss of fire detection capability for those areas. Note that the MNS Fire Protection Safe Shutdown Review considers the annulus to be part of the containment building.
This selected licensee commitment is part of the McGuire Fire Protection Program and therefore subject to the provisions of McGuire Facility Operating License Conditions C.4 (Unit 1) and C.7 (Unit 2).
TR 16.9.6.7, "Perform a functional test on at least 2% of the fixed temperature/rate of rise non-restorable spot type heat detectors," is satisfied by either testing within population or replacement of all heat detectors as per TR 16.9.6.8.
TR 16.9.6.8, "Replace all fixed temperature/rate of rise non-restorable spot type heat detectors," purpose is compliance with NFPA 72-2002 Table 10.4.2.2 Device 13 (d) 3. This is applicable to all containment fire zones (Unit 1 zones 134 - 152, Unit 2 zones 163 - 181).
McGuire Units 1 and 2 16.9.6-10 Revision 130
Fire Detection Instrumentation 16.
==9.6 REFERENCES==
: 1.
McGuire Nuclear Station UFSAR, Chapter 9.5.1
: 2.
McGuire Nuclear Station SER Supplement 2, Chapter 9.5.1 and Appendix D
: 3.
McGuire Nuclear Station SER Supplement 5, Chapter 9.5.1 and Appendix B
: 4.
McGuire Fire Protection Review, as revised
: 5.
McGuire Nuclear Station SER Supplement 6, Chapter 9.5.1 and Appendix C
: 6.
NFPA Codes 72D and 72E
: 7.
McGuire Nuclear Station Facility Operating Licenses, Unit 1 License Condition C.(4) and Unit 2 License Condition C.(7)
McGuire Units 1 and 2 16.9.6-11 Revision 130}}

Latest revision as of 22:23, 11 January 2025

Selected License Commitments Manual Update
ML12265A077
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/11/2012
From: Beaver B, Capps S
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
DUK122550021
Download: ML12265A077 (15)


Text

PRIORITY Normal DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW 1) 2)

3) 4)

5) 6)

7) 8)

9) 10) 02546 WC LIBRARY - MG01WC 03044 MCG DOC CNTRL MISC MAN MG05DM 03379 D E CALDWELL MG01MM 03447 HARRY J SLOAN MG01RP 03614 MCG OPS PROCEDURE GP MG01OP 03744 OPS TRNG MGR. MG03OT 03759 U S NUC REG WASHINGTON, DC 04809 MCG PLANT ENG. LIBR. MG05SE 09460 W C SPENCER MG01RP 09665 JON H THOMPSON, USNRC Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION RECORD RETENTION: 581188 SELECTED LICENSEE COMMITMENTS MANUAL --- (SLC)

Page 2 of 2 Date:

09/11112 Document Transmittal #:

DUK122550021 QA CONDITION E] Yes

  • No OTHER ACKNOWLEDGEMENT REQUIRED
  • Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C.

28078 Rec'd By Date DOCUMENT NO LOES 2 PAGES SLC 16.9.6 11 PAGES QACOND REV #/ DATE DISTR CODE I

2 3

4 5

6 7

8 9

10 11 12 13 14 15 TOTAL NA NA 111 05/16/12 130 09/05/12 MADM-03A V1 x

V1 V1 V1 V2 vi V1 V1 V1 24 REMARKS: PLEASE UPDATE ACCORDINGLY.

S D CAPPS REMARKS: PLEASE UPDATE ACCORDINGLY.

S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:

BC BEAVER MG01RC BCB/TLC

PRIORITY Normal DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW Date:

09/11/12 Document Transmittal #:

DUK122550021

1) 00003 NRI&IA MGR EC050
2) 00070 VICKIE BREWER - MG03OT
3) 00200 M E CARROLL EC08H
4) 00297 V M MCCREE REG ATL, GA
5) 00422 MCG BONNIE C BEAVER - MG01RC
6) 00485 OPS TEST GROUP - MG01OP
7) 00692 MCG OPS STAFF MGR MG01OP
8) 00707 SERV BLDG FILE ROOM - MG01S1
9) 00841 OPS HUMAN PERFORMANCE-MG01OP
10) 01202 K L CRANE - MG01RC
11) 01492 BLUE DOT LIBRARY MG02MO
12) 01503 VICKIE L MC GINNIS - MG03OT
13) 01623 G L MONTGOMERY MG01WC
14) 02467 ELECT. LICENSING LIBRARY EC050
15) 02532 RESIDENT NRC INSPECT MG01NRC Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION RECORD RETENTION: 581188 SELECTED LICENSEE COMMITMENTS MANUAL -- (SLC)

Page 1 of 2 QA CONDITION D

Yes E

No OTHER ACKNOWLEDGEMENT REQUIRED

  • Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C.

28078 Rec'd By Date r

-r

-r

-r*1

-r---r r

r r

r F

F t

DOCUMENT NO QA COND REV #/DATE DISTR CODE 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 TOTAL 4

A

+/-

-I----+/----

+/--+--+

F F

F F

F

-F LOES 2 PAGES SLC 16.9.6 11 PAGES NA NA 111 05/16/12 130 09/05/12 MADM-03A V1 T1 V1 vi v1 vi V1 V1 24 REMARKS: PLEASE UPDATE ACCORDINGLY.

S D CAPPS REMARKS: PLEASE UPDATE ACCORDINGLY.

S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:

B C BEAVER MGO1RC BCB/TLC

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 REVISION 115 0308/10 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 DELETED - REVISION 120 12/30/10 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED - REVISION 43 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 121 12/30/10 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 130 5/16/12 16.9.7 REVISION 122 1/14/11 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 DELETED - REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 McGuire Units 1 and 2 I

Revision 111

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.13 DELETED - REVISION 13

... 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 116 4/7/10 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 DELETED - REVISION 74 6/27/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 118 10/19/10 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 DELETED - REVISION 75 7/20/05 16.13.3 DELETED - REVISION 75 7/20/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2

Revision 111

Fire Detection Instrumentation 16.9.6 16.9 AUXILIARY SYSTEMS 16.9.6 Fire Detection Instrumentation COMMITMENT APPLICABILITY The fire detection instrumentation for each fire detection zone shown in Table 16.9.6-1 shall be OPERABLE.

Whenever equipment protected by fire detection instrument is required to be OPERABLE.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more, but not A.1 Restore the inoperable 14 days more than half, of the instrument(s) to Function A fire detectors OPERABLE status.

in any zone inoperable.

B.

More than half of the B.1 Establish fire watch patrol 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Function A fire detectors to inspect zones outside AND in any zone inoperable, containment with inoperable instruments.

Once per hour thereafter OR AND One or more Function B B.2.1 Establish a fire watch patrol 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire detectors inoperable, to inspect zones inside AND containment with OR inoperable instruments.

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter Two or more adjacent OR fire detectors inoperable.

B.2.2 Monitor containment air Once per hour OR temperature at the locations given in ITS Required Action and 3.6.5.1 or 3.6.5.2.

associated Completion Time of Condition A not met.

(continued)

McGuire Units 1 and 2 16.9.6-1 Revision 130

Fire Detection Instrumentation 16.9.6 REMEDIAL ACTIONS (continued CONDITION REQUIRED ACTION COMPLETION TIME C.

One or more annulus fire C.1 Perform a fire watch patrol 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> detectors inoperable, of the annulus.

AND C.2.1 Verify at least one adjacent Once per hour annulus fire detector zone thereafter is OPERABLE.

OR C.2.2 Perform a fire watch patrol Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the annulus if no thereafter adjacent zone is OPERABLE.

TESTING REQUIREMENTS TEST FREQUENCY TR 16.9.6.1 Verify the non-supervised circuits associated with 31 days detector alarms between the instrument and the control room are OPERABLE.

TR 16.9.6.2 Verify the NFPA Standard 72D supervised circuits 6 months supervision associated with detector alarms are OPERABLE.

TR 16.9.6.3 Perform a TADOT on fire detectors which are accessible 6 months during plant operation.

(continued)

McGuire Units 1 and 2 16.9.6-2 Revision 130

Fire Detection Instrumentation 16.9.6 TESTING REQUIREMENTS (continued)

TEST FREQUENCY

_TR_ 16.9.6A _ Perform a TADOT on fire detectors which_ are not-Prior to entering accessible during plant operation.

MODE 4 when the unit has been in MODE 5 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or more, if testing has not been performed in previous 6 months TR 16.9.6.5


NOTE-----------------

Different detectors shall be selected for each test.

Perform a TADOT on at least one detector on each 6 months signal initiating circuit for fixed temperature/rate of rise restorable spot type heat detectors which are accessible during plant operation.

TR 16.9.6.6 Perform a TADOT on fixed temperature/rate of rise Prior to entering restorable spot type heat detectors which are not MODE 4 when the accessible during plant operation.

unit has been in MODE 5 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or more, if testing has not been performed in previous 6 months TR 16.9.6.7


NOTES-----------------

1. For each failure that occurs, two additional detectors shall be removed and tested.
2. Replacement of all fixed temperature/rate of rise non-restorable spot type heat detectors within population satisfies testing requirement.

Perform a functional test on at least 2% of the fixed 5 years temperature/rate of rise non-restorable spot type heat detectors.

TR 16.9.6.8 Replace all fixed temperature/rate of rise non-restorable 15 years spot type heat detectors.

McGuire Units 1 and 2 16.9.6-3 Revision 130

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Description Location Zone 1

2 3

4 5

6 7

8 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45A 45B 45C 45D 45G Reactor Coolant Pump 1A Reactor Coolant Pump 1 B Reactor Coolant Pump 1C Reactor Coolant Pump 1 D Reactor Coolant Pump 2A Reactor Coolant Pump 2B Reactor Coolant Pump 2C Reactor Coolant Pump 2D Aux. Bldg. Vent Filter Elec. Pen. Rm.

Elec. Pen. Rm.

Elec. Pen. Rm.

Unit 2 Aux. Bldg. Vent. Filter Unit 2 Elec. Penetration Room Unit 2 Elec. Penetration Room Unit 2 Elec. Penetration Room Diesel Gen. 1A Diesel Gen. 2A Cable Room Control Room Swgr. Rm. IETA Swgr. Rm. IETB SWG. Room 2ETA SWG. Room 2ETB Battery Room EVCA Battery Room EVCB Battery Room EVCC Battery Room EVCD Battery Chg. Equip. & Pnl EVCA, EVCC RCP-1A RCP-1B RCP-1C RCP-1 D RCP-2A RCP-2B RCP-2C RCP-2D KK52-53 EL. 767 CC-51 EL. 767 CC-51 EL. 750 CC-51 EL. 733 KK-59/60 EL. 767 CC-61 EL. 767 CC-61 EL. 750 CC-61 EL. 733 CC-43 EL. 733 CC-69 EL. 733 CC-55 EL. 750 CC-56 EL. 767 AA-49 EL. 750 AA-49 EL. 733 AA-62 EL. 750 AA-62 EL. 733 CC-54 EL. 733 CC-55 EL. 733 CC-56 EL. 733 CC-57 EL. 733 CC-56 EL. 733 Number of Smoke Detectors 0

0 0

0 0

0 0

0 2

9 10(5) 1 (5) 2 9

10(5) 11(5) 0(0) 0(0) 24 9(5) 10(5) 9(5) 10(5) 2(5) 2(5) 2 (5) 2 (5) 13(5)

Number of Heat Detectors 0

1 I

0 0

1 1

1 0

0 0

0 0

0 0

0 0

0 8(4) 0 19 0

0 0

00 0

0 0

0 Function(z)

A A

A A

A A

A A

A A

A A

A A

A A

A(B)

A(B)

A A

A A

A A

A A

A A

A Revision 130 McGuire Units 1 and 2 16.9.6-4

0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Description Location Zone 45H 50 51 52 61 62 63 64 66 67 68 69 70 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 Battery Chg. Equip. & PnI EVCB, EVCD Diesel Gen. 1 B Diesel Gen. 2B Unit 2 Cable Room Cont. Spray Pump 1A/Corridor Cont. Spray Pump 1B/Cooridor RHR Pump 1B RHR Pump 1A Cont. Spray Pump 2B/Corridor Cont. Spray Pump 2A/Cooridor RHR Pump 2A RHR Pump 2B Aux. FW Pumps Mech. Pen. Rm./Cables Corridor/Cables Sample Panel/Cables Cent. Chg. Pump 1B Cent. Chg. Pump 1A PD Pump #1 Safety Injection Pump 1A Safety Injection Pump 1 B Aisle/Cables Aisle/Cables Cent. Chg. Pump 2B Cent. Chg. Pump 2A PD Pump #2 Safety Injection Pump 2A Safety Injection Pump 2B Aux. FW Pumps BB-56 EL. 733 BB-43 EL. 733 BB-69 EL. 733 CC-57 EL. 750 GG-55 EL. 695 GG-56 EL. 695 FF-54 EL. 695 GG-54 EL. 695 GG-56 EL. 695 GG-57 EL. 695 GG-58 EL. 695 FF-58 EL. 695 BB-51 EL. 716 JJ-51 EL. 716 HH-53 EL. 716 EE-55 EL. 716 JJ-55 EL. 716 JJ-55 EL. 716 JJ-54 EL. 716 HH-54 EL. 716 GG-54 EL. 716 GG-55 EL. 716 GG-57 EL. 716 JJ-57 EL. 716 JJ-57 EL. 716 JJ-58 EL. 716 HH-58 EL. 716 GG-58 EL. 716 CC-60 EL. 716 Number of Smoke Detectors 12(b) 0(0) 0(0) 11I(5) 2(5) 2 (5) 1 (5) 1 (5) 2 (5) 2 (5) 1 (5) 1 (5) 10(0o 5 6 (5) 5 (5) 2 (5) 2 (5) 2 (5) 2 (5) 2(5) 13(s) 11 (5) 2 (5) 2(5) 2 (5) 2 (5) 2(5) 10(0) (5)

Number of Heat Detectors 0

8(4) 8(4) 0 0

0 0

0 0

0 0

0 0(1) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0(1)

Function"'

A A(B)

A(B)

A A

A A

A A

A A

A A(B)

A A

A A

A A

A A

A A

A A

A A

A A(B)

Revision 130 McGuire Units I and 2 16.9.6-5

0 Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Zone 88 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 106 107 108 109 110 111 112 113 114 115 116 120 122 Description Location Mech. Penetration Room/Cables Corridor/Cables Corridor/Cables Corridor/Cables Corridor/Cables Aisle/Cables 600V MCC 1EMXB - 1 EMXB3 Cable Tray Access Cable Tray Access 600V MCC 2EMXB - 2EMXB3 Aisle/Cables Corridor/Cables Corridor/Cables Corridor/Cables Corridor/Cables Hatch Area Cables 600V MCC 1 EMXA 600V MCC 2EMXA Aisle/Cables Hatch Area Cables Corridor/Cables Corridor/Cables Aisle/Cables HVAC Equipment Area/Cables Respiratory Equipment Room Corridor/Cables HVAC Equipment Area/Cables Environmental Lab HVAC Equipment Area JJ-61 EL. 716 NN-59 EL. 716 EE-53 EL. 733 JJ-51 EL. 733 NN-52 EL. 733 JJ-55 EL. 733 FF-55 EL. 733 EE-55 EL. 733 EE-57 EL. 733 FF-57 EL. 733 JJ-57 EL. 733 NN-58 EL. 733 JJ-61 EL. 733 EE-59 EL. 733 MM-51 EL. 750 LL-53 EL. 750 FF-54 EL. 750 FF-57 EL. 750 JJ-55 EL. 750 PP-57 EL. 750 PP-60 EL. 750 LL-59 EL. 750 JJ-57 EL. 750 FF-56 EL. 767 GG-54 EL. 767 JJ-54 EL. 767 NN-52 EL. 767 PP-55 EL. 767 NN-59 EL. 767 Number of Smoke Detectors 4(5) 5(5) 4 6(5) 12 (5) 9(5) 1 (5) 2 (5) 2(5) 1 (5) 9(5) 12 (5) 6 (5) 4 7(5) 4(5) 5(5) 14 (5) 15 (5) 8 (5) 6 (5) 13(5) 11 (5) 1 (5) 16(5) 8(5) 1 (5) 10(5)

Number of Heat Detectors 0

0 4

0 0

0 0

0 0

0 0

0 0

4 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Function(2 )

A A

A A

A A

A A

A A

A A

A A

A A

A A

A A

A A

A A

A A

A A

A Revision 130 McGuire Units 1 and 2 16.9.6-6

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1' Detector Description Location Zone Detector Description Location Zone 123 125 127 128 129 130 131 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153A 153B 153C Corridor/Cables Fuel Pool Area Fuel Pool Area Aisle/Cable 600V MCC 2EMXH Cables/KF Pumps Respiratory RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit I RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Pipe Corridor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit I RB Below Oper, Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Below Oper. Floor-Unit 1 RB Annulus - Unit 1 RB Annulus - Unit 1 RB Annulus - Unit 1 JJ-57 EL. 767 NN-62 EL. 778+10 NN-50 EL. 731+ 6 EE-57 EL. 716 KK-56 EL. 733 PP-52 EL. 750 HH-56 EL. 767 2150 -2700 2700- 3150 3150 -0O 00 _ 440 440 - 900 90 - 1260 1260- 1730 3290 - 3490 130 - 290 340 - 510 510- 1240 1240 - 1430 1430- 1670 RCP - 1A Motor RCP - 1 B Motor RCP - 1C Motor RCP - 1D Motor Purge Filter Bed 1700-1900, R20'-R35' 00-3600 EL. 745 00-3600 EL. 765 00-3600 EL. 785 Number of Smoke Detectors 1V8)

Note 4 Note 4 5(5) 4 (5) 4(5) 6 (5) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Number of Heat Detectors 0

Note 4 Note 4 0

0 0

0 5

5 6

4 4

4 7

7 4

3 13 3

8 5

2 4

5 2

2 Note 3 Note 3 Note 3 Function (2 McGuire Units 1 and 2 16.9.6-7 Revision 130

Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Zone 153D 153E 153F 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182A 182B 182C 182D 182E 182F Description Location RB Annulus - Unit 1 RB Annulus - Unit 1 RB Annulus - Unit 1 Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Pipe Corridor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor Unit 2 RB Below Oper. Floor RB Annulus - Unit 2 RB Annulus - Unit 2 RB Annulus - Unit 2 RB Annulus - Unit 2 RB Annulus - Unit 2 RB Annulus - Unit 2 0o-3600 EL. 805 0o-3600 EL. 820 0o-3600 EL. 835 2150 -2700 2700- 3150 315°.00 00 440 440 - 900 900-1260 1260 -1730 3290 - 3470 130 - 290 340 510 510 - 1240 1240 -1430 1430- 1670 RCP - 2A Motor RCP - 2B Motor RCP - 2C Motor RCP - 2D Motor Purge Filter Bed 1700-1900, R20'-R35' 00-3600 EL. 745 00-3600 EL. 765 00-3600 EL. 785 00-3600 EL. 805 00-3600 EL. 820 0o-3600 EL. 835 Number of Smoke Detectors 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 Number of Heat Detectors Note 3 Note 3 Note 3 4

5 6

4 4

4 7

7 4

3 13 3

8 4

3 3

5 2

2 Note 3 Note 3 Note 3 Note 3 Note 3 Note 3 Function (2 )

McGuire Units 1 and 2 16.9.6-8 Revision 130

S Fire Detection Instrumentation 16.9.6 TABLE 16.9.6-1 FIRE DETECTION INSTRUMENTATION"1 '

Detector Description Location Number of Number of Function(2)

Zone Smoke Detectors Heat Detectors 197 Mech. Pen. Rm./UHI Valves JJ-52 EL. 750 5(t) 0 A

198 Mech. Pen. Rm./UHI Valves JJ-60 EL. 750 5(5) 0 A

206 Control Room Control Board AA-56 EL. 767 20 5

A NOTES:

1.

The fire detection instruments located within containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests.

2.

Function A: Early warning fire detection and notification only.

Function B: Actuation of fire suppression system and early warning and notification.

3.

The fire detection instruments located in the RB Annulus are restorable, cable-type sensors which cover the entire 360 degrees of the annulus at each subzone elevation.

4.

Upon implementation of MD501276 / EC95846, detection in each Spent Fuel Pool areas (Unit 1, Fire Zone 127 and Unit 2, Fire Zone 125) will consist of 4 video-based (camera) flame and smoke detectors (2 mounted above the Bypass Leakage Enclosure directed North and 2 mounted above the New Fuel Vault directed South), 1 linear heat detection circuit in the uppermost cable tray bordering the pool, 6 multimode heat/smoke detectors in the overhead of the Decon and vestibule areas adjacent to the containment, and 4 multimode heat/smoke detectors in the New Fuel Vault. A camera failure should be treated as any other single detector failure when determining remedial actions.

5.

Upon implementation of EC95846, EC95847, and subsequent modifications, the separate smoke and heat detectors are replaced with single multi-sensor detectors.

McGuire Units 1 and 2 16.9.6-9 Revision 130

Fire Detection Instrumentation 16.9.6 BASES Fire detection instrumentation is required to be operable at all times unless a complete evaluation has been made of the area protected by any particular instrument and all equipment in that area has been identified and determined not to be required operable.

This evaluation would have to consider not only mechanical equipment in the area but all piping, tubing, and cables that transit through the area.

OPERABILITY of the detection instrumentation ensures that both adequate warning capability is available for prompt detection of fires and that fire suppression systems, that are actuated by fire detectors, will discharge the extinguishing agent in a timely manner.

Prompt detection and suppression of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.

An inoperable detector is defined as: a) a fire alarm with no actual fire or b) a trouble alarm.

Fire detectors that are used to actuate Fire Suppression Systems represent a more critically important component of a plant's fire protection program than detectors that are installed solely for early fire warning and notification. Consequently, the minimum number of OPERABLE fire detectors must be greater.

The loss of detection capability for the Fire Suppression Systems, actuated by fire detectors, represents a significant degradation of fire protection for any area. The establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABLE status. If fire detection capability is monitored by a local or remote panel, the fire watch patrol needs only check the panel to verify no loss in fire detection capability. Note that Fire Alarm Control Panels (FACP) 1 and 9 monitor all areas that the Fireworks Operator Interface Computer monitors and both FACP 1 and 9 activate control room annunciator 1AD13.E-3. Therefore loss of the Fireworks Operator Interface Computer does not constitute a loss of fire detection capability for those areas. Note that the MNS Fire Protection Safe Shutdown Review considers the annulus to be part of the containment building.

This selected licensee commitment is part of the McGuire Fire Protection Program and therefore subject to the provisions of McGuire Facility Operating License Conditions C.4 (Unit 1) and C.7 (Unit 2).

TR 16.9.6.7, "Perform a functional test on at least 2% of the fixed temperature/rate of rise non-restorable spot type heat detectors," is satisfied by either testing within population or replacement of all heat detectors as per TR 16.9.6.8.

TR 16.9.6.8, "Replace all fixed temperature/rate of rise non-restorable spot type heat detectors," purpose is compliance with NFPA 72-2002 Table 10.4.2.2 Device 13 (d) 3. This is applicable to all containment fire zones (Unit 1 zones 134 - 152, Unit 2 zones 163 - 181).

McGuire Units 1 and 2 16.9.6-10 Revision 130

Fire Detection Instrumentation 16.

9.6 REFERENCES

1.

McGuire Nuclear Station UFSAR, Chapter 9.5.1

2.

McGuire Nuclear Station SER Supplement 2, Chapter 9.5.1 and Appendix D

3.

McGuire Nuclear Station SER Supplement 5, Chapter 9.5.1 and Appendix B

4.

McGuire Fire Protection Review, as revised

5.

McGuire Nuclear Station SER Supplement 6, Chapter 9.5.1 and Appendix C

6.

NFPA Codes 72D and 72E

7.

McGuire Nuclear Station Facility Operating Licenses, Unit 1 License Condition C.(4) and Unit 2 License Condition C.(7)

McGuire Units 1 and 2 16.9.6-11 Revision 130