IR 05000219/2014007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(11 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/05/2014
| issue date = 05/05/2014
| title = IR 05000219-14-007, on 03/24-28/2014 and 04/07-11/2014, Oyster Creek Nuclear Generating Station, Triennial Fire Protection Inspection
| title = IR 05000219-14-007, on 03/24-28/2014 and 04/07-11/2014, Oyster Creek Nuclear Generating Station, Triennial Fire Protection Inspection
| author name = Rogge J F
| author name = Rogge J
| author affiliation = NRC/RGN-I/DRS/EB3
| author affiliation = NRC/RGN-I/DRS/EB3
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000219
| docket = 05000219
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:May 5, 2014
[[Issue date::May 5, 2014]]


Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555
==SUBJECT:==
OYSTER CREEK GENERATING STATION - NRC TRIENNIAL FIRE


SUBJECT: OYSTER CREEK GENERATING STATION - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000219/2014007
PROTECTION INSPECTION REPORT 05000219/2014007


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On April 11, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a triennial fire protection inspection at the Oyster Creek Nuclear Generating Station. The enclosed inspection report documents the inspection results, which were discussed on April 11, 2014, with Mr. R. Peak and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed station personnel. The inspectors also reviewed mitigation strategies for addressing large fires and explosions.
On April 11, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a triennial fire protection inspection at the Oyster Creek Nuclear Generating Station. The enclosed inspection report documents the inspection results, which were discussed on April 11, 2014, with Mr. R. Peak and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed station personnel. The inspectors also reviewed mitigation strategies for addressing large fires and explosions.


Based on the results of this inspection, no findings were identified.
Based on the results of this inspection, no findings were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/
 
John F. Rogge, Chief
 
Engineering Branch 3


Sincerely,/RA/ John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No: 50-219 License No: DPR-16  
Division of Reactor Safety  
 
Docket No:
50-219 License No:
DPR-16  


===Enclosure:===
===Enclosure:===
Inspection Report 05000219/2014007  
Inspection Report 05000219/2014007 w/Attachment: Supplemental Information
 
REGION I==
Docket No:
 
50-219
 
License No:
 
DPR-16
 
Report No:
 
05000219/2014007
 
Licensee:
 
Exelon Generation Company, LLC
 
Facility:
 
Oyster Creek Nuclear Generating Station
 
Location:
 
P.O. Box 388
 
Forked River, NJ 08731
 
Dates:
 
March 24 - 28 and April 7 -11, 2014
 
Inspectors:
 
R. Fuhrmeister, Senior Reactor Inspector (Team Leader)


===w/Attachment:===
C. Cahill, Senior Reactor Analyst
Supplemental Information cc w/encl: Distribution via ListServ In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/ John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No: 50219 License No: DPR-16
K. Young, Senior Reactor Inspector


===Enclosure:===
J. Richmond, Reactor Inspector
Inspection Report 05000219/2014007
 
J. Rady, Reactor Inspector
 
L. DuMont, Reactor Inspector
 
Approved by:
John F. Rogge, Chief


===w/Attachment:===
Engineering Branch 3
Supplemental Information cc w/encl: Distribution via ListServ


ML14125A004 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRS NAME RFuhrmeister/RF JRogge/JR DATE 5/2/2014 5/5/2014 U. S. NUCLEAR REGULATORY COMMISSION REGION I Docket No: 50-219 License No: DPR-16 Report No: 05000219/2014007 Licensee: Exelon Generation Company, LLC Facility: Oyster Creek Nuclear Generating Station Location: P.O. Box 388 Forked River, NJ 08731 Dates: March 24 - 28 and April 7 -11, 2014 Inspectors: R. Fuhrmeister, Senior Reactor Inspector (Team Leader) C. Cahill, Senior Reactor Analyst K. Young, Senior Reactor Inspector J. Richmond, Reactor Inspector J. Rady, Reactor Inspector L. DuMont, Reactor Inspector Approved by: John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety  
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
IR 05000219/2014007; 03/24-28/2014 and 04/07-11/2014; Oyster Creek Nuclear Generating Station; Triennial Fire Protection Inspection. This report covered a two week on-site triennial fire protection team inspection by specialist inspectors. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006. No Findings were identified.
IR 05000219/2014007; 03/24-28/2014 and 04/07-11/2014; Oyster Creek Nuclear Generating  
 
Station; Triennial Fire Protection Inspection.
 
This report covered a two week on-site triennial fire protection team inspection by specialist inspectors. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
 
No Findings were identified.


=REPORT DETAILS=
=REPORT DETAILS=
Background This report presents the results of a triennial fire protection inspection conducted in accordance with NRC Inspection Procedure (IP) 71111.05T, "Fire Protection." The objective of the inspection was to assess whether Exelon Generation Company, LLC (Exelon) had implemented an adequate fire protection program and whether post-fire safe shutdown capabilities had been established and were properly maintained at Oyster Creek Nuclear Generating Station (Oyster Creek). The following fire areas (FAs) and associated fire zones (FZs) were selected for detailed review based on prior inspection results and risk insights from the Oyster Creek Individual Plant Examination of External Events (IPEEE): Fire Areas (Fire Zones)   TB-FZ-11D RB-FZ-1F3 OB-FZ-22A Inspection of these fire areas/zones fulfilled the inspection procedure requirement to inspect a minimum of three samples. The inspection team evaluated Exelon's fire protection program (FPP) against applicable requirements which included Operating License Condition, NRC Safety Evaluation Reports (SERs), 10 CFR 50.48, and 10 CFR 50, Appendix R. The team also reviewed related documents that included the Updated Final Safety Analysis Report (UFSAR), Section 9.5.1, fire protection plan, fire hazards analysis (FHA), and post-fire safe shutdown analyses. The team evaluated aspects of five mitigating strategies for responding to large fires and explosions, as required by Operating License Condition 2.C.17 and 10 CFR 50.54(hh)(2). The team also reviewed related documents that included NEI 06-12, "B.5.b Phases 2 & 3 Submittal Guidance," Revision 2 (ML070090060). Inspection of these strategies fulfills the inspection procedure requirement to inspect a minimum of one sample. Specific documents reviewed by the team are listed in the attachment to this report.
 
Background  
 
This report presents the results of a triennial fire protection inspection conducted in accordance with NRC Inspection Procedure (IP) 71111.05T, "Fire Protection." The objective of the inspection was to assess whether Exelon Generation Company, LLC (Exelon) had implemented an adequate fire protection program and whether post-fire safe shutdown capabilities had been established and were properly maintained at Oyster Creek Nuclear Generating Station (Oyster Creek). The following fire areas (FAs) and associated fire zones (FZs) were selected for detailed review based on prior inspection results and risk insights from the Oyster Creek Individual Plant Examination of External Events (IPEEE):  
 
Fire Areas (Fire Zones)
* TB-FZ-11D
* RB-FZ-1F3
* OB-FZ-22A  
 
Inspection of these fire areas/zones fulfilled the inspection procedure requirement to inspect a minimum of three samples.
 
The inspection team evaluated Exelon's fire protection program (FPP) against applicable requirements which included Operating License Condition, NRC Safety Evaluation Reports (SERs), 10 CFR 50.48, and 10 CFR 50, Appendix R. The team also reviewed related documents that included the Updated Final Safety Analysis Report (UFSAR), Section 9.5.1, fire protection plan, fire hazards analysis (FHA), and post-fire safe shutdown analyses.
 
The team evaluated aspects of five mitigating strategies for responding to large fires and explosions, as required by Operating License Condition 2.C.17 and 10 CFR 50.54(hh)(2). The team also reviewed related documents that included NEI 06-12, "B.5.b Phases 2 & 3 Submittal Guidance," Revision 2 (ML070090060). Inspection of these strategies fulfills the inspection procedure requirement to inspect a minimum of one sample.
 
Specific documents reviewed by the team are listed in the attachment to this report.


==REACTOR SAFETY==
==REACTOR SAFETY==
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity  1R05 Fire Protection (IP 71111.05T)
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity  
  {{a|1R05}}


==1R05 Fire Protection (IP 71111.05T)
==
===.1 Protection of Safe Shutdown Capabilities===
===.1 Protection of Safe Shutdown Capabilities===
====a. Inspection Scope====
The team reviewed the FHA, safe shutdown analyses, and supporting drawings and documentation to verify that post-fire safe shutdown capabilities were properly protected.


====a. Inspection Scope====
The team ensured that applicable separation requirements of Section III.G of 10 CFR Part 50, Appendix R, and the licensees design and licensing bases were maintained for the credited safe shutdown equipment and their supporting power, control, and instrumentation cables. This review included an assessment of the adequacy of the selected systems for reactivity control, reactor coolant makeup, reactor heat removal, process monitoring and associated support system functions.
The team reviewed the FHA, safe shutdown analyses, and supporting drawings and documentation to verify that post-fire safe shutdown capabilities were properly protected. The team ensured that applicable separation requirements of Section III.G of 10 CFR Part 50, Appendix R, and the licensee's design and licensing bases were maintained for the credited safe shutdown equipment and their supporting power, control, and instrumentation cables. This review included an assessment of the adequacy of the selected systems for reactivity control, reactor coolant makeup, reactor heat removal, process monitoring and associated support system functions.


====b. Findings====
====b. Findings====
Line 68: Line 148:


===.2 Passive Fire Protection===
===.2 Passive Fire Protection===
====a. Inspection Scope====
====a. Inspection Scope====
The team walked down accessible portions of the selected fire areas to evaluate whether the material conditions of the fire area boundaries were adequate for the fire hazards in the area. The team compared the fire area boundaries including walls, ceilings, floors, fire doors, fire dampers, penetration seals, electrical raceway and conduit fire barriers, and redundant equipment fire barriers and radiant energy heat barriers to the design and licensing basis requirements, industry standards, and the OCNGS FPP, as approved by the NRC, to identify any potential degradation or non-conformances.
The team walked down accessible portions of the selected fire areas to evaluate whether the material conditions of the fire area boundaries were adequate for the fire hazards in the area. The team compared the fire area boundaries including walls, ceilings, floors, fire doors, fire dampers, penetration seals, electrical raceway and conduit fire barriers, and redundant equipment fire barriers and radiant energy heat barriers to the design and licensing basis requirements, industry standards, and the OCNGS FPP, as approved by the NRC, to identify any potential degradation or non-conformances.
Line 80: Line 159:


===.3 Active Fire Protection===
===.3 Active Fire Protection===
====a. Inspection Scope====
The team evaluated manual and automatic fire suppression and detection systems in the selected fire areas to determine whether they were installed, tested, maintained and operated in accordance with NRC requirements, National Fire Protection Association (NFPA) codes of record and the OCNGS FPP. The team also assessed whether the suppression systems capabilities were adequate to control and/or extinguish fires associated with the hazards in the selected areas.


====a. Inspection Scope====
The team reviewed the as-built capability of the fire water supply system to verify whether the design and licensing basis and NFPA code of record requirements were satisfied and to assess whether those capabilities were adequate for the hazards involved. The team reviewed the fire water system design and hydraulic analysis to assess the adequacy of the system to supply the largest single hydraulic load on the fire water system plus concurrent fire hose usage with one fire pump out of service. The team evaluated fire pump performance tests to assess the adequacy of the test acceptance criteria for pump minimum discharge pressure at the required flow rate to verify whether the criteria was adequate to ensure that the design basis requirements were satisfied. The team also evaluated the underground fire loop flow tests and flushes to verify whether the combination of the tests and flushes adequately demonstrated that the flow distribution circuits were able to meet design basis requirements. In addition, the team reviewed recent pump and loop flow test results to verify whether the testing was adequately conducted, the acceptance criteria were met and any potential performance degradation was identified.
The team evaluated manual and automatic fire suppression and detection systems in the selected fire areas to determine whether they were installed, tested, maintained and operated in accordance with NRC requirements, National Fire Protection Association  (NFPA) codes of record and the OCNGS FPP. The team also assessed whether the suppression systems capabilities were adequate to control and/or extinguish fires associated with the hazards in the selected areas.


The team reviewed the as-built capability of the fire water supply system to verify whether the design and licensing basis and NFPA code of record requirements were satisfied and to assess whether those capabilities were adequate for the hazards involved. The team reviewed the fire water system design and hydraulic analysis to assess the adequacy of the system to supply the largest single hydraulic load on the fire water system plus concurrent fire hose usage with one fire pump out of service. The team evaluated fire pump performance tests to assess the adequacy of the test acceptance criteria for pump minimum discharge pressure at the required flow rate to verify whether the criteria was adequate to ensure that the design basis requirements were satisfied. The team also evaluated the underground fire loop flow tests and flushes to verify whether the combination of the tests and flushes adequately demonstrated that the flow distribution circuits were able to meet design basis requirements. In addition, the team reviewed recent pump and loop flow test results to verify whether the testing was adequately conducted, the acceptance criteria were met and any potential performance degradation was identified. The team walked down accessible portions of the detection and water suppression systems in the selected areas and major portions of the fire water supply system, including the motor and two diesel driven fire pumps, interviewed system and program engineers, and reviewed selected issue reports (IRs) to independently assess the material condition of the systems and components. In addition, the team reviewed recent test results for the fire detection and suppression systems for the selected fire areas to verify whether the testing was adequately conducted, the acceptance criteria were met and any potential performance degradation was identified.
The team walked down accessible portions of the detection and water suppression systems in the selected areas and major portions of the fire water supply system, including the motor and two diesel driven fire pumps, interviewed system and program engineers, and reviewed selected issue reports (IRs) to independently assess the material condition of the systems and components. In addition, the team reviewed recent test results for the fire detection and suppression systems for the selected fire areas to verify whether the testing was adequately conducted, the acceptance criteria were met and any potential performance degradation was identified.


The team assessed the fire brigade capabilities by reviewing training, qualification, and drill critique records. The team also reviewed Exelon's firefighting strategies (i.e., pre-fire plans) and smoke removal plans for the selected fire areas to determine if appropriate information was provided to fire brigade members and plant operators to identify safe shutdown equipment and instrumentation, and to facilitate suppression of a fire that could impact post-fire safe shutdown capability. The team independently inspected the fire brigade equipment, including personnel protective gear (e.g., turnout gear) and smoke removal equipment, to determine operational readiness for firefighting.
The team assessed the fire brigade capabilities by reviewing training, qualification, and drill critique records. The team also reviewed Exelon's firefighting strategies (i.e., pre-fire plans) and smoke removal plans for the selected fire areas to determine if appropriate information was provided to fire brigade members and plant operators to identify safe shutdown equipment and instrumentation, and to facilitate suppression of a fire that could impact post-fire safe shutdown capability. The team independently inspected the fire brigade equipment, including personnel protective gear (e.g., turnout gear) and smoke removal equipment, to determine operational readiness for firefighting.
Line 94: Line 174:


===.4 Protection from Damage from Fire Suppression Activities===
===.4 Protection from Damage from Fire Suppression Activities===
====a. Inspection Scope====
The team performed document reviews and plant walkdowns to determine whether redundant trains of systems required for post-fire safe shutdown, located in the same or adjacent fire areas, were subject to damage from fire suppression activities or from the rupture or inadvertent operation of fire suppression systems. Specifically, the team evaluated whether:
* A fire in one of the selected fire areas would release smoke, heat or hot gases that could cause unintended activation of suppression systems in adjacent fire areas which could potentially damage all redundant safe shutdown trains or
* A fire suppression system rupture, inadvertent actuation or actuation due to a fire, in one of the selected fire areas, could directly damage all redundant trains (e.g.


====a. Inspection Scope====
sprinkler caused flooding of other than the locally affected train) and
The team performed document reviews and plant walkdowns to determine whether redundant trains of systems required for post-fire safe shutdown, located in the same or  adjacent fire areas, were subject to damage from fire suppression activities or from the rupture or inadvertent operation of fire suppression systems. Specifically, the team evaluated whether:  A fire in one of the selected fire areas would release smoke, heat or hot gases that could cause unintended activation of suppression systems in adjacent fire areas which could potentially damage all redundant safe shutdown trains or  A fire suppression system rupture, inadvertent actuation or actuation due to a fire, in one of the selected fire areas, could directly damage all redundant trains (e.g. sprinkler caused flooding of other than the locally affected train) and   Adequate drainage was provided in areas protected by water suppression systems
* Adequate drainage was provided in areas protected by water suppression systems


====b. Findings====
====b. Findings====
Line 102: Line 186:


===.5 Alternative Shutdown Capability===
===.5 Alternative Shutdown Capability===
====a. Inspection Scope====
The team reviewed the safe shutdown analysis, operating procedures, piping and instrumentation drawings (P&lDs), electrical drawings, the UFSAR, and other supporting documents for the selected fire areas to verify whether Exelon had properly identified the systems and components necessary to achieve and maintain post-fire safe shutdown conditions. The team evaluated selected systems and components credited by the safe shutdown analysis for reactor pressure control, reactivity control, reactor coolant makeup, decay heat removal, process monitoring, and support system functions to assess the adequacy of Exelon's alternative shutdown methodology. The team also assessed whether alternative post-fire shutdown could be performed both with and without the availability of off-site power. The team walked down selected plant configurations to verify whether they were consistent with the assumptions and descriptions in the safe shutdown and fire hazards analyses. In addition, the team evaluated whether the systems and components credited for use during post-fire safe shutdown would remain free from fire damage.


====a. Inspection Scope====
The team reviewed the training program for licensed and non-licensed operators to verify whether it included alternative shutdown capability. The team also verified whether personnel required for post-fire safe shutdown, using either the normal or alternative shutdown methods, were trained and available on-site at all times, exclusive of those assigned as fire brigade members.
The team reviewed the safe shutdown analysis, operating procedures, piping and instrumentation drawings (P&lDs), electrical drawings, the UFSAR, and other supporting documents for the selected fire areas to verify whether Exelon had properly identified the systems and components necessary to achieve and maintain post-fire safe shutdown conditions. The team evaluated selected systems and components credited by the safe shutdown analysis for reactor pressure control, reactivity control, reactor coolant makeup, decay heat removal, process monitoring, and support system functions to assess the adequacy of Exelon's alternative shutdown methodology. The team also assessed whether alternative post-fire shutdown could be performed both with and without the availability of off-site power. The team walked down selected plant configurations to verify whether they were consistent with the assumptions and descriptions in the safe shutdown and fire hazards analyses. In addition, the team evaluated whether the systems and components credited for use during post-fire safe shutdown would remain free from fire damage. The team reviewed the training program for licensed and non-licensed operators to verify whether it included alternative shutdown capability. The team also verified whether personnel required for post-fire safe shutdown, using either the normal or alternative shutdown methods, were trained and available on-site at all times, exclusive of those assigned as fire brigade members.
 
The team reviewed the adequacy of procedures utilized for post-fire shutdown and performed an independent walk through of procedure steps (i.e., a procedure tabletop)to assess the adequacy of implementation and human factors within the procedures.
 
The team also evaluated the time required to perform specific actions to verify whether operators could reasonably be expected to perform those actions within sufficient time to maintain plant parameters within specified limits.
 
Specific procedures reviewed for normal and alternative post-fire shutdown included:
* ABN-30, Control Room Evacuation, Rev. 25
* FSP-TB11D, Turbine Building Basement Fire Support Procedure, Rev. 8
* FSP-RB1F3, Reactor Building Elev. -19 Foot, Rev. 3


The team reviewed the adequacy of procedures utilized for post-fire shutdown and performed an independent walk through of procedure steps (i.e., a procedure tabletop) to assess the adequacy of implementation and human factors within the procedures. The team also evaluated the time required to perform specific actions to verify whether operators could reasonably be expected to perform those actions within sufficient time to maintain plant parameters within specified limits. Specific procedures reviewed for normal and alternative post-fire shutdown included:  ABN-30, Control Room Evacuation, Rev. 25  FSP-TB11D, Turbine Building Basement Fire Support Procedure, Rev. 8  FSP-RB1F3, Reactor Building Elev. -19 Foot, Rev. 3  The team reviewed selected operator manual actions to verify whether they had been properly reviewed and approved and whether the actions could be implemented in accordance with plant procedures in the time necessary to support the safe shutdown method for each fire area. The team also reviewed the periodic testing of the alternative shutdown transfer and isolation capability, and instrumentation and control functions, to evaluate whether the tests were adequate to ensure the functionality of the alternative shutdown capability.
The team reviewed selected operator manual actions to verify whether they had been properly reviewed and approved and whether the actions could be implemented in accordance with plant procedures in the time necessary to support the safe shutdown method for each fire area. The team also reviewed the periodic testing of the alternative shutdown transfer and isolation capability, and instrumentation and control functions, to evaluate whether the tests were adequate to ensure the functionality of the alternative shutdown capability.


====b. Findings====
====b. Findings====
Line 112: Line 206:


===.6 Circuit Analysis===
===.6 Circuit Analysis===
====a. Inspection Scope====
The team reviewed Exelon's post-fire safe shutdown analysis for the selected fire areas to determine whether the analysis identified both required and associated electrical circuits and cables for the systems and components necessary to achieve and maintain safe shutdown. The team reviewed electrical schematics and cable routing data for power, control, and instrument cables associated with selected components.
Specifically, the team evaluated the selected circuits and cables to determine whether they were
: (a) adequately protected from potential fire damage, or
: (b) analyzed to show that fire-induced faults (e.g., hot shorts, open circuits, and shorts to ground) would not prevent safe shutdown, or
: (c) analyzed to show that potential damage could be mitigated with approved operator manual actions, in order to verify whether fire-induced faults could adversely impact safe shutdown capabilities. The team's evaluations considered credible fire scenarios, cable insulation attributes, cable failure modes, cable routing, and common power supply or electrical bus configurations.
In addition, the team reviewed cable raceway drawings and cable routing databases for a sample of components required for post-fire safe shutdown to determine whether those cables were routed as described in the safe shutdown analysis. The team also reviewed equipment important to safe shutdown, but not part of the success path, to assess whether Exelon's safe shutdown methodologies were appropriate, conformed to design and licensing basis requirements, and appropriately considered the guidance in NRC Regulatory Guide 1.189, "Fire Protection for Nuclear Power Plants," revision 2.
Cable failure modes were reviewed for the following components:
* P-15-1B
B Control Rod Drive Pump
* P-5-2
RBCCW Pump
* V-14-30
Steam Line Valve - Train A (AC)
* V-14-31
Steam Line Valve - Train A (DC)
* V-14-34


====a. Inspection Scope====
Condensate Valve - Train A (DC)
The team reviewed Exelon's post-fire safe shutdown analysis for the selected fire areas to determine whether the analysis identified both required and associated electrical circuits and cables for the systems and components necessary to achieve and maintain safe shutdown. The team reviewed electrical schematics and cable routing data for power, control, and instrument cables associated with selected components. Specifically, the team evaluated the selected circuits and cables to determine whether they were (a) adequately protected from potential fire damage, or (b) analyzed to show that fire-induced faults (e.g., hot shorts, open circuits, and shorts to ground) would not prevent safe shutdown, or (c) analyzed to show that potential damage could be mitigated with approved operator manual actions, in order to verify whether fire-induced faults could adversely impact safe shutdown capabilities. The team's evaluations considered credible fire scenarios, cable insulation attributes, cable failure modes, cable routing, and common power supply or electrical bus configurations. In addition, the team reviewed cable raceway drawings and cable routing databases for a sample of components required for post-fire safe shutdown to determine whether those cables were routed as described in the safe shutdown analysis. The team also reviewed equipment important to safe shutdown, but not part of the success path, to assess whether Exelon's safe shutdown methodologies were appropriate, conformed to design and licensing basis requirements, and appropriately considered the guidance in NRC Regulatory Guide 1.189, "Fire Protection for Nuclear Power Plants," revision 2. Cable failure modes were reviewed for the following components:  P-15-1B  'B' Control Rod Drive Pump  P-5-2    RBCCW Pump  V-14-30  Steam Line Valve - Train 'A' (AC)  V-14-31  Steam Line Valve - Train 'A' (DC)  V-14-34  Condensate Valve - Train 'A' (DC) V-14-36 Condensate Valve - Train 'A' (AC) LI-IG07A 'A' Isolation Condenser Shell Water Level The team reviewed a sample of circuit breaker and over-current protection coordination studies to determine whether equipment needed for post-fire safe shutdown activities could be adversely affected due to a lack of coordination that could result in a common power supply or common electrical bus concern. The team also evaluated whether coordination studies appropriately considered multiple faults due to fire. In addition, the team reviewed a sample of circuit breaker maintenance records, for components required for safe shutdown, to determine whether the breakers were properly maintained. The team assessed the transfer of control from the control room to the alternative shutdown locations to determine whether it would be affected by fire-induced circuit faults (e.g., by the provision of separate fuses and power supplies for alternative shutdown control circuits).
* V-14-36  
 
Condensate Valve - Train A (AC)
* LI-IG07A  
 
A Isolation Condenser Shell Water Level  
 
The team reviewed a sample of circuit breaker and over-current protection coordination studies to determine whether equipment needed for post-fire safe shutdown activities could be adversely affected due to a lack of coordination that could result in a common power supply or common electrical bus concern. The team also evaluated whether coordination studies appropriately considered multiple faults due to fire. In addition, the team reviewed a sample of circuit breaker maintenance records, for components required for safe shutdown, to determine whether the breakers were properly maintained.
 
The team assessed the transfer of control from the control room to the alternative shutdown locations to determine whether it would be affected by fire-induced circuit faults (e.g., by the provision of separate fuses and power supplies for alternative shutdown control circuits).


====b. Findings====
====b. Findings====
Line 120: Line 247:


===.7 Communications===
===.7 Communications===
====a. Inspection Scope====
====a. Inspection Scope====
The team reviewed safe shutdown procedures, the safe shutdown analysis, and associated documents to verify whether an adequate method of communications would be available to plant operators following a fire. Specifically, the team evaluated whether plant telephones, page systems, and portable radios would be available for use and were properly maintained.
The team reviewed safe shutdown procedures, the safe shutdown analysis, and associated documents to verify whether an adequate method of communications would be available to plant operators following a fire. Specifically, the team evaluated whether plant telephones, page systems, and portable radios would be available for use and were properly maintained. During this review, the team considered the effects of ambient noise levels, clarity of reception, reliability, and coverage patterns. The team inspected selected emergency storage lockers to independently verify whether portable communication equipment was available for the fire brigade and plant operators. In addition, the team evaluated whether radio or phone repeaters, transmitters, and power supplies would be reasonably unaffected by a fire.
 
During this review, the team considered the effects of ambient noise levels, clarity of reception, reliability, and coverage patterns. The team inspected selected emergency storage lockers to independently verify whether portable communication equipment was available for the fire brigade and plant operators. In addition, the team evaluated whether radio or phone repeaters, transmitters, and power supplies would be reasonably unaffected by a fire.


====b. Findings====
====b. Findings====
Line 130: Line 254:


===.8 Emergency Lighting===
===.8 Emergency Lighting===
====a. Inspection Scope====
The team walked down the emergency lights in the selected fire areas to independently evaluate the placement and coverage areas of the lights. The team assessed whether the lights provided adequate illumination on local equipment and instrumentation required for post-fire safe shutdown, to ensure local operations could be reliably performed under expected post-fire conditions. In addition, emergency light placement was also evaluated to determine adequate illumination of local area access and egress pathways.


====a. Inspection Scope====
The team verified whether the emergency light batteries were rated for at least an eight-hour capacity. The team interviewed system engineers and technical staff to evaluate the adequacy and the performance of the Emergency lighting Units (ELUs).
The team walked down the emergency lights in the selected fire areas to independently evaluate the placement and coverage areas of the lights. The team assessed whether the lights provided adequate illumination on local equipment and instrumentation required for post-fire safe shutdown, to ensure local operations could be reliably  performed under expected post-fire conditions. In addition, emergency light placement was also evaluated to determine adequate illumination of local area access and egress pathways. The team verified whether the emergency light batteries were rated for at least an eight-hour capacity. The team interviewed system engineers and technical staff to evaluate the adequacy and the performance of the Emergency lighting Units (ELUs). Preventive maintenance procedures, the vendor manual, conductance tests, and battery replacement practices were also reviewed to evaluate whether the ELUs had been maintained in a manner that would ensure reliable operation.
 
Preventive maintenance procedures, the vendor manual, conductance tests, and battery replacement practices were also reviewed to evaluate whether the ELUs had been maintained in a manner that would ensure reliable operation.


====b. Findings====
====b. Findings====
Line 138: Line 265:


===.9 Cold Shutdown Repairs===
===.9 Cold Shutdown Repairs===
====a. Inspection Scope====
====a. Inspection Scope====
The team reviewed Exelon's dedicated repair procedures, for components which might be damaged by fire and were required to achieve post-fire cold shutdown. The team evaluated selected cold shutdown repairs to determine whether they could be achieved within the time frames assumed in the design and licensing bases. In addition, the team verified whether the necessary repair equipment, tools, and materials (e.g., pre-cut cables with prepared attachment lugs) were available and accessible on site.
The team reviewed Exelon's dedicated repair procedures, for components which might be damaged by fire and were required to achieve post-fire cold shutdown. The team evaluated selected cold shutdown repairs to determine whether they could be achieved within the time frames assumed in the design and licensing bases. In addition, the team verified whether the necessary repair equipment, tools, and materials (e.g., pre-cut cables with prepared attachment lugs) were available and accessible on site.
Line 146: Line 272:


===.10 Compensatory Measures===
===.10 Compensatory Measures===
====a. Inspection Scope====
The team verified whether compensatory measures were in place for out-of-service, degraded, or inoperable fire protection and post-fire safe shutdown equipment, systems, or features (e.g., detection and suppression systems and equipment, passive fire barriers, pumps, valves, or electrical devices providing safe shutdown functions or capabilities). The team evaluated whether the short term compensatory measures adequately compensated for the degraded function or feature until appropriate corrective action could be taken and whether Exelon was effective in returning the equipment to service in a reasonable period of time.


====a. Inspection Scope====
The team reviewed selected compensatory measures in the form of operator manual actions for 10 CFR 50 Appendix R, Section III.G.2 areas to evaluate whether those actions could be reasonably accomplished. Specific attributes reviewed included availability of diagnostic instrumentation, expected environmental conditions, minimum staffing, communications, equipment availability, training, procedures, and verification and validation.
The team verified whether compensatory measures were in place for out-of-service, degraded, or inoperable fire protection and post-fire safe shutdown equipment, systems, or features (e.g., detection and suppression systems and equipment, passive fire barriers, pumps, valves, or electrical devices providing safe shutdown functions or capabilities). The team evaluated whether the short term compensatory measures adequately compensated for the degraded function or feature until appropriate corrective action could be taken and whether Exelon was effective in returning the equipment to service in a reasonable period of time. The team reviewed selected compensatory measures in the form of operator manual actions for 10 CFR 50 Appendix R, Section III.G.2 areas to evaluate whether those actions could be reasonably accomplished. Specific attributes reviewed included availability of diagnostic instrumentation, expected environmental conditions, minimum staffing, communications, equipment availability, training, procedures, and verification and validation.


====b. Findings====
====b. Findings====
Line 154: Line 281:


===.11 Review and Documentation of FPP Changes===
===.11 Review and Documentation of FPP Changes===
====a. Inspection Scope====
====a. Inspection Scope====
The team reviewed recent changes to the approved fire protection program to assess whether those changes had an adverse effect on the ability to safely shutdown.
The team reviewed recent changes to the approved fire protection program to assess whether those changes had an adverse effect on the ability to safely shutdown.
Line 162: Line 288:


===.12 Control of Transient Combustibles and Ignition Sources===
===.12 Control of Transient Combustibles and Ignition Sources===
====a. Inspection Scope====
====a. Inspection Scope====
The team reviewed Exelon's procedures and programs for the control of ignition sources and transient combustibles to assess their effectiveness in preventing fires and in controlling combustible loading within limits established in the FHA. A sample of hot work and transient combustible control permits were reviewed to assess the adequacy of Exelon's fire protection program administrative controls. The team performed plant walkdowns to independently verify whether transient combustibles and ignition sources were being properly controlled in accordance with the administrative controls.
The team reviewed Exelon's procedures and programs for the control of ignition sources and transient combustibles to assess their effectiveness in preventing fires and in controlling combustible loading within limits established in the FHA. A sample of hot work and transient combustible control permits were reviewed to assess the adequacy of Exelon's fire protection program administrative controls. The team performed plant walkdowns to independently verify whether transient combustibles and ignition sources were being properly controlled in accordance with the administrative controls.
Line 170: Line 295:


===.13 Large Fires and Explosions Mitigation Strategies===
===.13 Large Fires and Explosions Mitigation Strategies===
====a. Inspection Scope====
The team reviewed selected mitigation strategies intended to maintain or restore core cooling, containment integrity, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to large fires or explosions. The team assessed whether Exelon continued to meet the requirements of license condition 2.C.17. The team reviewed five mitigation strategies:
* Operation of the electro-magnetic relief valves using the portable power supply;
* Manual operation of the isolation condenser for B.5.b events;
* External makeup to the isolation condensers using the portable pump;
* External makeup to the fuel pool using the B.5.b pump and,
* Manually opening containment vent valves in a B.5.b event


====a. Inspection Scope====
The team's review included: a detailed assessment of the procedural guidance; a walkdown of the strategy with a trained operator to assess the feasibility of the strategy and operator familiarity; a review of maintenance and surveillance test records for the strategy equipment; and an independent inventory check of the strategy equipment, materials, and tools to ensure the appropriateness of equipment storage and availability.
The team reviewed selected mitigation strategies intended to maintain or restore core cooling, containment integrity, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to large fires or explosions. The team assessed whether Exelon continued to meet the requirements of license condition 2.C.17. The team reviewed five mitigation strategies:  Operation of the electro-magnetic relief valves using the portable power supply;  Manual operation of the isolation condenser for B.5.b events;  External makeup to the isolation condensers using the portable pump;  External makeup to the fuel pool using the B.5.b pump and,  Manually opening containment vent valves in a B.5.b event  The team's review included: a detailed assessment of the procedural guidance; a walkdown of the strategy with a trained operator to assess the feasibility of the strategy and operator familiarity; a review of maintenance and surveillance test records for the strategy equipment; and an independent inventory check of the strategy equipment, materials, and tools to ensure the appropriateness of equipment storage and availability.


====b. Findings====
====b. Findings====
Line 179: Line 310:
==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
{{a|4OA2}}
{{a|4OA2}}
==4OA2 Identification and Resolution of Problems==
==4OA2 Identification and Resolution of Problems==
  (IP 71152)
(IP 71152)


====a. Inspection Scope====
====a. Inspection Scope====
Line 186: Line 318:


====b. Findings====
====b. Findings====
No findings were identified.  
No findings were identified.
{{a|4OA6}}
 
{{a|4OA6}}
 
==4OA6 Meetings, including Exit==
==4OA6 Meetings, including Exit==
The team presented the inspection results to Mr. R. Peak, Plant Manager, and other members of Exelon 's staff on April 11, 2014. The team verified that this report does not contain proprietary information.
The team presented the inspection results to Mr. R. Peak, Plant Manager, and other members of Exelon 's staff on April 11, 2014. The team verified that this report does not contain proprietary information.


A-1 
=SUPPLEMENTAL INFORMATION=
 
KEY POINTS OF CONTACT


=SUPPLEMENTAL INFORMATION=
KEY POINTS OF CONTACT 
===Licensee Personnel===
===Licensee Personnel===
: [[contact::N. Onuorah]], Fire Protection Engineer  
: [[contact::N. Onuorah]], Fire Protection Engineer  
Line 208: Line 342:
: [[contact::M. Rossi]], Licensed Operator Training Instructor  
: [[contact::M. Rossi]], Licensed Operator Training Instructor  
: [[contact::T. Cannon]], Electrical Technician  
: [[contact::T. Cannon]], Electrical Technician  
: [[contact::R. Wojcik]], Electrical Technician
: [[contact::R. Wojcik]], Electrical Technician  
 
===NRC Personnel===
===NRC Personnel===
: [[contact::J. Kulp]], Senior Resident Inspector  
: [[contact::J. Kulp]], Senior Resident Inspector  
: [[contact::A. Patel]], Resident Inspector  
: [[contact::A. Patel]], Resident Inspector  
: [[contact::J. Schoppy]], Senior Reactor Inspector   LIST OF ITEMS OPENED, CLOSED AND DISCUSSED Opened
: [[contact::J. Schoppy]], Senior Reactor Inspector  
None Opened and Closed None Closed None
 
A-2  LIST OF DOUCMENTS REVIEWED Fire Protection Licensing and Design Basis Documents 990-1746 Fire Hazard Analysis Report, Revision 17 SP-1302-06-013, Augmented Quality Fire Protection Specification for Post-Fire Safe Shutdown   Requirements at Oyster Creek Generating Station, Rev. 5 Oyster Creek Nuclear Generating Station UFSAR, Section 9.5.1, Fire Protection, Rev. 18 Oyster Creek Nuclear Generating Station UFSAR, Section A.1.20, Fire Water System   (Aging Management), Rev. 18 Oyster Creek Nuclear Power Plant Technical Specifications, 8/8/00 OCNGS SER, Fire Protection 3/3/78 OCNGS SER, Fire Protection Supplement No. 2, 11/13/79 OCNGS SER, Fire Protection Supplement No. 3, 8/25/80 Letter Dated March 24, 1986, Exemption from Requirements of Appendix R to 10 CFR Part 50,   Section III.G.2 and the Post-Fire Safe Shutdown Capability Letter Dated June 25, 1990, Exemption from Certain Technical Requirements Contained in   Section II
LIST OF ITEMS OPENED, CLOSED AND DISCUSSED
: [[contact::I.G if Appendix R to 10 CFR Part 50 SP-1302-06-013]], Specification for Post-Fire Shutdown Program Requirements at OCNGS,   Rev. 4 Calculations, Analysis, and Engineering Evaluations BR Report 3731-042, Tripping Feedwater Pumps from Control Room for Fire Outside   the Control Room Complex, Rev. 2 C-1302-911-E120-001, Fire Area OB-FA-5 Safe Shutdown Analysis, Rev. 0 C-1302-911-E120-004, Fire Zone TB-FZ-11D Safe Shutdown Analysis, Rev. 0 C-1302-911-E120-015, Fire Zone RB-FZ-1F3 Safe Shutdown Analysis, Rev. 0 TDR 612, Appendix R Reactor Water Inventory Study, Rev. 0 AR 673565-37, Evaluation of Operator Manual Actions in 4160 Switchgear Rooms   during a Fire in the Turbine Building Basement, performed 06/04/08 748-41, BISCO Report, Three Hour Rated Fire Seal Utilizing BISCO SF-20 Silicone Foam,   4/17/81 748-134, BISCO Test Report, Fire Test Utilizing BISCO SF-20 and SE-Foam, 5/14/84 1042-01, BISCO Test Report, Qualification, Fire and Hose Stream Tests, 2/78 3001-01, Fire Test Configuration for BISCO Block Out Reduction System - Wall Openings   with Inner Lagging Attachment Supports, 7/3/79 375645, Biodiesel Blend Fuel Oil Evaluation, 5/21/09 BM-TE-01, Mecatiss MPF-60 Fire Barriers, Rev. 0 C-1302-811-E310-043, OCNGS Fire Protection Hydraulic Model Margin Analysis, Rev. 0 CTP-1198, Fire Endurance Test of 3M Interam Mat Fire Protective Envelopes   (24 in. and 6 in. Cable Trays, 5", 3", 2", and 1" Conduits, 2" Air Drop and a 12" x 12" x 8"    Junction Box), 11/9/95 CTP-1199, Fire Endurance Test of 3M Interam Mat Fire Protective Envelopes   (24" Cable Tray, 5" and 1" Conduits, and 2" Air Drop into the Tray Center), 9/18/95 CTP-2004, ASTM E136-94 Behavior of Materials in a Vertical Tube Furnace at 750oC,   3M E-50 Interam Series Mat, 1/17/95x 30" Deep Large Box Design, 11/10/98 CTP-2009, Fire Endurance Test of 3M Interam Fire Wrap Fire Protective Envelope, 5/19/98
Opened
A-3  CTP-2011, Fire Endurance Test of 3M Interam Fire Wrap 75" Wide x 56" High CTP-2037, Fire Endurance Test Report of a Heat Transfer Study on Heavy Steel Support   Elements protected with 3M E-50 Series E 54A Interam, 10/12/06 C312252, Thermo-Lag Raceway Cable Upgrades Modification, Rev. 0 C312257, Thermo-Lag Raceway Cable Upgrades Modification, Rev. 0 EC ECR A2014648, Evaluate Penetration Seal #435, 10/21/05 ECR A2161442, Evaluation of 3M Interam Installation for Conduit 86-71, 9/7/12 GL 86-10 Evaluation (AR 00732552-02), Sprinkler System #9 Turbine Basement, South GL 86-10 Evaluation (AR 00732559-02), Sprinkler System #15 Upper Cable Spreading Room Test Deck #1, UL Report, Raceway Fire Barriers for Aluminum Cable Tray & Aluminum   Conduit Systems, 2/5/96 Test Deck #3, UL Report, Raceway Fire Barriers for Aluminum Cable Tray and Aluminum   Conduit Systems, 2/7/96
None
Test Deck #5, UL Report, Raceway Fire Barriers for Aluminum Cable Tray, Aluminum Junction   Box and Aluminum Conduit Systems, 2/9/96 06-00797, Appendix R Evaluation of Electrical Protective Device Coordination, Rev. 0 C-1302-911-E120-001, Fire Area/Zone OB-FA-5 Fire Safe Shutdown Analysis, Rev. 2 C-1302-911-E120-004, Fire Area/Zone TB-FZ-11D Fire Safe Shutdown Analysis, Rev. 4 C-1302-911-E120-015, Fire Area/Zone RB-FZ-1F3 Fire Safe Shutdown Analysis, Rev. 3 OC-PRA-21.06, Oyster Creek Nuclear Generating Station Fire Probabilistic Risk Assessment,   Summary and Quantification Notebook OC-PSA-012, Internal Flood Evaluation Summary and Notebook, Oyster Creek Nuclear   Generating Station, Rev. 1 6-1302-104-5320-013, Design Of Support 1B for 3" Dia and 4" Dia Lines of Fire Protec. Sys. N.C.
Opened and Closed
: [[contact::S.R. O.C. Stn. 13432.30-105]], New CSR Floor Drain Line Sizing, Rev. 0 ECR OC 11-0507 002, Replace Deluge Valve for System #6 ECR OC 13-00350 001, Replace Fire Detectors on RB 95Drawings and Wiring Diagrams
None
23-56751-43, Auto Depressurization System Connection Diagram, Rev. 7 729E182 Sht. 5, Auto Depressurization System Elementary Diagram, Rev. 4
Closed
E1132, CRD Pump Elementary Diagram, Rev. 10 223R0173 Sht. 7, Feedwater System Elementary Diagram, Rev. 15 157B6350 Sht. 184A, Feedwater System Elementary Diagram, Rev. 2 BR 2192, Sht.1, Composite Yard Piping Key Plan, Rev. 12 BR 2192, Sht. 2, Composite Yard Piping Key Plan, Rev. 0 DJP FBS TB-FZ-11D-03, Isometric, Fire Barrier (Mecatiss), Rev. 0 DJP FBS TB-FZ-11D-03, Isometric, Fire Barrier (Mecatiss), Rev. 1 DJP 3E-811-17-1001, Fire Protection Water System, Electrical Elementary Diagram,   Fire Diesel Pump #1, Rev. 2
None  
GU 3D-911-01-001, Fire Area Layout Site Plan, Rev. 7 GU 3D-911-02-002, Fire Area Layout Turbine Building Basement Floor Plan, Rev. 5 GU 3D-911-02-006, Fire Area Layout Turbine Building Operating Floor, Rev. 8 GU 3D-911-02-007, Fire Area Layout Turbine Building Sections "A-A" & "B-B", Rev. 3   
 
LIST OF DOUCMENTS REVIEWED
Fire Protection Licensing and Design Basis Documents
990-1746 Fire Hazard Analysis Report, Revision 17
SP-1302-06-013, Augmented Quality Fire Protection Specification for Post-Fire Safe Shutdown
Requirements at Oyster Creek Generating Station, Rev. 5
Oyster Creek Nuclear Generating Station UFSAR, Section 9.5.1, Fire Protection, Rev. 18
Oyster Creek Nuclear Generating Station UFSAR, Section A.1.20, Fire Water System  
(Aging Management), Rev. 18
Oyster Creek Nuclear Power Plant Technical Specifications, 8/8/00
OCNGS SER, Fire Protection 3/3/78
OCNGS SER, Fire Protection Supplement No. 2, 11/13/79
OCNGS SER, Fire Protection Supplement No. 3, 8/25/80
Letter Dated March 24, 1986, Exemption from Requirements of Appendix R to 10 CFR Part 50,
Section III.G.2 and the Post-Fire Safe Shutdown Capability
Letter Dated June 25, 1990, Exemption from Certain Technical Requirements Contained in
Section III.G if Appendix R to 10 CFR Part 50
SP-1302-06-013, Specification for Post-Fire Shutdown Program Requirements at OCNGS,
Rev. 4
Calculations, Analysis, and Engineering Evaluations
BR Report 3731-042, Tripping Feedwater Pumps from Control Room for Fire Outside
the Control Room Complex, Rev. 2
C-1302-911-E120-001, Fire Area OB-FA-5 Safe Shutdown Analysis, Rev. 0
C-1302-911-E120-004, Fire Zone TB-FZ-11D Safe Shutdown Analysis, Rev. 0
C-1302-911-E120-015, Fire Zone RB-FZ-1F3 Safe Shutdown Analysis, Rev. 0
TDR 612, Appendix R Reactor Water Inventory Study, Rev. 0
AR 673565-37, Evaluation of Operator Manual Actions in 4160 Switchgear Rooms
during a Fire in the Turbine Building Basement, performed 06/04/08
748-41, BISCO Report, Three Hour Rated Fire Seal Utilizing BISCO SF-20 Silicone Foam,
4/17/81
748-134, BISCO Test Report, Fire Test Utilizing BISCO SF-20 and SE-Foam, 5/14/84
1042-01, BISCO Test Report, Qualification, Fire and Hose Stream Tests, 2/78
3001-01, Fire Test Configuration for BISCO Block Out Reduction System - Wall Openings
with Inner Lagging Attachment Supports, 7/3/79
375645, Biodiesel Blend Fuel Oil Evaluation, 5/21/09
BM-TE-01, Mecatiss MPF-60 Fire Barriers, Rev. 0
C-1302-811-E310-043, OCNGS Fire Protection Hydraulic Model Margin Analysis, Rev. 0
CTP-1198, Fire Endurance Test of 3M Interam Mat Fire Protective Envelopes  
(24 in. and 6 in. Cable Trays, 5, 3, 2, and 1 Conduits, 2 Air Drop and a 12 x 12 x 8
Junction Box), 11/9/95
CTP-1199, Fire Endurance Test of 3M Interam Mat Fire Protective Envelopes  
(24 Cable Tray, 5 and 1 Conduits, and 2 Air Drop into the Tray Center), 9/18/95
CTP-2004, ASTM E136-94 Behavior of Materials in a Vertical Tube Furnace at 750oC,
3M E-50 Interam Series Mat, 1/17/95x 30 Deep Large Box Design, 11/10/98
CTP-2009, Fire Endurance Test of 3M Interam Fire Wrap Fire Protective Envelope, 5/19/98  
 
CTP-2011, Fire Endurance Test of 3M Interam Fire Wrap 75 Wide x 56 High
CTP-2037, Fire Endurance Test Report of a Heat Transfer Study on Heavy Steel Support
Elements protected with 3M E-50 Series E 54A Interam, 10/12/06
C312252, Thermo-Lag Raceway Cable Upgrades Modification, Rev. 0
C312257, Thermo-Lag Raceway Cable Upgrades Modification, Rev. 0
EC ECR A2014648, Evaluate Penetration Seal #435, 10/21/05
ECR A2161442, Evaluation of 3M Interam Installation for Conduit 86-71, 9/7/12
GL 86-10 Evaluation (AR 00732552-02), Sprinkler System #9 Turbine Basement, South
GL 86-10 Evaluation (AR 00732559-02), Sprinkler System #15 Upper Cable Spreading Room
Test Deck #1, UL Report, Raceway Fire Barriers for Aluminum Cable Tray & Aluminum
Conduit Systems, 2/5/96
Test Deck #3, UL Report, Raceway Fire Barriers for Aluminum Cable Tray and Aluminum
Conduit Systems, 2/7/96
Test Deck #5, UL Report, Raceway Fire Barriers for Aluminum Cable Tray, Aluminum Junction
Box and Aluminum Conduit Systems, 2/9/96
06-00797, Appendix R Evaluation of Electrical Protective Device Coordination, Rev. 0
C-1302-911-E120-001, Fire Area/Zone OB-FA-5 Fire Safe Shutdown Analysis, Rev. 2
C-1302-911-E120-004, Fire Area/Zone TB-FZ-11D Fire Safe Shutdown Analysis, Rev. 4
C-1302-911-E120-015, Fire Area/Zone RB-FZ-1F3 Fire Safe Shutdown Analysis, Rev. 3
OC-PRA-21.06, Oyster Creek Nuclear Generating Station Fire Probabilistic Risk Assessment,
Summary and Quantification Notebook
OC-PSA-012, Internal Flood Evaluation Summary and Notebook, Oyster Creek Nuclear
Generating Station, Rev. 1
6-1302-104-5320-013, Design Of Support 1B for 3 Dia and 4 Dia Lines of Fire Protec. Sys.
N.C.S.R. O.C. Stn.
13432.30-105, New CSR Floor Drain Line Sizing, Rev. 0
ECR OC 11-0507 002, Replace Deluge Valve for System #6
ECR OC 13-00350 001, Replace Fire Detectors on RB 95
Drawings and Wiring Diagrams
23-56751-43, Auto Depressurization System Connection Diagram, Rev. 7
29E182 Sht. 5, Auto Depressurization System Elementary Diagram, Rev. 4
E1132, CRD Pump Elementary Diagram, Rev. 10
23R0173 Sht. 7, Feedwater System Elementary Diagram, Rev. 15
157B6350 Sht. 184A, Feedwater System Elementary Diagram, Rev. 2
BR 2192, Sht.1, Composite Yard Piping Key Plan, Rev. 12
BR 2192, Sht. 2, Composite Yard Piping Key Plan, Rev. 0
DJP FBS TB-FZ-11D-03, Isometric, Fire Barrier (Mecatiss), Rev. 0
DJP FBS TB-FZ-11D-03, Isometric, Fire Barrier (Mecatiss), Rev. 1
DJP 3E-811-17-1001, Fire Protection Water System, Electrical Elementary Diagram,
Fire Diesel Pump #1, Rev. 2
GU 3D-911-01-001, Fire Area Layout Site Plan, Rev. 7
GU 3D-911-02-002, Fire Area Layout Turbine Building Basement Floor Plan, Rev. 5
GU 3D-911-02-006, Fire Area Layout Turbine Building Operating Floor, Rev. 8
GU 3D-911-02-007, Fire Area Layout Turbine Building Sections A-A & B-B, Rev. 3  
 
GU 3D-911-02-008, Fire Area Layout Turbine Building Sections C-C & D-D, Rev. 2
GU 3D-911-02-009, Fire Area Layout Turbine Building Sections E-E & F-F, Rev. 3
GU 3D-911-02-011, Fire Area Layout Office Building Third Floor, Rev. 8
GU 3D-911-02-012, Fire Area Layout EDG Vaults, Rev. 7
GU 3D-911-02-013, Fire Area Layout Reactor Building E
: [[contact::L. -196]], -6-5 & -1-11, Rev. 3
GU 3D-911-02-030, Fire Area Layout Fresh Water Pump House & Redundant Fire Protection
Pump House & Tank, Rev. 3
GU 3D-911-02-039, Fire Area Layout Legend and Notes, Rev. 6
GU 3E-811-17-1000, Fire Protection Water System, Diesel Fire Pump #2, Electrical Elementary
Dia., Rev. 5
4092, Turbine Building Floor Plan @ E
: [[contact::L. 236]], 27 & 36, Beam and Slab Schedules, Rev. 10
13432.02-M-03, Redundant Fire Protection System Underground Piping Phase I, Rev. 3
103D5244, Connection Diagram Metal Clad Switchgear Unit A1 Bus 1A, Rev. 24
103D5287, Sht. 2, Metal Clad Switchgear Interconnection Diagram, Rev. 26
104D2511, Sht. 2, Emergency Diesel Generator 1 Connection Diagram, Rev. 7
2C3714, Sht. 4, Connection Diagram for Panel 13R, Rev. 21
3C-733-11-006, 120Vac Vital Power System Panel Schedule IP-4, Rev. 6
3D-211-18-006, Sht. 1, Emergency Condenser System Wiring Diagram Valve V-14-0030,
Rev. 2
3D-211-18-006, Sht. 2, Emergency Condenser System Wiring Diagram Valve V-14-0031,
Rev. 1
3D-211-18-006, Sht. 5, Emergency Condenser System Wiring Diagram Valve V-14-0034,
Rev. 1
3D-211-18-006, Sht. 5, Emergency Condenser System Wiring Diagram Valve V-14-0034,
Rev. 1
BR3000, Electrical Power System Key One Line Diagram, Rev. 14
BR3001, Sht. 1, Main One Line Diagram, Auxiliary Startup, Main Transformer and
Main Generator, Rev. 16
BR3001, Sht. 2, One Line Diagram Emergency Diesel Generators, Rev. 4
BR3001A, 4160V System One Line Diagram Switchgear Bus 1A, Rev. 11
BR3001C, 4160V System One Line Diagram Emergency Switchgear Bus 1C and 1D, Rev. 1
BR3002, Sht. 2, 480V System One Line Diagram Unit Substation 1A2 and 1B2, Rev. 13
BR3028, Sht. 1, 125V Station Dc System One Line Diagram, MCC DC-1, Rev. 20
E1101, Elementary Diagram Remote Shutdown Panel Transfer Scheme, Rev. 6
E1108, Elementary Diagram Remote Shutdown Panel Transfer Scheme, Rev. 16
E1126, Elementary Diagram Reactor Building Closed Cooling Water Pump 1-2, Rev. 12
GE103D5270, Sht. 1, 4160V System Electrical Connection Diagram, Rev. 27
GE106D9510, Sht. 1, Emergency Diesel Generator 2 Connection Diagram Switchgear Unit 1
and 3, Rev. 17
GE112C2248, Sht. 2, Connection Diagram Panel 11F, Rev. 46
GE116B8328, Sht. 17, 480V System Electrical Elementary Diagram 480V USS 1B2 Unit 041B,
Rev. 13
GE148F912, Sht. 3, Electrical Elementary Diagram Process Instrumentation, Rev. 17
GE157B6350, Sht. 151B, Emergency Condenser System Wiring Diagram Valve V-14-0032,
Rev. 11
GE157B6350, Sht. 152A, Emergency Condenser System Electrical Elementary Diagram Valve
V-14-0036, Rev. 4
 
GE157B6397, Sht. 15, Emergency Condenser System Electrical Elementary Diagram Valve
V-14-0034, Rev. 31
GE223R0173, Sht. 1A, 4160V System Electrical Elementary Diagram Switchgear 1A Unit A1,
Rev. 27
GE237E901, Sht. 2, Containment Spray Logic Electrical Elementary Diagram, Rev. 21
GE719E202, Sht. 1, Electrical Connection Diagram Panel ER8A, Rev. 17
GE719E203, Sht. 1, Electrical Connection Diagram Panel ER8B, Rev. 18
GE719E211, Sht. 10, Main Control Room Panel 1F/2F, Rev. 8
GE719E211, Sht. 4, Main Control Room Panel 1F/2F, Rev. 32
GE719E211, Sht. 7, Main Control Room Panel 1F/2F, Rev. 19
GE719E211, Sht. 8, Main Control Room Panel 1F/2F, Rev. 7
GE719E251, Sht. 1, Panel ER18A, Rev. 30
GE719E252, Sht. 1, Panel ER18B, Rev. 28
GE237E901, Sht. 1, Containment Spray Logic Electrical Elementary Diagram, Rev 35
Piping and Instrumentation Diagrams
148F262 Sht. 1, Emergency Condenser, Rev. 55
148F740, Containment Spray System, Rev. 44
2003, Condensate & Feed System, Rev. 95
2004, Condensate & Feed System, Rev. 100
JC 19479, Sht. 1, Fire Protection Water System Flow Diagram, Rev. 40
JC 19479, Sht. 2, Fire Protection Water System Flow Diagram, Rev. 42
JC 19479, Sht. 3, Fire Protection Water System Flow Diagram, Rev. 68
JC 19479, Sht. 4, Fire Protection Water System Flow Diagram, Rev. 30
GE148F262, Sht. 1, Emergency Condenser Flow Diagram, Rev. 55
Large Fires and Explosions Mitigation Strategies Documents
EDMG-01, Extensive Damage Mitigation Guidelines, Rev. 6
EDMG-SPX1, Operation of the B.5.b Portable Pump, Rev. 13
EDMG-SPX2, External Makeup to the Fuel Pool Using the B.5.b Portable Pump, Rev. 10
EDMG-SPX4, Manual Operation of the Isolation Condensers for a B.5.b Event, Rev. 3
EDMG-SPX5, External Makeup to the Isolation Condensers Using the Portable Pump, Rev. 10
EDMG-SPX8, Operation of the EMRVs using the Portable Power Supply, Rev.10
EDMG-SPX9, Manually Opening Containment Vent Valves in a B.5.b Event, Rev. 4
Fire Protection Evaluations of Modifications and Design Changes
ECR 11-00171, "A" CRD Pump Bypass Switch, Rev. 0
ECR OC 13-00362 000, Replace Fire Alarm Master Panel In Control Room
Design Changes
ECR 07-00428, Mecatiss Fire Barrier Replacement to 3M Interam, Rev.1
ECR 13-00362, Replace Fire Alarm Master Panel in Control Room, Rev. 0
 
Quality Assurance Audits and Self Assessments
NOSA-OYS-12-10, Oyster Creek Fire Protection Audit Report, 9/19/12
01554310, Oyster Creek Pre-NRC Triennial Fire Protection Inspection Self-Assessment,
2/3/13
Oyster Creek Pre-NRC Triennial Fire Protection Inspection Self-Assessment
System Health Reports
Emergency Lighting (Appendix R) Q3-2013
Emergency Lighting (Appendix R) Q4-2013
Oyster Creek Fire Protection/Fire Safe Shutdown Program, 3rd Quarter 2013
Oyster Creek Fire Protection/Fire Safe Shutdown Program, 4th Quarter 2013
Oyster Creek System Health Report, 655-Fire Protection Detection Systems, 3rd Quarter 2013
Oyster Creek System Health Report, 655-Fire Protection Detection Systems, 4rd Quarter 2013
Oyster Creek System Health Report, 813-Fire Protection Suppression Systems, 3rd Quarter
2013
Oyster Creek System Health Report, 813-Fire Protection Suppression Systems, 4rd
Quarter 2013
Oyster Creek System Health Report, 814-Fire Barriers, 3rd Quarter 2013
Oyster Creek System Health Report, 814-Fire Barriers, 4th Quarter 2013
25Vdc, 3rd and 4th Qtrs. 2013
4160Vac, 3rd and 4th Qtrs. 2013
480Vac, 3rd and 4th Qtrs. 2013
Emergency Diesel Generator, 3rd and 4th Qtrs. 2013
Procedures
101.2, Oyster Creek Site Fire Protection Program, Rev. 70
101.2-3, Oyster Creek Site Fire Protection Program, Technical Requirements, Rev. 70
2400-APR-3214.01, Appendix R Containment Spray Pump Temporary Cable Installation &
Control Cable Repair, Rev. 10
2400-APR-3228.01, Appendix R Temporary Torus Water Level Instrument, Rev. 9
2400-APR-3411.02, Appendix R Temporary EMRV Control & Indication, Rev. 10
2400-APR-3900.01, Appendix R Repair Kit Annual Inspection, Rev. 20
CC-AA-211, Fire Protection Program, Rev. 5
OP-OC-102-106-1001, Control of Time Critical Operator Actions, Rev. 1
OP-AA-201-002, Fire Event Reports, Rev. 5
OP-AA-201-003, Fire Drill Performance, Rev. 13
OP-AA-201-004, Fire Prevention for Hot Work, Rev. 11
OP-AA-201-005, Fire Brigade Qualification, Rev. 8
OP-AA-201-006, Control of Temporary Heat Sources, Rev. 6
OP-MA-201-007, Fire Protection System Impairment Control, Rev. 6
OP-MA-201-008, Pre-Fire Plan Manual, Rev. 3
OP-MA-201-009, Control of Transient Combustible Material, Rev. 12
TQ-AA-173, Emergency Services Training Programs, Rev. 1
645.6.026, Fire Damper Inspector, Rev. 13
 
2400-SME-3915.01, Motor Control Center Preventive Maintenance, Rev. 17
635.2.001, 4160V Switchgear Buses and Circulating Water Pump Protective Relay Surveillance,
Rev. 66
CC-AA-206, Fuse Control, Rev. 8
CC-OC-206-1000, Fuse Replacement, Rev. 0
658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 36
658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 37
658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 38
Operating Experience (OPEX) Evaluations
OPEX Review of NRC IN 2005-03, Seismic Gap Fire Barriers, 5/25/05
OPEX Review of NRC IN 2006-22, New Ultra-Low-Sulfur Diesel Fuel Oil Could Adversely
Impact Diesel Engine Performance, 10/8/06
OPEX Review of NRC IN 2009-02, Biodiesel Fuel could Adversely Impact Diesel Engine
Performance, 6/22/09
OPEX Review of NRC IN 2009-29, Potential Failure of Water Supply Pumps to Automatically
Start due to a Fire, 2/3/10
TP 461/2, Appendix R Emergency Lighting Test, Rev. o
Operations Procedures
307, Isolation Condenser System, Rev. 124
346, Remote and Local Shutdown Panels Operation, Rev. 21
ABN-1, Reactor Scram, Rev. 13
ABN-29, Plant Fires, Rev. 27
ABN-30, Control Room Evacuation, Rev. 25
EMG-3200.01A Attachment 1, RPV Control EOP Flowchart, Rev. 8
EMG-SP11, Alternate Pressure Control Systems - Isolation Condensers, Rev. 1
FSP-RB1F3, Reactor Building 19 Foot Elevation Fire Support Procedure, Rev. 3
FSP-TB11D, Turbine Building Basement Fire Support Procedure, Rev. 8
Operator Safe Shutdown Training
Scenario 2612.885.0.TBB, Fire Response in Turbine Building Basement, dated 7/17/12
TQ-AA-223-F010, Training Material Approval Process, Rev. 6
TQ-JA-155-01, SEG Development Job Aid, Rev. 1
JPM 308.01, Setup Remote Shutdown Panel upon Control Room Evacuation, dated 5/24/10
Scenario 2621.RECIRCOPS.01, Recirculation Operations, dated 9/3/13
JPM 308.02, Operate EDG #2 from LSP-DG2, dated 5/18/11
Scenario 2621.885.0.054C, Control Room Evacuation, dated 2/20/14
Fire Fighting Strategies (i.e., Pre-Fire Plans)
OP-OC-201-008-1010, Oyster Creek Generating Station Pre-Fire Plan,
  (Fire Area/Zone RB-FZ-1F3), Rev. 0
OP-OC-201-008-1019, Oyster Creek Generating Station Pre-Fire Plan,
(Fire Area/Zone OB-FZ-22A), Rev. 0
 
OP-OC-201-008-1027, Oyster Creek Generating Station Pre-Fire Plan,
(Fire Area/Zone TB-FZ-11D), Rev. 5
Fire Brigade Documents
2012 Fire Brigade End of Year Fire Drill Review, 1/2/13
2012 Fire Drill Log, Quarterly Review, 3/29/12, 7/11/12, 9/30/12, 1/3/13
2013 Fire Brigade End of Year Fire Drill Review, 2/13/13
2013 Fire Drill Log, Quarterly Review, 3/29/13, 7/15/13, 9/30/13, 12/10/13
Fire Brigade Training
Fire Brigade Learning Management System (LMS) Qualification Structure, 3/27/14
Fire Brigade Oyster Creek Qualification Status Report, 3/27/14
2011 Off-Site Fire Department Training, 5/9/11
2011 Off-Site Fire Department Drill, 11/7/11
2012 Off-Site Fire Department Training, 9/11/12
Fire Brigade Drills and Critiques
Rx Building 23 Elevation, North, MCC1A B2 Breaker, 8/28/12
Site Emergency Building (SEB-1 Electrical Room, Utility/Transformer Room, 2/11/14
SEB-1 Utility Room, 3/5/14
SEB-1 Utility Room - Battery Room, 3/13/14
Main Control Room - Panel 4-F, Announced, 1/16/14
Main Control Room - Panel 4-F, Announced, 3/21/14
MOB-3 Communications Room, 1/26/14
Transient Combustible Permits and Evaluations
13-011, Fire Zone TB-FZ-11A, Lube Oil Equipment, 3/23/14
14-004, Fire Zone TB-FZ-11D, Turbine Building South-Air Compressor Area, 2/19/14
14-005, Fire Zone TB-FZ-11D, Heat Exchangers, 3/1/14
14-008, Fire Zone TB-FZ-11G, Turbine Building Mezzanine-Cart, 3/23/13
2014 Transient Combustible Log, 3/27/14
Hot Work and Ignition Source Permits
C2030965, TB 3 Air Compressor Receivers/Dryers 1-1 Air Receiver Repair/ Replace Valve
C2031632, ORW 23 Pre-Coat Pump NV-24
Completed Tests and Surveillances
645.3.037, Fire Pump Diesel 1-2 Controller Check and Component Calibration, Rev. 2,
Completed 8/29/13
645.3.038, Fire Pump Diesel 1-1 Controller Check and Component Calibration, Rev. 2,
Completed 8/9/13
645.4.001, Fire Pump #1 Operability Test, Rev. 71, Completed 1/10/14 & 2/6/14
 
645.4.012, Fire Pump Functional Test, Rev. 10, Completed 12/28/11 & 2/26/13
645.4.012, Fire Pump Functional Test, Rev. 11, Completed 12/5/13
645.4.019, Redundant Fire Protection Water Supply Pump Operability Test, Rev. 20,
Completed 2/6/14 & 3/7/14
645.4.020, Redundant Fire Protection Water Supply Pump Functional Test, Rev. 5,
Completed 10/9/12 & 5/30/13
645.4.036, Fire Pump #2 Operability Test. Rev. 23, Completed 12/31/13 & 3/7/14
645.6.003, Fire Hose Station, Hose House and Fire Hydrant Inspection. Rev. 22,
Completed 1/14/14
645.6.003, Fire Hose Station, Hose House and Fire Hydrant Inspection. Rev. 23,
Completed 2/12/14
645.6.007, Fire Protection Flush, Rev. 21, Completed 10/12/11 & 12/3/12
645.6.008, Fire Hose Re-Rack & Blockage Check, Rev. 13, Completed 12/7/11 & 6/2/13
645.6.017, Fire Barrier Penetration Surveillance, Rev. 14, Completed 6/9/09 & 6/25/09
645.6.017, Fire Barrier Penetration Surveillance, Rev. 18, Completed 10/13/11
645.6.017, Fire Barrier Penetration Surveillance, Rev. 19, Completed 11/28/11 & 2/28/12
645.6.023, Fire Suppression Water Underground Flow Test, Rev. 14, Completed 4/15/10
and 8/30/13
645.6.028, Thermo-Lag and Mecatiss (and 3M Interam) Envelope System Fire Barriers,
Rev. 10, Completed 6/22/11 & 2/25/13
645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V
Switchgear Room, Rev. 20, Completed 2/28/11
645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V
Switchgear Room, Rev. 21, Completed 3/8/12 & 3/29/12
645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V
Switchgear Room, Rev. 22, Completed 8/2/13
645.6.033, Fire Detection System Alarm Circuitry Test for Control Room & Upper and
Lower Cable & Upper and Lower Cable Spreading Room, Rev. 5, Completed 6/5/12
645.6.037, Fire Detection System Alarm Circuitry Test for Reactor Building 75, 95, 119
and -19, Rev. 0, Completed 11/14/11 & 12/18/12
680.4.002, Local Shutdown Panel LSP-1AB2 Functional Test, Rev. 6, Completed 11/18/12
680.4.003, Local Shutdown Panel LSP-1B3 Functional Test, Rev. 12, Completed 4/25/12
and 11/10/12
680.4.004, Local Shutdown Panel LSP-1A2 Functional Test, Rev. 18, Completed 11/18/12
680.4.006, Remote Shutdown Panel Functional Test - Train B, Rev. 18, Completed 3/1/12
and 11/18/12
680.4.011, Local Shutdown Panel LSP-1D Functional Test, Rev. 8, Completed 11/11/12
Issue Reports (* denotes NRC identified during this inspection)
AR 01645241*
AR01645668*
IR01646051*
1187591
1582441
1639352*
27339
00931459
00935317
01181818
01348120
01349405
01406356
01410451
01414079
01466438
01448363
01593476
01598001
01629862
01629864
01632532*
01632800
01633052
01638726*
01644466
01644531
01645106*
01645125*
01645693*
01173474
01176224
 
267338
298893
01302134
01522732
01606938
01632238
01638171*
01638631*
01639317*
01639330*
01644668*
AR01500766
Work Orders
R2225828
R2225962
R2223472
R2218408
R2232003
R2232769
R2232794
R2233916
R2234017
R2209149
C2026742
A2346341
A2347715
A2348891
A2350251
C2026068
C2031632
R2219129
R2229838
R2233122
R2235981
C2026467
R2071783
R2092061
R2102792
R2110006
R2142334
R2166849
R2166875
R2171970
R2171971
R2171980
R2172146
R2172433
R2178096
R2186456
R2186457
R2190874
R2194398
R2218884
R2223923
R2228088
R2224209
R2234000
R21960778
R220714
R2226702
Vendor Manuals
VM-OC-2785 Vendor Technical Manual, Revision 2
Industry Standards
EPRI-TR-106826 Battery Performance Monitoring by Internal Ohmic Measurements -
Emergency Lighting Unit Batteries, December 1996
NFPA Fire Protection Handbook, 14th Edition, Section 11, Chapter 5, Test of Water Supplies
Miscellaneous Documents
Exelon Letter of Agreement, Bayville Fire Department, 1/15/14
Exelon Letter of Agreement, Forked River Volunteer Fire Company, 1/15/14
Exelon Letter of Agreement, Lanoka Harbor Fire Department, 1/15/14
Fire Impairment Log, 3/21/14
Training Module 6231-PGD-2685, Course Code 792.0.0007, B.5.b and EDMG Overview, Rev.3
Training Module 6231-PGD-2685, Course Code 792.0.0008, Startup, Operation and
Shutdown of the Godwin Portable Pump, Rev.2
Training Module 6231-PGD-2685, Course Code 792.0.0009, B.5.b and EDMG Walkthrough,
Rev.2
OCNGS Fire Protection - Comparison to Standard Review Plan 9.5.1, Appendix A, 12/3/76
PES-P-006, Procurement Standard for Diesel Fuel Oil, Rev. 10
Analysis of Diesel Fuel Oil, 1/16/14
Electrical Cable and Conduit Routing Information
 
LIST OF ACRONYMS
ADAMS
Agencywide Documents Access and Management System
AC
Alternating Current
APCSB
[NRC] Auxiliary and Power Conversion Systems Branch
ASME
American Society of Mechanical Engineers
ASSS
Alternate Safe Shutdown System
BTP
Branch Technical Position
CCW
Component Cooling Water
CDF
Core Damage Frequency
CFR
Code of Federal Regulations
CMEB
[NRC] Chemical Engineering Branch
CO2
Carbon Dioxide
DC
Direct Current
ELU
Emergency Lighting Unit
FA
Fire Area
FHA
Fire Hazards Analysis
FPP
Fire Protection Program
FW
Feedwater
FZ
Fire Zone
HRR
Heat Release Rate
IN
[NRC] Information Notice
IP
[NRC] Inspection Procedure
IPEEE
Individual Plant Examination of External Events
IR
[NRC] Inspection Report
IR
[Exelon] Issue Report
kV
kilo-Volt
LOCA
Loss of Coolant Accident
MOV
Motor Operated Valve
MSO
Multiple Spurious Operation
NEI
Nuclear Energy Institute
NFPA
National Fire Protection Association
NCV
Non-Cited Violation
NRC
Nuclear Regulatory Commission
OCNGS
Oyster Creek Nuclear Generating Station
PARS
Publicly Available Records System
P&ID
Piping and Instrumentation Drawing
PRA
Probabilistic Risk Assessment
RBCCW
Reactor Building Closed Cooling Water
RG
[NRC] Regulatory Guide
SCBA
Self-Contained Breathing Apparatus
SDP
[NRC] Significance Determination Process
SER
[NRC] Safety Evaluation Report
SSC
Structures, Systems and Components
SW
Service Water


A-4  GU 3D-911-02-008, Fire Area Layout Turbine Building Sections "C-C" & "D-D", Rev. 2 GU 3D-911-02-009, Fire Area Layout Turbine Building Sections "E-E" & "F-F", Rev. 3 GU 3D-911-02-011, Fire Area Layout Office Building Third Floor, Rev. 8 GU 3D-911-02-012, Fire Area Layout EDG Vaults, Rev. 7 GU 3D-911-02-013, Fire Area Layout Reactor Building E
TRM
: [[contact::L. -19'6"]], -6'-5" & -1'-11", Rev. 3 GU 3D-911-02-030, Fire Area Layout Fresh Water Pump House & Redundant Fire Protection    Pump House & Tank, Rev. 3
Technical Requirements Manual
GU 3D-911-02-039, Fire Area Layout Legend and Notes, Rev. 6 GU 3E-811-17-1000, Fire Protection Water System, Diesel Fire Pump #2, Electrical Elementary  Dia., Rev. 5 4092, Turbine Building Floor Plan @ E
UFSAR
: [[contact::L. 23'6"]], 27' & 36', Beam and Slab Schedules, Rev. 10 13432.02-M-03, Redundant Fire Protection System Underground Piping Phase I, Rev. 3 103D5244, Connection Diagram Metal Clad Switchgear Unit A1 Bus 1A, Rev. 24 103D5287, Sht. 2, Metal Clad Switchgear Interconnection Diagram, Rev. 26 104D2511, Sht. 2, Emergency Diesel Generator 1 Connection Diagram, Rev. 7 112C3714, Sht. 4, Connection Diagram for Panel 13R, Rev. 21 3C-733-11-006, 120Vac Vital Power System Panel Schedule IP-4, Rev. 6 3D-211-18-006, Sht. 1, Emergency Condenser System Wiring Diagram Valve V-14-0030,    Rev. 2 3D-211-18-006, Sht. 2, Emergency Condenser System Wiring Diagram Valve V-14-0031,  Rev. 1 3D-211-18-006, Sht. 5, Emergency Condenser System Wiring Diagram Valve V-14-0034,    Rev. 1 3D-211-18-006, Sht. 5, Emergency Condenser System Wiring Diagram Valve V-14-0034,    Rev. 1 BR3000, Electrical Power System Key One Line Diagram, Rev. 14 BR3001, Sht. 1, Main One Line Diagram, Auxiliary Startup, Main Transformer and    Main Generator, Rev. 16 BR3001, Sht. 2, One Line Diagram Emergency Diesel Generators, Rev. 4 BR3001A, 4160V System One Line Diagram Switchgear Bus 1A, Rev. 11 BR3001C, 4160V System One Line Diagram Emergency Switchgear Bus 1C and 1D, Rev. 1 BR3002, Sht. 2, 480V System One Line Diagram Unit Substation 1A2 and 1B2, Rev. 13 BR3028, Sht. 1, 125V Station Dc System One Line Diagram, MCC DC-1, Rev. 20 E1101, Elementary Diagram Remote Shutdown Panel Transfer Scheme, Rev. 6 E1108, Elementary Diagram Remote Shutdown Panel Transfer Scheme, Rev. 16 E1126, Elementary Diagram Reactor Building Closed Cooling Water Pump 1-2, Rev. 12 GE103D5270, Sht. 1, 4160V System Electrical Connection Diagram, Rev. 27 GE106D9510, Sht. 1, Emergency Diesel Generator 2 Connection Diagram Switchgear Unit 1    and 3, Rev. 17 GE112C2248, Sht. 2, Connection Diagram Panel 11F, Rev. 46 GE116B8328, Sht. 17, 480V System Electrical Elementary Diagram 480V USS 1B2 Unit 041B,    Rev. 13 GE148F912, Sht. 3, Electrical Elementary Diagram Process Instrumentation, Rev. 17 GE157B6350, Sht. 151B, Emergency Condenser System Wiring Diagram Valve V-14-0032,    Rev. 11 GE157B6350, Sht. 152A, Emergency Condenser System Electrical Elementary Diagram Valve    V-14-0036, Rev. 4
Updated Final Safety Analysis Report
A-5  GE157B6397, Sht. 15, Emergency Condenser System Electrical Elementary Diagram Valve    V-14-0034, Rev. 31 GE223R0173, Sht. 1A, 4160V System Electrical Elementary Diagram Switchgear 1A Unit A1,  Rev. 27 GE237E901, Sht. 2, Containment Spray Logic Electrical Elementary Diagram, Rev. 21 GE719E202, Sht. 1, Electrical Connection Diagram Panel ER8A, Rev. 17 GE719E203, Sht. 1, Electrical Connection Diagram Panel ER8B, Rev. 18 GE719E211, Sht. 10, Main Control Room Panel 1F/2F, Rev. 8 GE719E211, Sht. 4, Main Control Room Panel 1F/2F, Rev. 32 GE719E211, Sht. 7, Main Control Room Panel 1F/2F, Rev. 19 GE719E211, Sht. 8, Main Control Room Panel 1F/2F, Rev. 7 GE719E251, Sht. 1, Panel ER18A, Rev. 30 GE719E252, Sht. 1, Panel ER18B, Rev. 28 GE237E901, Sht. 1, Containment Spray Logic Electrical Elementary Diagram, Rev 35  Piping and Instrumentation Diagrams
V
148F262 Sht. 1, Emergency Condenser, Rev. 55 148F740, Containment Spray System, Rev. 44 2003, Condensate & Feed System, Rev. 95 2004, Condensate & Feed System, Rev. 100 JC 19479, Sht. 1, Fire Protection Water System Flow Diagram, Rev. 40 JC 19479, Sht. 2, Fire Protection Water System Flow Diagram, Rev. 42 JC 19479, Sht. 3, Fire Protection Water System Flow Diagram, Rev. 68 JC 19479, Sht. 4, Fire Protection Water System Flow Diagram, Rev. 30 GE148F262, Sht. 1, Emergency Condenser Flow Diagram, Rev. 55  Large Fires and Explosions Mitigation Strategies Documents
Volts
EDMG-01, Extensive Damage Mitigation Guidelines, Rev. 6 EDMG-SPX1, Operation of the B.5.b Portable Pump, Rev. 13 EDMG-SPX2, External Makeup to the Fuel Pool Using the B.5.b Portable Pump, Rev. 10 EDMG-SPX4, Manual Operation of the Isolation Condensers for a B.5.b Event, Rev. 3 EDMG-SPX5, External Makeup to the Isolation Condensers Using the Portable Pump, Rev. 10 EDMG-SPX8, Operation of the EMRVs using the Portable Power Supply, Rev.10 EDMG-SPX9, Manually Opening Containment Vent Valves in a B.5.b Event, Rev. 4  Fire Protection Evaluations of Modifications and Design Changes
Vac
ECR 11-00171, "A" CRD Pump Bypass Switch, Rev. 0 ECR OC 13-00362 000, Replace Fire Alarm Master Panel In Control Room Design Changes  ECR 07-00428, Mecatiss Fire Barrier Replacement to 3M Interam, Rev.1 ECR 13-00362, Replace Fire Alarm Master Panel in Control Room, Rev. 0
Voltage Alternating Current
A-6  Quality Assurance Audits and Self Assessments  NOSA-OYS-12-10, Oyster Creek Fire Protection Audit Report, 9/19/12 01554310, Oyster Creek Pre-NRC Triennial Fire Protection Inspection Self-Assessment, 12/3/13 Oyster Creek Pre-NRC Triennial Fire Protection Inspection Self-Assessment  System Health Reports  Emergency Lighting (Appendix R) Q3-2013 Emergency Lighting (Appendix R) Q4-2013 Oyster Creek Fire Protection/Fire Safe Shutdown Program, 3rd Quarter 2013 Oyster Creek Fire Protection/Fire Safe Shutdown Program, 4th Quarter 2013 Oyster Creek System Health Report, 655-Fire Protection Detection Systems, 3rd Quarter 2013 Oyster Creek System Health Report, 655-Fire Protection Detection Systems, 4rd Quarter 2013 Oyster Creek System Health Report, 813-Fire Protection Suppression Systems, 3rd Quarter    2013 Oyster Creek System Health Report, 813-Fire Protection Suppression Systems, 4rd    Quarter 2013 Oyster Creek System Health Report, 814-Fire Barriers, 3rd Quarter 2013 Oyster Creek System Health Report, 814-Fire Barriers, 4th Quarter 2013 125Vdc, 3rd and 4th Qtrs. 2013 4160Vac, 3rd and 4th Qtrs. 2013 480Vac, 3rd and 4th Qtrs. 2013 Emergency Diesel Generator, 3rd and 4th Qtrs. 2013  Procedures
Vdc
101.2, Oyster Creek Site Fire Protection Program, Rev. 70 101.2-3, Oyster Creek Site Fire Protection Program, Technical Requirements, Rev. 70 2400-APR-3214.01, Appendix R Containment Spray Pump Temporary Cable Installation &  Control Cable Repair, Rev. 10 2400-APR-3228.01, Appendix R Temporary Torus Water Level Instrument, Rev. 9 2400-APR-3411.02, Appendix R Temporary EMRV Control & Indication, Rev. 10 2400-APR-3900.01, Appendix R Repair Kit Annual Inspection, Rev. 20 CC-AA-211, Fire Protection Program, Rev. 5 OP-OC-102-106-1001, Control of Time Critical Operator Actions, Rev. 1 OP-AA-201-002, Fire Event Reports, Rev. 5 OP-AA-201-003, Fire Drill Performance, Rev. 13 OP-AA-201-004, Fire Prevention for Hot Work, Rev. 11 OP-AA-201-005, Fire Brigade Qualification, Rev. 8 OP-AA-201-006, Control of Temporary Heat Sources, Rev. 6 OP-MA-201-007, Fire Protection System Impairment Control, Rev. 6 OP-MA-201-008, Pre-Fire Plan Manual, Rev. 3 OP-MA-201-009, Control of Transient Combustible Material, Rev. 12 TQ-AA-173, Emergency Services Training Programs, Rev. 1 645.6.026, Fire Damper Inspector, Rev. 13
Voltage Direct Current
A-7  2400-SME-3915.01, Motor Control Center Preventive Maintenance, Rev. 17 635.2.001, 4160V Switchgear Buses and Circulating Water Pump Protective Relay Surveillance,
Rev. 66 CC-AA-206, Fuse Control, Rev. 8 CC-OC-206-1000, Fuse Replacement, Rev. 0 658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 36 658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 37 658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 38  Operating Experience (OPEX) Evaluations OPEX Review of NRC IN 2005-03, Seismic Gap Fire Barriers, 5/25/05 OPEX Review of NRC IN 2006-22, New Ultra-Low-Sulfur Diesel Fuel Oil Could Adversely  Impact Diesel Engine Performance, 10/8/06 OPEX Review of NRC IN 2009-02, Biodiesel Fuel could Adversely Impact Diesel Engine    Performance, 6/22/09 OPEX Review of NRC IN 2009-29, Potential Failure of Water Supply Pumps to Automatically Start due to a Fire, 2/3/10
TP 461/2, Appendix R Emergency Lighting Test, Rev. o  Operations Procedures
307, Isolation Condenser System, Rev. 124 346, Remote and Local Shutdown Panels Operation, Rev. 21 ABN-1, Reactor Scram, Rev. 13 ABN-29, Plant Fires, Rev. 27 ABN-30, Control Room Evacuation, Rev. 25 EMG-3200.01A Attachment 1, RPV Control EOP Flowchart, Rev. 8 EMG-SP11, Alternate Pressure Control Systems - Isolation Condensers, Rev. 1 FSP-RB1F3, Reactor Building 19 Foot Elevation Fire Support Procedure, Rev. 3 FSP-TB11D, Turbine Building Basement Fire Support Procedure, Rev. 8  Operator Safe Shutdown Training
Scenario 2612.885.0.TBB, Fire Response in Turbine Building Basement, dated 7/17/12 TQ-AA-223-F010, Training Material Approval Process, Rev. 6 TQ-JA-155-01, SEG Development Job Aid, Rev. 1 JPM 308.01, Setup Remote Shutdown Panel upon Control Room Evacuation, dated 5/24/10 Scenario 2621.RECIRCOPS.01, Recirculation Operations, dated 9/3/13 JPM 308.02, Operate EDG #2 from LSP-DG2, dated 5/18/11 Scenario 2621.885.0.054C, Control Room Evacuation, dated 2/20/14  Fire Fighting Strategies (i.e., Pre-Fire Plans)
OP-OC-201-008-1010, Oyster Creek Generating Station Pre-Fire Plan,    (Fire Area/Zone RB-FZ-1F3), Rev. 0 OP-OC-201-008-1019, Oyster Creek Generating Station Pre-Fire Plan,    (Fire Area/Zone OB-FZ-22A), Rev. 0
A-8  OP-OC-201-008-1027, Oyster Creek Generating Station Pre-Fire Plan,    (Fire Area/Zone TB-FZ-11D), Rev. 5  Fire Brigade Documents 2012 Fire Brigade End of Year Fire Drill Review, 1/2/13 2012 Fire Drill Log, Quarterly Review, 3/29/12, 7/11/12, 9/30/12, 1/3/13 2013 Fire Brigade End of Year Fire Drill Review, 2/13/13 2013 Fire Drill Log, Quarterly Review, 3/29/13, 7/15/13, 9/30/13, 12/10/13  Fire Brigade Training  Fire Brigade Learning Management System (LMS) Qualification Structure, 3/27/14 Fire Brigade Oyster Creek Qualification Status Report, 3/27/14 2011 Off-Site Fire Department Training, 5/9/11 2011 Off-Site Fire Department Drill, 11/7/11 2012 Off-Site Fire Department Training, 9/11/12  Fire Brigade Drills and Critiques  Rx Building 23' Elevation, North, MCC1A B2 Breaker, 8/28/12 Site Emergency Building (SEB-1 Electrical Room, Utility/Transformer Room, 2/11/14  SEB-1 Utility Room, 3/5/14 SEB-1 Utility Room - Battery Room, 3/13/14 Main Control Room - Panel 4-F, Announced, 1/16/14 Main Control Room - Panel 4-F, Announced, 3/21/14 MOB-3 Communications Room, 1/26/14  Transient Combustible Permits and Evaluations
13-011, Fire Zone TB-FZ-11A, Lube Oil Equipment, 3/23/14 14-004, Fire Zone TB-FZ-11D, Turbine Building South-Air Compressor Area, 2/19/14 14-005, Fire Zone TB-FZ-11D, Heat Exchangers, 3/1/14 14-008, Fire Zone TB-FZ-11G, Turbine Building Mezzanine-Cart, 3/23/13 2014 Transient Combustible Log, 3/27/14  Hot Work and Ignition Source Permits
C2030965, TB 3' Air Compressor Receivers/Dryers 1-1 Air Receiver Repair/ Replace Valve C2031632, ORW 23' Pre-Coat Pump NV-24  Completed Tests and Surveillances  645.3.037, Fire Pump Diesel 1-2 Controller Check and Component Calibration, Rev. 2,    Completed 8/29/13 645.3.038, Fire Pump Diesel 1-1 Controller Check and Component Calibration, Rev. 2,    Completed 8/9/13 645.4.001, Fire Pump #1 Operability Test, Rev. 71, Completed 1/10/14 & 2/6/14
A-9  645.4.012, Fire Pump Functional Test, Rev. 10, Completed 12/28/11 & 2/26/13 645.4.012, Fire Pump Functional Test, Rev. 11, Completed 12/5/13 645.4.019, Redundant Fire Protection Water Supply Pump Operability Test, Rev. 20,    Completed 2/6/14 & 3/7/14 645.4.020, Redundant Fire Protection Water Supply Pump Functional Test, Rev. 5,  Completed 10/9/12 & 5/30/13 645.4.036, Fire Pump #2 Operability Test. Rev. 23, Completed 12/31/13 & 3/7/14 645.6.003, Fire Hose Station, Hose House and Fire Hydrant Inspection. Rev. 22,    Completed 1/14/14 645.6.003, Fire Hose Station, Hose House and Fire Hydrant Inspection. Rev. 23,    Completed 2/12/14 645.6.007, Fire Protection Flush, Rev. 21, Completed 10/12/11 & 12/3/12 645.6.008, Fire Hose Re-Rack & Blockage Check, Rev. 13, Completed 12/7/11 & 6/2/13 645.6.017, Fire Barrier Penetration Surveillance, Rev. 14, Completed 6/9/09 & 6/25/09 645.6.017, Fire Barrier Penetration Surveillance, Rev. 18, Completed 10/13/11 645.6.017, Fire Barrier Penetration Surveillance, Rev. 19, Completed 11/28/11 & 2/28/12 645.6.023, Fire Suppression Water Underground Flow Test, Rev. 14, Completed 4/15/10    and 8/30/13 645.6.028, Thermo-Lag and Mecatiss (and 3M Interam) Envelope System Fire Barriers,    Rev. 10, Completed 6/22/11 & 2/25/13 645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V    Switchgear Room, Rev. 20, Completed 2/28/11 645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V    Switchgear Room, Rev. 21, Completed 3/8/12 & 3/29/12 645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V    Switchgear Room, Rev. 22, Completed 8/2/13 645.6.033, Fire Detection System Alarm Circuitry Test for Control Room & Upper and    Lower Cable & Upper and Lower Cable Spreading Room, Rev. 5, Completed 6/5/12 645.6.037, Fire Detection System Alarm Circuitry Test for Reactor Building 75', 95', 119'    and -19', Rev. 0, Completed 11/14/11 & 12/18/12 680.4.002, Local Shutdown Panel LSP-1AB2 Functional Test, Rev. 6, Completed 11/18/12 680.4.003, Local Shutdown Panel LSP-1B3 Functional Test, Rev. 12, Completed 4/25/12    and 11/10/12 680.4.004, Local Shutdown Panel LSP-1A2 Functional Test, Rev. 18, Completed 11/18/12 680.4.006, Remote Shutdown Panel Functional Test - Train B, Rev. 18, Completed 3/1/12  and 11/18/12 680.4.011, Local Shutdown Panel LSP-1D Functional Test, Rev. 8, Completed 11/11/12  Issue Reports (* denotes NRC identified during this inspection)  AR 01645241*  AR01645668*  IR01646051*  1187591 1582441  1639352*  0527339  00931459 00935317  01181818  01348120  01349405 01406356  01410451  01414079  01466438 01448363  01593476  01598001  01629862 01629864  01632532*  01632800  01633052 01638726*  01644466  01644531  01645106* 01645125*  01645693*  01173474  01176224
A-10  01267338  01298893  01302134  01522732 01606938  01632238  01638171*  01638631* 01639317*  01639330*  01644668*  AR01500766  Work Orders  R2225828  R2225962  R2223472  R2218408 R2232003  R2232769  R2232794  R2233916 R2234017  R2209149  C2026742  A2346341 A2347715  A2348891  A2350251  C2026068 C2031632  R2219129  R2229838  R2233122 R2235981  C2026467  R2071783  R2092061 R2102792  R2110006  R2142334  R2166849 R2166875  R2171970  R2171971  R2171980 R2172146  R2172433  R2178096  R2186456 R2186457  R2190874  R2194398  R2218884 R2223923  R2228088  R2224209  R2234000 R21960778  R220714  R2226702  Vendor Manuals
VM-OC-2785  Vendor Technical Manual, Revision 2  Industry Standards
EPRI-TR-106826 Battery Performance Monitoring by Internal Ohmic Measurements -Emergency Lighting Unit Batteries, December 1996  NFPA Fire Protection Handbook, 14th Edition, Section 11, Chapter 5, Test of Water Supplies  Miscellaneous Documents
Exelon Letter of Agreement, Bayville Fire Department, 1/15/14 Exelon Letter of Agreement, Forked River Volunteer Fire Company, 1/15/14 Exelon Letter of Agreement, Lanoka Harbor Fire Department, 1/15/14 Fire Impairment Log, 3/21/14 Training Module 6231-PGD-2685, Course Code 792.0.0007, B.5.b and EDMG Overview, Rev.3 Training Module 6231-PGD-2685, Course Code 792.0.0008, Startup, Operation and    Shutdown of the Godwin Portable Pump, Rev.2 Training Module 6231-PGD-2685, Course Code 792.0.0009, B.5.b and EDMG Walkthrough,  Rev.2 OCNGS Fire Protection - Comparison to Standard Review Plan 9.5.1, Appendix A, 12/3/76 PES-P-006, Procurement Standard for Diesel Fuel Oil, Rev. 10 Analysis of Diesel Fuel Oil, 1/16/14 Electrical Cable and Conduit Routing Information
A-11  LIST OF ACRONYMS  ADAMS Agencywide Documents Access and Management System AC  Alternating Current APCSB [NRC] Auxiliary and Power Conversion Systems Branch ASME  American Society of Mechanical Engineers ASSS  Alternate Safe Shutdown System BTP  Branch Technical Position CCW  Component Cooling Water CDF  Core Damage Frequency CFR  Code of Federal Regulations CMEB  [NRC] Chemical Engineering Branch CO2  Carbon Dioxide DC  Direct Current ELU  Emergency Lighting Unit FA  Fire Area FHA  Fire Hazards Analysis FPP  Fire Protection Program FW  Feedwater FZ  Fire Zone HRR  Heat Release Rate IN  [NRC] Information Notice IP  [NRC] Inspection Procedure IPEEE  Individual Plant Examination of External Events IR  [NRC] Inspection Report IR  [Exelon] Issue Report kV  kilo-Volt LOCA  Loss of Coolant Accident MOV  Motor Operated Valve MSO  Multiple Spurious Operation NEI  Nuclear Energy Institute NFPA  National Fire Protection Association NCV  Non-Cited Violation NRC  Nuclear Regulatory Commission OCNGS Oyster Creek Nuclear Generating Station PARS  Publicly Available Records System P&ID  Piping and Instrumentation Drawing PRA  Probabilistic Risk Assessment RBCCW Reactor Building Closed Cooling Water RG  [NRC] Regulatory Guide SCBA  Self-Contained Breathing Apparatus SDP  [NRC] Significance Determination Process SER  [NRC] Safety Evaluation Report SSC  Structures, Systems and Components SW  Service Water
A-12  TRM  Technical Requirements Manual UFSAR Updated Final Safety Analysis Report V Volts Vac Voltage Alternating Current Vdc Voltage Direct Current
}}
}}

Latest revision as of 21:15, 10 January 2025

IR 05000219-14-007, on 03/24-28/2014 and 04/07-11/2014, Oyster Creek Nuclear Generating Station, Triennial Fire Protection Inspection
ML14125A004
Person / Time
Site: Oyster Creek
Issue date: 05/05/2014
From: Rogge J
Engineering Region 1 Branch 3
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Rogge J
References
IR-14-007
Download: ML14125A004 (26)


Text

May 5, 2014

SUBJECT:

OYSTER CREEK GENERATING STATION - NRC TRIENNIAL FIRE

PROTECTION INSPECTION REPORT 05000219/2014007

Dear Mr. Pacilio:

On April 11, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a triennial fire protection inspection at the Oyster Creek Nuclear Generating Station. The enclosed inspection report documents the inspection results, which were discussed on April 11, 2014, with Mr. R. Peak and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed station personnel. The inspectors also reviewed mitigation strategies for addressing large fires and explosions.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

John F. Rogge, Chief

Engineering Branch 3

Division of Reactor Safety

Docket No:

50-219 License No:

DPR-16

Enclosure:

Inspection Report 05000219/2014007 w/Attachment: Supplemental Information

REGION I==

Docket No:

50-219

License No:

DPR-16

Report No:

05000219/2014007

Licensee:

Exelon Generation Company, LLC

Facility:

Oyster Creek Nuclear Generating Station

Location:

P.O. Box 388

Forked River, NJ 08731

Dates:

March 24 - 28 and April 7 -11, 2014

Inspectors:

R. Fuhrmeister, Senior Reactor Inspector (Team Leader)

C. Cahill, Senior Reactor Analyst

K. Young, Senior Reactor Inspector

J. Richmond, Reactor Inspector

J. Rady, Reactor Inspector

L. DuMont, Reactor Inspector

Approved by:

John F. Rogge, Chief

Engineering Branch 3

Division of Reactor Safety

SUMMARY

IR 05000219/2014007; 03/24-28/2014 and 04/07-11/2014; Oyster Creek Nuclear Generating

Station; Triennial Fire Protection Inspection.

This report covered a two week on-site triennial fire protection team inspection by specialist inspectors. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

No Findings were identified.

REPORT DETAILS

Background

This report presents the results of a triennial fire protection inspection conducted in accordance with NRC Inspection Procedure (IP) 71111.05T, "Fire Protection." The objective of the inspection was to assess whether Exelon Generation Company, LLC (Exelon) had implemented an adequate fire protection program and whether post-fire safe shutdown capabilities had been established and were properly maintained at Oyster Creek Nuclear Generating Station (Oyster Creek). The following fire areas (FAs) and associated fire zones (FZs) were selected for detailed review based on prior inspection results and risk insights from the Oyster Creek Individual Plant Examination of External Events (IPEEE):

Fire Areas (Fire Zones)

  • TB-FZ-11D
  • RB-FZ-1F3
  • OB-FZ-22A

Inspection of these fire areas/zones fulfilled the inspection procedure requirement to inspect a minimum of three samples.

The inspection team evaluated Exelon's fire protection program (FPP) against applicable requirements which included Operating License Condition, NRC Safety Evaluation Reports (SERs), 10 CFR 50.48, and 10 CFR 50, Appendix R. The team also reviewed related documents that included the Updated Final Safety Analysis Report (UFSAR), Section 9.5.1, fire protection plan, fire hazards analysis (FHA), and post-fire safe shutdown analyses.

The team evaluated aspects of five mitigating strategies for responding to large fires and explosions, as required by Operating License Condition 2.C.17 and 10 CFR 50.54(hh)(2). The team also reviewed related documents that included NEI 06-12, "B.5.b Phases 2 & 3 Submittal Guidance," Revision 2 (ML070090060). Inspection of these strategies fulfills the inspection procedure requirement to inspect a minimum of one sample.

Specific documents reviewed by the team are listed in the attachment to this report.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

==1R05 Fire Protection (IP 71111.05T)

==

.1 Protection of Safe Shutdown Capabilities

a. Inspection Scope

The team reviewed the FHA, safe shutdown analyses, and supporting drawings and documentation to verify that post-fire safe shutdown capabilities were properly protected.

The team ensured that applicable separation requirements of Section III.G of 10 CFR Part 50, Appendix R, and the licensees design and licensing bases were maintained for the credited safe shutdown equipment and their supporting power, control, and instrumentation cables. This review included an assessment of the adequacy of the selected systems for reactivity control, reactor coolant makeup, reactor heat removal, process monitoring and associated support system functions.

b. Findings

No findings were identified.

.2 Passive Fire Protection

a. Inspection Scope

The team walked down accessible portions of the selected fire areas to evaluate whether the material conditions of the fire area boundaries were adequate for the fire hazards in the area. The team compared the fire area boundaries including walls, ceilings, floors, fire doors, fire dampers, penetration seals, electrical raceway and conduit fire barriers, and redundant equipment fire barriers and radiant energy heat barriers to the design and licensing basis requirements, industry standards, and the OCNGS FPP, as approved by the NRC, to identify any potential degradation or non-conformances.

The team reviewed selected engineering evaluations and qualification records for a sample of penetration seals to determine whether the fill material was properly installed and whether the as-left configuration satisfied design requirements for the intended fire rating. The team also reviewed similar records for selected fire protection wraps to verify whether the material and configuration was appropriate for the required fire rating and conformed to the engineering design.

The team also reviewed recent inspection and test records for fire dampers and the inspection records for penetration seals and fire barriers to verify whether the inspection and testing was adequately conducted, the acceptance criteria were met, and any potential performance degradation was identified.

b. Findings

No findings were identified.

.3 Active Fire Protection

a. Inspection Scope

The team evaluated manual and automatic fire suppression and detection systems in the selected fire areas to determine whether they were installed, tested, maintained and operated in accordance with NRC requirements, National Fire Protection Association (NFPA) codes of record and the OCNGS FPP. The team also assessed whether the suppression systems capabilities were adequate to control and/or extinguish fires associated with the hazards in the selected areas.

The team reviewed the as-built capability of the fire water supply system to verify whether the design and licensing basis and NFPA code of record requirements were satisfied and to assess whether those capabilities were adequate for the hazards involved. The team reviewed the fire water system design and hydraulic analysis to assess the adequacy of the system to supply the largest single hydraulic load on the fire water system plus concurrent fire hose usage with one fire pump out of service. The team evaluated fire pump performance tests to assess the adequacy of the test acceptance criteria for pump minimum discharge pressure at the required flow rate to verify whether the criteria was adequate to ensure that the design basis requirements were satisfied. The team also evaluated the underground fire loop flow tests and flushes to verify whether the combination of the tests and flushes adequately demonstrated that the flow distribution circuits were able to meet design basis requirements. In addition, the team reviewed recent pump and loop flow test results to verify whether the testing was adequately conducted, the acceptance criteria were met and any potential performance degradation was identified.

The team walked down accessible portions of the detection and water suppression systems in the selected areas and major portions of the fire water supply system, including the motor and two diesel driven fire pumps, interviewed system and program engineers, and reviewed selected issue reports (IRs) to independently assess the material condition of the systems and components. In addition, the team reviewed recent test results for the fire detection and suppression systems for the selected fire areas to verify whether the testing was adequately conducted, the acceptance criteria were met and any potential performance degradation was identified.

The team assessed the fire brigade capabilities by reviewing training, qualification, and drill critique records. The team also reviewed Exelon's firefighting strategies (i.e., pre-fire plans) and smoke removal plans for the selected fire areas to determine if appropriate information was provided to fire brigade members and plant operators to identify safe shutdown equipment and instrumentation, and to facilitate suppression of a fire that could impact post-fire safe shutdown capability. The team independently inspected the fire brigade equipment, including personnel protective gear (e.g., turnout gear) and smoke removal equipment, to determine operational readiness for firefighting.

In addition, the team reviewed Exelon's fire brigade equipment inventory and inspection procedure and recent inspection and inventory results to verify whether adequate equipment was available, and whether any potential material deficiencies were identified.

b. Findings

No findings were identified.

.4 Protection from Damage from Fire Suppression Activities

a. Inspection Scope

The team performed document reviews and plant walkdowns to determine whether redundant trains of systems required for post-fire safe shutdown, located in the same or adjacent fire areas, were subject to damage from fire suppression activities or from the rupture or inadvertent operation of fire suppression systems. Specifically, the team evaluated whether:

  • A fire in one of the selected fire areas would release smoke, heat or hot gases that could cause unintended activation of suppression systems in adjacent fire areas which could potentially damage all redundant safe shutdown trains or
  • A fire suppression system rupture, inadvertent actuation or actuation due to a fire, in one of the selected fire areas, could directly damage all redundant trains (e.g.

sprinkler caused flooding of other than the locally affected train) and

  • Adequate drainage was provided in areas protected by water suppression systems

b. Findings

No findings were identified.

.5 Alternative Shutdown Capability

a. Inspection Scope

The team reviewed the safe shutdown analysis, operating procedures, piping and instrumentation drawings (P&lDs), electrical drawings, the UFSAR, and other supporting documents for the selected fire areas to verify whether Exelon had properly identified the systems and components necessary to achieve and maintain post-fire safe shutdown conditions. The team evaluated selected systems and components credited by the safe shutdown analysis for reactor pressure control, reactivity control, reactor coolant makeup, decay heat removal, process monitoring, and support system functions to assess the adequacy of Exelon's alternative shutdown methodology. The team also assessed whether alternative post-fire shutdown could be performed both with and without the availability of off-site power. The team walked down selected plant configurations to verify whether they were consistent with the assumptions and descriptions in the safe shutdown and fire hazards analyses. In addition, the team evaluated whether the systems and components credited for use during post-fire safe shutdown would remain free from fire damage.

The team reviewed the training program for licensed and non-licensed operators to verify whether it included alternative shutdown capability. The team also verified whether personnel required for post-fire safe shutdown, using either the normal or alternative shutdown methods, were trained and available on-site at all times, exclusive of those assigned as fire brigade members.

The team reviewed the adequacy of procedures utilized for post-fire shutdown and performed an independent walk through of procedure steps (i.e., a procedure tabletop)to assess the adequacy of implementation and human factors within the procedures.

The team also evaluated the time required to perform specific actions to verify whether operators could reasonably be expected to perform those actions within sufficient time to maintain plant parameters within specified limits.

Specific procedures reviewed for normal and alternative post-fire shutdown included:

  • ABN-30, Control Room Evacuation, Rev. 25
  • FSP-TB11D, Turbine Building Basement Fire Support Procedure, Rev. 8
  • FSP-RB1F3, Reactor Building Elev. -19 Foot, Rev. 3

The team reviewed selected operator manual actions to verify whether they had been properly reviewed and approved and whether the actions could be implemented in accordance with plant procedures in the time necessary to support the safe shutdown method for each fire area. The team also reviewed the periodic testing of the alternative shutdown transfer and isolation capability, and instrumentation and control functions, to evaluate whether the tests were adequate to ensure the functionality of the alternative shutdown capability.

b. Findings

No findings were identified.

.6 Circuit Analysis

a. Inspection Scope

The team reviewed Exelon's post-fire safe shutdown analysis for the selected fire areas to determine whether the analysis identified both required and associated electrical circuits and cables for the systems and components necessary to achieve and maintain safe shutdown. The team reviewed electrical schematics and cable routing data for power, control, and instrument cables associated with selected components.

Specifically, the team evaluated the selected circuits and cables to determine whether they were

(a) adequately protected from potential fire damage, or
(b) analyzed to show that fire-induced faults (e.g., hot shorts, open circuits, and shorts to ground) would not prevent safe shutdown, or
(c) analyzed to show that potential damage could be mitigated with approved operator manual actions, in order to verify whether fire-induced faults could adversely impact safe shutdown capabilities. The team's evaluations considered credible fire scenarios, cable insulation attributes, cable failure modes, cable routing, and common power supply or electrical bus configurations.

In addition, the team reviewed cable raceway drawings and cable routing databases for a sample of components required for post-fire safe shutdown to determine whether those cables were routed as described in the safe shutdown analysis. The team also reviewed equipment important to safe shutdown, but not part of the success path, to assess whether Exelon's safe shutdown methodologies were appropriate, conformed to design and licensing basis requirements, and appropriately considered the guidance in NRC Regulatory Guide 1.189, "Fire Protection for Nuclear Power Plants," revision 2.

Cable failure modes were reviewed for the following components:

  • P-15-1B

B Control Rod Drive Pump

  • P-5-2

RBCCW Pump

  • V-14-30

Steam Line Valve - Train A (AC)

  • V-14-31

Steam Line Valve - Train A (DC)

  • V-14-34

Condensate Valve - Train A (DC)

  • V-14-36

Condensate Valve - Train A (AC)

  • LI-IG07A

A Isolation Condenser Shell Water Level

The team reviewed a sample of circuit breaker and over-current protection coordination studies to determine whether equipment needed for post-fire safe shutdown activities could be adversely affected due to a lack of coordination that could result in a common power supply or common electrical bus concern. The team also evaluated whether coordination studies appropriately considered multiple faults due to fire. In addition, the team reviewed a sample of circuit breaker maintenance records, for components required for safe shutdown, to determine whether the breakers were properly maintained.

The team assessed the transfer of control from the control room to the alternative shutdown locations to determine whether it would be affected by fire-induced circuit faults (e.g., by the provision of separate fuses and power supplies for alternative shutdown control circuits).

b. Findings

No findings were identified.

.7 Communications

a. Inspection Scope

The team reviewed safe shutdown procedures, the safe shutdown analysis, and associated documents to verify whether an adequate method of communications would be available to plant operators following a fire. Specifically, the team evaluated whether plant telephones, page systems, and portable radios would be available for use and were properly maintained. During this review, the team considered the effects of ambient noise levels, clarity of reception, reliability, and coverage patterns. The team inspected selected emergency storage lockers to independently verify whether portable communication equipment was available for the fire brigade and plant operators. In addition, the team evaluated whether radio or phone repeaters, transmitters, and power supplies would be reasonably unaffected by a fire.

b. Findings

No findings were identified.

.8 Emergency Lighting

a. Inspection Scope

The team walked down the emergency lights in the selected fire areas to independently evaluate the placement and coverage areas of the lights. The team assessed whether the lights provided adequate illumination on local equipment and instrumentation required for post-fire safe shutdown, to ensure local operations could be reliably performed under expected post-fire conditions. In addition, emergency light placement was also evaluated to determine adequate illumination of local area access and egress pathways.

The team verified whether the emergency light batteries were rated for at least an eight-hour capacity. The team interviewed system engineers and technical staff to evaluate the adequacy and the performance of the Emergency lighting Units (ELUs).

Preventive maintenance procedures, the vendor manual, conductance tests, and battery replacement practices were also reviewed to evaluate whether the ELUs had been maintained in a manner that would ensure reliable operation.

b. Findings

No findings were identified.

.9 Cold Shutdown Repairs

a. Inspection Scope

The team reviewed Exelon's dedicated repair procedures, for components which might be damaged by fire and were required to achieve post-fire cold shutdown. The team evaluated selected cold shutdown repairs to determine whether they could be achieved within the time frames assumed in the design and licensing bases. In addition, the team verified whether the necessary repair equipment, tools, and materials (e.g., pre-cut cables with prepared attachment lugs) were available and accessible on site.

b. Findings

No findings were identified.

.10 Compensatory Measures

a. Inspection Scope

The team verified whether compensatory measures were in place for out-of-service, degraded, or inoperable fire protection and post-fire safe shutdown equipment, systems, or features (e.g., detection and suppression systems and equipment, passive fire barriers, pumps, valves, or electrical devices providing safe shutdown functions or capabilities). The team evaluated whether the short term compensatory measures adequately compensated for the degraded function or feature until appropriate corrective action could be taken and whether Exelon was effective in returning the equipment to service in a reasonable period of time.

The team reviewed selected compensatory measures in the form of operator manual actions for 10 CFR 50 Appendix R, Section III.G.2 areas to evaluate whether those actions could be reasonably accomplished. Specific attributes reviewed included availability of diagnostic instrumentation, expected environmental conditions, minimum staffing, communications, equipment availability, training, procedures, and verification and validation.

b. Findings

No findings were identified.

.11 Review and Documentation of FPP Changes

a. Inspection Scope

The team reviewed recent changes to the approved fire protection program to assess whether those changes had an adverse effect on the ability to safely shutdown.

b. Findings

No findings were identified.

.12 Control of Transient Combustibles and Ignition Sources

a. Inspection Scope

The team reviewed Exelon's procedures and programs for the control of ignition sources and transient combustibles to assess their effectiveness in preventing fires and in controlling combustible loading within limits established in the FHA. A sample of hot work and transient combustible control permits were reviewed to assess the adequacy of Exelon's fire protection program administrative controls. The team performed plant walkdowns to independently verify whether transient combustibles and ignition sources were being properly controlled in accordance with the administrative controls.

b. Findings

No findings were identified.

.13 Large Fires and Explosions Mitigation Strategies

a. Inspection Scope

The team reviewed selected mitigation strategies intended to maintain or restore core cooling, containment integrity, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to large fires or explosions. The team assessed whether Exelon continued to meet the requirements of license condition 2.C.17. The team reviewed five mitigation strategies:

  • Operation of the electro-magnetic relief valves using the portable power supply;
  • Manual operation of the isolation condenser for B.5.b events;
  • External makeup to the isolation condensers using the portable pump;
  • External makeup to the fuel pool using the B.5.b pump and,
  • Manually opening containment vent valves in a B.5.b event

The team's review included: a detailed assessment of the procedural guidance; a walkdown of the strategy with a trained operator to assess the feasibility of the strategy and operator familiarity; a review of maintenance and surveillance test records for the strategy equipment; and an independent inventory check of the strategy equipment, materials, and tools to ensure the appropriateness of equipment storage and availability.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA2 Identification and Resolution of Problems

(IP 71152)

a. Inspection Scope

The team reviewed a sample of issue reports and action requests associated with the fire protection program, post-fire safe shutdown issues, and mitigation strategy issues to determine whether Exelon was appropriately identifying, characterizing, and correcting problems associated with these areas and whether the planned or completed corrective actions were appropriate. The condition reports reviewed are listed in the attachment.

b. Findings

No findings were identified.

4OA6 Meetings, including Exit

The team presented the inspection results to Mr. R. Peak, Plant Manager, and other members of Exelon 's staff on April 11, 2014. The team verified that this report does not contain proprietary information.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

N. Onuorah, Fire Protection Engineer
T. Prosser, Fire Marshall
T. Trettel, Fire Protection System Engineer
J. Chrisley, Senior Regulatory Specialist
D. Brown, ELU System Engineer
A. Bready, PRA Engineer
M. Carlson, Fire Protection Safe Shutdown Engineer
C. Pragman, Exelon Corp. Fire Protection Manager
Z. Demeke, License Renewal Engineer
S. Rios, Senior Reactor Operator
M. Rossi, Licensed Operator Training Instructor
T. Cannon, Electrical Technician
R. Wojcik, Electrical Technician

NRC Personnel

J. Kulp, Senior Resident Inspector
A. Patel, Resident Inspector
J. Schoppy, Senior Reactor Inspector

LIST OF ITEMS OPENED, CLOSED AND DISCUSSED

Opened

None

Opened and Closed

None

Closed

None

LIST OF DOUCMENTS REVIEWED

Fire Protection Licensing and Design Basis Documents

990-1746 Fire Hazard Analysis Report, Revision 17

SP-1302-06-013, Augmented Quality Fire Protection Specification for Post-Fire Safe Shutdown

Requirements at Oyster Creek Generating Station, Rev. 5

Oyster Creek Nuclear Generating Station UFSAR, Section 9.5.1, Fire Protection, Rev. 18

Oyster Creek Nuclear Generating Station UFSAR, Section A.1.20, Fire Water System

(Aging Management), Rev. 18

Oyster Creek Nuclear Power Plant Technical Specifications, 8/8/00

OCNGS SER, Fire Protection 3/3/78

OCNGS SER, Fire Protection Supplement No. 2, 11/13/79

OCNGS SER, Fire Protection Supplement No. 3, 8/25/80

Letter Dated March 24, 1986, Exemption from Requirements of Appendix R to 10 CFR Part 50,

Section III.G.2 and the Post-Fire Safe Shutdown Capability

Letter Dated June 25, 1990, Exemption from Certain Technical Requirements Contained in

Section III.G if Appendix R to 10 CFR Part 50

SP-1302-06-013, Specification for Post-Fire Shutdown Program Requirements at OCNGS,

Rev. 4

Calculations, Analysis, and Engineering Evaluations

BR Report 3731-042, Tripping Feedwater Pumps from Control Room for Fire Outside

the Control Room Complex, Rev. 2

C-1302-911-E120-001, Fire Area OB-FA-5 Safe Shutdown Analysis, Rev. 0

C-1302-911-E120-004, Fire Zone TB-FZ-11D Safe Shutdown Analysis, Rev. 0

C-1302-911-E120-015, Fire Zone RB-FZ-1F3 Safe Shutdown Analysis, Rev. 0

TDR 612, Appendix R Reactor Water Inventory Study, Rev. 0

AR 673565-37, Evaluation of Operator Manual Actions in 4160 Switchgear Rooms

during a Fire in the Turbine Building Basement, performed 06/04/08

748-41, BISCO Report, Three Hour Rated Fire Seal Utilizing BISCO SF-20 Silicone Foam,

4/17/81

748-134, BISCO Test Report, Fire Test Utilizing BISCO SF-20 and SE-Foam, 5/14/84

1042-01, BISCO Test Report, Qualification, Fire and Hose Stream Tests, 2/78

3001-01, Fire Test Configuration for BISCO Block Out Reduction System - Wall Openings

with Inner Lagging Attachment Supports, 7/3/79

375645, Biodiesel Blend Fuel Oil Evaluation, 5/21/09

BM-TE-01, Mecatiss MPF-60 Fire Barriers, Rev. 0

C-1302-811-E310-043, OCNGS Fire Protection Hydraulic Model Margin Analysis, Rev. 0

CTP-1198, Fire Endurance Test of 3M Interam Mat Fire Protective Envelopes

(24 in. and 6 in. Cable Trays, 5, 3, 2, and 1 Conduits, 2 Air Drop and a 12 x 12 x 8

Junction Box), 11/9/95

CTP-1199, Fire Endurance Test of 3M Interam Mat Fire Protective Envelopes

(24 Cable Tray, 5 and 1 Conduits, and 2 Air Drop into the Tray Center), 9/18/95

CTP-2004, ASTM E136-94 Behavior of Materials in a Vertical Tube Furnace at 750oC,

3M E-50 Interam Series Mat, 1/17/95x 30 Deep Large Box Design, 11/10/98

CTP-2009, Fire Endurance Test of 3M Interam Fire Wrap Fire Protective Envelope, 5/19/98

CTP-2011, Fire Endurance Test of 3M Interam Fire Wrap 75 Wide x 56 High

CTP-2037, Fire Endurance Test Report of a Heat Transfer Study on Heavy Steel Support

Elements protected with 3M E-50 Series E 54A Interam, 10/12/06

C312252, Thermo-Lag Raceway Cable Upgrades Modification, Rev. 0

C312257, Thermo-Lag Raceway Cable Upgrades Modification, Rev. 0

EC ECR A2014648, Evaluate Penetration Seal #435, 10/21/05

ECR A2161442, Evaluation of 3M Interam Installation for Conduit 86-71, 9/7/12

GL 86-10 Evaluation (AR 00732552-02), Sprinkler System #9 Turbine Basement, South

GL 86-10 Evaluation (AR 00732559-02), Sprinkler System #15 Upper Cable Spreading Room

Test Deck #1, UL Report, Raceway Fire Barriers for Aluminum Cable Tray & Aluminum

Conduit Systems, 2/5/96

Test Deck #3, UL Report, Raceway Fire Barriers for Aluminum Cable Tray and Aluminum

Conduit Systems, 2/7/96

Test Deck #5, UL Report, Raceway Fire Barriers for Aluminum Cable Tray, Aluminum Junction

Box and Aluminum Conduit Systems, 2/9/96

06-00797, Appendix R Evaluation of Electrical Protective Device Coordination, Rev. 0

C-1302-911-E120-001, Fire Area/Zone OB-FA-5 Fire Safe Shutdown Analysis, Rev. 2

C-1302-911-E120-004, Fire Area/Zone TB-FZ-11D Fire Safe Shutdown Analysis, Rev. 4

C-1302-911-E120-015, Fire Area/Zone RB-FZ-1F3 Fire Safe Shutdown Analysis, Rev. 3

OC-PRA-21.06, Oyster Creek Nuclear Generating Station Fire Probabilistic Risk Assessment,

Summary and Quantification Notebook

OC-PSA-012, Internal Flood Evaluation Summary and Notebook, Oyster Creek Nuclear

Generating Station, Rev. 1

6-1302-104-5320-013, Design Of Support 1B for 3 Dia and 4 Dia Lines of Fire Protec. Sys.

N.C.S.R. O.C. Stn.

13432.30-105, New CSR Floor Drain Line Sizing, Rev. 0

ECR OC 11-0507 002, Replace Deluge Valve for System #6

ECR OC 13-00350 001, Replace Fire Detectors on RB 95

Drawings and Wiring Diagrams

23-56751-43, Auto Depressurization System Connection Diagram, Rev. 7

29E182 Sht. 5, Auto Depressurization System Elementary Diagram, Rev. 4

E1132, CRD Pump Elementary Diagram, Rev. 10

23R0173 Sht. 7, Feedwater System Elementary Diagram, Rev. 15

157B6350 Sht. 184A, Feedwater System Elementary Diagram, Rev. 2

BR 2192, Sht.1, Composite Yard Piping Key Plan, Rev. 12

BR 2192, Sht. 2, Composite Yard Piping Key Plan, Rev. 0

DJP FBS TB-FZ-11D-03, Isometric, Fire Barrier (Mecatiss), Rev. 0

DJP FBS TB-FZ-11D-03, Isometric, Fire Barrier (Mecatiss), Rev. 1

DJP 3E-811-17-1001, Fire Protection Water System, Electrical Elementary Diagram,

Fire Diesel Pump #1, Rev. 2

GU 3D-911-01-001, Fire Area Layout Site Plan, Rev. 7

GU 3D-911-02-002, Fire Area Layout Turbine Building Basement Floor Plan, Rev. 5

GU 3D-911-02-006, Fire Area Layout Turbine Building Operating Floor, Rev. 8

GU 3D-911-02-007, Fire Area Layout Turbine Building Sections A-A & B-B, Rev. 3

GU 3D-911-02-008, Fire Area Layout Turbine Building Sections C-C & D-D, Rev. 2

GU 3D-911-02-009, Fire Area Layout Turbine Building Sections E-E & F-F, Rev. 3

GU 3D-911-02-011, Fire Area Layout Office Building Third Floor, Rev. 8

GU 3D-911-02-012, Fire Area Layout EDG Vaults, Rev. 7

GU 3D-911-02-013, Fire Area Layout Reactor Building E

L. -196, -6-5 & -1-11, Rev. 3

GU 3D-911-02-030, Fire Area Layout Fresh Water Pump House & Redundant Fire Protection

Pump House & Tank, Rev. 3

GU 3D-911-02-039, Fire Area Layout Legend and Notes, Rev. 6

GU 3E-811-17-1000, Fire Protection Water System, Diesel Fire Pump #2, Electrical Elementary

Dia., Rev. 5

4092, Turbine Building Floor Plan @ E

L. 236, 27 & 36, Beam and Slab Schedules, Rev. 10

13432.02-M-03, Redundant Fire Protection System Underground Piping Phase I, Rev. 3

103D5244, Connection Diagram Metal Clad Switchgear Unit A1 Bus 1A, Rev. 24

103D5287, Sht. 2, Metal Clad Switchgear Interconnection Diagram, Rev. 26

104D2511, Sht. 2, Emergency Diesel Generator 1 Connection Diagram, Rev. 7

2C3714, Sht. 4, Connection Diagram for Panel 13R, Rev. 21

3C-733-11-006, 120Vac Vital Power System Panel Schedule IP-4, Rev. 6

3D-211-18-006, Sht. 1, Emergency Condenser System Wiring Diagram Valve V-14-0030,

Rev. 2

3D-211-18-006, Sht. 2, Emergency Condenser System Wiring Diagram Valve V-14-0031,

Rev. 1

3D-211-18-006, Sht. 5, Emergency Condenser System Wiring Diagram Valve V-14-0034,

Rev. 1

3D-211-18-006, Sht. 5, Emergency Condenser System Wiring Diagram Valve V-14-0034,

Rev. 1

BR3000, Electrical Power System Key One Line Diagram, Rev. 14

BR3001, Sht. 1, Main One Line Diagram, Auxiliary Startup, Main Transformer and

Main Generator, Rev. 16

BR3001, Sht. 2, One Line Diagram Emergency Diesel Generators, Rev. 4

BR3001A, 4160V System One Line Diagram Switchgear Bus 1A, Rev. 11

BR3001C, 4160V System One Line Diagram Emergency Switchgear Bus 1C and 1D, Rev. 1

BR3002, Sht. 2, 480V System One Line Diagram Unit Substation 1A2 and 1B2, Rev. 13

BR3028, Sht. 1, 125V Station Dc System One Line Diagram, MCC DC-1, Rev. 20

E1101, Elementary Diagram Remote Shutdown Panel Transfer Scheme, Rev. 6

E1108, Elementary Diagram Remote Shutdown Panel Transfer Scheme, Rev. 16

E1126, Elementary Diagram Reactor Building Closed Cooling Water Pump 1-2, Rev. 12

GE103D5270, Sht. 1, 4160V System Electrical Connection Diagram, Rev. 27

GE106D9510, Sht. 1, Emergency Diesel Generator 2 Connection Diagram Switchgear Unit 1

and 3, Rev. 17

GE112C2248, Sht. 2, Connection Diagram Panel 11F, Rev. 46

GE116B8328, Sht. 17, 480V System Electrical Elementary Diagram 480V USS 1B2 Unit 041B,

Rev. 13

GE148F912, Sht. 3, Electrical Elementary Diagram Process Instrumentation, Rev. 17

GE157B6350, Sht. 151B, Emergency Condenser System Wiring Diagram Valve V-14-0032,

Rev. 11

GE157B6350, Sht. 152A, Emergency Condenser System Electrical Elementary Diagram Valve

V-14-0036, Rev. 4

GE157B6397, Sht. 15, Emergency Condenser System Electrical Elementary Diagram Valve

V-14-0034, Rev. 31

GE223R0173, Sht. 1A, 4160V System Electrical Elementary Diagram Switchgear 1A Unit A1,

Rev. 27

GE237E901, Sht. 2, Containment Spray Logic Electrical Elementary Diagram, Rev. 21

GE719E202, Sht. 1, Electrical Connection Diagram Panel ER8A, Rev. 17

GE719E203, Sht. 1, Electrical Connection Diagram Panel ER8B, Rev. 18

GE719E211, Sht. 10, Main Control Room Panel 1F/2F, Rev. 8

GE719E211, Sht. 4, Main Control Room Panel 1F/2F, Rev. 32

GE719E211, Sht. 7, Main Control Room Panel 1F/2F, Rev. 19

GE719E211, Sht. 8, Main Control Room Panel 1F/2F, Rev. 7

GE719E251, Sht. 1, Panel ER18A, Rev. 30

GE719E252, Sht. 1, Panel ER18B, Rev. 28

GE237E901, Sht. 1, Containment Spray Logic Electrical Elementary Diagram, Rev 35

Piping and Instrumentation Diagrams

148F262 Sht. 1, Emergency Condenser, Rev. 55

148F740, Containment Spray System, Rev. 44

2003, Condensate & Feed System, Rev. 95

2004, Condensate & Feed System, Rev. 100

JC 19479, Sht. 1, Fire Protection Water System Flow Diagram, Rev. 40

JC 19479, Sht. 2, Fire Protection Water System Flow Diagram, Rev. 42

JC 19479, Sht. 3, Fire Protection Water System Flow Diagram, Rev. 68

JC 19479, Sht. 4, Fire Protection Water System Flow Diagram, Rev. 30

GE148F262, Sht. 1, Emergency Condenser Flow Diagram, Rev. 55

Large Fires and Explosions Mitigation Strategies Documents

EDMG-01, Extensive Damage Mitigation Guidelines, Rev. 6

EDMG-SPX1, Operation of the B.5.b Portable Pump, Rev. 13

EDMG-SPX2, External Makeup to the Fuel Pool Using the B.5.b Portable Pump, Rev. 10

EDMG-SPX4, Manual Operation of the Isolation Condensers for a B.5.b Event, Rev. 3

EDMG-SPX5, External Makeup to the Isolation Condensers Using the Portable Pump, Rev. 10

EDMG-SPX8, Operation of the EMRVs using the Portable Power Supply, Rev.10

EDMG-SPX9, Manually Opening Containment Vent Valves in a B.5.b Event, Rev. 4

Fire Protection Evaluations of Modifications and Design Changes

ECR 11-00171, "A" CRD Pump Bypass Switch, Rev. 0

ECR OC 13-00362 000, Replace Fire Alarm Master Panel In Control Room

Design Changes

ECR 07-00428, Mecatiss Fire Barrier Replacement to 3M Interam, Rev.1

ECR 13-00362, Replace Fire Alarm Master Panel in Control Room, Rev. 0

Quality Assurance Audits and Self Assessments

NOSA-OYS-12-10, Oyster Creek Fire Protection Audit Report, 9/19/12

01554310, Oyster Creek Pre-NRC Triennial Fire Protection Inspection Self-Assessment,

2/3/13

Oyster Creek Pre-NRC Triennial Fire Protection Inspection Self-Assessment

System Health Reports

Emergency Lighting (Appendix R) Q3-2013

Emergency Lighting (Appendix R) Q4-2013

Oyster Creek Fire Protection/Fire Safe Shutdown Program, 3rd Quarter 2013

Oyster Creek Fire Protection/Fire Safe Shutdown Program, 4th Quarter 2013

Oyster Creek System Health Report, 655-Fire Protection Detection Systems, 3rd Quarter 2013

Oyster Creek System Health Report, 655-Fire Protection Detection Systems, 4rd Quarter 2013

Oyster Creek System Health Report, 813-Fire Protection Suppression Systems, 3rd Quarter

2013

Oyster Creek System Health Report, 813-Fire Protection Suppression Systems, 4rd

Quarter 2013

Oyster Creek System Health Report, 814-Fire Barriers, 3rd Quarter 2013

Oyster Creek System Health Report, 814-Fire Barriers, 4th Quarter 2013

25Vdc, 3rd and 4th Qtrs. 2013

4160Vac, 3rd and 4th Qtrs. 2013

480Vac, 3rd and 4th Qtrs. 2013

Emergency Diesel Generator, 3rd and 4th Qtrs. 2013

Procedures

101.2, Oyster Creek Site Fire Protection Program, Rev. 70

101.2-3, Oyster Creek Site Fire Protection Program, Technical Requirements, Rev. 70

2400-APR-3214.01, Appendix R Containment Spray Pump Temporary Cable Installation &

Control Cable Repair, Rev. 10

2400-APR-3228.01, Appendix R Temporary Torus Water Level Instrument, Rev. 9

2400-APR-3411.02, Appendix R Temporary EMRV Control & Indication, Rev. 10

2400-APR-3900.01, Appendix R Repair Kit Annual Inspection, Rev. 20

CC-AA-211, Fire Protection Program, Rev. 5

OP-OC-102-106-1001, Control of Time Critical Operator Actions, Rev. 1

OP-AA-201-002, Fire Event Reports, Rev. 5

OP-AA-201-003, Fire Drill Performance, Rev. 13

OP-AA-201-004, Fire Prevention for Hot Work, Rev. 11

OP-AA-201-005, Fire Brigade Qualification, Rev. 8

OP-AA-201-006, Control of Temporary Heat Sources, Rev. 6

OP-MA-201-007, Fire Protection System Impairment Control, Rev. 6

OP-MA-201-008, Pre-Fire Plan Manual, Rev. 3

OP-MA-201-009, Control of Transient Combustible Material, Rev. 12

TQ-AA-173, Emergency Services Training Programs, Rev. 1

645.6.026, Fire Damper Inspector, Rev. 13

2400-SME-3915.01, Motor Control Center Preventive Maintenance, Rev. 17

635.2.001, 4160V Switchgear Buses and Circulating Water Pump Protective Relay Surveillance,

Rev. 66

CC-AA-206, Fuse Control, Rev. 8

CC-OC-206-1000, Fuse Replacement, Rev. 0

658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 36

658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 37

658.4.002, Fire Brigade and Safe Shutdown Radio Test, Rev. 38

Operating Experience (OPEX) Evaluations

OPEX Review of NRC IN 2005-03, Seismic Gap Fire Barriers, 5/25/05

OPEX Review of NRC IN 2006-22, New Ultra-Low-Sulfur Diesel Fuel Oil Could Adversely

Impact Diesel Engine Performance, 10/8/06

OPEX Review of NRC IN 2009-02, Biodiesel Fuel could Adversely Impact Diesel Engine

Performance, 6/22/09

OPEX Review of NRC IN 2009-29, Potential Failure of Water Supply Pumps to Automatically

Start due to a Fire, 2/3/10

TP 461/2, Appendix R Emergency Lighting Test, Rev. o

Operations Procedures

307, Isolation Condenser System, Rev. 124

346, Remote and Local Shutdown Panels Operation, Rev. 21

ABN-1, Reactor Scram, Rev. 13

ABN-29, Plant Fires, Rev. 27

ABN-30, Control Room Evacuation, Rev. 25

EMG-3200.01A Attachment 1, RPV Control EOP Flowchart, Rev. 8

EMG-SP11, Alternate Pressure Control Systems - Isolation Condensers, Rev. 1

FSP-RB1F3, Reactor Building 19 Foot Elevation Fire Support Procedure, Rev. 3

FSP-TB11D, Turbine Building Basement Fire Support Procedure, Rev. 8

Operator Safe Shutdown Training

Scenario 2612.885.0.TBB, Fire Response in Turbine Building Basement, dated 7/17/12

TQ-AA-223-F010, Training Material Approval Process, Rev. 6

TQ-JA-155-01, SEG Development Job Aid, Rev. 1

JPM 308.01, Setup Remote Shutdown Panel upon Control Room Evacuation, dated 5/24/10

Scenario 2621.RECIRCOPS.01, Recirculation Operations, dated 9/3/13

JPM 308.02, Operate EDG #2 from LSP-DG2, dated 5/18/11

Scenario 2621.885.0.054C, Control Room Evacuation, dated 2/20/14

Fire Fighting Strategies (i.e., Pre-Fire Plans)

OP-OC-201-008-1010, Oyster Creek Generating Station Pre-Fire Plan,

(Fire Area/Zone RB-FZ-1F3), Rev. 0

OP-OC-201-008-1019, Oyster Creek Generating Station Pre-Fire Plan,

(Fire Area/Zone OB-FZ-22A), Rev. 0

OP-OC-201-008-1027, Oyster Creek Generating Station Pre-Fire Plan,

(Fire Area/Zone TB-FZ-11D), Rev. 5

Fire Brigade Documents

2012 Fire Brigade End of Year Fire Drill Review, 1/2/13

2012 Fire Drill Log, Quarterly Review, 3/29/12, 7/11/12, 9/30/12, 1/3/13

2013 Fire Brigade End of Year Fire Drill Review, 2/13/13

2013 Fire Drill Log, Quarterly Review, 3/29/13, 7/15/13, 9/30/13, 12/10/13

Fire Brigade Training

Fire Brigade Learning Management System (LMS) Qualification Structure, 3/27/14

Fire Brigade Oyster Creek Qualification Status Report, 3/27/14

2011 Off-Site Fire Department Training, 5/9/11

2011 Off-Site Fire Department Drill, 11/7/11

2012 Off-Site Fire Department Training, 9/11/12

Fire Brigade Drills and Critiques

Rx Building 23 Elevation, North, MCC1A B2 Breaker, 8/28/12

Site Emergency Building (SEB-1 Electrical Room, Utility/Transformer Room, 2/11/14

SEB-1 Utility Room, 3/5/14

SEB-1 Utility Room - Battery Room, 3/13/14

Main Control Room - Panel 4-F, Announced, 1/16/14

Main Control Room - Panel 4-F, Announced, 3/21/14

MOB-3 Communications Room, 1/26/14

Transient Combustible Permits and Evaluations13-011, Fire Zone TB-FZ-11A, Lube Oil Equipment, 3/23/14

14-004, Fire Zone TB-FZ-11D, Turbine Building South-Air Compressor Area, 2/19/14

14-005, Fire Zone TB-FZ-11D, Heat Exchangers, 3/1/14

14-008, Fire Zone TB-FZ-11G, Turbine Building Mezzanine-Cart, 3/23/13

2014 Transient Combustible Log, 3/27/14

Hot Work and Ignition Source Permits

C2030965, TB 3 Air Compressor Receivers/Dryers 1-1 Air Receiver Repair/ Replace Valve

C2031632, ORW 23 Pre-Coat Pump NV-24

Completed Tests and Surveillances

645.3.037, Fire Pump Diesel 1-2 Controller Check and Component Calibration, Rev. 2,

Completed 8/29/13

645.3.038, Fire Pump Diesel 1-1 Controller Check and Component Calibration, Rev. 2,

Completed 8/9/13

645.4.001, Fire Pump #1 Operability Test, Rev. 71, Completed 1/10/14 & 2/6/14

645.4.012, Fire Pump Functional Test, Rev. 10, Completed 12/28/11 & 2/26/13

645.4.012, Fire Pump Functional Test, Rev. 11, Completed 12/5/13

645.4.019, Redundant Fire Protection Water Supply Pump Operability Test, Rev. 20,

Completed 2/6/14 & 3/7/14

645.4.020, Redundant Fire Protection Water Supply Pump Functional Test, Rev. 5,

Completed 10/9/12 & 5/30/13

645.4.036, Fire Pump #2 Operability Test. Rev. 23, Completed 12/31/13 & 3/7/14

645.6.003, Fire Hose Station, Hose House and Fire Hydrant Inspection. Rev. 22,

Completed 1/14/14

645.6.003, Fire Hose Station, Hose House and Fire Hydrant Inspection. Rev. 23,

Completed 2/12/14

645.6.007, Fire Protection Flush, Rev. 21, Completed 10/12/11 & 12/3/12

645.6.008, Fire Hose Re-Rack & Blockage Check, Rev. 13, Completed 12/7/11 & 6/2/13

645.6.017, Fire Barrier Penetration Surveillance, Rev. 14, Completed 6/9/09 & 6/25/09

645.6.017, Fire Barrier Penetration Surveillance, Rev. 18, Completed 10/13/11

645.6.017, Fire Barrier Penetration Surveillance, Rev. 19, Completed 11/28/11 & 2/28/12

645.6.023, Fire Suppression Water Underground Flow Test, Rev. 14, Completed 4/15/10

and 8/30/13

645.6.028, Thermo-Lag and Mecatiss (and 3M Interam) Envelope System Fire Barriers,

Rev. 10, Completed 6/22/11 & 2/25/13

645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V

Switchgear Room, Rev. 20, Completed 2/28/11

645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V

Switchgear Room, Rev. 21, Completed 3/8/12 & 3/29/12

645.6.032, Fire Detection System Alarm Circuitry Test for Turbine Building & 4160V

Switchgear Room, Rev. 22, Completed 8/2/13

645.6.033, Fire Detection System Alarm Circuitry Test for Control Room & Upper and

Lower Cable & Upper and Lower Cable Spreading Room, Rev. 5, Completed 6/5/12

645.6.037, Fire Detection System Alarm Circuitry Test for Reactor Building 75, 95, 119

and -19, Rev. 0, Completed 11/14/11 & 12/18/12

680.4.002, Local Shutdown Panel LSP-1AB2 Functional Test, Rev. 6, Completed 11/18/12

680.4.003, Local Shutdown Panel LSP-1B3 Functional Test, Rev. 12, Completed 4/25/12

and 11/10/12

680.4.004, Local Shutdown Panel LSP-1A2 Functional Test, Rev. 18, Completed 11/18/12

680.4.006, Remote Shutdown Panel Functional Test - Train B, Rev. 18, Completed 3/1/12

and 11/18/12

680.4.011, Local Shutdown Panel LSP-1D Functional Test, Rev. 8, Completed 11/11/12

Issue Reports (* denotes NRC identified during this inspection)

AR 01645241*

AR01645668*

IR01646051*

1187591

1582441

1639352*

27339

00931459

00935317

01181818

01348120

01349405

01406356

01410451

01414079

01466438

01448363

01593476

01598001

01629862

01629864

01632532*

01632800

01633052

01638726*

01644466

01644531

01645106*

01645125*

01645693*

01173474

01176224

267338

298893

01302134

01522732

01606938

01632238

01638171*

01638631*

01639317*

01639330*

01644668*

AR01500766

Work Orders

R2225828

R2225962

R2223472

R2218408

R2232003

R2232769

R2232794

R2233916

R2234017

R2209149

C2026742

A2346341

A2347715

A2348891

A2350251

C2026068

C2031632

R2219129

R2229838

R2233122

R2235981

C2026467

R2071783

R2092061

R2102792

R2110006

R2142334

R2166849

R2166875

R2171970

R2171971

R2171980

R2172146

R2172433

R2178096

R2186456

R2186457

R2190874

R2194398

R2218884

R2223923

R2228088

R2224209

R2234000

R21960778

R220714

R2226702

Vendor Manuals

VM-OC-2785 Vendor Technical Manual, Revision 2

Industry Standards

EPRI-TR-106826 Battery Performance Monitoring by Internal Ohmic Measurements -

Emergency Lighting Unit Batteries, December 1996

NFPA Fire Protection Handbook, 14th Edition, Section 11, Chapter 5, Test of Water Supplies

Miscellaneous Documents

Exelon Letter of Agreement, Bayville Fire Department, 1/15/14

Exelon Letter of Agreement, Forked River Volunteer Fire Company, 1/15/14

Exelon Letter of Agreement, Lanoka Harbor Fire Department, 1/15/14

Fire Impairment Log, 3/21/14

Training Module 6231-PGD-2685, Course Code 792.0.0007, B.5.b and EDMG Overview, Rev.3

Training Module 6231-PGD-2685, Course Code 792.0.0008, Startup, Operation and

Shutdown of the Godwin Portable Pump, Rev.2

Training Module 6231-PGD-2685, Course Code 792.0.0009, B.5.b and EDMG Walkthrough,

Rev.2

OCNGS Fire Protection - Comparison to Standard Review Plan 9.5.1, Appendix A, 12/3/76

PES-P-006, Procurement Standard for Diesel Fuel Oil, Rev. 10

Analysis of Diesel Fuel Oil, 1/16/14

Electrical Cable and Conduit Routing Information

LIST OF ACRONYMS

ADAMS

Agencywide Documents Access and Management System

AC

Alternating Current

APCSB

[NRC] Auxiliary and Power Conversion Systems Branch

ASME

American Society of Mechanical Engineers

ASSS

Alternate Safe Shutdown System

BTP

Branch Technical Position

CCW

Component Cooling Water

CDF

Core Damage Frequency

CFR

Code of Federal Regulations

CMEB

[NRC] Chemical Engineering Branch

CO2

Carbon Dioxide

DC

Direct Current

ELU

Emergency Lighting Unit

FA

Fire Area

FHA

Fire Hazards Analysis

FPP

Fire Protection Program

FW

Feedwater

FZ

Fire Zone

HRR

Heat Release Rate

IN

[NRC] Information Notice

IP

[NRC] Inspection Procedure

IPEEE

Individual Plant Examination of External Events

IR

[NRC] Inspection Report

IR

[Exelon] Issue Report

kV

kilo-Volt

LOCA

Loss of Coolant Accident

MOV

Motor Operated Valve

MSO

Multiple Spurious Operation

NEI

Nuclear Energy Institute

NFPA

National Fire Protection Association

NCV

Non-Cited Violation

NRC

Nuclear Regulatory Commission

OCNGS

Oyster Creek Nuclear Generating Station

PARS

Publicly Available Records System

P&ID

Piping and Instrumentation Drawing

PRA

Probabilistic Risk Assessment

RBCCW

Reactor Building Closed Cooling Water

RG

[NRC] Regulatory Guide

SCBA

Self-Contained Breathing Apparatus

SDP

[NRC] Significance Determination Process

SER

[NRC] Safety Evaluation Report

SSC

Structures, Systems and Components

SW

Service Water

TRM

Technical Requirements Manual

UFSAR

Updated Final Safety Analysis Report

V

Volts

Vac

Voltage Alternating Current

Vdc

Voltage Direct Current