IR 05000282/2017005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 28, 2017 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 31: | Line 31: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Billy Dickson, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Enclosure: | |||
Inspection Plan cc: Distribution via LISTSERV | Billy Dickson, Chief Branch 2 Division of Reactor Projects | ||
Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Enclosure: | |||
Inspection Plan | |||
cc: Distribution via LISTSERV | |||
}} | }} | ||
Latest revision as of 12:44, 8 January 2025
| ML17240A315 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 08/28/2017 |
| From: | Billy Dickson NRC/RGN-III/DRP/B2 |
| To: | Northard S Northern States Power Company, Minnesota |
| References | |
| IR 2017005 | |
| Download: ML17240A315 (5) | |
Text
August 28, 2017
SUBJECT:
UPDATED INSPECTION PLAN FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (REPORT 05000282/2017005 AND 05000306/2017005)
Dear Mr. Northard:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Prairie Island Nuclear Generating Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
The NRC staff completed Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans at Prairie Island Nuclear Generating Plant, Units 1 and 2 on July 14, 2017, to confirm full implementation of orders Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The results of the inspection can be found in inspection report 05000282/2017007; 05000306/201007. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 630-829-9827 with any questions you have regarding this letter.
Sincerely,
/RA/
Billy Dickson, Chief Branch 2 Division of Reactor Projects
Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Enclosure:
Inspection Plan
cc: Distribution via LISTSERV