{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION
{{#Wiki_filter:February 4, 2015


==REGION I==
==SUBJECT:==
2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 February 4, 2015 Mr. Eric Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077-0004 SUBJECT: BEAVER VALLEY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000334/2014005 AND 05000412/2014005 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT NO. 07201043/2014004
BEAVER VALLEY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000334/2014005 AND 05000412/2014005 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT NO. 07201043/2014004


==Dear Mr. Larson:==
==Dear Mr. Larson:==
Line 33: Line 33:


Sincerely,
Sincerely,
/RA/
/RA/  
Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73
 
Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects  
 
Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73  


===Enclosure:===
===Enclosure:===
Inspection Report 05000334/2014005 and 05000412/2014005 and 07201043/2014004, w/Attachment: Supplementary Information
Inspection Report 05000334/2014005 and 05000412/2014005 and 07201043/2014004, w/Attachment: Supplementary Information  


REGION I==
REGION I==
Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73 Report No.: 05000334/2014005, 05000412/2014005, and 07201043/2014004 Licensee: FirstEnergy Nuclear Operating Company (FENOC)
Docket Nos.:
Facility: Beaver Valley Power Station (BVPS), Units 1 and 2 Location: Shippingport, PA 15077 Dates: October 1, 2014 to December 31, 2014 Inspectors: J. Krafty, Senior Resident Inspector B. Reyes, Resident Inspector A. Dugandzic, Reactor Inspector J. Furia, Senior Health Physicist S. Hammann, Senior Health Physicist C. Morell, Storage Safety & Transportation Inspector P. Presby Senior Operations Engineer R. Rolph, Health Physicist J. Trapp, Safety Inspector R. Temps, Senior Safety Inspector Approved By: Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects Enclosure
50-334, 50-412  
 
License Nos.:
DPR-66, NPF-73  
 
Report No.:  
 
05000334/2014005, 05000412/2014005, and 07201043/2014004  
 
Licensee:  
 
FirstEnergy Nuclear Operating Company (FENOC)  
 
Facility:  
 
Beaver Valley Power Station (BVPS), Units 1 and 2  
 
Location:  
 
Shippingport, PA 15077  
 
Dates:  
 
October 1, 2014 to December 31, 2014  
 
Inspectors:  
 
J. Krafty, Senior Resident Inspector B. Reyes, Resident Inspector A. Dugandzic, Reactor Inspector  
 
J. Furia, Senior Health Physicist S. Hammann, Senior Health Physicist  
 
C. Morell, Storage Safety & Transportation Inspector P. Presby Senior Operations Engineer R. Rolph, Health Physicist  
 
J. Trapp, Safety Inspector R. Temps, Senior Safety Inspector  
 
Approved By:
Silas R. Kennedy, Chief Reactor Projects Branch 6  
 
Division of Reactor Projects  
 
Enclosure  


=SUMMARY=
=SUMMARY=
IR 05000334/2014005, 05000412/2014005, 07201043/2014004; 10/01/2014 - 12/31/2014;
IR 05000334/2014005, 05000412/2014005, 07201043/2014004; 10/01/2014 - 12/31/2014;  


Beaver Valley Power Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Control, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation This report covered a three-month period of inspection by resident inspectors and announced inspections performed by regional inspectors. Inspectors identified two findings of very low safety significance (Green), which are non-cited violations (NCVs). The significance of most findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP), dated June 2, 2011. Cross-cutting aspects are determined using IMC 0310, Aspects Within Cross-Cutting Areas, dated December 4, 2014. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy, dated July 9, 2013. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.
Beaver Valley Power Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Control, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation  
 
This report covered a three-month period of inspection by resident inspectors and announced inspections performed by regional inspectors. Inspectors identified two findings of very low safety significance (Green), which are non-cited violations (NCVs). The significance of most findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP), dated June 2, 2011. Cross-cutting aspects are determined using IMC 0310, Aspects Within Cross-Cutting Areas, dated December 4, 2014. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy, dated July 9, 2013. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.


===Cornerstone: Mitigating Systems===
===Cornerstone: Mitigating Systems===
Line 54: Line 99:
FENOC entered the issue into their corrective action program as CR 2015-00267.
FENOC entered the issue into their corrective action program as CR 2015-00267.


The performance deficiency is more than minor because it is associated with the Equipment Performance attribute of the Mitigating Systems cornerstone and adversely affected its objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, FENOCs failure to implement a contingency plan resulted in an increase in the duration of an elevated risk condition and unavailability of equipment relied upon to mitigate the consequences of a loss of the main intake structure. The finding was determined to be of very low safety significance (Green) because the incremental core damage probability (ICDP) for the event was less than 1.0 E-6. The inspectors determined that this finding had a cross-cutting aspect in the Human Performance, Work Management, because the FENOC work process failed to adequately manage the risk commensurate to the work [H.5]. (Section 1R13)
The performance deficiency is more than minor because it is associated with the Equipment Performance attribute of the Mitigating Systems cornerstone and adversely affected its objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, FENOCs failure to implement a contingency plan resulted in an increase in the duration of an elevated risk condition and unavailability of equipment relied upon to mitigate the consequences of a loss of the main intake structure. The finding was determined to be of very low safety significance (Green) because the incremental core damage probability (ICDP) for the event was less than 1.0 E-6. The inspectors determined that this finding had a cross-cutting aspect in the Human Performance, Work Management, because the FENOC work process failed to adequately manage the risk commensurate to the work [H.5]. (Section 1R13)  


===Cornerstone: Occupational/Public Radiation Safety===
===Cornerstone: Occupational/Public Radiation Safety===
Line 65: Line 110:


===Summary of Plant Status===
===Summary of Plant Status===
Unit 1 began the inspection period at 100 percent power. On October 10, 2014, Operators reduced Unit 1 to 13 percent power to reconnect the unit station service transformers to the main generator. Operators returned Unit 1 to 100 percent power on October 16, 2014, and the unit remained at or near 100 percent power for the remainder of the inspection period.
Unit 1 began the inspection period at 100 percent power. On October 10, 2014, Operators reduced Unit 1 to 13 percent power to reconnect the unit station service transformers to the main generator. Operators returned Unit 1 to 100 percent power on October 16, 2014, and the unit remained at or near 100 percent power for the remainder of the inspection period.


Line 71: Line 115:


==REACTOR SAFETY==
==REACTOR SAFETY==
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity  
 
  {{a|1R01}}
  {{a|1R01}}
==1R01 Adverse Weather Protection==
==1R01 Adverse Weather Protection==
{{IP sample|IP=IP 71111.01|count=3}}
{{IP sample|IP=IP 71111.01|count=3}}


===.1 Readiness for Seasonal Extreme Weather Conditions===
===.1 Readiness for Seasonal Extreme Weather Conditions===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed a review of FENOCs readiness for the onset of seasonal cold temperatures. The review focused on service and river water systems, Unit 2 emergency diesel generators, and heat tracing for the Unit 1 charging and quench spray systems. The inspectors reviewed the technical specifications, and the corrective action program to determine what temperatures or other seasonal weather could challenge these systems, and to ensure FENOC personnel had adequately prepared for these challenges. The inspectors reviewed station procedures, including FENOCs seasonal weather preparation procedure and applicable operating procedures. The inspectors performed walkdowns of the selected systems to ensure station personnel identified issues that could challenge the operability of the systems during cold weather conditions. Documents reviewed for each section of this inspection report are listed in the Attachment.
The inspectors performed a review of FENOCs readiness for the onset of seasonal cold temperatures. The review focused on service and river water systems, Unit 2 emergency diesel generators, and heat tracing for the Unit 1 charging and quench spray systems. The inspectors reviewed the technical specifications, and the corrective action program to determine what temperatures or other seasonal weather could challenge these systems, and to ensure FENOC personnel had adequately prepared for these challenges. The inspectors reviewed station procedures, including FENOCs seasonal weather preparation procedure and applicable operating procedures. The inspectors performed walkdowns of the selected systems to ensure station personnel identified issues that could challenge the operability of the systems during cold weather conditions. Documents reviewed for each section of this inspection report are listed in the Attachment.
Line 85: Line 130:


===.2 Readiness for Impending Adverse Weather Conditions===
===.2 Readiness for Impending Adverse Weather Conditions===
====a. Inspection Scope====
====a. Inspection Scope====
On December 24, 2014, the inspectors evaluated FENOCs readiness during a high wind advisory and subsequent entry into abnormal operating procedure (AOP) 1/2OM-53C.4A.75.1, Acts of Nature - Tornado or High Winds. The inspectors efforts focused on review of specific unit actions based on actual environmental conditions and adherence to mitigating procedures. The inspectors performed a walkdown of each units external structures, areas that could potentially impact safety related equipment, and emergency response facilities to verify the adequacy of protection from high winds.
On December 24, 2014, the inspectors evaluated FENOCs readiness during a high wind advisory and subsequent entry into abnormal operating procedure (AOP) 1/2OM-53C.4A.75.1, Acts of Nature - Tornado or High Winds. The inspectors efforts focused on review of specific unit actions based on actual environmental conditions and adherence to mitigating procedures. The inspectors performed a walkdown of each units external structures, areas that could potentially impact safety related equipment, and emergency response facilities to verify the adequacy of protection from high winds.
Line 95: Line 139:


===.3 External Flooding===
===.3 External Flooding===
====a. Inspection Scope====
====a. Inspection Scope====
On December 30, 2014, the inspectors performed an inspection of the external flood protection measures for Beaver Valley Power Station. The inspectors reviewed technical specifications, procedures, design documents, and Updated Final Safety Analysis Report (UFSAR), Chapter 2, which depicted the design flood levels and protection areas containing safety-related equipment to identify areas that may be affected by external flooding. The inspectors conducted a general site walkdown of all external areas of the plant, including the turbine building, auxiliary building, and the main intake structure to ensure that FENOC erected flood protection measures in accordance with design specifications. The inspectors also reviewed operating procedures for mitigating external flooding during severe weather to determine if FENOC planned or established adequate measures to protect against external flooding events.
On December 30, 2014, the inspectors performed an inspection of the external flood protection measures for Beaver Valley Power Station. The inspectors reviewed technical specifications, procedures, design documents, and Updated Final Safety Analysis Report (UFSAR), Chapter 2, which depicted the design flood levels and protection areas containing safety-related equipment to identify areas that may be affected by external flooding. The inspectors conducted a general site walkdown of all external areas of the plant, including the turbine building, auxiliary building, and the main intake structure to ensure that FENOC erected flood protection measures in accordance with design specifications. The inspectors also reviewed operating procedures for mitigating external flooding during severe weather to determine if FENOC planned or established adequate measures to protect against external flooding events.
Line 101: Line 144:
====b. Findings====
====b. Findings====
No findings were identified. {{a|1R04}}
No findings were identified. {{a|1R04}}
==1R04 Equipment Alignment==
 
==1R04 Equipment Alignment  


Partial System Walkdowns (71111.04 - 2 samples)
Partial System Walkdowns (71111.04 - 2 samples)


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed partial walkdowns of the following systems:
==
Unit 1 quench spray system following preventative maintenance on the B train quench spray and recirculation spray systems on October 21, 2014 Unit 2 train boric acid system due to the A boric acid pump being out of service for maintenance on October 28, 2014 The inspectors selected these systems based on their risk-significance relative to the reactor safety cornerstones at the time they were inspected. The inspectors reviewed applicable operating procedures, system diagrams, the UFSAR, technical specifications, work orders, condition reports, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have impacted system performance of their intended safety functions. The inspectors also performed field walkdowns of accessible portions of the systems to verify system components and support equipment were aligned correctly and were operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no deficiencies. The inspectors also reviewed whether FENOCs staff had properly identified equipment issues and entered them into the corrective action program for resolution with the appropriate significance characterization.
The inspectors performed partial walkdowns of the following systems:  
 
Unit 1 quench spray system following preventative maintenance on the B train quench spray and recirculation spray systems on October 21, 2014  
 
Unit 2 train boric acid system due to the A boric acid pump being out of service for maintenance on October 28, 2014  
 
The inspectors selected these systems based on their risk-significance relative to the reactor safety cornerstones at the time they were inspected. The inspectors reviewed applicable operating procedures, system diagrams, the UFSAR, technical specifications, work orders, condition reports, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have impacted system performance of their intended safety functions. The inspectors also performed field walkdowns of accessible portions of the systems to verify system components and support equipment were aligned correctly and were operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no deficiencies. The inspectors also reviewed whether FENOCs staff had properly identified equipment issues and entered them into the corrective action program for resolution with the appropriate significance characterization.


====b. Findings====
====b. Findings====
No findings were identified. {{a|1R05}}
No findings were identified. {{a|1R05}}
==1R05 Fire Protection==


Resident Inspector Quarterly Walkdowns (71111.05Q - 2 samples)
==1R05 Fire Protection


Resident Inspector Quarterly Walkdowns (71111.05Q - 2 samples)
==
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors conducted tours of the areas listed below to assess the material condition and operational status of fire protection features. The inspectors verified that FENOC controlled combustible materials and ignition sources in accordance with administrative procedures. The inspectors verified that fire protection and suppression equipment was available for use as specified in the area pre-fire plan, and passive fire barriers were maintained in good material condition. The inspectors also verified that station personnel implemented compensatory measures for out of service, degraded, or inoperable fire protection equipment, as applicable, in accordance with procedures.
The inspectors conducted tours of the areas listed below to assess the material condition and operational status of fire protection features. The inspectors verified that FENOC controlled combustible materials and ignition sources in accordance with administrative procedures. The inspectors verified that fire protection and suppression equipment was available for use as specified in the area pre-fire plan, and passive fire barriers were maintained in good material condition. The inspectors also verified that station personnel implemented compensatory measures for out of service, degraded, or inoperable fire protection equipment, as applicable, in accordance with procedures.


Unit 2 718 main steam cable vault pipe tunnel, fire area PT-1 on October 7, 2014 Unit 2 primary auxiliary building, fire area PA-6 on November 11, 2014
Unit 2 718 main steam cable vault pipe tunnel, fire area PT-1 on October 7, 2014  
 
Unit 2 primary auxiliary building, fire area PA-6 on November 11, 2014


====b. Findings====
====b. Findings====
Line 124: Line 178:


  {{a|1R11}}
  {{a|1R11}}
==1R11 Licensed Operator Requalification Program==
==1R11 Licensed Operator Requalification Program==
{{IP sample|IP=IP 71111.11Q|count=2}}
{{IP sample|IP=IP 71111.11Q|count=2}}


===.1 Quarterly Review of Licensed Operator Requalification Testing and Training===
===.1 Quarterly Review of Licensed Operator Requalification Testing and Training===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed licensed operator simulator training on October 20, 2014, which included a stuck open power-operated relief valve, a faulted steam generator, loss of emergency alternating current (AC) busses, and failure of select components to automatically start as required. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the technical specification action statements entered by the shift manager. Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.
The inspectors observed licensed operator simulator training on October 20, 2014, which included a stuck open power-operated relief valve, a faulted steam generator, loss of emergency alternating current (AC) busses, and failure of select components to automatically start as required. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the technical specification action statements entered by the shift manager. Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.
Line 136: Line 190:


===.2 Quarterly Review of Licensed Operator Performance in the Main Control Room===
===.2 Quarterly Review of Licensed Operator Performance in the Main Control Room===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed and reviewed a power reduction on Unit 1 which included securing of the second main feed pump to opening the main generator output breakers on October 10 and 11, 2014. The inspectors observed pre-job briefings, and reactivity control briefings to verify that the briefings met the criteria specified in station procedure NOP-OP-1002, Conduct of Operations, Revision 9. Additionally, the inspectors observed operator performance to verify that procedure use, crew communications, reactivity management, and coordination of activities between work groups similarly met established expectations and standards.
The inspectors observed and reviewed a power reduction on Unit 1 which included securing of the second main feed pump to opening the main generator output breakers on October 10 and 11, 2014. The inspectors observed pre-job briefings, and reactivity control briefings to verify that the briefings met the criteria specified in station procedure NOP-OP-1002, Conduct of Operations, Revision 9. Additionally, the inspectors observed operator performance to verify that procedure use, crew communications, reactivity management, and coordination of activities between work groups similarly met established expectations and standards.
Line 147: Line 200:


====a. Inspection Scope====
====a. Inspection Scope====
On December 23, 2014, one NRC region-based inspector conducted an in-office review of the results of the Beaver Valley Station, Unit 2, licensee-administered annual operating tests and the biennial written exam for the year 2014. The results of the Beaver Valley Station, Unit 1 biennial written exam for the year 2013 were also reviewed. The inspection assessed whether pass rates were consistent with the guidance of NRC Manual Chapter 0609, Appendix I, Operator Requalification Human Performance Significance Determination Process (SDP). The inspector verified that:
On December 23, 2014, one NRC region-based inspector conducted an in-office review of the results of the Beaver Valley Station, Unit 2, licensee-administered annual operating tests and the biennial written exam for the year 2014. The results of the Beaver Valley Station, Unit 1 biennial written exam for the year 2013 were also reviewed. The inspection assessed whether pass rates were consistent with the guidance of NRC Manual Chapter 0609, Appendix I, Operator Requalification Human Performance Significance Determination Process (SDP). The inspector verified that:  
For Unit 2 Annual Operating Test in 2014:
 
For Unit 2 Annual Operating Test in 2014:  
 
Individual pass rate on the dynamic simulator test was greater than 80 percent.
Individual pass rate on the dynamic simulator test was greater than 80 percent.


          (Pass rate was 88.3 percent.)
(Pass rate was 88.3 percent.)


Individual pass rate on the job performance measures of the operating exam was greater than 80 percent. (Pass rate was 100 percent.)
Individual pass rate on the job performance measures of the operating exam was greater than 80 percent. (Pass rate was 100 percent.)
Line 159: Line 214:
Crew pass rate was greater than 80 percent. (Pass rate was 100 percent.)
Crew pass rate was greater than 80 percent. (Pass rate was 100 percent.)


For Unit 2 Biennial Written Exam in 2014:
For Unit 2 Biennial Written Exam in 2014:  
 
Individual pass rate on the written examination was greater than 80 percent. (The pass rate was 88 percent.)
Individual pass rate on the written examination was greater than 80 percent. (The pass rate was 88 percent.)


For Unit 1 Biennial Written Exam in 2013:
For Unit 1 Biennial Written Exam in 2013:  
 
Individual pass rate on the written examination was greater than 80 percent.
Individual pass rate on the written examination was greater than 80 percent.


          (The pass rate was 100 percent.)
(The pass rate was 100 percent.)


====b. Findings====
====b. Findings====
Line 171: Line 228:


  {{a|1R12}}
  {{a|1R12}}
==1R12 Maintenance Effectiveness==
==1R12 Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12Q|count=1}}
{{IP sample|IP=IP 71111.12Q|count=1}}
Line 181: Line 239:


  {{a|1R13}}
  {{a|1R13}}
==1R13 Maintenance Risk Assessments and Emergent Work Control==
==1R13 Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13|count=2}}
{{IP sample|IP=IP 71111.13|count=2}}
Line 187: Line 246:
The inspectors reviewed station evaluation and management of plant risk for the maintenance and emergent work activities listed below to verify that FENOC performed the appropriate risk assessments prior to removing equipment for work. The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that FENOC personnel performed risk assessments as required by 10 CFR 50.65(a)(4) and that the assessments were accurate and complete. When FENOC performed emergent work, the inspectors verified that operations personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work and discussed the results of the assessment with the stations probabilistic risk analyst to verify plant conditions were consistent with the risk assessment. The inspectors also reviewed the technical specification requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met.
The inspectors reviewed station evaluation and management of plant risk for the maintenance and emergent work activities listed below to verify that FENOC performed the appropriate risk assessments prior to removing equipment for work. The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that FENOC personnel performed risk assessments as required by 10 CFR 50.65(a)(4) and that the assessments were accurate and complete. When FENOC performed emergent work, the inspectors verified that operations personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work and discussed the results of the assessment with the stations probabilistic risk analyst to verify plant conditions were consistent with the risk assessment. The inspectors also reviewed the technical specification requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met.


Yellow risk associated with placing degraded Unit 1 battery charger 1A in service for load testing of battery charger 1B on October 11, 2014 Planned maintenance in the Unit 1 auxiliary intake structure A bay on October 14, 2014
Yellow risk associated with placing degraded Unit 1 battery charger 1A in service for load testing of battery charger 1B on October 11, 2014  
 
Planned maintenance in the Unit 1 auxiliary intake structure A bay on October 14, 2014


====b. Findings====
====b. Findings====
=====Introduction.=====
=====Introduction.=====
The inspectors identified a Green NCV of 10 CFR 50.65(a)(4) for FENOCs failure to implement adequate risk management actions (RMAs) associated with maintenance on the alternate intake structure A bay. Specifically, FENOC did not establish a contingency plan for the maintenance activity as required by FENOCs risk management procedure.
The inspectors identified a Green NCV of 10 CFR 50.65(a)(4) for FENOCs failure to implement adequate risk management actions (RMAs) associated with maintenance on the alternate intake structure A bay. Specifically, FENOC did not establish a contingency plan for the maintenance activity as required by FENOCs risk management procedure.
Line 199: Line 259:
FENOC was using a submersible pump to clean the alternate intake structure A bay.
FENOC was using a submersible pump to clean the alternate intake structure A bay.


The submersible pump failed and FENOC deployed a team to repair the pump and rented a backup pump in the event that the repairs were unsuccessful. The inspectors questioned FENOCs RMAs and determined that FENOC did not establish a contingency plan prior to performing the maintenance activity. Repair of the failed submersible pump delayed the maintenance activity for over six hours, thus increasing the duration of an elevated risk condition. FENOC procedure NOP-OP-1007, Risk Management, requires in part that, each of the risk management controls of Attachment 4 should be implemented, as feasible, to increase risk awareness and control, reduce the duration of activities and plant conditions associated with elevated risk, and minimize the magnitude of risk increase. Establishing contingency plans is one of the RMAs listed in Attachment 4 of NOP-OP-1007. The inspectors determined that it was reasonable for FENOC to establish a contingency plan for the elevated risk activity in order to minimize the increase in duration of the work due to potential equipment failures. FENOC entered the issue into their corrective action program (CAP) as CR 2015-00267
The submersible pump failed and FENOC deployed a team to repair the pump and rented a backup pump in the event that the repairs were unsuccessful. The inspectors questioned FENOCs RMAs and determined that FENOC did not establish a contingency plan prior to performing the maintenance activity. Repair of the failed submersible pump delayed the maintenance activity for over six hours, thus increasing the duration of an elevated risk condition. FENOC procedure NOP-OP-1007, Risk Management, requires in part that, each of the risk management controls of Attachment 4 should be implemented, as feasible, to increase risk awareness and control, reduce the duration of activities and plant conditions associated with elevated risk, and minimize the magnitude of risk increase. Establishing contingency plans is one of the RMAs listed in Attachment 4 of NOP-OP-1007. The inspectors determined that it was reasonable for FENOC to establish a contingency plan for the elevated risk activity in order to minimize the increase in duration of the work due to potential equipment failures. FENOC entered the issue into their corrective action program (CAP) as CR 2015-00267  


=====Analysis.=====
=====Analysis.=====
Line 208: Line 268:
An NRC senior reactor analyst calculated incremental core damage probability (ICDP) of the event to be 8.06 E-10 based on a six-hour exposure time. Using IMC 0609, Appendix K, Flowchart 2, Assessment of RMAs, issued May 19, 2005, the finding is determined to be of very low safety significance (Green) because the ICDP for the event was less than 1.0 E-6.
An NRC senior reactor analyst calculated incremental core damage probability (ICDP) of the event to be 8.06 E-10 based on a six-hour exposure time. Using IMC 0609, Appendix K, Flowchart 2, Assessment of RMAs, issued May 19, 2005, the finding is determined to be of very low safety significance (Green) because the ICDP for the event was less than 1.0 E-6.


The inspectors determined that this finding had a cross-cutting aspect in Human Performance, Work Management, because the FENOC work process failed to adequately manage the risk commensurate to the work. Specifically, the FENOC work processes did not appropriately incorporate contingency plans when performing maintenance activities in the alternate intake structure A bay on October 14, 2014 [H.5].
The inspectors determined that this finding had a cross-cutting aspect in Human Performance, Work Management, because the FENOC work process failed to adequately manage the risk commensurate to the work. Specifically, the FENOC work processes did not appropriately incorporate contingency plans when performing maintenance activities in the alternate intake structure A bay on October 14, 2014 [H.5].  


=====Enforcement.=====
=====Enforcement.=====
10 CFR 50.65(a)(4) requires, in part, that, the licensee shall assess and manage the increase in risk that may result from the proposed maintenance activities.
10 CFR 50.65(a)(4) requires, in part, that, the licensee shall assess and manage the increase in risk that may result from the proposed maintenance activities.


Contrary to the above, FENOC did not appropriately manage the increase in risk resulting from maintenance activities. Specifically, FENOC failed to implement a contingency plan during an elevated risk condition when performing maintenance in the alternate intake structure A bay on October 14, 2014. Because this finding was of very low safety significance (Green) and was entered into FENOCs corrective action program (CAP) as CR 2015-00267, this violation is being treated as an NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy. (NCV 05000334/2014005-01, Failure to Adequately Implement Risk Management Actions)
Contrary to the above, FENOC did not appropriately manage the increase in risk resulting from maintenance activities. Specifically, FENOC failed to implement a contingency plan during an elevated risk condition when performing maintenance in the alternate intake structure A bay on October 14, 2014. Because this finding was of very low safety significance (Green) and was entered into FENOCs corrective action program (CAP) as CR 2015-00267, this violation is being treated as an NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy. (NCV 05000334/2014005-01, Failure to Adequately Implement Risk Management Actions)  


{{a|1R15}}
{{a|1R15}}
==1R15 Operability Determinations and Functionality Assessments==
==1R15 Operability Determinations and Functionality Assessments==
{{IP sample|IP=IP 71111.15|count=8}}
{{IP sample|IP=IP 71111.15|count=8}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed operability determinations for the following degraded or non-conforming conditions:
The inspectors reviewed operability determinations for the following degraded or non-conforming conditions:  
CR 2014-15436, Unit 2 48 Volt DC power supply to the reactor trip breakers low out of tolerance on October 17, 2014 CR 2014-15944, Unit 1 B quench spray pump suction isolation valve loose yoke bolt on October 21, 2014 CR 2014-15990, Unit 2 B safety injection accumulator in-leakage on October 22, 2014 CR 2014-15874, Unit 1 potential glycol leakage on 1A main feed regulating valve November 5, 2014 CR 2014-16599, 2MSS-SOV105E, steam supply isolation valve to the Unit 2 turbine driven auxiliary feed water pump exceeded its limiting closed stroke time on November 6, 2014 Engineering Evaluation Request 600931138, Evaluate data obtained per MSP-36.51A-E for margin in engineered safety features Time Response Beaver Valley Unit 1 test on November 10, 2014 CR 2014-17079, Leak in Unit 1 24 river water header supplying the recirculation spray heat exchangers on November 18, 2014 CR 2014-18292, Leak in Unit 2 four inch service water line in north safeguards room on December 15, 2014 The inspectors selected these issues based on the risk significance of the associated components and systems. The inspectors evaluated the technical adequacy of the operability determinations to assess whether technical specification operability was properly justified and the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the technical specifications and UFSAR to FENOCs evaluations to determine whether the components or systems were operable.
 
CR 2014-15436, Unit 2 48 Volt DC power supply to the reactor trip breakers low out of tolerance on October 17, 2014  
 
CR 2014-15944, Unit 1 B quench spray pump suction isolation valve loose yoke bolt on October 21, 2014  
 
CR 2014-15990, Unit 2 B safety injection accumulator in-leakage on October 22, 2014  
 
CR 2014-15874, Unit 1 potential glycol leakage on 1A main feed regulating valve November 5, 2014  
 
CR 2014-16599, 2MSS-SOV105E, steam supply isolation valve to the Unit 2 turbine driven auxiliary feed water pump exceeded its limiting closed stroke time on November 6, 2014  
 
Engineering Evaluation Request 600931138, Evaluate data obtained per MSP-36.51A-E for margin in engineered safety features Time Response Beaver Valley Unit 1 test on November 10, 2014  
 
CR 2014-17079, Leak in Unit 1 24 river water header supplying the recirculation spray heat exchangers on November 18, 2014  
 
CR 2014-18292, Leak in Unit 2 four inch service water line in north safeguards room on December 15, 2014  
 
The inspectors selected these issues based on the risk significance of the associated components and systems. The inspectors evaluated the technical adequacy of the operability determinations to assess whether technical specification operability was properly justified and the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the technical specifications and UFSAR to FENOCs evaluations to determine whether the components or systems were operable.


Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled by FENOC. The inspectors determined, where appropriate, compliance with bounding limitations associated with the evaluations.
Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled by FENOC. The inspectors determined, where appropriate, compliance with bounding limitations associated with the evaluations.
Line 229: Line 307:


  {{a|1R19}}
  {{a|1R19}}
==1R19 Post-Maintenance Testing==
==1R19 Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=3}}
{{IP sample|IP=IP 71111.19|count=3}}
Line 235: Line 314:
The inspectors reviewed the post-maintenance tests for the maintenance activities listed below to verify that procedures and test activities ensured system operability and functional capability. The inspectors reviewed the test procedure to verify that the procedure adequately tested the safety functions that may have been affected by the maintenance activity, that the acceptance criteria in the procedure was consistent with the information in the applicable licensing basis and/or design basis documents, and that the procedure had been properly reviewed and approved. The inspectors also witnessed the test or reviewed test data to verify that the test results adequately demonstrated restoration of the affected safety functions.
The inspectors reviewed the post-maintenance tests for the maintenance activities listed below to verify that procedures and test activities ensured system operability and functional capability. The inspectors reviewed the test procedure to verify that the procedure adequately tested the safety functions that may have been affected by the maintenance activity, that the acceptance criteria in the procedure was consistent with the information in the applicable licensing basis and/or design basis documents, and that the procedure had been properly reviewed and approved. The inspectors also witnessed the test or reviewed test data to verify that the test results adequately demonstrated restoration of the affected safety functions.


Unit 1 emergency diesel generator header isolation valve breaker replacement on November 5, 2014 Unit 2 system station service transformer bus A load tap changer repair on November 12, 2014 Unit 1 C river water pump expansion joint replacement and motor maintenance on December 1, 2014
Unit 1 emergency diesel generator header isolation valve breaker replacement on November 5, 2014  
 
Unit 2 system station service transformer bus A load tap changer repair on November 12, 2014  
 
Unit 1 C river water pump expansion joint replacement and motor maintenance on December 1, 2014


====b. Findings====
====b. Findings====
Line 241: Line 324:


  {{a|1R22}}
  {{a|1R22}}
==1R22 Surveillance Testing==
==1R22 Surveillance Testing==
{{IP sample|IP=IP 71111.22|count=4}}
{{IP sample|IP=IP 71111.22|count=4}}
Line 246: Line 330:
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed performance of surveillance tests and/or reviewed test data of selected risk-significant SSCs to assess whether test results satisfied technical specifications, the UFSAR, and FENOC procedure requirements. The inspectors verified that test acceptance criteria were clear, tests demonstrated operational readiness and were consistent with design documentation, test instrumentation had current calibrations and the range and accuracy for the application, tests were performed as written, and applicable test prerequisites were satisfied. Upon test completion, the inspectors considered whether the test results supported that equipment was capable of performing the required safety functions. The inspectors reviewed the following surveillance tests:
The inspectors observed performance of surveillance tests and/or reviewed test data of selected risk-significant SSCs to assess whether test results satisfied technical specifications, the UFSAR, and FENOC procedure requirements. The inspectors verified that test acceptance criteria were clear, tests demonstrated operational readiness and were consistent with design documentation, test instrumentation had current calibrations and the range and accuracy for the application, tests were performed as written, and applicable test prerequisites were satisfied. Upon test completion, the inspectors considered whether the test results supported that equipment was capable of performing the required safety functions. The inspectors reviewed the following surveillance tests:
2OST-1.12B, Safeguards Protection System Train B Safety Injection System Go Test, Revision 49, on October 30, 2014 1OST-24.2, Motor Driven Auxiliary Feed Pump Test (1FW-P-3A), Revision 50, on November 17, 2012 (In-service test)2OST-11.2, Low Head Safety Injection Pump (2SIS*P21B) Test, Revision 31, on December 16, 2014 1OST-13.7B, 2B Recirculation Spray Pump Flow Test, Revision 12, on December 22, 2014
2OST-1.12B, Safeguards Protection System Train B Safety Injection System Go Test, Revision 49, on October 30, 2014  
 
1OST-24.2, Motor Driven Auxiliary Feed Pump Test (1FW-P-3A), Revision 50, on November 17, 2012 (In-service test)  
 
2OST-11.2, Low Head Safety Injection Pump (2SIS*P21B) Test, Revision 31, on December 16, 2014  
 
1OST-13.7B, 2B Recirculation Spray Pump Flow Test, Revision 12, on December 22, 2014


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.  


===Cornerstone: Emergency Preparedness===
===Cornerstone: Emergency Preparedness===
{{a|1EP6}}


{{a|1EP6}}
==1EP6 Drill Evaluation==
==1EP6 Drill Evaluation==
{{IP sample|IP=IP 71114.06|count=1}}
{{IP sample|IP=IP 71114.06|count=1}}


===.1 Emergency Preparedness Drill Observation===
===.1 Emergency Preparedness Drill Observation===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors evaluated the conduct of a routine FENOC emergency drill on October 9, 2014, to identify any weaknesses and deficiencies in the classification, notification, and protective action recommendation development activities. The inspectors observed emergency response operations in the simulator, technical support center, and emergency operations facility to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures.
The inspectors evaluated the conduct of a routine FENOC emergency drill on October 9, 2014, to identify any weaknesses and deficiencies in the classification, notification, and protective action recommendation development activities. The inspectors observed emergency response operations in the simulator, technical support center, and emergency operations facility to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures.
Line 268: Line 357:


==RADIATION SAFETY==
==RADIATION SAFETY==
===Cornerstone: Public Radiation Safety and Occupational Radiation Safety===
===Cornerstone: Public Radiation Safety and Occupational Radiation Safety===
{{a|2RS6}}


{{a|2RS6}}
==2RS6 Radioactive Gaseous and Liquid Effluent Treatment==
==2RS6 Radioactive Gaseous and Liquid Effluent Treatment==
{{IP sample|IP=IP 71124.06|count=1}}
{{IP sample|IP=IP 71124.06|count=1}}
a  Inspection Scope During the period November 3-7, 2014, the inspectors reviewed FENOCs performance in treatment, monitoring, and control of effluent releases including adequacy of public dose calculations and projections. The inspectors used the requirements in 10 CFR Part 20; 10 CFR 50, Appendix I; technical specifications; Offsite Dose Calculation Manual (ODCM); applicable industry standards; and procedures required by technical specifications as criteria for determining compliance.


Inspection Planning The inspector conducted in-office preparation and review of FENOC submitted effluent and environmental program documents and reviewed associated UFSAR and the ODCM.
a Inspection Scope
 
During the period November 3-7, 2014, the inspectors reviewed FENOCs performance in treatment, monitoring, and control of effluent releases including adequacy of public dose calculations and projections. The inspectors used the requirements in 10 CFR Part 20; 10 CFR 50, Appendix I; technical specifications; Offsite Dose Calculation Manual (ODCM); applicable industry standards; and procedures required by technical specifications as criteria for determining compliance.
 
=====Inspection Planning=====
The inspector conducted in-office preparation and review of FENOC submitted effluent and environmental program documents and reviewed associated UFSAR and the ODCM.
 
Event Report and Effluent Report Reviews
 
The inspectors reviewed the following:
 
Annual radiological effluent and environmental reports for 2012 and 2013 including unexpected trends or abnormal releases
 
Reported effluent monitor operability issues
 
ODCM and UFSAR Reviews
 
The inspectors reviewed the following:
 
UFSAR changes associated with effluent monitoring and control
 
Changes to ODCM including technical justifications


Event Report and Effluent Report Reviews The inspectors reviewed the following:
Identification of any contaminated non-radioactive system and associated 10 CFR 50.59 evaluations  
Annual radiological effluent and environmental reports for 2012 and 2013 including unexpected trends or abnormal releases Reported effluent monitor operability issues ODCM and UFSAR Reviews The inspectors reviewed the following:
UFSAR changes associated with effluent monitoring and control Changes to ODCM including technical justifications Identification of any contaminated non-radioactive system and associated 10 CFR 50.59 evaluations Ground Water Protection Initiative The inspectors reviewed the following:
Reported groundwater monitoring results and changes to the written program for identifying and controlling contaminated spills/leaks to groundwater Changes to the program since last inspection Procedures, Special Reports, and Other Documents The inspectors reviewed the following:
Any Licensee Event Reports (LERs), and special reports related to the effluent program Effluent program implementing procedures, including those associated with effluent sampling, effluent monitor set-point determinations, and dose calculations Evaluation reports of the effluent monitoring program since the last inspection Walkdowns and Observations The inspectors reviewed the following:
Walked down selected components of the gaseous effluent monitoring systems Potential unmonitored release points, building alterations which could impact airborne, or liquid, and effluent controls, and ventilation system leakage Effluent release system material condition surveillance records Changes to effluent release paths Routine processing and discharge of liquid waste 10 CFR 50.59, Changes, Tests, and Experiments, reviews for changes to effluent release points Sampling and Analyses The inspectors reviewed the following:
Effluent sampling activities with respect to representative sampling Effluent discharges made with inoperable effluent radiation monitors Use of compensatory effluent sampling Results of the inter-laboratory and intra-laboratory comparison program, including hard-to-detect isotopes, to verify the quality of the radioactive effluent sample analyses Dose Calculations The inspectors reviewed the following:
Significant changes in reported dose values compared to the previous radioactive effluent release reports Liquid and gaseous waste discharge permits Methods used to include hard-to-detect radionuclides in the effluent release reports Changes in the methodology for offsite dose calculations since the last inspection Meteorological dispersion and deposition factors used in offsite dose calculations Latest Land Use Census to verify that changes in land use have been factored into public dose projections and the environmental sampling program Dose calculations (monthly, quarterly, annual)
Records of any abnormal gaseous or liquid discharges Discharges made with inoperable effluent radiation monitors Groundwater Protection Initiative (GPI) Implementation The inspectors reviewed the following:
Groundwater monitoring results Changes made to the GPI program Anomalous results of groundwater samples Leakage or spill events and entries made into the decommissioning files (10 CFR50.75(g))
On-site contamination events involving contamination of groundwater Discharges from onsite surface water bodies Problem Identification and Resolution The inspectors evaluated whether problems associated with the effluent monitoring and control program were being identified at an appropriate threshold and were properly addressed for resolution in the licensee corrective action program.


b Findings No findings were identified.
Ground Water Protection Initiative
 
The inspectors reviewed the following:
 
Reported groundwater monitoring results and changes to the written program for identifying and controlling contaminated spills/leaks to groundwater
 
Changes to the program since last inspection
 
Procedures, Special Reports, and Other Documents
 
The inspectors reviewed the following:
 
Any Licensee Event Reports (LERs), and special reports related to the effluent program
 
Effluent program implementing procedures, including those associated with effluent sampling, effluent monitor set-point determinations, and dose calculations
 
Evaluation reports of the effluent monitoring program since the last inspection
 
Walkdowns and Observations
 
The inspectors reviewed the following:
 
Walked down selected components of the gaseous effluent monitoring systems Potential unmonitored release points, building alterations which could impact airborne, or liquid, and effluent controls, and ventilation system leakage
 
Effluent release system material condition surveillance records
 
Changes to effluent release paths
 
Routine processing and discharge of liquid waste
 
10 CFR 50.59, Changes, Tests, and Experiments, reviews for changes to effluent release points
 
Sampling and Analyses
 
The inspectors reviewed the following:
 
Effluent sampling activities with respect to representative sampling
 
Effluent discharges made with inoperable effluent radiation monitors
 
Use of compensatory effluent sampling
 
Results of the inter-laboratory and intra-laboratory comparison program, including hard-to-detect isotopes, to verify the quality of the radioactive effluent sample analyses
 
Dose Calculations
 
The inspectors reviewed the following:
 
Significant changes in reported dose values compared to the previous radioactive effluent release reports
 
Liquid and gaseous waste discharge permits
 
Methods used to include hard-to-detect radionuclides in the effluent release reports
 
Changes in the methodology for offsite dose calculations since the last inspection
 
Meteorological dispersion and deposition factors used in offsite dose calculations
 
Latest Land Use Census to verify that changes in land use have been factored into public dose projections and the environmental sampling program
 
Dose calculations (monthly, quarterly, annual)
 
Records of any abnormal gaseous or liquid discharges
 
Discharges made with inoperable effluent radiation monitors
 
Groundwater Protection Initiative (GPI) Implementation
 
The inspectors reviewed the following:
 
Groundwater monitoring results
 
Changes made to the GPI program
 
Anomalous results of groundwater samples
 
Leakage or spill events and entries made into the decommissioning files (10 CFR50.75(g))
 
On-site contamination events involving contamination of groundwater
 
Discharges from onsite surface water bodies Problem Identification and Resolution
 
The inspectors evaluated whether problems associated with the effluent monitoring and control program were being identified at an appropriate threshold and were properly addressed for resolution in the licensee corrective action program.
 
b Findings  
 
No findings were identified.


{{a|2RS8}}
{{a|2RS8}}
==2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and==
==2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and==
Transportation (71124.08 - 1 sample)
Transportation (71124.08 - 1 sample)


Line 305: Line 489:
The inspectors conducted an in-office review of the solid radioactive waste system description in the UFSAR, the Process Control Program, and the recent radiological effluent release report for information on the types, amounts, and processing of radioactive waste disposed. The inspectors reviewed the scope of quality assurance audits performed for this area since the last inspection.
The inspectors conducted an in-office review of the solid radioactive waste system description in the UFSAR, the Process Control Program, and the recent radiological effluent release report for information on the types, amounts, and processing of radioactive waste disposed. The inspectors reviewed the scope of quality assurance audits performed for this area since the last inspection.


Radioactive Material Storage The inspectors inspected areas where containers of radioactive waste were stored. The inspectors verified that the licensee had established a process for monitoring the impact of long-term storage.
Radioactive Material Storage  
 
The inspectors inspected areas where containers of radioactive waste were stored. The inspectors verified that the licensee had established a process for monitoring the impact of long-term storage.
 
Radioactive Waste System Walk-down
 
The inspectors walked down areas of the plant, and reviewed:
 
accessible portions of liquid and solid radioactive waste processing systems to verify current system alignment and material condition
 
radioactive waste processing equipment that was abandoned in place, and reviewed the controls in place to ensure protection of personnel
 
changes made to the radioactive waste processing systems since the last inspection
 
processes for transferring radioactive waste resin and/or sludge discharges into shipping/disposal containers
 
current methods and procedures for dewatering waste Waste Characterization and Classification
 
The inspectors identified radioactive waste streams and reviewed radiochemical sample analysis results to support radioactive waste characterization. The inspectors reviewed the use of scaling factors and calculations to account for difficult-to-measure radionuclides.


Radioactive Waste System Walk-down The inspectors walked down areas of the plant, and reviewed:
Shipment Preparation
accessible portions of liquid and solid radioactive waste processing systems to verify current system alignment and material condition radioactive waste processing equipment that was abandoned in place, and reviewed the controls in place to ensure protection of personnel changes made to the radioactive waste processing systems since the last inspection processes for transferring radioactive waste resin and/or sludge discharges into shipping/disposal containers current methods and procedures for dewatering waste Waste Characterization and Classification The inspectors identified radioactive waste streams and reviewed radiochemical sample analysis results to support radioactive waste characterization. The inspectors reviewed the use of scaling factors and calculations to account for difficult-to-measure radionuclides.


Shipment Preparation The inspectors reviewed the records of shipment packaging, surveying, labeling, marking, placarding, vehicle checks, emergency instructions, disposal manifest, shipping papers provided to the driver, and licensee verification of shipment readiness.
The inspectors reviewed the records of shipment packaging, surveying, labeling, marking, placarding, vehicle checks, emergency instructions, disposal manifest, shipping papers provided to the driver, and licensee verification of shipment readiness.


Shipping Records The inspectors reviewed selected non-excepted package shipment records.
Shipping Records  


Identification and Resolution of Problems The inspectors reviewed problems associated with radioactive waste processing, handling, storage, and transportation, and were addressed for resolution in the licensee corrective action program.
The inspectors reviewed selected non-excepted package shipment records.
 
Identification and Resolution of Problems  
 
The inspectors reviewed problems associated with radioactive waste processing, handling, storage, and transportation, and were addressed for resolution in the licensee corrective action program.


====b. Findings and Observations====
====b. Findings and Observations====
=====Introduction.=====
=====Introduction.=====
The inspectors identified a Green NCV of 10 CFR 71.5, Transportation of licensed material, and 49 CFR 172, Subpart I, Safety and Security Plans. Specifically, FENOC personnel shipped a category 2 RAM-QC on public highways to a waste processor without adhering to a transportation security plan. Prior to shipment, FENOC staff failed to recognize that the quantity of radioactive material met the definition RAM-QC.
The inspectors identified a Green NCV of 10 CFR 71.5, Transportation of licensed material, and 49 CFR 172, Subpart I, Safety and Security Plans. Specifically, FENOC personnel shipped a category 2 RAM-QC on public highways to a waste processor without adhering to a transportation security plan. Prior to shipment, FENOC staff failed to recognize that the quantity of radioactive material met the definition RAM-QC.
Line 337: Line 541:


=====Enforcement.=====
=====Enforcement.=====
10 CFR 71.5, Transportation of Licensed Material, requires compliance with the applicable requirements of Department of Transportation regulations in 49 CFR Parts 171 through 180. 49 CFR 172, Subpart I, Safety and Security Plans, [49 CFR 172.800(b)] requires that known radionuclides in forms listed as category 2 RAM-QC must adhere to a transportation security plan. Contrary to the above, FENOC made a category 2 shipment of radioactive material on May 21, 2013 (Shipment ID B-4247)without implementing the required transportation security plan. FENOCs corrective actions included revising procedure NOP-OP-2501, Shipment of Radioactive Material -
10 CFR 71.5, Transportation of Licensed Material, requires compliance with the applicable requirements of Department of Transportation regulations in 49 CFR Parts 171 through 180. 49 CFR 172, Subpart I, Safety and Security Plans, [49 CFR 172.800(b)] requires that known radionuclides in forms listed as category 2 RAM-QC must adhere to a transportation security plan. Contrary to the above, FENOC made a category 2 shipment of radioactive material on May 21, 2013 (Shipment ID B-4247)without implementing the required transportation security plan. FENOCs corrective actions included revising procedure NOP-OP-2501, Shipment of Radioactive Material - Waste, to reflect the appropriate Department of Transportation requirements for shipment of Category 2 radioactive material. Because this violation was of very low safety significance (Green) and FENOC entered this issue into their CAP as CR 2014-
Waste, to reflect the appropriate Department of Transportation requirements for shipment of Category 2 radioactive material. Because this violation was of very low safety significance (Green) and FENOC entered this issue into their CAP as CR 2014-


===17260, this violation is being treated as an NCV, consistent with Section 2.3.2. of the NRC Enforcement Policy. (05000334/2014005-02; 05000412/2014005-02, Failure to Properly Ship Category 2 Radioactive Material)
===17260, this violation is being treated as an NCV, consistent with Section 2.3.2. of the NRC Enforcement Policy. (05000334/2014005-02; 05000412/2014005-02, Failure to Properly Ship Category 2 Radioactive Material)
Line 344: Line 547:
==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
{{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator Verification==
==4OA1 Performance Indicator Verification==
{{IP sample|IP=IP 71151}}
{{IP sample|IP=IP 71151}}
===.1 Mitigating Systems Performance Index (4 samples)===
===.1 Mitigating Systems Performance Index (4 samples)===
====a. Inspection Scope====
The inspectors reviewed FENOCs submittal of the Mitigating Systems Performance Index for the following systems for the period of October 1, 2013, through September 30, 2014:


====a. Inspection Scope====
Unit 1 Emergency AC Power System  
The inspectors reviewed FENOCs submittal of the Mitigating Systems Performance Index for the following systems for the period of October 1, 2013, through September 30, 2014:
 
Unit 1 Emergency AC Power System Unit 2 Emergency AC Power System Unit 1 High Pressure Injection System Unit 2 High Pressure Injection System To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors also reviewed FENOCs condition reports, mitigating systems performance index derivation reports, event reports, and system health reports to validate the accuracy of the submittals.
Unit 2 Emergency AC Power System  
 
Unit 1 High Pressure Injection System  
 
Unit 2 High Pressure Injection System To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors also reviewed FENOCs condition reports, mitigating systems performance index derivation reports, event reports, and system health reports to validate the accuracy of the submittals.


====b. Findings====
====b. Findings====
Line 356: Line 567:


===.2 Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual===
===.2 Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual===
 
Radiological Effluent Occurrences===
Radiological Effluent Occurrences ===
{{IP sample|IP=IP 17260|count=1}}
{{IP sample|IP=IP 17260|count=1}}


Line 369: Line 579:


  {{a|4OA2}}
  {{a|4OA2}}
==4OA2 Problem Identification and Resolution==
==4OA2 Problem Identification and Resolution==
{{IP sample|IP=IP 71152|count=1}}
{{IP sample|IP=IP 71152|count=1}}


===.1 Routine Review of Problem Identification and Resolution Activities===
===.1 Routine Review of Problem Identification and Resolution Activities===
====a. Inspection Scope====
====a. Inspection Scope====
As required by Inspection Procedure (IP) 71152, Problem Identification and Resolution, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that FENOC entered issues into the corrective action program at an appropriate threshold, gave adequate attention to timely corrective actions, and identified and addressed adverse trends. In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the corrective action program and periodically attended condition report screening meetings.
As required by Inspection Procedure (IP) 71152, Problem Identification and Resolution, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that FENOC entered issues into the corrective action program at an appropriate threshold, gave adequate attention to timely corrective actions, and identified and addressed adverse trends. In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the corrective action program and periodically attended condition report screening meetings.
Line 381: Line 591:


===.2 Annual Sample: Fire Protection Challenges Corrective Actions===
===.2 Annual Sample: Fire Protection Challenges Corrective Actions===
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed an in-depth review of FENOCs apparent cause analysis and corrective actions associated with condition report CR-2013-16140, fire protection challenges. Specifically, the condition report documented challenges to fire protection equipment reliability, defensive strategies, and compensatory measures and to timely resolution of fire protection system reliability issues.
The inspectors performed an in-depth review of FENOCs apparent cause analysis and corrective actions associated with condition report CR-2013-16140, fire protection challenges. Specifically, the condition report documented challenges to fire protection equipment reliability, defensive strategies, and compensatory measures and to timely resolution of fire protection system reliability issues.
Line 399: Line 608:


{{a|4OA3}}
{{a|4OA3}}
==4OA3 Follow-Up of Events and Notices of Enforcement Discretion==
==4OA3 Follow-Up of Events and Notices of Enforcement Discretion==
{{IP sample|IP=IP 71153|count=1}}
{{IP sample|IP=IP 71153|count=1}}
    (Closed) LER 05000334/2014-005-00 and 05000412/2014-005-00: Containment Equipment Hatch Missile Shield Removal Results in Exceeding Technical Specification 3.6.1 Required Completion Times Between January 2003 and April 2014, FENOC improperly established and implemented procedures to remove the Unit 1 and Unit 2 containment equipment hatch missile barriers while in a Mode in which containment was required to be operable. The most recent occurrence was on April 18, 2014, when FENOC removed the Unit 2 equipment hatch missile barrier in preparation for the units refueling outage. The enforcement aspects of this issue were documented in inspection report 05000334/2014003 and 05000412/2014003. The inspectors did not identify any additional findings during the review of the LER. This LER is closed.
 
(Closed) LER 05000334/2014-005-00 and 05000412/2014-005-00: Containment Equipment Hatch Missile Shield Removal Results in Exceeding Technical Specification 3.6.1 Required Completion Times  
 
Between January 2003 and April 2014, FENOC improperly established and implemented procedures to remove the Unit 1 and Unit 2 containment equipment hatch missile barriers while in a Mode in which containment was required to be operable. The most recent occurrence was on April 18, 2014, when FENOC removed the Unit 2 equipment hatch missile barrier in preparation for the units refueling outage. The enforcement aspects of this issue were documented in inspection report 05000334/2014003 and 05000412/2014003. The inspectors did not identify any additional findings during the review of the LER. This LER is closed.


{{a|4OA5}}
{{a|4OA5}}
==4OA5 Other Activities==
==4OA5 Other Activities==
 
Preoperational Testing of an Independent Spent Fuel Storage Installation (ISFSI) (IP 60854 and 60854.1), Review of 10 CFR 72.212
Preoperational Testing of an Independent Spent Fuel Storage Installation (ISFSI) (IP     60854 and 60854.1), Review of 10 CFR 72.212
: (b) Evaluations (IP 60856 and 60856.1)
: (b) Evaluations (IP 60856 and 60856.1)


Line 423: Line 636:
====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
  {{a|4OA6}}
  {{a|4OA6}}
==4OA6 Meetings, Including Exit==
==4OA6 Meetings, Including Exit==
On November 21, 2014, the inspectors presented the Occupation Radiation Safety inspection results to C. McFeaters, Director, Site Operations, and other members of the BVPS staff.
On November 21, 2014, the inspectors presented the Occupation Radiation Safety inspection results to C. McFeaters, Director, Site Operations, and other members of the BVPS staff.


Line 439: Line 653:


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
===Licensee Personnel===
===Licensee Personnel===
E. Larson         Site Vice President
E. Larson
: [[contact::C. McFeaters       Director]], Site Operations
Site Vice President
D. Barth           Radiation Protection Technician
C. McFeaters
J. Belfiore       Senior Consulting Engineer
Director, Site Operations
M. Benkowski       ISFSI Project Manager
D. Barth
W. Blazier         Reactor Operator
Radiation Protection Technician
: [[contact::D. Bloom           Engineer]], Analysis engineering
J. Belfiore
G. Cacciani       10 CFR 50.59 Engineer
Senior Consulting Engineer
V. Carnevale       Quality Control Oversight
M. Benkowski
E. Crosby         Radiation Protection Manager
ISFSI Project Manager
: [[contact::A. Crotty         Supervisor]], System Engineering
W. Blazier
J. DiCioccio       System Engineer
Reactor Operator
A. Doby           Reactor Operator
D. Bloom
T. Dometrovich     Licensing Consultant
Engineer, Analysis engineering
: [[contact::G. Ebeck           Supervisor]], Nuclear Civil/Structural Engineering
G. Cacciani
: [[contact::K. Frederick       Engineer]], Analysis Engineering
CFR 50.59 Engineer
B. Furdak         Chemistry Supervisor
V. Carnevale
S. Gattuso         Senior Reactor Operator
Quality Control Oversight
: [[contact::T. Gaydosik       Lead]], Fleet Exam Team
E. Crosby
R. Gilchrist       Nuclear Unit Supervisor
Radiation Protection Manager
K. Gillespie       Nuclear Engineer II
A. Crotty
J. Gorman         System Engineer
Supervisor, System Engineering
J. Gross           Radiation Protection Technician
J. DiCioccio
D. Gyms           System Engineer
System Engineer
E. Hall           Staff Nuclear Specialist
A. Doby
R. Hayward         Mechanical/Structural Engineer
Reactor Operator
D. Hoover         Staff Nuclear Engineering Specialist
T. Dometrovich
: [[contact::S. Hovanec         Manager]], Plant Engineering
Licensing Consultant
D. Jones           IST Program Engineer
G. Ebeck
H. Kahl           Nuclear Engineer V
Supervisor, Nuclear Civil/Structural Engineering
S. Keener         Nuclear Unit Supervisor
K. Frederick
R. Kristophel     Shift Manager
Engineer, Analysis Engineering
: [[contact::E. Loehlein       Manager]], Operations
B. Furdak
P. Logoyda         Radiation Protection Superintendent
Chemistry Supervisor
J. Manning         Radiation Protection Supervisor
S. Gattuso
A. Matty           Radiation Protection Technician
Senior Reactor Operator
D. McBride         System Engineer
T. Gaydosik
J. Miller         Fire Marshall
Lead, Fleet Exam Team
R. Miller         Performance Improvement Specialist
R. Gilchrist
K. Mitchell       Nuclear Engineer
Nuclear Unit Supervisor
R. Novak           RETS/REMP Administrator
K. Gillespie
: [[contact::D. Price           Supervisor]], Mechanical/Structural Engineering
Nuclear Engineer II
: [[contact::B. Prinkey         Supervisor]], Nuclear Supply Systems Engineering
J. Gorman
R. Ruby           Radwaste Shipper
System Engineer
J. Gross
Radiation Protection Technician
D. Gyms
System Engineer
E. Hall
Staff Nuclear Specialist
R. Hayward
Mechanical/Structural Engineer
D. Hoover
Staff Nuclear Engineering Specialist
S. Hovanec
Manager, Plant Engineering
D. Jones
IST Program Engineer
H. Kahl
Nuclear Engineer V
S. Keener
Nuclear Unit Supervisor
R. Kristophel
Shift Manager
E. Loehlein
Manager, Operations
P. Logoyda
Radiation Protection Superintendent
J. Manning
Radiation Protection Supervisor
A. Matty
Radiation Protection Technician
D. McBride
System Engineer
J. Miller
Fire Marshall
R. Miller
Performance Improvement Specialist
K. Mitchell
Nuclear Engineer
R. Novak
RETS/REMP Administrator
D. Price
Supervisor, Mechanical/Structural Engineering
B. Prinkey
Supervisor, Nuclear Supply Systems Engineering
R. Ruby
Radwaste Shipper  


D. Salera           Chemistry Superintendent
D. Salera
J. Saunders         Radwaste Supervisor
Chemistry Superintendent
: [[contact::S. Sawtschenko     Manager]], Emergency Response
J. Saunders
D. Scheider         Plant Operator
Radwaste Supervisor
J. Schwer           Nuclear Shift Manager
S. Sawtschenko
: [[contact::B. Sepelak         Supervisor]], Regulatory Compliance
Manager, Emergency Response
S. Snodgrass       Reactor Operator
D. Scheider
B. Spiesman         Fleet Regulatory Affairs
Plant Operator
: [[contact::J. Tolbert         Supervisor]], Licensed Operator Requalification Training
J. Schwer
H. Trembley         System Engineer
Nuclear Shift Manager
G. Wain             Plant Operator
B. Sepelak
: [[contact::Z. Warchol         Supervisor]], BOP Systems
Supervisor, Regulatory Compliance
T. White           Quality Control Oversight
S. Snodgrass
D. Wilson           Component Engineer
Reactor Operator
: [[contact::T. Winfield         Supervisor]], Relays
B. Spiesman
Fleet Regulatory Affairs
J. Tolbert
Supervisor, Licensed Operator Requalification Training
H. Trembley
System Engineer
G. Wain
Plant Operator
Z. Warchol
Supervisor, BOP Systems
T. White
Quality Control Oversight
D. Wilson
Component Engineer
T. Winfield
Supervisor, Relays
Areva TN
Areva TN
E. Clendenning     Welder
E. Clendenning
M. Hunt             PT Inspector
Welder
M. Williams         Director of Field Operations
M. Hunt
PT Inspector
M. Williams
Director of Field Operations  


==LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED==
==LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED==
===Opened/Closed===
: 05000334/2014005-01


===Opened/Closed===
NCV
: 05000334/2014005-01            NCV        Failure to Adequately Implement Risk Management Actions (Section 1R13)
 
: 05000334/2014005-02             NCV         Failure to Properly Ship Category 2 Radioactive
Failure to Adequately Implement Risk Management Actions (Section 1R13)  
: 05000412/2014005-02                        Material (Section 2RS8)
: 05000334/2014005-02  
: 05000412/2014005-02
 
NCV  
 
Failure to Properly Ship Category 2 Radioactive Material (Section 2RS8)  


===Closed===
===Closed===
: 05000334/2014-005-00           LER          Containment Equipment Hatch Missile Shield
: 05000334/2014-005-00  
: 05000412/2014-005-00                         Removal Inadvertently Results in Exceeding Technical Specification 3.6.1 Required Completion Times (Section 4OA3)
: 05000412/2014-005-00 LER Containment Equipment Hatch Missile Shield Removal Inadvertently Results in Exceeding Technical Specification 3.6.1 Required Completion Times (Section 4OA3)  


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==


}}
}}

Latest revision as of 14:37, 10 January 2025

IR 05000334/2014005 and 05000412/2014005 and Independent Spent Fuel Storage Installation IR 07201043/2014004, October 1, 2014 to December 31, 2014, Beaver Valley Power Station, NRC Integrated Report
ML15035A606
Person / Time
Site: Beaver Valley
Issue date: 02/04/2015
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To: Emily Larson
FirstEnergy Nuclear Operating Co
KENNEDY, SR
References
2014-04 ISFSI, IR 2014005
Download: ML15035A606 (34)


Text

February 4, 2015

SUBJECT:

BEAVER VALLEY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000334/2014005 AND 05000412/2014005 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT NO. 07201043/2014004

Dear Mr. Larson:

On December 31, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Beaver Valley Power Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on January 29, 2015, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents two violations of NRC requirements, all of which were of very low safety significance (Green). However, because of the very low safety significance, and because they are entered into your corrective action program, the NRC is treating these findings as non-cited violations, consistent with Section 2.3.2.a of the NRC Enforcement Policy. If you contest the non-cited violations in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Beaver Valley Power Station. In addition, if you disagree with the cross-cutting aspect assigned to any finding, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC Resident Inspector at Beaver Valley Power Station. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73

Enclosure:

Inspection Report 05000334/2014005 and 05000412/2014005 and 07201043/2014004, w/Attachment: Supplementary Information

REGION I==

Docket Nos.:

50-334, 50-412

License Nos.:

DPR-66, NPF-73

Report No.:

05000334/2014005, 05000412/2014005, and 07201043/2014004

Licensee:

FirstEnergy Nuclear Operating Company (FENOC)

Facility:

Beaver Valley Power Station (BVPS), Units 1 and 2

Location:

Shippingport, PA 15077

Dates:

October 1, 2014 to December 31, 2014

Inspectors:

J. Krafty, Senior Resident Inspector B. Reyes, Resident Inspector A. Dugandzic, Reactor Inspector

J. Furia, Senior Health Physicist S. Hammann, Senior Health Physicist

C. Morell, Storage Safety & Transportation Inspector P. Presby Senior Operations Engineer R. Rolph, Health Physicist

J. Trapp, Safety Inspector R. Temps, Senior Safety Inspector

Approved By:

Silas R. Kennedy, Chief Reactor Projects Branch 6

Division of Reactor Projects

Enclosure

SUMMARY

IR 05000334/2014005, 05000412/2014005, 07201043/2014004; 10/01/2014 - 12/31/2014;

Beaver Valley Power Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Control, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

This report covered a three-month period of inspection by resident inspectors and announced inspections performed by regional inspectors. Inspectors identified two findings of very low safety significance (Green), which are non-cited violations (NCVs). The significance of most findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP), dated June 2, 2011. Cross-cutting aspects are determined using IMC 0310, Aspects Within Cross-Cutting Areas, dated December 4, 2014. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy, dated July 9, 2013. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.

Cornerstone: Mitigating Systems

Green.

The inspectors identified an NCV of 10 CFR 50.65(a)(4), Requirements for monitoring the effectiveness of maintenance at nuclear power plants, for FENOCs failure to implement adequate risk management actions (RMAs) associated with maintenance on the alternate intake structure A bay. Specifically, FENOC did not establish a contingency plan for the maintenance activity as required by FENOCs risk management procedure.

FENOC entered the issue into their corrective action program as CR 2015-00267.

The performance deficiency is more than minor because it is associated with the Equipment Performance attribute of the Mitigating Systems cornerstone and adversely affected its objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, FENOCs failure to implement a contingency plan resulted in an increase in the duration of an elevated risk condition and unavailability of equipment relied upon to mitigate the consequences of a loss of the main intake structure. The finding was determined to be of very low safety significance (Green) because the incremental core damage probability (ICDP) for the event was less than 1.0 E-6. The inspectors determined that this finding had a cross-cutting aspect in the Human Performance, Work Management, because the FENOC work process failed to adequately manage the risk commensurate to the work [H.5]. (Section 1R13)

Cornerstone: Occupational/Public Radiation Safety

Green.

The inspectors identified an NCV of 10 CFR 71.5, Transportation of licensed material, and 49 CFR 172, Subpart I, Safety and Security Plans. Specifically, FENOC personnel shipped a category 2 radioactive material of concern (RAM-QC) on public highways to a waste processor without adhering to a transportation security plan. FENOCs corrective actions included revising procedure NOP-OP-5201, Shipment of Radioactive Material - Waste, to reflect the appropriate Department of Transportation requirements for shipment of Category 2 radioactive material. FENOC entered the issue into their corrective action program as CR 2014-17260.

The issue is more than minor because it is associated with the Program and Process attribute of the Public Radiation Safety cornerstone and adversely affected its objective to ensure the safe transport of radioactive material on public highways in accordance with regulations. The finding was determined to be of very low safety significance (Green)because FENOC had an issue involving transportation of radioactive material, but it did not involve: (1) a radiation limit that was exceeded; (2) a breach of package during transport; (3) a certificate of compliance issue; (4) a low level burial ground nonconformance; or (5) a failure to make notifications or provide emergency information. The inspectors determined that the finding did not have a cross-cutting aspect because the issue was not reflective of current plant performance. Specifically, FENOC implemented changes to the radioactive waste shipment procedure that addressed applicable requirements and implemented a formal process for reviewing pending regulatory changes for impacts to FENOC operations and support activities. (Section 2RS8)

REPORT DETAILS

Summary of Plant Status

Unit 1 began the inspection period at 100 percent power. On October 10, 2014, Operators reduced Unit 1 to 13 percent power to reconnect the unit station service transformers to the main generator. Operators returned Unit 1 to 100 percent power on October 16, 2014, and the unit remained at or near 100 percent power for the remainder of the inspection period.

Unit 2 began the inspection period at 100 percent power. On October 17, 2014, Operators reduced Unit 2 to 82 percent power to repair main condenser water box leakage. Operators returned Unit 2 to 100 percent power on October 20, 2014, and the unit remained at or near 100 percent power for the remainder of the inspection period.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R01 Adverse Weather Protection

.1 Readiness for Seasonal Extreme Weather Conditions

a. Inspection Scope

The inspectors performed a review of FENOCs readiness for the onset of seasonal cold temperatures. The review focused on service and river water systems, Unit 2 emergency diesel generators, and heat tracing for the Unit 1 charging and quench spray systems. The inspectors reviewed the technical specifications, and the corrective action program to determine what temperatures or other seasonal weather could challenge these systems, and to ensure FENOC personnel had adequately prepared for these challenges. The inspectors reviewed station procedures, including FENOCs seasonal weather preparation procedure and applicable operating procedures. The inspectors performed walkdowns of the selected systems to ensure station personnel identified issues that could challenge the operability of the systems during cold weather conditions. Documents reviewed for each section of this inspection report are listed in the Attachment.

b. Findings

No findings were identified.

.2 Readiness for Impending Adverse Weather Conditions

a. Inspection Scope

On December 24, 2014, the inspectors evaluated FENOCs readiness during a high wind advisory and subsequent entry into abnormal operating procedure (AOP) 1/2OM-53C.4A.75.1, Acts of Nature - Tornado or High Winds. The inspectors efforts focused on review of specific unit actions based on actual environmental conditions and adherence to mitigating procedures. The inspectors performed a walkdown of each units external structures, areas that could potentially impact safety related equipment, and emergency response facilities to verify the adequacy of protection from high winds.

The inspectors verified completion of actions required by the AOP.

b. Findings

No findings were identified.

.3 External Flooding

a. Inspection Scope

On December 30, 2014, the inspectors performed an inspection of the external flood protection measures for Beaver Valley Power Station. The inspectors reviewed technical specifications, procedures, design documents, and Updated Final Safety Analysis Report (UFSAR), Chapter 2, which depicted the design flood levels and protection areas containing safety-related equipment to identify areas that may be affected by external flooding. The inspectors conducted a general site walkdown of all external areas of the plant, including the turbine building, auxiliary building, and the main intake structure to ensure that FENOC erected flood protection measures in accordance with design specifications. The inspectors also reviewed operating procedures for mitigating external flooding during severe weather to determine if FENOC planned or established adequate measures to protect against external flooding events.

b. Findings

No findings were identified.

==1R04 Equipment Alignment

Partial System Walkdowns (71111.04 - 2 samples)

a. Inspection Scope

==

The inspectors performed partial walkdowns of the following systems:

Unit 1 quench spray system following preventative maintenance on the B train quench spray and recirculation spray systems on October 21, 2014

Unit 2 train boric acid system due to the A boric acid pump being out of service for maintenance on October 28, 2014

The inspectors selected these systems based on their risk-significance relative to the reactor safety cornerstones at the time they were inspected. The inspectors reviewed applicable operating procedures, system diagrams, the UFSAR, technical specifications, work orders, condition reports, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have impacted system performance of their intended safety functions. The inspectors also performed field walkdowns of accessible portions of the systems to verify system components and support equipment were aligned correctly and were operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no deficiencies. The inspectors also reviewed whether FENOCs staff had properly identified equipment issues and entered them into the corrective action program for resolution with the appropriate significance characterization.

b. Findings

No findings were identified.

==1R05 Fire Protection

Resident Inspector Quarterly Walkdowns (71111.05Q - 2 samples)

==

a. Inspection Scope

The inspectors conducted tours of the areas listed below to assess the material condition and operational status of fire protection features. The inspectors verified that FENOC controlled combustible materials and ignition sources in accordance with administrative procedures. The inspectors verified that fire protection and suppression equipment was available for use as specified in the area pre-fire plan, and passive fire barriers were maintained in good material condition. The inspectors also verified that station personnel implemented compensatory measures for out of service, degraded, or inoperable fire protection equipment, as applicable, in accordance with procedures.

Unit 2 718 main steam cable vault pipe tunnel, fire area PT-1 on October 7, 2014

Unit 2 primary auxiliary building, fire area PA-6 on November 11, 2014

b. Findings

No findings were identified.

1R11 Licensed Operator Requalification Program

.1 Quarterly Review of Licensed Operator Requalification Testing and Training

a. Inspection Scope

The inspectors observed licensed operator simulator training on October 20, 2014, which included a stuck open power-operated relief valve, a faulted steam generator, loss of emergency alternating current (AC) busses, and failure of select components to automatically start as required. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the technical specification action statements entered by the shift manager. Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.

b. Findings

No findings were identified.

.2 Quarterly Review of Licensed Operator Performance in the Main Control Room

a. Inspection Scope

The inspectors observed and reviewed a power reduction on Unit 1 which included securing of the second main feed pump to opening the main generator output breakers on October 10 and 11, 2014. The inspectors observed pre-job briefings, and reactivity control briefings to verify that the briefings met the criteria specified in station procedure NOP-OP-1002, Conduct of Operations, Revision 9. Additionally, the inspectors observed operator performance to verify that procedure use, crew communications, reactivity management, and coordination of activities between work groups similarly met established expectations and standards.

b. Findings

No findings were identified.

.3 Licensed Operator Requalification Program

a. Inspection Scope

On December 23, 2014, one NRC region-based inspector conducted an in-office review of the results of the Beaver Valley Station, Unit 2, licensee-administered annual operating tests and the biennial written exam for the year 2014. The results of the Beaver Valley Station, Unit 1 biennial written exam for the year 2013 were also reviewed. The inspection assessed whether pass rates were consistent with the guidance of NRC Manual Chapter 0609, Appendix I, Operator Requalification Human Performance Significance Determination Process (SDP). The inspector verified that:

For Unit 2 Annual Operating Test in 2014:

Individual pass rate on the dynamic simulator test was greater than 80 percent.

(Pass rate was 88.3 percent.)

Individual pass rate on the job performance measures of the operating exam was greater than 80 percent. (Pass rate was 100 percent.)

More than 80 percent of the individuals passed all portions of the requalification exam. (Pass rate was 88.3 percent.)

Crew pass rate was greater than 80 percent. (Pass rate was 100 percent.)

For Unit 2 Biennial Written Exam in 2014:

Individual pass rate on the written examination was greater than 80 percent. (The pass rate was 88 percent.)

For Unit 1 Biennial Written Exam in 2013:

Individual pass rate on the written examination was greater than 80 percent.

(The pass rate was 100 percent.)

b. Findings

No findings were identified.

1R12 Maintenance Effectiveness

a. Inspection Scope

The inspectors reviewed the Unit 1 480 Volt Station Service System during the week of November 4, 2014, to assess the effectiveness of maintenance activities on structure system, or component (SSC) performance and reliability. The inspectors reviewed system health reports, corrective action program documents, maintenance work orders, and maintenance rule basis documents to ensure that FENOC was identifying and properly evaluating performance problems within the scope of the maintenance rule. For each sample selected, the inspectors verified that the SSC was properly scoped into the maintenance rule in accordance with 10 CFR 50.65 and verified that the (a)(2)performance criteria established by FENOC staff was reasonable. As applicable, for SSCs classified as (a)(1), the inspectors assessed the adequacy of goals and corrective actions to return these SSCs to (a)(2). Additionally, the inspectors ensured that FENOC staff was identifying and addressing common cause failures that occurred within and across maintenance rule system boundaries.

b. Findings

No findings were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control

a. Inspection Scope

The inspectors reviewed station evaluation and management of plant risk for the maintenance and emergent work activities listed below to verify that FENOC performed the appropriate risk assessments prior to removing equipment for work. The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that FENOC personnel performed risk assessments as required by 10 CFR 50.65(a)(4) and that the assessments were accurate and complete. When FENOC performed emergent work, the inspectors verified that operations personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work and discussed the results of the assessment with the stations probabilistic risk analyst to verify plant conditions were consistent with the risk assessment. The inspectors also reviewed the technical specification requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met.

Yellow risk associated with placing degraded Unit 1 battery charger 1A in service for load testing of battery charger 1B on October 11, 2014

Planned maintenance in the Unit 1 auxiliary intake structure A bay on October 14, 2014

b. Findings

Introduction.

The inspectors identified a Green NCV of 10 CFR 50.65(a)(4) for FENOCs failure to implement adequate risk management actions (RMAs) associated with maintenance on the alternate intake structure A bay. Specifically, FENOC did not establish a contingency plan for the maintenance activity as required by FENOCs risk management procedure.

Description.

During the week of October 13, 2014, FENOC was performing a silt check and bay cleaning of the alternate intake structure A bay during an elevated risk condition (yellow risk). The alternate intake structure A bay houses two alternate river water pumps for Unit 1 to mitigate the consequences of a loss of the main intake structure due to a postulated barge impact and subsequent explosion.

FENOC was using a submersible pump to clean the alternate intake structure A bay.

The submersible pump failed and FENOC deployed a team to repair the pump and rented a backup pump in the event that the repairs were unsuccessful. The inspectors questioned FENOCs RMAs and determined that FENOC did not establish a contingency plan prior to performing the maintenance activity. Repair of the failed submersible pump delayed the maintenance activity for over six hours, thus increasing the duration of an elevated risk condition. FENOC procedure NOP-OP-1007, Risk Management, requires in part that, each of the risk management controls of Attachment 4 should be implemented, as feasible, to increase risk awareness and control, reduce the duration of activities and plant conditions associated with elevated risk, and minimize the magnitude of risk increase. Establishing contingency plans is one of the RMAs listed in Attachment 4 of NOP-OP-1007. The inspectors determined that it was reasonable for FENOC to establish a contingency plan for the elevated risk activity in order to minimize the increase in duration of the work due to potential equipment failures. FENOC entered the issue into their corrective action program (CAP) as CR 2015-00267

Analysis.

The inspectors determined that failure to implement a contingency plan for the purpose of managing risk pursuant to 10 CFR 50.65(a)(4) was a performance deficiency that was within the capability of FENOC to foresee and correct and should have been prevented. The performance deficiency was more than minor because it is associated with the Equipment Performance attribute of the Mitigating Systems cornerstone and adversely affected its objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.

Specifically, FENOCs failure to implement a contingency plan resulted in an increase of the duration of elevated risk condition and unavailability of equipment relied upon to mitigate the consequences of a loss of the main intake structure.

An NRC senior reactor analyst calculated incremental core damage probability (ICDP) of the event to be 8.06 E-10 based on a six-hour exposure time. Using IMC 0609, Appendix K, Flowchart 2, Assessment of RMAs, issued May 19, 2005, the finding is determined to be of very low safety significance (Green) because the ICDP for the event was less than 1.0 E-6.

The inspectors determined that this finding had a cross-cutting aspect in Human Performance, Work Management, because the FENOC work process failed to adequately manage the risk commensurate to the work. Specifically, the FENOC work processes did not appropriately incorporate contingency plans when performing maintenance activities in the alternate intake structure A bay on October 14, 2014 [H.5].

Enforcement.

10 CFR 50.65(a)(4) requires, in part, that, the licensee shall assess and manage the increase in risk that may result from the proposed maintenance activities.

Contrary to the above, FENOC did not appropriately manage the increase in risk resulting from maintenance activities. Specifically, FENOC failed to implement a contingency plan during an elevated risk condition when performing maintenance in the alternate intake structure A bay on October 14, 2014. Because this finding was of very low safety significance (Green) and was entered into FENOCs corrective action program (CAP) as CR 2015-00267, this violation is being treated as an NCV, consistent with Section 2.3.2 of the NRC Enforcement Policy. (NCV 05000334/2014005-01, Failure to Adequately Implement Risk Management Actions)

1R15 Operability Determinations and Functionality Assessments

a. Inspection Scope

The inspectors reviewed operability determinations for the following degraded or non-conforming conditions:

CR 2014-15436, Unit 2 48 Volt DC power supply to the reactor trip breakers low out of tolerance on October 17, 2014

CR 2014-15944, Unit 1 B quench spray pump suction isolation valve loose yoke bolt on October 21, 2014

CR 2014-15990, Unit 2 B safety injection accumulator in-leakage on October 22, 2014

CR 2014-15874, Unit 1 potential glycol leakage on 1A main feed regulating valve November 5, 2014

CR 2014-16599, 2MSS-SOV105E, steam supply isolation valve to the Unit 2 turbine driven auxiliary feed water pump exceeded its limiting closed stroke time on November 6, 2014

Engineering Evaluation Request 600931138, Evaluate data obtained per MSP-36.51A-E for margin in engineered safety features Time Response Beaver Valley Unit 1 test on November 10, 2014

CR 2014-17079, Leak in Unit 1 24 river water header supplying the recirculation spray heat exchangers on November 18, 2014

CR 2014-18292, Leak in Unit 2 four inch service water line in north safeguards room on December 15, 2014

The inspectors selected these issues based on the risk significance of the associated components and systems. The inspectors evaluated the technical adequacy of the operability determinations to assess whether technical specification operability was properly justified and the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the technical specifications and UFSAR to FENOCs evaluations to determine whether the components or systems were operable.

Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled by FENOC. The inspectors determined, where appropriate, compliance with bounding limitations associated with the evaluations.

b. Findings

No findings were identified.

1R19 Post-Maintenance Testing

a. Inspection Scope

The inspectors reviewed the post-maintenance tests for the maintenance activities listed below to verify that procedures and test activities ensured system operability and functional capability. The inspectors reviewed the test procedure to verify that the procedure adequately tested the safety functions that may have been affected by the maintenance activity, that the acceptance criteria in the procedure was consistent with the information in the applicable licensing basis and/or design basis documents, and that the procedure had been properly reviewed and approved. The inspectors also witnessed the test or reviewed test data to verify that the test results adequately demonstrated restoration of the affected safety functions.

Unit 1 emergency diesel generator header isolation valve breaker replacement on November 5, 2014

Unit 2 system station service transformer bus A load tap changer repair on November 12, 2014

Unit 1 C river water pump expansion joint replacement and motor maintenance on December 1, 2014

b. Findings

No findings were identified.

1R22 Surveillance Testing

a. Inspection Scope

The inspectors observed performance of surveillance tests and/or reviewed test data of selected risk-significant SSCs to assess whether test results satisfied technical specifications, the UFSAR, and FENOC procedure requirements. The inspectors verified that test acceptance criteria were clear, tests demonstrated operational readiness and were consistent with design documentation, test instrumentation had current calibrations and the range and accuracy for the application, tests were performed as written, and applicable test prerequisites were satisfied. Upon test completion, the inspectors considered whether the test results supported that equipment was capable of performing the required safety functions. The inspectors reviewed the following surveillance tests:

2OST-1.12B, Safeguards Protection System Train B Safety Injection System Go Test, Revision 49, on October 30, 2014

1OST-24.2, Motor Driven Auxiliary Feed Pump Test (1FW-P-3A), Revision 50, on November 17, 2012 (In-service test)

2OST-11.2, Low Head Safety Injection Pump (2SIS*P21B) Test, Revision 31, on December 16, 2014

1OST-13.7B, 2B Recirculation Spray Pump Flow Test, Revision 12, on December 22, 2014

b. Findings

No findings were identified.

Cornerstone: Emergency Preparedness

1EP6 Drill Evaluation

.1 Emergency Preparedness Drill Observation

a. Inspection Scope

The inspectors evaluated the conduct of a routine FENOC emergency drill on October 9, 2014, to identify any weaknesses and deficiencies in the classification, notification, and protective action recommendation development activities. The inspectors observed emergency response operations in the simulator, technical support center, and emergency operations facility to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures.

The inspectors also attended the station drill critique to compare inspector observations with those identified by FENOC staff in order to evaluate FENOCs critique and to verify whether the FENOC staff was properly identifying weaknesses and entering them into the corrective action program.

b. Findings

No findings were identified.

RADIATION SAFETY

Cornerstone: Public Radiation Safety and Occupational Radiation Safety

2RS6 Radioactive Gaseous and Liquid Effluent Treatment

a Inspection Scope

During the period November 3-7, 2014, the inspectors reviewed FENOCs performance in treatment, monitoring, and control of effluent releases including adequacy of public dose calculations and projections. The inspectors used the requirements in 10 CFR Part 20; 10 CFR 50, Appendix I; technical specifications; Offsite Dose Calculation Manual (ODCM); applicable industry standards; and procedures required by technical specifications as criteria for determining compliance.

Inspection Planning

The inspector conducted in-office preparation and review of FENOC submitted effluent and environmental program documents and reviewed associated UFSAR and the ODCM.

Event Report and Effluent Report Reviews

The inspectors reviewed the following:

Annual radiological effluent and environmental reports for 2012 and 2013 including unexpected trends or abnormal releases

Reported effluent monitor operability issues

ODCM and UFSAR Reviews

The inspectors reviewed the following:

UFSAR changes associated with effluent monitoring and control

Changes to ODCM including technical justifications

Identification of any contaminated non-radioactive system and associated 10 CFR 50.59 evaluations

Ground Water Protection Initiative

The inspectors reviewed the following:

Reported groundwater monitoring results and changes to the written program for identifying and controlling contaminated spills/leaks to groundwater

Changes to the program since last inspection

Procedures, Special Reports, and Other Documents

The inspectors reviewed the following:

Any Licensee Event Reports (LERs), and special reports related to the effluent program

Effluent program implementing procedures, including those associated with effluent sampling, effluent monitor set-point determinations, and dose calculations

Evaluation reports of the effluent monitoring program since the last inspection

Walkdowns and Observations

The inspectors reviewed the following:

Walked down selected components of the gaseous effluent monitoring systems Potential unmonitored release points, building alterations which could impact airborne, or liquid, and effluent controls, and ventilation system leakage

Effluent release system material condition surveillance records

Changes to effluent release paths

Routine processing and discharge of liquid waste

10 CFR 50.59, Changes, Tests, and Experiments, reviews for changes to effluent release points

Sampling and Analyses

The inspectors reviewed the following:

Effluent sampling activities with respect to representative sampling

Effluent discharges made with inoperable effluent radiation monitors

Use of compensatory effluent sampling

Results of the inter-laboratory and intra-laboratory comparison program, including hard-to-detect isotopes, to verify the quality of the radioactive effluent sample analyses

Dose Calculations

The inspectors reviewed the following:

Significant changes in reported dose values compared to the previous radioactive effluent release reports

Liquid and gaseous waste discharge permits

Methods used to include hard-to-detect radionuclides in the effluent release reports

Changes in the methodology for offsite dose calculations since the last inspection

Meteorological dispersion and deposition factors used in offsite dose calculations

Latest Land Use Census to verify that changes in land use have been factored into public dose projections and the environmental sampling program

Dose calculations (monthly, quarterly, annual)

Records of any abnormal gaseous or liquid discharges

Discharges made with inoperable effluent radiation monitors

Groundwater Protection Initiative (GPI) Implementation

The inspectors reviewed the following:

Groundwater monitoring results

Changes made to the GPI program

Anomalous results of groundwater samples

Leakage or spill events and entries made into the decommissioning files (10 CFR50.75(g))

On-site contamination events involving contamination of groundwater

Discharges from onsite surface water bodies Problem Identification and Resolution

The inspectors evaluated whether problems associated with the effluent monitoring and control program were being identified at an appropriate threshold and were properly addressed for resolution in the licensee corrective action program.

b Findings

No findings were identified.

2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation (71124.08 - 1 sample)

a. Inspection Scope

During November 17-21, 2014, the inspectors verified the effectiveness of FENOCs programs for processing, handling, storage, and transportation of radioactive material.

The inspectors used the requirements of 49 CFR 170-177; 10 CFR 20, 61, and 71; applicable industry standards; and procedures required by TSs as criteria for determining compliance.

Inspection Planning

The inspectors conducted an in-office review of the solid radioactive waste system description in the UFSAR, the Process Control Program, and the recent radiological effluent release report for information on the types, amounts, and processing of radioactive waste disposed. The inspectors reviewed the scope of quality assurance audits performed for this area since the last inspection.

Radioactive Material Storage

The inspectors inspected areas where containers of radioactive waste were stored. The inspectors verified that the licensee had established a process for monitoring the impact of long-term storage.

Radioactive Waste System Walk-down

The inspectors walked down areas of the plant, and reviewed:

accessible portions of liquid and solid radioactive waste processing systems to verify current system alignment and material condition

radioactive waste processing equipment that was abandoned in place, and reviewed the controls in place to ensure protection of personnel

changes made to the radioactive waste processing systems since the last inspection

processes for transferring radioactive waste resin and/or sludge discharges into shipping/disposal containers

current methods and procedures for dewatering waste Waste Characterization and Classification

The inspectors identified radioactive waste streams and reviewed radiochemical sample analysis results to support radioactive waste characterization. The inspectors reviewed the use of scaling factors and calculations to account for difficult-to-measure radionuclides.

Shipment Preparation

The inspectors reviewed the records of shipment packaging, surveying, labeling, marking, placarding, vehicle checks, emergency instructions, disposal manifest, shipping papers provided to the driver, and licensee verification of shipment readiness.

Shipping Records

The inspectors reviewed selected non-excepted package shipment records.

Identification and Resolution of Problems

The inspectors reviewed problems associated with radioactive waste processing, handling, storage, and transportation, and were addressed for resolution in the licensee corrective action program.

b. Findings and Observations

Introduction.

The inspectors identified a Green NCV of 10 CFR 71.5, Transportation of licensed material, and 49 CFR 172, Subpart I, Safety and Security Plans. Specifically, FENOC personnel shipped a category 2 RAM-QC on public highways to a waste processor without adhering to a transportation security plan. Prior to shipment, FENOC staff failed to recognize that the quantity of radioactive material met the definition RAM-QC.

Description.

FENOC staff prepared a liner for shipment to a waste processor. The liner, containing spent resin, was determined to have a total activity of 1300 curies (including 40.9 curies of cobalt (Co-60) as indicated on the Uniform Low-Level Radioactive Waste Manifest (NRC Form 541) which FENOC had generated. The liner was shipped on May 21, 2013. The inspectors reviewed the shipment and determined that the shipment met the definition of category 2 RAM-QC since it contained more than 8.1 curies of Co-60. The liner was shipped without FENOC implementing the required transportation security plan. At the time of the shipment, FENOCs applicable procedure, NOP-OP-5201, Shipment of Radioactive Material - Waste, did not identify category 2 RAM-QC material.

FENOCs corrective actions included revising procedure NOP-OP-2501, Shipment of Radioactive Material - Waste, to reflect the appropriate Department of Transportation requirements for shipment of Category 2 radioactive material. Additionally, FENOC implemented a formal process for reviewing pending regulatory changes for impacts to FENOC operations and support activities.

Analysis.

The failure to ship the spent resin material as category 2 RAM-QC as required by 49 CFR 172, subpart I, Safety and Security Plans, was a performance deficiency that was reasonably within FENOCs ability to foresee and correct, and should have been prevented. The issue is more than minor because it is associated with the program and process attribute of the Public Radiation Safety cornerstone and affected the cornerstone objective to ensure the safe transport of radioactive material on public highways in accordance with regulations. In accordance with IMC 0609, Appendix D, "Public Radiation Safety Significance Determination Process," the finding was determined to be of very low safety significance (Green) because FENOC had an issue involving transportation of radioactive material, but it did not involve:

(1) a radiation limit that was exceeded;
(2) a breach of package during transport;
(3) a certificate of compliance issue;
(4) a low level burial ground nonconformance; or
(5) a failure to make notifications or provide emergency information.

The inspectors determined that the finding did not have a cross-cutting aspect because the issue was not reflective of current plant performance. Specifically, FENOC implemented changes to the radioactive waste shipment procedure that addressed applicable requirements and implemented a formal process for reviewing pending regulatory changes for impacts to FENOC operations and support activities.

Enforcement.

10 CFR 71.5, Transportation of Licensed Material, requires compliance with the applicable requirements of Department of Transportation regulations in 49 CFR Parts 171 through 180. 49 CFR 172, Subpart I, Safety and Security Plans, [49 CFR 172.800(b)] requires that known radionuclides in forms listed as category 2 RAM-QC must adhere to a transportation security plan. Contrary to the above, FENOC made a category 2 shipment of radioactive material on May 21, 2013 (Shipment ID B-4247)without implementing the required transportation security plan. FENOCs corrective actions included revising procedure NOP-OP-2501, Shipment of Radioactive Material - Waste, to reflect the appropriate Department of Transportation requirements for shipment of Category 2 radioactive material. Because this violation was of very low safety significance (Green) and FENOC entered this issue into their CAP as CR 2014-

===17260, this violation is being treated as an NCV, consistent with Section 2.3.2. of the NRC Enforcement Policy. (05000334/2014005-02; 05000412/2014005-02, Failure to Properly Ship Category 2 Radioactive Material)

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

.1 Mitigating Systems Performance Index (4 samples)

a. Inspection Scope

The inspectors reviewed FENOCs submittal of the Mitigating Systems Performance Index for the following systems for the period of October 1, 2013, through September 30, 2014:

Unit 1 Emergency AC Power System

Unit 2 Emergency AC Power System

Unit 1 High Pressure Injection System

Unit 2 High Pressure Injection System To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors also reviewed FENOCs condition reports, mitigating systems performance index derivation reports, event reports, and system health reports to validate the accuracy of the submittals.

b. Findings

No findings were identified.

.2 Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual

Radiological Effluent Occurrences===

a. Inspection Scope

During December 15 - 18, 2014, the inspector reviewed licensee submittals for the radiological effluent technical specifications/ODCM radiological effluent occurrences performance indicator (PI) for the period from the first quarter 2013 through the fourth quarter 2013. The inspector used PI definitions and guidance contained in NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, dated August 31, 2013, to determine if the PI data was reported properly during this period.

The inspector reviewed FENOCs corrective action report database and selected individual reports generated since this indicator was last reviewed to identify any potential occurrences that may impact offsite dose. The inspector reviewed gaseous and liquid effluent summary data and the results of associated offsite dose calculations between the first quarter 2013 and the fourth quarter 2013.

b. Findings

No findings were identified.

4OA2 Problem Identification and Resolution

.1 Routine Review of Problem Identification and Resolution Activities

a. Inspection Scope

As required by Inspection Procedure (IP) 71152, Problem Identification and Resolution, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that FENOC entered issues into the corrective action program at an appropriate threshold, gave adequate attention to timely corrective actions, and identified and addressed adverse trends. In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the corrective action program and periodically attended condition report screening meetings.

b. Findings

No findings were identified.

.2 Annual Sample: Fire Protection Challenges Corrective Actions

a. Inspection Scope

The inspectors performed an in-depth review of FENOCs apparent cause analysis and corrective actions associated with condition report CR-2013-16140, fire protection challenges. Specifically, the condition report documented challenges to fire protection equipment reliability, defensive strategies, and compensatory measures and to timely resolution of fire protection system reliability issues.

The inspectors assessed FENOCs problem identification threshold, cause analyses, and the prioritization and timeliness of FENOCs corrective actions to determine whether FENOC was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of FENOCs corrective action program and 10 CFR 50, Appendix B. In addition, the inspectors interviewed engineering personnel to assess the effectiveness of the implemented corrective actions.

b. Findings and Observations

No findings were identified.

FENOC determined the apparent cause was the failure of site management to reinforce standards and expectations of the fire protection program. Contributing causes included failure to effectively implement corrective actions and site wide lack of sensitivity to the importance of the fire protection program and systems.

FENOC implemented 13 corrective actions. Three of the corrective actions addressed the apparent cause which included changes to the form used in the management alignment and ownership meeting to highlight the status of fire protection equipment, providing periodic fire protection program updates to the management team, and allocating additional resources to support the fire protection program. The inspectors determined that this has been effective at raising the awareness of and addressing fire protection issues. Although fire protection program improvements have been made, the program is not yet meeting FENOCs expectations. The fire protection program and fire protection system health reports are both rated as yellow. Additionally, one of the corrective actions was to prioritize the items in the Fire Protection Improvement Plan.

The inspectors noted that several items in the plan had been completed. The inspectors also noted that many of the items remaining to be completed have had their due dates extended. Some item due dates have been extended more than once. This is an indication that there are still some challenges with timely resolution of fire protection reliability issues.

FENOC also performed four effectiveness reviews. Two of the four reviews were determined to be ineffective (control of transient combustibles and fire brigade drills) and additional effectiveness reviews have been scheduled. FENOCs assessment of transient combustible control is consistent with observations made by the inspectors.

4OA3 Follow-Up of Events and Notices of Enforcement Discretion

(Closed) LER 05000334/2014-005-00 and 05000412/2014-005-00: Containment Equipment Hatch Missile Shield Removal Results in Exceeding Technical Specification 3.6.1 Required Completion Times

Between January 2003 and April 2014, FENOC improperly established and implemented procedures to remove the Unit 1 and Unit 2 containment equipment hatch missile barriers while in a Mode in which containment was required to be operable. The most recent occurrence was on April 18, 2014, when FENOC removed the Unit 2 equipment hatch missile barrier in preparation for the units refueling outage. The enforcement aspects of this issue were documented in inspection report 05000334/2014003 and 05000412/2014003. The inspectors did not identify any additional findings during the review of the LER. This LER is closed.

4OA5 Other Activities

Preoperational Testing of an Independent Spent Fuel Storage Installation (ISFSI) (IP 60854 and 60854.1), Review of 10 CFR 72.212

(b) Evaluations (IP 60856 and 60856.1)

a. Inspection Scope

The inspectors evaluated FENOCs performance during NRC observed pre-operational dry run activities that were performed in order to fulfill requirements in the Certificate of Compliance (CoC) No. 1004, Amendment 13, Condition 8. The inspectors observed FENOC dry run activities on September 15-18, 2014, and were also on-site September 23-26, 2014, to review the BVPS 10 CFR 72.212 evaluation report.

During the dry run activities, the inspectors observed cask processing activities to determine whether the FENOC staff and contractors had developed the capability to properly process the dry shielded canister (DSC) to be used in storage of spent fuel at the BVPS site. The inspectors observed DSC activities including: blowdown, vacuum drying, helium backfilling, reflooding, welding, hydrogen monitoring, non-destructive examinations, and helium leak testing. The inspectors verified that the required vacuum pressure and helium backfill pressure could be achieved and maintained within the technical specification limits. The inspectors examined the DSC processing equipment and reviewed worker qualification records. During the dry run, the inspectors observed pre-job briefs and verified FENOC utilized adequate radiological controls and discussed relevant examples of operating experience. The inspectors verified that work instructions and procedures appropriately captured the commitments and requirements contained in the UFSAR, CoC, technical specifications, and 10 CFR Part 72.

The inspectors evaluated FENOCs compliance with the requirements of 10 CFR 72.212. The inspectors verified FENOCs written evaluations were in accordance with 10 CFR 72.212(b)(5) and confirmed:

(1) the conditions set forth in the CoC had been met prior to use;
(2) the ISFSI pad had been designed to support the load of stored casks; and
(3) the radiological requirements of 72.104 had been met. The inspectors verified that applicable reactor site parameters, such as fire and explosions, tornadoes, wind-generated missile impacts, seismic qualifications, lightning, flooding and temperature, had been evaluated for acceptability with bounding values specified in the UFSAR and the NRC Safety Evaluation Report. The inspectors also verified that a 50.59 evaluation of the construction and operation of the ISFSI and plant interfaces was performed and that ISFSI related work activities would not require a change in the facility TS or require a license amendment for the facility.

The inspectors reviewed corrective action reports conditions reports associated with preparations for the ISFSI loading campaign to ensure that issues were being properly identified, prioritized, and evaluated commensurate with their safety significance.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On November 21, 2014, the inspectors presented the Occupation Radiation Safety inspection results to C. McFeaters, Director, Site Operations, and other members of the BVPS staff.

On December 18, 2014, the inspectors presented the ISFSI inspection results to B. Sepelak, BVPS Regulatory Compliance.

On December 18, 2014, the inspector presented the public and occupational radiation safety inspection results to T. Steed, Beaver Valleys Director of Performance Improvement, and other members of the BVPS staff.

On January 29, 2015, the inspectors presented the inspection results to Eric Larson, Site Vice President, and other members of the BVPS staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.

ATTACHMENT:

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

E. Larson

Site Vice President

C. McFeaters

Director, Site Operations

D. Barth

Radiation Protection Technician

J. Belfiore

Senior Consulting Engineer

M. Benkowski

ISFSI Project Manager

W. Blazier

Reactor Operator

D. Bloom

Engineer, Analysis engineering

G. Cacciani

CFR 50.59 Engineer

V. Carnevale

Quality Control Oversight

E. Crosby

Radiation Protection Manager

A. Crotty

Supervisor, System Engineering

J. DiCioccio

System Engineer

A. Doby

Reactor Operator

T. Dometrovich

Licensing Consultant

G. Ebeck

Supervisor, Nuclear Civil/Structural Engineering

K. Frederick

Engineer, Analysis Engineering

B. Furdak

Chemistry Supervisor

S. Gattuso

Senior Reactor Operator

T. Gaydosik

Lead, Fleet Exam Team

R. Gilchrist

Nuclear Unit Supervisor

K. Gillespie

Nuclear Engineer II

J. Gorman

System Engineer

J. Gross

Radiation Protection Technician

D. Gyms

System Engineer

E. Hall

Staff Nuclear Specialist

R. Hayward

Mechanical/Structural Engineer

D. Hoover

Staff Nuclear Engineering Specialist

S. Hovanec

Manager, Plant Engineering

D. Jones

IST Program Engineer

H. Kahl

Nuclear Engineer V

S. Keener

Nuclear Unit Supervisor

R. Kristophel

Shift Manager

E. Loehlein

Manager, Operations

P. Logoyda

Radiation Protection Superintendent

J. Manning

Radiation Protection Supervisor

A. Matty

Radiation Protection Technician

D. McBride

System Engineer

J. Miller

Fire Marshall

R. Miller

Performance Improvement Specialist

K. Mitchell

Nuclear Engineer

R. Novak

RETS/REMP Administrator

D. Price

Supervisor, Mechanical/Structural Engineering

B. Prinkey

Supervisor, Nuclear Supply Systems Engineering

R. Ruby

Radwaste Shipper

D. Salera

Chemistry Superintendent

J. Saunders

Radwaste Supervisor

S. Sawtschenko

Manager, Emergency Response

D. Scheider

Plant Operator

J. Schwer

Nuclear Shift Manager

B. Sepelak

Supervisor, Regulatory Compliance

S. Snodgrass

Reactor Operator

B. Spiesman

Fleet Regulatory Affairs

J. Tolbert

Supervisor, Licensed Operator Requalification Training

H. Trembley

System Engineer

G. Wain

Plant Operator

Z. Warchol

Supervisor, BOP Systems

T. White

Quality Control Oversight

D. Wilson

Component Engineer

T. Winfield

Supervisor, Relays

Areva TN

E. Clendenning

Welder

M. Hunt

PT Inspector

M. Williams

Director of Field Operations

LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED

Opened/Closed

05000334/2014005-01

NCV

Failure to Adequately Implement Risk Management Actions (Section 1R13)

05000334/2014005-02
05000412/2014005-02

NCV

Failure to Properly Ship Category 2 Radioactive Material (Section 2RS8)

Closed

05000334/2014-005-00
05000412/2014-005-00 LER Containment Equipment Hatch Missile Shield Removal Inadvertently Results in Exceeding Technical Specification 3.6.1 Required Completion Times (Section 4OA3)

LIST OF DOCUMENTS REVIEWED