| issue date = 09/01/2015 | | issue date = 09/01/2015 | ||
| title = Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015005 and 05000499/2015005) | | title = Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015005 and 05000499/2015005) | ||
| author name = Taylor N | | author name = Taylor N | ||
| author affiliation = NRC/RGN-IV/DRP | | author affiliation = NRC/RGN-IV/DRP | ||
| addressee name = Koehl D | | addressee name = Koehl D | ||
| addressee affiliation = South Texas Project Nuclear Operating Co | | addressee affiliation = South Texas Project Nuclear Operating Co | ||
| docket = 05000498, 05000499 | | docket = 05000498, 05000499 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:September 1, 2015 | ||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION (REPORT 05000498/2015005 AND 05000499/2015005) | ==SUBJECT:== | ||
MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION (REPORT 05000498/2015005 AND 05000499/2015005) | |||
==Dear Mr. Koehl:== | ==Dear Mr. Koehl:== | ||
On August 11, 2015, the Nuclear Regulatory Commission (NRC) completed its mid | On August 11, 2015, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | ||
-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1 , 2014 through June 30 , 2015. This letter informs you of the | |||
The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the | The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end | The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | ||
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non | |||
-publicly available correspondence. | |||
In response to the accident at Fukushima, the Commission issued Order EA | In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit has been completed at South Texas Project Electric Generating Station, Units 1 and 2, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. | ||
-12-049, | |||
-Design-Basis External Events, | |||
-design-basis external event. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at 817-200-1141 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects | |||
Docket Nos.: 50-498; 50-499 License Nos.: NPF-76; NPF-80 | |||
Enclosure: South Texas Project Electric Generating Station, Units 1 and 2 Inspection /Activity Plan | |||
SUNSI Review By: NHTaylor ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME NTaylor AVegel TPruett SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE 8/26/15 8/26/15 8/27/15 | |||
Taylor, | Letter to Dennis from Nicholas H. Taylor dated September 1, 2015 | ||
SUBJECT: | |||
ANNUAL ASSESSMENT LETTER SOUTH TEXAS PROJECT ELECTRIC | |||
GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2015005 AND 05000499/2015005) | |||
DISTRIBUTION: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | Regional Administrator (Marc.Dapas@nrc.gov) | ||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | DRP Deputy Director (Ryan.Lantz@nrc.gov) | ||
DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) | DRS Director (Anton.Vegel@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | ||
Resident Inspector (Nick.Hernandez@nrc.gov) | Resident Inspector (Nick.Hernandez@nrc.gov) | ||
| Line 82: | Line 79: | ||
Director, DIRS, NRR (Scott.Morris@nrc.gov) | Director, DIRS, NRR (Scott.Morris@nrc.gov) | ||
Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov) | Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov) | ||
Acting Director, DORL, NRR (Louise.Lund@nrc.gov | Acting Director, DORL, NRR (Louise.Lund@nrc.gov) | ||
Acting Deputy Director, DORL (James.Trapp@nrc.gov) | |||
Director, NSIR/DPR (Rob.Lewis@nrc.gov) | Director, NSIR/DPR (Rob.Lewis@nrc.gov) | ||
Chief, PLB IV, DORL, NRR (Michael.Markey@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) | Chief, PLB IV, DORL, NRR (Michael.Markey@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Technical Support Assistant (Loretta.Williams@nrc.gov) | Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | ||
RIV/ETA: OEDO (Cindy.Rosales | RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) | ||
-Cooper@nrc.gov) ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for South Texas Project Electric Generating Station | ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov | ||
Electronic Distribution for South Texas Project Electric Generating Station | |||
Page 1 of 3 08/26/2015 14:08:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2015 - 06/30/2017 EXAM | |||
- INITIAL OPERATOR EXAM | |||
1 INITIAL EXAM STP UNIT 1 (9/2015) | |||
X02554 08/31/2015 09/04/2015 | |||
INITIAL EXAM STP UNIT 2 (9/2015) | |||
X02555 08/31/2015 09/04/2015 | |||
INITIAL EXAM STP UNIT 1 (9/2015) | |||
X02554 09/28/2015 10/09/2015 | |||
INITIAL EXAM STP UNIT 2 (9/2015) | |||
X02555 09/28/2015 10/09/2015 ISFSI | |||
- PAD POUR INSPECTION (ONE WEEK VISIT) | |||
1 IP Operation Of An ISFSI 60855 07/01/2015 07/31/2015 RS 24 | |||
- RADIATION SAFETY | |||
1, 2 IP Occupational ALARA Planning and Controls 71124.02 07/27/2015 07/31/2015 1, 2 IP Occupational Dose Assessment 71124.04 07/27/2015 07/31/2015 INSP | |||
- OPERATOR REQUAL INSPECTION | |||
1, 2 IP Licensed Operator Requalification Program 7111111B 09/14/2015 09/18/2015 71111.08 | |||
- INSERVICE INSPECTION 1R19 | |||
1 IP Inservice Inspection Activities - PWR 7111108P 10/12/2015 10/23/2015 EP-1 | |||
- BIENNIAL EP PROGAM INSPECTION | |||
1, 2 IP Alert and Notification System Testing 7111402 11/16/2015 11/20/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/16/2015 11/20/2015 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/16/2015 11/20/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/16/2015 11/20/2015 EP-2 | |||
- EP PERFORMANCE INDICATORS | |||
1, 2 IP Drill/Exercise Performance 71151-EP01 11/16/2015 11/20/2015 1, 2 IP ERO Readiness 71151-EP02 11/16/2015 11/20/2015 1, 2 IP Alert & Notification System Reliability 71151-EP03 11/16/2015 11/20/2015 EB1-07T | |||
- STP TRIENNIAL HEAT SINK PERFORMANCE | |||
1, 2 IP Heat Sink Performance 7111107T 12/07/2015 12/11/2015 EB1-21T | |||
- STP COMPONENT DESIGN BASIS INSPECTION | |||
1, 2 IP Component Design Bases Inspection 7111121 01/25/2016 02/12/2016 ISFSI | |||
- DRY RUN INSPECTION (MULTIPLE VISITS) | |||
2 IP Operation Of An ISFSI 60855 03/01/2016 05/30/2016 EB1-21EQ | |||
- STP EQ/CDBI INSPECTION (PILOT) | |||
1, 2 IP Component Design Bases Inspection 7111121 03/21/2016 03/25/2016 EP-2 | |||
- EP PERFORMANCE INDICATORS | |||
1 IP Drill/Exercise Performance 71151-EP01 07/11/2016 07/15/2016 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 3 08/26/2015 14:08:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2015 - 06/30/2017 EP-2 | |||
- EP PERFORMANCE INDICATORS | |||
1 IP ERO Readiness 71151-EP02 07/11/2016 07/15/2016 | |||
IP Alert & Notification System Reliability 71151-EP03 07/11/2016 07/15/2016 EP-3 | |||
- BIENNIAL EP EXERCISE INSPECTION | |||
1 IP Exercise Evaluation 7111401 07/11/2016 07/16/2016 | |||
IP Emergency Action Level and Emergency Plan Changes 7111404 07/11/2016 07/16/2016 71111.08 | |||
- INSERVICE INSPECTION | |||
2 IP Inservice Inspection Activities - PWR 7111108P 10/10/2016 10/21/2016 RS 12 PI | |||
- RADIATION SAFETY | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/17/2016 10/21/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/17/2016 10/21/2016 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 10/17/2016 10/21/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/17/2016 10/21/2016 TSB 52B | |||
- BIENNIAL PI&R INSPECTION | |||
1, 2 IP Problem Identification and Resolution 71152B 11/14/2016 11/18/2016 1, 2 IP Problem Identification and Resolution 71152B 12/05/2016 12/09/2016 RS 5678 | |||
- RADIATION SAFETY - TEAM | |||
1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/28/2016 12/02/2016 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/28/2016 12/02/2016 1, 2 IP Radiological Environmental Monitoring Program 71124.07 11/28/2016 12/02/2016 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/28/2016 12/02/2016 EB2-05T | |||
- TRIENNIAL FIRE PROTECTION INSPECTION | |||
1, 2 IP Fire Protection [Triennial] | |||
7111105T 01/23/2017 01/27/2017 1, 2 IP Fire Protection [Triennial] | |||
7111105T 02/06/2017 02/10/2017 RS 13 PI | |||
- RADIATION SAFETY | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/27/2017 03/31/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/27/2017 03/31/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 03/27/2017 03/31/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 03/27/2017 03/31/2017 71111.08 | |||
- INSERVICE INSPECTION UNIT 1 | |||
1 IP Inservice Inspection Activities - PWR 7111108P 03/27/2017 04/07/2017 EP-1 | |||
- BIENNIAL EP PROGRAM INSPECTION | |||
1, 2 IP Alert and Notification System Testing 7111402 05/08/2017 05/12/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/08/2017 05/12/2017 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 3 of 3 08/26/2015 14:08:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2015 - 06/30/2017 EP-1 | |||
- BIENNIAL EP PROGRAM INSPECTION | |||
1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/08/2017 05/12/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/08/2017 05/12/2017 EP-2 | |||
- EP PERFORMANCE INDICATOR VERIFICATION | |||
1, 2 IP ERO Readiness 71151-EP02 05/08/2017 05/12/2017 1, 2 IP Alert & Notification System Reliability 71151-EP03 05/08/2017 05/12/2017 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Latest revision as of 08:56, 10 January 2025
| ML15243A561 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/01/2015 |
| From: | Nick Taylor NRC/RGN-IV/DRP |
| To: | Koehl D South Texas |
| Nicholas Taylor | |
| References | |
| IR 2015005 | |
| Download: ML15243A561 (7) | |
Text
September 1, 2015
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION (REPORT 05000498/2015005 AND 05000499/2015005)
Dear Mr. Koehl:
On August 11, 2015, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit has been completed at South Texas Project Electric Generating Station, Units 1 and 2, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects
Docket Nos.: 50-498; 50-499 License Nos.: NPF-76; NPF-80
Enclosure: South Texas Project Electric Generating Station, Units 1 and 2 Inspection /Activity Plan
SUNSI Review By: NHTaylor ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME NTaylor AVegel TPruett SIGNATURE
/RA/
/RA/
/RA/
DATE 8/26/15 8/26/15 8/27/15
Letter to Dennis from Nicholas H. Taylor dated September 1, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER SOUTH TEXAS PROJECT ELECTRIC
GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2015005 AND 05000499/2015005)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nick.Hernandez@nrc.gov)
Branch Chief, DRP/B (Nicholas.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Project Engineer, DRP/B (Shawn.Money@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
RIV State Liaison Officer (Bill.Maier@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
Director, DIRS, NRR (Scott.Morris@nrc.gov)
Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)
Acting Director, DORL, NRR (Louise.Lund@nrc.gov)
Acting Deputy Director, DORL (James.Trapp@nrc.gov)
Director, NSIR/DPR (Rob.Lewis@nrc.gov)
Chief, PLB IV, DORL, NRR (Michael.Markey@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov
Electronic Distribution for South Texas Project Electric Generating Station
Page 1 of 3 08/26/2015 14:08:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2015 - 06/30/2017 EXAM
- INITIAL OPERATOR EXAM
1 INITIAL EXAM STP UNIT 1 (9/2015)
X02554 08/31/2015 09/04/2015
INITIAL EXAM STP UNIT 2 (9/2015)
X02555 08/31/2015 09/04/2015
INITIAL EXAM STP UNIT 1 (9/2015)
X02554 09/28/2015 10/09/2015
INITIAL EXAM STP UNIT 2 (9/2015)
X02555 09/28/2015 10/09/2015 ISFSI
- PAD POUR INSPECTION (ONE WEEK VISIT)
1 IP Operation Of An ISFSI 60855 07/01/2015 07/31/2015 RS 24
- RADIATION SAFETY
1, 2 IP Occupational ALARA Planning and Controls 71124.02 07/27/2015 07/31/2015 1, 2 IP Occupational Dose Assessment 71124.04 07/27/2015 07/31/2015 INSP
- OPERATOR REQUAL INSPECTION
1, 2 IP Licensed Operator Requalification Program 7111111B 09/14/2015 09/18/2015 71111.08
- INSERVICE INSPECTION 1R19
1 IP Inservice Inspection Activities - PWR 7111108P 10/12/2015 10/23/2015 EP-1
- BIENNIAL EP PROGAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 11/16/2015 11/20/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/16/2015 11/20/2015 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/16/2015 11/20/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/16/2015 11/20/2015 EP-2
- EP PERFORMANCE INDICATORS
1, 2 IP Drill/Exercise Performance 71151-EP01 11/16/2015 11/20/2015 1, 2 IP ERO Readiness 71151-EP02 11/16/2015 11/20/2015 1, 2 IP Alert & Notification System Reliability 71151-EP03 11/16/2015 11/20/2015 EB1-07T
- STP TRIENNIAL HEAT SINK PERFORMANCE
1, 2 IP Heat Sink Performance 7111107T 12/07/2015 12/11/2015 EB1-21T
- STP COMPONENT DESIGN BASIS INSPECTION
1, 2 IP Component Design Bases Inspection 7111121 01/25/2016 02/12/2016 ISFSI
- DRY RUN INSPECTION (MULTIPLE VISITS)
2 IP Operation Of An ISFSI 60855 03/01/2016 05/30/2016 EB1-21EQ
- STP EQ/CDBI INSPECTION (PILOT)
1, 2 IP Component Design Bases Inspection 7111121 03/21/2016 03/25/2016 EP-2
- EP PERFORMANCE INDICATORS
1 IP Drill/Exercise Performance 71151-EP01 07/11/2016 07/15/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 3 08/26/2015 14:08:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2015 - 06/30/2017 EP-2
- EP PERFORMANCE INDICATORS
1 IP ERO Readiness 71151-EP02 07/11/2016 07/15/2016
IP Alert & Notification System Reliability 71151-EP03 07/11/2016 07/15/2016 EP-3
- BIENNIAL EP EXERCISE INSPECTION
1 IP Exercise Evaluation 7111401 07/11/2016 07/16/2016
IP Emergency Action Level and Emergency Plan Changes 7111404 07/11/2016 07/16/2016 71111.08
- INSERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 10/10/2016 10/21/2016 RS 12 PI
- RADIATION SAFETY
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/17/2016 10/21/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/17/2016 10/21/2016 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 10/17/2016 10/21/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/17/2016 10/21/2016 TSB 52B
- BIENNIAL PI&R INSPECTION
1, 2 IP Problem Identification and Resolution 71152B 11/14/2016 11/18/2016 1, 2 IP Problem Identification and Resolution 71152B 12/05/2016 12/09/2016 RS 5678
- RADIATION SAFETY - TEAM
1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/28/2016 12/02/2016 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/28/2016 12/02/2016 1, 2 IP Radiological Environmental Monitoring Program 71124.07 11/28/2016 12/02/2016 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/28/2016 12/02/2016 EB2-05T
- TRIENNIAL FIRE PROTECTION INSPECTION
1, 2 IP Fire Protection [Triennial]
7111105T 01/23/2017 01/27/2017 1, 2 IP Fire Protection [Triennial]
7111105T 02/06/2017 02/10/2017 RS 13 PI
- RADIATION SAFETY
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/27/2017 03/31/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/27/2017 03/31/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 03/27/2017 03/31/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 03/27/2017 03/31/2017 71111.08
- INSERVICE INSPECTION UNIT 1
1 IP Inservice Inspection Activities - PWR 7111108P 03/27/2017 04/07/2017 EP-1
- BIENNIAL EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 05/08/2017 05/12/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/08/2017 05/12/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 08/26/2015 14:08:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2015 - 06/30/2017 EP-1
- BIENNIAL EP PROGRAM INSPECTION
1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/08/2017 05/12/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/08/2017 05/12/2017 EP-2
- EP PERFORMANCE INDICATOR VERIFICATION
1, 2 IP ERO Readiness 71151-EP02 05/08/2017 05/12/2017 1, 2 IP Alert & Notification System Reliability 71151-EP03 05/08/2017 05/12/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.