Line 2: Line 2:
| number = ML17158B141
| number = ML17158B141
| issue date = 06/13/2017
| issue date = 06/13/2017
| title = Callaway Plant Unit 1 - NRC Security Baseline Inspection Report 05000483/2017201
| title = NRC Security Baseline Inspection Report 05000483/2017201
| author name = Johnson C
| author name = Johnson C
| author affiliation = NRC/NSIR/DSO/SPEB
| author affiliation = NRC/NSIR/DSO/SPEB
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:June 13, 2017
[[Issue date::June 13, 2017]]


Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Nuclear Plant Junction Highway CC and Highway O Fulton, MO 65251
==SUBJECT:==
 
CALLAWAY PLANT, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000483/2017201
SUBJECT: CALLAWAY PLANT, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000483/2017201


==Dear Mr. Diya:==
==Dear Mr. Diya:==
On May 25, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Callaway Plant, Unit 1.
On May 25, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Callaway Plant, Unit 1. The NRC inspectors discussed results of this inspection with Mr. Mark McLachlan and other members of your staff. The results of this inspection are documented in the enclosed inspection report.
 
The NRC inspectors discussed results of this inspection with Mr. Mark McLachlan and other members of your staff. The results of this inspection are documented in the enclosed inspection report.


The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
Line 34: Line 30:
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Callaway Plant, Unit 1.
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Callaway Plant, Unit 1.


If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Director, Office of Nuclear Security, and Incident Response. This letter will be available for public inspection at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding."
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Director, Office of Nuclear Security, and Incident Response. This letter will be available for public inspection at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding.
 
The enclosed report contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended; therefore, the material in the enclosed report will not be made publicly available. If you choose to provide a response that contains Safeguards Information, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,
/RA/


The enclosed report contains Safeguards Information as defined by 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended; therefore, the material in the enclosed report will not be made publicly available. If you choose to provide a response that contains Safeguards Information, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclos ure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response


response.
Docket No. 50-483 License No. NPF-30


Sincerely,/RA/ Robert C. Johnson, Chief Security Performance Evaluation Branch
Nonpublic Enclosure: Inspection Report 05000483/2017201 w/Attachment: Supplemental Information


Division of Security Operations Office of Nuclear Security and Incident Response
cc w/enclosure: Billy Brown, Security Manager


Docket No. 50-483 License No. NPF-30
ML17158B141 Entire Report:
SUNSI Review Complete By:
Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
MD 3.4 Non-Public A.3 Cover Letter Only:
SUNSI Review Complete By:
Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
SUNSI Review Complete OFFICE NSIR/DSO NSIR/DSO NSIR/DSO RG NSIR/DSO/SPEB


Nonpublic
NAME T. Barry J. Clark J. Berry J. Groom C. Johnson


===Enclosure:===
SIGNATURE
Inspection Report 05000483/2017201


===w/Attachment:===
Via email
Supplemental Information cc w/enclosure: Billy Brown, Security Manager


ML17158B141 Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete OFFICE NSIR/DSO NSIR/DSO NSIR/DSORG NSIR/DSO/SPEB NAME T. Barry J. Clark J. Berry J. Groom C. Johnson SIGNATURE Via email DATE 6/5/17 6/7/17 6/12/17 6/12/17 6/13/17
DATE 6/5/17 6/7/17 6/12/17 6/12/17 6/13/17
}}
}}

Latest revision as of 19:37, 8 January 2025

NRC Security Baseline Inspection Report 05000483/2017201
ML17158B141
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/13/2017
From: Clay Johnson
Security Performance Evaluation Branch
To: Diya F
Ameren Missouri
Barry T
References
IR 2017201
Download: ML17158B141 (3)


Text

June 13, 2017

SUBJECT:

CALLAWAY PLANT, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000483/2017201

Dear Mr. Diya:

On May 25, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Callaway Plant, Unit 1. The NRC inspectors discussed results of this inspection with Mr. Mark McLachlan and other members of your staff. The results of this inspection are documented in the enclosed inspection report.

The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Callaway Plant, Unit 1.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Director, Office of Nuclear Security, and Incident Response. This letter will be available for public inspection at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding.

The enclosed report contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended; therefore, the material in the enclosed report will not be made publicly available. If you choose to provide a response that contains Safeguards Information, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response

Docket No. 50-483 License No. NPF-30

Nonpublic Enclosure: Inspection Report 05000483/2017201 w/Attachment: Supplemental Information

cc w/enclosure: Billy Brown, Security Manager

ML17158B141 Entire Report:

SUNSI Review Complete By:

Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

MD 3.4 Non-Public A.3 Cover Letter Only:

SUNSI Review Complete By:

Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

SUNSI Review Complete OFFICE NSIR/DSO NSIR/DSO NSIR/DSO RG NSIR/DSO/SPEB

NAME T. Barry J. Clark J. Berry J. Groom C. Johnson

SIGNATURE

Via email

DATE 6/5/17 6/7/17 6/12/17 6/12/17 6/13/17