=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 16, 2016 Mr. Michael Perito Vice President, Oversight Entergy Nuclear Operations, Inc. 1340 Echelon Parkway Jackson, MS | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 16, 2016 Mr. Michael Perito Vice President, Oversight Entergy Nuclear Operations, Inc. | ||
1340 Echelon Parkway Jackson, MS 39213 | |||
==SUBJECT:== | ==SUBJECT:== | ||
ENTERGY VERMONT YANKEE QUALITY ASSURANCE PROGRAM MANUAL VERMONT YANKEE NUCLEAR POWER STATION AND INDEPENDENT SPENT FUEL STORAGE FACILITY - REVIEW AND ACCEPTANCE OF CHANGES (CAC NO. | ENTERGY VERMONT YANKEE QUALITY ASSURANCE PROGRAM MANUAL VERMONT YANKEE NUCLEAR POWER STATION AND INDEPENDENT SPENT FUEL STORAGE FACILITY - REVIEW AND ACCEPTANCE OF CHANGES (CAC NO. L53120) | ||
L53120) | |||
==Dear Mr. Perito:== | ==Dear Mr. Perito:== | ||
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the proposed changes to the Entergy Nuclear Operations, Inc. (ENO) Vermont Yankee Nuclear Power Station (VYNPS) Quality Assurance Program Manual (QAPM) in response to your {{letter dated|date=February 4, 2016|text=letter dated February 4, 2016}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16035A506), as supplemented by {{letter dated|date=May 5, 2016|text=letter dated May 5, 2016}}. | |||
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the proposed changes to the Entergy Nuclear Operations, Inc. (ENO) Vermont Yankee Nuclear Power Station (VYNPS) Quality Assurance Program Manual (QAPM) in response to your letter dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16035A506), as supplemented by letter dated May 5, 2016. | |||
The VY QAPM is associated with license DPR-28 for the VYNPS and docket no. 72-059 for the Independent Spent Fuel Storage Installation. | The VY QAPM is associated with license DPR-28 for the VYNPS and docket no. 72-059 for the Independent Spent Fuel Storage Installation. | ||
The proposed QAPM reflects changes and simplifications based on the VYNPS decommissioning status. Changes include those to the scope of structures, systems and components, due to the decommissioning status; removing the need for maintaining NRC Licensed Operators as part of the site organization; the qualification of Certified Fuel Handlers; transitioning the onsite-review function to an independent review function; and, modifying the function of the off-site safety review to reflect the complexity of operations for a decommissioning facility. The changes, some of which are considered to be reductions in commitments, were submitted for NRC review and approval in accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) paragraph 50.54(a)(4). | The proposed QAPM reflects changes and simplifications based on the VYNPS decommissioning status. Changes include those to the scope of structures, systems and components, due to the decommissioning status; removing the need for maintaining NRC Licensed Operators as part of the site organization; the qualification of Certified Fuel Handlers; transitioning the onsite-review function to an independent review function; and, modifying the function of the off-site safety review to reflect the complexity of operations for a decommissioning facility. The changes, some of which are considered to be reductions in commitments, were submitted for NRC review and approval in accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) paragraph 50.54(a)(4). | ||
The NRC staff has completed its review of your request and has determined that the Quality Assurance Program, as described in the VYNPS QAPM, is in conformance with the applicable portions of Appendix B to 10 CFR Part 50. The NRC staff concludes that the proposed Vermont Yankee QAPM Revision 4 follows the NRC guidance in the attached NRC safety evaluation, conforms to the format of NUREG-0800, Section 17.3, complies with Appendix B to 10 CFR Part 50 requirements for the QA program and is, therefore, acceptable. | The NRC staff has completed its review of your request and has determined that the Quality Assurance Program, as described in the VYNPS QAPM, is in conformance with the applicable portions of Appendix B to 10 CFR Part 50. The NRC staff concludes that the proposed Vermont Yankee QAPM Revision 4 follows the NRC guidance in the attached NRC safety evaluation, conforms to the format of NUREG-0800, Section 17.3, complies with Appendix B to 10 CFR Part 50 requirements for the QA program and is, therefore, acceptable. | ||
M. Perito 2 If you have any questions, please contact me at (301) 415-6634 or via e-mail at Jack.Parrott@nrc.gov. | M. Perito 2 | ||
Sincerely, | If you have any questions, please contact me at (301) 415-6634 or via e-mail at Jack.Parrott@nrc.gov. | ||
Sincerely, | |||
Reactor Decommissioning Branch | /RA/ | ||
Jack D. Parrott, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos. 50-271 and 72-059 | |||
Division of Decommissioning, Uranium | |||
Docket Nos. 50-271 and 72-059 | |||
==Enclosure:== | ==Enclosure:== | ||
Safety Evaluation cc: Distribution via Listserv | |||
Safety Evaluation cc: Distribution via Listserv | |||
ML16165A465 | ML16165A465 | ||
* via e-mail OFFICE NMSS NMSS NMSS* NRO* NMSS NMSS NAME J. Parrott C. Holston P. Silva K. | * via e-mail OFFICE NMSS NMSS NMSS* | ||
NRO* | |||
NMSS NMSS NAME J. Parrott C. Holston P. Silva K. Kavanagh B. Watson J. Parrott DATE 06/14/2016 06/14/2016 06/15/2016 06/14/2016 06/16/2016 06/16/2016}} | |||
Latest revision as of 22:15, 9 January 2025
| ML16165A466 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 06/16/2016 |
| From: | Jack Parrott Division of Decommissioning, Uranium Recovery and Waste Programs |
| To: | Mike Perito Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee |
| Parrott J | |
| Shared Package | |
| ML16165A465 | List: |
| References | |
| CAC L53120 | |
| Download: ML16165A466 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 16, 2016 Mr. Michael Perito Vice President, Oversight Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213
SUBJECT:
ENTERGY VERMONT YANKEE QUALITY ASSURANCE PROGRAM MANUAL VERMONT YANKEE NUCLEAR POWER STATION AND INDEPENDENT SPENT FUEL STORAGE FACILITY - REVIEW AND ACCEPTANCE OF CHANGES (CAC NO. L53120)
Dear Mr. Perito:
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the proposed changes to the Entergy Nuclear Operations, Inc. (ENO) Vermont Yankee Nuclear Power Station (VYNPS) Quality Assurance Program Manual (QAPM) in response to your letter dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16035A506), as supplemented by letter dated May 5, 2016.
The VY QAPM is associated with license DPR-28 for the VYNPS and docket no.72-059 for the Independent Spent Fuel Storage Installation.
The proposed QAPM reflects changes and simplifications based on the VYNPS decommissioning status. Changes include those to the scope of structures, systems and components, due to the decommissioning status; removing the need for maintaining NRC Licensed Operators as part of the site organization; the qualification of Certified Fuel Handlers; transitioning the onsite-review function to an independent review function; and, modifying the function of the off-site safety review to reflect the complexity of operations for a decommissioning facility. The changes, some of which are considered to be reductions in commitments, were submitted for NRC review and approval in accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) paragraph 50.54(a)(4).
The NRC staff has completed its review of your request and has determined that the Quality Assurance Program, as described in the VYNPS QAPM, is in conformance with the applicable portions of Appendix B to 10 CFR Part 50. The NRC staff concludes that the proposed Vermont Yankee QAPM Revision 4 follows the NRC guidance in the attached NRC safety evaluation, conforms to the format of NUREG-0800, Section 17.3, complies with Appendix B to 10 CFR Part 50 requirements for the QA program and is, therefore, acceptable.
M. Perito 2
If you have any questions, please contact me at (301) 415-6634 or via e-mail at Jack.Parrott@nrc.gov.
Sincerely,
/RA/
Jack D. Parrott, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos. 50-271 and 72-059
Enclosure:
Safety Evaluation cc: Distribution via Listserv
- via e-mail OFFICE NMSS NMSS NMSS*
NRO*
NMSS NMSS NAME J. Parrott C. Holston P. Silva K. Kavanagh B. Watson J. Parrott DATE 06/14/2016 06/14/2016 06/15/2016 06/14/2016 06/16/2016 06/16/2016