| number = ML17264A661
| number = ML17264A661
| issue date = 09/20/2017
| issue date = 09/20/2017
| title = Ltr 09/20/17 Clinton Power Station - Acknowledgement of Reply to Notice of Violation 05000461/2017002-02; Dated August 11, 2017
| title = Acknowledgement of Reply to Notice of Violation 05000461/2017002-02; Dated August 11, 2017
| author name = Hills D E
| author name = Hills D
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000461
| docket = 05000461
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:September 20, 2017
[[Issue date::September 20, 2017]]


Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
==SUBJECT:==
CLINTON POWER STATION-ACKNOWLEDGEMENT OF REPLY TO NOTICE OF VIOLATION 05000461/2017002-02; DATED AUGUST 11, 2017


SUBJECT: CLINTON POWER STATIONACKNOWLEDGEMENT OF REPLY TO NOTICE OF VIOLATION 05000461/2017002-02; DATED AUGUST 11, 2017
==Dear Mr. Stoner:==
This letter acknowledges the letter from Mr. T. R. Stoner, Site Vice President, Clinton Power Station, to the U.S. Nuclear Regulatory Commission (NRC), dated September 7, 2017, which provided a response to the Notice of Violation that was issued in NRC Inspection Report 05000461/ 2017002; dated August 11, 2017.
 
We reviewed your response and find that it meets the requirements of Title 10 of the Code of Federal Regulations, Part 2.201, Notice of Violation. In the letter dated September 7, 2017, you identify the corrective actions that your facility has taken or plans to take to address the violation. The NRC has reviewed the corrective actions, which appear to be adequate, and has no further questions at this time. The actions that Clinton Power Station has taken, and plans to take to address the violation, may be examined during a future inspection.
 
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.


==Dear Mr. Stoner:==
Please feel free to contact Mr. Vijay Meghani of my staff if you have any questions regarding this inspection. Mr. Vijay Meghani can be reached at 630-829-9751.
This letter acknowledges the letter from Mr. T. R. Stoner, Site Vice President, Clinton Power Station, to the U.S. Nuclear Regulatory Commission (NRC), dated September 7, 2017, which provided a response to the Notice of Violation that was issued in NRC Inspection Report 05000461/ 2017002; dated August 11, 2017. We reviewed your response and find that it meets the requirements of Title 10 of the Code of Federal RegulationsNotice of Violation. In the letter dated September 7, 2017, you identify the corrective actions that your facility has taken or plans to take to address the violation. The NRC has reviewed the corrective actions, which appear to be adequate, and has no further questions at this time. The actions that Clinton Power Station has taken, and plans to take to address the violation, may be examined during a future inspection. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part Please feel free to contact Mr. Vijay Meghani of my staff if you have any questions regarding this inspection. Mr. Vijay Meghani can be reached at 630-829-9751.
 
Sincerely,
/RA/
 
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV
 
Letter to Bryan C. Hanson from David E. Hills dated September 20, 2017 SUBJECT: CLINTON POWER STATION-ACKNOWLEDGEMENT OF REPLY TO NOTICE OF VIOLATION 05000461/2017002-02; DATED AUGUST 11, 2017 DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII
 
ADAMS Accession Number ML17264A661 OFFICE RIII
 
RIII
 
RIII
 
RIII
 
NAME VMeghani:cl DHills
 
DATE 09/20/17 09/20/17


Sincerely,/RA/ David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50461 License No. NPF62 cc: Distribution via LISTSERV Letter to Bryan C. Hanson from David E. Hills dated September 20, 2017 SUBJECT: CLINTON POWER STATIONACKNOWLEDGEMENT OF REPLY TO NOTICE OF VIOLATION 05000461/2017002-02; DATED AUGUST 11, 2017 DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII  ADAMS Accession Number ML17264A661 OFFICE RIII RIII RIII RIII NAME VMeghani:cl DHills DATE 09/20/17 09/20/17 OFFICIAL RECORD COPY
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 09:54, 8 January 2025

Acknowledgement of Reply to Notice of Violation 05000461/2017002-02; Dated August 11, 2017
ML17264A661
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/20/2017
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2017002
Preceding documents:
Download: ML17264A661 (2)


Text

September 20, 2017

SUBJECT:

CLINTON POWER STATION-ACKNOWLEDGEMENT OF REPLY TO NOTICE OF VIOLATION 05000461/2017002-02; DATED AUGUST 11, 2017

Dear Mr. Stoner:

This letter acknowledges the letter from Mr. T. R. Stoner, Site Vice President, Clinton Power Station, to the U.S. Nuclear Regulatory Commission (NRC), dated September 7, 2017, which provided a response to the Notice of Violation that was issued in NRC Inspection Report 05000461/ 2017002; dated August 11, 2017.

We reviewed your response and find that it meets the requirements of Title 10 of the Code of Federal Regulations, Part 2.201, Notice of Violation. In the letter dated September 7, 2017, you identify the corrective actions that your facility has taken or plans to take to address the violation. The NRC has reviewed the corrective actions, which appear to be adequate, and has no further questions at this time. The actions that Clinton Power Station has taken, and plans to take to address the violation, may be examined during a future inspection.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please feel free to contact Mr. Vijay Meghani of my staff if you have any questions regarding this inspection. Mr. Vijay Meghani can be reached at 630-829-9751.

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV

Letter to Bryan C. Hanson from David E. Hills dated September 20, 2017 SUBJECT: CLINTON POWER STATION-ACKNOWLEDGEMENT OF REPLY TO NOTICE OF VIOLATION 05000461/2017002-02; DATED AUGUST 11, 2017 DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII

ADAMS Accession Number ML17264A661 OFFICE RIII

RIII

RIII

RIII

NAME VMeghani:cl DHills

DATE 09/20/17 09/20/17

OFFICIAL RECORD COPY