{{#Wiki_filter: | {{#Wiki_filter:July 31, 2017 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 34: | Line 34: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 | |||
Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects | |||
Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 | |||
===Enclosure:=== | ===Enclosure:=== | ||
IR 05000325, 324/2017002 w/Attachment: Supplementary Information | IR 05000325, 324/2017002 w/Attachment: Supplementary Information | ||
REGION II== | REGION II== | ||
Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 Report No.: 05000325/2017002, 05000324/2017002 | Docket Nos.: | ||
50-325, 50-324 | |||
License Nos.: | |||
DPR-71, DPR-62 | |||
Report No.: | |||
05000325/2017002, 05000324/2017002 | |||
Facility: Brunswick Steam Electric Plant, Units 1 & 2 Location: Southport, NC Dates: April 1, 2017 through June 30, 2017 Inspectors: M. Catts, Senior Resident Inspector M. Schwieg, Resident Inspector D. Jackson, RII Project Engineer Approved by: Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects | Licensee: | ||
Duke Energy Progress, Inc. | |||
Facility: | |||
Brunswick Steam Electric Plant, Units 1 & 2 | |||
Location: | |||
Southport, NC | |||
Dates: | |||
April 1, 2017 through June 30, 2017 | |||
Inspectors: | |||
M. Catts, Senior Resident Inspector M. Schwieg, Resident Inspector D. Jackson, RII Project Engineer | |||
Approved by: | |||
Steven D. Rose, Chief Reactor Projects Branch 4 | |||
Division of Reactor Projects | |||
=SUMMARY= | =SUMMARY= | ||
Integrated Inspection Report 05000325/2017002, 05000324/2017002; April 1, 2017, through | Integrated Inspection Report 05000325/2017002, 05000324/2017002; April 1, 2017, through | ||
June 30, 2017; Brunswick Steam Electric Plant, Units 1 and 2. | June 30, 2017; Brunswick Steam Electric Plant, Units 1 and 2. | ||
| Line 60: | Line 89: | ||
===Summary of Plant Status=== | ===Summary of Plant Status=== | ||
Unit 1 began the inspection period at 100 percent rated thermal power (RTP). On April 25, 2017, the unit was shut down for a forced outage to repair the 1B recirculation pump seal. On April 28, 2017, the unit was restarted and power was returned to 100 percent on May 1, 2017. On May 2, 2017, power was reduced to 66 percent for a control rod improvement and power was returned to 100 percent on May 4, 2017. On May 6, 2017, power was reduced to 80 percent for a control rod improvement and power was returned to 100 percent on May 8, 2017. On May 31, 2017, power was reduced to 98 percent due to a loss of the 1B variable frequency device controller for the 1B recirculation pump. Power was returned to 100 percent after restoration of the 1B variable frequency device controller on May 31, 2017. | Unit 1 began the inspection period at 100 percent rated thermal power (RTP). On April 25, 2017, the unit was shut down for a forced outage to repair the 1B recirculation pump seal. On April 28, 2017, the unit was restarted and power was returned to 100 percent on May 1, 2017. On May 2, 2017, power was reduced to 66 percent for a control rod improvement and power was returned to 100 percent on May 4, 2017. On May 6, 2017, power was reduced to 80 percent for a control rod improvement and power was returned to 100 percent on May 8, 2017. On May 31, 2017, power was reduced to 98 percent due to a loss of the 1B variable frequency device controller for the 1B recirculation pump. Power was returned to 100 percent after restoration of the 1B variable frequency device controller on May 31, 2017. | ||
| Line 67: | Line 95: | ||
Unit 2 began the inspection period shutdown for refueling outage B223R1. On April 14, 2017, the unit was restarted and power was returned to 100 percent on April 22, 2017. On May 22, 2017, power was reduced to 70 percent to repair a steam leak on 2-MD-V16 and power was returned to 100 percent on May 22, 2017. On June 3, 2017, power was reduced to 70 percent for a control rod sequence exchange and valve testing. Power was returned to 100 percent on June 3, 2017. On June 5, 2017, power was reduced to 70 percent for a control rod sequence exchange. Power was returned to 100 percent on June 5, 2017. The unit remained at or near 100 percent RTP for the remainder of the inspection period. | Unit 2 began the inspection period shutdown for refueling outage B223R1. On April 14, 2017, the unit was restarted and power was returned to 100 percent on April 22, 2017. On May 22, 2017, power was reduced to 70 percent to repair a steam leak on 2-MD-V16 and power was returned to 100 percent on May 22, 2017. On June 3, 2017, power was reduced to 70 percent for a control rod sequence exchange and valve testing. Power was returned to 100 percent on June 3, 2017. On June 5, 2017, power was reduced to 70 percent for a control rod sequence exchange. Power was returned to 100 percent on June 5, 2017. The unit remained at or near 100 percent RTP for the remainder of the inspection period. | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity | Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity | ||
{{a|1R01}} | |||
==1R01 Adverse Weather Protection== | ==1R01 Adverse Weather Protection== | ||
{{IP sample|IP=IP 71111.01|count=1}} | {{IP sample|IP=IP 71111.01|count=1}} | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Seasonal Extreme Weather Conditions The inspectors conducted a detailed review of the stations adverse weather procedures written for extreme high temperatures. The inspectors verified that weather-related equipment deficiencies identified during the previous year had been placed into the work control process and/or corrected before the onset of seasonal extremes. The inspectors evaluated the licensees implementation of adverse weather preparation procedures and compensatory measures before the onset of seasonal extreme weather conditions. | Seasonal Extreme Weather Conditions | ||
The inspectors conducted a detailed review of the stations adverse weather procedures written for extreme high temperatures. The inspectors verified that weather-related equipment deficiencies identified during the previous year had been placed into the work control process and/or corrected before the onset of seasonal extremes. The inspectors evaluated the licensees implementation of adverse weather preparation procedures and compensatory measures before the onset of seasonal extreme weather conditions. | |||
Documents reviewed are listed in the Attachment. | Documents reviewed are listed in the Attachment. | ||
| Line 85: | Line 115: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. {{a|1R04}} | ||
{{a|1R04}} | |||
==1R04 Equipment Alignment | ==1R04 Equipment Alignment | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Partial Walkdown (71111.04 - 4 samples) | Partial Walkdown (71111.04 - 4 samples) | ||
== | |||
The inspectors verified that critical portions of the selected systems were correctly aligned by performing partial walkdowns. The inspectors selected systems for assessment because they were a redundant or backup system or train, were important for mitigating risk for the current plant conditions, had been recently realigned, or were a single-train system. The inspectors determined the correct system lineup by reviewing plant procedures and drawings. Documents reviewed are listed in the Attachment. | The inspectors verified that critical portions of the selected systems were correctly aligned by performing partial walkdowns. The inspectors selected systems for assessment because they were a redundant or backup system or train, were important for mitigating risk for the current plant conditions, had been recently realigned, or were a single-train system. The inspectors determined the correct system lineup by reviewing plant procedures and drawings. Documents reviewed are listed in the Attachment. | ||
| Line 100: | Line 132: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. {{a|1R05}} | ||
{{a|1R05}} | |||
==1R05 Fire Protection | ==1R05 Fire Protection | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Quarterly Inspection (71111.05Q - 5 samples) | Quarterly Inspection (71111.05Q - 5 samples) | ||
== | |||
The inspectors evaluated the adequacy of selected pre-fire plans by comparing the pre-fire plans to the defined hazards and defense-in-depth features specified in the fire protection program. In evaluating the pre-fire plans, the inspectors assessed the following items: | The inspectors evaluated the adequacy of selected pre-fire plans by comparing the pre-fire plans to the defined hazards and defense-in-depth features specified in the fire protection program. In evaluating the pre-fire plans, the inspectors assessed the following items: | ||
* control of transient combustibles and ignition sources | * control of transient combustibles and ignition sources | ||
| Line 114: | Line 148: | ||
* passive fire protection features | * passive fire protection features | ||
* compensatory measures and fire watches | * compensatory measures and fire watches | ||
* issues related to fire protection contained in the licensees CAP The inspectors toured the following fire areas to assess material condition and operational status of fire protection equipment. Documents reviewed are listed in the | * issues related to fire protection contained in the licensees CAP | ||
The inspectors toured the following fire areas to assess material condition and operational status of fire protection equipment. Documents reviewed are listed in the | |||
. | . | ||
* 2PFP-TB2-01A, Unit 2 Turbine Building Breezeway, North 20 foot elevation | * 2PFP-TB2-01A, Unit 2 Turbine Building Breezeway, North 20 foot elevation | ||
| Line 125: | Line 161: | ||
No findings were identified. | No findings were identified. | ||
{{a|1R06}} | {{a|1R06}} | ||
==1R06 Flood Protection Measures== | ==1R06 Flood Protection Measures== | ||
{{IP sample|IP=IP 71111.06|count=1}} | {{IP sample|IP=IP 71111.06|count=1}} | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Underground Cables The inspectors reviewed related flood analysis documents and inspected the areas listed below containing cables whose failure could disable risk-significant equipment. The inspectors directly observed the condition of cables and cable support structures and, as applicable, verified that dewatering devices and drainage systems were functioning properly. In addition, the inspectors verified the licensee was identifying and properly addressing issues using the CAP. Documents reviewed are listed in the Attachment. | Underground Cables | ||
The inspectors reviewed related flood analysis documents and inspected the areas listed below containing cables whose failure could disable risk-significant equipment. The inspectors directly observed the condition of cables and cable support structures and, as applicable, verified that dewatering devices and drainage systems were functioning properly. In addition, the inspectors verified the licensee was identifying and properly addressing issues using the CAP. Documents reviewed are listed in the Attachment. | |||
* Unit 2, manhole 2-MH-6NW, 2-MH-6SW | * Unit 2, manhole 2-MH-6NW, 2-MH-6SW | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|1R11}} | |||
{{a|1R11}} | |||
==1R11 Licensed Operator Requalification Program and Licensed Operator Performance== | ==1R11 Licensed Operator Requalification Program and Licensed Operator Performance== | ||
{{IP sample|IP=IP 71111.11|count=2}} | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
===.1 Resident Inspector Quarterly Review of Licensed Operator Requalification=== | ===.1 Resident Inspector Quarterly Review of Licensed Operator Requalification=== | ||
On June 1, 2017 the inspectors observed an evaluated simulator scenario, involving a NSW header leak and RCIC steam line break with failure to isolate, administered to an operating crew as part of the annual requalification operating test required by 10 CFR 55.59, Requalification. | On June 1, 2017 the inspectors observed an evaluated simulator scenario, involving a NSW header leak and RCIC steam line break with failure to isolate, administered to an operating crew as part of the annual requalification operating test required by 10 CFR 55.59, Requalification. | ||
| Line 149: | Line 188: | ||
* the ability of the licensee to administer the scenario and evaluate the operators | * the ability of the licensee to administer the scenario and evaluate the operators | ||
* the quality of the post-scenario critique | * the quality of the post-scenario critique | ||
* simulator performance Documents reviewed are listed in the Attachment. | * simulator performance | ||
Documents reviewed are listed in the Attachment. | |||
===.2 Resident Inspector Quarterly Review of Licensed Operator Performance in the Actual=== | ===.2 Resident Inspector Quarterly Review of Licensed Operator Performance in the Actual=== | ||
Plant/Main Control Room | |||
The inspectors observed licensed operator performance in the main control room on April 14, 2017, during plant startup from Unit 2 refueling outage B223R1. | |||
The inspectors assessed the following: | The inspectors assessed the following: | ||
| Line 162: | Line 204: | ||
* use of human error prevention techniques | * use of human error prevention techniques | ||
* documentation of activities | * documentation of activities | ||
* management and supervision Documents reviewed are listed in the Attachment. | * management and supervision | ||
Documents reviewed are listed in the Attachment. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|1R12}} | {{a|1R12}} | ||
==1R12 Maintenance Effectiveness== | ==1R12 Maintenance Effectiveness== | ||
{{IP sample|IP=IP 71111.12|count=1}} | {{IP sample|IP=IP 71111.12|count=1}} | ||
| Line 178: | Line 223: | ||
No findings were identified. | No findings were identified. | ||
{{a|1R13}} | {{a|1R13}} | ||
==1R13 Maintenance Risk Assessments and Emergent Work Control== | ==1R13 Maintenance Risk Assessments and Emergent Work Control== | ||
{{IP sample|IP=IP 71111.13|count=4}} | {{IP sample|IP=IP 71111.13|count=4}} | ||
| Line 192: | Line 238: | ||
No findings were identified. | No findings were identified. | ||
{{a|1R15}} | {{a|1R15}} | ||
==1R15 Operability Determinations and Functionality Assessments== | ==1R15 Operability Determinations and Functionality Assessments== | ||
{{IP sample|IP=IP 71111.15|count=5}} | {{IP sample|IP=IP 71111.15|count=5}} | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Operability and Functionality Review The inspectors selected the operability determinations or functionality evaluations listed below for review based on the risk-significance of the associated components and systems. The inspectors reviewed the technical adequacy of the determinations to ensure that TS operability was properly justified and the components or systems remained capable of performing their design functions. To verify whether components or systems were operable, the inspectors compared the operability and design criteria in the appropriate sections of the TS and updated final safety analysis report to the licensees evaluations. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with operability evaluations. Documents reviewed are listed in the Attachment. | Operability and Functionality Review | ||
The inspectors selected the operability determinations or functionality evaluations listed below for review based on the risk-significance of the associated components and systems. The inspectors reviewed the technical adequacy of the determinations to ensure that TS operability was properly justified and the components or systems remained capable of performing their design functions. To verify whether components or systems were operable, the inspectors compared the operability and design criteria in the appropriate sections of the TS and updated final safety analysis report to the licensees evaluations. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with operability evaluations. Documents reviewed are listed in the Attachment. | |||
* Unit 2, residual heat removal (RHR) valve F047B, heat exchanger 2B inlet valve, ground alarm, NCR 2113446 | * Unit 2, residual heat removal (RHR) valve F047B, heat exchanger 2B inlet valve, ground alarm, NCR 2113446 | ||
* Unit 2, emergency diesel generators (EDG) 2 overspeed relay failure, NCR 2120738 | * Unit 2, emergency diesel generators (EDG) 2 overspeed relay failure, NCR 2120738 | ||
| Line 207: | Line 256: | ||
One licensee-identified violation was documented in Section 4OA7. | One licensee-identified violation was documented in Section 4OA7. | ||
{{a|1R18}} | {{a|1R18}} | ||
==1R18 Plant Modifications== | ==1R18 Plant Modifications== | ||
{{IP sample|IP=IP 71111.18|count=2}} | {{IP sample|IP=IP 71111.18|count=2}} | ||
| Line 214: | Line 264: | ||
The inspectors verified that the plant modifications listed below did not affect the safety functions of important safety systems. The inspectors confirmed the modifications did not degrade the design bases, licensing bases, and performance capability of risk significant SSCs. The inspectors also verified modifications performed during plant configurations involving increased risk did not place the plant in an unsafe condition. | The inspectors verified that the plant modifications listed below did not affect the safety functions of important safety systems. The inspectors confirmed the modifications did not degrade the design bases, licensing bases, and performance capability of risk significant SSCs. The inspectors also verified modifications performed during plant configurations involving increased risk did not place the plant in an unsafe condition. | ||
Additionally, the inspectors evaluated whether system operability and availability, configuration control, post-installation test activities, and changes to documents, such as drawings, procedures, and operator training materials, complied with licensee standards and NRC requirements. In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with modifications. Documents reviewed are listed in the | Additionally, the inspectors evaluated whether system operability and availability, configuration control, post-installation test activities, and changes to documents, such as drawings, procedures, and operator training materials, complied with licensee standards and NRC requirements. In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with modifications. Documents reviewed are listed in the | ||
. | . | ||
* NCR 2124497, Carabiners installed for barring gear locking pins on EDGs 1, 2 and 3 | * NCR 2124497, Carabiners installed for barring gear locking pins on EDGs 1, 2 and 3 | ||
| Line 222: | Line 272: | ||
No findings were identified. | No findings were identified. | ||
{{a|1R19}} | {{a|1R19}} | ||
==1R19 Post-Maintenance Testing== | ==1R19 Post-Maintenance Testing== | ||
{{IP sample|IP=IP 71111.19|count=6}} | {{IP sample|IP=IP 71111.19|count=6}} | ||
| Line 232: | Line 283: | ||
* WO 20153997, Unit 1, service water backdraft damper lubrication, May 25, 2017 | * WO 20153997, Unit 1, service water backdraft damper lubrication, May 25, 2017 | ||
* WO 20157390, Unit 2, RHR F047B, heat exchanger 2B inlet valve, motor replacement, May 30, 2017 | * WO 20157390, Unit 2, RHR F047B, heat exchanger 2B inlet valve, motor replacement, May 30, 2017 | ||
* WO 20156298 , Unit 2, HPCI planned maintenance outage, June 14, 2017 | * WO 20156298, Unit 2, HPCI planned maintenance outage, June 14, 2017 | ||
* WO 13538781, Units 1, EDG 2 planned maintenance outage, June 8, 2017 The inspectors evaluated these activities for the following: | * WO 13538781, Units 1, EDG 2 planned maintenance outage, June 8, 2017 | ||
The inspectors evaluated these activities for the following: | |||
* Acceptance criteria were clear and demonstrated operational readiness | * Acceptance criteria were clear and demonstrated operational readiness | ||
* Effects of testing on the plant were adequately addressed | * Effects of testing on the plant were adequately addressed | ||
| Line 239: | Line 292: | ||
* Tests were performed in accordance with approved procedures | * Tests were performed in accordance with approved procedures | ||
* Equipment was returned to its operational status following testing | * Equipment was returned to its operational status following testing | ||
* Test documentation was properly evaluated Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with post-maintenance testing. Documents reviewed are listed in the Attachment. | * Test documentation was properly evaluated | ||
Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with post-maintenance testing. Documents reviewed are listed in the Attachment. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|1R20}} | {{a|1R20}} | ||
==1R20 Refueling and Other Outage Activities== | ==1R20 Refueling and Other Outage Activities== | ||
{{IP sample|IP=IP 71111.20|count=2}} | {{IP sample|IP=IP 71111.20|count=2}} | ||
| Line 264: | Line 320: | ||
* Maintenance of secondary containment as required by TS | * Maintenance of secondary containment as required by TS | ||
* Startup and ascension to full power operation, tracking of startup prerequisites, walkdown of the drywell (primary containment) to verify that debris had not been left which could block emergency core cooling system suction strainers, and reactor physics testing | * Startup and ascension to full power operation, tracking of startup prerequisites, walkdown of the drywell (primary containment) to verify that debris had not been left which could block emergency core cooling system suction strainers, and reactor physics testing | ||
* Licensee identification and resolution of problems related to refueling outage activities Documents reviewed are listed in the Attachment. | * Licensee identification and resolution of problems related to refueling outage activities | ||
Documents reviewed are listed in the Attachment. | |||
===.2 Unit 1 Maintenance Outage B120F1=== | ===.2 Unit 1 Maintenance Outage B120F1=== | ||
| Line 276: | Line 334: | ||
* developed work schedules to manage fatigue | * developed work schedules to manage fatigue | ||
* developed mitigation strategies for loss of key safety functions | * developed mitigation strategies for loss of key safety functions | ||
* adhered to operating license and TS requirements Inspectors verified that safety-related and risk-significant SSCs not accessible during power operations were maintained in an operable condition. The inspectors also reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with outage activities. Documents reviewed are listed in the Attachment. | * adhered to operating license and TS requirements | ||
Inspectors verified that safety-related and risk-significant SSCs not accessible during power operations were maintained in an operable condition. The inspectors also reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with outage activities. Documents reviewed are listed in the Attachment. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|1R22}} | {{a|1R22}} | ||
==1R22 Surveillance Testing== | ==1R22 Surveillance Testing== | ||
{{IP sample|IP=IP 71111.22|count=4}} | {{IP sample|IP=IP 71111.22|count=4}} | ||
| Line 294: | Line 355: | ||
Routine Surveillance Tests | Routine Surveillance Tests | ||
* Procedure 2MST-RPS41R, RPS Logic System Functional Test, April 6, 2017 | * Procedure 2MST-RPS41R, RPS Logic System Functional Test, April 6, 2017 | ||
* Procedure 0PT-80.1, Reactor Pressure Vessel ASME Section XI Pressure Test, May 11, 2017 In-Service Tests (IST) | * Procedure 0PT-80.1, Reactor Pressure Vessel ASME Section XI Pressure Test, May 11, 2017 | ||
* Procedure 0PT-09.2, HPCI System Operability Test, May 10, 2017 Reactor Coolant System Leak Detection | |||
In-Service Tests (IST) | |||
* Procedure 0PT-09.2, HPCI System Operability Test, May 10, 2017 | |||
Reactor Coolant System Leak Detection | |||
* Procedure 0OI-02.3, Unit 1 Drywell Leakage Control, April 25, 2017 | * Procedure 0OI-02.3, Unit 1 Drywell Leakage Control, April 25, 2017 | ||
| Line 302: | Line 367: | ||
===Cornerstone: Emergency Preparedness=== | ===Cornerstone: Emergency Preparedness=== | ||
{{a|1EP6}} | |||
==1EP6 Drill Evaluation== | ==1EP6 Drill Evaluation== | ||
{{IP sample|IP=IP 71114.06|count=1}} | {{IP sample|IP=IP 71114.06|count=1}} | ||
| Line 310: | Line 375: | ||
The inspectors observed the emergency preparedness drill conducted on June 1, 2017, involving a NSW header leak and RCIC steam line break with failure to isolate. The inspectors observed licensee activities in the simulator and technical support center to evaluate implementation of the emergency plan, including event classification, notification, and protective action recommendations. The inspectors evaluated the licensees performance against criteria established in the licensees procedures. | The inspectors observed the emergency preparedness drill conducted on June 1, 2017, involving a NSW header leak and RCIC steam line break with failure to isolate. The inspectors observed licensee activities in the simulator and technical support center to evaluate implementation of the emergency plan, including event classification, notification, and protective action recommendations. The inspectors evaluated the licensees performance against criteria established in the licensees procedures. | ||
Additionally, the inspectors attended the post-exercise critique to assess the licensees effectiveness in identifying emergency preparedness weaknesses and verified the identified weaknesses were entered in the CAP. Documents reviewed are listed in the | Additionally, the inspectors attended the post-exercise critique to assess the licensees effectiveness in identifying emergency preparedness weaknesses and verified the identified weaknesses were entered in the CAP. Documents reviewed are listed in the | ||
. | . | ||
| Line 316: | Line 381: | ||
No findings were identified. | No findings were identified. | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
{{a|4OA1}} | |||
==4OA1 Performance Indicator (PI) Verification== | ==4OA1 Performance Indicator (PI) Verification== | ||
{{IP sample|IP=IP 71151|count=6}} | {{IP sample|IP=IP 71151|count=6}} | ||
| Line 336: | Line 400: | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA2}} | {{a|4OA2}} | ||
==4OA2 Problem Identification and Resolution== | ==4OA2 Problem Identification and Resolution== | ||
{{IP sample|IP=IP 71152|count=2}} | {{IP sample|IP=IP 71152|count=2}} | ||
===.1 Routine Review=== | ===.1 Routine Review=== | ||
The inspectors screened items entered into the licensees corrective action program to identify repetitive equipment failures or specific human performance issues for follow-up. | The inspectors screened items entered into the licensees corrective action program to identify repetitive equipment failures or specific human performance issues for follow-up. | ||
| Line 347: | Line 411: | ||
===.2 Semi-Annual Trend Review=== | ===.2 Semi-Annual Trend Review=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors reviewed issues entered in the licensees corrective action program and associated documents to identify trends that could indicate the existence of a more significant safety issue. The inspectors focused their review on human performance trends during Unit 2 refueling outage B223R1, but also considered the results of inspector daily condition report screenings, licensee trending efforts, and licensee human performance results. The review nominally considered the 6-month period of January 1, 2017, through June 30, 2017, although some examples extended beyond those dates when the scope of the trend warranted. The inspectors compared their results with the licensees analysis of trends. Additionally, the inspectors reviewed the adequacy of corrective actions associated with a sample of the issues identified in the licensees trend reports. The inspectors also reviewed corrective action documents that were processed by the licensee to identify potential adverse trends in the condition of structures, systems, and/or components as evidenced by acceptance of long-standing non-conforming or degraded conditions. Documents reviewed are listed in the | The inspectors reviewed issues entered in the licensees corrective action program and associated documents to identify trends that could indicate the existence of a more significant safety issue. The inspectors focused their review on human performance trends during Unit 2 refueling outage B223R1, but also considered the results of inspector daily condition report screenings, licensee trending efforts, and licensee human performance results. The review nominally considered the 6-month period of January 1, 2017, through June 30, 2017, although some examples extended beyond those dates when the scope of the trend warranted. The inspectors compared their results with the licensees analysis of trends. Additionally, the inspectors reviewed the adequacy of corrective actions associated with a sample of the issues identified in the licensees trend reports. The inspectors also reviewed corrective action documents that were processed by the licensee to identify potential adverse trends in the condition of structures, systems, and/or components as evidenced by acceptance of long-standing non-conforming or degraded conditions. Documents reviewed are listed in the | ||
. | . | ||
| Line 356: | Line 419: | ||
===.3 Annual Follow-Up of Selected Issues=== | ===.3 Annual Follow-Up of Selected Issues=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors conducted a detailed review of the following condition report: | The inspectors conducted a detailed review of the following condition report: | ||
* NCR 2120423, rising trend in Unit 2 suppression pool temperature, April 30, 2017 The inspectors evaluated the following attributes of the licensees actions: | * NCR 2120423, rising trend in Unit 2 suppression pool temperature, April 30, 2017 | ||
The inspectors evaluated the following attributes of the licensees actions: | |||
* complete and accurate identification of the problem in a timely manner | * complete and accurate identification of the problem in a timely manner | ||
* evaluation and disposition of operability and reportability issues | * evaluation and disposition of operability and reportability issues | ||
| Line 366: | Line 430: | ||
* identification of root and contributing causes of the problem | * identification of root and contributing causes of the problem | ||
* identification of any additional condition reports | * identification of any additional condition reports | ||
* completion of corrective actions in a timely manner Documents reviewed are listed in the Attachment. | * completion of corrective actions in a timely manner | ||
Documents reviewed are listed in the Attachment. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA3}} | {{a|4OA3}} | ||
==4OA3 Follow-up of Events== | ==4OA3 Follow-up of Events== | ||
{{IP sample|IP=IP 71153|count=4}} | {{IP sample|IP=IP 71153|count=4}} | ||
===.1 (Closed) Licensee Event Report (LER) 05000324/2017-001-00, Implementation of=== | ===.1 (Closed) Licensee Event Report (LER) 05000324/2017-001-00, Implementation of=== | ||
Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 | Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 | ||
| Line 382: | Line 448: | ||
On March 22, 2017, Unit 2 implemented the guidance of EGM 11-003, Revision 3, Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with TS Containment Requirements During Operations with a Potential for Draining the Reactor Vessel. Consistent with this EGM, secondary containment operability was not maintained during operations with the potential for draining the reactor vessel activities. The EGM guidance was implemented from March 22, 2017, at 1209 to March 28, 2017, at 1230. The activities are discussed in Section 4OA5. | On March 22, 2017, Unit 2 implemented the guidance of EGM 11-003, Revision 3, Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with TS Containment Requirements During Operations with a Potential for Draining the Reactor Vessel. Consistent with this EGM, secondary containment operability was not maintained during operations with the potential for draining the reactor vessel activities. The EGM guidance was implemented from March 22, 2017, at 1209 to March 28, 2017, at 1230. The activities are discussed in Section 4OA5. | ||
Inspectors verified compliance with the guidelines of EGM 11-003 prior to and during these activities. The licensee has submitted a license amendment request to adopt TS Task Force traveler associated with generic resolution of this issue. The licensee entered this issue into the CAP as NCR 2110409. Documents reviewed are listed in the | Inspectors verified compliance with the guidelines of EGM 11-003 prior to and during these activities. The licensee has submitted a license amendment request to adopt TS Task Force traveler associated with generic resolution of this issue. The licensee entered this issue into the CAP as NCR 2110409. Documents reviewed are listed in the | ||
. | . | ||
====b. Findings==== | ====b. Findings==== | ||
The enforcement actions associated with this LER are documented in Sections 4OA5. | The enforcement actions associated with this LER are documented in Sections 4OA5. | ||
No findings were identified during the review of this LER. This LER is closed. | No findings were identified during the review of this LER. This LER is closed. | ||
===.2 (Closed) LER 05000324/2017-002-00, Plant Mode Change with Primary Containment=== | ===.2 (Closed) LER 05000324/2017-002-00, Plant Mode Change with Primary Containment=== | ||
Inoperable | Inoperable | ||
| Line 401: | Line 465: | ||
====b. Findings==== | ====b. Findings==== | ||
The enforcement actions associated with this LER are documented in Section 4OA7. | The enforcement actions associated with this LER are documented in Section 4OA7. | ||
No findings were identified during the review of this LER. This LER is closed. | No findings were identified during the review of this LER. This LER is closed. | ||
===.3 (Closed) LER 05000325;324/2016-006-01, Control Room AC Units Inoperable Due to=== | ===.3 (Closed) LER 05000325;324/2016-006-01, Control Room AC Units Inoperable Due to=== | ||
Corroded Supports | Corroded Supports | ||
| Line 419: | Line 481: | ||
===.4 (Closed) LER 05000325;324/2017-002, Foreign Material in Switch Results in Unplanned=== | ===.4 (Closed) LER 05000325;324/2017-002, Foreign Material in Switch Results in Unplanned=== | ||
Automatic Start of Emergency Diesel Generators | Automatic Start of Emergency Diesel Generators | ||
| Line 430: | Line 491: | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA5}} | {{a|4OA5}} | ||
==4OA5 Other Activities== | ==4OA5 Other Activities== | ||
===.1 Implementation of EGM 11-003, Revision 3, Enforcement Guidance Memorandum on=== | ===.1 Implementation of EGM 11-003, Revision 3, Enforcement Guidance Memorandum on=== | ||
Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements During Operations with a Potential for Draining the Reactor Vessel | Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements During Operations with a Potential for Draining the Reactor Vessel | ||
| Line 441: | Line 501: | ||
====b. Findings==== | ====b. Findings==== | ||
=====Description.===== | =====Description.===== | ||
During the Unit 2 refueling outage, the OPDRVs activities are listed below: | During the Unit 2 refueling outage, the OPDRVs activities are listed below: | ||
| Line 447: | Line 506: | ||
* March 23, 2017: 48 gallons per minute leakage for hydraulic control unit draining to support rod maintenance | * March 23, 2017: 48 gallons per minute leakage for hydraulic control unit draining to support rod maintenance | ||
* March 24, 2017: 65 gallons per minute leakage to close the excess flow check valve and cap the drain line | * March 24, 2017: 65 gallons per minute leakage to close the excess flow check valve and cap the drain line | ||
* March 27, 2017: 71.2 gallons per minute leakage to replace the low power range monitors and intermediate power range monitors These activities took place without secondary containment being operable. | * March 27, 2017: 71.2 gallons per minute leakage to replace the low power range monitors and intermediate power range monitors | ||
These activities took place without secondary containment being operable. | |||
=====Enforcement.===== | =====Enforcement.===== | ||
| Line 455: | Line 516: | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Meetings, Including Exit== | ==4OA6 Meetings, Including Exit== | ||
On July 12, 2017, the resident inspectors presented the inspection results to Mr. Gideon and other members of the licensees staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report. | On July 12, 2017, the resident inspectors presented the inspection results to Mr. Gideon and other members of the licensees staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report. | ||
{{a|4OA7}} | {{a|4OA7}} | ||
==4OA7 Licensee Identified Violations== | ==4OA7 Licensee Identified Violations== | ||
The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meet the criteria of the NRC Enforcement Policy, for being dispositioned as a non-cited violation. | The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meet the criteria of the NRC Enforcement Policy, for being dispositioned as a non-cited violation. | ||
* LCO 3.0.4 states, in part, when an LCO is not met, entry into a MODE or other specified condition in the applicability shall only be made when the associated ACTIONS to be entered permit continued operation in the MODE for an unlimited period of time. | * LCO 3.0.4 states, in part, when an LCO is not met, entry into a MODE or other specified condition in the applicability shall only be made when the associated ACTIONS to be entered permit continued operation in the MODE for an unlimited period of time. | ||
| Line 474: | Line 535: | ||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
===Licensee Personnel=== | |||
K. Allen | |||
Director, Design Engineering | |||
B. Bagwell | |||
Environmental & Chemistry | |||
A. Baker | |||
Supervisor, Environmental & Chemistry | |||
J. Berry | |||
Supervisor, LOCT Training | |||
A. Brittain | |||
Director, Nuclear Plant Security | |||
P. Brown | |||
Manager, Nuclear Performance Improvement | |||
B. Bryant | |||
Manager, Nuclear Oversight | |||
J. Bryant | |||
Regulatory Affairs | |||
R. Carpenter | |||
Radiation Monitor Engineer | |||
P. Dubrouillet | |||
Director, Nuclear Engineering, Mechanical Systems | |||
C. Dunsmore | |||
Manager, Nuclear Outage | |||
W. Gideon | |||
Vice President | |||
L. Grzeck | |||
Manager, Nuclear Regulatory Affairs | |||
J. Hicks | |||
Manager, Nuclear Training | |||
B. Houston | |||
Manager, Nuclear Maintenance | |||
J. Johnson | |||
Manager, Nuclear Chemistry | |||
K. Krueger | |||
Manager, Nuclear Operations | |||
J. McAdoo | |||
Manager, Nuclear Rad Protection | |||
K. Moser | |||
B. Murray | |||
Plant Manager | |||
Licensing | |||
J. Nolin | |||
General Manager, Nuclear Engineering | |||
W. Orlando | |||
Superintendent, E/I&C | |||
O. Paladiy | |||
Welding Engineer/Repair & Replacement Engineer | |||
A. Padleckas | |||
Assistant Ops Manager, Training | |||
D. Petrusic | |||
Superintendent, Environmental & Chemistry | |||
J. Pierce | |||
Manager, Nuclear Work Management | |||
E. Rau | |||
Operations Training | |||
M. Regan | |||
Project Manager, Major Projects | |||
L. Rohrbaugh | |||
Operator Training | |||
M. Smiley | |||
Manager, Nuclear Ops Training | |||
L. Spencer | |||
Operator Training | |||
R. Wiemann | |||
Director, Nuclear Engineering, Electrical Reactor Systems | |||
E. Williams | |||
Operations Manager | |||
S. Williams | |||
BWRVIP Program Engineer | |||
C. Winslow | |||
ISI Program Engineer | |||
B. Wonton | |||
Director, Nuclear Organizational Effectiveness | |||
State of North Carolina | |||
P. Cox | |||
Department of Health and Human Services | |||
===NRC Personnel=== | ===NRC Personnel=== | ||
S. Rose | |||
Chief, Reactor Projects Branch 4 | |||
P. Niebaum | |||
Acting Chief, Reactor Projects Branch 4 | |||
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ||
===Opened and Closed=== | |||
: 05000324/2017-001-00 | |||
LER | |||
Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 (Section 4OA3.1) | |||
: 05000324/2017-002-00 LER Plant Mode Change with Primary Containment Inoperable (Section 4OA3.2) | |||
: 05000325;324/2016-006-01 | |||
LER | |||
Control Room AC Units Inoperable Due to Corroded Supports (Section 4OA3.3) | |||
: 05000325;324/2017-002 | |||
LER | |||
Foreign Material in Switch Results in Unplanned Automatic Start of Emergency Diesel Generators (Section 4OA3.4) | |||
Supports (Section 4OA3.3) | |||
: 05000325;324/2017-002 | |||
Automatic Start of Emergency Diesel Generators | |||
==LIST OF DOCUMENTS REVIEWED== | ==LIST OF DOCUMENTS REVIEWED== | ||
}} | }} | ||
Latest revision as of 15:55, 8 January 2025
| ML17212A137 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 07/31/2017 |
| From: | Steven Rose NRC/RGN-II/DRP/RPB4 |
| To: | William Gideon Duke Energy Progress |
| References | |
| EA-17-123 IR 2017002 | |
| Download: ML17212A137 (27) | |
Text
July 31, 2017
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - NRC INTEGRATED INSPECTION REPORT NOS.: 05000325/2017002 AND 05000324/2017002 AND EXERCISE OF ENFORCEMENT DISCRETION
Dear Mr. Gideon:
On June 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Plant, Units 1 and 2. On July 12, 2017, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
A violation of Technical Specification 3.6.4.1, Secondary Containment, was identified. Because the violation was identified during the discretion period described in Enforcement Guidance Memorandum 11-003, Revision 3, the NRC is exercising enforcement discretion in accordance with Section 3.5, Violations Involving Special Circumstances, of the NRC Enforcement Policy and, therefore, will not issue enforcement action for this violation, subject to the license amendment request which was submitted on June 29, 2017.
Further, inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating this violation as non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or the significance of the violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, and the NRC Resident Inspector at the Brunswick Steam Electric Plant. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects
Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62
Enclosure:
IR 05000325, 324/2017002 w/Attachment: Supplementary Information
REGION II==
Docket Nos.:
50-325, 50-324
License Nos.:
Report No.:
05000325/2017002, 05000324/2017002
Licensee:
Duke Energy Progress, Inc.
Facility:
Brunswick Steam Electric Plant, Units 1 & 2
Location:
Southport, NC
Dates:
April 1, 2017 through June 30, 2017
Inspectors:
M. Catts, Senior Resident Inspector M. Schwieg, Resident Inspector D. Jackson, RII Project Engineer
Approved by:
Steven D. Rose, Chief Reactor Projects Branch 4
Division of Reactor Projects
SUMMARY
Integrated Inspection Report 05000325/2017002, 05000324/2017002; April 1, 2017, through
June 30, 2017; Brunswick Steam Electric Plant, Units 1 and 2.
The report covered a 3-month period of inspection by resident inspectors and regional inspectors. There were no NRC-identified or self-revealing violations documented in this report.
The significance of inspection findings are indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609,
Significance Determination Process, (SDP) dated April 29, 2015. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy dated November 1, 2016. The NRCs program for overseeing the safe operations of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 6.
One violation of very low safety significance that was identified by the licensee has been reviewed by the NRC. Corrective action taken or planned by the licensee has been entered into the licensees corrective action program (CAP). This violation and corrective action tracking number is listed in Section 4OA7 of this report.
REPORT DETAILS
Summary of Plant Status
Unit 1 began the inspection period at 100 percent rated thermal power (RTP). On April 25, 2017, the unit was shut down for a forced outage to repair the 1B recirculation pump seal. On April 28, 2017, the unit was restarted and power was returned to 100 percent on May 1, 2017. On May 2, 2017, power was reduced to 66 percent for a control rod improvement and power was returned to 100 percent on May 4, 2017. On May 6, 2017, power was reduced to 80 percent for a control rod improvement and power was returned to 100 percent on May 8, 2017. On May 31, 2017, power was reduced to 98 percent due to a loss of the 1B variable frequency device controller for the 1B recirculation pump. Power was returned to 100 percent after restoration of the 1B variable frequency device controller on May 31, 2017.
On June 9, 2017, power was reduced to 70 percent for a control rod improvement and power was returned to 100 percent on June 11, 2017. The unit remained at or near 100 percent RTP for the remainder of the inspection period.
Unit 2 began the inspection period shutdown for refueling outage B223R1. On April 14, 2017, the unit was restarted and power was returned to 100 percent on April 22, 2017. On May 22, 2017, power was reduced to 70 percent to repair a steam leak on 2-MD-V16 and power was returned to 100 percent on May 22, 2017. On June 3, 2017, power was reduced to 70 percent for a control rod sequence exchange and valve testing. Power was returned to 100 percent on June 3, 2017. On June 5, 2017, power was reduced to 70 percent for a control rod sequence exchange. Power was returned to 100 percent on June 5, 2017. The unit remained at or near 100 percent RTP for the remainder of the inspection period.
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R01 Adverse Weather Protection
a. Inspection Scope
Seasonal Extreme Weather Conditions
The inspectors conducted a detailed review of the stations adverse weather procedures written for extreme high temperatures. The inspectors verified that weather-related equipment deficiencies identified during the previous year had been placed into the work control process and/or corrected before the onset of seasonal extremes. The inspectors evaluated the licensees implementation of adverse weather preparation procedures and compensatory measures before the onset of seasonal extreme weather conditions.
Documents reviewed are listed in the Attachment.
The inspectors evaluated the following risk-significant systems:
- service water system
- transformer yard
b. Findings
No findings were identified.
==1R04 Equipment Alignment
a. Inspection Scope
Partial Walkdown (71111.04 - 4 samples)
==
The inspectors verified that critical portions of the selected systems were correctly aligned by performing partial walkdowns. The inspectors selected systems for assessment because they were a redundant or backup system or train, were important for mitigating risk for the current plant conditions, had been recently realigned, or were a single-train system. The inspectors determined the correct system lineup by reviewing plant procedures and drawings. Documents reviewed are listed in the Attachment.
The inspectors selected the following systems or trains to inspect:
- Unit 1, core spray (CS) train B
- Unit 2, reactor core isolation cooling (RCIC)
- Unit 1, nuclear service water (NSW)
- Unit 2, CS train B
b. Findings
No findings were identified.
==1R05 Fire Protection
a. Inspection Scope
Quarterly Inspection (71111.05Q - 5 samples)
==
The inspectors evaluated the adequacy of selected pre-fire plans by comparing the pre-fire plans to the defined hazards and defense-in-depth features specified in the fire protection program. In evaluating the pre-fire plans, the inspectors assessed the following items:
- control of transient combustibles and ignition sources
- fire detection systems
- water-based fire suppression systems
- gaseous fire suppression systems
- manual firefighting equipment and capability
- passive fire protection features
- compensatory measures and fire watches
- issues related to fire protection contained in the licensees CAP
The inspectors toured the following fire areas to assess material condition and operational status of fire protection equipment. Documents reviewed are listed in the
.
- 2PFP-TB2-01A, Unit 2 Turbine Building Breezeway, North 20 foot elevation
- 2PFP-RB2-07, Unit 2 Drywell, 20 foot elevation
- 1PFP-DG-05/04, Unit 1 Diesel Generator Cells 1-2, 23 foot elevation
- 2PFP-TB2-01M, Unit 2 Turbine Building Laydown Area, 70 foot elevation
- 2PFP-RB2-01T, Unit 2 Reactor Building Torus, 0 foot elevation
b. Findings
No findings were identified.
1R06 Flood Protection Measures
a. Inspection Scope
Underground Cables
The inspectors reviewed related flood analysis documents and inspected the areas listed below containing cables whose failure could disable risk-significant equipment. The inspectors directly observed the condition of cables and cable support structures and, as applicable, verified that dewatering devices and drainage systems were functioning properly. In addition, the inspectors verified the licensee was identifying and properly addressing issues using the CAP. Documents reviewed are listed in the Attachment.
- Unit 2, manhole 2-MH-6NW, 2-MH-6SW
b. Findings
No findings were identified.
1R11 Licensed Operator Requalification Program and Licensed Operator Performance
a. Inspection Scope
.1 Resident Inspector Quarterly Review of Licensed Operator Requalification
On June 1, 2017 the inspectors observed an evaluated simulator scenario, involving a NSW header leak and RCIC steam line break with failure to isolate, administered to an operating crew as part of the annual requalification operating test required by 10 CFR 55.59, Requalification.
The inspectors assessed the following:
- licensed operator performance
- the ability of the licensee to administer the scenario and evaluate the operators
- the quality of the post-scenario critique
- simulator performance
Documents reviewed are listed in the Attachment.
.2 Resident Inspector Quarterly Review of Licensed Operator Performance in the Actual
Plant/Main Control Room
The inspectors observed licensed operator performance in the main control room on April 14, 2017, during plant startup from Unit 2 refueling outage B223R1.
The inspectors assessed the following:
- use of plant procedures
- control board manipulations
- communications between crew members
- use and interpretation of instruments, indications, and alarms
- use of human error prevention techniques
- documentation of activities
- management and supervision
Documents reviewed are listed in the Attachment.
b. Findings
No findings were identified.
1R12 Maintenance Effectiveness
a. Inspection Scope
The inspectors assessed the licensees treatment of the issues listed below to verify the licensee appropriately addressed equipment problems within the scope of the maintenance rule (10 CFR 50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants). The inspectors reviewed procedures and records to evaluate the licensees identification, assessment, and characterization of the problems as well as their corrective actions for returning the equipment to a satisfactory condition. Documents reviewed are listed in the Attachment.
- WO 20132630, Unit 1 high pressure coolant injection (HPCI) auxiliary oil pump motor overload relay replacement
b. Findings
No findings were identified.
1R13 Maintenance Risk Assessments and Emergent Work Control
a. Inspection Scope
The inspectors reviewed the maintenance activities listed below to verify that the licensee assessed and managed plant risk as required by 10 CFR 50.65(a)(4) and licensee procedures. The inspectors assessed the adequacy of the licensees risk assessments and implementation of risk management actions. The inspectors also verified that the licensee was identifying and resolving problems with assessing and managing maintenance-related risk using the CAP. Additionally, for maintenance resulting from unforeseen situations, the inspectors assessed the effectiveness of the licensees planning and control of emergent work activities. Documents reviewed are listed in the Attachment.
- Unit 2, April 3, 2017, elevated risk during refueling outage B223R1 fuel movement
- Unit 2, April 6, 2017, elevated risk during refueling outage B223R1 electrical work window
- Unit 2, April 10, 2017, elevated risk during refueling outage B223R1 vessel draindown
- Unit 2, May 15, 2017, elevated risk with 2-CAC-V17, reactor building to torus vacuum breaker, unplanned inoperability
b. Findings
No findings were identified.
1R15 Operability Determinations and Functionality Assessments
a. Inspection Scope
Operability and Functionality Review
The inspectors selected the operability determinations or functionality evaluations listed below for review based on the risk-significance of the associated components and systems. The inspectors reviewed the technical adequacy of the determinations to ensure that TS operability was properly justified and the components or systems remained capable of performing their design functions. To verify whether components or systems were operable, the inspectors compared the operability and design criteria in the appropriate sections of the TS and updated final safety analysis report to the licensees evaluations. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with operability evaluations. Documents reviewed are listed in the Attachment.
- Unit 2, residual heat removal (RHR) valve F047B, heat exchanger 2B inlet valve, ground alarm, NCR 2113446
- Unit 2, emergency diesel generators (EDG) 2 overspeed relay failure, NCR 2120738
- Unit 2, primary containment inoperable during startup, NCR 2116753
b. Findings
One licensee-identified violation was documented in Section 4OA7.
1R18 Plant Modifications
a. Inspection Scope
The inspectors verified that the plant modifications listed below did not affect the safety functions of important safety systems. The inspectors confirmed the modifications did not degrade the design bases, licensing bases, and performance capability of risk significant SSCs. The inspectors also verified modifications performed during plant configurations involving increased risk did not place the plant in an unsafe condition.
Additionally, the inspectors evaluated whether system operability and availability, configuration control, post-installation test activities, and changes to documents, such as drawings, procedures, and operator training materials, complied with licensee standards and NRC requirements. In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with modifications. Documents reviewed are listed in the
.
b. Findings
No findings were identified.
1R19 Post-Maintenance Testing
a. Inspection Scope
The inspectors either observed post-maintenance testing or reviewed the test results for the maintenance activities listed below to verify the work performed was completed correctly and the test activities were adequate to verify system operability and functional capability.
- WO 20156990, Unit 2, EDG 4 starting air pin failure, March 30, 2017
- WO 20096176, Unit 2, 2-CAC-V17 reactor building to torus vacuum breaker inoperable, May 15, 2017
- WO 20153997, Unit 1, service water backdraft damper lubrication, May 25, 2017
- WO 20157390, Unit 2, RHR F047B, heat exchanger 2B inlet valve, motor replacement, May 30, 2017
- WO 20156298, Unit 2, HPCI planned maintenance outage, June 14, 2017
- WO 13538781, Units 1, EDG 2 planned maintenance outage, June 8, 2017
The inspectors evaluated these activities for the following:
- Acceptance criteria were clear and demonstrated operational readiness
- Effects of testing on the plant were adequately addressed
- Test instrumentation was appropriate
- Tests were performed in accordance with approved procedures
- Equipment was returned to its operational status following testing
- Test documentation was properly evaluated
Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with post-maintenance testing. Documents reviewed are listed in the Attachment.
b. Findings
No findings were identified.
1R20 Refueling and Other Outage Activities
a. Inspection Scope
.1 Unit 2 Refueling Outage B223R1
Unit 2 began the inspection period in refueling outage B223R1. The inspectors reviewed outage plans and contingency plans for the Unit 2 refueling outage, which ended with the generator synchronization to the grid on April 15, 2017, to confirm that the licensee had appropriately considered risk, industry experience, and previous site-specific problems in developing and implementing a plan that assured maintenance of defense-in-depth of key safety functions.
During the refueling outage, the inspectors monitored licensee controls over the following outage activities:
- Licensee configuration management, including maintenance of defense-in-depth for key safety functions and compliance with the applicable Technical Specifications (TSs) when taking equipment out of service
- Implementation of clearance activities and confirmation that tags were properly hung and equipment appropriately configured to safely support the work or testing
- Installation and configuration of reactor coolant pressure, level, and temperature instruments to provide accurate indication, accounting for instrument error
- Controls over the status and configuration of electrical systems to ensure that TS and outage safety plan requirements were met, and controls over switchyard activities
- Monitoring of decay heat removal processes, systems, and components
- Controls to ensure that outage work was not impacting the ability of the operators to operate the spent fuel pool cooling system
- Reactor water inventory controls including flow paths, configurations, and alternative means for inventory addition, and controls to prevent inventory loss
- Controls over activities that could affect reactivity
- Maintenance of secondary containment as required by TS
- Startup and ascension to full power operation, tracking of startup prerequisites, walkdown of the drywell (primary containment) to verify that debris had not been left which could block emergency core cooling system suction strainers, and reactor physics testing
- Licensee identification and resolution of problems related to refueling outage activities
Documents reviewed are listed in the Attachment.
.2 Unit 1 Maintenance Outage B120F1
For the Unit 1 maintenance outage to replace the 1B recirculation pump seal, from April 25, 2017, through April 28, 2017, the inspectors evaluated the following outage activities:
- shutdown, cooldown, heatup, and startup
- reactor coolant system instrumentation and electrical power configuration
- reactivity and inventory control
- decay heat removal and spent fuel pool cooling system operation The inspectors verified that the licensee:
- controlled plant configuration in accordance with administrative risk reduction methodologies
- developed work schedules to manage fatigue
- developed mitigation strategies for loss of key safety functions
- adhered to operating license and TS requirements
Inspectors verified that safety-related and risk-significant SSCs not accessible during power operations were maintained in an operable condition. The inspectors also reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with outage activities. Documents reviewed are listed in the Attachment.
b. Findings
No findings were identified.
1R22 Surveillance Testing
a. Inspection Scope
The inspectors reviewed the surveillance tests listed below and either observed the test or reviewed test results to verify testing activities adequately demonstrated that the affected SSCs remained capable of performing the intended safety functions (under conditions as close as practical to design bases conditions or as required by TS) and maintained their operational readiness.
The inspectors evaluated the test activities to assess for preconditioning of equipment, procedure adherence, and equipment alignment following completion of the surveillance.
Additionally, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with surveillance testing. Documents reviewed are listed in the Attachment.
Routine Surveillance Tests
- Procedure 2MST-RPS41R, RPS Logic System Functional Test, April 6, 2017
- Procedure 0PT-80.1, Reactor Pressure Vessel ASME Section XI Pressure Test, May 11, 2017
In-Service Tests (IST)
Reactor Coolant System Leak Detection
- Procedure 0OI-02.3, Unit 1 Drywell Leakage Control, April 25, 2017
b. Findings
No findings were identified.
Cornerstone: Emergency Preparedness
1EP6 Drill Evaluation
a. Inspection Scope
The inspectors observed the emergency preparedness drill conducted on June 1, 2017, involving a NSW header leak and RCIC steam line break with failure to isolate. The inspectors observed licensee activities in the simulator and technical support center to evaluate implementation of the emergency plan, including event classification, notification, and protective action recommendations. The inspectors evaluated the licensees performance against criteria established in the licensees procedures.
Additionally, the inspectors attended the post-exercise critique to assess the licensees effectiveness in identifying emergency preparedness weaknesses and verified the identified weaknesses were entered in the CAP. Documents reviewed are listed in the
.
b. Findings
No findings were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator (PI) Verification
a. Inspection Scope
The inspectors reviewed a sample of the performance indicator data, submitted by the licensee, for the Unit 1 and Unit 2 PIs listed below. The inspectors reviewed plant records compiled between April 1, 2016, through March 31, 2017, to verify the accuracy and completeness of the data reported for the station. The inspectors verified that the PI data complied with guidance contained in Nuclear Energy Institute 99-02, Regulatory Assessment Performance Indicator Guideline, and licensee procedures. The inspectors verified the accuracy of reported data that were used to calculate the value of each PI.
In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with PI data. Documents reviewed are listed in the Attachment.
Cornerstone: Mitigating Systems
- Units 1 and 2, safety system functional failures
- Units 1 and 2, emergency AC power system
- Units 1 and 2, cooling water system
b. Findings
No findings were identified.
4OA2 Problem Identification and Resolution
.1 Routine Review
The inspectors screened items entered into the licensees corrective action program to identify repetitive equipment failures or specific human performance issues for follow-up.
The inspectors reviewed condition reports, attended screening meetings, or accessed the licensees computerized corrective action database.
.2 Semi-Annual Trend Review
a. Inspection Scope
The inspectors reviewed issues entered in the licensees corrective action program and associated documents to identify trends that could indicate the existence of a more significant safety issue. The inspectors focused their review on human performance trends during Unit 2 refueling outage B223R1, but also considered the results of inspector daily condition report screenings, licensee trending efforts, and licensee human performance results. The review nominally considered the 6-month period of January 1, 2017, through June 30, 2017, although some examples extended beyond those dates when the scope of the trend warranted. The inspectors compared their results with the licensees analysis of trends. Additionally, the inspectors reviewed the adequacy of corrective actions associated with a sample of the issues identified in the licensees trend reports. The inspectors also reviewed corrective action documents that were processed by the licensee to identify potential adverse trends in the condition of structures, systems, and/or components as evidenced by acceptance of long-standing non-conforming or degraded conditions. Documents reviewed are listed in the
.
b. Findings
No findings were identified.
.3 Annual Follow-Up of Selected Issues
a. Inspection Scope
The inspectors conducted a detailed review of the following condition report:
- NCR 2120423, rising trend in Unit 2 suppression pool temperature, April 30, 2017
The inspectors evaluated the following attributes of the licensees actions:
- complete and accurate identification of the problem in a timely manner
- evaluation and disposition of operability and reportability issues
- consideration of extent of condition, generic implications, common cause, and previous occurrences
- classification and prioritization of the problem
- identification of root and contributing causes of the problem
- identification of any additional condition reports
- completion of corrective actions in a timely manner
Documents reviewed are listed in the Attachment.
b. Findings
No findings were identified.
4OA3 Follow-up of Events
.1 (Closed) Licensee Event Report (LER) 05000324/2017-001-00, Implementation of
Enforcement Guidance Memorandum (EGM) 11-003, Revision 3
a. Inspection Scope
On March 22, 2017, Unit 2 implemented the guidance of EGM 11-003, Revision 3, Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with TS Containment Requirements During Operations with a Potential for Draining the Reactor Vessel. Consistent with this EGM, secondary containment operability was not maintained during operations with the potential for draining the reactor vessel activities. The EGM guidance was implemented from March 22, 2017, at 1209 to March 28, 2017, at 1230. The activities are discussed in Section 4OA5.
Inspectors verified compliance with the guidelines of EGM 11-003 prior to and during these activities. The licensee has submitted a license amendment request to adopt TS Task Force traveler associated with generic resolution of this issue. The licensee entered this issue into the CAP as NCR 2110409. Documents reviewed are listed in the
.
b. Findings
The enforcement actions associated with this LER are documented in Sections 4OA5.
No findings were identified during the review of this LER. This LER is closed.
.2 (Closed) LER 05000324/2017-002-00, Plant Mode Change with Primary Containment
a. Inspection Scope
On April 13, 2017, Unit 2 was in Mode 4 preparing to exit refueling outage B223R1. The primary containment was being vented to ensure habitability during maintenance in the drywell. At 2347, the reactor was taken to Mode 2 with the primary containment still aligned for venting. In this condition, the drywell ventilation makes the primary containment inoperable due to the drywell and the suppression chamber being in communication to each other. With primary containment inoperable during startup, the plant violated Limiting Condition for Operation (LCO) 3.0.4, which requires all LCOs to be met for the plant condition prior to entry into the applicable mode.
The licensee reported this event in accordance with 10 CFR 50.72(b)(3)(v)(D), a non-emergency 8-hour report. The licensee also reported this event in accordance with 10 CFR 50.73(a)(2)(i)(B), for entering a condition prohibited by TSs, and 10 CFR 50.73(a)(2)(v)(D), for a loss of safety function. The cause of the event was the failure of operations personnel to initiate a tracking LCO for primary containment being inoperable in accordance with licensee procedure 0OI-01.01, BNP Conduct of Operations Supplement. The licensee determined a tracking LCO should have been initiated to ensure the primary containment was restored to operable prior to entering Mode 2. As immediate corrective actions, the licensee restored containment to operable on April 14, 2017, at 0030, and the Shift Manager and Control Room Supervisor were removed from shift. Further, a remediation plan was developed and implemented to assess the Shift Manager and Control Room Supervisor for watch standing and reinstatement. The licensee entered this issue into CAP as NCR 2116753. Documents reviewed are listed in the Attachment.
b. Findings
The enforcement actions associated with this LER are documented in Section 4OA7.
No findings were identified during the review of this LER. This LER is closed.
.3 (Closed) LER 05000325;324/2016-006-01, Control Room AC Units Inoperable Due to
Corroded Supports
a. Inspection Scope
On December 14, 2016, the 2D control room AC unit was declared inoperable due to corrosion on the support channels, and Units 1 and 2 entered TS 3.7.4, Condition A. On January 30, 2017, the 1D control room AC unit was declared inoperable for corrosion on the support channels. The corrosion was due to trapped moisture in contact with steel supports exposed to a local marine environment. The corrosion degraded the supports to the point that the safety function of the AC unit would be lost during a seismic event.
Since the degradation was due to corrosion, both units were determined to be inoperable at the same time. The conditions were determined to have existed longer than the TS 3.7.4 allowed outage time. The licensee entered this issue into the CAP as NCRs 2113799 and 2113800. As corrective actions, the licensee replaced both AC units supports, declared the units operable, and inspected the 2E control room AC unit for corrosion.
b. Findings
The inspectors identified the licensee failed to recognize the 1D AC unit was inoperable on December 1, 2016, during the periodic inspection. The inspectors documented an NRC-identified Green NCV in Inspection Report 05000325;324/2017001, Section 4OA2.
No additional findings were identified during the review of this LER. This LER is closed.
.4 (Closed) LER 05000325;324/2017-002, Foreign Material in Switch Results in Unplanned
Automatic Start of Emergency Diesel Generators
a. Inspection Scope
On April 17, 2017, Unit 2 was in Mode 1 at approximately 22 percent of rated power and was starting up from a refueling outage. Operators manually tripped the Unit 2 main turbine to halt increasing bearing vibration. The power circuit breakers for the Unit 2 main generator did not open as expected on the turbine trip, but subsequently opened when main generator reverse power relays actuated. This resulted in the automatic start of all four EDGs. The EDGs did not tie to emergency busses because offsite power was still available. This event was caused by a turbine stop valve limit switch failing to open due to foreign material intrusion. There was no safety impact of the failed limit switch.
The licensee entered this issue into the CAP as NCR 2117033. As corrective actions, the licensee will inspect similar switches during the next scheduled refueling outage on each unit (i.e., spring 2018 for Unit 1 and spring 2019 for Unit 2).
b. Findings
No findings were identified.
4OA5 Other Activities
.1 Implementation of EGM 11-003, Revision 3, Enforcement Guidance Memorandum on
Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements During Operations with a Potential for Draining the Reactor Vessel
a. Inspection Scope
The inspectors reviewed the plants implementation of NRC EGM 11-003, Revision 3, during Unit 2 maintenance activities for operations with a potential for draining the reactor vessel (OPDRVs), during the Unit 2 refueling outage. Inspectors verified that for all dates, all other TS requirements were met during OPDRVs with secondary containment inoperable. Documents reviewed are listed in the Attachment.
b. Findings
Description.
During the Unit 2 refueling outage, the OPDRVs activities are listed below:
- March 21, 2017: 6 gallons per minute leakage for maintenance associated with the 2B recirculation pump seal rebuild
- March 23, 2017: 48 gallons per minute leakage for hydraulic control unit draining to support rod maintenance
- March 24, 2017: 65 gallons per minute leakage to close the excess flow check valve and cap the drain line
- March 27, 2017: 71.2 gallons per minute leakage to replace the low power range monitors and intermediate power range monitors
These activities took place without secondary containment being operable.
Enforcement.
TS 3.6.4.1, Secondary Containment, requires that secondary containment be operable and is applicable during OPDRVs. The required action if secondary containment is inoperable in this condition is to initiate actions to suspend OPDRVs immediately. Contrary to the above, on March 21, 2017, March 23, 2017, March 24, 2017, and March 27, 2017, the licensee failed to maintain secondary containment operable while performing OPDRVs.
However, because the violations were identified during the discretion period described in EGM 11-003, Revision 3, and the licensee met the criteria established in the EGM prior to and during these activities, the NRC exercised enforcement discretion (Enforcement Action-17-123) for the dates of March 21, 2017, March 23, 2017, March 24, 2017, and March 27, 2017, in accordance with Section 3.5, Violations Involving Special Circumstances, of the NRC Enforcement Policy and, therefore, will not issue enforcement action for this violation. The inspectors observed that Brunswick has already submitted a license amendment request (BSEP 17-0060) on June 29, 2017 which was accepted for review by the NRC on July 18, 2017. The licensee entered this issue into the CAP as NCR 2110409.
4OA6 Meetings, Including Exit
On July 12, 2017, the resident inspectors presented the inspection results to Mr. Gideon and other members of the licensees staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
4OA7 Licensee Identified Violations
The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRC requirements which meet the criteria of the NRC Enforcement Policy, for being dispositioned as a non-cited violation.
- LCO 3.0.4 states, in part, when an LCO is not met, entry into a MODE or other specified condition in the applicability shall only be made when the associated ACTIONS to be entered permit continued operation in the MODE for an unlimited period of time.
Contrary to the above, on April 13, 2017, at 2347, the licensee changed modes on Unit 2 from Mode 4 to Mode 2 with the primary containment inoperable. Specifically, TS 3.6.1.1, Primary Containment, requires primary containment to be operable in Modes 1, 2, and 3, however, the reactor was taken to Mode 2 with the primary containment still aligned for venting. In this condition, the drywell ventilation makes the primary containment inoperable due to the drywell and the suppression chamber being in communication to each other. This condition is allowed for two hours before the required action to shutdown to Mode 4 is required. Since the required action is not permitted for continued operation, a violation of LCO 3.0.4 occurred. The cause of the event was the failure of operations personnel to initiate a tracking LCO for primary containment being inoperable in accordance with licensee procedure 0OI-01.01, BNP Conduct of Operations Supplement. The licensee determined a tracking LCO should have been initiated to ensure the primary containment was restored to operable prior to entering Mode 2. As immediate corrective actions, the licensee restored containment to operable on April 14, 2017, at 0030, and the Shift Manager and Control Room Supervisor were removed from shift. Further, a remediation plan was developed and implemented to assess the Shift Manager and Control Room Supervisor for watch standing and reinstatement.
This finding is associated with the Barrier Integrity Cornerstone. Using IMC 0609, Appendix G, Shutdown Operations Significance Determination Process, 1, Exhibit 4, Barrier Integrity Screening Questions, the finding screened to Green because it did not degrade the ability to close or isolate the containment, it did not degrade the physical integrity of reactor containment, and it did not involve an actual reduction in function of hydrogen control. This issue was documented in the licensees CAP as NCR 2116753.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
K. Allen
Director, Design Engineering
B. Bagwell
Environmental & Chemistry
A. Baker
Supervisor, Environmental & Chemistry
J. Berry
Supervisor, LOCT Training
A. Brittain
Director, Nuclear Plant Security
P. Brown
Manager, Nuclear Performance Improvement
B. Bryant
Manager, Nuclear Oversight
J. Bryant
Regulatory Affairs
R. Carpenter
Radiation Monitor Engineer
P. Dubrouillet
Director, Nuclear Engineering, Mechanical Systems
C. Dunsmore
Manager, Nuclear Outage
W. Gideon
Vice President
L. Grzeck
Manager, Nuclear Regulatory Affairs
J. Hicks
Manager, Nuclear Training
B. Houston
Manager, Nuclear Maintenance
J. Johnson
Manager, Nuclear Chemistry
K. Krueger
Manager, Nuclear Operations
J. McAdoo
Manager, Nuclear Rad Protection
K. Moser
B. Murray
Plant Manager
Licensing
J. Nolin
General Manager, Nuclear Engineering
W. Orlando
Superintendent, E/I&C
O. Paladiy
Welding Engineer/Repair & Replacement Engineer
A. Padleckas
Assistant Ops Manager, Training
D. Petrusic
Superintendent, Environmental & Chemistry
J. Pierce
Manager, Nuclear Work Management
E. Rau
Operations Training
M. Regan
Project Manager, Major Projects
L. Rohrbaugh
Operator Training
M. Smiley
Manager, Nuclear Ops Training
L. Spencer
Operator Training
R. Wiemann
Director, Nuclear Engineering, Electrical Reactor Systems
E. Williams
Operations Manager
S. Williams
BWRVIP Program Engineer
C. Winslow
ISI Program Engineer
B. Wonton
Director, Nuclear Organizational Effectiveness
State of North Carolina
P. Cox
Department of Health and Human Services
NRC Personnel
S. Rose
Chief, Reactor Projects Branch 4
P. Niebaum
Acting Chief, Reactor Projects Branch 4
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened and Closed
- 05000324/2017-001-00
LER
Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 (Section 4OA3.1)
- 05000324/2017-002-00 LER Plant Mode Change with Primary Containment Inoperable (Section 4OA3.2)
- 05000325;324/2016-006-01
LER
Control Room AC Units Inoperable Due to Corroded Supports (Section 4OA3.3)
- 05000325;324/2017-002 LER
Foreign Material in Switch Results in Unplanned Automatic Start of Emergency Diesel Generators (Section 4OA3.4)