==Dear Mr. Flores:==
==Dear Mr. Flores:==
On March 9, 2015, Garry Struble, Simulator and Licensing Examination Manager, notified the U.S. Nuclear Regulatory Commission's (NRC) Region IV's staff via electronic mail that the initial retake examination scheduled at Comanche Peak Nuclear Power Plant for the week of March 23, 2015, was no longer needed. This retake examination included a written examination for two reactor operator applicants.
On March 9, 2015, Garry Struble, Simulator and Licensing Examination Manager, notified the U.S. Nuclear Regulatory Commissions (NRC) Region IVs staff via electronic mail that the initial retake examination scheduled at Comanche Peak Nuclear Power Plant for the week of March 23, 2015, was no longer needed. This retake examination included a written examination for two reactor operator applicants.


Mr. Kenneth Peters of your staff formally cancelled the examination by letter to Marc Dapas, Regional Administrator, dated March 12, 2015. Per the request, applications for the two reactor operator applicants have been withdrawn. The examination development process was cancelled after the completion of the draft examination review process at your request; however, the portions of the examination that were reviewed with comments provided to your staff will be included in the NRC's Agencywide Documents Access and Management System (ADAMS).
Mr. Kenneth Peters of your staff formally cancelled the examination by letter to Marc Dapas, Regional Administrator, dated March 12, 2015. Per the request, applications for the two reactor operator applicants have been withdrawn. The examination development process was cancelled after the completion of the draft examination review process at your request; however, the portions of the examination that were reviewed with comments provided to your staff will be included in the NRCs Agencywide Documents Access and Management System (ADAMS).


No findings were identified during this examination.
No findings were identified during this examination.


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
UNITED STATES NUCLEAR REGULATORY COMMISSION  
 
==REGION IV==
1600 E LAMAR BLVD ARLINGTON, TX In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.


Sincerely,
Sincerely,
/RA/
/RA/  
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety  
 
Vincent G. Gaddy, Chief Operations Branch  
 
Division of Reactor Safety  


Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89  
Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89  


cc: Electronic Distribution to Comanche Peak Nuclear Power Plant In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
cc: Electronic Distribution to Comanche Peak Nuclear Power Plant In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.


Sincerely,
Sincerely,
/RA/
/RA/  
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety  
 
Vincent G. Gaddy, Chief Operations Branch  
 
Division of Reactor Safety  
 
Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89


Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 cc: Electronic Distribution to Comanche Peak Nuclear Power Plant  
cc: Electronic Distribution to Comanche Peak Nuclear Power Plant  


Distribution See next page  
Distribution See next page  


CP-201503 Exam Report-sdh.docx ADAMS Accession Number: ML15093A110 SUNSI Review By: VGG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SOE:OB OE:OB NAME SHedger VGaddy SIGNATURE /RA/ /RA/ DATE 4/1/15 4/2/15 OFFICIAL RECORD COPY  
CP-201503 Exam Report-sdh.docx  
 
ADAMS Accession Number: ML15093A110 SUNSI Review By: VGG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
RGN-002 OFFICE  
 
SOE:OB  
 
OE:OB NAME SHedger  
 
VGaddy SIGNATURE  
/RA/  
 
/RA/
DATE 4/1/15  
 
4/2/15 OFFICIAL RECORD COPY  


Letter to Rafael Flores from Vincent G. Gaddy, dated April 2, 2015  
Letter to Rafael Flores from Vincent G. Gaddy, dated April 2, 2015  


SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2015301; 05000446/2015301  
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2015301; 05000446/2015301  


DISTRIBUTION
DISTRIBUTION:
: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (John.Kramer@nrc.gov) Senior Resident Inspector (Jeffrey.Josey@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Senior Resident Inspector (Jeffrey.Josey@nrc.gov)
Resident Inspector (Rayomand.Kumana@nrc.gov)
Resident Inspector (Rayomand.Kumana@nrc.gov)
Administrative Assistant (Rhonda.Smith@nrc.gov)
Administrative Assistant (Rhonda.Smith@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Project Engineer, DRP/A (Margaret.Tobin@nrc.gov)
Project Engineer, DRP/A (Margaret.Tobin@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 13:29, 10 January 2025

Examination Report 05000445/2015301; 05000446/2015301
ML15093A110
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/02/2015
From: Vincent Gaddy
Operations Branch IV
To: Flores R
Luminant Generation Co
S. Hedger
References
50-445/15-301, 50-446/15-301
Download: ML15093A110 (4)


Text

April 2, 2015

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2015301; 05000446/2015301

Dear Mr. Flores:

On March 9, 2015, Garry Struble, Simulator and Licensing Examination Manager, notified the U.S. Nuclear Regulatory Commissions (NRC) Region IVs staff via electronic mail that the initial retake examination scheduled at Comanche Peak Nuclear Power Plant for the week of March 23, 2015, was no longer needed. This retake examination included a written examination for two reactor operator applicants.

Mr. Kenneth Peters of your staff formally cancelled the examination by letter to Marc Dapas, Regional Administrator, dated March 12, 2015. Per the request, applications for the two reactor operator applicants have been withdrawn. The examination development process was cancelled after the completion of the draft examination review process at your request; however, the portions of the examination that were reviewed with comments provided to your staff will be included in the NRCs Agencywide Documents Access and Management System (ADAMS).

No findings were identified during this examination.

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD ARLINGTON, TX In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Vincent G. Gaddy, Chief Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89

cc: Electronic Distribution to Comanche Peak Nuclear Power Plant In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Vincent G. Gaddy, Chief Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89

cc: Electronic Distribution to Comanche Peak Nuclear Power Plant

Distribution See next page

CP-201503 Exam Report-sdh.docx

ADAMS Accession Number: ML15093A110 SUNSI Review By: VGG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

RGN-002 OFFICE

SOE:OB

OE:OB NAME SHedger

VGaddy SIGNATURE

/RA/

/RA/

DATE 4/1/15

4/2/15 OFFICIAL RECORD COPY

Letter to Rafael Flores from Vincent G. Gaddy, dated April 2, 2015

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2015301; 05000446/2015301

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Senior Resident Inspector (Jeffrey.Josey@nrc.gov)

Resident Inspector (Rayomand.Kumana@nrc.gov)

Administrative Assistant (Rhonda.Smith@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Project Engineer, DRP/A (Margaret.Tobin@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)