IR 05000483/2015406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15126A476
| number = ML15126A476
| issue date = 05/05/2015
| issue date = 05/05/2015
| title = Callaway Plant - NRC Inspection Report 05000483/2015406
| title = NRC Inspection Report 05000483/2015406
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Diya F
| addressee name = Diya F
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " May 5, 2015  
{{#Wiki_filter:May 5, 2015


Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
==SUBJECT:==
CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015406


SUBJECT: CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015406
==Dear Mr. Diya:==
On April 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Callaway Plant, and the NRC inspectors discussed the results of this inspection with Mr. L. Graessle, Senior Director, Operations Support, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
 
The NRC inspector did not identify any findings or violation of more than minor significance.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with
 
UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION IV==
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,
/RA/  


==Dear Mr. Diya:==
Mark S. Haire, Branch Chief
On April 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Callaway Plant, and the NRC inspectors discussed the results of this inspection with Mr. L. Graessle, Senior Director, Operations Support, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report. The NRC inspector did not identify any findings or violation of more than minor significance.
 
Plant Support Branch 1


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Division of Reactor Safety


Sincerely,/RA/
Docket No. 50-483 License No. NPF-30  
Mark S. Haire, Branch Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 Nonpublic


===Enclosure:===
Nonpublic Enclosure:
NRC Inspection Report 05000483/2015406  
NRC Inspection Report 05000483/2015406 w/Attachment: Supplemental Information


===w/Attachment:===
cc w/encl:
Supplemental Information cc w/encl: Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008  
Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008  


cc w/o encl:
cc w/o encl:
Electronic Distribution for Callaway Plant  
Electronic Distribution for Callaway Plant  


ML15126A476 Entire Report: SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:
ML15126A476 Entire Report:
SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME JBuchanan MHaire GWarnick MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 4/29/15 4/30/15 4/30/15 5/5/15 Letter to Fadi Diya from Mark S. Haire, dated May 5, 2015
SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:
SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBC C:PSB1  
 
NAME JBuchanan MHaire GWarnick MHaire  
 
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA/  


SUBJECT: CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015406 Distribution w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
DATE 4/29/15 4/30/15 4/30/15 5/5/15 Letter to Fadi Diya from Mark S. Haire, dated May 5, 2015
 
SUBJECT:
CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015406  
 
Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Administrative Assistant (Dawn.Yancey@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Electronic distribution by RIV w/o enclosure: Regional Administrator (Marc.Dapas@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Administrative Assistant (Dawn.Yancey@nrc.gov)  
 
Electronic distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov)
Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Fred.Lyon@nrc.gov) Branch Chief, DRS/TSS (Don.Allen@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Branch Chief, DRS/TSS (Don.Allen@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 12:11, 10 January 2025

NRC Inspection Report 05000483/2015406
ML15126A476
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/05/2015
From: Mark Haire
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR 2015406
Download: ML15126A476 (4)


Text

May 5, 2015

SUBJECT:

CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015406

Dear Mr. Diya:

On April 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Callaway Plant, and the NRC inspectors discussed the results of this inspection with Mr. L. Graessle, Senior Director, Operations Support, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspector did not identify any findings or violation of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Branch Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-483 License No. NPF-30

Nonpublic Enclosure:

NRC Inspection Report 05000483/2015406 w/Attachment: Supplemental Information

cc w/encl:

Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008

cc w/o encl:

Electronic Distribution for Callaway Plant

ML15126A476 Entire Report:

SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:

SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBC C:PSB1

NAME JBuchanan MHaire GWarnick MHaire

SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE 4/29/15 4/30/15 4/30/15 5/5/15 Letter to Fadi Diya from Mark S. Haire, dated May 5, 2015

SUBJECT:

CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2015406

Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Administrative Assistant (Dawn.Yancey@nrc.gov)

Electronic distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSS (Don.Allen@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)