IR 05000272/2016005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 08/31/2016 | | issue date = 08/31/2016 | ||
| title = Mid-Cycle Assessment Letter for Salem Nuclear Generating Station - Unit Nos. 1 and 2 (Report 05000272/2016005 and 05000311/2016005) | | title = Mid-Cycle Assessment Letter for Salem Nuclear Generating Station - Unit Nos. 1 and 2 (Report 05000272/2016005 and 05000311/2016005) | ||
| author name = Scott M | | author name = Scott M | ||
| author affiliation = NRC/RGN-I/DRP/PB3 | | author affiliation = NRC/RGN-I/DRP/PB3 | ||
| addressee name = Sena | | addressee name = Sena P | ||
| addressee affiliation = PSEG Nuclear, LLC | | addressee affiliation = PSEG Nuclear, LLC | ||
| docket = 05000272, 05000311 | | docket = 05000272, 05000311 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 31, 2016 | ||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272/2016005 AND | ==SUBJECT:== | ||
MID-CYCLE ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272/2016005 AND 05000311/2016005) | |||
05000311/2016005) | |||
==Dear Mr. Sena:== | ==Dear Mr. Sena:== | ||
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the | On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | ||
The NRC determined that overall, Salem Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem Unit 1 during the most recent quarter was within the Licensee Response Column of the | The NRC determined that overall, Salem Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections for Salem Unit 1. | ||
The NRC determined that overall, Salem Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem Unit 2 during the most recent quarter was within the Regulatory Response Column of the | The NRC determined that overall, Salem Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem Unit 2 during the most recent quarter was within the Regulatory Response Column of the NRCs ROP Action Matrix due to a White PI for Unplanned Scrams per 7,000 Hours Critical. | ||
This PI changed to White in the second quarter of 2016 due to a reactor trip on June 28, 2016, preceded by three other unplanned reactor trips (August 5, 2015, February 4, 2016, and February 14, 2016) within the assessment period. | This PI changed to White in the second quarter of 2016 due to a reactor trip on June 28, 2016, preceded by three other unplanned reactor trips (August 5, 2015, February 4, 2016, and February 14, 2016) within the assessment period. | ||
Therefore, in addition to ROP baseline | Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection at Unit 2 in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, upon notification of your readiness. The inspection will be focused on ensuring that root causes and contributing causes of the unplanned scrams are understood, the extent of condition and causes are identified, and the corrective actions implemented are sufficient to prevent recurrence. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. | ||
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | ||
In response to the accident at Fukushima, the Commission issued Order EA-12-049, | In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the Salem site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections, the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. | ||
Basis External Events, | |||
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession No. ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters. | |||
In | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter. | ||
Sincerely, | |||
/RA/ | |||
Michael L. Scott, Director Division of Reactor Projects | |||
Docket Nos. 50-272 and 50-311 License Nos. DPR 70 and DPR 75 | Docket Nos. 50-272 and 50-311 License Nos. DPR 70 and DPR 75 | ||
Enclosure: Salem Inspection/Activity Plan | |||
Salem Inspection/Activity Plan | |||
Cc w/encl: Distribution via ListServ | Cc w/encl: Distribution via ListServ | ||
ML16242A099 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE R1/DRP R1/DRP R1/DRP R1/DRP R1/DRP NAME RVadella/RB for MDraxton PFinney FBower MScott DATE 08/22/16 08/18/16 08/22/16 08/28/16 08/31/16 | ML16242A099 | ||
SUNSI Review | |||
Non-Sensitive Sensitive | |||
Publicly Available | |||
Non-Publicly Available OFFICE R1/DRP R1/DRP R1/DRP R1/DRP R1/DRP NAME RVadella/RB for MDraxton PFinney FBower MScott DATE 08/22/16 08/18/16 08/22/16 08/28/16 08/31/16 | |||
Page 1 of 3 08/12/2016 09:10:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 07/01/2016 - 06/30/2018 7111117T | |||
- MODS INSPECTION | |||
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 07/18/2016 07/22/2016 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 08/01/2016 08/05/2016 ISFSI | |||
- ISFSI FOLLOWUP INSPECTION | |||
1, 2 IP Operation Of An ISFSI 60855 07/26/2016 07/26/2016 71124 | |||
- RADIATION PROTECTION | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/25/2016 07/29/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 07/25/2016 07/29/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/25/2016 07/29/2016 1, 2 IP Occupational Dose Assessment 71124.04 07/25/2016 07/29/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 07/25/2016 07/29/2016 EXM12/12 | |||
- SALEM INITIAL OL EXAMINATION | |||
1 FY17-SALEM INITIAL OPERATOR LICENSING EXAM U01930 11/14/2016 11/18/2016 | |||
FY17-SALEM INITIAL OPERATOR LICENSING EXAM U01930 12/12/2016 12/23/2016 71124 | |||
- RADIATION PROTECTION | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/22/2016 08/26/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/22/2016 08/26/2016 1, 2 IP Occupational Dose Assessment 71124.04 08/22/2016 08/26/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 08/22/2016 08/26/2016 711107T | |||
- TRIENNIAL HEAT SINK | |||
1, 2 IP Heat Sink Performance 7111107T 11/14/2016 11/18/2016 71124 | |||
- RADIATION PROTECTION | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/12/2016 12/16/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/12/2016 12/16/2016 1, 2 IP Occupational Dose Assessment 71124.04 12/12/2016 12/16/2016 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/12/2016 12/16/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/12/2016 12/16/2016 71124 | |||
- RADIATION PROTECTION | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/03/2017 04/07/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/03/2017 04/07/2017 | |||
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/03/2017 04/07/2017 | |||
IP Occupational Dose Assessment 71124.04 04/03/2017 04/07/2017 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/03/2017 04/07/2017 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 3 08/12/2016 09:10:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 07/01/2016 - 06/30/2018 EP | |||
- EP PROGRAM INSPECTION | |||
1, 2 IP Alert and Notification System Testing 7111402 05/15/2017 05/19/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/15/2017 05/19/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/15/2017 05/19/2017 1, 2 IP Performance Indicator Verification 71151 05/15/2017 05/19/2017 7111108P | |||
- U2 INSERVICE INSPECTION | |||
2 IP Inservice Inspection Activities - PWR 7111108P 04/24/2017 05/05/2017 71124 | |||
- RADIATION PROTECTION | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/01/2017 05/05/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/01/2017 05/05/2017 | |||
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/01/2017 05/05/2017 1, 2 IP Occupational Dose Assessment 71124.04 05/01/2017 05/05/2017 1, 2 IP Radiation Monitoring Instrumentation 71124.05 05/01/2017 05/05/2017 71152B | |||
- PI&R BIENNIAL | |||
1, 2 IP Problem Identification and Resolution 71152B 05/22/2017 05/26/2017 1, 2 IP Problem Identification and Resolution 71152B 06/05/2017 06/09/2017 71124 | |||
- RADIOACTIVE EFFLUENTS | |||
1, 2 IP Radiation Monitoring Instrumentation 71124.05 06/12/2017 06/16/2017 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/12/2017 06/16/2017 CDBI | |||
- COMPONENT DESIGN BASIS INSPECTION | |||
1, 2 IP Component Design Bases Inspection 7111121 06/12/2017 06/16/2017 1, 2 IP Component Design Bases Inspection 7111121 06/26/2017 06/30/2017 1, 2 IP Component Design Bases Inspection 7111121 07/10/2017 07/14/2017 7111111B | |||
- SALEM REQUAL INSP WITH P/F RESULTS | |||
1, 2 IP Licensed Operator Requalification Program 7111111B 09/12/2017 09/16/2017 1/22EXM | |||
- SALEM INITIAL EXAM | |||
1 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 12/11/2017 12/15/2018 | |||
FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 01/22/2018 02/02/2018 71124 | |||
- RADIATION PROTECTION | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/21/2017 08/25/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 08/21/2017 08/25/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/21/2017 08/25/2017 1, 2 IP Occupational Dose Assessment 71124.04 08/21/2017 08/25/2017 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 3 of 3 08/12/2016 09:10:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 07/01/2016 - 06/30/2018 71124 | |||
- RADIATION PROTECTION | |||
1, 2 IP Radiation Monitoring Instrumentation 71124.05 08/21/2017 08/25/2017 71124.08 | |||
- RADWASTE | |||
1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/16/2017 10/20/2017 7111108P | |||
- U1 INSERVICE INSPECTION | |||
1 IP Inservice Inspection Activities - PWR 7111108P 10/23/2017 11/03/2017 71124 | |||
- RADIATION PROTECTION | |||
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/23/2017 10/27/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/23/2017 10/27/2017 | |||
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/23/2017 10/27/2017 1, 2 IP Occupational Dose Assessment 71124.04 10/23/2017 10/27/2017 | |||
IP Radiation Monitoring Instrumentation 71124.05 10/23/2017 10/27/2017 71124 | |||
- RADIATION PROTECTION AND PI | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/04/2017 12/08/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/04/2017 12/08/2017 1, 2 IP Occupational Dose Assessment 71124.04 12/04/2017 12/08/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/04/2017 12/08/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/04/2017 12/08/2017 7111105T | |||
- TRIENNIAL FIRE PROTECTION | |||
1, 2 IP Fire Protection [Triennial] | |||
7111105T 02/12/2018 02/16/2018 1, 2 IP Fire Protection [Triennial] | |||
7111105T 02/26/2018 03/02/2018 EP | |||
- EP EXERCISE INSPECTION | |||
1, 2 IP Exercise Evaluation 7111401 05/21/2018 05/25/2018 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Latest revision as of 20:44, 9 January 2025
| ML16242A099 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/31/2016 |
| From: | Michael Scott Reactor Projects Branch 3 |
| To: | Sena P Public Service Enterprise Group |
| References | |
| IR 2016005 | |
| Download: ML16242A099 (7) | |
Text
August 31, 2016
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272/2016005 AND 05000311/2016005)
Dear Mr. Sena:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Salem Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections for Salem Unit 1.
The NRC determined that overall, Salem Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem Unit 2 during the most recent quarter was within the Regulatory Response Column of the NRCs ROP Action Matrix due to a White PI for Unplanned Scrams per 7,000 Hours Critical.
This PI changed to White in the second quarter of 2016 due to a reactor trip on June 28, 2016, preceded by three other unplanned reactor trips (August 5, 2015, February 4, 2016, and February 14, 2016) within the assessment period.
Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection at Unit 2 in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, upon notification of your readiness. The inspection will be focused on ensuring that root causes and contributing causes of the unplanned scrams are understood, the extent of condition and causes are identified, and the corrective actions implemented are sufficient to prevent recurrence. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the Salem site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections, the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession No. ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Michael L. Scott, Director Division of Reactor Projects
Docket Nos. 50-272 and 50-311 License Nos. DPR 70 and DPR 75
Enclosure: Salem Inspection/Activity Plan
Cc w/encl: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE R1/DRP R1/DRP R1/DRP R1/DRP R1/DRP NAME RVadella/RB for MDraxton PFinney FBower MScott DATE 08/22/16 08/18/16 08/22/16 08/28/16 08/31/16
Page 1 of 3 08/12/2016 09:10:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 07/01/2016 - 06/30/2018 7111117T
- MODS INSPECTION
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 07/18/2016 07/22/2016 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 08/01/2016 08/05/2016 ISFSI
- ISFSI FOLLOWUP INSPECTION
1, 2 IP Operation Of An ISFSI 60855 07/26/2016 07/26/2016 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/25/2016 07/29/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 07/25/2016 07/29/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/25/2016 07/29/2016 1, 2 IP Occupational Dose Assessment 71124.04 07/25/2016 07/29/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 07/25/2016 07/29/2016 EXM12/12
- SALEM INITIAL OL EXAMINATION
1 FY17-SALEM INITIAL OPERATOR LICENSING EXAM U01930 11/14/2016 11/18/2016
FY17-SALEM INITIAL OPERATOR LICENSING EXAM U01930 12/12/2016 12/23/2016 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/22/2016 08/26/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/22/2016 08/26/2016 1, 2 IP Occupational Dose Assessment 71124.04 08/22/2016 08/26/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 08/22/2016 08/26/2016 711107T
- TRIENNIAL HEAT SINK
1, 2 IP Heat Sink Performance 7111107T 11/14/2016 11/18/2016 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/12/2016 12/16/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/12/2016 12/16/2016 1, 2 IP Occupational Dose Assessment 71124.04 12/12/2016 12/16/2016 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/12/2016 12/16/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/12/2016 12/16/2016 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/03/2017 04/07/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/03/2017 04/07/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/03/2017 04/07/2017
IP Occupational Dose Assessment 71124.04 04/03/2017 04/07/2017 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/03/2017 04/07/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 3 08/12/2016 09:10:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 07/01/2016 - 06/30/2018 EP
- EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 05/15/2017 05/19/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/15/2017 05/19/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/15/2017 05/19/2017 1, 2 IP Performance Indicator Verification 71151 05/15/2017 05/19/2017 7111108P
- U2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 04/24/2017 05/05/2017 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/01/2017 05/05/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/01/2017 05/05/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/01/2017 05/05/2017 1, 2 IP Occupational Dose Assessment 71124.04 05/01/2017 05/05/2017 1, 2 IP Radiation Monitoring Instrumentation 71124.05 05/01/2017 05/05/2017 71152B
- PI&R BIENNIAL
1, 2 IP Problem Identification and Resolution 71152B 05/22/2017 05/26/2017 1, 2 IP Problem Identification and Resolution 71152B 06/05/2017 06/09/2017 71124
- RADIOACTIVE EFFLUENTS
1, 2 IP Radiation Monitoring Instrumentation 71124.05 06/12/2017 06/16/2017 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/12/2017 06/16/2017 CDBI
- COMPONENT DESIGN BASIS INSPECTION
1, 2 IP Component Design Bases Inspection 7111121 06/12/2017 06/16/2017 1, 2 IP Component Design Bases Inspection 7111121 06/26/2017 06/30/2017 1, 2 IP Component Design Bases Inspection 7111121 07/10/2017 07/14/2017 7111111B
- SALEM REQUAL INSP WITH P/F RESULTS
1, 2 IP Licensed Operator Requalification Program 7111111B 09/12/2017 09/16/2017 1/22EXM
- SALEM INITIAL EXAM
1 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 12/11/2017 12/15/2018
FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 01/22/2018 02/02/2018 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/21/2017 08/25/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 08/21/2017 08/25/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/21/2017 08/25/2017 1, 2 IP Occupational Dose Assessment 71124.04 08/21/2017 08/25/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 08/12/2016 09:10:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 07/01/2016 - 06/30/2018 71124
- RADIATION PROTECTION
1, 2 IP Radiation Monitoring Instrumentation 71124.05 08/21/2017 08/25/2017 71124.08
- RADWASTE
1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/16/2017 10/20/2017 7111108P
- U1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 10/23/2017 11/03/2017 71124
- RADIATION PROTECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/23/2017 10/27/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/23/2017 10/27/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/23/2017 10/27/2017 1, 2 IP Occupational Dose Assessment 71124.04 10/23/2017 10/27/2017
IP Radiation Monitoring Instrumentation 71124.05 10/23/2017 10/27/2017 71124
- RADIATION PROTECTION AND PI
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/04/2017 12/08/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/04/2017 12/08/2017 1, 2 IP Occupational Dose Assessment 71124.04 12/04/2017 12/08/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/04/2017 12/08/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/04/2017 12/08/2017 7111105T
- TRIENNIAL FIRE PROTECTION
1, 2 IP Fire Protection [Triennial]
7111105T 02/12/2018 02/16/2018 1, 2 IP Fire Protection [Triennial]
7111105T 02/26/2018 03/02/2018 EP
- EP EXERCISE INSPECTION
1, 2 IP Exercise Evaluation 7111401 05/21/2018 05/25/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.