IR 05000324/2012001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 03/04/2013 | | issue date = 03/04/2013 | ||
| title = Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 & 2, (IR 05000325-12-001 and 05000324-12-001,) on 02/13/2013, | | title = Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 & 2, (IR 05000325-12-001 and 05000324-12-001,) on 02/13/2013, | ||
| author name = Croteau R | | author name = Croteau R | ||
| author affiliation = NRC/RGN-II/DRP | | author affiliation = NRC/RGN-II/DRP | ||
| addressee name = Annacone M | | addressee name = Annacone M | ||
| addressee affiliation = Progress Energy Carolinas, Inc | | addressee affiliation = Progress Energy Carolinas, Inc | ||
| docket = 05000324, 05000325 | | docket = 05000324, 05000325 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:March 4, 2013 | ||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (NRC INSPECTION REPORT 05000325/2012001 AND 05000324/2012001) | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (NRC INSPECTION REPORT 05000325/2012001 AND 05000324/2012001) | ==Dear Mr. Annacone:== | ||
On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the Brunswick Steam Electric Plant, Units 1 and 2. The NRC reviewed the most recent quarterly Performance Indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined that overall, Brunswick Steam Electric Plant, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Brunswick Steam Electric Plant, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
During the first three quarters of 2012, the performance of Brunswick Steam Electric Plant, Units 1 and 2 performance was in the Regulatory Response Column of the NRCs ROP Action Matrix based on one inspection finding classified as low to moderate safety significance (White) in the Mitigating Systems Cornerstone and all PIs indicated that your performance was within the nominal, expected range (i.e., green). The White finding was related to the failure to identify and correct a condition adverse to quality associated with the entrance enclosures for the Emergency Diesel Generator (EDG) fuel oil tank rooms. This finding was identified on November 29, 2011. On June 21, 2012, the NRC completed a supplemental inspection pursuant to Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, at Brunswick Unit 1 and 2 facilities. As a result, the NRC determined the performance at Brunswick Steam Electric Plant Units 1 and 2 to be in the Licensee Response Column of the ROP Action Matrix as of October 1, 2012. The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | |||
We also plan on conducting an infrequently performed inspection, TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact Randy Musser at 404-997-4603 with any questions you may have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Richard P. Croteau, Director Division of Reactor Projects | |||
Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 | |||
Enclosure: Brunswick Inspection/Activity Plan (03/01/2013 - 06/30/2014) | |||
cc w/Encl: (See page 3) | |||
_________________________ | |||
X SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP | |||
SIGNATURE JGW:/RA/ | |||
RXM:/RA/ | |||
NAME JWorosilo RMusser | |||
DATE 02/20/2013 02/25/2013 | |||
E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl: | |||
Plant General Manager Brunswick Steam Electric Plant Progress Energy Electronic Mail Distribution | |||
Edward L. Wills, Jr. | |||
Director Site Operations Brunswick Steam Electric Plant Electronic Mail Distribution | |||
J. W. (Bill) Pitesa Senior Vice President Nuclear Operations Duke Energy Corporation Electronic Mail Distribution | |||
John A. Krakuszeski Plant Manager Brunswick Steam Electric Plant Electronic Mail Distribution | |||
Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution | |||
M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution | |||
Michael Vice President Brunswick Steam Electric Plant Electronic Mail Distribution | |||
Annette H. Pope Manager-Organizational Effectiveness Brunswick Steam Electric Plant Electronic Mail Distribution | |||
Lee Grzeck Regulatory Affairs Manager Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. | |||
Electronic Mail Distribution Randy C. Ivey Manager, Nuclear Oversight Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. | |||
Electronic Mail Distribution | |||
Paul E. Dubrouillet Manager, Training Brunswick Steam Electric Plant Electronic Mail Distribution | |||
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution | |||
Senior Resident Inspector U.S. Nuclear Regulatory Commission Brunswick Steam Electric Plant U.S. NRC 8470 River Road, SE Southport, NC 28461 | |||
John H. O'Neill, Jr. | |||
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 | |||
Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602 | |||
Chairman North Carolina Utilities Commission Electronic Mail Distribution | |||
Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 | |||
(cc:w/encl continued next page) cc:w/encl. continued Anthony Marzano Director Brunswick County Emergency Services Electronic Mail Distribution | |||
Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 | |||
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution | |||
Warren Lee Emergency Management Division New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC 28403 Letter to Michael from Richard P. Croteau dated March 4, 2013 | |||
SUBJECT: | |||
ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (NRC INSPECTION REPORT 05000325/2012001 AND 05000324/2012001) | |||
Distribution w/encl: | |||
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROP Assessment Institute of Nuclear Power Operations (INPO) | |||
Brunswick Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 07:41:19 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title | |||
ISI | |||
- UNIT 2 INSERVICE INSPECTION | |||
03/11/2013 03/15/2013 IP 7111108G Inservice Inspection Activities - BWR | |||
LR | |||
- UNIT 2 POST APPROVAL LR PHASE 1 | |||
03/11/2013 03/15/2013 IP 71003 Post-Approval Site Inspection for License Renewal | |||
RP | |||
- RP OCCUPATIONAL BASELINE 1, 2 03/11/2013 03/15/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/11/2013 03/15/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/11/2013 03/15/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/11/2013 03/15/2013 IP 71124.04 Occupational Dose Assessment 1, 2 03/11/2013 03/15/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/11/2013 03/15/2013 IP 71151 Performance Indicator Verification | |||
RP | |||
- RP OCCUPATIONAL BASELINE WEEK2 1, 2 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/25/2013 03/29/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/25/2013 03/29/2013 IP 71124.04 Occupational Dose Assessment 1, 2 03/25/2013 03/29/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/25/2013 03/29/2013 IP 71151 Performance Indicator Verification | |||
PI&R | |||
- PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 04/29/2013 05/03/2013 IP 71152B Problem Identification and Resolution 1, 2 05/13/2013 05/17/2013 IP 71152B Problem Identification and Resolution | |||
EP | |||
- EMERGENCY PREPAREDNESS INSPECTION 1, 2 08/19/2013 08/23/2013 IP 7111402 Alert and Notification System Testing 1, 2 08/19/2013 08/23/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 08/19/2013 08/23/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/19/2013 08/23/2013 IP 71151 Performance Indicator Verification | |||
CDBI | |||
- COMPONENT DESIGN BASES INSPECTION 1, 2 08/19/2013 08/23/2013 IP 7111121 Component Design Bases Inspection 1, 2 09/09/2013 09/13/2013 IP 7111121 Component Design Bases Inspection 1, 2 09/23/2013 09/27/2013 IP 7111121 Component Design Bases Inspection 1, 2 10/07/2013 10/11/2013 IP 7111121 Component Design Bases Inspection | |||
TI-182 | |||
- TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 10/15/2013 10/17/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Brunswick Inspection / Activity Plan 03/01/2013 | Enclosure | ||
-06/30/2014 Unit Number Page 2 of 2 03/04/2013 07:41:19 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title | |||
Brunswick Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 07:41:19 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title | |||
RP | |||
- RP PUBLIC RADIATION SAFETY BASELINE 1, 2 01/27/2014 01/31/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/27/2014 01/31/2014 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 01/27/2014 01/31/2014 IP 71151 Performance Indicator Verification | |||
ISI | |||
- UNIT 1 IN-SERVICE INSPECTION | |||
03/10/2014 03/14/2014 IP 7111108G Inservice Inspection Activities - BWR | |||
RP | |||
- RAD HAZARDS ANALYSIS AND TRANSPORTATION 1, 2 03/10/2014 03/14/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/10/2014 03/14/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/10/2014 03/14/2014 IP 71151 Performance Indicator Verification | |||
LR | |||
- POST APPROVAL LR PHASE 2 1, 2 06/02/2014 06/06/2014 IP 71003 Post-Approval Site Inspection for License Renewal 1, 2 06/16/2014 06/20/2014 IP 71003 Post-Approval Site Inspection for License Renewal Comments: | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Enclosure | |||
}} | }} | ||
Latest revision as of 10:43, 11 January 2025
| ML13063A188 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 03/04/2013 |
| From: | Croteau R Division Reactor Projects II |
| To: | Annacone M Progress Energy Carolinas |
| References | |
| IR-12-001 | |
| Download: ML13063A188 (8) | |
Text
March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (NRC INSPECTION REPORT 05000325/2012001 AND 05000324/2012001)
Dear Mr. Annacone:
On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the Brunswick Steam Electric Plant, Units 1 and 2. The NRC reviewed the most recent quarterly Performance Indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Brunswick Steam Electric Plant, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Brunswick Steam Electric Plant, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
During the first three quarters of 2012, the performance of Brunswick Steam Electric Plant, Units 1 and 2 performance was in the Regulatory Response Column of the NRCs ROP Action Matrix based on one inspection finding classified as low to moderate safety significance (White) in the Mitigating Systems Cornerstone and all PIs indicated that your performance was within the nominal, expected range (i.e., green). The White finding was related to the failure to identify and correct a condition adverse to quality associated with the entrance enclosures for the Emergency Diesel Generator (EDG) fuel oil tank rooms. This finding was identified on November 29, 2011. On June 21, 2012, the NRC completed a supplemental inspection pursuant to Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, at Brunswick Unit 1 and 2 facilities. As a result, the NRC determined the performance at Brunswick Steam Electric Plant Units 1 and 2 to be in the Licensee Response Column of the ROP Action Matrix as of October 1, 2012. The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
We also plan on conducting an infrequently performed inspection, TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Randy Musser at 404-997-4603 with any questions you may have regarding this letter.
Sincerely,
/RA/
Richard P. Croteau, Director Division of Reactor Projects
Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62
Enclosure: Brunswick Inspection/Activity Plan (03/01/2013 - 06/30/2014)
cc w/Encl: (See page 3)
_________________________
X SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP
SIGNATURE JGW:/RA/
RXM:/RA/
NAME JWorosilo RMusser
DATE 02/20/2013 02/25/2013
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:
Plant General Manager Brunswick Steam Electric Plant Progress Energy Electronic Mail Distribution
Edward L. Wills, Jr.
Director Site Operations Brunswick Steam Electric Plant Electronic Mail Distribution
J. W. (Bill) Pitesa Senior Vice President Nuclear Operations Duke Energy Corporation Electronic Mail Distribution
John A. Krakuszeski Plant Manager Brunswick Steam Electric Plant Electronic Mail Distribution
Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution
M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution
Michael Vice President Brunswick Steam Electric Plant Electronic Mail Distribution
Annette H. Pope Manager-Organizational Effectiveness Brunswick Steam Electric Plant Electronic Mail Distribution
Lee Grzeck Regulatory Affairs Manager Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Electronic Mail Distribution Randy C. Ivey Manager, Nuclear Oversight Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Electronic Mail Distribution
Paul E. Dubrouillet Manager, Training Brunswick Steam Electric Plant Electronic Mail Distribution
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution
Senior Resident Inspector U.S. Nuclear Regulatory Commission Brunswick Steam Electric Plant U.S. NRC 8470 River Road, SE Southport, NC 28461
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602
Chairman North Carolina Utilities Commission Electronic Mail Distribution
Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326
(cc:w/encl continued next page) cc:w/encl. continued Anthony Marzano Director Brunswick County Emergency Services Electronic Mail Distribution
Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
Warren Lee Emergency Management Division New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC 28403 Letter to Michael from Richard P. Croteau dated March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (NRC INSPECTION REPORT 05000325/2012001 AND 05000324/2012001)
Distribution w/encl:
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
Brunswick Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 07:41:19 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
- UNIT 2 INSERVICE INSPECTION
03/11/2013 03/15/2013 IP 7111108G Inservice Inspection Activities - BWR
LR
- UNIT 2 POST APPROVAL LR PHASE 1
03/11/2013 03/15/2013 IP 71003 Post-Approval Site Inspection for License Renewal
- RP OCCUPATIONAL BASELINE 1, 2 03/11/2013 03/15/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/11/2013 03/15/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/11/2013 03/15/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/11/2013 03/15/2013 IP 71124.04 Occupational Dose Assessment 1, 2 03/11/2013 03/15/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/11/2013 03/15/2013 IP 71151 Performance Indicator Verification
- RP OCCUPATIONAL BASELINE WEEK2 1, 2 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/25/2013 03/29/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/25/2013 03/29/2013 IP 71124.04 Occupational Dose Assessment 1, 2 03/25/2013 03/29/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/25/2013 03/29/2013 IP 71151 Performance Indicator Verification
- PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 04/29/2013 05/03/2013 IP 71152B Problem Identification and Resolution 1, 2 05/13/2013 05/17/2013 IP 71152B Problem Identification and Resolution
- EMERGENCY PREPAREDNESS INSPECTION 1, 2 08/19/2013 08/23/2013 IP 7111402 Alert and Notification System Testing 1, 2 08/19/2013 08/23/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 08/19/2013 08/23/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 08/19/2013 08/23/2013 IP 71151 Performance Indicator Verification
- COMPONENT DESIGN BASES INSPECTION 1, 2 08/19/2013 08/23/2013 IP 7111121 Component Design Bases Inspection 1, 2 09/09/2013 09/13/2013 IP 7111121 Component Design Bases Inspection 1, 2 09/23/2013 09/27/2013 IP 7111121 Component Design Bases Inspection 1, 2 10/07/2013 10/11/2013 IP 7111121 Component Design Bases Inspection
TI-182
- TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 10/15/2013 10/17/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Brunswick Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 07:41:19 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
- RP PUBLIC RADIATION SAFETY BASELINE 1, 2 01/27/2014 01/31/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/27/2014 01/31/2014 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 01/27/2014 01/31/2014 IP 71151 Performance Indicator Verification
- UNIT 1 IN-SERVICE INSPECTION
03/10/2014 03/14/2014 IP 7111108G Inservice Inspection Activities - BWR
- RAD HAZARDS ANALYSIS AND TRANSPORTATION 1, 2 03/10/2014 03/14/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/10/2014 03/14/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/10/2014 03/14/2014 IP 71151 Performance Indicator Verification
LR
- POST APPROVAL LR PHASE 2 1, 2 06/02/2014 06/06/2014 IP 71003 Post-Approval Site Inspection for License Renewal 1, 2 06/16/2014 06/20/2014 IP 71003 Post-Approval Site Inspection for License Renewal Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure