| number = ML16244A127
| number = ML16244A127
| issue date = 08/31/2016
| issue date = 08/31/2016
| title = Mid-Cycle Assessment Letter for Catawba Nuclear Station Units 1 and 2 (Nrc Inspection Report 05000413/2016005 and 05000414/2016005)
| title = Mid-Cycle Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2016005 and 05000414/2016005)
| author name = Ehrhardt F J
| author name = Ehrhardt F
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
| addressee name = Henderson K
| addressee name = Henderson K
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:August 31, 2016
[[Issue date::August 31, 2016]]


Mr. Kelvin Henderson Site Vice President Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2016005 AND 05000414/2016005)


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2016005 AND 05000414/2016005)
==Dear Mr. Henderson:==
On August 9, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Catawba Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Catawba Nuclear Station, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Catawba Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
 
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence.
 
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
 
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 404-997-4611 with any questions you have regarding this letter.
 
Sincerely,
/RA/
 
Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects
 
Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52
 
Enclosure: Catawba Inspection/Activity Plan
 
(09/01/2016 - 06/30/2018)
 
cc distribution via ListServ
 
_________________________
 
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP
 
SIGNATURE MMT2 JGW1 FJE
 
NAME M. Toth J. Worosilo F. Ehrhardt
 
DATE 8/25/2016 8/25/2016 8/25/2016 8/ /2016 8/ /2016 8/ /2016 8/ /2016 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Kelvin Henderson from Frank Ehrhardt dated August 31, 2016
 
SUBJECT: MID-CYLCE ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2016005 AND 05000414/2016005)  
 
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
 
Page 1 of 2 08/31/2016 06:54:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba Inspection / Activity Plan 09/01/2016 - 06/30/2018 RP
- RP OCCUPATIONAL INSPECTION WEEK 1
 
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/12/2016 09/16/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/12/2016 09/16/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/12/2016 09/16/2016 1, 2 IP Occupational Dose Assessment 71124.04 09/12/2016 09/16/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/12/2016 09/16/2016 1, 2 IP Performance Indicator Verification 71151 09/12/2016 09/16/2016 ISI
- UNIT 2 IN-SERVICE INSPECTION
 
2 IP Inservice Inspection Activities - PWR 7111108P 09/19/2016 09/23/2016 SGISI
- UNIT 2 SG IN-SERVICE INSPECTION
 
2 IP Inservice Inspection Activities - PWR 7111108P 09/26/2016 09/30/2016 RP
- RP OCCUPATIONAL INSPECTION WEEK 2
 
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/26/2016 09/30/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/26/2016 09/30/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/26/2016 09/30/2016 1, 2 IP Occupational Dose Assessment 71124.04 09/26/2016 09/30/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/26/2016 09/30/2016 1, 2 IP Performance Indicator Verification 71151 09/26/2016 09/30/2016 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
 
1, 2 IP Problem Identification and Resolution 71152B 10/24/2016 10/28/2016 1, 2 IP Problem Identification and Resolution 71152B 11/07/2016 11/11/2016 MODS
- PLANT MODIFICATIONS INSPECTION
 
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 01/23/2017 01/27/2017 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 02/06/2017 02/10/2017 EP
- EP PROGRAM INSPECTION
 
1, 2 IP Alert and Notification System Testing 7111402 03/27/2017 03/31/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/27/2017 03/31/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 03/27/2017 03/31/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/27/2017 03/31/2017 1, 2 IP Performance Indicator Verification 71151 03/27/2017 03/31/2017 ISI
- UNIT 1 IN-SERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 05/08/2017 05/12/2017 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Enclosure
 
Page 2 of 2 08/31/2016 06:54:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba Inspection / Activity Plan 09/01/2016 - 06/30/2018 RP
- RAD HAZARDS ANALYSIS AND TRANSPORTATION
 
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/08/2017 05/12/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 05/08/2017 05/12/2017 OL EXAM
- INITIAL LICENSE EXAM PREP
 
1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 05/29/2017 06/02/2017 OL EXAM
- INITIAL LICENSE EXAM
 
1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 06/26/2017 07/07/2017 RP
- RP PUBLIC RAD SAFETY BASELINE


==Dear Mr. Henderson:==
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/24/2017 07/28/2017 1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/24/2017 07/28/2017 1, 2 IP Performance Indicator Verification 71151 07/24/2017 07/28/2017 TFPI
On August 9, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Catawba Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Catawba Nuclear Station, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Catawba Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."
- TRIENNIEL FIRE PROTECTION INSPECTION
 
1, 2 IP Fire Protection [Triennial]
7111105T 07/24/2017 07/28/2017 1, 2 IP Fire Protection [Triennial]
7111105T 08/07/2017 08/11/2017 ISI
- UNIT 2 IN-SERVICE INSPECTION
 
2 IP Inservice Inspection Activities - PWR 7111108P 03/26/2018 03/30/2018 SGISI
- UNIT 2 SG IN-SERVICE INSPECTION
 
2 IP Inservice Inspection Activities - PWR 7111108P 04/02/2018 04/06/2018 EP
- EP EXERCISE


In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
1, 2 IP Exercise Evaluation 7111401 06/04/2018 06/08/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/04/2018 06/08/2018 1, 2 IP Exercise Evaluation - Scenario Review 7111408 06/04/2018 06/08/2018 1, 2 IP Performance Indicator Verification 71151 06/04/2018 06/08/2018 CDBI
- COMPONENT DESIGN BASES INSPECTION


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.
1, 2 IP Component Design Bases Inspection 7111121 06/04/2018 06/08/2018 1, 2 IP Component Design Bases Inspection 7111121 06/25/2018 06/29/2018 This report does not include INPO and OUTAGE activities.


Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52
This report shows only on-site and announced inspection procedures.


===Enclosure:===
Enclosure
Catawba Inspection/Activity Plan  (09/01/2016 - 06/30/2018)
cc distribution via ListServ
}}
}}

Latest revision as of 20:38, 9 January 2025

Mid-Cycle Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2016005 and 05000414/2016005)
ML16244A127
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/2016
From: Frank Ehrhardt
Division Reactor Projects II
To: Henderson K
Duke Energy Corp
References
IR 2016005
Download: ML16244A127 (6)


Text

August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2016005 AND 05000414/2016005)

Dear Mr. Henderson:

On August 9, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Catawba Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Catawba Nuclear Station, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Catawba Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects

Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52

Enclosure: Catawba Inspection/Activity Plan

(09/01/2016 - 06/30/2018)

cc distribution via ListServ

_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP

SIGNATURE MMT2 JGW1 FJE

NAME M. Toth J. Worosilo F. Ehrhardt

DATE 8/25/2016 8/25/2016 8/25/2016 8/ /2016 8/ /2016 8/ /2016 8/ /2016 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Kelvin Henderson from Frank Ehrhardt dated August 31, 2016

SUBJECT: MID-CYLCE ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2016005 AND 05000414/2016005)

DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 08/31/2016 06:54:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba Inspection / Activity Plan 09/01/2016 - 06/30/2018 RP

- RP OCCUPATIONAL INSPECTION WEEK 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/12/2016 09/16/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/12/2016 09/16/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/12/2016 09/16/2016 1, 2 IP Occupational Dose Assessment 71124.04 09/12/2016 09/16/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/12/2016 09/16/2016 1, 2 IP Performance Indicator Verification 71151 09/12/2016 09/16/2016 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 09/19/2016 09/23/2016 SGISI

- UNIT 2 SG IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 09/26/2016 09/30/2016 RP

- RP OCCUPATIONAL INSPECTION WEEK 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/26/2016 09/30/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/26/2016 09/30/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/26/2016 09/30/2016 1, 2 IP Occupational Dose Assessment 71124.04 09/26/2016 09/30/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/26/2016 09/30/2016 1, 2 IP Performance Indicator Verification 71151 09/26/2016 09/30/2016 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 10/24/2016 10/28/2016 1, 2 IP Problem Identification and Resolution 71152B 11/07/2016 11/11/2016 MODS

- PLANT MODIFICATIONS INSPECTION

1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 01/23/2017 01/27/2017 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 02/06/2017 02/10/2017 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 03/27/2017 03/31/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/27/2017 03/31/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 03/27/2017 03/31/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/27/2017 03/31/2017 1, 2 IP Performance Indicator Verification 71151 03/27/2017 03/31/2017 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 05/08/2017 05/12/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 08/31/2016 06:54:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba Inspection / Activity Plan 09/01/2016 - 06/30/2018 RP

- RAD HAZARDS ANALYSIS AND TRANSPORTATION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/08/2017 05/12/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 05/08/2017 05/12/2017 OL EXAM

- INITIAL LICENSE EXAM PREP

1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 05/29/2017 06/02/2017 OL EXAM

- INITIAL LICENSE EXAM

1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 06/26/2017 07/07/2017 RP

- RP PUBLIC RAD SAFETY BASELINE

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/24/2017 07/28/2017 1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/24/2017 07/28/2017 1, 2 IP Performance Indicator Verification 71151 07/24/2017 07/28/2017 TFPI

- TRIENNIEL FIRE PROTECTION INSPECTION

1, 2 IP Fire Protection [Triennial]

7111105T 07/24/2017 07/28/2017 1, 2 IP Fire Protection [Triennial]

7111105T 08/07/2017 08/11/2017 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 03/26/2018 03/30/2018 SGISI

- UNIT 2 SG IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 04/02/2018 04/06/2018 EP

- EP EXERCISE

1, 2 IP Exercise Evaluation 7111401 06/04/2018 06/08/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/04/2018 06/08/2018 1, 2 IP Exercise Evaluation - Scenario Review 7111408 06/04/2018 06/08/2018 1, 2 IP Performance Indicator Verification 71151 06/04/2018 06/08/2018 CDBI

- COMPONENT DESIGN BASES INSPECTION

1, 2 IP Component Design Bases Inspection 7111121 06/04/2018 06/08/2018 1, 2 IP Component Design Bases Inspection 7111121 06/25/2018 06/29/2018 This report does not include INPO and OUTAGE activities.