{{#Wiki_filter: | {{#Wiki_filter:August 31, 2016 | ||
==SUBJECT:== | |||
MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION, | |||
UNITS 2 AND 3 (REPORT 05000336/2016005 AND 05000423/2016005) | |||
==Dear Mr. Heacock:== | ==Dear Mr. Heacock:== | ||
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Millstone Power Station (Millstone), Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the | On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Millstone Power Station (Millstone), Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | ||
The NRC determined that overall, Millstone Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Millstone Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the | The NRC determined that overall, Millstone Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Millstone Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. | |||
As discussed in the End-of-Cycle letter dated March 2, 2016, the NRC will be following up on the following traditional enforcement actions to Millstone: EA-14-126, a Severity Level III Notice of Violation for impeding the regulatory process issued February 10, 2015; EA-13-188, an Alternative Dispute Resolution Confirmatory Order issued August 26, 2015; and a Severity Level IV violation for impeding the regulatory process issued on June 12, 2015. In accordance with Inspection Manual Chapter 0305, Sections 13.02.a and 13.02.b, the NRC will follow-up on these violations through Inspection Procedure 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders. | |||
The NRC staff received the Millstone Final Compliance letter for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the Millstone Safety Evaluation on July 1, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16099A171) and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. | |||
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession No. ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at 610-337-5233 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Glenn T. Dentel, Chief Reactor Projects Branch 2 Division of Reactor Projects | |||
Docket Nos. | |||
50-336 and 50-423 License Nos. DPR-65 and NPF-49 | |||
Enclosure: | |||
Millstone Inspection/Activity Plan | Millstone Inspection/Activity Plan | ||
cc w/encl: Distribution via ListServ | cc w/encl: Distribution via ListServ | ||
ML16239A167 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JAmbrosini via email KWarner GDentel DATE 8/23/16 8/23/16 8/24 | ML16239A167 | ||
/16 Letter to Mr. David Heacock from Glenn T. Dentel dated August 31, 2016 | |||
SUNSI Review | |||
Non-Sensitive Sensitive | |||
Publicly Available | |||
Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP | |||
NAME JAmbrosini via email KWarner GDentel | |||
DATE 8/23/16 8/23/16 8/24/16 | |||
Letter to Mr. David Heacock from Glenn T. Dentel dated August 31, 2016 | |||
SUBJECT: | |||
MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION, | |||
UNITS 2 AND 3 (REPORT 05000336/2016005 AND 05000423/2016005) | |||
Distribution w/encl: (via email) | |||
DDorman, RA | |||
DLew, DRA | |||
MScott, DRP | |||
DPelton, DRP | |||
RLorson, DRS | |||
PKrohn, DRS | |||
GDentel, DRP JSchussler, DRP KWarner, DRP JAmbrosini, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI ARancourt, DRP, AA JBowen, RI OEDO | |||
RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPReports Resource DRS Branch Chiefs (6) | |||
NMcNamara, SLO DTifft, SLO DScrenci, PAO NSheehan, PAO ROPAssessment Resource RidsNrrDirslpab Resource | |||
Page 1 of 3 08/29/2016 12:43:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Millstone Inspection / Activity Plan 07/01/2016 - 06/30/2018 EXM8/8 | |||
- MILLSTONE 2 INITIAL EXAMINATION | |||
2 FY16-MS2 INITIAL OPERATOR LICENSING EXAM U01927 08/08/2016 08/12/2016 | |||
FY16-MS2 INITIAL OPERATOR LICENSING EXAM U01927 09/05/2016 09/09/2016 71152BI | |||
- PI&R BIENNIAL | |||
2, 3 IP Problem Identification and Resolution 71152B 06/27/2016 07/01/2016 EP | |||
- EP EXERCISE EVALUATION | |||
2, 3 IP Exercise Evaluation 7111401 08/15/2016 08/19/2016 TRI FI | |||
- TRIENNIAL FIRE PROTECTION | |||
2, 3 IP Fire Protection [Triennial] | |||
7111105T 07/25/2016 07/29/2016 2, 3 IP Fire Protection [Triennial] | |||
7111105T 08/08/2016 08/12/2016 BI | |||
- RADIOLOGICAL SAFETY - EXT EXPOSURE | |||
2, 3 IP Occupational Dose Assessment 71124.04 08/01/2016 08/05/2016 7111107T | |||
- TRIENNIAL HEAT SINK | |||
2, 3 IP Heat Sink Performance 7111107T 09/12/2016 09/16/2016 7111111B | |||
- MS2 REQUAL INSP WITH P/F RESULTS | |||
2 IP Licensed Operator Requalification Program 7111111B 10/31/2016 11/04/2016 TI-191 | |||
- FUKUSHIMA LESSONS-LEARNED | |||
2, 3 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 10/24/2016 10/28/2016 7111117T | |||
- PERMANENT PLANT MODIFICATIONS | |||
2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 10/31/2016 11/04/2016 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 11/14/2016 11/18/2016 92702 | |||
- CONFIRMATORY ORDER INSPECTION (U2 50.59) | |||
2 IP Followup On Corrective Actions For Violations And Deviations 92702 10/31/2016 11/18/2016 92702 | |||
- SL III FOLLOWUP INSPECTION (SLOD) | |||
2, 3 IP Followup On Corrective Actions For Violations And Deviations 92702 10/31/2016 11/18/2016 BI | |||
- RADIOLOGICAL SAFETY - RAD HAZ & PIV | |||
2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/14/2016 11/18/2016 2, 3 IP Occupational Exposure Control Effectiveness 71151-OR01 11/14/2016 11/18/2016 2, 3 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/14/2016 11/18/2016 71124 | |||
- RADIOLOGICAL SAFETY - ALARA | |||
2, 3 IP Occupational ALARA Planning and Controls 71124.02 01/23/2017 01/27/2017 71124.08 | |||
- RADWASTE | |||
2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/06/2017 02/10/2017 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure | |||
Page 2 of 3 08/29/2016 12:43:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Millstone Inspection / Activity Plan 07/01/2016 - 06/30/2018 71124 | |||
- RADIATION SAFETY - RAD HAZ PIV | |||
2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/10/2017 04/14/2017 2, 3 IP Occupational Exposure Control Effectiveness 71151-OR01 04/10/2017 04/14/2017 2, 3 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 04/10/2017 04/14/2017 7111108P | |||
- U2 INSERVICE INSPECTION | |||
2 IP Inservice Inspection Activities - PWR 7111108P 04/17/2017 04/28/2017 7111111B | |||
- MS3 REQUAL INSP WITH P/F RESULTS | |||
3 IP Licensed Operator Requalification Program 7111111B 08/14/2017 08/18/2017 12/3EXM | |||
- MILLSTONE 3 INITIAL EXAM | |||
3 FY18-MS3 INITIAL OPERATOR LICENSING EXAM U01946 11/06/2017 11/10/2017 | |||
FY18-MS3 INITIAL OPERATOR LICENSING EXAM U01946 12/04/2017 12/08/2017 71124 | |||
- RADIATION SAFETY - TEAM INST RETS REMP | |||
2, 3 IP Radiation Monitoring Instrumentation 71124.05 07/10/2017 07/14/2017 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/10/2017 07/14/2017 2, 3 IP Radiological Environmental Monitoring Program 71124.07 07/10/2017 07/14/2017 EP | |||
- EP PROGRAM INSPECTION | |||
2, 3 IP Alert and Notification System Testing 7111402 08/07/2017 08/11/2017 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/07/2017 08/11/2017 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/07/2017 08/11/2017 2, 3 IP Performance Indicator Verification 71151 08/07/2017 08/11/2017 7111108P | |||
- U3 INSERVICE INSPECTION | |||
3 IP Inservice Inspection Activities - PWR 7111108P 10/16/2017 10/27/2017 HP | |||
- ALARA | |||
2 IP Occupational ALARA Planning and Controls 71124.02 01/29/2018 02/03/2018 EP | |||
- EXERCISE INSPECTION | |||
2, 3 IP Exercise Evaluation 7111401 03/19/2018 03/23/2018 HP | |||
- RAD HAZARD | |||
2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2018 03/16/2018 7111121 | |||
- CDBI | |||
2, 3 IP Component Design Bases Inspection 7111121 04/23/2018 04/27/2018 2, 3 IP Component Design Bases Inspection 7111121 05/07/2018 05/11/2018 2, 3 IP Component Design Bases Inspection 7111121 05/21/2018 05/25/2018 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 3 of 3 08/29/2016 12:43:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Millstone Inspection / Activity Plan 07/01/2016 - 06/30/2018 ISFSI | |||
- ISFSI LOADING CAMPAIGN INSPECTION | |||
2, 3 IP Operation Of An ISFSI 60855 05/28/2018 06/01/2018 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/28/2018 06/01/2018 HP | |||
1 | - RAD AIRBORNE | ||
2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/04/2018 06/08/2018 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Latest revision as of 20:46, 9 January 2025
| ML16239A167 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/31/2016 |
| From: | Glenn Dentel Reactor Projects Branch 2 |
| To: | Heacock D Dominion Resources |
| Dentel G | |
| References | |
| IR 2016005 | |
| Download: ML16239A167 (7) | |
Text
August 31, 2016
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION,
UNITS 2 AND 3 (REPORT 05000336/2016005 AND 05000423/2016005)
Dear Mr. Heacock:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Millstone Power Station (Millstone), Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Millstone Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Millstone Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
As discussed in the End-of-Cycle letter dated March 2, 2016, the NRC will be following up on the following traditional enforcement actions to Millstone: EA-14-126, a Severity Level III Notice of Violation for impeding the regulatory process issued February 10, 2015; EA-13-188, an Alternative Dispute Resolution Confirmatory Order issued August 26, 2015; and a Severity Level IV violation for impeding the regulatory process issued on June 12, 2015. In accordance with Inspection Manual Chapter 0305, Sections 13.02.a and 13.02.b, the NRC will follow-up on these violations through Inspection Procedure 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders.
The NRC staff received the Millstone Final Compliance letter for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the Millstone Safety Evaluation on July 1, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16099A171) and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession No. ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5233 with any questions you have regarding this letter.
Sincerely,
/RA/
Glenn T. Dentel, Chief Reactor Projects Branch 2 Division of Reactor Projects
Docket Nos.
50-336 and 50-423 License Nos. DPR-65 and NPF-49
Enclosure:
Millstone Inspection/Activity Plan
cc w/encl: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP
NAME JAmbrosini via email KWarner GDentel
DATE 8/23/16 8/23/16 8/24/16
Letter to Mr. David Heacock from Glenn T. Dentel dated August 31, 2016
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION,
UNITS 2 AND 3 (REPORT 05000336/2016005 AND 05000423/2016005)
Distribution w/encl: (via email)
DDorman, RA
DLew, DRA
MScott, DRP
DPelton, DRP
RLorson, DRS
PKrohn, DRS
GDentel, DRP JSchussler, DRP KWarner, DRP JAmbrosini, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI ARancourt, DRP, AA JBowen, RI OEDO
RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPReports Resource DRS Branch Chiefs (6)
NMcNamara, SLO DTifft, SLO DScrenci, PAO NSheehan, PAO ROPAssessment Resource RidsNrrDirslpab Resource
Page 1 of 3 08/29/2016 12:43:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Millstone Inspection / Activity Plan 07/01/2016 - 06/30/2018 EXM8/8
- MILLSTONE 2 INITIAL EXAMINATION
2 FY16-MS2 INITIAL OPERATOR LICENSING EXAM U01927 08/08/2016 08/12/2016
FY16-MS2 INITIAL OPERATOR LICENSING EXAM U01927 09/05/2016 09/09/2016 71152BI
- PI&R BIENNIAL
2, 3 IP Problem Identification and Resolution 71152B 06/27/2016 07/01/2016 EP
- EP EXERCISE EVALUATION
2, 3 IP Exercise Evaluation 7111401 08/15/2016 08/19/2016 TRI FI
- TRIENNIAL FIRE PROTECTION
2, 3 IP Fire Protection [Triennial]
7111105T 07/25/2016 07/29/2016 2, 3 IP Fire Protection [Triennial]
7111105T 08/08/2016 08/12/2016 BI
- RADIOLOGICAL SAFETY - EXT EXPOSURE
2, 3 IP Occupational Dose Assessment 71124.04 08/01/2016 08/05/2016 7111107T
- TRIENNIAL HEAT SINK
2, 3 IP Heat Sink Performance 7111107T 09/12/2016 09/16/2016 7111111B
- MS2 REQUAL INSP WITH P/F RESULTS
2 IP Licensed Operator Requalification Program 7111111B 10/31/2016 11/04/2016 TI-191
- FUKUSHIMA LESSONS-LEARNED
2, 3 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 10/24/2016 10/28/2016 7111117T
- PERMANENT PLANT MODIFICATIONS
2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 10/31/2016 11/04/2016 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 11/14/2016 11/18/2016 92702
- CONFIRMATORY ORDER INSPECTION (U2 50.59)
2 IP Followup On Corrective Actions For Violations And Deviations 92702 10/31/2016 11/18/2016 92702
- SL III FOLLOWUP INSPECTION (SLOD)
2, 3 IP Followup On Corrective Actions For Violations And Deviations 92702 10/31/2016 11/18/2016 BI
- RADIOLOGICAL SAFETY - RAD HAZ & PIV
2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/14/2016 11/18/2016 2, 3 IP Occupational Exposure Control Effectiveness 71151-OR01 11/14/2016 11/18/2016 2, 3 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/14/2016 11/18/2016 71124
- RADIOLOGICAL SAFETY - ALARA
2, 3 IP Occupational ALARA Planning and Controls 71124.02 01/23/2017 01/27/2017 71124.08
- RADWASTE
2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/06/2017 02/10/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 3 08/29/2016 12:43:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Millstone Inspection / Activity Plan 07/01/2016 - 06/30/2018 71124
- RADIATION SAFETY - RAD HAZ PIV
2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/10/2017 04/14/2017 2, 3 IP Occupational Exposure Control Effectiveness 71151-OR01 04/10/2017 04/14/2017 2, 3 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 04/10/2017 04/14/2017 7111108P
- U2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 04/17/2017 04/28/2017 7111111B
- MS3 REQUAL INSP WITH P/F RESULTS
3 IP Licensed Operator Requalification Program 7111111B 08/14/2017 08/18/2017 12/3EXM
- MILLSTONE 3 INITIAL EXAM
3 FY18-MS3 INITIAL OPERATOR LICENSING EXAM U01946 11/06/2017 11/10/2017
FY18-MS3 INITIAL OPERATOR LICENSING EXAM U01946 12/04/2017 12/08/2017 71124
- RADIATION SAFETY - TEAM INST RETS REMP
2, 3 IP Radiation Monitoring Instrumentation 71124.05 07/10/2017 07/14/2017 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/10/2017 07/14/2017 2, 3 IP Radiological Environmental Monitoring Program 71124.07 07/10/2017 07/14/2017 EP
- EP PROGRAM INSPECTION
2, 3 IP Alert and Notification System Testing 7111402 08/07/2017 08/11/2017 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/07/2017 08/11/2017 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/07/2017 08/11/2017 2, 3 IP Performance Indicator Verification 71151 08/07/2017 08/11/2017 7111108P
- U3 INSERVICE INSPECTION
3 IP Inservice Inspection Activities - PWR 7111108P 10/16/2017 10/27/2017 HP
- ALARA
2 IP Occupational ALARA Planning and Controls 71124.02 01/29/2018 02/03/2018 EP
- EXERCISE INSPECTION
2, 3 IP Exercise Evaluation 7111401 03/19/2018 03/23/2018 HP
- RAD HAZARD
2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2018 03/16/2018 7111121
- CDBI
2, 3 IP Component Design Bases Inspection 7111121 04/23/2018 04/27/2018 2, 3 IP Component Design Bases Inspection 7111121 05/07/2018 05/11/2018 2, 3 IP Component Design Bases Inspection 7111121 05/21/2018 05/25/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 08/29/2016 12:43:16 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Millstone Inspection / Activity Plan 07/01/2016 - 06/30/2018 ISFSI
- ISFSI LOADING CAMPAIGN INSPECTION
2, 3 IP Operation Of An ISFSI 60855 05/28/2018 06/01/2018 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/28/2018 06/01/2018 HP
- RAD AIRBORNE
2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/04/2018 06/08/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.