| issue date = 08/16/2017
| issue date = 08/16/2017
| title = Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2017005 and 05000370/2017005
| title = Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2017005 and 05000370/2017005
| author name = Ehrhardt F J
| author name = Ehrhardt F
| author affiliation = NRC/RGN-II/DRP/RPB1
| author affiliation = NRC/RGN-II/DRP/RPB1
| addressee name = Capps S D
| addressee name = Capps S
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000369, 05000370
| docket = 05000369, 05000370
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:August 16, 2017
-1257 August 16 , 2017 Steven Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078
-8985


SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/
==SUBJECT:==
201 7 005 AND 05000370/
UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2017005 AND 05000370/2017005)
201 7 005)


==Dear Mr. Capps:==
==Dear Mr. Capps:==
The enclosed inspection plan lists the inspections scheduled through June 30, 20 19 for McGuire Nuclear Station
The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for McGuire Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for securi ty-related inspections, which will be sent via separate, non
-publicly available correspondence.


In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 61 1 with any questions you have regarding this letter.


Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.
Sincerely,
: 50-369, 50-370 License Nos.
/RA/  
: NPF-9, NPF-17


===Enclosure:===
Frank Ehrhardt, Chief
McGuire Inspection/Activity Plan (0 9/01/201 7 - 06/3 0/201 9) cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/
201 7 005 AND 05000370/
201 7 005) August 16, 2017 DISTRIBUTION
: M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII: DRP NAME JWorosilo MToth FEhrhardt DATE 8/15/2017 8/15/2017 8/15/2017 OFFICIAL AGENCY RECORD


Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site McGuireInspection / Activity Plan 09/01/2017
Reactor Projects Branch 1  
-06/30/2019 Page 1 of 2 08/14/2017 09:02:19 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/02/2017 10/06/2017DBAI-DESIGN BASES ASSURANCE INSPECTION (TEAM)
6 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 01/22/2018 01/26/2018 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 02/12/2018 02/16/2018 1, 2 IP Design Bases Assurance Inspection (Teams)7111121M 02/26/2018 03/02/2018OL EXAM-INITIAL LICENSE EXAM PREP 3 1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV23511 03/19/2018 03/23/2018OL EXAM-INITIAL LICENSE EXAM 3 1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIESV23511 04/16/2018 04/27/2018 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 IP Fire Protection - NFPA 805 (Triennial)7111105X 04/30/2018 05/04/2018 1, 2 IP Fire Protection - NFPA 805 (Triennial)7111105X 05/14/2018 05/18/2018 EP-EP PROGRAM INSPECTION 3 1, 2 IP A lert and Notification System Testing7111402 06/18/2018 06/22/2018 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/18/2018 06/22/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 06/18/2018 06/22/2018 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/18/2018 06/22/2018 1, 2 IP Performance Indicator Verification71151 06/18/2018 06/22/2018OL RQ-REQUAL INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 06/18/2018 06/22/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 06/25/2018 06/29/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP Problem Identification and Resolution71152B 07/09/2018 07/13/2018 1, 2 IP Problem Identification and Resolution71152B 07/23/2018 07/27/2018 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 IP Inservice Inspection Activities - PWR7111108P 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/24/2018 09/28/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site McGuireInspection / Activity Plan 09/01/2017
Division of Reactor Projects
-06/30/2019 Page 2 of 2 08/14/2017 09:02:19 RP-RP OCCUPATIONAL - WEEK 1 3 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/24/2018 09/28/2018 1, 2 IP Occupational Dose Assessment71124.04 09/24/2018 09/28/2018 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/24/2018 09/28/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 09/24/2018 09/28/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/15/2018 10/19/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/15/2018 10/19/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/15/2018 10/19/2018 1, 2 IP Occupational Dose Assessment71124.04 10/15/2018 10/19/2018 1, 2 IP Radiation Monitoring Instrumentation71124.05 10/15/2018 10/19/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 10/15/2018 10/19/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/01/2019 04/05/2019 RP-RP RADHAZARD & TRANS 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/01/2019 04/05/2019 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 04/01/2019 04/05/2019 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/01/2019 04/05/2019 RP-RP PUBLIC 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/03/2019 06/07/2019 1, 2 IP Radiological Environmental Monitoring Program71124.07 06/03/2019 06/07/2019 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 06/03/2019 06/07/2019 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17
 
Enclosure:
McGuire Inspection/Activity Plan (09/01/2017 - 06/30/2019)
 
cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2017005 AND 05000370/2017005)
August 16, 2017
 
DISTRIBUTION:
M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
 
ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII: DRP
 
NAME JWorosilo MToth FEhrhardt
 
DATE 8/15/2017 8/15/2017 8/15/2017
 
OFFICIAL AGENCY RECORD
 
17230A280
 
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/14/2017 09:02:19 ISI
- UNIT 1 IN-SERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 10/02/2017 10/06/2017 SGISI
- UNIT 1 SG IN-SERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 10/02/2017 10/06/2017 DBAI
- DESIGN BASES ASSURANCE INSPECTION (TEAM)
 
1, 2 IP Design Bases Assurance Inspection (Teams)
7111121M 01/22/2018 01/26/2018 1, 2 IP Design Bases Assurance Inspection (Teams)
7111121M 02/12/2018 02/16/2018 1, 2 IP Design Bases Assurance Inspection (Teams)
7111121M 02/26/2018 03/02/2018 OL EXAM
- INITIAL LICENSE EXAM PREP
 
1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIES V23511 03/19/2018 03/23/2018 OL EXAM
- INITIAL LICENSE EXAM
 
1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIES V23511 04/16/2018 04/27/2018 TFPI
- TRIENNIAL FIRE PROTECTION INSPECTION
 
1, 2 IP Fire Protection - NFPA 805 (Triennial)
7111105X 04/30/2018 05/04/2018 1, 2 IP Fire Protection - NFPA 805 (Triennial)
7111105X 05/14/2018 05/18/2018 EP
- EP PROGRAM INSPECTION
 
1, 2 IP Alert and Notification System Testing 7111402 06/18/2018 06/22/2018 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/18/2018 06/22/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/18/2018 06/22/2018 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/18/2018 06/22/2018 1, 2 IP Performance Indicator Verification 71151 06/18/2018 06/22/2018 OL RQ
- REQUAL INSPECTION
 
1, 2 IP Licensed Operator Requalification Program 7111111B 06/18/2018 06/22/2018 HS
- TRIENNIAL HEAT SINK PERFORMANCE
 
1, 2 IP Heat Sink Performance 7111107T 06/25/2018 06/29/2018 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
 
1, 2 IP Problem Identification and Resolution 71152B 07/09/2018 07/13/2018 1, 2 IP Problem Identification and Resolution 71152B 07/23/2018 07/27/2018 ISI
- UNIT 2 IN-SERVICE INSPECTION & RVH EXAM
 
2 IP Inservice Inspection Activities - PWR 7111108P 09/24/2018 09/28/2018 RP
- RP OCCUPATIONAL - WEEK 1
 
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2018 09/28/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Enclosure
 
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/14/2017 09:02:19 RP
- RP OCCUPATIONAL - WEEK 1
 
1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2018 09/28/2018 1, 2 IP Occupational Dose Assessment 71124.04 09/24/2018 09/28/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/24/2018 09/28/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 09/24/2018 09/28/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 09/24/2018 09/28/2018 RP
- RP OCCUPATIONAL - WEEK 2
 
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2018 10/19/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/15/2018 10/19/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/15/2018 10/19/2018 1, 2 IP Occupational Dose Assessment 71124.04 10/15/2018 10/19/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 10/15/2018 10/19/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/15/2018 10/19/2018 ISI
- UNIT 1 IN-SERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 04/01/2019 04/05/2019 RP
- RP RADHAZARD & TRANS
 
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/01/2019 04/05/2019 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/01/2019 04/05/2019 SGISI
- UNIT 1 SG IN-SERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 04/01/2019 04/05/2019 RP
- RP PUBLIC
 
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/03/2019 06/07/2019 1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/03/2019 06/07/2019 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 06/03/2019 06/07/2019 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 12:56, 8 January 2025

Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2017005 and 05000370/2017005
ML17230A280
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/16/2017
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Capps S
Duke Energy Carolinas
References
IR 2017005
Download: ML17230A280 (5)


Text

August 16, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2017005 AND 05000370/2017005)

Dear Mr. Capps:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for McGuire Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17

Enclosure:

McGuire Inspection/Activity Plan (09/01/2017 - 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR MCGUIRE NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000369/2017005 AND 05000370/2017005)

August 16, 2017

DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII: DRP

NAME JWorosilo MToth FEhrhardt

DATE 8/15/2017 8/15/2017 8/15/2017

OFFICIAL AGENCY RECORD

17230A280

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/14/2017 09:02:19 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 10/02/2017 10/06/2017 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 10/02/2017 10/06/2017 DBAI

- DESIGN BASES ASSURANCE INSPECTION (TEAM)

1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 01/22/2018 01/26/2018 1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 02/12/2018 02/16/2018 1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 02/26/2018 03/02/2018 OL EXAM

- INITIAL LICENSE EXAM PREP

1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIES V23511 03/19/2018 03/23/2018 OL EXAM

- INITIAL LICENSE EXAM

1 MCGUIRE/APRIL 2018 INITIAL EXAM AT POWER FACILITIES V23511 04/16/2018 04/27/2018 TFPI

- TRIENNIAL FIRE PROTECTION INSPECTION

1, 2 IP Fire Protection - NFPA 805 (Triennial)

7111105X 04/30/2018 05/04/2018 1, 2 IP Fire Protection - NFPA 805 (Triennial)

7111105X 05/14/2018 05/18/2018 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 06/18/2018 06/22/2018 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/18/2018 06/22/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/18/2018 06/22/2018 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/18/2018 06/22/2018 1, 2 IP Performance Indicator Verification 71151 06/18/2018 06/22/2018 OL RQ

- REQUAL INSPECTION

1, 2 IP Licensed Operator Requalification Program 7111111B 06/18/2018 06/22/2018 HS

- TRIENNIAL HEAT SINK PERFORMANCE

1, 2 IP Heat Sink Performance 7111107T 06/25/2018 06/29/2018 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 07/09/2018 07/13/2018 1, 2 IP Problem Identification and Resolution 71152B 07/23/2018 07/27/2018 ISI

- UNIT 2 IN-SERVICE INSPECTION & RVH EXAM

2 IP Inservice Inspection Activities - PWR 7111108P 09/24/2018 09/28/2018 RP

- RP OCCUPATIONAL - WEEK 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2018 09/28/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site McGuire Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/14/2017 09:02:19 RP

- RP OCCUPATIONAL - WEEK 1

1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2018 09/28/2018 1, 2 IP Occupational Dose Assessment 71124.04 09/24/2018 09/28/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/24/2018 09/28/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 09/24/2018 09/28/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 09/24/2018 09/28/2018 RP

- RP OCCUPATIONAL - WEEK 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2018 10/19/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/15/2018 10/19/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/15/2018 10/19/2018 1, 2 IP Occupational Dose Assessment 71124.04 10/15/2018 10/19/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 10/15/2018 10/19/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/15/2018 10/19/2018 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/01/2019 04/05/2019 RP

- RP RADHAZARD & TRANS

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/01/2019 04/05/2019 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/01/2019 04/05/2019 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/01/2019 04/05/2019 RP

- RP PUBLIC

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/03/2019 06/07/2019 1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/03/2019 06/07/2019 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 06/03/2019 06/07/2019 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.