IR 05000280/2017301: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (10 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML17090A456 | | number = ML17090A456 | ||
| issue date = 03/31/2017 | | issue date = 03/31/2017 | ||
| title = | | title = Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) | ||
| author name = Guthrie E | | author name = Guthrie E | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS | ||
| addressee name = Stoddard D | | addressee name = Stoddard D | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000280, 05000281 | | docket = 05000280, 05000281 | ||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:March 31, 2017 | ||
==SUBJECT:== | |||
SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR | |||
INITIAL EXAMINATION (05000280/2017301 AND 05000281/2017301) | |||
==Dear Mr. Stoddard:== | ==Dear Mr. Stoddard:== | ||
During a telephone conversation on March 29, 2017, between Mr. Richard Philpot, Initial | During a telephone conversation on March 29, 2017, between Mr. Richard Philpot, Initial License Training & Simulator Supervisor, Mr. Mike Meyer, Lead Exam Writer, Mr. Paul Orrison, Exam Writer, and Mr. Michael Donithan, Operations Engineer, arrangements were made for the administration of licensing examinations at the Surry Power Station. The on-site preparatory week is scheduled for the week of October 2, 2017. The operating test is scheduled to be administered during the weeks of October 30 and November 6, 2017. The written examination is scheduled to be administered the week of November 6, 2017. | ||
License Training & Simulator Supervisor, Mr. Mike Meyer, Lead Exam Writer, Mr. Paul Orrison, Exam Writer, and Mr. Michael Donithan, Operations Engineer, arrangements were made for the administration of licensing examinations at the Surry Power Station. The on-site preparatory week is scheduled for the week of October 2, 2017. The operating test is scheduled to be administered during the weeks of October 30 and November 6, 2017. The written examination is scheduled to be administered the week of November 6, 2017. | |||
As agreed during the telephone conversation, your staff will prepare both the operating test and written examinations based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. | As agreed during the telephone conversation, your staff will prepare both the operating test and written examinations based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. | ||
| Line 34: | Line 33: | ||
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline and the supporting reference materials identified in Attachment 3 to ES-201 by June 2, 2017. Mr. Donithan provided the written examination outline to your staff in November, 2016. | To meet the above schedule, it will be necessary for your staff to furnish the operating test outline and the supporting reference materials identified in Attachment 3 to ES-201 by June 2, 2017. Mr. Donithan provided the written examination outline to your staff in November, 2016. | ||
The operating tests, written examinations, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 16, 2017. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and | The operating tests, written examinations, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 16, 2017. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. | ||
ready-to-use. | |||
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applicants and any adjudicatory actions on any hearing demands are complete. | We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applicants and any adjudicatory actions on any hearing demands are complete. | ||
| Line 42: | Line 39: | ||
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. | Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. | ||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination date (if possible). Contact Mr. Donithan to determine the method for submission of waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before | To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination date (if possible). Contact Mr. Donithan to determine the method for submission of waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) | ||
should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date. | |||
Although the guideline for receiving waiver or excusal requests calls for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. | |||
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications Statement - Licensee, or as directed by Mr. Donithan when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency. | |||
Paperwork Reduction Act Statement | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018. | |||
The burden to the public for these voluntary information collections is estimated to average 2,250 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. Public Protection Notification | |||
the | The NRC may not conduct nor sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number. | ||
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). | |||
the | Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Mike Donithan at (404) 997-4538, (Michael.Donithan@nrc.gov), or me at (404) 997-4662, (Eugene.Guthrie@nrc.gov). | ||
Sincerely, | |||
/RA/ | |||
Eugene F. Guthrie, Chief | |||
Operations Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 | |||
cc: Distribution via Listserv | cc: Distribution via Listserv | ||
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RSB2 for MGD1 GXG NAME DONITHAN GUTHRIE DATE 3/31/2017 3/31/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | _________________________ | ||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS | |||
SIGNATURE RSB2 for MGD1 GXG | |||
NAME DONITHAN GUTHRIE | |||
DATE 3/31/2017 3/31/2017 | |||
E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
}} | }} | ||
Latest revision as of 10:43, 9 January 2025
| ML17090A456 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/31/2017 |
| From: | Eugene Guthrie Division of Reactor Safety II |
| To: | Stoddard D Virginia Electric & Power Co (VEPCO) |
| References | |
| 50-280/17-01, 50-281/17-01 50-280/OL-17, 50-281/OL-17 | |
| Download: ML17090A456 (4) | |
Text
March 31, 2017
SUBJECT:
SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION (05000280/2017301 AND 05000281/2017301)
Dear Mr. Stoddard:
During a telephone conversation on March 29, 2017, between Mr. Richard Philpot, Initial License Training & Simulator Supervisor, Mr. Mike Meyer, Lead Exam Writer, Mr. Paul Orrison, Exam Writer, and Mr. Michael Donithan, Operations Engineer, arrangements were made for the administration of licensing examinations at the Surry Power Station. The on-site preparatory week is scheduled for the week of October 2, 2017. The operating test is scheduled to be administered during the weeks of October 30 and November 6, 2017. The written examination is scheduled to be administered the week of November 6, 2017.
As agreed during the telephone conversation, your staff will prepare both the operating test and written examinations based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline and the supporting reference materials identified in Attachment 3 to ES-201 by June 2, 2017. Mr. Donithan provided the written examination outline to your staff in November, 2016.
The operating tests, written examinations, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 16, 2017. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applicants and any adjudicatory actions on any hearing demands are complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination date (if possible). Contact Mr. Donithan to determine the method for submission of waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024)
should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guideline for receiving waiver or excusal requests calls for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications Statement - Licensee, or as directed by Mr. Donithan when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Mike Donithan at (404) 997-4538, (Michael.Donithan@nrc.gov), or me at (404) 997-4662, (Eugene.Guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
cc: Distribution via Listserv
_________________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS
SIGNATURE RSB2 for MGD1 GXG
NAME DONITHAN GUTHRIE
DATE 3/31/2017 3/31/2017
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO