IR 05000390/2015005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/01/2015
| issue date = 09/01/2015
| title = Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005
| title = Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005
| author name = Blamey A J
| author name = Blamey A
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000390
| docket = 05000390
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:September 1, 2015
-1257 September 1
, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D
-C Chattanooga, TN 37402
-2801 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005


Dear Mr. Shea
==SUBJECT:==
:
MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005
On August 13, 2015, the NRC completed its mid
-cycle performance review of Watts Bar Nuclear Plant Unit The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 1 4 through June 30, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30 , 201 Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the second half of the inspection plan are tentative and may be revised at the end
-of-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondenc In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, "Inspection of Commercial
-Grade Dedication Programs
," and an initial operator license examinatio J. Shea 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 404-997-4415 with any questions you have regarding this lette
==Dear Mr. Shea:==
On August 13, 2015, the NRC completed its mid-cycle performance review of Watts Bar Nuclear Plant Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015.
 
This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
 
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
 
In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, and an initial operator license examination. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 404-997-4415 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/
/RA/  
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50
 
-390 License No NPF
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects  
-90 Enclosure: Watts Bar Inspection/Activity Plan
 
Docket Nos.: 50-390 License Nos. NPF-90
 
Enclosure: Watts Bar Inspection/Activity Plan
 
(07/01/2015 - 06/30/2017)
 
cc distribution via ListServ
 
_________________________
 
XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP
 
SIGNATURE BDB3 CRK1 AJB3
 
NAME BBISHOP CKONTZ ABLAMEY
 
DATE 8/25/2015 8/25/2015 8/31/2015
 
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO Letter to Joseph Shea from Alan Blamey dated September 1, 2015
 
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005
 
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
 
Page 1 of 3 09/01/2015 10:35:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar Inspection / Activity Plan 09/01/2015 - 06/30/2017 ISFSI
- ISFSI PAD CONCRETE PLACEMENT
 
1 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 09/21/2015 09/25/2015 RP
- RP OCCUPATIONAL BASELINE WEEK 1
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/05/2015 10/09/2015
 
IP Occupational ALARA Planning and Controls 71124.02 10/05/2015 10/09/2015
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/05/2015 10/09/2015
 
IP Occupational Dose Assessment 71124.04 10/05/2015 10/09/2015
 
IP Radiation Monitoring Instrumentation 71124.05 10/05/2015 10/09/2015
 
IP Performance Indicator Verification 71151 10/05/2015 10/09/2015 ISI
- UNIT 1 IN-SERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 10/12/2015 10/16/2015 RP
- RP OCCUPATIONAL BASELINE WEEK 2
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/19/2015 10/23/2015
 
IP Occupational ALARA Planning and Controls 71124.02 10/19/2015 10/23/2015
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/19/2015 10/23/2015
 
IP Occupational Dose Assessment 71124.04 10/19/2015 10/23/2015
 
IP Radiation Monitoring Instrumentation 71124.05 10/19/2015 10/23/2015
 
IP Performance Indicator Verification 71151 10/19/2015 10/23/2015 EP
- EP EXERCISE
 
1 IP Emergency Action Level and Emergency Plan Changes 7111404 11/16/2015 11/20/2015
 
IP Exercise Evaluation - Hostile Action (HA) Event 7111407 11/16/2015 11/20/2015
 
IP Performance Indicator Verification 71151 11/16/2015 11/20/2015 CDBI
- COMPONENT DESIGN BASES INSPECTION
 
1 IP Component Design Bases Inspection 7111121 02/01/2016 02/05/2016
 
IP Component Design Bases Inspection 7111121 02/29/2016 03/04/2016
 
IP Component Design Bases Inspection 7111121 03/14/2016 03/18/2016
 
IP Component Design Bases Inspection 7111121 03/28/2016 04/01/2016 OL EXAM
- INITIAL LICENSE EXAM PREP
 
1 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V23475 06/20/2016 06/24/2016 OL EXAM
- INITIAL LICENSE EXAM
 
1 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V23475 07/18/2016 07/22/2016 MODS
- PLANT MODIFICATIONS INSPECTION
 
1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 07/25/2016 07/29/2016 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Enclosure
 
Page 2 of 3 09/01/2015 10:35:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar Inspection / Activity Plan 09/01/2015 - 06/30/2017 MODS
- PLANT MODIFICATIONS INSPECTION
 
1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 08/08/2016 08/12/2016 RP
- RP PUBLIC RAD SAFETY BASELINE
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/01/2016 08/05/2016
 
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/01/2016 08/05/2016
 
IP Radiological Environmental Monitoring Program 71124.07 08/01/2016 08/05/2016
 
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/01/2016 08/05/2016
 
IP Performance Indicator Verification 71151 08/01/2016 08/05/2016 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
 
1 IP Problem Identification and Resolution 71152B 10/31/2016 11/04/2016
 
IP Problem Identification and Resolution 71152B 11/14/2016 11/18/2016 EP
- EP PROGRAM INSPECTION
 
1 IP Alert and Notification System Testing 7111402 11/14/2016 11/18/2016
 
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/14/2016 11/18/2016
 
IP Emergency Action Level and Emergency Plan Changes 7111404 11/14/2016 11/18/2016
 
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/14/2016 11/18/2016
 
IP Performance Indicator Verification 71151 11/14/2016 11/18/2016 ISI
- UNIT 1 IN-SERVICE INSPECTION & RVH EXAM
 
1 IP Inservice Inspection Activities - PWR 7111108P 03/27/2017 03/31/2017 RP
- RP OCCUPATIONAL INSPECTION WEEK 1
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/27/2017 03/31/2017
 
IP Occupational ALARA Planning and Controls 71124.02 03/27/2017 03/31/2017
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/27/2017 03/31/2017
 
IP Occupational Dose Assessment 71124.04 03/27/2017 03/31/2017
 
IP Radiation Monitoring Instrumentation 71124.05 03/27/2017 03/31/2017
 
IP Performance Indicator Verification 71151 03/27/2017 03/31/2017 SGISI
- UNIT 1 SG IN-SERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 04/03/2017 04/07/2017 RP
- RP OCCUPATIONAL INSPECTION WEEK 2
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/10/2017 04/14/2017
 
IP Occupational ALARA Planning and Controls 71124.02 04/10/2017 04/14/2017
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/10/2017 04/14/2017
 
IP Occupational Dose Assessment 71124.04 04/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Enclosure
 
Page 3 of 3 09/01/2015 10:35:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar Inspection / Activity Plan 09/01/2015 - 06/30/2017 RP
- RP OCCUPATIONAL INSPECTION WEEK 2


(0 7/01/2015 - 06/30/2017)
1 IP Radiation Monitoring Instrumentation 71124.05 04/10/2017 04/14/2017
cc distribution via ListServ


_________________________
IP Performance Indicator Verification 71151 04/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities.
XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 Letter to Joseph Shea from Alan Blamey dated September 1, 2015 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005 DISTRIBUTION
: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR


RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
This report shows only on-site and announced inspection procedures.


Page 1 of 3 09/01/2015 10:35:16 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015
Enclosure
-06/30/2017 ISFSI-ISFSI PAD CONCRETE PLACEMENT 1 1 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 09/21/2015 09/25/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/05/2015 10/09/2015 1 IP Occupational ALARA Planning and Controls71124.02 10/05/2015 10/09/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/05/2015 10/09/2015 1 IP Occupational Dose Assessment71124.04 10/05/2015 10/09/2015 1 IP Radiation Monitoring Instrumentation71124.05 10/05/2015 10/09/2015 1 IP Performance Indicator Verification71151 10/05/2015 10/09/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/12/2015 10/16/2015 RP-RP OCCUPATIONAL BASELINE WEEK 2 3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/19/2015 10/23/2015 1 IP Occupational ALARA Planning and Controls71124.02 10/19/2015 10/23/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/19/2015 10/23/2015 1 IP Occupational Dose Assessment71124.04 10/19/2015 10/23/2015 1 IP Radiation Monitoring Instrumentation71124.05 10/19/2015 10/23/2015 1 IP Performance Indicator Verification71151 10/19/2015 10/23/2015 EP-EP EXERCISE 8 1 IP Emergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 1 IP Performance Indicator Verification7115111/16/201511/20/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1 IP Component Design Bases Inspection7111121 02/01/2016 02/05/2016 1 IP Component Design Bases Inspection7111121 02/29/2016 03/04/2016 1 IP Component Design Bases Inspection7111121 03/14/2016 03/18/2016 1 IP Component Design Bases Inspection7111121 03/28/2016 04/01/2016OL EXAM-INITIAL LICENSE EXAM PREP 3 1 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V23475 06/20/2016 06/24/2016OL EXAM-INITIAL LICENSE EXAM 3 1 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V23475 07/18/2016 07/22/2016 MODS-PLANT MODIFICATIONS INSPECTION 3 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/25/2016 07/29/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 2 of 3 09/01/2015 10:35:16 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015
-06/30/2017 MODS-PLANT MODIFICATIONS INSPECTION 3 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 08/08/2016 08/12/2016 RP-RP PUBLIC RAD SAFETY BASELINE 4 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 08/01/2016 08/05/2016 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 08/01/2016 08/05/2016 1 IP Radiological Environmental Monitoring Program71124.07 08/01/2016 08/05/2016 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 08/01/2016 08/05/2016 1 IP Performance Indicator Verification71151 08/01/2016 08/05/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP Problem Identification and Resolution71152B 10/31/201611/04/2016 1 IP Problem Identification and Resolution71152B11/14/201611/18/2016 EP-EP PROGRAM INSPECTION 4 1 IP A lert and Notification System Testing711140211/14/201611/18/2016 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016 1 IP Emergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016 1 IP Performance Indicator Verification7115111/14/201611/18/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 IP Inservice Inspection Activities - PWR7111108P 03/27/2017 03/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/27/2017 03/31/2017 1 IP Occupational ALARA Planning and Controls71124.02 03/27/2017 03/31/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/27/2017 03/31/2017 1 IP Occupational Dose Assessment71124.04 03/27/2017 03/31/2017 1 IP Radiation Monitoring Instrumentation71124.05 03/27/2017 03/31/2017 1 IP Performance Indicator Verification71151 03/27/2017 03/31/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/03/2017 04/07/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/10/2017 04/14/2017 1 IP Occupational ALARA Planning and Controls71124.02 04/10/2017 04/14/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/10/2017 04/14/2017 1 IP Occupational Dose Assessment71124.04 04/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 3 of 3 09/01/2015 10:35:16 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015
-06/30/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 3 1 IP Radiation Monitoring Instrumentation71124.05 04/10/2017 04/14/2017 1 IP Performance Indicator Verification71151 04/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 08:51, 10 January 2025

Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005
ML15244B056
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2015
From: Alan Blamey
Division Reactor Projects II
To: James Shea
Tennessee Valley Authority
References
IR 2015005
Download: ML15244B056 (7)


Text

September 1, 2015

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005

Dear Mr. Shea:

On August 13, 2015, the NRC completed its mid-cycle performance review of Watts Bar Nuclear Plant Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014 through June 30, 2015.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, and an initial operator license examination. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket Nos.: 50-390 License Nos. NPF-90

Enclosure: Watts Bar Inspection/Activity Plan

(07/01/2015 - 06/30/2017)

cc distribution via ListServ

_________________________

XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP

SIGNATURE BDB3 CRK1 AJB3

NAME BBISHOP CKONTZ ABLAMEY

DATE 8/25/2015 8/25/2015 8/31/2015

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO Letter to Joseph Shea from Alan Blamey dated September 1, 2015

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005

DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 3 09/01/2015 10:35:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar Inspection / Activity Plan 09/01/2015 - 06/30/2017 ISFSI

- ISFSI PAD CONCRETE PLACEMENT

1 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 09/21/2015 09/25/2015 RP

- RP OCCUPATIONAL BASELINE WEEK 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/05/2015 10/09/2015

IP Occupational ALARA Planning and Controls 71124.02 10/05/2015 10/09/2015

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/05/2015 10/09/2015

IP Occupational Dose Assessment 71124.04 10/05/2015 10/09/2015

IP Radiation Monitoring Instrumentation 71124.05 10/05/2015 10/09/2015

IP Performance Indicator Verification 71151 10/05/2015 10/09/2015 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 10/12/2015 10/16/2015 RP

- RP OCCUPATIONAL BASELINE WEEK 2

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/19/2015 10/23/2015

IP Occupational ALARA Planning and Controls 71124.02 10/19/2015 10/23/2015

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/19/2015 10/23/2015

IP Occupational Dose Assessment 71124.04 10/19/2015 10/23/2015

IP Radiation Monitoring Instrumentation 71124.05 10/19/2015 10/23/2015

IP Performance Indicator Verification 71151 10/19/2015 10/23/2015 EP

- EP EXERCISE

1 IP Emergency Action Level and Emergency Plan Changes 7111404 11/16/2015 11/20/2015

IP Exercise Evaluation - Hostile Action (HA) Event 7111407 11/16/2015 11/20/2015

IP Performance Indicator Verification 71151 11/16/2015 11/20/2015 CDBI

- COMPONENT DESIGN BASES INSPECTION

1 IP Component Design Bases Inspection 7111121 02/01/2016 02/05/2016

IP Component Design Bases Inspection 7111121 02/29/2016 03/04/2016

IP Component Design Bases Inspection 7111121 03/14/2016 03/18/2016

IP Component Design Bases Inspection 7111121 03/28/2016 04/01/2016 OL EXAM

- INITIAL LICENSE EXAM PREP

1 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V23475 06/20/2016 06/24/2016 OL EXAM

- INITIAL LICENSE EXAM

1 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V23475 07/18/2016 07/22/2016 MODS

- PLANT MODIFICATIONS INSPECTION

1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 07/25/2016 07/29/2016 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 3 09/01/2015 10:35:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar Inspection / Activity Plan 09/01/2015 - 06/30/2017 MODS

- PLANT MODIFICATIONS INSPECTION

1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 08/08/2016 08/12/2016 RP

- RP PUBLIC RAD SAFETY BASELINE

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/01/2016 08/05/2016

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/01/2016 08/05/2016

IP Radiological Environmental Monitoring Program 71124.07 08/01/2016 08/05/2016

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/01/2016 08/05/2016

IP Performance Indicator Verification 71151 08/01/2016 08/05/2016 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1 IP Problem Identification and Resolution 71152B 10/31/2016 11/04/2016

IP Problem Identification and Resolution 71152B 11/14/2016 11/18/2016 EP

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 11/14/2016 11/18/2016

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/14/2016 11/18/2016

IP Emergency Action Level and Emergency Plan Changes 7111404 11/14/2016 11/18/2016

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/14/2016 11/18/2016

IP Performance Indicator Verification 71151 11/14/2016 11/18/2016 ISI

- UNIT 1 IN-SERVICE INSPECTION & RVH EXAM

1 IP Inservice Inspection Activities - PWR 7111108P 03/27/2017 03/31/2017 RP

- RP OCCUPATIONAL INSPECTION WEEK 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/27/2017 03/31/2017

IP Occupational ALARA Planning and Controls 71124.02 03/27/2017 03/31/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/27/2017 03/31/2017

IP Occupational Dose Assessment 71124.04 03/27/2017 03/31/2017

IP Radiation Monitoring Instrumentation 71124.05 03/27/2017 03/31/2017

IP Performance Indicator Verification 71151 03/27/2017 03/31/2017 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/03/2017 04/07/2017 RP

- RP OCCUPATIONAL INSPECTION WEEK 2

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/10/2017 04/14/2017

IP Occupational ALARA Planning and Controls 71124.02 04/10/2017 04/14/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/10/2017 04/14/2017

IP Occupational Dose Assessment 71124.04 04/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 3 of 3 09/01/2015 10:35:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar Inspection / Activity Plan 09/01/2015 - 06/30/2017 RP

- RP OCCUPATIONAL INSPECTION WEEK 2

1 IP Radiation Monitoring Instrumentation 71124.05 04/10/2017 04/14/2017

IP Performance Indicator Verification 71151 04/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure