| issue date = 11/20/2013
| issue date = 11/20/2013
| title = IR 05000280-13-405, 05000281-13-405, on 10/24/2013, Surry Power Station - NRC Security Inspection
| title = IR 05000280-13-405, 05000281-13-405, on 10/24/2013, Surry Power Station - NRC Security Inspection
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:November 20, 2013
[[Issue date::November 20, 2013]]


Mr. DavidPresident and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
==SUBJECT:==
 
SURRY POWER STATION - NRC SECURITY INSPECTION REPORT 05000280/2013405 AND 05000281/2013405
SUBJECT:   SURRY POWER STATION - NRC SECURITY INSPECTION REPORT 05000280/2013405 AND 05000281/2013405


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
On October 24, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results that were discussed on October 24, 2013, with Mr. N. Martin and other members of your staff.
On October 24, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results that were discussed on October 24, 2013, with Mr. N. Martin and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings were identified during this inspection.
No findings were identified during this inspection.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from ADAMS.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS)
component of NRC's Agencywide Documents Access and Management System (ADAMS),
which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from ADAMS.


If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information -
If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -
Withhold from Public Disclosure under 10 CFR 2.390," in accordance with 10 CFR 2.390(d)(1),
Withhold from Public Disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1),
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,/RA/
Sincerely,
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37  
/RA/  
 
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety  
 
Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37  
 
Enclosure:
Inspection Report 05000280/2013405 and 05000281/2013405 w/Attachment: Supplementary Information (OUO)
 
cc: (See page 3)
 
ML13324A917 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRP/BR5 RI:PSB1 NSIR RII:DRS/PSB2
 
SIGNATURE BBD for JHW2 MFK1 JRC6 via e-mail FXS1 via e-mail BBD
 
NAME J. Wallo M. King J. Cherubini F. Sullivan B. Desai
 
DATE 11/ 19 /2013 11/ 20 /2013 11/ 18 /2013 11/ 18 /2013 11/ 20 /2013
 
E-MAIL COPY YES NO YES NO YES NO YES NO YES NO cc:
 
Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
 
Margaret A. Earle Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711


===Enclosure:===
Gregory S. Haynes Manager, Nuclear Protection Services Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315
Inspection Report 05000280/2013405    and 05000281/2013405   


===w/Attachment:===
Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, VA 23883-0315
Supplementary Information (OUO)
cc:  (See page 3)
}}
}}

Latest revision as of 02:00, 11 January 2025

IR 05000280-13-405, 05000281-13-405, on 10/24/2013, Surry Power Station - NRC Security Inspection
ML13324A917
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/20/2013
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Heacock D
Virginia Electric & Power Co (VEPCO)
Linda K. Gruhler 404-997-4633
References
IR 13-405
Download: ML13324A917 (4)


Text

November 20, 2013

SUBJECT:

SURRY POWER STATION - NRC SECURITY INSPECTION REPORT 05000280/2013405 AND 05000281/2013405

Dear Mr. Heacock:

On October 24, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results that were discussed on October 24, 2013, with Mr. N. Martin and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS)

component of NRC's Agencywide Documents Access and Management System (ADAMS),

which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from ADAMS.

If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -

Withhold from Public Disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1),

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety

Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37

Enclosure:

Inspection Report 05000280/2013405 and 05000281/2013405 w/Attachment: Supplementary Information (OUO)

cc: (See page 3)

ML13324A917 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRP/BR5 RI:PSB1 NSIR RII:DRS/PSB2

SIGNATURE BBD for JHW2 MFK1 JRC6 via e-mail FXS1 via e-mail BBD

NAME J. Wallo M. King J. Cherubini F. Sullivan B. Desai

DATE 11/ 19 /2013 11/ 20 /2013 11/ 18 /2013 11/ 18 /2013 11/ 20 /2013

E-MAIL COPY YES NO YES NO YES NO YES NO YES NO cc:

Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

Margaret A. Earle Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

Gregory S. Haynes Manager, Nuclear Protection Services Surry Power Station 5570 Hog Island Road Surry, VA 23883-0315

Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, VA 23883-0315