IR 05000458/2016005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:ber 12, 2016
{{#Wiki_filter:September 12, 2016


==SUBJECT:==
==SUBJECT:==
Line 25: Line 25:


==Dear Mr. Maguire:==
==Dear Mr. Maguire:==
It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16242A326) was improperly marked. The inspection plan contained the markings of Official Use Only - Sensitive Internal Information/Security-Related Information, however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed.
August 31, 2016
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/
Thomas R. Hipschman, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Docket Nos.: 50-458 License Nos.: NPF-47 Enclosures:
1. River Bend Station Inspection/Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16242A326)
 
Attachment 2 - Proposed Inspection Plan      RB Page 1 of 2      River Bend 08/30/2016 09:36:05    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title on Site EXAM - INITIAL EXAM    4 1 08/15/2016 08/19/2016 X02575 INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
1 09/12/2016 09/16/2016 X02575 INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
EP-2 - EP PERFORMANCE INDICATORS    2 1 06/27/2016 07/01/2016 IP 71151-EP01 Drill/Exercise Performance 1 06/27/2016 07/01/2016 IP 71151-EP02 ERO Readiness 1 06/27/2016 07/01/2016 IP 71151-EP03 Alert & Notification System Reliability EP-3 - BIENNIAL EXERCISE INSPECTION    4 1 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation 1 06/27/2016 07/01/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes INSP - BIENNIAL REQUAL INSPECTION    2 1 08/29/2016 09/02/2016 IP 7111111B Licensed Operator Requalification Program RS 12 PI - RADIATION SAFETY    2 1 02/06/2017 02/10/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/06/2017 02/10/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 02/06/2017 02/10/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 02/06/2017 02/10/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION    1 1 02/13/2017 02/17/2017 IP 7111108G Inservice Inspection Activities - BWR TSB 52B - BIENNIAL PI&R    5 1 04/10/2017 04/14/2017 IP 71152B Problem Identification and Resolution 1 04/24/2017 04/28/2017 IP 71152B Problem Identification and Resolution EP-1 - BIENNIAL EP PROGRAM INSPECTION    1 1 05/22/2017 05/26/2017 IP 7111402 Alert and Notification System Testing 1 05/22/2017 05/26/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/22/2017 05/26/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/22/2017 05/26/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATOR VERIFICATION    1 1 05/22/2017 05/26/2017 IP 71151-EP01 Drill/Exercise Performance 1 05/22/2017 05/26/2017 IP 71151-EP02 ERO Readiness 1 05/22/2017 05/26/2017 IP 71151-EP03 Alert & Notification System Reliability EB1-21M - RBS COMPONENT DESIGN BASIS INSPECTION    6 1 06/12/2017 07/14/2017 IP 7111121M Component Design Bases Inspection (Teams)
This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures. Enclosure 1
 
Attachment 2 - Proposed Inspection Plan        RB Page 2 of 2      River Bend 08/30/2016 09:36:05    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site RS 5678 - RS TEAM        5 1 08/21/2017 08/25/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 08/21/2017 08/25/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/21/2017 08/25/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 08/21/2017 08/25/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-07T - RBS HEAT SINK PERFORMANCE      1 1 09/18/2017 09/22/2017 IP 7111107T Heat Sink Performance EXAM - INITIAL EXAM      5 1 05/21/2018 05/25/2018 X02622 INITIAL EXAM RB(6/18)
1 06/25/2018 07/03/2018 X02622 INITIAL EXAM RB(6/18)
EB2-02 - LICENSE RENEWAL INSPECTION      4 1 03/05/2018 03/09/2018 IP 71002  License Renewal Inspection 1 03/19/2018 03/23/2018 IP 71002  License Renewal Inspection EP-1 - EP EXERCISE INSPECTION      4 1 06/25/2018 06/29/2018 IP 7111401 Exercise Evaluation 1 06/25/2018 06/29/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 06/25/2018 06/29/2018 IP 71151-EP01 Drill/Exercise Performance 1 06/25/2018 06/29/2018 IP 71151-EP02 ERO Readiness 1 06/25/2018 06/29/2018 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Enclosure 1
 
UNITED STATES ust 31, 2016


==SUBJECT:==
==SUBJECT:==
Line 78: Line 54:


Sincerely,
Sincerely,
/RA/
/RA/  
Troy Pruett, Director Division of Reactor Projects Docket No. 50-458 License No. NPF-47 Enclosure:
 
Troy Pruett, Director Division of Reactor Projects  
 
Docket No.
 
50-458 License No.
 
NPF-47  
 
Enclosure:
River Bend Station Inspection/
River Bend Station Inspection/
Activity Plan
Activity Plan  
 
Page 1 of 2 08/30/2016 09:36:05 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site River Bend Inspection / Activity Plan 07/01/2016 - 06/30/2018 EXAM
- INITIAL EXAM
 
1 INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
X02575 08/15/2016 08/19/2016
 
INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
X02575 09/12/2016 09/16/2016 EP-2
- EP PERFORMANCE INDICATORS
 
1 IP Drill/Exercise Performance 71151-EP01 06/27/2016 07/01/2016
 
IP ERO Readiness 71151-EP02 06/27/2016 07/01/2016
 
IP Alert & Notification System Reliability 71151-EP03 06/27/2016 07/01/2016 EP-3
- BIENNIAL EXERCISE INSPECTION
 
1 IP Exercise Evaluation 7111401 06/27/2016 07/01/2016
 
IP Emergency Action Level and Emergency Plan Changes 7111404 06/27/2016 07/01/2016 INSP
- BIENNIAL REQUAL INSPECTION
 
1 IP Licensed Operator Requalification Program 7111111B 08/29/2016 09/02/2016 RS 12 PI
- RADIATION SAFETY
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/06/2017 02/10/2017
 
IP Occupational ALARA Planning and Controls 71124.02 02/06/2017 02/10/2017
 
IP Occupational Exposure Control Effectiveness 71151-OR01 02/06/2017 02/10/2017
 
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/06/2017 02/10/2017 71111.08
- INSERVICE INSPECTION
 
1 IP Inservice Inspection Activities - BWR 7111108G 02/13/2017 02/17/2017 TSB 52B
- BIENNIAL PI&R
 
1 IP Problem Identification and Resolution 71152B 04/10/2017 04/14/2017
 
IP Problem Identification and Resolution 71152B 04/24/2017 04/28/2017 EP-1
- BIENNIAL EP PROGRAM INSPECTION
 
1 IP Alert and Notification System Testing 7111402 05/22/2017 05/26/2017
 
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/22/2017 05/26/2017
 
IP Emergency Action Level and Emergency Plan Changes 7111404 05/22/2017 05/26/2017
 
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/22/2017 05/26/2017 EP-2
- EP PERFORMANCE INDICATOR VERIFICATION
 
1 IP Drill/Exercise Performance 71151-EP01 05/22/2017 05/26/2017


Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information RB Page 1 of 2      River Bend 08/30/2016 09:36:05    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EXAM - INITIAL EXAM      4 1 08/15/2016 08/19/2016 X02575  INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
IP ERO Readiness 71151-EP02 05/22/2017 05/26/2017
1 09/12/2016 09/16/2016 X02575  INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
EP-2 - EP PERFORMANCE INDICATORS    2 1 06/27/2016 07/01/2016 IP 71151-EP01 Drill/Exercise Performance 1 06/27/2016 07/01/2016 IP 71151-EP02 ERO Readiness 1 06/27/2016 07/01/2016 IP 71151-EP03 Alert & Notification System Reliability EP-3 - BIENNIAL EXERCISE INSPECTION    4 1 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation 1 06/27/2016 07/01/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes INSP - BIENNIAL REQUAL INSPECTION    2 1 08/29/2016 09/02/2016 IP 7111111B Licensed Operator Requalification Program RS 12 PI - RADIATION SAFETY      2 1 02/06/2017 02/10/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/06/2017 02/10/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 02/06/2017 02/10/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 02/06/2017 02/10/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION    1 1 02/13/2017 02/17/2017 IP 7111108G Inservice Inspection Activities - BWR TSB 52B - BIENNIAL PI&R      5 1 04/10/2017 04/14/2017 IP 71152B  Problem Identification and Resolution 1 04/24/2017 04/28/2017 IP 71152B  Problem Identification and Resolution EP-1 - BIENNIAL EP PROGRAM INSPECTION    1 1 05/22/2017 05/26/2017 IP 7111402 Alert and Notification System Testing 1 05/22/2017 05/26/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/22/2017 05/26/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/22/2017 05/26/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATOR VERIFICATION    1 1 05/22/2017 05/26/2017 IP 71151-EP01 Drill/Exercise Performance 1 05/22/2017 05/26/2017 IP 71151-EP02 ERO Readiness 1 05/22/2017 05/26/2017 IP 71151-EP03 Alert & Notification System Reliability EB1-21M - RBS COMPONENT DESIGN BASIS INSPECTION    6 1 06/12/2017 07/14/2017 IP 7111121M Component Design Bases Inspection (Teams)
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures. Enclosure Official Use Only - Sensitive Internal Information/Security-Related Information
IP Alert & Notification System Reliability 71151-EP03 05/22/2017 05/26/2017 EB1-21M
- RBS COMPONENT DESIGN BASIS INSPECTION


Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information  RB Page 2 of 2      River Bend 08/30/2016 09:36:05    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates          No. of Staff Number Start End Inspection Activity    Title  on Site RS 5678 - RS TEAM        5 1 08/21/2017 08/25/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 08/21/2017 08/25/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/21/2017 08/25/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 08/21/2017 08/25/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-07T - RBS HEAT SINK PERFORMANCE      1 1 09/18/2017 09/22/2017 IP 7111107T Heat Sink Performance EXAM - INITIAL EXAM      5 1 05/21/2018 05/25/2018 X02622  INITIAL EXAM RB(6/18)
1 IP Component Design Bases Inspection (Teams)
1 06/25/2018 07/03/2018 X02622  INITIAL EXAM RB(6/18)
7111121M 06/12/2017 07/14/2017 This report does not include INPO and OUTAGE activities.
EB2-02 - LICENSE RENEWAL INSPECTION      4 1 03/05/2018 03/09/2018 IP 71002  License Renewal Inspection 1 03/19/2018 03/23/2018 IP 71002  License Renewal Inspection EP-1 - EP EXERCISE INSPECTION      4 1 06/25/2018 06/29/2018 IP 7111401 Exercise Evaluation 1 06/25/2018 06/29/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 06/25/2018 06/29/2018 IP 71151-EP01 Drill/Exercise Performance 1 06/25/2018 06/29/2018 IP 71151-EP02 ERO Readiness 1 06/25/2018 06/29/2018 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Enclosure Official Use Only - Sensitive Internal Information/Security-Related Information
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information RB Official Use Only - Sensitive Internal Information/Security-Related Information Enclosure
 
Page 2 of 2 08/30/2016 09:36:05 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site River Bend Inspection / Activity Plan 07/01/2016 - 06/30/2018 RS 5678
- RS TEAM
 
1 IP Radiation Monitoring Instrumentation 71124.05 08/21/2017 08/25/2017
 
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/21/2017 08/25/2017
 
IP Radiological Environmental Monitoring Program 71124.07 08/21/2017 08/25/2017
 
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/21/2017 08/25/2017 EB1-07T
- RBS HEAT SINK PERFORMANCE
 
1 IP Heat Sink Performance 7111107T 09/18/2017 09/22/2017 EXAM
- INITIAL EXAM
 
1 INITIAL EXAM RB(6/18)
X02622 05/21/2018 05/25/2018
 
INITIAL EXAM RB(6/18)
X02622 06/25/2018 07/03/2018 EB2-02
- LICENSE RENEWAL INSPECTION
 
1 IP License Renewal Inspection 71002 03/05/2018 03/09/2018
 
IP License Renewal Inspection 71002 03/19/2018 03/23/2018 EP-1
- EP EXERCISE INSPECTION


ML16242A326 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
1 IP Exercise Evaluation 7111401 06/25/2018 06/29/2018
By: CHY  Yes No Non-Publicly Available Sensitive NRC-002 OFFICE DRP:C/SPE DRS: D DRP:PBC DRP: D NAME CYoung AVegel GWarnick TPruett SIGNATURE /RA/ /RA/JClark,for /RA/ /RA/
DATE 8/16/16 8/17/16 8/29/16 8/22/16


Letter to Mr. William from Troy W. Pruett dated August 31, 2016 DISTRIBUTION:
IP Emergency Action Level and Emergency Plan Changes 7111404 06/25/2018 06/29/2018
 
IP Drill/Exercise Performance 71151-EP01 06/25/2018 06/29/2018
 
IP ERO Readiness 71151-EP02 06/25/2018 06/29/2018
 
IP Alert & Notification System Reliability 71151-EP03 06/25/2018 06/29/2018 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information RB Official Use Only - Sensitive Internal Information/Security-Related Information Enclosure
 
ML16242A326 SUNSI Review By: CHY ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
NRC-002 OFFICE DRP:C/SPE DRS: D DRP:PBC DRP: D
 
NAME CYoung AVegel GWarnick TPruett
 
SIGNATURE
/RA/
/RA/JClark,for
/RA/
/RA/
 
DATE 8/16/16 8/17/16 8/29/16 8/22/16
 
Letter to Mr. William from Troy W. Pruett dated August 31, 2016  
 
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
Line 135: Line 222:
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov  
 
ML16256A169 / PACKAGE ML16256A141 SUNSI Review By: EDU ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
NRC-002 OFFICE TL:IPAT
 
NAME THipschman
 
SIGNATURE
/RA/
 
DATE 9/12/16


ML16256A169 / PACKAGE ML16256A141 SUNSI Review  ADAMS Publicly Available Non-Sensitive Keyword:
Letter to Mr. William from Thomas R. Hipschman dated September 12, 2016 SUBJECT:
By: EDU  Yes No Non-Publicly Available Sensitive NRC-002 OFFICE TL:IPAT NAME THipschman SIGNATURE /RA/
ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2016005)
DATE 9/12/16


Letter to Mr. William from Thomas R. Hipschman dated September 12, 2016 SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2016005)
DISTRIBUTION:
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Regional Administrator (Kriss.Kennedy@nrc.gov)

Latest revision as of 20:24, 9 January 2025

Errata for Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005)
ML16256A169
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/12/2016
From: Thomas Hipschman
Division of Reactor Safety IV
To: Maguire W
Entergy Operations
Hipschman T
Shared Package
ML16256A141 List:
References
IR 2016005, ML16237A057
Download: ML16256A169 (12)


Text

September 12, 2016

SUBJECT:

ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2016005)

Dear Mr. Maguire:

August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2016005)

Dear Mr. Maguire:

On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of River Bend Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at River Bend Station during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because the Unplanned Scrams with Complications PI was a White input in the Initiating Events Cornerstone from the fourth quarter of 2014 through the third quarter of 2015, and a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, has not been completed.

On August 12, 2016, your staff notified the NRC of your readiness for a supplemental inspection to review the actions taken to address the performance issues associated with this PI.

Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with IP 95001 in September 2016. The supplemental inspection will provide assurance that the root causes and contributing causes of risk-significant performance issues are understood, that the extent of condition and extent of cause of risk significant performance issues are identified, and that the corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence.

Additionally, one finding in the Mitigating Systems Cornerstone, as described in our letter (ML15253A352) dated September 10, 2015, was a White input beginning in the second quarter of 2015. On April 13, 2016, the NRC issued supplemental inspection report 05000458/2016010 (ML16146A792), which stated that the performance issue will remain open beyond the normal four quarters and will not be removed from consideration in the NRCs assessment program until the identified weaknesses involving the extent of condition evaluation are addressed and corrected. On May 25, 2016, your staff notified the NRC of your readiness to resume the Enclosure 2 supplemental inspection to review the actions taken to address the inadequate extent of condition evaluation. On June 29, 2016, the NRC completed the supplemental inspection in accordance with IP 95001. Based on the results of this inspection, as documented in supplemental inspection report 05000458/2016011 (ML16223A956) dated August 10, 2016, the White finding is no longer considered as an Action Matrix input as of the end of the second quarter of 2016.

The NRC identified the first occurrence of a cross-cutting theme in the Human Performance area. Specifically, there were twenty findings issued during the assessment period which had a cross-cutting aspect in Human Performance. The NRC will continue to monitor your staffs effort and progress in addressing human performance until the theme criterion is no longer met.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC staff received the River Bend Station Final Compliance letter for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the River Bend Station Safety Evaluation on August, 11, 2016, and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Troy Pruett, Director Division of Reactor Projects

Docket No.

50-458 License No.

NPF-47

Enclosure:

River Bend Station Inspection/

Activity Plan

Page 1 of 2 08/30/2016 09:36:05 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site River Bend Inspection / Activity Plan 07/01/2016 - 06/30/2018 EXAM

- INITIAL EXAM

1 INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)

X02575 08/15/2016 08/19/2016

INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)

X02575 09/12/2016 09/16/2016 EP-2

- EP PERFORMANCE INDICATORS

1 IP Drill/Exercise Performance 71151-EP01 06/27/2016 07/01/2016

IP ERO Readiness 71151-EP02 06/27/2016 07/01/2016

IP Alert & Notification System Reliability 71151-EP03 06/27/2016 07/01/2016 EP-3

- BIENNIAL EXERCISE INSPECTION

1 IP Exercise Evaluation 7111401 06/27/2016 07/01/2016

IP Emergency Action Level and Emergency Plan Changes 7111404 06/27/2016 07/01/2016 INSP

- BIENNIAL REQUAL INSPECTION

1 IP Licensed Operator Requalification Program 7111111B 08/29/2016 09/02/2016 RS 12 PI

- RADIATION SAFETY

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/06/2017 02/10/2017

IP Occupational ALARA Planning and Controls 71124.02 02/06/2017 02/10/2017

IP Occupational Exposure Control Effectiveness 71151-OR01 02/06/2017 02/10/2017

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/06/2017 02/10/2017 71111.08

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - BWR 7111108G 02/13/2017 02/17/2017 TSB 52B

- BIENNIAL PI&R

1 IP Problem Identification and Resolution 71152B 04/10/2017 04/14/2017

IP Problem Identification and Resolution 71152B 04/24/2017 04/28/2017 EP-1

- BIENNIAL EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 05/22/2017 05/26/2017

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/22/2017 05/26/2017

IP Emergency Action Level and Emergency Plan Changes 7111404 05/22/2017 05/26/2017

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/22/2017 05/26/2017 EP-2

- EP PERFORMANCE INDICATOR VERIFICATION

1 IP Drill/Exercise Performance 71151-EP01 05/22/2017 05/26/2017

IP ERO Readiness 71151-EP02 05/22/2017 05/26/2017

IP Alert & Notification System Reliability 71151-EP03 05/22/2017 05/26/2017 EB1-21M

- RBS COMPONENT DESIGN BASIS INSPECTION

1 IP Component Design Bases Inspection (Teams)

7111121M 06/12/2017 07/14/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information RB Official Use Only - Sensitive Internal Information/Security-Related Information Enclosure

Page 2 of 2 08/30/2016 09:36:05 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site River Bend Inspection / Activity Plan 07/01/2016 - 06/30/2018 RS 5678

- RS TEAM

1 IP Radiation Monitoring Instrumentation 71124.05 08/21/2017 08/25/2017

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/21/2017 08/25/2017

IP Radiological Environmental Monitoring Program 71124.07 08/21/2017 08/25/2017

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/21/2017 08/25/2017 EB1-07T

- RBS HEAT SINK PERFORMANCE

1 IP Heat Sink Performance 7111107T 09/18/2017 09/22/2017 EXAM

- INITIAL EXAM

1 INITIAL EXAM RB(6/18)

X02622 05/21/2018 05/25/2018

INITIAL EXAM RB(6/18)

X02622 06/25/2018 07/03/2018 EB2-02

- LICENSE RENEWAL INSPECTION

1 IP License Renewal Inspection 71002 03/05/2018 03/09/2018

IP License Renewal Inspection 71002 03/19/2018 03/23/2018 EP-1

- EP EXERCISE INSPECTION

1 IP Exercise Evaluation 7111401 06/25/2018 06/29/2018

IP Emergency Action Level and Emergency Plan Changes 7111404 06/25/2018 06/29/2018

IP Drill/Exercise Performance 71151-EP01 06/25/2018 06/29/2018

IP ERO Readiness 71151-EP02 06/25/2018 06/29/2018

IP Alert & Notification System Reliability 71151-EP03 06/25/2018 06/29/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information RB Official Use Only - Sensitive Internal Information/Security-Related Information Enclosure

ML16242A326 SUNSI Review By: CHY ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

NRC-002 OFFICE DRP:C/SPE DRS: D DRP:PBC DRP: D

NAME CYoung AVegel GWarnick TPruett

SIGNATURE

/RA/

/RA/JClark,for

/RA/

/RA/

DATE 8/16/16 8/17/16 8/29/16 8/22/16

Letter to Mr. William from Troy W. Pruett dated August 31, 2016

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Acting Resident Inspector (Jim.Melfi@nrc.gov)

Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Stephen.Koenick@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov

ML16256A169 / PACKAGE ML16256A141 SUNSI Review By: EDU ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

NRC-002 OFFICE TL:IPAT

NAME THipschman

SIGNATURE

/RA/

DATE 9/12/16

Letter to Mr. William from Thomas R. Hipschman dated September 12, 2016 SUBJECT:

ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Acting Resident Inspector (Jim.Melfi@nrc.gov)

Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (James.Kim@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (G-R4-DRP-BC@nrc.gov)

DRS Branch Chiefs (R4DRS-BC1@nrc.gov)

ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov