{{Adams
{{Adams
| number = ML13233A144
| number = ML14016A477
| issue date = 08/16/2013
| issue date = 01/16/2014
| title = Edwin I. Hatch, Units 1 and 2, Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC IR 05000321-13-009 and 05000366-13-009)
| title = IR 05000321-13-009, 05000366-13-009; 11/18-22/2013 and 12/2-6/2013; E.I. Hatch Nuclear Plant, Units 1 and 2; Fire Protection (Triennial)
| author name = King M F
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRS/EB2
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Madison D R
| addressee name = Vineyard D
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| docket = 05000321, 05000366
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = IR-13-009
| document report number = IR-13-009
| document type = Inspection Report Correspondence, Letter
| document type = Inspection Report, Letter
| page count = 13
| page count = 30
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 16, 2013
{{#Wiki_filter:January 16, 2014


Mr. Dennis Vice President
==SUBJECT:==
EDWIN I. HATCH NUCLEAR PLANT - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000321/2013009 AND 05000366/2013009 AND EXERCISE OF ENFORCEMENT DISCRETION


==Dear Mr. Vineyard:==
On December 6, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Edwin I. Hatch Nuclear Plant, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
The inspection examined activities conducted under your license as they related to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The team reviewed selected procedures and records, observed activities, and interviewed personnel.
The NRC inspectors did not identify any findings or violations of more than minor significance.
However, the enclosed report documents three noncompliances for which the NRC is exercising enforcement discretion in accordance with Section 9.1 of the NRC Enforcement Policy, Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48). The noncompliances are associated with your implementation of the requirements and standards of 10 CFR 50, Appendix R, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979. The non-compliances were identified by the NRC, and are violations of NRC requirements. The inspectors have screened the violations and determined that they warranted enforcement discretion per the Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues, and Section 11.05(b) of Inspection Manual Chapter 0305 Operating Reactor Assessment Program. You are not required to respond to this letter. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov./reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, RA
Scott M. Shaeffer, Chief Engineering Branch 2
Division of Reactor Safety
Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5
===Enclosures:===
Inspection Report 05000321/2013009, 05000366/2013009 w/Attachment: Supplementary Information
REGION II==
Docket Nos:
50-321, 50-366
License Nos.:
DPR-57, NPF-5
Report Nos.:
05000321/2013009 and 05000366/2013009
Licensee:
Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.


Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
Facility:
Edwin I. Hatch Nuclear Plant  
 
Location:
Baxley, GA 31513  
 
Dates:
November 18 - 22, 2013 (Week 1)
 
December 2 - 6, 2013 (Week 2)
 
Inspectors:
J. Montgomery, Reactor Inspector (Lead Inspector)
 
O. López, Senior Reactor Inspector


SUBJECT: EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 - NOTIFICATION OF CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT NOS. 05000321/2013009 AND 05000366/2013009)
M. Thomas, Senior Reactor Inspector


==Dear Mr. Madison:==
P. Braxton, Reactor Inspector  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct a triennial fire protection baseline inspection at E.I. Hatch Nuclear Plant, Units 1 and 2, in November and December 2013. The inspection team will be led by Mr. Jonathan Montgomery, a Reactor Inspector from the NRC Region II Office. The team will be composed of personnel from the NRC Region II Office. The inspection will be conducted in accordance with IP 71111.05T, the NRC's baseline fire protection inspection procedure, dated January 31, 2013.


On August 13, 2013, during a telephone conversation between Mr. Steve Tipps (Principal Licensing Engineer) of your staff, and Mr. Montgomery, our respective staffs confirmed arrangements for a three-day information gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as follows:
Accompanying
* Information Gathering Visit: October 22 - 24, 2013
* Week 1 of onsite inspection: November 18 - 22, 2013
* Week 2 of onsite inspection: December 2 - 6, 2013 The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the E.I. Hatch Nuclear Plant fire protection program, fire protection features, post-fire safe shutdown capabilities, plant layout, mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)
(2); and, as necessary, obtain plant specific site access training and badging for unescorted site access. An initial list of the documents the team will review during the conduct of the inspection is listed in Enclosures 1 and 2. The team leader will contact you with any additional specific document requests prior to the information gathering visit. During the information gathering visit, the team will also discuss the following inspection support administrative details: office space size and location; specific documents requested to be madeavailable to the team in their office spaces; arrangements for reactor site access (including radiation protection training, security, safety and fitness for duty requirements); and the availability of knowledgeable plant staff and licensing organization personnel to serve as points of contact during the inspection.


We request that during the on-site inspection weeks you ensure that copies of analyses, evaluations or documentation regarding the implementation and maintenance of the station fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review. Of specific interest for the fire protection portion of the inspection are those documents which establish that your fire protection program satisfies NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire protection compliance assessment documents). For the 10 CFR 50.54(hh) (2) portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest. Also, personnel should be available at the site during the inspection who are knowledgeable regarding those plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room, including the electrical aspects of the relevant post-fire safe shutdown analyses, reactor plant fire protection systems and features, and the station fire protection program and its implementation. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Personnel:


In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.hmtl (the Public Electronic Reading Room). Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspection team's information or logistical needs, please contact Mr. Jonathan Montgomery, the team leader, in the Region II Office at 404-997-4880 or me at 404-997-4511.
W. Monk, Reactor Inspector (Training)  


Sincerely,/RA/ Michael F. King, Chief Engineering Branch 2
Approved by:


Division of Reactor Safety  
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety  
 
=SUMMARY=
IR 05000321/2013-009, 05000366/2013-009; 11/18-22/2013 and 12/2-6/2013; E.I. Hatch
 
Nuclear Plant, Units 1 and 2; Fire Protection (Triennial).
 
This report covers an announced two-week triennial fire protection inspection by a team of four regional inspectors and one inspector in training. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process Rev. 4, dated December 2006.
 
No findings were identified.
 
=REPORT DETAILS=
 
==REACTOR SAFETY==
Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity
{{a|1R05}}
 
==1R05 Fire Protection==
This report documents the results of a triennial fire protection inspection of the E.I. Hatch Nuclear Plant (HNP) Units 1 and 2. The inspection was conducted in accordance with the guidance provided in NRC Inspection Procedure 71111.05T, Fire Protection (Triennial), dated January 31, 2013. The objective of the inspection was to review a minimum sample of three risk-significant fire areas (FAs) to evaluate implementation of the Hatch Fire Protection Program (FPP). An additional objective was to review site specific implementation of one mitigating strategy from Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security Compensatory Measures (commonly referred to as B.5.b), as well as the storage, maintenance, and testing of B.5.b mitigating equipment. The sample FAs were chosen based on a review of available risk information as analyzed by a senior reactor analyst from Region II, a review of previous inspection results, plant walkdowns of FAs, consideration of relational characteristics of combustible material to targets, and location of equipment needed to achieve and maintain safe shutdown (SSD) of the reactor. In selecting a B.5.b mitigating strategy sample, the team reviewed licensee submittal letters, safety evaluation reports (SERs), licensee commitments, B.5.b implementing procedures, and previous NRC inspection reports. Section 71111.05-05 of the IP specifies a minimum sample size of three FAs and one B.5.b mitigating strategy for addressing large fires and explosions. This inspection fulfilled the requirements of the procedure by selecting a sample of three FAs and one B.5.b mitigating strategy. The FAs chosen were identified as follows:
 
===1. Fire Zone 0024B, Computer Room===
===2. Fire Area 1017, East 600V Switchgear Room 1D===
===3. Fire Area 1020, East DC Switchgear Room 1B===
For each of the selected FAs, the team evaluated the licensees FPP against applicable NRC requirements and licensee design basis documents. Applicable licensing and design basis documents reviewed by the team are listed in the Attachment to this report.
 
===.01 Protection of Safe Shutdown Capabilities===
====a. Inspection Scope====
The team reviewed the licensees FPP referenced in the Unit 1 Updated Final Safety Analysis Report (UFSAR) Section 10.8; the licensees safe shutdown analysis report (SSAR); fire hazards analysis (FHA); plant procedures; piping and instrumentation drawings (P&IDs);electrical drawings; and other supporting documents. The team performed the review to verify that hot and cold shutdown could be achieved and maintained from the main control room (MCR) for postulated fires in FAs 1017 and 1020. The review included verification that shutdown from the MCR could be performed both with and without the availability of offsite power. The team performed in-plant inspections to verify that the plant configuration was consistent with that described in the FHA and SSAR. The team reviewed the licensees shutdown methodology to verify that it properly identified the components and systems necessary to achieve and maintain SSD conditions for postulated fires resulting in shutdown from the MCR. The team focused their inspection activities on systems specified in the SSAR for reactivity control, reactor coolant makeup, and decay heat removal, as well as process monitoring instrumentation and necessary support systems.
 
The team reviewed and performed a walkthrough of procedure steps used for post-fire SSD to ensure the technical and human factors adequacy of the procedures. The team verified the licensee personnel credited for performance of procedures were available in the event a fire occurred, had procedures available, and were trained on implementation. The team also verified that operators could reasonably be expected to perform the procedure actions in order to maintain plant parameters within specified limits. The team reviewed and walked down applicable sections of Abnormal Operating Procedure (AOP) 34AB-X43-001-1, Fire Procedure for Unit 1 FAs 1017 and 1020. The team reviewed operator actions to ensure these actions could be implemented in accordance with plant procedures in a manner necessary to support the SSD method for the applicable fire area.
 
====b. Findings====
No findings were identified.
 
===.02 Passive Fire Protection===
====a. Inspection Scope====
The team walked down the selected FAs and fire zone (FZ) to evaluate the adequacy of the fire resistance of walls, ceilings, and floors. This evaluation also included fire barrier concrete block walls, penetration seals, fire doors, and fire dampers to ensure that at least one train of SSD equipment would be maintained free of fire damage. Construction detail drawings and fire tests were reviewed as necessary. Where applicable, the team observed the installed barrier assemblies and compared the as-built configurations to the approved construction details. The team also reviewed supporting fire endurance test data; licensing basis commitments; and standard industry practices.
 
====b. Findings====
No findings were identified.
 
===.03 Active Fire Protection===
====a. Inspection Scope====
The team reviewed the redundancy of fire protection water sources and fire pumps to confirm they were installed in accordance with the National Fire Protection Association (NFPA) codes of record. The team performed in-plant observations of the material condition and operational lineup of the fire water pumps and fire protection water supply distribution piping, including manual fire hose and standpipe systems for the selected FAs/FZ. Using operating and valve cycle/alignment procedures, as well as engineering drawings, the team examined the electric motor-driven and the diesel-driven fire pumps and accessible portions of the fire main piping system to evaluate operational status, accuracy of as-built configurations, and to verify correct system valve lineups (i.e. position of valves).
 
The team compared the fire detection and fire suppression systems for the selected FAs/FZ to the applicable NFPA standard(s) by reviewing design documents; and observed the as-installed configurations of the systems during plant walkdowns. The team reviewed selected fire protection vendor equipment specifications, drawings, and engineering calculations to determine whether the fire detection and suppression methods were appropriate for the types of fire hazards that existed in the selected FAs/FZ. During plant walkdowns, the team observed the placement of the fire hose stations, fire extinguishers, fire hose nozzle types, and fire hose lengths, as designated in the firefighting pre-plan strategies, to verify they were not blocked, and that adequate reach and coverage was provided consistent with the firefighting strategies and FPP documents. The team reviewed completed periodic surveillance testing and maintenance program procedures for the fire detection and suppression systems and compared them to operability requirements, testing criteria, and compensatory measures. This review was to assess whether the test program was sufficient to validate proper operation of the fire detection and suppression systems in accordance with their design requirements.
 
Aspects of fire brigade readiness were reviewed, including, but not limited to, the fire brigades personal protective equipment, self-contained breathing apparatuses, portable communications equipment, and other fire brigade equipment to determine accessibility, material condition and operational readiness of equipment. During plant walkdowns, the team compared firefighting pre-plan strategies to existing plant layout and equipment configurations and to fire response procedures for the selected FAs/FZ. This was done to verify that firefighting pre-fire plan strategies and drawings were consistent with the fire protection features and potential fire conditions within the area and also to determine if appropriate information was provided to fire brigade members to facilitate suppression of an exposure fire that could impact the SSD strategy.
 
====b. Findings====
===1. Adequacy of Carbon Dioxide (CO2) Concentration in FZ 0024B===
=====Introduction:=====
The NRC identified a non-compliance of Hatch Renewed Operating License Conditions (OLCs) 2.C.(3) and 2.C.(3)(a), for Units 1 and 2 respectively, because the installed carbon dioxide (CO2) fire suppression system in the computer room (FZ 0024B) could not deliver the required gas concentration.
 
=====Description:=====
The computer room (FZ 0024B) CO2 gas suppression system was designed in accordance with NFPA 12, Carbon Dioxide Extinguishing Systems 1973. NFPA 12 required a minimum concentration of 50 percent to extinguish fires in dry electrical and wiring insulation hazards. The computer room contained dry electrical wiring insulation hazards in the form of cable insulation and computer/server components. The licensee could not show that 50 percent concentration could be met for the installed system configuration in the computer room.
 
The team identified the problem by calculating the initial CO2 concentration that would be achieved upon system activation. The team reviewed calculation SX11992, FP-LP CO2 Flow Calculation Cable Spreading Room; Section IV.C of the FHA; and procedure 52SV-FPX-010-0, Low Pressure CO2 System Surveillance, Version 3. Procedure 52SV-FPX-010-0 stated that the acceptable range for discharge time was between 3 minutes and 17 seconds and 3 minutes and 23 seconds. The team obtained the volume of the room, the required design concentration, expected CO2 loss due to leakage, and CO2 discharge rate in 2 minutes. Based on the room volume, including expected losses due to leakage, and expected flow rate, the team determined a discharge time of 3 minutes and 45 seconds would be required to reach the design concentration. Using the criteria in procedure 52SV-FPX-010-0, the team determined that the system would discharge approximately 88% of the required concentration.
 
As a result, the team determined that the time of discharge was not sufficient to release the needed concentration of CO2 in the room to adequately suppress a fire in that room. Since system discharge testing had not been performed, the problem went undetected until identified by the team. The licensee performed a preliminary calculation that confirmed the teams results, and entered the issue into the corrective action program (CAP) as Condition Report (CR) 736771. Additionally, the licensee determined that the current procedure did not address leakage out of the room to ensure that the required concentration was maintained.
 
The licensee implemented interim actions to ensure adequate CO2 concentration in the event of a fire in the computer room. The interim actions included increasing the minimum CO2 level in the associated tank to 70%; and revising procedure 34SO-Z43-002-2 to require an additional 60 seconds of discharge time.
 
=====Analysis:=====
The team determined that the licensees failure to implement design requirements for the CO2 system in the computer room was a performance deficiency. This performance deficiency was determined to be more than minor because it was associated with the reactor safety Mitigating Systems cornerstone attribute of protection against external factors (i.e. fire),and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.
 
Specifically, the discharge time for the fire suppression system in FZ 0024B was not sufficient to release the required CO2 concentration to adequately suppress a fire.
 
The finding was screened in accordance with NRC Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP), Attachment 4, Initial Characterization of Findings, which determined that an IMC 0609 Appendix F, Fire Protection Significance Determination Process, review was required because the finding affected fixed fire protection systems. Using the Fire Protection SDP Phase 1 Screening, the finding was assigned a category of Fixed Fire Protection Systems.


Docket Nos.: 50-321; 50-366 License No.: DPR-57, NPF-5
Using IMC 0609, Appendix F, Attachment 2, the finding was assigned a High degradation rating because the suppression system would not reach the designed concentration as required by NFPA 12. The team used step 1.4 Qualitative Screening Question Set for Seven Individual Categories, task 1.4.2 Fixed Fire Protection System of IMC 0609, Appendix F, Attachment 1 to determine the finding to be of very low safety significance (i.e., Green) because the finding affected only a manually actuated suppression system for an area that is accessible by the fire brigade.


===Enclosures:===
The team determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance.
1. Triennial Fire Protection Inspection Supporting Documentation 2. Mitigating Strategies Supporting Documentation


cc: Distribution via Listserv
=====Enforcement:=====
Hatch Renewed OLCs 2.C.(3) and 2.C.(3)(a), for Units 1 and 2 respectively, state, in part, that Southern Nuclear shall implement and maintain in effect all provisions of the fire protection program, which is referenced in the Updated Final Safety Analysis Report for the facility, as contained in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch Nuclear Plant, Units 1 and 2, which was originally submitted by letter dated July 22, 1986.


__ML13233A144_____________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME J. Montgomery M. King DATE 8/16 /2013 8/16 /2013 8/ /2013 8/ /2013 8/ /2013 8/ /2013 8/ /2013 E-MAIL COPY?
Section IV.C.5, Carbon Dioxide Suppression Systems, of Appendix D of the FHA states, in part, that the computer room design concentrations are in compliance with NFPA Standard No. 12, Section 2421, which requires a 50-percent concentration for "dry electrical, wiring insulation hazards in general". NFPA 12 states, in part, that an acceptable CO2 system deliver and hold a minimum gas concentration of 50 percent in the protected area.
YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure 1 Triennial Fire Protection Inspection Supporting Documentation The documents and information requested below should generally be made available to the inspection team during the on-site information gathering visit for the team's use both on-site and off-site during the inspection. Electronic format is the preferred media, except where specifically noted, if readily available (The preferred file format is searchable ".pdf" files). If electronic media is made available via an internet based remote document management system, then the remote document access must allow inspectors to download, save, and print the documents in the NRC's regional office. Electronic media on com pact disc or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the team's possession will not be retained.


Approximately three weeks before the on-site information gathering visit, the following documents should be made available to the team leader for review in the regional office:
Contrary to the above, the CO2 system design concentration in the computer room is not in compliance with the Hatch FHA, in that the CO2 system would not deliver and hold a minimum gas concentration of 50 percent in the protected area. The violation has existed since initial plant start-up. The licensee entered the deficiency in the CAP as CR 736771.


* Post-fire Safe Shutdown or Alternative Shutdown Analysis (request A.1)
Because the licensee committed to adopt NFPA 805 and change their fire protection licensing bases to comply with 10 CFR 50.48(c), the NRC is exercising enforcement and reactor oversight process (ROP) discretion for this issue in accordance with the NRC Enforcement Policy, Section 9.1, Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)and Inspection Manual Chapter 0305. Specifically, this issue was identified and will be addressed during the licensees transition to NFPA 805, was entered into the licensees corrective action program, immediate corrective action and compensatory measures were taken, was not likely to have been previously identified by routine licensee efforts, was not willful, and it was not associated with a finding of high safety significance (i.e., Red).
* Fire Hazards Analysis (request A.2)  
* Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)
Based on review of the above three documents, the team leader will identify a preliminary list of fire areas being considered for inspection prior to the on-site information gathering visit. During the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be determined.


This document request is based on typical documents that a generic plant might have. As such, this generic document request is not meant to imply that any specific plant is required to have all of the listed documents. It is recognized that some documents listed below may not be available for your plant. In addition, the document titles listed below are based on typical industry document names; your plant specific document titles may vary.
Failure to Meet Section IV.C, Fire Detection and Suppression of Appendix D of the Fire Hazards Analysis


A. DESIGN AND LICENSING BASIS DOCUMENTS
=====Introduction:=====
The NRC identified a non-compliance of Hatch OLCs 2.C.(3) and 2.C.(3)(a), for Units 1 and 2 respectively, for the failure to locate fire extinguishers in the cable spreading room (CSR) in accordance with NFPA 10 and for the failure to locate manual hose stations in or near the CSR, such that an effective hose stream could be directed to any area in the room.


A.1 Post-fire Safe Shutdown or Alternative Shutdown Analysis.
=====Description:=====
The FHA stated that the CSR (FZ 0024A) was equipped with a hose station and a fire extinguisher located in the adjacent room (FA 0025 mezzanine) for manual firefighting. The FHA stated that the area had mostly Class A (cable insulation) combustibles with a fire duration of greater than three hours. As a result, the licensee designated the CSR as having a high combustible loading. The FHA stated that manual firefighting equipment was fully adequate to extinguish the fire if the automatic suppression system failed.


A.2 Fire Hazards Analysis.
The requirements for manual firefighting capabilities were described in Section IV.C, Fire Detection and Suppression of Appendix D of the FHA. Section IV.C.6 required the licensee to provide portable fire extinguishers in the plant in accordance with NFPA 10, Standard for Portable Fire Extinguishers. For Class A hazards (such as cable insulation), NFPA 10 required fire extinguishers to be located such that the maximum travel distance to an extinguisher was 75 feet.


A.3 Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY), including:
The team identified that there were no fire extinguishers located in the CSR. The closest fire extinguisher to the CSR was located in an adjacent room (FA 0025 mezzanine). Based on the physical dimensions of the CSR, and physical obstructions in the room due to cable trays, the team determined that the travel distances from at least half of the CSR to the closest fire extinguisher exceeded the 75 foot maximum travel distance specified in NFPA 10.
* Results of any post-IPEEE reviews; and  
* LIST of actions taken or plant modifications performed in response to the IPEEE results. A.4 Fire Protection Program and/or Fire Protection PlanA.5 LIST of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown equipment list).


A.6 Fire Protection System Design Basis Document.
Section IV.C.3.d of Appendix D of the FHA required the licensee to provide manual hose stations throughout the plant to ensure that an effective hose stream could be directed to any area in the plant. The team observed that there was one hose station (HS-C20) inside the CSR and another hose station (HS-C21) in the adjacent room (FA 0025 mezzanine). However, the team noted that the licensee had deemed HS-C20 as not usable because cable trays blocked access to the hose. On July 20, 2011, the licensee implemented LDCR 2011-024 to remove the regulatory requirements for this hose station. Hose station HS-C21 was selected to serve the CSR. Additional fire hose was staged at HS-C21 to ensure that area wide coverage of the CSR was available with the fire hose stream. The team noted that the licensee did not consider physical obstructions presented in the room due to cable trays and the torturous path that responders would have to take to cover the entire CSR. Therefore, the team determined that the additional fire hose staged at HS-C21 was not sufficient to provide an effective hose stream to all areas in the CSR.


A.7 Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.
In response to these issues, the licensee initiated CR 740396 for the deficiency related to fire extinguisher placement; and CR 741521 for the deficiency related to the CSR fire hose coverage. The licensee also began evaluating potential locations in the CSR where fire extinguishers could be installed to facilitate firefighting efforts in the CSR.


A.8 LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of record).
=====Analysis:=====
The team determined that the licensees failure to locate fire extinguishers in the CSR, and failure to locate manual hose stations in or near the CSR such that an effective hose stream could be directed to any area in the room were performance deficiencies. The performance deficiencies were determined to be more than minor because they were associated with the reactor safety Mitigating Systems cornerstone attribute of protection against external factors (i.e. fire), and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiencies could adversely impact timely manual fire suppression capability of a fire.


2 A.9 LIST of deviations from NFPA codes of record.
The finding was screened in accordance with IMC 0609, Significance Determination Process (SDP), Attachment 4, Initial Characterization of Findings, which determined that an IMC 0609 Appendix F, Fire Protection Significance Determination Process, review was required because the finding affected manual firefighting. Using the Fire Protection SDP Phase 1 Screening, the finding was assigned a category of Manual Firefighting.


A.10 NFPA Compliance Review Report.
The team used step 1.3 Ability to Achieve Safe Shutdown, task 1.3.1 Screen Fire Finding for Ability to Achieve Safe Shutdown of IMC 0609, Appendix F, Attachment 1 to determine the finding to be of very low safety significance (i.e., Green) because the finding was assigned a low degradation rating. Using IMC 0609, Appendix F, Attachment 2, the finding was assigned a low degradation rating because the CSR was equipped with pre-action sprinkler system and fire detection that would alarm in the control room. Additionally, a hose station and fire extinguisher located outside the room would provide partial coverage for the CSR.


A.11 Report or evaluation that compares the fire protection program to the NRC Branch Technical Position (BTP) 9.5-1 Appendix A.
The team determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance.


A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are specifically listed in the facility operating license for the approved fire protection program.
=====Enforcement:=====
Hatch Renewed OLCs 2.C.(3) and 2.C.(3)(a), for Units 1 and 2 respectively, states, in part, that Southern Nuclear shall implement and maintain in effect all provisions of the fire protection program, which is referenced in the Updated Final Safety Analysis Report for the facility, as contained in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch Nuclear Plant, Units 1 and 2, which was originally submitted by letter dated July 22, 1986. Section IV.C, Fire Detection and Suppression of Appendix D of the FHA, contains requirements for the licensees manual suppression capability.


A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe shutdown or alternative shutdown features.
Contrary to the above, the licensee failed to meet the requirements of Section IV.C. of Appendix D of the FHA, with the following examples:


A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or alternative shutdown features.
===1. Section IV.C.3.d, Water Sprinkler and Hose Standpipe Systems, of Appendix D of the===
FHA states, in part, that manual hose stations are located throughout the plant. An effective hose stream can be directed to any area in the plant. Contrary to the above, the licensee failed to locate manual hose stations in or near the CSR such that an effective hose stream could be directed to any area of the CSR. This issue has existed since 2011, when the licensee completed a plant change to take credit for hose HS-C21 to combat a fire in the CSR.


A.15 Exemption requests submitted but not yet approved for plant fire protection and post-fire safe shutdown or alternative shutdown features.
===2. Section IV.C.6, Portable Extinguishers, of Appendix D of the FHA states that portable===
fire extinguishers are provided in the plant in accordance with NFPA 10. NFPA 10 (1975 Edition), requires that fire extinguishers serving Class A hazards (such as cable insulation) be located such that the maximum travel distance to extinguisher is 75 feet.


A.16 Facility Operating License (electronic format only).
Contrary to the above, the licensee failed to locate fire extinguishers in an area serving Class A hazards such that the maximum travel distance to an extinguisher was not greater than 75 feet. Specifically, the licensee failed to locate portable fire extinguishers in the CSR, which contained Class A hazards such as cable insulation. This issue has existed since initial plant startup.


A.17 Technical Specifications (electronic format only).
Because the licensee committed to adopt NFPA 805 and change their fire protection licensing bases to comply with 10 CFR 50.48(c), the NRC is exercising enforcement and reactor oversight process (ROP) discretion for this issue in accordance with the NRC Enforcement Policy, Section 9.1, Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)and Inspection Manual Chapter 0305. Specifically, this issue was identified and will be addressed during the licensees transition to NFPA 805, was entered into the licensees corrective action program, immediate corrective action and compensatory measures were taken, was not likely to have been previously identified by routine licensee efforts, was not willful, and it was not associated with a finding of high safety significance (i.e., Red).


A.18 Technical Requirements Manual (electronic format only).
04.


A.19 Updated Final Safety Analysis Report (electronic format only).
Protection From Damage From Fire Suppression Activities


B. GENERAL PLANT DESIGN DOCUMENTS B.1 Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe shutdown or alternative shutdown system s (C-size paper drawings and electronic copy).
====a. Inspection Scope====
The team evaluated whether water-based manual firefighting activities could adversely affect equipment credited for SSD, inhibit access to alternate shutdown equipment, or adversely affect local operator manual actions (OMAs) required for SSD in the selected FAs/FZ. The team reviewed available documentation related to flooding analysis from fire protection activities, being sensitive to potential flooding through unsealed concrete floor cracks.


B.2 P&IDs and legend list for fire protection systems, including fire water supply, water suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings and electronic copy).
The team reviewed firefighting pre-plan strategies; fire brigade training procedures; fire damper locations; heating, ventilation and air conditioning (HVAC) drawings; and fire response procedures to verify that inter-area migration of ventilation of gaseous heat and smoke was addressed, and access to SSD equipment and OMAs would not be inhibited by smoke migration from the affected fire area to adjacent plant areas used to accomplish SSD.


B.3 AC and DC electrical system single line di agrams, from off-site power down to the highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings and electronic copy ). B.4 Single line diagrams for motor control centers (MCCs) that supply post-fire safe shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper drawings and electronic copy ).  
====b. Findings====
No findings were identified.


B.5 Equipment location drawings which identify the physical plant locations of post-fire safe shutdown or alternative shutdown equipment (C-size paper drawings and electronic copy).
===.05 Alternative Shutdown Capability===
====a. Inspection Scope====
Methodology


B.6 Plant layout drawings which identify: (C-size paper drawings and electronic copy)
The team reviewed the licensees FPP referenced in Unit 1 UFSAR Section 10.8, the FHA, SSAR, plant procedures, P&IDs, electrical drawings, and other supporting documents for postulated fires in FZ 0024B. The team performed the review to ensure that the required functions for post-fire SSD, and the corresponding equipment necessary to perform those functions, were included in the procedures. The team assessed whether transfer of control from the MCR to the remote shutdown panel (RSDP), as well as hot and cold shutdown from outside the MCR, could be successfully accomplished. The review included verification that shutdown from outside the MCR could be performed both with and without the availability of offsite power.
3 * Plant fire area boundaries;
* Combustible control zone drawings;
* Areas protected by automatic fire suppression and detection; and  
* Locations of fire protection equipment.


C. CLASSICAL FIRE PROTECTION
The team performed in-plant inspections to verify that the plant configuration was consistent with that described in the SSAR. The team focused their inspection activities on systems specified in the SSAR for reactivity control, reactor coolant makeup, and decay heat removal, as well as process monitoring instrumentation and necessary support systems.


C.1 Fire protection program implementing procedures (e.g., administrative controls, surveillance testing, fire brigade).
Operational Implementation


C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire protection system, including the fire water system.
The team reviewed shift attendance records to verify that personnel required to accomplish SSD, exclusive of those assigned as fire brigade members, were available. The team also verified that licensee personnel had adequate SSD procedures and were trained on implementation. The team reviewed training lesson plans, job performance measures, and simulator scenarios for licensed and non-licensed operators to verify that the training included the shutdown methodology of the SSAR and the SSD procedures required to be used for a fire in FZ 0024B.


C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire areas. C.4 Last two completed surveillance's records of fire protection features in the selected fire areas (detection, suppression, damper inspections, damper tests, penetration inspections, barrier inspections, etc.).  
The team reviewed and walked down selected applicable steps of AOP 34AB-X43-001-1, Abnormal Operating Procedure, Fire Procedure and remote shutdown procedure 31RS-OPS-001-1, Shutdown From Outside Control Room, in order to assess technical and human factors adequacy of the procedures. The team also verified that operators could reasonably be expected to perform the procedure actions in order to maintain plant parameters within specified limits. The team reviewed periodic test procedures and test records of alternate shutdown transfer capability and instrumentation and control functions, to ensure that the tests were adequate to verify the functionality of alternative shutdown capability.


C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps, including pump controllers and batteries.
====b. Findings====
No findings were identified.


C.6 Last two completed annual fire pump pressure and flow tests.
===.06 Circuit Analyses===
====a. Inspection Scope====
This segment was suspended for plants that have been in transition to NFPA 805 for less than 3 years because a more detailed review of cable routing and circuit analysis will be conducted as part of the FPP transition to NFPA 805.


C.7 Last two completed monthly and/or quarterly fire pump tests.
====b. Findings====
No findings were identified.


C.8 Last two completed fire loop flow tests and loop flushes.
===.07 Communications===
====a. Inspection Scope====
The team reviewed the communication capabilities required to support plant personnel in the performance of OMAs to achieve and maintain SSD, as credited in the Hatch FPP. The team performed plant walkdowns with the licensees operations staff to assess the credited method of communications used to complete SSD actions as specified in post-fire SSD procedures for the selected FAs/FZ. The team assessed the operators ability to communicate by observing the performance of radio checks from applicable control locations by licensee operations personnel.


C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate concentrations and soak or hold times can be achieved (only for selected fire areas).
The team assessed if communications were possible, given the background noise from plant equipment, to determine if this would deter the operators ability to implement the response strategy within the time required by the plant feasibility analysis. The team also verified that portable radio communications, sound powered phones and fixed emergency communication systems were available, operable, and adequate for the performance of designated activities to support fire event notification and fire brigade firefighting activities. The team reviewed preventive maintenance and surveillance test records and vendor manuals to verify that the communication equipment was being properly maintained and tested.


C.10 Last five hot work permits (at power).
====b. Findings====
No findings were identified.


C.11 Last five transient combustible permits (at power).
===.08 Emergency Lighting===
====a. Inspection Scope====
The team reviewed maintenance and design aspects of the fixed 8-hour battery pack emergency lighting units (ELUs) required by 10 CFR 50 Appendix R, Section III.J, and the Hatch approved FPP. The team performed plant walkdowns of the post-fire SSD procedures for the selected FAs/FZ to observe the placement and coverage area of the ELUs required to illuminate operator access and egress pathways, and any equipment requiring local operation and/or instrumentation monitoring for post-fire SSD. In some instances, operations personnel performed onsite tests of the ELUs to verify operation. The team also reviewed completed surveillances, system health reports, and maintenance tests to verify that adequate surveillance testing was in place. The manufacturers information and vendor manuals for the fixed and portable 8-hour battery pack ELUs were reviewed to verify that the battery power supplies were rated with at least an 8-hour capacity, and that the ELUs were being stored and maintained in accordance with vendor guidance.


C.12 For Fire Brigade Drills, provide the following:
====b. Findings====
* Last drill critique for a drill with off-site fire department support;
No findings were identified.
* Summary of any unsatisfactory drill performance items for last three years; and
* Last unannounced drill critique by a qualified individual independent of the licensee's staff.


C.13 For fire brigade equipment provide the following:
===.09 Cold Shutdown Repairs===
* Procedure for inventory and inspection; and
====a. Inspection Scope====
* Most recent inspection and inventory results.
The team reviewed the licensees FHA and SSAR to verify that the licensee had evaluated the need for cold shutdown repairs. The team determined from the review that the licensee did not take credit for repairs to cold shutdown components in order to achieve cold shutdown.


C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained breathing apparatus (SCBA) and training lesson plans.
====b. Findings====
No findings were identified.


4 C.15 Electronic copy of the mutual aid agreement for the "first-due" local fire department that is currently in effect.
===.10 Compensatory Measures===
====a. Inspection Scope====
: (1) Compensatory Measures for Degraded Fire Protection Components


C.16 Flooding analysis for selected fire areas which demonstrates:
The team reviewed the administrative controls for out-of-service, degraded and/or inoperable fire protection features (e.g. detection and suppression systems and passive fire barriers) to verify that short-term compensatory measures adequately compensated for the degraded function or feature until appropriate corrective actions could be taken.
* a fire water pipe break in the selected fire areas, won't affect safe shutdown (SSD) capability for equipment in the selected fire areas;
: (2) Operator Manual Actions as Compensatory Measures for Safe Shutdown
* a fire water pipe break in an adjacent fire area, won't affect SSD capability for equipment in the selected fire areas;
* hydrostatic rating of any floor penetration seals installed within the fire areas that are credited with keeping water from leaking into fire areas below.


C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.
The team reviewed the SSAR, FHA, and applicable AOPs, to determine if the licensees SSD methodology credited OMAs outside the MCR as compensatory measures for SSD, for postulated fires in Unit 1 FAs 1017 and 1020, and Unit 2 FA 2203.


C.18 For Emergency Lighting Units (ELU), provide the following:
====b. Findings====
* LIST of Preventive Maintenance tasks, frequencies, and bases;
No findings were identified.
* Most recently performed monthly or quarterly functional test;
* Most recently performed battery discharge performance test; if applicable
* ELU battery loading analysis;
* vendor manual(s);
* results of black-out testing (if performed);
* Maintenance Rule program information related to the ELU, if applicable; and
* Compensatory measures taken when ELU are out of service.


C.19 Impairment Log (for period of 3 months before the start of inspection), for fire protection features that are out of service.
===.11 Review and Documentation of Fire Protection Program Changes===
====a. Inspection Scope====
The team reviewed a sample of FPP changes made between August 2010 and December 2013 to assess the licensees effectiveness of the FPP change process, and to determine if the changes to the FPP were in accordance with the fire protection license condition and had no adverse effect on the ability to achieve SSD. The team also reviewed additional FPP changes to support review of LER 2013-004-01.


C.20 LIST of Fire Protection screening reviews since the last inspection for recent design changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10 review that screened out).
====b. Findings====
=====Introduction:=====
The NRC identified a non-compliance of Hatch Unit 2 Renewed OLC 2.C.(3)(a),
Fire Protection, for making a change to the FPP that adversely affected the licensees ability to achieve and maintain safe shutdown. Specifically, the licensee removed the installed Unit 2 RSDP halon suppression system that was required to meet an approved exemption. The licensee failed to submit the FPP change to the NRC for review and approval prior to implementing the modification, which impacted the ability of the NRC to perform its regulatory oversight function.


C.21 LIST of fire protection system design changes completed in the last three years (including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).
=====Description:=====
In an SER dated April 18, 1984, the NRC allowed an exemption request from 10 CFR 50, Appendix R, Section III.G.2 for the Unit 2 Reactor Building elevation 130. In this SER, the NRC documented that the licensee committed to several modifications, which included the installation of an automatic halon fire suppression system for the Unit 2 RSDP. The halon suppression system would limit the consequences of a fire internal to the RSDP. The NRC concluded that the existing fire protection measures, with the proposed modifications, would achieve a level of safety equivalent to that provided by 10 CFR 50, Appendix R, Section III.G.2.


C.22 LIST of penetration seal work, re-work, or installation activities, in the last three years.
During a plant walkdown of FA 2203 to support the review of LER 2013-004, the team noted that the halon suppression system had been abandoned in place. Discussions with the licensee revealed that the system had been abandoned since 1999. Additionally, in 2006, the licensee initiated a design change (DCP 2009001901) to completely remove the halon system, along with its associated piping and support, from the Unit 2 RSDP.


C.23 LIST of fire wrap work, re-work, or installation activities, in the last three years.
The team noted that the licensees FPP is based on the defense-in-depth concept, and that this approach includes promptly detecting and extinguishing fires that occur. The condition of not having the committed suppression system was a degradation of the defense-in-depth concept.


C.24 Fire protection system health repor ts for the two most recent years.
Specifically, the lack of a suppression system would adversely affect the ability to control and promptly extinguish a fire. The licensee entered the deficiency into their CAP as CR 736483.


C.25 Fire protection program health report for the two most recent years.
An hourly fire watch was already in place for the affected FA, because of LER 2013-004.


C.26 Emergency lighting system health reports for the two most recent years.
=====Analysis:=====
The team determined that the failure to obtain NRC approval prior to making a change to the FPP that was adverse to safe shutdown was a performance deficiency. This performance deficiency was determined to be more than minor because it was associated with the reactor safety Mitigating Systems cornerstone attribute of protection against external factors (i.e. fire), and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.


C.27 Licensee evaluation of industry operating experience, related to the Fire Protection Program for the three most recent years.
Specifically, the licensee removed the halon suppression system for the RSDP, which degraded the ability to suppress a fire that originated in the panel.


5 D. ELECTRICAL D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
The finding was screened in accordance with IMC 0609, Significance Determination Process (SDP), Attachment 4, Initial Characterization of Findings, dated June 19, 2012, which determined that an IMC 0609 Appendix F, Fire Protection Significance Determination Process review was required because the finding affected fixed fire protection systems. Using the Fire Protection SDP Phase 1 Screening, the finding was assigned a category of Fixed Fire Protection Systems.


areas.
The team used step 1.3 Ability to Achieve Safe Shutdown, task 1.3.1 Screen Fire Finding for Ability to Achieve Safe Shutdown, of IMC 0609, Appendix F, Attachment 1 to determine the finding to be of very low safety significance (i.e., Green) because the reactor would have been able to reach and maintain safe shutdown conditions. The reactor would be able to reach and maintain safe shutdown conditions because photoelectric detectors were installed inside the RSDP and linear heat detection was installed along the sides of the cable raceways located directly above the RSDP. The installed detectors would aid in preventing the growth and spread of a fire by allowing sufficient time for the fire brigade to intervene.


D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative shutdown equipment (only for selected fire areas).
The team determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance.


D.3 Administrative or configuration control procedures that govern fuse replacement (e.g., fuse control procedures).
Additionally, the licensees failure to submit the adverse FPP change to the NRC for review was screened under the traditional enforcement criteria, because it impacted the ability of the NRC to perform its regulatory oversight function. In accordance with Section 6.1.d.2 of the NRC Enforcement Policy, this violation was characterized as Severity Level IV because the resulting changes were evaluated by the SDP as having very low safety significance (Green).


D.4 Maintenance procedures that verify breaker over-current trip settings to ensure coordination remains functional, for post-fire safe shutdown or alternative shutdown equipment.
=====Enforcement:=====
Hatch Unit 2 Renewed OLC 2.C.(3)(a) states, in part, that the licensee may make changes to the fire protection program without prior Commission approval only if the changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. This license condition also states that the Hatch Fire Protection Program is referenced in the Updated Final Safety Analysis Report for the facility, as contained in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch Nuclear Plant Units 1 and 2, which was originally submitted by letter from GPC to the Commission dated July 22, 1986.


D.5 Electrical system health reports for the two most recent years.
Contrary to the above the licensee made a change to the FPP, without prior Commission approval, that adversely affected the ability to achieve and maintain SSD in the event of a fire.


D.6 Last completed preventive maintenance of those components as tested from the safe shutdown or alternative shutdown panel.
Specifically the licensee completed a 10 CFR 50.59 evaluation that erroneously concluded that the halon suppression system installed for the RSDP was not required to meet Appendix R requirements and, therefore, could be removed without prior Commission approval. The removal of the halon suppression system degraded the ability to suppress a fire and challenged the ability to achieve and maintain SSD in the event of a fire.


D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by inspector (C-size paper drawings and electronic copy).
Because the licensee committed to adopt NFPA 805 and change their fire protection licensing bases to comply with 10 CFR 50.48(c), the NRC is exercising enforcement and reactor oversight process (ROP) discretion for this issue in accordance with the NRC Enforcement Policy, Section 9.1, Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48),and Inspection Manual Chapter 0305. Specifically, this issue was identified and will be addressed during the licensees transition to NFPA 805, was entered into the licensees corrective action program, immediate corrective action and compensatory measures were taken, was not likely to have been previously identified by routine licensee efforts, was not willful, and it was not associated with a finding of high safety significance (i.e., Red).


D.8 Cable routing for components and equipment credited for post-fire safe shutdown or alternative shutdown (only for selected fire areas).
===.12 Control of Combustibles and Ignition Sources===
====a. Inspection Scope====
The team conducted tours of numerous plant areas that were important to reactor safety, including the selected FAs/FZ, to verify the licensees implementation of FPP requirements as described in the FHA and administrative procedure 31GO-OPS-026-0, Use, Control, and Storage of Flammable/Combustible Materials. For the selected FAs/FZ, the team evaluated generic fire protection training; fire event history; the potential for fires or explosions; the combustible fire load characteristics; and, the potential exposure fire severity to verify that adequate controls were in place to maintain general housekeeping consistent with the FPP, administrative procedures, and other FPP procedures. There were no hot work activities ongoing within the selected fire areas during the inspection and observation of this activity could not be performed.


D.9 LIST of post-fire safe shutdown or alternative shutdown design changes completed, since the last inspection.
====b. Findings====
No findings were identified.


E. SPURIOUS FIRE INDUCED CIRCUIT FAULTS
===.13 B.5.b Inspection Activities===
====a. Inspection Scope====
The team reviewed, on a sample basis, the licensees mitigation measures for reactor pressure vessel depressurization and injection for large fires and explosions to verify that the measures were feasible, personnel were trained to implement the measures, and equipment was properly staged and maintained. The team reviewed surveillance testing records to verify that required equipment was adequately maintained. Through discussions with plant staff, review of documentation, and plant walkdowns, the team verified the engineering basis to establish reasonable assurance that the makeup capability could be provided using the specified equipment and water sources. The team reviewed the licensees capability to provide a reliable and available water source and the ability to provide the minimum fuel supply. The team reviewed inventory records and performed a walkdown of the storage and staging areas for the B.5.b equipment to verify that equipment identified for use in the procedures was available and maintained. The team conducted an independent audit and inventory of required equipment and a visual inspection of the dedicated credited power and water source. The team reviewed training records to verify that operations and security personnel training/familiarity with the strategy objectives and implementing guidelines were accomplished according to the established training procedures.


E.1 LIST of identified fire induced circuit failure configurations (only for selected fire areas). E.2 Multiple Spurious Operation (MSO) Expert Panel Report.
====b. Findings====
No findings were identified.


E.3 Corrective actions for fire-induced circuit failures, both single and multiple spurious actuations for the selected fire areas.
==OTHER ACTIVITIES==
{{a|4OA2}}


F. OPERATIONS
==4OA2 Problem Identification and Resolution==
====a. Inspection Scope====
The team reviewed recent independent licensee audits, self-assessments, and system/program health report for thoroughness, completeness and conformance to FPP requirements. The team also reviewed CAP documents, including completed corrective actions documented in selected CRs, and operating experience program documents, to ascertain whether industry identified fire protection issues (actual or potential) affecting HNP were appropriately entered into the CAP for resolution. Items included in the operating experience program effectiveness review were NRC Information Notices, Regulatory Issue Summaries, industry or vendor generated reports of defects and non-compliances submitted pursuant to 10 CFR Part 21, and vendor information letters. The team evaluated the effectiveness of the corrective actions for the identified issues. The documents reviewed are listed in the Attachment.


F.1 LIST of calculations and engineering analyses, studies, or evaluations for the safe shutdown or alternative shutdown methodology.
====b. Findings====
No findings were identified.


F.2 LIST of licensed operator Job Performance Measures (JPMs) for operator manual actions required by post-fire safe shutdown or alternative shutdown.
{{a|4OA3}}


6 F.3 LIST of non-licensed operator training associated with post-fire safe shutdown or alternative shutdown manual actions which would be performed by a non-licensed operator (including JPMs, in-field training walkdowns, simulations, or initial qualification).
==4OA3 Follow-up of Events==
(Discussed) Licensee Event Report (LER) 50-366/2013-004-01, Postulated Inter-cable Fault Vulnerability for RHR Shutdown Cooling Isolation Valves During A Postulated Fire Event Results in Unanalyzed Condition


F.4 LIST of lesson plans for post-fire safe shutdown or alternative shutdown training for licensed and non-licensed operators.
The licensee described a condition in Revision 0 of the subject LER (dated October 8, 2013)where, during a postulated fire scenario for Unit 2 FA 2203F, an inter-cable hot short could occur on the control cables for two RHR shutdown cooling isolation valves, causing the valves to spuriously open while at rated power. The valves spuriously opening at rated power could result in an inter-system loss of coolant accident. The vulnerability was identified in August 2013 during circuit analysis that considered inter-cable shorts as a plausible vector in the SSA for some high/low pressure interface components. Originally, Hatchs FHA and SSAR limited the circuit analysis to intra-cable hot shorts (conductors within the cable), but did not consider inter-cable hot shorts (conductors within co-located cables in the same tray). Additionally, the FHA and the SSAR stated, in part, that hot shorts between conductors of different cables need not be postulated.


F.5 For operator manual actions (OMAs) provide the following:
Upon discovering this condition, the licensee took immediate corrective actions that included establishing hourly fire watches, and de-energizing both valves in the closed position to remove the vulnerability. The licensee concluded that the vulnerability did not exist for the corresponding Unit 1 set of valves. Revision 1 of the LER (dated November 14, 2013) stated, upon further evaluation, the cause of the event was attributed to the ineffective monitoring and follow-up of regulatory activities/guidance (Regulatory Guide 1.189 and Nuclear Energy Institute 00-01) involving inter-cable hot shorts in identifying the vulnerability associated with the RHR isolation valves. This LER remains open pending further NRC review.
* Manual Action Feasibility Study;
* Operator Time Critical Action Program;
* Time lines for time-critical OMAs; and  
* Time line validations.


* Environmental and habitability evaluations for post-fire operator manual actions (temperature, smoke, humidity, SCBAs, etc.).
{{a|4OA6}}
F.6 Thermal hydraulic calculation or analysis that determines the time requirements for time-critical manual operator actions.


F.7 Operating procedures for post-fire safe shutdown from the control room with a postulated fire in the selected fire areas.
==4OA6 Meetings, Including Exit==
On December 6, 2013, the lead inspector presented the preliminary inspection results to Mr.


F.8 Operating procedures for post-fire safe shutdown or alternative shutdown from outside the control room.
David Vineyard and other members of the licensees staff, who acknowledged the results.


F.9 For safe shutdown equipment and tools, provide the following:
Following completion of additional reviews in the Region II office, a conference call was held with Mr. Steve Tipps on January 16, 2014, to provide an update on changes to the preliminary inspection findings. The licensee acknowledged the findings. Proprietary information is not included in this inspection report.


* Procedure for inventory and inspection; and
ATTACHMENT:
* Most recent inspection and inventory results.


F.10 LIST of procedures that implement Cold Shutdown Repairs.
=SUPPLEMENTARY INFORMATION=


F.11 For Cold Shutdown Repairs, provide the following:  
==KEY POINTS OF CONTACT==
* Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
===Licensee Personnel===
* Most recent inspection and inventory results.
: [[contact::S. Beverly]], Licensing Engineer
: [[contact::P. Burns]], Fire Protection Engineer, SNC Corporate
: [[contact::M. Dean]], Maintenance
: [[contact::D. Edenfield]], PRA Engineer
: [[contact::J. Gardner]], Fire Marshall
: [[contact::J. Lattner]], Principal Fire Protection Engineer, SNC Corporate
: [[contact::J. Moser]], Fire Brigade Instructor
: [[contact::D. Patel]], Component Supervisor
: [[contact::M. Sykes]], Fire Protection Engineer, SNC Corporate
: [[contact::S. Tipps]], Licensing Supervisor
: [[contact::D. Vineyard]], Site Vice President
: [[contact::J. Whitt]], Fire Protection Engineer, SNC Corporate
: [[contact::J. Yurkosky]], Fire Protection Engineer


F.12 Calculation or analysis that demonstrates pressurizer level will remain within the indicating range for a PWR, or reactor water level will remain above the top of active fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance with the requirements of 10 CFR 50 Appendix R III.L performance goals.
===NRC Personnel===
: [[contact::D. Hardage]], Resident Inspector
: [[contact::E. Morris]], Senior Resident Inspector
: [[contact::S. Shaeffer]], Chief, Engineering Branch 2, DRS, Region II


F.13 For Radio communications, provide the following:  
==LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED==
===Discussed===
: 05000366/2013-004-01 LER Postulated Inter-cable Fault Vulnerability for RHR Shutdown Cooling Isolation Valves During A Postulated Fire Event Results in Unanalyzed Condition (Section 4OA3)


* Communications Plan for firefighting and post-fire safe shutdown manual actions;
LIST OF FIRE BARRIER FEATURES INSPECTED (Refer Report Section 1RO5.02-Passive Fire Barriers)
* Repeater locations;
* Cable routing for repeater power supply cables;
* Radio coverage test results; and
* Radio Dead Spot locations in the plant.


7 F.14 NRC approved exemption requests for operator manual actions for 10 CFR 50 Appendix R III.G.2 fire areas.
Fire Barriers Floors/Walls/Ceiling Identification Description


F.15 Exemption requests submitted but not yet approved, for operator manual actions for 10 CFR 50 Appendix R III.G.2 fire areas.
1Z43-H007D


G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
FA 1017 to FZ 0014N 1Z43-H004D


G.1 Corrective actions for fire-induced circui t failures (including but not limited to NRC IN 92-18), both single and multiple spurious actuations (only for selected fire areas).
FA 1017 to FA 1104 1Z43-H810D


G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown operator manual actions.
FA 1017 to FA 1020 1Z43-H010D


G.3 Internal and external self assessments, peer assessments, and audits of fire protection activities for the last three years.
FA 1020 to FA 1104 1Z43-H012D


G.4 Internal and external self assessments, peer assessments, and audits of post-fire safe shutdown or alternative shutdown capabilities for the last three years.
FA 1020 to FZ 0014N 1Z43-H063F


G.5 LIST of condition reports for the fire protection system for the last three years.
FZ 0024B to FA 0025 1Z43-H062F


G.6 LIST of condition reports for emergency lighting units for the last three years.
FZ 0024B to FA 0025 1Z43-H064F


G.7 LIST of condition reports for post-fire safe shutdown (SSD) or alternative shutdown (ASD) issues for the last three years. This includes issues affecting the SSD or ASD analysis, fire hazards analysis, SSD or ASD operating procedures and/or training, timeline evaluations for operator actions, and supporting engineering evaluations, analysis, or calculations.
FZ 0024B to FA 0025 1X43-H522D


G.8 LIST of all Generic Letter 86-10 evaluations.
Fire Pump House 1X43-H521D


G.9 Copy of all Generic Letter 86-10 evaluations performed in the last three years.
Fire Pump House


G.10 All fire loading calculations and evaluations performed (only for selected fire areas and their adjacent fire areas).
Fire Door Identification


Enclosure 2 Mitigating Strategies Supporting Documentation H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
Description


H.1 LIST of all changes to regulatory commitments made to meet the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
1L48C31


H.2 LIST of procedures and guidelines that were revised or generated to implement the mitigating strategies. These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.
FA 1017 to FZ 0014N 1L48C29


H.3 A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline," issued December 2006, and the site-specific procedures or guidelines that are used to implement each strategy.
FA 1020 to FZ 0014N 1L48D214


H.4 LIST of engineering evaluations or calculations that were used to verify the engineering bases for the mitigating strategies.
Fire Pump House 1L48D215


H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow diagrams for systems relied upon in the mitigating strategies. These could be the type used for training. (C-size paper drawings and electronic copy)
Fire Pump House
H.6 LIST of modification packages or summary descriptions of modifications with simplified drawings, for necessary facility changes to implement the mitigating strategies.


H.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies.
Fire Damper Identification


H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies, provide the following:
Description
* Procedures for inventory, testing, and inspection; and
* Most recent inspection, inventory, and testing results.


* Copies of the last two completed performance tests, surveillances, and preventative maintenance performed on the pumps, including the pump controllers and batteries.
1Z41-FD-F071


H.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that differ from that documented in the submittals or the safety evaluation report.
FZ 0024B to FA 0025 1Z41-FD-F064


2 H.10 Site general arrangement drawings that show the majority of buildings and areas referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic
FA 1017 to FA 1020


copy). H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
==LIST OF DOCUMENTS REVIEWED==


H.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments) required to implement any mitigating strategies.
}}
}}

Latest revision as of 23:52, 10 January 2025

IR 05000321-13-009, 05000366-13-009; 11/18-22/2013 and 12/2-6/2013; E.I. Hatch Nuclear Plant, Units 1 and 2; Fire Protection (Triennial)
ML14016A477
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/16/2014
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Vineyard D
Southern Nuclear Operating Co
References
IR-13-009
Download: ML14016A477 (30)


Text

January 16, 2014

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000321/2013009 AND 05000366/2013009 AND EXERCISE OF ENFORCEMENT DISCRETION

Dear Mr. Vineyard:

On December 6, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Edwin I. Hatch Nuclear Plant, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

The inspection examined activities conducted under your license as they related to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The team reviewed selected procedures and records, observed activities, and interviewed personnel.

The NRC inspectors did not identify any findings or violations of more than minor significance.

However, the enclosed report documents three noncompliances for which the NRC is exercising enforcement discretion in accordance with Section 9.1 of the NRC Enforcement Policy, Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48). The noncompliances are associated with your implementation of the requirements and standards of 10 CFR 50, Appendix R, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979. The non-compliances were identified by the NRC, and are violations of NRC requirements. The inspectors have screened the violations and determined that they warranted enforcement discretion per the Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues, and Section 11.05(b) of Inspection Manual Chapter 0305 Operating Reactor Assessment Program. You are not required to respond to this letter. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov./reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, RA

Scott M. Shaeffer, Chief Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5

Enclosures:

Inspection Report 05000321/2013009, 05000366/2013009 w/Attachment: Supplementary Information

REGION II==

Docket Nos:

50-321, 50-366

License Nos.:

DPR-57, NPF-5

Report Nos.:

05000321/2013009 and 05000366/2013009

Licensee:

Southern Nuclear Operating Company, Inc.

Facility:

Edwin I. Hatch Nuclear Plant

Location:

Baxley, GA 31513

Dates:

November 18 - 22, 2013 (Week 1)

December 2 - 6, 2013 (Week 2)

Inspectors:

J. Montgomery, Reactor Inspector (Lead Inspector)

O. López, Senior Reactor Inspector

M. Thomas, Senior Reactor Inspector

P. Braxton, Reactor Inspector

Accompanying

Personnel:

W. Monk, Reactor Inspector (Training)

Approved by:

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

SUMMARY

IR 05000321/2013-009, 05000366/2013-009; 11/18-22/2013 and 12/2-6/2013; E.I. Hatch

Nuclear Plant, Units 1 and 2; Fire Protection (Triennial).

This report covers an announced two-week triennial fire protection inspection by a team of four regional inspectors and one inspector in training. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process Rev. 4, dated December 2006.

No findings were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity

1R05 Fire Protection

This report documents the results of a triennial fire protection inspection of the E.I. Hatch Nuclear Plant (HNP) Units 1 and 2. The inspection was conducted in accordance with the guidance provided in NRC Inspection Procedure 71111.05T, Fire Protection (Triennial), dated January 31, 2013. The objective of the inspection was to review a minimum sample of three risk-significant fire areas (FAs) to evaluate implementation of the Hatch Fire Protection Program (FPP). An additional objective was to review site specific implementation of one mitigating strategy from Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security Compensatory Measures (commonly referred to as B.5.b), as well as the storage, maintenance, and testing of B.5.b mitigating equipment. The sample FAs were chosen based on a review of available risk information as analyzed by a senior reactor analyst from Region II, a review of previous inspection results, plant walkdowns of FAs, consideration of relational characteristics of combustible material to targets, and location of equipment needed to achieve and maintain safe shutdown (SSD) of the reactor. In selecting a B.5.b mitigating strategy sample, the team reviewed licensee submittal letters, safety evaluation reports (SERs), licensee commitments, B.5.b implementing procedures, and previous NRC inspection reports. Section 71111.05-05 of the IP specifies a minimum sample size of three FAs and one B.5.b mitigating strategy for addressing large fires and explosions. This inspection fulfilled the requirements of the procedure by selecting a sample of three FAs and one B.5.b mitigating strategy. The FAs chosen were identified as follows:

1. Fire Zone 0024B, Computer Room

2. Fire Area 1017, East 600V Switchgear Room 1D

3. Fire Area 1020, East DC Switchgear Room 1B

For each of the selected FAs, the team evaluated the licensees FPP against applicable NRC requirements and licensee design basis documents. Applicable licensing and design basis documents reviewed by the team are listed in the Attachment to this report.

.01 Protection of Safe Shutdown Capabilities

a. Inspection Scope

The team reviewed the licensees FPP referenced in the Unit 1 Updated Final Safety Analysis Report (UFSAR) Section 10.8; the licensees safe shutdown analysis report (SSAR); fire hazards analysis (FHA); plant procedures; piping and instrumentation drawings (P&IDs);electrical drawings; and other supporting documents. The team performed the review to verify that hot and cold shutdown could be achieved and maintained from the main control room (MCR) for postulated fires in FAs 1017 and 1020. The review included verification that shutdown from the MCR could be performed both with and without the availability of offsite power. The team performed in-plant inspections to verify that the plant configuration was consistent with that described in the FHA and SSAR. The team reviewed the licensees shutdown methodology to verify that it properly identified the components and systems necessary to achieve and maintain SSD conditions for postulated fires resulting in shutdown from the MCR. The team focused their inspection activities on systems specified in the SSAR for reactivity control, reactor coolant makeup, and decay heat removal, as well as process monitoring instrumentation and necessary support systems.

The team reviewed and performed a walkthrough of procedure steps used for post-fire SSD to ensure the technical and human factors adequacy of the procedures. The team verified the licensee personnel credited for performance of procedures were available in the event a fire occurred, had procedures available, and were trained on implementation. The team also verified that operators could reasonably be expected to perform the procedure actions in order to maintain plant parameters within specified limits. The team reviewed and walked down applicable sections of Abnormal Operating Procedure (AOP) 34AB-X43-001-1, Fire Procedure for Unit 1 FAs 1017 and 1020. The team reviewed operator actions to ensure these actions could be implemented in accordance with plant procedures in a manner necessary to support the SSD method for the applicable fire area.

b. Findings

No findings were identified.

.02 Passive Fire Protection

a. Inspection Scope

The team walked down the selected FAs and fire zone (FZ) to evaluate the adequacy of the fire resistance of walls, ceilings, and floors. This evaluation also included fire barrier concrete block walls, penetration seals, fire doors, and fire dampers to ensure that at least one train of SSD equipment would be maintained free of fire damage. Construction detail drawings and fire tests were reviewed as necessary. Where applicable, the team observed the installed barrier assemblies and compared the as-built configurations to the approved construction details. The team also reviewed supporting fire endurance test data; licensing basis commitments; and standard industry practices.

b. Findings

No findings were identified.

.03 Active Fire Protection

a. Inspection Scope

The team reviewed the redundancy of fire protection water sources and fire pumps to confirm they were installed in accordance with the National Fire Protection Association (NFPA) codes of record. The team performed in-plant observations of the material condition and operational lineup of the fire water pumps and fire protection water supply distribution piping, including manual fire hose and standpipe systems for the selected FAs/FZ. Using operating and valve cycle/alignment procedures, as well as engineering drawings, the team examined the electric motor-driven and the diesel-driven fire pumps and accessible portions of the fire main piping system to evaluate operational status, accuracy of as-built configurations, and to verify correct system valve lineups (i.e. position of valves).

The team compared the fire detection and fire suppression systems for the selected FAs/FZ to the applicable NFPA standard(s) by reviewing design documents; and observed the as-installed configurations of the systems during plant walkdowns. The team reviewed selected fire protection vendor equipment specifications, drawings, and engineering calculations to determine whether the fire detection and suppression methods were appropriate for the types of fire hazards that existed in the selected FAs/FZ. During plant walkdowns, the team observed the placement of the fire hose stations, fire extinguishers, fire hose nozzle types, and fire hose lengths, as designated in the firefighting pre-plan strategies, to verify they were not blocked, and that adequate reach and coverage was provided consistent with the firefighting strategies and FPP documents. The team reviewed completed periodic surveillance testing and maintenance program procedures for the fire detection and suppression systems and compared them to operability requirements, testing criteria, and compensatory measures. This review was to assess whether the test program was sufficient to validate proper operation of the fire detection and suppression systems in accordance with their design requirements.

Aspects of fire brigade readiness were reviewed, including, but not limited to, the fire brigades personal protective equipment, self-contained breathing apparatuses, portable communications equipment, and other fire brigade equipment to determine accessibility, material condition and operational readiness of equipment. During plant walkdowns, the team compared firefighting pre-plan strategies to existing plant layout and equipment configurations and to fire response procedures for the selected FAs/FZ. This was done to verify that firefighting pre-fire plan strategies and drawings were consistent with the fire protection features and potential fire conditions within the area and also to determine if appropriate information was provided to fire brigade members to facilitate suppression of an exposure fire that could impact the SSD strategy.

b. Findings

1. Adequacy of Carbon Dioxide (CO2) Concentration in FZ 0024B

Introduction:

The NRC identified a non-compliance of Hatch Renewed Operating License Conditions (OLCs) 2.C.(3) and 2.C.(3)(a), for Units 1 and 2 respectively, because the installed carbon dioxide (CO2) fire suppression system in the computer room (FZ 0024B) could not deliver the required gas concentration.

Description:

The computer room (FZ 0024B) CO2 gas suppression system was designed in accordance with NFPA 12, Carbon Dioxide Extinguishing Systems 1973. NFPA 12 required a minimum concentration of 50 percent to extinguish fires in dry electrical and wiring insulation hazards. The computer room contained dry electrical wiring insulation hazards in the form of cable insulation and computer/server components. The licensee could not show that 50 percent concentration could be met for the installed system configuration in the computer room.

The team identified the problem by calculating the initial CO2 concentration that would be achieved upon system activation. The team reviewed calculation SX11992, FP-LP CO2 Flow Calculation Cable Spreading Room;Section IV.C of the FHA; and procedure 52SV-FPX-010-0, Low Pressure CO2 System Surveillance, Version 3. Procedure 52SV-FPX-010-0 stated that the acceptable range for discharge time was between 3 minutes and 17 seconds and 3 minutes and 23 seconds. The team obtained the volume of the room, the required design concentration, expected CO2 loss due to leakage, and CO2 discharge rate in 2 minutes. Based on the room volume, including expected losses due to leakage, and expected flow rate, the team determined a discharge time of 3 minutes and 45 seconds would be required to reach the design concentration. Using the criteria in procedure 52SV-FPX-010-0, the team determined that the system would discharge approximately 88% of the required concentration.

As a result, the team determined that the time of discharge was not sufficient to release the needed concentration of CO2 in the room to adequately suppress a fire in that room. Since system discharge testing had not been performed, the problem went undetected until identified by the team. The licensee performed a preliminary calculation that confirmed the teams results, and entered the issue into the corrective action program (CAP) as Condition Report (CR) 736771. Additionally, the licensee determined that the current procedure did not address leakage out of the room to ensure that the required concentration was maintained.

The licensee implemented interim actions to ensure adequate CO2 concentration in the event of a fire in the computer room. The interim actions included increasing the minimum CO2 level in the associated tank to 70%; and revising procedure 34SO-Z43-002-2 to require an additional 60 seconds of discharge time.

Analysis:

The team determined that the licensees failure to implement design requirements for the CO2 system in the computer room was a performance deficiency. This performance deficiency was determined to be more than minor because it was associated with the reactor safety Mitigating Systems cornerstone attribute of protection against external factors (i.e. fire),and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.

Specifically, the discharge time for the fire suppression system in FZ 0024B was not sufficient to release the required CO2 concentration to adequately suppress a fire.

The finding was screened in accordance with NRC Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP), Attachment 4, Initial Characterization of Findings, which determined that an IMC 0609 Appendix F, Fire Protection Significance Determination Process, review was required because the finding affected fixed fire protection systems. Using the Fire Protection SDP Phase 1 Screening, the finding was assigned a category of Fixed Fire Protection Systems.

Using IMC 0609, Appendix F, Attachment 2, the finding was assigned a High degradation rating because the suppression system would not reach the designed concentration as required by NFPA 12. The team used step 1.4 Qualitative Screening Question Set for Seven Individual Categories, task 1.4.2 Fixed Fire Protection System of IMC 0609, Appendix F, Attachment 1 to determine the finding to be of very low safety significance (i.e., Green) because the finding affected only a manually actuated suppression system for an area that is accessible by the fire brigade.

The team determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance.

Enforcement:

Hatch Renewed OLCs 2.C.(3) and 2.C.(3)(a), for Units 1 and 2 respectively, state, in part, that Southern Nuclear shall implement and maintain in effect all provisions of the fire protection program, which is referenced in the Updated Final Safety Analysis Report for the facility, as contained in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch Nuclear Plant, Units 1 and 2, which was originally submitted by letter dated July 22, 1986.

Section IV.C.5, Carbon Dioxide Suppression Systems, of Appendix D of the FHA states, in part, that the computer room design concentrations are in compliance with NFPA Standard No. 12, Section 2421, which requires a 50-percent concentration for "dry electrical, wiring insulation hazards in general". NFPA 12 states, in part, that an acceptable CO2 system deliver and hold a minimum gas concentration of 50 percent in the protected area.

Contrary to the above, the CO2 system design concentration in the computer room is not in compliance with the Hatch FHA, in that the CO2 system would not deliver and hold a minimum gas concentration of 50 percent in the protected area. The violation has existed since initial plant start-up. The licensee entered the deficiency in the CAP as CR 736771.

Because the licensee committed to adopt NFPA 805 and change their fire protection licensing bases to comply with 10 CFR 50.48(c), the NRC is exercising enforcement and reactor oversight process (ROP) discretion for this issue in accordance with the NRC Enforcement Policy, Section 9.1, Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)and Inspection Manual Chapter 0305. Specifically, this issue was identified and will be addressed during the licensees transition to NFPA 805, was entered into the licensees corrective action program, immediate corrective action and compensatory measures were taken, was not likely to have been previously identified by routine licensee efforts, was not willful, and it was not associated with a finding of high safety significance (i.e., Red).

Failure to Meet Section IV.C, Fire Detection and Suppression of Appendix D of the Fire Hazards Analysis

Introduction:

The NRC identified a non-compliance of Hatch OLCs 2.C.(3) and 2.C.(3)(a), for Units 1 and 2 respectively, for the failure to locate fire extinguishers in the cable spreading room (CSR) in accordance with NFPA 10 and for the failure to locate manual hose stations in or near the CSR, such that an effective hose stream could be directed to any area in the room.

Description:

The FHA stated that the CSR (FZ 0024A) was equipped with a hose station and a fire extinguisher located in the adjacent room (FA 0025 mezzanine) for manual firefighting. The FHA stated that the area had mostly Class A (cable insulation) combustibles with a fire duration of greater than three hours. As a result, the licensee designated the CSR as having a high combustible loading. The FHA stated that manual firefighting equipment was fully adequate to extinguish the fire if the automatic suppression system failed.

The requirements for manual firefighting capabilities were described in Section IV.C, Fire Detection and Suppression of Appendix D of the FHA.Section IV.C.6 required the licensee to provide portable fire extinguishers in the plant in accordance with NFPA 10, Standard for Portable Fire Extinguishers. For Class A hazards (such as cable insulation), NFPA 10 required fire extinguishers to be located such that the maximum travel distance to an extinguisher was 75 feet.

The team identified that there were no fire extinguishers located in the CSR. The closest fire extinguisher to the CSR was located in an adjacent room (FA 0025 mezzanine). Based on the physical dimensions of the CSR, and physical obstructions in the room due to cable trays, the team determined that the travel distances from at least half of the CSR to the closest fire extinguisher exceeded the 75 foot maximum travel distance specified in NFPA 10.

Section IV.C.3.d of Appendix D of the FHA required the licensee to provide manual hose stations throughout the plant to ensure that an effective hose stream could be directed to any area in the plant. The team observed that there was one hose station (HS-C20) inside the CSR and another hose station (HS-C21) in the adjacent room (FA 0025 mezzanine). However, the team noted that the licensee had deemed HS-C20 as not usable because cable trays blocked access to the hose. On July 20, 2011, the licensee implemented LDCR 2011-024 to remove the regulatory requirements for this hose station. Hose station HS-C21 was selected to serve the CSR. Additional fire hose was staged at HS-C21 to ensure that area wide coverage of the CSR was available with the fire hose stream. The team noted that the licensee did not consider physical obstructions presented in the room due to cable trays and the torturous path that responders would have to take to cover the entire CSR. Therefore, the team determined that the additional fire hose staged at HS-C21 was not sufficient to provide an effective hose stream to all areas in the CSR.

In response to these issues, the licensee initiated CR 740396 for the deficiency related to fire extinguisher placement; and CR 741521 for the deficiency related to the CSR fire hose coverage. The licensee also began evaluating potential locations in the CSR where fire extinguishers could be installed to facilitate firefighting efforts in the CSR.

Analysis:

The team determined that the licensees failure to locate fire extinguishers in the CSR, and failure to locate manual hose stations in or near the CSR such that an effective hose stream could be directed to any area in the room were performance deficiencies. The performance deficiencies were determined to be more than minor because they were associated with the reactor safety Mitigating Systems cornerstone attribute of protection against external factors (i.e. fire), and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiencies could adversely impact timely manual fire suppression capability of a fire.

The finding was screened in accordance with IMC 0609, Significance Determination Process (SDP), Attachment 4, Initial Characterization of Findings, which determined that an IMC 0609 Appendix F, Fire Protection Significance Determination Process, review was required because the finding affected manual firefighting. Using the Fire Protection SDP Phase 1 Screening, the finding was assigned a category of Manual Firefighting.

The team used step 1.3 Ability to Achieve Safe Shutdown, task 1.3.1 Screen Fire Finding for Ability to Achieve Safe Shutdown of IMC 0609, Appendix F, Attachment 1 to determine the finding to be of very low safety significance (i.e., Green) because the finding was assigned a low degradation rating. Using IMC 0609, Appendix F, Attachment 2, the finding was assigned a low degradation rating because the CSR was equipped with pre-action sprinkler system and fire detection that would alarm in the control room. Additionally, a hose station and fire extinguisher located outside the room would provide partial coverage for the CSR.

The team determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance.

Enforcement:

Hatch Renewed OLCs 2.C.(3) and 2.C.(3)(a), for Units 1 and 2 respectively, states, in part, that Southern Nuclear shall implement and maintain in effect all provisions of the fire protection program, which is referenced in the Updated Final Safety Analysis Report for the facility, as contained in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch Nuclear Plant, Units 1 and 2, which was originally submitted by letter dated July 22, 1986.Section IV.C, Fire Detection and Suppression of Appendix D of the FHA, contains requirements for the licensees manual suppression capability.

Contrary to the above, the licensee failed to meet the requirements of Section IV.C. of Appendix D of the FHA, with the following examples:

1.Section IV.C.3.d, Water Sprinkler and Hose Standpipe Systems, of Appendix D of the

FHA states, in part, that manual hose stations are located throughout the plant. An effective hose stream can be directed to any area in the plant. Contrary to the above, the licensee failed to locate manual hose stations in or near the CSR such that an effective hose stream could be directed to any area of the CSR. This issue has existed since 2011, when the licensee completed a plant change to take credit for hose HS-C21 to combat a fire in the CSR.

2.Section IV.C.6, Portable Extinguishers, of Appendix D of the FHA states that portable

fire extinguishers are provided in the plant in accordance with NFPA 10. NFPA 10 (1975 Edition), requires that fire extinguishers serving Class A hazards (such as cable insulation) be located such that the maximum travel distance to extinguisher is 75 feet.

Contrary to the above, the licensee failed to locate fire extinguishers in an area serving Class A hazards such that the maximum travel distance to an extinguisher was not greater than 75 feet. Specifically, the licensee failed to locate portable fire extinguishers in the CSR, which contained Class A hazards such as cable insulation. This issue has existed since initial plant startup.

Because the licensee committed to adopt NFPA 805 and change their fire protection licensing bases to comply with 10 CFR 50.48(c), the NRC is exercising enforcement and reactor oversight process (ROP) discretion for this issue in accordance with the NRC Enforcement Policy, Section 9.1, Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)and Inspection Manual Chapter 0305. Specifically, this issue was identified and will be addressed during the licensees transition to NFPA 805, was entered into the licensees corrective action program, immediate corrective action and compensatory measures were taken, was not likely to have been previously identified by routine licensee efforts, was not willful, and it was not associated with a finding of high safety significance (i.e., Red).

04.

Protection From Damage From Fire Suppression Activities

a. Inspection Scope

The team evaluated whether water-based manual firefighting activities could adversely affect equipment credited for SSD, inhibit access to alternate shutdown equipment, or adversely affect local operator manual actions (OMAs) required for SSD in the selected FAs/FZ. The team reviewed available documentation related to flooding analysis from fire protection activities, being sensitive to potential flooding through unsealed concrete floor cracks.

The team reviewed firefighting pre-plan strategies; fire brigade training procedures; fire damper locations; heating, ventilation and air conditioning (HVAC) drawings; and fire response procedures to verify that inter-area migration of ventilation of gaseous heat and smoke was addressed, and access to SSD equipment and OMAs would not be inhibited by smoke migration from the affected fire area to adjacent plant areas used to accomplish SSD.

b. Findings

No findings were identified.

.05 Alternative Shutdown Capability

a. Inspection Scope

Methodology

The team reviewed the licensees FPP referenced in Unit 1 UFSAR Section 10.8, the FHA, SSAR, plant procedures, P&IDs, electrical drawings, and other supporting documents for postulated fires in FZ 0024B. The team performed the review to ensure that the required functions for post-fire SSD, and the corresponding equipment necessary to perform those functions, were included in the procedures. The team assessed whether transfer of control from the MCR to the remote shutdown panel (RSDP), as well as hot and cold shutdown from outside the MCR, could be successfully accomplished. The review included verification that shutdown from outside the MCR could be performed both with and without the availability of offsite power.

The team performed in-plant inspections to verify that the plant configuration was consistent with that described in the SSAR. The team focused their inspection activities on systems specified in the SSAR for reactivity control, reactor coolant makeup, and decay heat removal, as well as process monitoring instrumentation and necessary support systems.

Operational Implementation

The team reviewed shift attendance records to verify that personnel required to accomplish SSD, exclusive of those assigned as fire brigade members, were available. The team also verified that licensee personnel had adequate SSD procedures and were trained on implementation. The team reviewed training lesson plans, job performance measures, and simulator scenarios for licensed and non-licensed operators to verify that the training included the shutdown methodology of the SSAR and the SSD procedures required to be used for a fire in FZ 0024B.

The team reviewed and walked down selected applicable steps of AOP 34AB-X43-001-1, Abnormal Operating Procedure, Fire Procedure and remote shutdown procedure 31RS-OPS-001-1, Shutdown From Outside Control Room, in order to assess technical and human factors adequacy of the procedures. The team also verified that operators could reasonably be expected to perform the procedure actions in order to maintain plant parameters within specified limits. The team reviewed periodic test procedures and test records of alternate shutdown transfer capability and instrumentation and control functions, to ensure that the tests were adequate to verify the functionality of alternative shutdown capability.

b. Findings

No findings were identified.

.06 Circuit Analyses

a. Inspection Scope

This segment was suspended for plants that have been in transition to NFPA 805 for less than 3 years because a more detailed review of cable routing and circuit analysis will be conducted as part of the FPP transition to NFPA 805.

b. Findings

No findings were identified.

.07 Communications

a. Inspection Scope

The team reviewed the communication capabilities required to support plant personnel in the performance of OMAs to achieve and maintain SSD, as credited in the Hatch FPP. The team performed plant walkdowns with the licensees operations staff to assess the credited method of communications used to complete SSD actions as specified in post-fire SSD procedures for the selected FAs/FZ. The team assessed the operators ability to communicate by observing the performance of radio checks from applicable control locations by licensee operations personnel.

The team assessed if communications were possible, given the background noise from plant equipment, to determine if this would deter the operators ability to implement the response strategy within the time required by the plant feasibility analysis. The team also verified that portable radio communications, sound powered phones and fixed emergency communication systems were available, operable, and adequate for the performance of designated activities to support fire event notification and fire brigade firefighting activities. The team reviewed preventive maintenance and surveillance test records and vendor manuals to verify that the communication equipment was being properly maintained and tested.

b. Findings

No findings were identified.

.08 Emergency Lighting

a. Inspection Scope

The team reviewed maintenance and design aspects of the fixed 8-hour battery pack emergency lighting units (ELUs) required by 10 CFR 50 Appendix R, Section III.J, and the Hatch approved FPP. The team performed plant walkdowns of the post-fire SSD procedures for the selected FAs/FZ to observe the placement and coverage area of the ELUs required to illuminate operator access and egress pathways, and any equipment requiring local operation and/or instrumentation monitoring for post-fire SSD. In some instances, operations personnel performed onsite tests of the ELUs to verify operation. The team also reviewed completed surveillances, system health reports, and maintenance tests to verify that adequate surveillance testing was in place. The manufacturers information and vendor manuals for the fixed and portable 8-hour battery pack ELUs were reviewed to verify that the battery power supplies were rated with at least an 8-hour capacity, and that the ELUs were being stored and maintained in accordance with vendor guidance.

b. Findings

No findings were identified.

.09 Cold Shutdown Repairs

a. Inspection Scope

The team reviewed the licensees FHA and SSAR to verify that the licensee had evaluated the need for cold shutdown repairs. The team determined from the review that the licensee did not take credit for repairs to cold shutdown components in order to achieve cold shutdown.

b. Findings

No findings were identified.

.10 Compensatory Measures

a. Inspection Scope

(1) Compensatory Measures for Degraded Fire Protection Components

The team reviewed the administrative controls for out-of-service, degraded and/or inoperable fire protection features (e.g. detection and suppression systems and passive fire barriers) to verify that short-term compensatory measures adequately compensated for the degraded function or feature until appropriate corrective actions could be taken.

(2) Operator Manual Actions as Compensatory Measures for Safe Shutdown

The team reviewed the SSAR, FHA, and applicable AOPs, to determine if the licensees SSD methodology credited OMAs outside the MCR as compensatory measures for SSD, for postulated fires in Unit 1 FAs 1017 and 1020, and Unit 2 FA 2203.

b. Findings

No findings were identified.

.11 Review and Documentation of Fire Protection Program Changes

a. Inspection Scope

The team reviewed a sample of FPP changes made between August 2010 and December 2013 to assess the licensees effectiveness of the FPP change process, and to determine if the changes to the FPP were in accordance with the fire protection license condition and had no adverse effect on the ability to achieve SSD. The team also reviewed additional FPP changes to support review of LER 2013-004-01.

b. Findings

Introduction:

The NRC identified a non-compliance of Hatch Unit 2 Renewed OLC 2.C.(3)(a),

Fire Protection, for making a change to the FPP that adversely affected the licensees ability to achieve and maintain safe shutdown. Specifically, the licensee removed the installed Unit 2 RSDP halon suppression system that was required to meet an approved exemption. The licensee failed to submit the FPP change to the NRC for review and approval prior to implementing the modification, which impacted the ability of the NRC to perform its regulatory oversight function.

Description:

In an SER dated April 18, 1984, the NRC allowed an exemption request from 10 CFR 50, Appendix R, Section III.G.2 for the Unit 2 Reactor Building elevation 130. In this SER, the NRC documented that the licensee committed to several modifications, which included the installation of an automatic halon fire suppression system for the Unit 2 RSDP. The halon suppression system would limit the consequences of a fire internal to the RSDP. The NRC concluded that the existing fire protection measures, with the proposed modifications, would achieve a level of safety equivalent to that provided by 10 CFR 50, Appendix R, Section III.G.2.

During a plant walkdown of FA 2203 to support the review of LER 2013-004, the team noted that the halon suppression system had been abandoned in place. Discussions with the licensee revealed that the system had been abandoned since 1999. Additionally, in 2006, the licensee initiated a design change (DCP 2009001901) to completely remove the halon system, along with its associated piping and support, from the Unit 2 RSDP.

The team noted that the licensees FPP is based on the defense-in-depth concept, and that this approach includes promptly detecting and extinguishing fires that occur. The condition of not having the committed suppression system was a degradation of the defense-in-depth concept.

Specifically, the lack of a suppression system would adversely affect the ability to control and promptly extinguish a fire. The licensee entered the deficiency into their CAP as CR 736483.

An hourly fire watch was already in place for the affected FA, because of LER 2013-004.

Analysis:

The team determined that the failure to obtain NRC approval prior to making a change to the FPP that was adverse to safe shutdown was a performance deficiency. This performance deficiency was determined to be more than minor because it was associated with the reactor safety Mitigating Systems cornerstone attribute of protection against external factors (i.e. fire), and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.

Specifically, the licensee removed the halon suppression system for the RSDP, which degraded the ability to suppress a fire that originated in the panel.

The finding was screened in accordance with IMC 0609, Significance Determination Process (SDP), Attachment 4, Initial Characterization of Findings, dated June 19, 2012, which determined that an IMC 0609 Appendix F, Fire Protection Significance Determination Process review was required because the finding affected fixed fire protection systems. Using the Fire Protection SDP Phase 1 Screening, the finding was assigned a category of Fixed Fire Protection Systems.

The team used step 1.3 Ability to Achieve Safe Shutdown, task 1.3.1 Screen Fire Finding for Ability to Achieve Safe Shutdown, of IMC 0609, Appendix F, Attachment 1 to determine the finding to be of very low safety significance (i.e., Green) because the reactor would have been able to reach and maintain safe shutdown conditions. The reactor would be able to reach and maintain safe shutdown conditions because photoelectric detectors were installed inside the RSDP and linear heat detection was installed along the sides of the cable raceways located directly above the RSDP. The installed detectors would aid in preventing the growth and spread of a fire by allowing sufficient time for the fire brigade to intervene.

The team determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance.

Additionally, the licensees failure to submit the adverse FPP change to the NRC for review was screened under the traditional enforcement criteria, because it impacted the ability of the NRC to perform its regulatory oversight function. In accordance with Section 6.1.d.2 of the NRC Enforcement Policy, this violation was characterized as Severity Level IV because the resulting changes were evaluated by the SDP as having very low safety significance (Green).

Enforcement:

Hatch Unit 2 Renewed OLC 2.C.(3)(a) states, in part, that the licensee may make changes to the fire protection program without prior Commission approval only if the changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. This license condition also states that the Hatch Fire Protection Program is referenced in the Updated Final Safety Analysis Report for the facility, as contained in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch Nuclear Plant Units 1 and 2, which was originally submitted by letter from GPC to the Commission dated July 22, 1986.

Contrary to the above the licensee made a change to the FPP, without prior Commission approval, that adversely affected the ability to achieve and maintain SSD in the event of a fire.

Specifically the licensee completed a 10 CFR 50.59 evaluation that erroneously concluded that the halon suppression system installed for the RSDP was not required to meet Appendix R requirements and, therefore, could be removed without prior Commission approval. The removal of the halon suppression system degraded the ability to suppress a fire and challenged the ability to achieve and maintain SSD in the event of a fire.

Because the licensee committed to adopt NFPA 805 and change their fire protection licensing bases to comply with 10 CFR 50.48(c), the NRC is exercising enforcement and reactor oversight process (ROP) discretion for this issue in accordance with the NRC Enforcement Policy, Section 9.1, Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48),and Inspection Manual Chapter 0305. Specifically, this issue was identified and will be addressed during the licensees transition to NFPA 805, was entered into the licensees corrective action program, immediate corrective action and compensatory measures were taken, was not likely to have been previously identified by routine licensee efforts, was not willful, and it was not associated with a finding of high safety significance (i.e., Red).

.12 Control of Combustibles and Ignition Sources

a. Inspection Scope

The team conducted tours of numerous plant areas that were important to reactor safety, including the selected FAs/FZ, to verify the licensees implementation of FPP requirements as described in the FHA and administrative procedure 31GO-OPS-026-0, Use, Control, and Storage of Flammable/Combustible Materials. For the selected FAs/FZ, the team evaluated generic fire protection training; fire event history; the potential for fires or explosions; the combustible fire load characteristics; and, the potential exposure fire severity to verify that adequate controls were in place to maintain general housekeeping consistent with the FPP, administrative procedures, and other FPP procedures. There were no hot work activities ongoing within the selected fire areas during the inspection and observation of this activity could not be performed.

b. Findings

No findings were identified.

.13 B.5.b Inspection Activities

a. Inspection Scope

The team reviewed, on a sample basis, the licensees mitigation measures for reactor pressure vessel depressurization and injection for large fires and explosions to verify that the measures were feasible, personnel were trained to implement the measures, and equipment was properly staged and maintained. The team reviewed surveillance testing records to verify that required equipment was adequately maintained. Through discussions with plant staff, review of documentation, and plant walkdowns, the team verified the engineering basis to establish reasonable assurance that the makeup capability could be provided using the specified equipment and water sources. The team reviewed the licensees capability to provide a reliable and available water source and the ability to provide the minimum fuel supply. The team reviewed inventory records and performed a walkdown of the storage and staging areas for the B.5.b equipment to verify that equipment identified for use in the procedures was available and maintained. The team conducted an independent audit and inventory of required equipment and a visual inspection of the dedicated credited power and water source. The team reviewed training records to verify that operations and security personnel training/familiarity with the strategy objectives and implementing guidelines were accomplished according to the established training procedures.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA2 Problem Identification and Resolution

a. Inspection Scope

The team reviewed recent independent licensee audits, self-assessments, and system/program health report for thoroughness, completeness and conformance to FPP requirements. The team also reviewed CAP documents, including completed corrective actions documented in selected CRs, and operating experience program documents, to ascertain whether industry identified fire protection issues (actual or potential) affecting HNP were appropriately entered into the CAP for resolution. Items included in the operating experience program effectiveness review were NRC Information Notices, Regulatory Issue Summaries, industry or vendor generated reports of defects and non-compliances submitted pursuant to 10 CFR Part 21, and vendor information letters. The team evaluated the effectiveness of the corrective actions for the identified issues. The documents reviewed are listed in the Attachment.

b. Findings

No findings were identified.

4OA3 Follow-up of Events

(Discussed) Licensee Event Report (LER) 50-366/2013-004-01, Postulated Inter-cable Fault Vulnerability for RHR Shutdown Cooling Isolation Valves During A Postulated Fire Event Results in Unanalyzed Condition

The licensee described a condition in Revision 0 of the subject LER (dated October 8, 2013)where, during a postulated fire scenario for Unit 2 FA 2203F, an inter-cable hot short could occur on the control cables for two RHR shutdown cooling isolation valves, causing the valves to spuriously open while at rated power. The valves spuriously opening at rated power could result in an inter-system loss of coolant accident. The vulnerability was identified in August 2013 during circuit analysis that considered inter-cable shorts as a plausible vector in the SSA for some high/low pressure interface components. Originally, Hatchs FHA and SSAR limited the circuit analysis to intra-cable hot shorts (conductors within the cable), but did not consider inter-cable hot shorts (conductors within co-located cables in the same tray). Additionally, the FHA and the SSAR stated, in part, that hot shorts between conductors of different cables need not be postulated.

Upon discovering this condition, the licensee took immediate corrective actions that included establishing hourly fire watches, and de-energizing both valves in the closed position to remove the vulnerability. The licensee concluded that the vulnerability did not exist for the corresponding Unit 1 set of valves. Revision 1 of the LER (dated November 14, 2013) stated, upon further evaluation, the cause of the event was attributed to the ineffective monitoring and follow-up of regulatory activities/guidance (Regulatory Guide 1.189 and Nuclear Energy Institute 00-01) involving inter-cable hot shorts in identifying the vulnerability associated with the RHR isolation valves. This LER remains open pending further NRC review.

4OA6 Meetings, Including Exit

On December 6, 2013, the lead inspector presented the preliminary inspection results to Mr.

David Vineyard and other members of the licensees staff, who acknowledged the results.

Following completion of additional reviews in the Region II office, a conference call was held with Mr. Steve Tipps on January 16, 2014, to provide an update on changes to the preliminary inspection findings. The licensee acknowledged the findings. Proprietary information is not included in this inspection report.

ATTACHMENT:

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

S. Beverly, Licensing Engineer
P. Burns, Fire Protection Engineer, SNC Corporate
M. Dean, Maintenance
D. Edenfield, PRA Engineer
J. Gardner, Fire Marshall
J. Lattner, Principal Fire Protection Engineer, SNC Corporate
J. Moser, Fire Brigade Instructor
D. Patel, Component Supervisor
M. Sykes, Fire Protection Engineer, SNC Corporate
S. Tipps, Licensing Supervisor
D. Vineyard, Site Vice President
J. Whitt, Fire Protection Engineer, SNC Corporate
J. Yurkosky, Fire Protection Engineer

NRC Personnel

D. Hardage, Resident Inspector
E. Morris, Senior Resident Inspector
S. Shaeffer, Chief, Engineering Branch 2, DRS, Region II

LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED

Discussed

05000366/2013-004-01 LER Postulated Inter-cable Fault Vulnerability for RHR Shutdown Cooling Isolation Valves During A Postulated Fire Event Results in Unanalyzed Condition (Section 4OA3)

LIST OF FIRE BARRIER FEATURES INSPECTED (Refer Report Section 1RO5.02-Passive Fire Barriers)

Fire Barriers Floors/Walls/Ceiling Identification Description

1Z43-H007D

FA 1017 to FZ 0014N 1Z43-H004D

FA 1017 to FA 1104 1Z43-H810D

FA 1017 to FA 1020 1Z43-H010D

FA 1020 to FA 1104 1Z43-H012D

FA 1020 to FZ 0014N 1Z43-H063F

FZ 0024B to FA 0025 1Z43-H062F

FZ 0024B to FA 0025 1Z43-H064F

FZ 0024B to FA 0025 1X43-H522D

Fire Pump House 1X43-H521D

Fire Pump House

Fire Door Identification

Description

1L48C31

FA 1017 to FZ 0014N 1L48C29

FA 1020 to FZ 0014N 1L48D214

Fire Pump House 1L48D215

Fire Pump House

Fire Damper Identification

Description

1Z41-FD-F071

FZ 0024B to FA 0025 1Z41-FD-F064

FA 1017 to FA 1020

LIST OF DOCUMENTS REVIEWED