| issue date = 05/04/1992
| issue date = 05/04/1992
| title = Rev 3 to Vol 3,Part 9 of Plant Operating Manual Procedure OST-1083, ESFAS Train 'A' Slave Relay Test 18 Months Interval Modes 5 & 6.
| title = Rev 3 to Vol 3,Part 9 of Plant Operating Manual Procedure OST-1083, ESFAS Train a Slave Relay Test 18 Months Interval Modes 5 & 6
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:9210280094 921009 PDR ADOCK 0500040 Osl                                                    P PD R CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 3 PART 9 PROCEDURE TYPE'perations                 Surveillance Test OST-1083 TITLE 'SFAS                     Train "A" Slave Relay Test 18 Months Interval Modes 5 and 6 REVISION 3 HNP 00CUMKMTCGMTRQ.
{{#Wiki_filter:Osl 9210280094 921009 PDR ADOCK 0500040 P
NOTE: This procedure has been screened in accordance with       PLP-100           AQ criteria and determined to be a Case II procedure.       This procedure requires POD or Outage meeting, SubUnit Manager, or     higher,           3 )
PDR CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 3 PART 9
evaluation as to level of management required to be       involved in preparations and conduct of this test.
PROCEDURE TYPE'perations Surveillance Test OST-1083 TITLE'SFAS Train "A" Slave Relay Test 18 Months Interval Modes 5 and 6
                                                ~FFFl >~E APR ) 6     Ml APPROVED:
REVISION 3 HNP 00CUMKMTCGMTRQ.
xgna     re                               Date
NOTE: This procedure has been screened in accordance with PLP-100 AQ criteria and determined to be a Case II procedure.
                                  ~~J TITLE:                 MANAGER - OPERATIONS HNP CONTROLLED COPY          P~                   Page 1 of 52
This procedure requires POD or Outage meeting, SubUnit Manager, or higher, 3
)
evaluation as to level of management required to be involved in preparations and conduct of this test.
~FFFl >~E APR )
6 Ml APPROVED:
xgna re
~~J Date TITLE:
MANAGER - OPERATIONS HNP CONTROLLED COPYP~
Page 1 of 52


OS1 List of Effective Pa es
OS1 List of Effective Pa es
~Pa e                                             Revision 1, 2                                             AC-3/1 3, 4 5, 5a                         ~   ~ ~   ~ ~ . AC-3/1 6-52                ~ \ I ~   ~  I ~ ~              3 OST-1083 Rev. 3                               Page 2 of 52
~Pa e
Revision 1,
2 3,
4 5,
5a 6-52
~
~
~
~
\\
I
~
~
I
~
~
AC-3/1
~
~
AC-3/1 3
OST-1083 Rev.
3 Page 2 of 52


OS1 1.0   PURPOSE
OS1 1.0 PURPOSE
, The purpose   of this procedure is to test the operability of the slave relays of the Solid State Protection System using the Go Circuits. This test will be performed every 18 months during refueling and during each cold shutdown greater than 72 hours unless the relay has been tested within the previous 92 days.
, The purpose of this procedure is to test the operability of the slave relays of the Solid State Protection System using the Go Circuits.
This procedure satisfies the requirements of Technical Specifications 4.3.2     ', Table 4.3-2, Steps l.b, 3.a.2, 3.a.3, 3.c.3, 5.c, 6.d, 6g, 7.a, 7.b, 8.a, and 8.b for Train A. ESFAS Slave Relay Response testing via OST's 1809, 1812, and 1825 or 1826 fulfills the requirements of this test.
This test will be performed every 18 months during refueling and during each cold shutdown greater than 72 hours unless the relay has been tested within the previous 92 days.
This procedure satisfies the requirements of Technical Specifications 4.3.2', Table 4.3-2, Steps l.b, 3.a.2, 3.a.3, 3.c.3, 5.c, 6.d, 6g, 7.a, 7.b, 8.a, and 8.b for Train A.
ESFAS Slave Relay Response testing via OST's
: 1809, 1812, and 1825 or 1826 fulfills the requirements of this test.


==2.0 REFERENCES==
==2.0 REFERENCES==
 
L.
L. Tech. Spec. 3.3.2
Tech.
: 2. FSAR   Section 7.3
Spec.
: 3. SD-103, Reactor Protection/Engineered       Safety Features Actuation System
3.3.2 2.
: 4. Procedures:
FSAR Section 7.3 3.
: a. OP-155, Diesel Generator Emergency Power System
SD-103, Reactor Protection/Engineered Safety Features Actuation System 4.
: b. OST-1825, Safety   Injection - ESF Response Time Train   A
Procedures:
: c. OST-1812;   AFW Isolation   ESF Response Time
a.
: d. OST-1809, Switchover to Recirc     Sump " ESF,Response Time
OP-155, Diesel Generator Emergency Power System b.
: e. OST-1826, Safety   Injection   ESF Response Time Train   B
OST-1825, Safety Injection - ESF Response Time Train A c.
: 5. Drawings:
OST-1812; AFW Isolation ESF Response Time d.
: a. Simplified Flow   Diagrams 2165-S (1)   544, Feedwater System (2)   547, Circulating   & Service Water System (3)   550, Containment Spray System (4)   551, Steam Generator Blowdown System (5)   552, Sample System (Nuclear)
OST-1809, Switchover to Recirc Sump " ESF,Response Time e.
(6)   1303, Chemi'cal & Volume Control System (7)   1308, 1309, 1310, Safety   Injection System OST"1083 Rev. 3                                               Page 3 of 52
OST-1826, Safety Injection ESF Response Time Train B
5.
Drawings:
a.
Simplified Flow Diagrams 2165-S (1)
: 544, Feedwater System (2) 547, Circulating
& Service Water System (3) 550, Containment Spray System (4)
: 551, Steam Generator Blowdown System (5)
: 552, Sample System (Nuclear)
(6)
: 1303, Chemi'cal
& Volume Control System (7)
: 1308, 1309, 1310, Safety Injection System OST"1083 Rev.
3 Page 3 of 52


OS1
OS1


==2.0   REFERENCES==
==2.0 REFERENCES==
(continued)
(continued) b.
: b. Control Wiring Diagrams 2166-8401 (1)               Shs. 270, 409, 413, 1206, 1988 Safety Injection   (K601)
Control Wiring Diagrams 2166-8401 (1)
(2)               Shs. 242, 243, 972, 1211, Safety         Injection (K602)
Shs.
(3)               Shs. 271, 407, 411, 1207, 2972.     " Safety Ingectxon (K603)
: 270, 409, 413,
(4)               Shs. 1204, 1205, 1209, 2286 Safety         Injection (K608)
: 1206, 1988 Safety Injection (K601)
(5)               Shs. 1988, 2639, 2641, 3177       - Safety Injection (K610)
(2)
(6)               Shs. 1933, 1944,   - Loop 1 AFW Isolation   (K615)
Shs.
(7)               Shs. 1934, 1945 Loop     2 AFW Isolation   (K616)
: 242, 243,
(8)               Shs. 1935, 1946 Loop     3 AFW Isolation   (K617)
: 972, 1211, Safety Injection (K602)
(9)               Shs. 286, 421, 2253, 2254, 2703     - Containment Phase   A Isolation (K622)
(3)
(10) Shs. 416, 418, 458 " Safety Injection (K740)
Shs.
(11) Shs. 418, 1039                 - RWST Lo-Lo Level (K739, K741)
: 271, 407, 411,
(12) Shs. 317                 Safety   Injection   (K636)
: 1207, 2972. " Safety Ingectxon (K603)
: c. Vendor'Drawings.'1)
(4)
EBASCO Dwg. 1364-46575 Sheets     9, 10,   ll (2)               EBASCO Dwg. 1364-2776 Sheets     16-31 (3)               EBASCO. Dwg. 1364-46576 Sheets     9, 10,   11
Shs.
: 6. Solid State Protection System Equipment Reference Manual PRL Volume                 1.
: 1204, 1205,
: 7. Solid State Protection System Equipment Reference Manual PRL Volume                 2.
: 1209, 2286 Safety Injection (K608)
OST-10&3 Rev. 3                                                                 Page 4   of 52
(5)
Shs.
: 1988, 2639,
: 2641, 3177 - Safety Injection (K610)
(6)
Shs.
: 1933, 1944, - Loop 1
AFW Isolation (K615)
(7)
Shs.
: 1934, 1945 Loop 2
AFW Isolation (K616)
(8)
Shs.
: 1935, 1946 Loop 3
AFW Isolation (K617)
(9)
Shs.
: 286, 421,
: 2253, 2254, 2703 - Containment Phase A Isolation (K622)
(10) Shs.
: 416, 418, 458 " Safety Injection (K740)
(11) Shs.
: 418, 1039 -
RWST Lo-Lo Level (K739, K741)
(12) Shs.
317 Safety Injection (K636) c.
Vendor'Drawings.'1)
EBASCO Dwg. 1364-46575 Sheets 9, 10, ll (2)
EBASCO Dwg. 1364-2776 Sheets 16-31 (3)
EBASCO. Dwg. 1364-46576 Sheets 9,
10, 11 6.
Solid State Protection System Equipment Reference Manual PRL Volume 1.
7.
Solid State Protection System Equipment Reference Manual PRL Volume 2.
OST-10&3 Rev.
3 Page 4 of 52


Osl 3.0   PRERE UISITES
Osl 3.0 PRERE UISITES 1.
: 1. Review the Control Room Status File and verify that the systems being tested are aligned in a manner that will support the performance of this test.
Review the Control Room Status File and verify that the systems being tested are aligned in a manner that will support the performance of this test.
: 2. The performance   of this OST has been coordinated with other plant evolutions such that the minimum operability requirements of Technical Specifications will continue to be satisfied during the performance of the OST or the appropriate LCO's have been written.
2.
: 3. Any special tools and equipment required per Section 5.0 of this procedure   have been obtained.
The performance of this OST has been coordinated with other plant evolutions such that the minimum operability requirements of Technical Specifications will continue to be satisfied during the performance of the OST or the appropriate LCO's have been written.
3.
Any special tools and equipment required per Section 5.0 of this procedure have been obtained.
Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
: 5. IGC support required for this test has been obtained.
5.
: 6. Electrical   Maintenance support required for this test   has been obtained.
IGC support required for this test has been obtained.
7.-   All switches in   the Safeguards Test Cabinet are in the "NORMAL"   position.
6.
CAUTION This procedure involves an infrequent test or evolution with the potential to reduce margins of safety or introduce unwanted transients or accidents if performed incorrectly, depending on the specific plant conditions at the time of the test. Conditions and management involvement are documented on PLP-100-1.                                       'A 7a. A PLP-100   shift brief has been performed by the applicable level of   management,.
Electrical Maintenance support required for this test has been obtained.
: 8. The Shift Foreman has given permission to perform this   OST and all prerequisites are met.
7.-
Shift Foreman                             Date OST-1083 Rev. 3                                                 Page 5 og 52 r
All switches in the Safeguards Test Cabinet are in the "NORMAL" position.
CAUTION This procedure involves an infrequent test or evolution with the potential to reduce margins of safety or introduce unwanted transients or accidents if performed incorrectly, depending on the specific plant conditions at the time of the test.
Conditions and management involvement are documented on PLP-100-1.
'A 7a.
A PLP-100 shift brief has been performed by the applicable level of management,.
8.
The Shift Foreman has given permission to perform this OST and all prerequisites are met.
Shift Foreman Date OST-1083 Rev.
3 Page 5 og 52 r


OS1 4.0   PRECAUTIONS AND LIMITATIONS Prior to performing safeguards actuations, plant configuration should be established to allow for minimum disturbance to plant operation (i.e., valve positions, starting of redundant equipment).
OS1 4.0 PRECAUTIONS AND LIMITATIONS Prior to performing safeguards actuations, plant configuration should be established to allow for minimum disturbance to plant operation (i.e., valve positions, starting of redundant equipment).
AC OST-1083 Rev. 3                                           Page 5a of 52
OST-1083 Rev.
3 Page 5a of 52 AC
(
(


Osl 4.0   PRECAUTIONS AND LIMITATIONS     (continued)
Osl 4.0 PRECAUTIONS AND LIMITATIONS (continued) 2.
: 2. Before starting a new step, clear all trips and reset any associated alarms, lights and relays unless the procedure specifies otherwise.
Before starting a new step, clear all trips and reset any associated
: 3. If any   response   is not as required, stop procedure and immediately   notify the Shift   Foreman for resolution.
: alarms, lights and relays unless the procedure specifies otherwise.
: 4. During Solid Plant Operation, steps that isolate charging and/or letdown should not be performed unless the alternate pressure= control methods are readily available and the operators are aware of expected pressure fluctuations.
3.
: 5. Steps   within a procedure section must be completed in the order written before the next section is started.
If any response is not as required, stop procedure and immediately notify the Shift Foreman for resolution.
5.0   TOOLS AND E UIPMENT
4.
: 1. Headsets   or Radios (as required),,
During Solid Plant Operation, steps that isolate charging and/or letdown should not be performed unless the alternate pressure= control methods are readily available and the operators are aware of expected pressure fluctuations.
: 2. Voltmeter     Fluke 8600A (or equivalent)
5.
: 3. Stopwatch Fischer Model 14-649-5 (or equivalent)
Steps within a procedure section must be completed in the order written before the next section is started.
: 4. Electrical Jumper(s)
5.0 TOOLS AND E UIPMENT 1.
: 5. Ronan X-85   Calibrator or equivalent (as required per drained S/G) 6.0   ACCEPTANCE CRITERIA
Headsets or Radios (as required),,
: 1. For Go Circuit testing, all   components listed respond as specified after the slave relay is energized       and after it is reset.
2.
: 2. Each device   that was activated shall be documented as to the condition     left at the completion of the section.
Voltmeter Fluke 8600A (or equivalent) 3.
7 '   PROCEDURE STEPS NOTE:     To reopen   isolation valves after. test, control switch for motor"operated valve must be placed momentarily to the SHUT position, then to OPEN position to reset seal"in relays. The associated flow control valve of the opposite header.gay then also be re-opened.
Stopwatch Fischer Model 14-649-5 (or equivalent) 4.
OST-1083 Rev. 3                                             Page 6 of 52
Electrical Jumper(s) 5.
Ronan X-85 Calibrator or equivalent (as required per drained S/G) 6.0 ACCEPTANCE CRITERIA 1.
For Go Circuit testing, all components listed respond as specified after the slave relay is energized and after it is reset.
2.
Each device that was activated shall be documented as to the condition left at the completion of the section.
7 '
PROCEDURE STEPS NOTE:
To reopen isolation valves after. test, control switch for motor"operated valve must be placed momentarily to the SHUT position, then to OPEN position to reset seal"in relays.
The associated flow control valve of the opposite header.gay then also be re-opened.
OST-1083 Rev.
3 Page 6 of 52


Osl 7.1   Train   A Safet   In'ection   Go   Circuit (K601) (continued)
Osl 7.1 Train A Safet In'ection Go Circuit (K601) (continued) 2.
: 2. Establish     phone communications between operations     in the Hain Control     Room and the Safeguards Test Cabinet.
Establish phone communications between operations in the Hain Control Room and the Safeguards Test Cabinet.
CAUTION At SSPS   (A) Output Cabinet No.       1 have an I&C Technician connect a multimeter across Terminal        1 of   TB604 and ground and Terminal 2 of TB604 and ground to ensure        no voltage is present which may damage multimeter.
CAUTION At SSPS (A) Output Cabinet multimeter across Terminal TB604 and ground to ensure multimeter.
: 3. At SSPS (A) Output Cabinet No. 1, have an I&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.
No.
: 4. Open   Protection System Safeguards Test Train "A" Cabinet 2   door and, with Shift Foreman,'s approval, commence slave rel,ay test.
1 have an I&C Technician connect a
: 5. Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K601 by turning test switch S907 clockwise then depressing momentarily. (Test switch will spring return to the normal   left-hand position.)
1 of TB604 and ground and Terminal 2 of no voltage is present which may damage 3.
: 6. Verify the following equipment starts or repositions           as follows;
At SSPS (A) Output Cabinet No.
: a.     Diesel Generator     1A                 STARTS
1, have an I&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.
: b.     1CS-214, CSIP's   Miniflow Isolation     SHUT
4.
: c.     1SI-248, Accumulator 1C-SA Discharge       OPEN
Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman,'s
: d.     1SI-1, CSIP's to BIT Isolation             OPEN
: approval, commence slave rel,ay test.
: e.     1SP-227,   S/G 1C-SN Sample CNMT   Isol   SHUT 7 ~  At SSPS (A) Output Cabinet No. 1, have an I&C Technician connect a multimeter across Terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are closed. This verifies the DG 1A-SA Breaker 106 trip clrcul t   ~
5.
OST-1083 Rev.     3                                               Page 8 of 52
Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K601 by turning test switch S907 clockwise then depressing momentarily.
(Test switch will spring return to the normal left-hand position.)
6.
Verify the following equipment starts or repositions as follows; a.
Diesel Generator 1A STARTS b.
1CS-214, CSIP's Miniflow Isolation SHUT c.
1SI-248, Accumulator 1C-SA Discharge OPEN d.
1SI-1, CSIP's to BIT Isolation OPEN 7 ~
e.
1SP-227, S/G 1C-SN Sample CNMT Isol SHUT At SSPS (A) Output Cabinet No. 1, have an I&C Technician connect a multimeter across Terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are closed.
This verifies the DG 1A-SA Breaker 106 trip clrcul t ~
OST-1083 Rev.
3 Page 8 of 52


OS1 7.1 Train   A Safet   In 'ection   Go Circuit (K601) (continued)
OS1 7.1 Train A Safet In 'ection Go Circuit (K601) (continued) 8.
: 8. Position reset switch     S921 to RESET.
Position reset switch S921 to RESET.
: 9. Verify the following     equipment status'.
9.
: a. Diesel Generator 1A-SA                   RUNNING H
Verify the following equipment status'.
s   ICS-2l4, CSIP's Miniiloe Isolation           SHUT
a.
: c. 1SI-248, Accumulator 1C-SA Discharge         SHUT
Diesel Generator 1A-SA RUNNING H
: d. 1SI-1, CSIP's to BIT Isolation               OPEN
s ICS-2l4, CSIP's Miniiloe Isolation SHUT c.
: e. 1SP-227,   S/GP 1C-SN Sample   CNHT Isol   SHUT
1SI-248, Accumulator 1C-SA Discharge SHUT d.
: 10. At SSPS (A) Output Cabinet No. 1, have an 1&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.
1SI-1, CSIP's to BIT Isolation OPEN e.
: 11. Direct the I&C Technician to disconnect the multimeter from terminals 1 and 2 of TB604 in SSPS (A) Output Cabinet No. 1.
1SP-227, S/GP 1C-SN Sample CNHT Isol SHUT 10.
Technician                   Verifier
At SSPS (A) Output Cabinet No.
: 12. Secure Diesel Generator 1A-SA per OP-155.
1, have an 1&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.
: 13. Realign the following valves as required         for plant operations'.
11.
: a. 1CS-214,   CSIP's   Miniflow Isolation Final Position         Positioner         Verifier
Direct the I&C Technician to disconnect the multimeter from terminals 1 and 2 of TB604 in SSPS (A) Output Cabinet No.
: b. 1SI-248, Accumulator 1C-SA Discharge Final Position   'ositioner               Verifier
1.
: c. 1SI-1, CSIP's to BIT Isolation Final Position         Positioner         Verifier OST-1083 Rev. 3                                               Page 9 of 52
Technician Verifier 12.
Secure Diesel Generator 1A-SA per OP-155.
13.
Realign the following valves as required for plant operations'.
a.
1CS-214, CSIP's Miniflow Isolation Final Position Positioner b.
1SI-248, Accumulator 1C-SA Discharge Verifier Final Position 'ositioner c.
1SI-1, CSIP's to BIT Isolation Verifier Final Position Positioner Verifier OST-1083 Rev.
3 Page 9 of 52


OS1 7.1 Train   A Safet   In'ection   Go   Circuit (K601) (continued)
OS1 7.1 Train A Safet In'ection Go Circuit (K601) (continued) d.
: d. 1SP-227,   S/G 1C-SN Sample     CNMT Isolation Final Position           Positioner         Verifier
1SP-227, S/G 1C-SN Sample CNMT Isolation Final Position Positioner Verifier e.
: e. 1SI-248 breaker on     MCC 1A21-SA Cub. 3D Final Position           Positioner         Verifier
1SI-248 breaker on MCC 1A21-SA Cub.
: 14. Verify Accumulator 1C-SA is repressurized         once discharge valve 1SI-248 is SHUT if depressurized in         a previous step.
3D Final Position Positioner Verifier 14.
7.2   Train A Safet   In'ection   Go   Circuit (K602)
Verify Accumulator 1C-SA is repressurized once discharge valve 1SI-248 is SHUT if depressurized in a previous step.
7.2 Train A Safet In'ection Go Circuit (K602)
CAUTION Ensure the CSIP suction valves are aligned properly to maintain adequate suction flow to the pumps during the test.
CAUTION Ensure the CSIP suction valves are aligned properly to maintain adequate suction flow to the pumps during the test.
: 1. Direct the I&C Technician to install jumper between terminals 21 and 35 in ARP"19A (SA)F3 to defeat the             SG Low Pressure interlock for 1BD-49 unless already done by OP"183.03. (Ref. 2.5.b.2) 2~   If any   Steam Generator level is below 38.5X, direct the 1&C Technician to   lift   the lead at Terminal 60 in ARP-19A (SA) F3 to defeat the S.G. low level interlock for 1BD-49.
1.
3 E   Prepare the following equipment         for testing as follows.'
Direct the I&C Technician to install jumper between terminals 21 and 35 in ARP"19A (SA)F3 to defeat the SG Low Pressure interlock for 1BD-49 unless already done by OP"183.03.
              ~   1CS-291,   RWST   to CSIP Isolation           SHUT
(Ref. 2.5.b.2) 2 ~
: b. 1CS-165, VCT Outlet       Isolation             OPEN C~   1CC-114,   CCW to Sample   HX Isolation     OPEN
If any Steam Generator level is below 38.5X, direct the 1&C Technician to lift the lead at Terminal 60 in ARP-19A (SA) F3 to defeat the S.G.
: d. 1BD-49, S/G 1C-SN Blowdown       CNMT Isol   OPEN
low level interlock for 1BD-49.
: e. 1CC-304,   CCW to Gross Failed Fuel Detector                                       OPEN
3 E Prepare the following equipment for testing as follows.'
: f. SGWLU pump   for   C S/G                   SECURED OST-1083 Rev. 3                                                   Page 10 of 52
~
b.
1CS-291, RWST to CSIP Isolation 1CS-165, VCT Outlet Isolation SHUT OPEN C ~
d.
1CC-114, CCW to Sample HX Isolation 1BD-49, S/G 1C-SN Blowdown CNMT Isol OPEN OPEN e.
1CC-304, CCW to Gross Failed Fuel Detector OPEN f.
SGWLU pump for C S/G SECURED OST-1083 Rev.
3 Page 10 of 52


OS1 7.2 Train A Safet     In'ection - Go   Circuit (K602) (continued)
OS1 7.2 Train A Safet In'ection - Go Circuit (K602) (continued) 4.
: 4. Have the I&C   Technician perform the following steps:
Have the I&C Technician perform the following steps:
: a. At SSPS   (A) Output Cabinet No. 1,   verify the voltage between Time Delay Relay TD1 Terminal       6 (+)
a.
and Logic Ground (-) is 48 + 2 VDC.
At SSPS (A) Output Cabinet No.
: b. At SSPS (A) Output Cabinet No. 1,   verify the voltage between Time Delay Relay TD1 Terminal       2 (+)
1, verify the voltage between Time Delay Relay TD1 Terminal 6 (+)
and Logic Ground (-) is 0 + 2 VDC.
and Logic Ground (-) is 48
: c. At SSPS (A) Logic Cabinet, connect the multimeter between TB505-7 (+) and Signal Ground     (-).
+
: d. If a   Reactor Trip Signal is present as a result of a drained steam generator(s),     lift and tape transmitter field leads and install Ronans (transmitter simulator) on the following points to clear the Lo-Lo Level Bistable on the appropriate steam generator(s):
2 VDC.
                            'A'team   Generator PIC-2       TBF 10 and 11 PIC-3       TBF 10 and 11
b.
                            'B'team   Generator PIC-2       TBF 13 and 14 V
At SSPS (A) Output Cabinet No.
PIC-3        TBF 13 and 14
1, verify the voltage between Time Delay Relay TD1 Terminal 2 (+)
                            'C'team   Generator PIC-2       TBF 16 and 17 PIC-3       TBF 16 and 17
and Logic Ground (-) is 0
: e. Adjust Ronan(s) as necessary to clear the Lo-Lo Level Bistables for the appropriate steam generator.
+
OST-1083 Rev. 3                                             Page 11 of 52
2 VDC.
c.
At SSPS (A) Logic Cabinet, connect the multimeter between TB505-7 (+) and Signal Ground (-).
d.
If a Reactor Trip Signal is present as a result of a drained steam generator(s), lift and tape transmitter field leads and install Ronans (transmitter simulator) on the following points to clear the Lo-Lo Level Bistable on the appropriate steam generator(s):
'A'team Generator PIC-2 TBF 10 and 11 PIC-3 TBF 10 and 11
'B'team Generator PIC-2 PIC-3 TBF 13 and 14 V
TBF 13 and 14
'C'team Generator PIC-2 TBF 16 and 17 PIC-3 TBF 16 and 17 e.
Adjust Ronan(s) as necessary to clear the Lo-Lo Level Bistables for the appropriate steam generator.
OST-1083 Rev.
3 Page 11 of 52


Os 1 7.2   Train   A Safet   In 'ection '- Go   circuit (K602) (continued)
Os 1 7.2 Train A Safet In 'ection '- Go circuit (K602) (continued)
NOTE:       To   prevent flashing in Sample HX, secure sampling prior to energizing slave relay K602.
NOTE:
: 5. Establish phone communications between operations             in the Main Control Room and Safeguards Test Cabinet.
To prevent flashing in Sample HX, secure sampling prior to energizing slave relay K602.
: a. Close then reopen the Reactor Trip Beakers as needed to reset the P-4 interlock.
5.
: 6. Open   Protection System Safeguards Test Train "A" Cabinet 2   door and, with Shift Foreman's approval, commence the slave relay test.
Establish phone communications between operations in the Main Control Room and Safeguards Test Cabinet.
: 7. Simultaneously start a stop watch to time the SI Time Delay Relay and energize slave relay K602 by turning test switch S908 clockwise and depressing momentarily.
a.
Close then reopen the Reactor Trip Beakers as needed to reset the P-4 interlock.
6.
Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's
: approval, commence the slave relay test.
7.
Simultaneously start a stop watch to time the SI Time Delay Relay and energize slave relay K602 by turning test switch S908 clockwise and depressing momentarily.
(Test switch will spring return to the normal left"hand position.)
(Test switch will spring return to the normal left"hand position.)
NOTES       The   following   two steps must be performed       within   60 seconds   after K602 has   been energized to     verify   SI will not reset.
NOTES The following two steps must be performed within 60 seconds after K602 has been energized to verify SI will not reset.
: 8. Place the Safety     Injection Train   A Reset Switch to RESET.
8.
: 9. Verify the SI     RESET AUTO-SI BLOCKED     Light is   OFF at Bypass Permissive     Light Box (BPLB).
Place the Safety Injection Train A Reset Switch to RESET.
: 10. Veri.fy the following valves reposition         as follows:
9.
a ~   1CS"291,   RWST to CSIP   Isolation             OPEN
Verify the SI RESET AUTO-SI BLOCKED Light is OFF at Bypass Permissive Light Box (BPLB).
: b. 1CS-165, VCT,Outlet     Isolation               SHUT C ~    1CC-114,   CCW to Sample   HX Isolation       SHUT
10.
: d. 1BD-49, S/G 1C-SN Blowdown       CNMT Isol     SHUT
Veri.fy the following valves reposition as follows:
: e. 1CC-304,   CCW to Gross Failed Fuel Detector                                         SHUT OST-1083 Rev. 3                                                     Page   12 of 52
a ~
1CS"291, RWST to CSIP Isolation OPEN b.
C ~
1CS-165, VCT,Outlet Isolation 1CC-114, CCW to Sample HX Isolation SHUT SHUT d.
1BD-49, S/G 1C-SN Blowdown CNMT Isol SHUT e.
1CC-304, CCW to Gross Failed Fuel Detector SHUT OST-1083 Rev.
3 Page 12 of 52


OS1 7.2   Train A Safet   In'ection -   Go circuit         (K602) (continued)
OS1 7.2 Train A Safet In'ection - Go circuit (K602) (continued) 11.
: 11. Verify the voltage     on the multimeter connected in Step 7.2.4 increases to 48 + 2 VDC one minute + 3 Sec. after slave relay K602 is energized.
Verify the voltage on the multimeter connected in Step 7.2.4 increases to 48
VDC                                         T'e
+
: 12. Place the Safety Injection Train               A Reset switch to Reset.
2 VDC one minute
: 13. Verify the voltage     on the   multimeter connected in Step 7.2.4 decreases   to 0 + 2 VDC.
+
VDC
3 Sec. after slave relay K602 is energized.
: 14. Verify the   SI RESET AUTO-SI BLOCKED             Light is ON at Bypass Permissive Light Box (BPLB).
VDC T'e 12.
: 15. Position Test Switch     S921 to Reset.
Place the Safety Injection Train A Reset switch to Reset.
: 16. Verify the following valve       status.'.
13.
1CS-291, RWST   to CSIP Isolation                   OPEN
Verify the voltage on the multimeter connected in Step 7.2.4 decreases to 0 +
: b. 1CS-165, VCT Outlet     Isolation                     SHUT
2 VDC.
: c. 1CC-114, CCW to Sample           HX Isolation     SHUT
VDC 14.
: d. 1BD-49, S/G 1C-SN Blowdown             CNMT Isol   SHUT
Verify the SI RESET AUTO-SI BLOCKED Light is ON at Bypass Permissive Light Box (BPLB).
: e. 1CC-304, CCW to Cross Failed Fuel Detector                                             SHUT
15.
: 17. Direct the   I&C Technician to disconnect the multimeter connected in Step 7.2.4.
Position Test Switch S921 to Reset.
Technician                                       Verifier
16.
: 18. Direct the I&C Technician to remove jumper installed in Step 7.2.1 unless required by OP-183.03.
Verify the following valve status.'.
Technician                                     Verifier OST-1083 Rev. 3                                                         Page 13 of 52
1CS-291, RWST to CSIP Isolation OPEN b.
1CS-165, VCT Outlet Isolation c.
1CC-114, CCW to Sample HX Isolation SHUT SHUT d.
1BD-49, S/G 1C-SN Blowdown CNMT Isol SHUT e.
1CC-304, CCW to Cross Failed Fuel Detector SHUT 17.
Direct the I&C Technician to disconnect the multimeter connected in Step 7.2.4.
Technician Verifier 18.
Direct the I&C Technician to remove jumper installed in Step 7.2.1 unless required by OP-183.03.
Technician Verifier OST-1083 Rev.
3 Page 13 of 52


OS1 7.2 Train A Safet   Iniection   Go circuit   (K602) (continued)
OS1 7.2 Train A Safet Iniection Go circuit (K602) (continued) 19.
: 19. Direct the I&C Technician to reconnect the lead lifted in Step 7.2.2 (Mark this step NA if Section 7.3 is to be performed next).
Direct the I&C Technician to reconnect the lead lifted in Step 7.2.2 (Mark this step NA if Section 7.3 is to be performed next).
                .echnician                             Verifier
.echnician Verifier 20.
: 20. Reposition the following valves     as required for plant operations:
Reposition the following valves as required for plant operations:
CAUTION 1CS-165, VCT Outlet Isolation, must be reopened before closing 1CS-291, RWST to CSIP Isolation, to prevent losing suction to the CSIP's.
CAUTION 1CS-165, VCT Outlet Isolation, must be reopened before closing 1CS-291, RWST to CSIP Isolation, to prevent losing suction to the CSIP's.
: a. 1CS-165, VCT   Outlet Isolation Final Position       Positioner         Verifier
a.
: b. 1CS-291, RWST to CSIP Isolation Final Position       Positioner         Verifier
1CS-165, VCT Outlet Isolation Final Position Positioner b.
: c. 1CC-114, CCW to Sample HX Isolation Final Position       Positioner         Verifier
1CS-291, RWST to CSIP Isolation Verifier Final Position Positioner c.
: d. 1BD-49, S/G 1C-SN BLovdovn     CNMT   Isolation Final Position       Positioner         Verifier
1CC-114, CCW to Sample HX Isolation Verifier Final Position Positioner Verifier d.
: e. 1CC-304, CCW to Cross Failed Fuel Detector Final Position       Positioner         Verifier
1BD-49, S/G 1C-SN BLovdovn CNMT Isolation Final Position Positioner Verifier e.
: 21. Return the   SGWLU System to desired   lineup per OP-183.03.
1CC-304, CCW to Cross Failed Fuel Detector Final Position Positioner Verifier 21.
OST"1083 Rev. 3                                                 Page 14 of 52
Return the SGWLU System to desired lineup per OP-183.03.
OST"1083 Rev.
3 Page 14 of 52


OS1 7.2   Train   A Safet   In 'ection - Go Circuit   (K602) (continued)
OS1 7.2 Train A Safet In 'ection - Go Circuit (K602) (continued) 22.
: 22. Remove Ronans     and land leads   lifted in   Step 7.2.4.d on the appropriate points:
Remove Ronans and land leads lifted in Step 7.2.4.d on the appropriate points:
                              'A'team   Generator PIC-2       TBF 10 and 11 TECHNICIAN                         VERIFIER PIC-3       TBF 10 and 11 TECHNICIAN                         VERIFIER
'A'team Generator PIC-2 TBF 10 and 11 TECHNICIAN VERIFIER PIC-3 TBF 10 and 11 TECHNICIAN
                              'B'team   Generator PIC-2       TBF 13 and 14 TECHNICIAN                         VERIFIER PIC-3       TBF 13 and 14 TECHNICIAN                         VERIFIER
'B'team Generator VERIFIER PIC-2 TBF 13 and 14 TECHNICIAN VERIFIER PIC-3 TBF 13 and 14 TECHNICIAN
                              'C'team   Generator PIC-2       TBF 16 and 17 TECHNICIAN                         VERIFIER PIC-3       TBF 16 and 17 TECHNICIAN                         VERIFIER 7.3 Train   A Safet   In ection -   Go Circuit   (K603)
'C'team Generator VERIFIER PIC-2 TBF 16 and 17 TECHNICIAN PIC-3 TBF 16 and 17 VERIFIER TECHNICIAN 7.3 Train A Safet In ection - Go Circuit (K603)
CAUTION The following test isolates the normal charging line.
VERIFIER CAUTION The following test isolates the normal charging line.
: 1. Direct the I6C Technician to install jumper between terminals 44 and 58 in ARP-19A (SA)F3 to defeat the           SG Low Pressure     interlock for   1BD-11 unless   already done by OP-183.01. (Ref. 2.5.b.3)
1.
OST-1083 Rev. 3                                                   Page 15 of 52
Direct the I6C Technician to install jumper between terminals 44 and 58 in ARP-19A (SA)F3 to defeat the SG Low Pressure interlock for 1BD-11 unless already done by OP-183.01.
(Ref. 2.5.b.3)
OST-1083 Rev.
3 Page 15 of 52


Os 1 7.3   Train   A Safet   In'ection -   Go Circuit   (K603) (continued)
Os 1 7.3 Train A Safet In'ection - Go Circuit (K603) (continued) 2.
: 2. If any Steam Generator level is below 38.5X, direct the I&C Technician to   lift the lead at terminal 60 in ARP-19A (SA) F3 to defeat the S.G. low level interlock for 1BD-11 (Mark this step NA if. the lead was not reconnected   in Section 7.2).
If any Steam Generator level is below 38.5X, direct the I&C Technician to lift the lead at terminal 60 in ARP-19A (SA)
: 3. Prepare the following equipment       for testing as follows'.
F3 to defeat the S.G.
a ~   1CS-238,   Charging Line   Isolation         OPEN
low level interlock for 1BD-11 (Mark this step NA if. the lead was not reconnected in Section 7.2).
: b. 1SI-4, BIT Outlet Isolation                   SHUT C ~   1SI-246, Accumulator 1A-SA Discharge           SHUT
- 3.
: d. 1SI-246, Control Switch                       SHUT
Prepare the following equipment for testing as follows'.
: e. 1BD-11, S/G 1A-SN Blowdown       Isolation     OPEN 1SI-246 Breaker on     MCC 1A21-SA Cob.e SC   SHUT g ~   1SI-1, CSIP's to BIT Isolation                 SHUT
a ~
: h. 1SI-2, CSIP's to BIT Isolation                 SHUT 1 ~  SGWLU pump   for A SIG                     SECURED
b.
: j. Train A Ventilation'.
1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation OPEN SHUT C ~
(1)   3CZ-B1(SA-1),   CR Norm Intake       OPEN (MCB)
1SI-246, Accumulator 1A-SA Discharge SHUT d.
(2)   3CZ-B3(SA-1),   CR Norm Exh           OPEN (MCB)
1SI-246, Control Switch SHUT e.
(3) E-9(1A-SA), Normal Exhaust       Fan     ON (MCB)
1BD-11, S/G 1A-SN Blowdown Isolation OPEN 1SI-246 Breaker on MCC 1A21-SA Cob.e SC SHUT g ~
(4)   3CZ-BS(SA-l), Equip Prot     Room Air OPEN (AEP-1)         Inlet Vlv (5)   3CZ-B7(SA"1), Elec Equip Prot       Room OPEN (AEP-1)         Vent Isol L
h.
(6)  3AC-D4(SA-~)s   RAB Swgr Rm A   Ret   SHUT (AEP-1)         Air Damper (7)   E-28(1A-SA), Swgr     Rm A Exh Fan     ON (AEP-1)
1 ~
OST-1083 Rev. 3                                                   Page 16 of 52
1SI-1, CSIP's to BIT Isolation 1SI-2, CSIP's to BIT Isolation SGWLU pump for A SIG SHUT SHUT SECURED j.
Train A Ventilation'.
(1) 3CZ-B1(SA-1),
CR Norm Intake (MCB)
OPEN (2) 3CZ-B3(SA-1),
CR Norm Exh (MCB)
OPEN (3)
E-9(1A-SA), Normal Exhaust Fan ON (MCB)
(4) 3CZ-BS(SA-l), Equip Prot Room Air OPEN (AEP-1)
Inlet Vlv (5)
(6) 3CZ-B7(SA"1), Elec Equip Prot Room OPEN (AEP-1)
Vent Isol L
3AC-D4(SA-~)s RAB Swgr Rm A Ret SHUT (AEP-1)
Air Damper (7)
E-28(1A-SA),
Swgr Rm A Exh Fan ON (AEP-1)
OST-1083 Rev.
3 Page 16 of 52


Osl 7.3   Train A Safet In 'ection - Co Circuit   (K603) (continued)
Osl 7.3 Train A Safet In 'ection - Co Circuit (K603) (continued)
(8) E-28(1B-SA), Swgr   Rm A Exh Fan     ON (AEP-1)
(8)
(9) 3AC-D3(SA-1), Swgr   Rm. A OAI 1st 1 OPEN (AEP-', SLB-11)
E-28(1B-SA),
(10) E-10(1A-SA), Elec Equip     Rm Exh Fan ON (A P-1)
Swgr Rm A Exh Fan ON (AEP-1)
(11) 3CZ-Bll(SA-1),   CR Em Filt   OAI Vlv OPEN (MCB)
(9) 3AC-D3(SA-1), Swgr Rm. A OAI 1st 1 OPEN (AEP-', SLB-11)
(12) 3CZ"B9(SA-1)   CR Em Filt OAI   Vlv (MCB)                                   OPEN (13) R-13(l&2A-NNS),   ARR For Comp/Comm   OFF (AEP-3)           Rm (14) R-13(1&2B-NNS)   ARR For Comp/Comm Rm (AEP-3)                                 OFF (15) CK-B7-1&2,   Comp Rm Normal   Intake   OPEN (AEP-3)
(10) E-10(1A-SA), Elec Equip Rm Exh Fan ON (A P-1)
(16) CK"B8-1&2,   Comp Rm Normal Intake     OPEN (AEP-3)
(11) 3CZ-Bll(SA-1),
(17) 3CZ-D16(SA"1),   CR EM Filt   Recirc   SHUT (MCB)
CR Em Filt OAI Vlv OPEN (MCB)
NOTE:       Accumulator 1A-SA must be depressurized or at the same pressure as the RCS to prevent injection of water into the loops. If necessary, use 1SI"295 and 1SI-298 to reduce the pressure in the accumulator.
(12) 3CZ"B9(SA-1)
: 4. Verify Accumulator   1A"SA pressure is less than or equal to RCS pressure.
CR Em Filt OAI Vlv (MCB)
5     Establish phone communications between operations       in the Main Control Room and the Safeguards Test Cabinet.
OPEN (13) R-13(l&2A-NNS), ARR For Comp/Comm OFF (AEP-3)
: 6. Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.
Rm (14) R-13(1&2B-NNS)
OST-1083 Rev. 3                                               Page 17 of 52
ARR For Comp/Comm Rm (AEP-3)
OFF (15) CK-B7-1&2, Comp Rm Normal Intake OPEN (AEP-3)
(16) CK"B8-1&2, Comp Rm Normal Intake OPEN (AEP-3)
(17) 3CZ-D16(SA"1),
CR EM Filt Recirc SHUT (MCB)
NOTE:
Accumulator 1A-SA must be depressurized or at the same pressure as the RCS to prevent injection of water into the loops.
If necessary, use 1SI"295 and 1SI-298 to reduce the pressure in the accumulator.
4.
Verify Accumulator 1A"SA pressure is less than or equal to RCS pressure.
5 Establish phone communications between operations in the Main Control Room and the Safeguards Test Cabinet.
6.
Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's
: approval, commence the slave relay test.
OST-1083 Rev.
3 Page 17 of 52


Osl 7.3 Train   A Safet   In 'ection - Go Circuit   (K603) (continued)
Osl 7.3 Train A Safet In 'ection - Go Circuit (K603) (continued) 7.
: 7. Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily.
: 8. Verify the equipment, realigns     as follows:
(Test switch will spring return to the normal left-hand position.)
a ~   1CS-238,   Charging Line   Isolation         SHUT
8.
: b. 1SI-4, BIT Outlet Isolation                   OPEN C ~  1SI-246, Accumulator 1A-SA Discharge           OPEN 1BD-11, S/G lA"SN Blowdown       Isolation     SHUT
Verify the equipment, realigns as follows:
: e. Train A Ventilation:
a ~
(1)   3CZ-B1(SA-l),   CR Norm Intake       SHUT (MCB)
b.
(2)   3CZ-B3(SA-1),   CR Norm Exh           SHUT (MCB)
C ~
(3)   E-9(1A-SA) Normal Exhaust Fan           OFF (MCB)
e.
(4)   3CZ-B5(SA-1), Equip Prot       Room Air SHUT (AEP-1)         Inlet Vlv (5)   3CZ-B7(SA-1), Elec Equip Prot       Room SHUT (AEP-1)         Vent Isol (6)   3AC-D4(SA-1),   RAB Swgr Rm A Ret   OPEN (AEP-1)         Air Damper (7)   E-28(lA-SA), Swgr     Rm A Exh Fan     OFF (AEP-1)
1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation 1SI-246, Accumulator 1A-SA Discharge 1BD-11, S/G lA"SN Blowdown Isolation Train A Ventilation:
(8)   E-28(1B-SA), Swgr     Rm A Exh Fan     OFF (AEP-1)
SHUT OPEN OPEN SHUT (1) 3CZ-B1(SA-l),
(9)   3AC-D3(SA-1), Swgr     Rm A OAI Isol   SHUT (AEP-l, SLB-11)
CR Norm Intake (MCB)
(10) E-10(lA-SAQ, Elec Equip       Rm Exh Fan OFF (AEP-1)
(2) 3CZ-B3(SA-1),
(ll) 3CZ-Bll(SA-1),     CR Emer   Filt OAI     SHUT (MCB)             Vlv OST-1083 Rev. 3                                                 Page 18 of 52
CR Norm Exh (MCB)
(3)
E-9(1A-SA) Normal Exhaust Fan (MCB)
SHUT SHUT OFF (4) 3CZ-B5(SA-1), Equip Prot Room Air SHUT (AEP-1)
Inlet Vlv (5) 3CZ-B7(SA-1), Elec Equip Prot Room SHUT (AEP-1)
Vent Isol (6) 3AC-D4(SA-1),
RAB Swgr Rm A Ret (AEP-1)
Air Damper (7)
E-28(lA-SA), Swgr Rm A Exh Fan (AEP-1)
(8)
E-28(1B-SA),
Swgr Rm A Exh Fan (AEP-1)
OPEN OFF OFF (9) 3AC-D3(SA-1),
Swgr Rm A OAI Isol (AEP-l, SLB-11)
(10) E-10(lA-SAQ, Elec Equip Rm Exh Fan (AEP-1)
(ll) 3CZ-Bll(SA-1),
CR Emer Filt OAI (MCB)
Vlv SHUT OFF SHUT OST-1083 Rev.
3 Page 18 of 52


OS1 7.3 Train A Safet   in'ection   Go Circuit   (K603) (continued)
OS1 7.3 Train A Safet in'ection Go Circuit (K603) (continued)
(12) 3CZ-B9(SA-1),     CR Emer Filt OAI Vlv SHUT (MCB)
(12) 3CZ-B9(SA-1),
(13) R-13(l&"A-NNS),     ARR For Comp/Comm   ON (AEP-3)           Rm (14) R-13(1&2B-NNS),     ARR For Comp/Comm   ON (AEP-3)           Rm (15) CK-B7-1&2,   Comp Rm   Normal Intake   SHUT (AEP-3)
CR Emer Filt OAI Vlv SHUT (MCB)
(16) CK-B8-1&2,   Comp Rm   Normal Intake     SHUT (AEP-3)
(13) R-13(l&"A-NNS), ARR For Comp/Comm ON (AEP-3)
(17) 3CZ-D16(SA-1),   CR Em   Filt Recirc   OPEN (MCB)
Rm (14) R-13(1&2B-NNS),
: 9. Position reset svitch     S921 to RESET.
ARR For Comp/Comm ON (AEP-3)
: 10. Reset the Control Room     Isolation Signal ll. Prepare following equipment       for testing   as follows'.
Rm (15) CK-B7-1&2, Comp Rm Normal Intake SHUT (AEP-3)
: a. Train   A ventilation (1)   CK-B6 (1&2), Smoke Pur   In Comp Rm   OPEN (AEP-3)
(16) CK-B8-1&2, Comp Rm Normal Intake SHUT (AEP-3)
(2) ES-7(1&2-NNS), Smoke Pur Exh Fan         ON (AEP"3)
(17) 3CZ-D16(SA-1),
(3) ES-1A, Purge Exhaust     Fan             ON (MCB)
CR Em Filt Recirc OPEN (MCB) 9.
(4) 3CZ-B17(SA-1),     CR Purge Makeup Vlv   OPEN (MCB)
Position reset svitch S921 to RESET.
(5) 3CZ-B13(SA-1),     CR Purge Exh           OPEN (MCB)
10.
: 12. Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily. (Test svitch             vill spring return to the 'Normal left-hand position).
Reset the Control Room Isolation Signal ll.
OST-1083 Rev. 3                                               Page 19 of 52
Prepare following equipment for testing as follows'.
a.
Train A ventilation (1)
CK-B6 (1&2), Smoke Pur In Comp Rm OPEN (AEP-3)
(2)
ES-7(1&2-NNS),
Smoke Pur Exh Fan ON (AEP"3)
(3)
ES-1A, Purge Exhaust Fan (MCB)
ON (4) 3CZ-B17(SA-1),
CR Purge Makeup Vlv OPEN (MCB)
(5) 3CZ-B13(SA-1),
CR Purge Exh (MCB)
OPEN 12.
Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily.
(Test svitch vill spring return to the 'Normal left-hand position).
OST-1083 Rev.
3 Page 19 of 52


OSl 7.3 Train   A Safet   In'ection   Go Circuit   (K603) (continued)
OSl 7.3 Train A Safet In'ection Go Circuit (K603) (continued) 13.
: 13. Verify the following     equipment realigns as     follows:
Verify the following equipment realigns as follows:
: a. Train A ventilation (1)   CK-B6 (1&2), Smoke   Pur In Comp Rm   SHUT (2)   ES-7(1&2-NNS), Smoke Pur Exh Fan         OFF (3)   ES-lA, Purge Exhaust Fan                 OFF (4)   3CZ-B17(SA-1),   CR Purge Makeup Vlv   SHUT (5)   3CZ-B13(SA-1),   CR Purge Exh           SHUT
a.
: 14. Position reset switch     S921   to RESET.
Train A ventilation (1)
: 15. Verify the following     equipment status:
CK-B6 (1&2), Smoke Pur In Comp Rm SHUT (2)
1CS-238, Charging Line     Isolation           SHUT
ES-7(1&2-NNS),
: b. 1SI-4, BIT Outlet Isolation                     OPEN C ~    1SI-246, Accumulator lA-SA Discharge           SHUT
Smoke Pur Exh Fan OFF (3)
: d. 1BD-'ll, S/G 1A-SN Blowdown     Isolation     SHUT
ES-lA, Purge Exhaust Fan OFF (4) 3CZ-B17(SA-1),
: e. Train A Ventilation (1)   3CZ-Bl(SA-1),   CR Norm Intake         SHUT (MCB)
CR Purge Makeup Vlv SHUT (5) 3CZ-B13(SA-1),
(2)   3CZ-B3(SA-1),   CR Norm Exh             SHUT (MCB)
CR Purge Exh 14.
(3)   E-9(1A-SA), Normal Exhaust Fan           OFF (MCB)
Position reset switch S921 to RESET.
(4)   3CZ-B5(SA-1), Equip Prot       Rm Air     SHUT (AEP"1)         Inlet Vlv (5)   3CZ-B7(SA-l), Elec Equip Prot       Rm   SHUT (AEP-1)         Vent   Isol I
SHUT 15.
(6)   3AC-D4(SA-1')p   RAB Swgr   Rm A Ret     OPEN (AEP-1)         Damper (7)   E"28(lA-SA), Swgr     Rm A   Exh Fan     OFF (AEP-1)
Verify the following equipment status:
OST-1083 Rev. 3                                                 Page 20 of 52
b.
C ~
1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation 1SI-246, Accumulator lA-SA Discharge SHUT OPEN SHUT d.
e.
1BD-'ll, S/G 1A-SN Blowdown Isolation SHUT Train A Ventilation (1) 3CZ-Bl(SA-1),
CR Norm Intake (MCB)
(2) 3CZ-B3(SA-1),
CR Norm Exh (MCB)
SHUT SHUT (3)
E-9(1A-SA), Normal Exhaust Fan (MCB)
(4) 3CZ-B5(SA-1), Equip Prot Rm Air (AEP"1)
Inlet Vlv (5) 3CZ-B7(SA-l), Elec Equip Prot Rm (AEP-1)
Vent Isol I
(6) 3AC-D4(SA-1')p RAB Swgr Rm A Ret (AEP-1)
Damper (7)
E"28(lA-SA), Swgr Rm A Exh Fan (AEP-1)
OFF SHUT SHUT OPEN OFF OST-1083 Rev.
3 Page 20 of 52


OS1 7.3 Train A Safet   In'ection - Go Circuit   (K603) (continued)
OS1 7.3 Train A Safet In'ection - Go Circuit (K603) (continued)
(8)   E-28(1B-SA), Swgr   Rm A   Exh Fan               OFF (AEP-1) 3AC-D3(SA-1), Swgr   Pw A OAI   Isol             SHUT (AEP-1, SLB-ll)
(8)
(10) E"10(1A-SA), Elec Equip     Rm Exh Fan           OFF (AEP-1)
E-28(1B-SA),
(11) 3CZ-B17(SA-1),   CR Purge Makeup           Vlv   SHUT (MCB)
Swgr Rm A Exh Fan OFF (AEP-1) 3AC-D3(SA-1),
(12) 3CZ-B11(SA-1),   CR Emer   Filt OAI             SHUT (MCB)           Vlv (13) R-13(1&2A-NNS),   ARR for Comp/Comm Rm (AEP-3)                                           ON (14) R-13(1&2B-NNS),   ARR for Comp/Comm Rm (AEP-3)                                           ON (15) ES-7(l&2X-NNS),   Smoke Purge Exh                 OFF Fan (AEP-3)
Swgr Pw A OAI Isol SHUT (AEP-1, SLB-ll)
(16) CK"B7-1&2,   Comp Rm   Normal Intake               SHUT (AEP-3)
(10) E"10(1A-SA), Elec Equip Rm Exh Fan OFF (AEP-1)
(17) CK-B8-1&2,Comp   Rm Normal Intake                 SHUT (AEP-3)
(11) 3CZ-B17(SA-1),
(18) CK-B6-1&2,   Smoke Pur   Intake                   SHUT (AEP"3)
CR Purge Makeup Vlv SHUT (MCB)
(19) 3CZ-D16(SA-1),   CR Em Filt   Recirc             OPEN (MCB)
(12) 3CZ-B11(SA-1),
(20) 3CZ"B13(SA-1),   CR Purge Exh                     SHUT (MCB)
CR Emer Filt OAI SHUT (MCB)
(21) ES-1A, Purge Exhaust Fan                           OFF (MCB)
Vlv (13) R-13(1&2A-NNS),
(22) 3CZ-B9(SA"1),   CR Emer Filt OAI             Vlv (MCB) .                                          SHUT
ARR for Comp/Comm Rm (AEP-3)
: 16. Direct the I&C Technician to remove jumper installed in Step. 7.3.1 unless required by OP-183.01 Verifier
ON (14) R-13(1&2B-NNS),
                                                        'echnician OST-1083 Rev. 3                                                         Page 21 of 52
ARR for Comp/Comm Rm (AEP-3)
ON (15) ES-7(l&2X-NNS), Smoke Purge Exh OFF Fan (AEP-3)
(16) CK"B7-1&2, Comp Rm Normal Intake SHUT (AEP-3)
(17) CK-B8-1&2,Comp Rm Normal Intake SHUT (AEP-3)
(18) CK-B6-1&2, Smoke Pur Intake (AEP"3)
SHUT (19)
(20)
SHUT 3CZ-D16(SA-1),
CR Em Filt Recirc OPEN (MCB) 3CZ"B13(SA-1),
CR Purge Exh (MCB)
(21) ES-1A, Purge Exhaust Fan (MCB)
OFF (22) 3CZ-B9(SA"1),
CR Emer Filt OAI Vlv (MCB)
SHUT 16.
Direct the I&C Technician to remove jumper installed in Step.
7.3.1 unless required by OP-183.01
'echnicianVerifier OST-1083 Rev.
3 Page 21 of 52


OS1 7.3   Train A Safet   Iniection   Go Circuit   (K603) (continued)
OS1 7.3 Train A Safet Iniection Go Circuit (K603) (continued) 17.
: 17. Direct the I&C Technician to reconnect the lead lifted in Step 7.3.2 (Mark this Step NA if Section 7.4 is to be performed next).
Direct the I&C Technician to reconnect the lead lifted in Step 7.3.2 (Mark this Step NA if Section 7.4 is to be performed next).
Techni"ian                               Verifier
Techni"ian Verifier 18.
: 18. Realign the following equipment as required for plant operations',
Realign the following equipment as required for plant operations',
: a. 1CS-238, Charging Line     Isolation Final Position       Positioner         Verifier
a.
: b. 1SI-4, BIT Outlet Isolation Final Position       Positioner         Verifier
1CS-238, Charging Line Isolation Final Position Positioner Verifier b.
: c. 1SI-246, Accumulator lA-SA Discharge Final Position       Positioner         Verifier
1SI-4, BIT Outlet Isolation Final Position Positioner Verifier c.
: d. 1BD-ll,   S/G 1A-SN Blowdown   Isolation Final Position       Positioner         Verifier
1SI-246, Accumulator lA-SA Discharge Final Position Positioner d.
: e. 1SI-246 Breaker on     MCC 1A21-SA Cub. 5C Final Position       Positioner         Verifier
1BD-ll, S/G 1A-SN Blowdown Isolation Verifier Final Position Positioner Verifier e.
: f. Train   A Ventilation (1)   3CZ-B1(SA-1),   CR Norm Intake (MCB)
1SI-246 Breaker on MCC 1A21-SA Cub.
Final Position       Positioner         Verifier (2)   E-9(lA-SA), Normal Exhaust     Fan (MCB)
5C Final Position Positioner Verifier f.
Final Position       Positioner       Verifier OST-1083 Rev. 3                                                 Page 22 of 52
Train A Ventilation (1) 3CZ-B1(SA-1),
CR Norm Intake (MCB)
Final Position Positioner Verifier (2)
E-9(lA-SA), Normal Exhaust Fan (MCB)
Final Position Positioner Verifier OST-1083 Rev.
3 Page 22 of 52


OS1 7.3 Train A Safet   In ection "   Go Circuit (K603) (continued)
OS1 7.3 Train A Safet In ection " Go Circuit (K603) (continued)
(3)   3CZ-B3(SA-1),   CR Norm Exh (HCB)
(3) 3CZ-B3(SA-1),
Final Position       Positioner         Verifier (4)   3CZ-B5(SA-I), Equip Pro"     Room Air Inlet Valve (AEP-1)
CR Norm Exh (HCB)
Final Position       Positioner         Verifier (5)   3CZ-B7(SA-l), Elec Equip Prot     Rm Vent Isol (AEP-1)
Final Position Positioner Verifier (4) 3CZ-B5(SA-I), Equip Pro" Room Air Inlet Valve (AEP-1)
Final Position       Positioner         Verifier (6)   3AC-D4(SA"1),   RAB SWGR Rm A Ret Air Damper (AEP-1)
Final Position Positioner Verifier (5) 3CZ-B7(SA-l), Elec Equip Prot Rm Vent Isol (AEP-1)
Final Position       Positioner         Verifier (7)   E-28(1A-SA),   SWGR Rm A Exh Fan (AEP-1)
Final Position Positioner Verifier (6) 3AC-D4(SA"1),
Final Position       Positioner         Verifier (8)   E-28(lB-SA),   SWGR Rm A Exh Fan (AEP-1)
RAB SWGR Rm A Ret Air Damper (AEP-1)
Final Position       Positioner         Verifier (9)   3AC-D3(SA-1), SWGR   Rm A OAI Isol (AEP"1, SLB-11)
Final Position Positioner Verifier (7)
Final Position       Positioner         Verifier (10) E-10(1A-SA), Elec Equip     Rm Exh Fan (AEP-1)
E-28(1A-SA),
Final Position       Positioner         Verifier
SWGR Rm A Exh Fan (AEP-1)
( 11) 3CZ-B17 ( SA-1), CR Purge Nakeup   Vlv (MCB)
Final Position Positioner Verifier (8)
Final Position       Positioner         Verifier OST-1083 Rev. 3                                               Page 23 of 52
E-28(lB-SA),
SWGR Rm A Exh Fan (AEP-1)
Final Position Positioner Verifier (9) 3AC-D3(SA-1),
SWGR Rm A OAI Isol (AEP"1, SLB-11)
Final Position Positioner Verifier (10) E-10(1A-SA), Elec Equip Rm Exh Fan (AEP-1)
Final Position Positioner Verifier
( 11) 3CZ-B17 ( SA-1),
CR Purge Nakeup Vlv (MCB)
Final Position Positioner Verifier OST-1083 Rev.
3 Page 23 of 52


Osl 7.3 Train A Safet   In ection - Co Circuit   (K603) (continued)
Osl 7.3 Train A Safet In ection - Co Circuit (K603) (continued)
(12) 3"2-811(SA-1), CR Emer   Filt OAI Vlv (MCB)
(12) 3"2-811(SA-1),
Final Position       Positioner         Verifier (13) R-13(l&2A-NNS), ARR for Comp/Comm Rm (AEP-3)
CR Emer Filt OAI Vlv (MCB)
Final Position'ositioner               Verifier (14) ES-7(1&2X-NNS), Smoke Pur Exh Fan (AEP-3)
Final Position Positioner Verifier (13) R-13(l&2A-NNS), ARR for Comp/Comm Rm (AEP-3)
Final Position       Positioner         Verifier (15) CK-B7-1&2, Computer   Room Normal Intake (AEP-3)
Final Position'ositioner Verifier (14) ES-7(1&2X-NNS),
Final Position       Positioner         Verifier (16) CK-B8-1&2, Computer   Room Normal intake (AEP"3)
Smoke Pur Exh Fan (AEP-3)
Final Position       Positioner         Verifier (17) CK-B6-1&2, Smoke Pur Intake (AEP-3)
Final Position Positioner Verifier (15) CK-B7-1&2, Computer Room Normal Intake (AEP-3)
Final Position       Positioner         Verifier (18) 3CZ-D16(SA-l), CR Em Filt Recirc (MCB)
Final Position Positioner Verifier (16) CK-B8-1&2, Computer Room Normal intake (AEP"3)
Final Position       Positioner         Verifier (19) 3CZ-B13(SA-1), CR Purge Exh (MCB)
Final Position Positioner Verifier (17) CK-B6-1&2, Smoke Pur Intake (AEP-3)
Final Position       Positioner         Verifier (20) ES-1A, Purge Exhaust Fan Final Position      Positioner          Verifier OST-1083 Rev. 3                                             Page 24 of 52
Final Position Positioner (18) 3CZ-D16(SA-l),
CR Em Filt Recirc (MCB)
Verifier Final Position Positioner Verifier (19) 3CZ-B13(SA-1),
CR Purge Exh (MCB)
Final Position Positioner Verifier (20) ES-1A, Purge Exhaust Fan OST-1083 Rev.
3 Final Position Positioner Verifier Page 24 of 52


Osl 7.3 Train A Safet   In'ection -   Go Circuit (K603) (continued)
Osl 7.3 Train A Safet In'ection - Go Circuit (K603) (continued)
(21) 3CZ"B9(SA-1),     CR Emer Filt OAI   Vlv Final Position         Positioner           Verifier (22) R-13(162B)   ARR for Comp/Comm   Rm (AEP-3)
(21) 3CZ"B9(SA-1),
Final Position         Positioner           Verifier
CR Emer Filt OAI Vlv Final Position Positioner Verifier (22) R-13(162B)
      ]9. Verify Accumulator 1A-SA is repressurized           once discharge valve 1SI-246 is SHUT if depressurized in         a previous step.
ARR for Comp/Comm Rm (AEP-3)
: 20. Return the   SGMLU System to the desired     lineup per OP-183.01.
Final Position Positioner Verifier
7.4 Train A Safet   In'ection   Go Circuit   (K608)
]9.
CAUTION The perEormance   of this test diverts the A Train ESM Return Header to the Auxiliary Reservoir. This test should not be performed             if the Circulating Mater System has been recently chlorinated (check with Chemistry to determine restrictions) OR         if the CTMU System is not available for makeup to the cooling tower basin. Maintain maximum makeup Elow and monitor basin level to avoid the cavitation of a Service Water Pump.
Verify Accumulator 1A-SA is repressurized once discharge valve 1SI-246 is SHUT if depressurized in a previous step.
: 1. Direct the I&C Technician to install jumper between terminals 93 and 107 in ARP-19A (SA)F3 to defeat the           SG Low Pressure interlock Eor 1BD-30 unless already done by OP-183.02.   (Ref. 2.5.b.2)
20.
: 2. If any Steam Generator level is below 38.5X, direct the ISC Technician to   lift the lead at terminal 60 in ARP" 19A (SA) F3 to defeat the SG low level interlock Eor 1BD-30 (Mark this sXep NA       if lead not reconnected in Section 7.3)   ~
Return the SGMLU System to the desired lineup per OP-183.01.
OST-1083 Rev. 3                                                   Page 25 of 52
7.4 Train A Safet In'ection Go Circuit (K608)
CAUTION The perEormance of this test diverts the A Train ESM Return Header to the Auxiliary Reservoir.
This test should not be performed if the Circulating Mater System has been recently chlorinated (check with Chemistry to determine restrictions)
OR if the CTMU System is not available for makeup to the cooling tower basin.
Maintain maximum makeup Elow and monitor basin level to avoid the cavitation of a Service Water Pump.
1.
Direct the I&C Technician to install jumper between terminals 93 and 107 in ARP-19A (SA)F3 to defeat the SG Low Pressure interlock Eor 1BD-30 unless already done by OP-183.02.
(Ref. 2.5.b.2) 2.
If any Steam Generator level is below 38.5X, direct the ISC Technician to lift the lead at terminal 60 in ARP" 19A (SA) F3 to defeat the SG low level interlock Eor 1BD-30 (Mark this sXep NA if lead not reconnected in Section 7.3) ~
OST-1083 Rev.
3 Page 25 of 52


OS1 7.3 Train   A Safet     In 'ection "   Go Circuit (K603) (continued)
OS1 7.3 Train A Safet In 'ection " Go Circuit (K603) (continued) 3.
: 3. Prepare the following equipment           for testing   as fcl.lows:
Prepare the following equipment for testing as fcl.lows:
: a.       1SW-270,   ESW   Hdr A Return to Aux Rsvr     SHUT B
a.
s     1BD-30, S/G IE-SN Bloudoun       CNHT Isol     OPEN
1SW-270, ESW Hdr A Return to Aux Rsvr SHUT B
: c.       1SP-222,   S/G 1B-SN Sample CNMT     Isol       OPEN
s 1BD-30, S/G IE-SN Bloudoun CNHT Isol OPEN c.
: d.       1SP-217,   S/G 1A"SN Sample   CNMT   Isol       OPEN
1SP-222, S/G 1B-SN Sample CNMT Isol OPEN d.
: e.       SGWLU pump     for B S/G                     SECURED 4e   Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
1SP-217, S/G 1A"SN Sample CNMT Isol OPEN e.
: 5. Open     Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's           approval, commence the slave relay test.
SGWLU pump for B S/G SECURED 4e Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
NOTE:       1SM-270     will cycle     from shut to open then back to shut when K608     is energized.
5.
: 6. Energize slave relay K608 by turning test switch S910 clockwise and depressing momentarily. (Test s~itch will spring return to the normal left"hand position.)
Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's
: 7. Verify the following valves realign           as follows',
: approval, commence the slave relay test.
: a.     1SM-270,   ESM   Hdr A Return to Aux Rsvr         OPEN THEN SHUT U.
NOTE:
IBD-30,   S7G   IB-SN Bloudoun   CNHT   Isol     SHUT
1SM-270 will cycle from shut to open then back to shut when K608 is energized.
: c. 1SP-222, S/G 1B-SN Sample       CNMT   Isol       SHUT
6.
: d.     1SP-217,   S/G lA-SN Sample CNMT     Isol       SHUT
Energize slave relay K608 by turning test switch S910 clockwise and depressing momentarily.
: 8. Position reset switch         S921 to RESET.
(Test s~itch will spring return to the normal left"hand position.)
: 9. Verify the following valve status'.
7.
: a.     1SW-270,   ESW Hdr A Return   to Aux Rsvr       SHUT OST-1083 Rev. 3                                                       Page 26 of 52
Verify the following valves realign as follows',
a.
1SM-270, ESM Hdr A Return to Aux Rsvr OPEN THEN SHUT U.
IBD-30, S7G IB-SN Bloudoun CNHT Isol SHUT c.
1SP-222, S/G 1B-SN Sample CNMT Isol SHUT d.
1SP-217, S/G lA-SN Sample CNMT Isol SHUT 8.
Position reset switch S921 to RESET.
9.
Verify the following valve status'.
a.
1SW-270, ESW Hdr A Return to Aux Rsvr SHUT OST-1083 Rev.
3 Page 26 of 52


Osl 7.4 Train A Safet   In ection - Go Circuit (K608) (continued)
Osl 7.4 Train A Safet In ection - Go Circuit (K608) (continued) b.
: b. 1BD-30, S/G 1B"SN Bio+down     CNMT Isol   SHUT
1BD-30, S/G 1B"SN Bio+down CNMT Isol SHUT c.
: c. 1SP-222, S/G 1B-SN Sample CNMT   Isol     SHUT
1SP-222, S/G 1B-SN Sample CNMT Isol SHUT d.
: d. 1SP-217, S/G 1A-SN Sample CNMT     Isol     SHUT
1SP-217, S/G 1A-SN Sample CNMT Isol SHUT 10.
: 10. Direct the   I&C Technician to remove jumper installed in Step. 7.4.1 unless required by OP-183.02.
Direct the I&C Technician to remove jumper installed in Step.
Technician                             Verifier
7.4.1 unless required by OP-183.02.
: 11. Direct the 16C Technician to reconnect the lead lifted in Step 7.4.2.
Technician Verifier 11.
Technician                             Verifier
Direct the 16C Technician to reconnect the lead lifted in Step 7.4.2.
: 12. Reposition the following valves as required for plant operations:
Technician Verifier 12.
: a. 1SW-270, ESW Hdr A Return to Aux Rsvr Final Position       Positioner         Verifier
Reposition the following valves as required for plant operations:
: b. 1BD-30, S/G 18-SN Blovdown     CNMT Isol Final Position       Positioner         Verifier
a.
: c. 1SP-222, S/G 1B-SN Sample   CNMT Isol Final Position       Positioner         Verifier
1SW-270, ESW Hdr A Return to Aux Rsvr Final Position Positioner Verifier b.
: d. 1SP-217, S/G lA-SN Sample CNMT     Isol Final Position       Positioner         Verifier
1BD-30, S/G 18-SN Blovdown CNMT Isol Final Position Positioner c.
: 13. Return the   SGWLU System to the desired lineup per OP-183.02.
1SP-222, S/G 1B-SN Sample CNMT Isol Verifier Final Position Positioner Verifier d.
OST-1083 Rev. 3                                               Page 27 of 52
1SP-217, S/G lA-SN Sample CNMT Isol Final Position Positioner Verifier 13.
Return the SGWLU System to the desired lineup per OP-183.02.
OST-1083 Rev.
3 Page 27 of 52


OS1 7.5 Train A Safet   In'ection   Go     Circuit (K610)
OS1 7.5 Train A Safet In'ection Go Circuit (K610) 1.
: 1. Prepare the equipment       for testing as follows:
Prepare the equipment for testing as follows:
: a. Diesel Generator 1A-SA         Prepare for startup per OP-155
a.
: b. 1CH-149, Chill Water to     NESSR Fan   Clrs   OPEN
Diesel Generator 1A-SA Prepare for startup per OP-155 b.
: c. 1CH-197, Chill Water to     NESSR Fan   Clrs   OPEN
1CH-149, Chill Water to NESSR Fan Clrs OPEN c.
: d. ALB-23-3-7,   RAB NORM EXE XBOL DMPR TRBL OPP
1CH-197, Chill Water to NESSR Fan Clrs OPEN d.
: e. A Train RAB Normal Exhaust Dampers:
ALB-23-3-7, RAB NORM EXE XBOL DMPR TRBL OPP e.
(1)   AV-D3SA-1                                 OPEN (2)   AV-D5SA-1                                 OPEN (3)   AV-D7SA-1                                 OPEN (4)   AV-D9SA-1                                 OPEN (5)   AV-D11SA-1                                 OPEN (6)   AV-D13SA-1                                 OPEN (7)   AV-D15SA-1                                 OPEN (8)   AV-D17SA-1                                 OPEN (9)   AV"D19SA-1                                 OPEN (10) AV-D21SA-1                                 OPEN (11) AV-D23SA-1                                 OPEN (12) AV"D25SA-1                                 OPEN (13) AV-D27SA-1                                 OPEN (14) AV-D29SA-1                                 OPEN (15) AV-D31SA-1                                 OPEN (16) AV-D33SA-1                                 OPEN AV-D35SA-1
A Train RAB Normal Exhaust Dampers:
                                  '17)
(1)
OPEN (18) AV-D37SA-1                                 OPEN OST"1083 Rev. 3                                                   Page 28 of 52
AV-D3SA-1 (2)
AV-D5SA-1 (3)
AV-D7SA-1 (4)
AV-D9SA-1 (5)
AV-D11SA-1 (6)
AV-D13SA-1 (7)
AV-D15SA-1 (8)
AV-D17SA-1 (9)
AV"D19SA-1 (10) AV-D21SA-1 (11) AV-D23SA-1 (12) AV"D25SA-1 (13) AV-D27SA-1 (14) AV-D29SA-1 (15) AV-D31SA-1 (16) AV-D33SA-1
'17)
AV-D35SA-1 (18) AV-D37SA-1 OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OST"1083 Rev.
3 Page 28 of 52


OS1 7.5   Train   A Safet   In ection - Go Circuit (K610) (continued)
OS1 7.5 Train A Safet In ection - Go Circuit (K610) (continued)
(19) AV-D52SA-1                             OPEN (20) AV-D58SA-1                             OPEN (21) AV-D62SA-1                             OPEN (22) AV-D66SA"1                             OPEN (23) AV-D70SA-1                             OPEN (24) AV-D74SA-1                             OPEN (25) AV-D78SA-1                             OPEN (26) AV-D82SA-1                             OPEN (27) AV-D86SA-1                             OPEN
(19) AV-D52SA-1 (20) AV-D58SA-1 (21) AV-D62SA-1 (22) AV-D66SA"1 (23) AV-D70SA-1 (24) AV-D74SA-1 (25) AV-D78SA-1 (26) AV-D82SA-1 (27) AV-D86SA-1 OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN 2.
: 2. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
: 3. Open   Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.
3.
: 4. Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K610 by turning test switch S912 clockvise and depressing momentarily. (Test switch vill spring return to the normal left"hand position.)
Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's
5'erify the         equipment realigns as follows:
: approval, commence the slave relay test.
Diesel Generator 1A-SA                   STARTS
4.
: b. 1CH-149, Chill Water to NESSR Fan Clrs   SHUT C  ~  1CH-197, Chill Water to NESSR Fan Clrs   SHUT
Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K610 by turning test switch S912 clockvise and depressing momentarily.
            'd ~  ALB-23-3-7,   RAB CFORM EXH ISOL DMPR TRBL     ON
(Test switch vill spring return to the normal left"hand position.)
: e. A Train RAB Normal Exhaust Dampers:
5'erify the equipment realigns as follows:
(1) AV-D3SA-1                             SHUT (2 ) AV-D5SA-1                             SHUT OST-1083 Rev. 3                                              Page 29 of 52
Diesel Generator 1A-SA STARTS b.
C ~
'd ~
1CH-149, Chill Water to NESSR Fan Clrs SHUT 1CH-197, Chill Water to NESSR Fan Clrs SHUT ALB-23-3-7, RAB CFORM EXH ISOL DMPR TRBL ON e.
OST-1083 Rev.
3 A Train RAB Normal Exhaust Dampers:
(1)
AV-D3SA-1 (2 )
AV-D5SA-1 SHUT SHUT Page 29 of 52


OS1 7.5 Train A Safet   In'ection - Go Circuit (K610) (continued)
OS1 7.5 Train A Safet In'ection - Go Circuit (K610) (continued)
(3) AV-D7SA-1                             SHUT (4) AV-D9SA-1                             SHUT (5) AV-011SA-1                             SBUT (6) AV-D13SA-1                           SHUT (7) AV-D15SA-1                           SHUT (8) AV"D17SA-1                             SHUT (9) AV-D19SA-1                           SHUT (10) AV-D21SA-1                           SHUT (11) AV-D23SA-1                           SHUT (12) AV-D25SA-1                           SHUT (13) AV-D27SA-1                           SHUT (14) AV-D29SA-1                           SHUT (15) AV-D31SA-1                           SHUT (16) AV-D33SA-1                           SHUT (1/) AV-D35SA-1                           SHUT (18) AV-D37SA-1                           SHUT (19) AV-D52SA-1                           SHUT (20) AV-D58SA-1                           SHUT (21) AV-D62SA-1                           SHUT (22) AV-D66SA"1                           SHUT (23) AV-D70SA-1                           SHUT (24) AV-D74SA-1                           SHUT (25) AV-D78SA-.3.                         SHUT (26) AV-D82SA-1                           SHUT (27) AV-D86SA-1                           SHUT
(3)
: 6. Position reset switch   S921 to RESET.
AV-D7SA-1 (4)
OST-1083 Rev. 3                                           Page 30 of 52
AV-D9SA-1 (5)
AV-011SA-1 (6)
AV-D13SA-1 (7)
AV-D15SA-1 (8)
AV"D17SA-1 (9)
AV-D19SA-1 (10) AV-D21SA-1 (11) AV-D23SA-1 (12) AV-D25SA-1 (13) AV-D27SA-1 (14) AV-D29SA-1 (15) AV-D31SA-1 (16) AV-D33SA-1 (1/) AV-D35SA-1 (18) AV-D37SA-1 (19) AV-D52SA-1 (20) AV-D58SA-1 (21) AV-D62SA-1 (22) AV-D66SA"1 (23) AV-D70SA-1 (24) AV-D74SA-1 (25) AV-D78SA-.3.
(26) AV-D82SA-1 (27) AV-D86SA-1 6.
Position reset switch S921 to RESET.
SHUT SHUT SBUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT OST-1083 Rev.
3 Page 30 of 52


S Osl 7.5  Train  A Safet  In'ection -    Go Circuit  (K610) (continued)
S
: 7. Verify the folloving equipment status'.
: a. Diesel Generator 1A-SA                    RlJNN ING b."  1CH-149,  Chill  Water to  NESSR  Fan C's    SHUT C ~  1CH-197,  Chill  Water to. NESSR Fan  Clrs  SHUT
: d. ALB-23-3-7,  RAB NORM EXH ISOL DMPR TRBL        OFF
: e. A Train  RAB Normal Exhaust Dampers:
(1)  AV-D3SA-1                              ,OPEN (2)  AV-D5SA-1                                OPEN (3)  AV-D7SA"1                                OPEN (4)  AV"D9SA-1                                OPEN (5)  AV-D11SA-1                              OPEN (6)  AV-D13SA-1                              OPEN (7)  AV-D15SA-1                              OPEN (8)  AV-D17SA-1                              OPEN (9)  AV-D19SA-1                              OPEN (10) AV-D21SA-1                              OPEN (11) AV-D23SA-1                              OPEN (12) AV-D25SA-1                              OPEN (13) AV-D27SA-1                              OPEN (14) AV-D29SA-1                              OPEN (15) AV"D31SA-1                              OPEN (16) AV-D33SA-1                              OPEN (17) AV-D35SA~l
                              ':                              OPEN "C.
(18) AV-D37SA-1                              OPEN (19) AV"D52SA-1                              OPEN (20) AV-D58SA-1                              OPEN OST-1083 Rev. 3                                                Page 31 of 52


OS1 7.5 Train A Safet     ln 'ection Go Circuit (K610) (continued)
Osl 7.5 Train A Safet In'ection - Go Circuit (K610) (continued) 7.
(21) AV-D62SA-1                             OPEN (22) AV-D66SA-1                             OPEN (23) AV-D70SA-1                             OPEN (24) AV-D74SA-'PEN (25) AV-D78SA-1                             OPEN (26) AV-D82SA-1                             OPEN (27) AV-D86SA-1                             OPEN
Verify the folloving equipment status'.
: 8. Secure the 1A-SA Diesel Generator per OP-155.
a.
: 9. Return  RAB Normal  Ventilation to service per  OP-172, RAB HVAC  System.
Diesel Generator 1A-SA RlJNNING b."
: 10. Realign the following equipment as required for plant operations:
1CH-149, Chill Water to NESSR Fan C's SHUT C ~
: a. 1CH-149,   Chilled Water to  NESSR Fan Coolers Final Position      Positioner      Verifier
1CH-197, Chill Water to. NESSR Fan Clrs SHUT d.
: b. 1CH-197,  Chilled Water to  NESSR Fan Coolers Final Position      Positioner      Verifier OST-1083 Rev. 3                                             Page 32 of 52
ALB-23-3-7, RAB NORM EXH ISOL DMPR TRBL OFF e.
A Train RAB Normal Exhaust Dampers:
(1)
AV-D3SA-1 (2)
AV-D5SA-1 (3)
AV-D7SA"1 (4)
AV"D9SA-1 (5)
AV-D11SA-1 (6)
AV-D13SA-1 (7)
AV-D15SA-1 (8)
AV-D17SA-1 (9)
AV-D19SA-1 (10) AV-D21SA-1 (11) AV-D23SA-1 (12) AV-D25SA-1 (13) AV-D27SA-1 (14) AV-D29SA-1 (15) AV"D31SA-1 (16) AV-D33SA-1 (17) AV-D35SA~l
': "C.
(18) AV-D37SA-1
,OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN (19) AV"D52SA-1 (20) AV-D58SA-1 OPEN OPEN OST-1083 Rev.
3 Page 31 of 52


OS1 7.Train   A Safet   In'ection Go Circuit   (K636)
OS1 7.5 Train A Safet ln 'ection Go Circuit (K610) (continued)
CAUTION 1CS-745, CSIP  A  Alt Miniflow Val.ve,    must be CLOSED  prior to opening 1CS-746 to prevent    lifting the    Miniflow Line relief valve.
(21) AV-D62SA-1 (22) AV-D66SA-1 (23) AV-D70SA-1 OPEN OPEN OPEN (24) AV-D74SA-'PEN (25) AV-D78SA-1 (26) AV-D82SA-1 (27) AV-D86SA-1 OPEN OPEN OPEN 8.
: 1. Prepare the valves for testing as follows:
Secure the 1A-SA Diesel Generator per OP-155.
: a. 1CS-746, CSIP  A  Alt Miniflow Valve          SHUT
9.
: b. 1CS-745, CSIP  A  Alt Miniflow Valve          SHUT 2 ~  Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
Return RAB Normal Ventilation to service per OP-172, RAB HVAC System.
: 3. Open  Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence slave relay test.
10.
: 4. Energize slave relay K636 by turning test switch S911 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
Realign the following equipment as required for plant operations:
: 5. Verify the valves realign    as   follows.
a.
: a. 1CS-746, CSIP  A Alt Miniflow Valve          OPEN
1CH-149, Chilled Water to NESSR Fan Coolers Final Position Positioner Verifier b.
: 6. Position reset switch  S921  to  RESET.
1CH-197, Chilled Water to NESSR Fan Coolers Final Position Positioner Verifier OST-1083 Rev.
: 7. Verify the following valve status.
3 Page 32 of 52
: a. 1CS-746, CSIP A  Alt Miniflow Valve          OPEN OST-1083 Rev. 3                                               Page 33  of 52


Osl 7,6 Train A Safet   Zn ection   Go Circuit   (K636) (continued)
OS1 7.6 Train A Safet In'ection - Go Circuit (K636)
CAUTION 1CS-745, CSIP A   Alt Miniflow Valve,   must be CLOSED   prior to opening 1CS-746 to prevent   lifting the   Miniflow Line relief valve.
CAUTION 1CS-745, CSIP A Alt Miniflow Val.ve, must be CLOSED prior to opening 1CS-746 to prevent lifting the Miniflow Line relief valve.
: 8. Reposition the following valves     as required for plant operations:
1.
: a. 1CS-745, CSIP 1A-SA  Alternate Miniflow Valve Final Position       Positioner        Verifier
Prepare the valves for testing as follows:
: b. 1CS-746, CSIP lA-SA  Alternate Miniflow Valve Final Position        Positioner        Verifier OST"1083 Rev. 3                                             Page 34  of 52
a.
1CS-746, CSIP A Alt Miniflow Valve b.
1CS-745, CSIP A Alt Miniflow Valve SHUT SHUT 2 ~
Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
3.
Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's
: approval, commence slave relay test.
4.
Energize slave relay K636 by turning test switch S911 clockwise and depressing momentarily.
(Test switch will spring return to the normal left-hand position.)
5.
Verify the valves realign as follows.
a.
1CS-746, CSIP A Alt Miniflow Valve OPEN 6.
Position reset switch S921 to RESET.
7.
Verify the following valve status.
a.
1CS-746, CSIP A Alt Miniflow Valve OPEN OST-1083 Rev.
3 Page 33 of 52


Os  1 7 Train   A  Containment  Isolation  Phase  A -          Go Circuit (K622)
Osl 7,6 Train A Safet Zn ection Go Circuit (K636) (continued)
NOTE:      The  actuation of this slave relay              will cause  one letdown orifice isolation valve to      SHUT.
CAUTION 1CS-745, CSIP A Alt Miniflow Valve, must be CLOSED prior to opening 1CS-746 to prevent lifting the Miniflow Line relief valve.
: 1. Prepare    the equipment  for testing            as  follows:
8.
: a. 1CS-9, Letdown  Orifice  C Isolation                  OPEN
Reposition the following valves as required for plant operations:
: b. 1SI-263, Accumulator Test Return Isol                  OPEN
a.
: c. 1SW-231,  NNS CENT Peo  Cooler            SW  Supply  OPEN
1CS-745, CSIP 1A-SA Alternate MiniflowValve Final Position Positioner Verifier b.
: d. 1SW-2402  NNS CNMT  Fan Cooler            SW  Return  OPEN
1CS-746, CSIP lA-SA Alternate Miniflow Valve Final Position Positioner Verifier OST"1083 Rev.
: e. CNMT  Fan Coolers:
3 Page 34 of 52
(1)  AH-37 (1A-NNS)                                      ON (2)  AH-37 (1B-NNS)                                      ON (3)  AH-38 (1A-NNS)                                      ON (4)  AH-38 (1B-NNS)                                      ON (5)  AH-39 (1A-NNS)                                      ON (6)  AH-39 (18-NNS)                                      ON
: 2. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
NOTE:      Monitor CNMT area temperatures and RCP motor and winding temperatures while CNMT Fans are out of service.
3 ~  Open  Protection System Safeguards Test Train "A" Cabinet 2  door and, with  Shift Foreman's approval, commence the slave relay test.
: 4. Energize slave relay K622 by turning test switch S916 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
5 ~  Verify the    equipment realigns as    follows.'.
1CS-9, Letdown  Orifice  C Isolation                  SHUT
: b. 1SI-263, Accumulator Test Return Isol                  SHUT OST-1083 Rev. 3                                                           Page 35 of 52


0$ 1 7.7 Train A Containment Isolation       Phase A - Go Circuit   (K622)
Os 1 7 '
(continued)
Train A Containment Isolation Phase A - Go Circuit (K622)
: c. 1SW"231> NNS CNMT Fan     Cooler   SW Supply   SHUT
NOTE:
: d. 1SW-240, NNS CNMT   Fan Cooler   SW Return   SHUT
The actuation of this slave relay will cause one letdown orifice isolation valve to SHUT.
: e. CNMT Fan Coolers:
1.
(1) AH-37 (1A-NNS)                               OFF (2) AH-37 (1B"NNS)                               OFF (3) AH-38 (1A-NNS)                               OFF (4 ) AH-38 ( 1B-NNS )                             OFF (5) AH-39 (1A-NNS)                               OFF (6) AH-39 (1B-NNS)                               OFF
Prepare the equipment for testing as follows:
: 6. Position reset switch     S921 to RESET.
a.
: 7. Verify the following     equipment status'.
1CS-9, Letdown Orifice C Isolation OPEN b.
a ~   1CS-9, Letdown   Orifice   C Isolation       'HUT
1SI-263, Accumulator Test Return Isol OPEN c.
: b. 1SI-263, Accumulator Test Return Isol           SHUT C ~  1SW-231, NNS CNMT   Fan Cooler   SW Supply   SHUT
1SW-231, NNS CENT Peo Cooler SW Supply OPEN d.
: d. 1SW"240, NNS CNMT   Fan Cooler   SW Return   SHUT
1SW-2402 NNS CNMT Fan Cooler SW Return OPEN e.
: e. CNMT Fan Coolers:
CNMT Fan Coolers:
(1) ,AH-37 (1A-NNS)                               OFF (2) AH-37 (1B-NNS)                               OFF (3) AH-38 (1A-NNS)                               OFF (4) AH"38 (1B-NNS)                               OFF (5) AH-39 (1A-NNS)                               OFF L
(1)
                              ~ '~
AH-37 (1A-NNS)
(6) AH-39 (1B-NNS)
(2)
OST-1083 Rev. 3                                                 Page 36 of 52
AH-37 (1B-NNS)
(3)
AH-38 (1A-NNS)
(4)
AH-38 (1B-NNS)
(5)
AH-39 (1A-NNS)
(6)
AH-39 (18-NNS)
ON ON ON ON ON ON 2.
Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
NOTE:
Monitor CNMT area temperatures and RCP motor and winding temperatures while CNMT Fans are out of service.
3 ~
Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's
: approval, commence the slave relay test.
4.
Energize slave relay K622 by turning test switch S916 clockwise and depressing momentarily.
(Test switch will spring return to the normal left-hand position.)
5 ~
Verify the equipment realigns as follows.'.
1CS-9, Letdown Orifice C Isolation SHUT b.
1SI-263, Accumulator Test Return Isol SHUT OST-1083 Rev.
3 Page 35 of 52
 
0$ 1 7.7 Train A Containment Isolation Phase A - Go Circuit (K622)
(continued) c.
1SW"231>
NNS CNMT Fan Cooler SW Supply SHUT d.
1SW-240, NNS CNMT Fan Cooler SW Return SHUT e.
CNMT Fan Coolers:
(1)
AH-37 (1A-NNS)
(2)
AH-37 (1B"NNS)
(3)
AH-38 (1A-NNS)
(4 )
AH-38 ( 1B-NNS )
(5)
AH-39 (1A-NNS)
(6)
AH-39 (1B-NNS) 6.
Position reset switch S921 to RESET.
OFF OFF OFF OFF OFF OFF 7.
Verify the following equipment status'.
a ~
b.
C ~
d.
1CS-9, Letdown Orifice C Isolation
'HUT 1SI-263, Accumulator Test Return Isol SHUT 1SW-231, NNS CNMT Fan Cooler SW Supply SHUT 1SW"240, NNS CNMT Fan Cooler SW Return SHUT e.
CNMT Fan Coolers:
(1)
,AH-37 (1A-NNS)
(2)
AH-37 (1B-NNS)
(3)
AH-38 (1A-NNS)
(4)
AH"38 (1B-NNS)
(5)
AH-39 (1A-NNS)
L
~'~
(6)
AH-39 (1B-NNS)
OFF OFF OFF OFF OFF OST-1083 Rev.
3 Page 36 of 52
 
Osl 7.7 Train A Containment Isolation Phase A " Go Circuit (K622)
(continued 8.
Realign the following equioment as required for plant operations:
a.
1CS-9, Letdown Orifice C Isolation Final Positior Positioner Verifier b.
1SI-263, Accumulator Test Return Isolation Final Pos tion Positioner Ver'fier c.
1SW-231, NNS CNMT Fan Cooler SW Supply Final Position Positioner Verifier d.
1SW-240, NNS CNMT Fan Cooler SW Return Final Position Positioner Verifier e.
CNMT Coolers:
(1)
AH"37 (lA-NNS)
Final Position Positioner (2)
AH"37 (18-NNS)
Verifier Final Position Positioner (3)
AH-38 (1A-NNS)
Verifier Final Position Positioner (4) 'H-38 (1B-NNS)
Verifier Final Position Positioner
''E.
(5)
AH-39 (1A-NNS)
Verifier Final Position Positioner Verifier OST-1083 Rev.
3 Page 37 of 52


Osl 7.7  Train A Containment Isolation    Phase  A  "  Go  Circuit  (K622)
0
(continued
: 8. Realign the following equioment as required for plant operations:
: a. 1CS-9, Letdown  Orifice  C Isolation Final Positior      Positioner          Verifier
: b. 1SI-263, Accumulator Test Return Isolation Final  Pos tion      Positioner          Ver'fier
: c. 1SW-231,  NNS CNMT Fan  Cooler  SW  Supply Final Position      Positioner          Verifier
: d. 1SW-240,  NNS CNMT Fan  Cooler  SW  Return Final Position      Positioner          Verifier
: e. CNMT  Coolers:
(1)  AH"37 (lA-NNS)
Final Position      Positioner          Verifier (2)  AH"37 (18-NNS)
Final Position      Positioner          Verifier (3)  AH-38 (1A-NNS)
Final Position      Positioner          Verifier (4) 'H-38 (1B-NNS)
Final Position''E. Positioner          Verifier (5)  AH-39 (1A-NNS)
Final Position      Positioner          Verifier OST-1083 Rev. 3                                                Page 37 of 52


0 OS1
OS1
~
~
7.7 Train A Containment Isolation   Phase A - Co Circuit (K622) continued)
7.7 Train A Containment Isolation Phase A - Co Circuit (K622) continued)
(6)   AH-39 (1B-NNS)
(6)
Final. Positior. Positioner       Verifier OST-1083 Rev. 3                                           Page 38 of 52
AH-39 (1B-NNS)
Final. Positior.
Positioner Verifier OST-1083 Rev.
3 Page 38 of 52


OS1 7.8 Train A Loo   1 AFW Line Isolation   Go   Circuit   (K615)
OS1 7.8 Train A Loo 1
: 1. Prepare the valves   for testing   as follows:
AFW Line Isolation Go Circuit (K615) 1.
a.. 1AF-137, AFW Pump 1X"SAB   to S/G 1A-SN     OPEN
Prepare the valves for testing as follows:
: b. 1AF-49, AFW Reg Valve to S/G 1A-SN           OPEN
a..
: 2. Unlock and Shut the. following valves to preven't cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running. (NA for pump not to be run)
1AF-137, AFW Pump 1X"SAB to S/G 1A-SN OPEN b.
: a. 1A MDAFW Pump (1)   1AF-36, AFWP 1A First Isol. to   C S/G.
1AF-49, AFW Reg Valve to S/G 1A-SN OPEN 2.
(2)   1AF-40, AFWP 1A Isolation to   A S/G.
Unlock and Shut the. following valves to preven't cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running.
: b. 1B MDAFW Pump (1)   1AF-39, AFWP 1B First Isolation to     C S/G.
(NA for pump not to be run) a.
(2)   1AF-42, AFWP 1B Isol,ation to B S/G.
1A MDAFW Pump (1) 1AF-36, AFWP 1A First Isol. to C S/G.
: 3. Start   Aux Feedwater Pump 1A OR 1B (NA pump     not used).
(2) 1AF-40, AFWP 1A Isolation to A S/G.
: a. 1A MDAFW Pump
b.
: b. 1B MDAFW Pump
1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isolation to C S/G.
: 4. Establish phone communications between operators the Main Control Room and the Safeguards Test Cabinet.
(2) 1AF-42, AFWP 1B Isol,ation to B S/G.
: 5. Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's approval, commence the slave relay test.
3.
6     Energize slave relay K615 by turning test switch S922 clockwise and 'depressing momentarily. (Test switch will spring return to the normal left-hand position.)
Start Aux Feedwater Pump 1A OR 1B (NA pump not used).
OST-1083 Rev. 3                                                 Page 39 of 52
a.
1A MDAFW Pump b.
1B MDAFW Pump 4.
Establish phone communications between operators the Main Control Room and the Safeguards Test Cabinet.
5.
Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's
: approval, commence the slave relay test.
6 Energize slave relay K615 by turning test switch S922 clockwise and 'depressing momentarily.
(Test switch will spring return to the normal left-hand position.)
OST-1083 Rev.
3 Page 39 of 52


Osl 7.8   Train A Loo     1 AFW Line Isolation   - Go Circuit (K615)
Osl 7.8 Train A Loo 1
(continued)
AFW Line Isolation -
: 7. Verify the valves realign       as follows:
Go Circuit (K615)
: a. 1AF-137,   AFW Pump 1X-SAB   to S/G 1A-SN     SHUT
(continued) 7.
: b. 1AF-49,   AFW Reg Valve to S/G 1A-SN             SHUT
Verify the valves realign as follows:
: 8. Release test switch S922 (Test s~itch           will spring return to the normal left"hand position).
a.
: 9. Position reset switch       S921 to   RESET.
1AF-137, AFW Pump 1X-SAB to S/G 1A-SN SHUT b.
: 10. Realign the following valves as required for plant operations:
1AF-49, AFW Reg Valve to S/G 1A-SN SHUT 8.
: a. 'AF-137,       AFW Pump 1X"SAB   to S/G 1A"SN Final Position         Positioner           Verifier
Release test switch S922 (Test s~itch will spring return to the normal left"hand position).
: b. 1AF-49,   AFW Reg Valve to S/G 1A-SN Final Position         Positioner           Verifier NOTE:     Mark the     following steps   N/A   if Section   7.9 is to be performed next.
9.
Stop the Aux Feedwater       Pump   started in Step   3 per OP-137.     (NA pump not used) a ~   lA MDAFW Pump
Position reset switch S921 to RESET.
: b. 1B MDAFW Pump
10.
: 12. Open and     lock open the following valves'(NA valves not shut in Step 2)
Realign the following valves as required for plant operations:
: a. 1A MDAFW Pump.
: a. 'AF-137, AFW Pump 1X"SAB to S/G 1A"SN Final Position Positioner b.
(1)   1AF-36, AFWP 1A   First Isol to     C S/G LOCKED OPEN VERIF OST-1083 Rev. 3                                                   Page 40 of 52
1AF-49, AFW Reg Valve to S/G 1A-SN Verifier Final Position Positioner Verifier NOTE:
Mark the following steps N/A if Section 7.9 is to be performed next.
Stop the Aux Feedwater Pump started in Step 3 per OP-137.
(NA pump not used) a ~
lA MDAFW Pump 12.
b.
1B MDAFW Pump Open and lock open the following valves'(NA valves not shut in Step 2) a.
1A MDAFW Pump.
(1) 1AF-36, AFWP 1A First Isol to C S/G LOCKED OPEN VERIF OST-1083 Rev.
3 Page 40 of 52


OS1 7.8   Train A"Loo     1 AFW Line Isolation   Go Circuit   (K615) continued (2)     1AF-40, AFWP 1A Isolation to   A   S/G LOCKED OPEN VERIF
OS1 7.8 Train A"Loo 1
: b. 1B MDAFW Pump (1)     1AF-39, AFWP 1B First Isol to   C S/G LOCKED OPEN VERIF (2)     1AF-42, AFWP 1B Isolation to   B   S/G LOCKED OPEN VERIF 7.9   Train   A Loo   2 AFW   Line Isolation   - Go Circuit   (K616)
AFW Line Isolation Go Circuit (K615) continued (2) 1AF-40, AFWP 1A Isolation to A S/G LOCKED OPEN VERIF b.
: 1. Prepare the valves     for testing   as follows:
1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isol to C S/G LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G LOCKED OPEN VERIF 7.9 Train A Loo 2
: a. 1AF"143,     AFW Pump 1X-SAB   to S/G )B-SB     OPEN B. 1AF-51,     AFW ReS Valve te S/G 1B-SB           OPEN NOTE:       Mark the     following 2 steps N/A     if this equipment     was left in   the required lineup in Section 7.8.
AFW Line Isolation - Go Circuit (K616) 1.
2~    Unlock and Shut the following valves to prevent cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running. (NA for pump not to be run) a ~   1A MDAFW Pump (1)     1AF-36, AFWP 1A First Isol. to     C S/G.
Prepare the valves for testing as follows:
(2)     1AF-40, AFWP lA Isolation to   A   S/G.
a.
: b. 1B MDAFW Pump (1)     1AF-39, AFA'B First Isol. to       C S/G.
1AF"143, AFW Pump 1X-SAB to S/G )B-SB OPEN B.
(2)     1AF-42, AFWP 1B   Isolation to B   S/G.
1AF-51, AFW ReS Valve te S/G 1B-SB OPEN NOTE:
OST-1083 Rev. 3                                                     Page 41 of 52
2 ~
Mark the following 2 steps N/A if this equipment was left in the required lineup in Section 7.8.
Unlock and Shut the following valves to prevent cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running.
(NA for pump not to be run) a ~
b.
1A MDAFW Pump (1) 1AF-36, AFWP 1A First Isol. to C S/G.
(2) 1AF-40, AFWP lA Isolation to A S/G.
1B MDAFW Pump (1) 1AF-39, AFA'B First Isol. to C S/G.
(2) 1AF-42, AFWP 1B Isolation to B S/G.
OST-1083 Rev.
3 Page 41 of 52


Osl 7.9   Train A Loon   2 AFW   Line isolation       Go   Circuit (K616)
Osl 7.9 Train A Loon 2
(continued
AFW Line isolation Go Circuit (K616)
: 3. Start Aux Feedwater   Pump     lA OR   1B.   (NA pump not used)
(continued 3.
: a. 1A MDAFW Pump
Start Aux Feedwater Pump lA OR 1B.
: b. 1B MDAFW Pump
(NA pump not used) a.
: 4. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
1A MDAFW Pump b.
1 Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's approval, commence the slave relay test.
1B MDAFW Pump 4.
6,     Energize slave relay K616 by turning test switch S923 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
: 7. Verify the valves realign         as follows:
1 Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's
: a. 1AF-143, AFW Pump   1X-SAB     to S/G 1B-SN   SHUT B. 1AF-51, AFW Reg   Valve to S/G 1B-SN             SHUT
: approval, commence the slave relay test.
: 8. Release   test switch S923 (Test switch           will spring return to the normal left-hand position).
6, Energize slave relay K616 by turning test switch S923 clockwise and depressing momentarily.
: 9. Position reset s~itch       S921   to RESET.
(Test switch will spring return to the normal left-hand position.)
10 'ealign     the following valves as required for plant operations:
7.
: a. 1AF-143, AFW Pump   1X-SAB   to S/G 1B-SN Final Position   'ositioner E.
Verify the valves realign as follows:
Verifier
a.
: b. 1AF-51, AFW Reg Valve to S/G 1B-SN Final Position         Positioner             Verifier OST-1083 Rev. 3                                                     Page 42 of 52
1AF-143, AFW Pump 1X-SAB to S/G 1B-SN SHUT B.
1AF-51, AFW Reg Valve to S/G 1B-SN SHUT 8.
Release test switch S923 (Test switch will spring return to the normal left-hand position).
9.
Position reset s~itch S921 to RESET.
10'ealign the following valves as required for plant operations:
a.
1AF-143, AFW Pump 1X-SAB to S/G 1B-SN Final Position 'ositioner E.
Verifier b.
1AF-51, AFW Reg Valve to S/G 1B-SN Final Position Positioner Verifier OST-1083 Rev.
3 Page 42 of 52


OS1 7.9   Train A Loo     2 AFW   Line Isolation - Go Circuit (616)
OS1 7.9 Train A Loo 2
AFW Line Isolation - Go Circuit (616)
(continued)
(continued)
NOTE:     Mark the     following steps   N/A if Section   7,10   is'to be performed next.
NOTE:
Stop the Aux Feedwater Pump       started in Step     3 per OP-137.     (NA pump not used) a ~     1A MDAFW Pump
Mark the following steps N/A if Section 7,10 is'to be performed next.
: b.      1B MDAFW Pump
Stop the Aux Feedwater Pump started in Step 3 per OP-137.
: 12. Open and     lock   open the following valves'(NA valves not shut in Step     2 of this section or 7.8) a ~     1A MDAFW Pump (1)   1AF-36   AFWP 1A First Isol to   C S/G.
(NA pump not used) a
LOCKED OPEN VERIF (2)   1AF-40   AFWP 1A Isolation to   A S/G.
~
LOCKED OPEN VERIF
b.
: b.     1B MDAFW Pump (1)   1AF-39,   AFWP 1B First Isol. to   C S/G LOCKED OPEN VERIF (2)   1AF-42,   AFWP 1B Isolation to   B S/G LOCKED OPEN VERIF 7.10 Train   A Loo     3 AFW   Line Isolation - Go Circuit   (K617)
1A MDAFW Pump 1B MDAFW Pump 12.
: 1. Prepare the valves Efor testing as follows'.
Open and lock open the following valves'(NA valves not shut in Step 2 of this section or 7.8) a ~
: a.     1AF-149,   AFW Pump 1X-SAB   to S/G 1C-SN     OPEN
1A MDAFW Pump (1) 1AF-36 AFWP 1A First Isol to C S/G.
: b.     1AF-50, AFW Reg   Valve to S/G 1C-SN           OPEN OST-1083 Rev. 3                                                 Page 43 of 52
LOCKED OPEN VERIF (2) 1AF-40 AFWP 1A Isolation to A S/G.
LOCKED OPEN VERIF b.
1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isol. to C S/G LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G LOCKED OPEN VERIF 7.10 Train A Loo 3
AFW Line Isolation - Go Circuit (K617) 1.
Prepare the valves Efor testing as follows'.
a.
1AF-149, AFW Pump 1X-SAB to S/G 1C-SN b.
1AF-50, AFW Reg Valve to S/G 1C-SN OPEN OPEN OST-1083 Rev.
3 Page 43 of 52


Osl 7.10 Train   A Loo   3 AFW Line Isolation -   Go Circuit   (K617)
Osl 7.10 Train A Loo 3
AFW Line Isolation - Go Circuit (K617)
(continued)
(continued)
NOTE:     Mark the   following 2 steps N/A   if this equ'pment   was left in   the requireo lineup 'n Sr tion 7.9
NOTE:
: 2. Unlock and Shut the following valves to prevent co'.d water from being inj cted to the Steam Generators when Motor Driven Auxiliary Feedwate" Pump is running. (NA for pump not to be run)
Mark the following 2 steps N/A if this equ'pment was left in the requireo lineup 'n Sr tion 7.9 2.
: a. 1A MDAFW Pump (1)   lAF-36, AFWP 1A First Isol. to   C S/G.
Unlock and Shut the following valves to prevent co'.d water from being inj cted to the Steam Generators when Motor Driven Auxiliary Feedwate" Pump is running.
(2)   1AF-40, AFWP 1A Isolation to   A S/G.
(NA for pump not to be run) a.
: b. 1B MDAFW Pump (1)   1AF-39, AFWP 1B First isoi. to   C S/U ~
1A MDAFW Pump (1) lAF-36, AFWP 1A First Isol. to C S/G.
(2)   1AF-42, AFWP 1B Isolation to   B S/G.
(2) 1AF-40, AFWP 1A Isolation to A S/G.
: 3. Start   Aux Feedwater   Pump 1A OR 1B.   (NA pump not used)
b.
: a. 1A MDAFW Pump
1B MDAFW Pump (1) 1AF-39, AFWP 1B First isoi. to C S/U ~
: b. 1B MDAFW Pump
(2) 1AF-42, AFWP 1B Isolation to B S/G.
: 4. Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
3.
5 ~ Open   the Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's approval, commence the slave relay test.
Start Aux Feedwater Pump 1A OR 1B.
: 6. Energize slave relay K617 by turning test switch S924 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
(NA pump not used) a.
: 7. Verify the valves .realign     as follows'.
1A MDAFW Pump b.
t
1B MDAFW Pump 4.
: a. 1AF-149, AFW Pump 1X"SAB to S/G 1C-SN     SHUT
Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.
: b. 1AF-50, AFW Reg Valve to S/G 1C-SN         SHUT OST-1083 Rev. 3                                               Page 44 of 52
5 ~
Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's
: approval, commence the slave relay test.
6.
Energize slave relay K617 by turning test switch S924 clockwise and depressing momentarily.
(Test switch will spring return to the normal left-hand position.)
7.
Verify the valves.realign as follows'.
t a.
1AF-149, AFW Pump 1X"SAB to S/G 1C-SN SHUT b.
1AF-50, AFW Reg Valve to S/G 1C-SN SHUT OST-1083 Rev.
3 Page 44 of 52


Osl 7.10 Train A Loo   3 AFW Line Isolation -   Go Circuit (K617) continued
Osl 7.10 Train A Loo 3
: 8. Release   test s~itch S924 (Test switch     w'll spring return to the normal left-hand position).
AFW Line Isolation - Go Circuit (K617) continued 8.
: 9. Position reset switch     S921 to RESET.
Release test s~itch S924 (Test switch w'll spring return to the normal left-hand position).
: 10. Realign the following valves as required for plant operations:
9.
: a. 1AF-149,   AFW Pump 1X-SAB   to S/G 1C-SN Final Position         Positioner         Verifier
Position reset switch S921 to RESET.
: b. 1AF-50, AFW Reg Valve to S/G 1C-SN Final Position       Positioner         Verifier
10.
: 11. Stop the Aux Feedwater Pump started       in Step 3   per OP-137.   (NA pump not used)
Realign the following valves as required for plant operations:
: a. 1A MDAFW Pump
a.
: b. 1B MDAFW Pump
1AF-149, AFW Pump 1X-SAB to S/G 1C-SN Final Position Positioner b.
: 12. Open and   lock open the following valves: (NA valves not shut in Step   2 of this section or 7.8 or 7.9)
1AF-50, AFW Reg Valve to S/G 1C-SN Verifier Final Position Positioner Verifier 11.
: a. 1A MDAFW Pump (1)   lAF-36, AFWP 1A   First Isol to   C S/G ~
Stop the Aux Feedwater Pump started in Step 3 per OP-137.
(NA pump not used) a.
1A MDAFW Pump b.
1B MDAFW Pump 12.
Open and lock open the following valves:
(NA valves not shut in Step 2 of this section or 7.8 or 7.9) a.
1A MDAFW Pump (1) lAF-36, AFWP 1A First Isol to C S/G ~
LOCKED OPEN VERIF.
LOCKED OPEN VERIF.
(2)   1AF"40, AFWP 1A   Isolation to "B"   S/G.
(2) 1AF"40, AFWP 1A Isolation to "B" S/G.
LOCKED OPEN VERIF.
LOCKED OPEN VERIF.
OST-1083 Rev. 3                                                 Page 45 of 52
OST-1083 Rev.
3 Page 45 of 52


Osl 7.10 Train   A Loo     3 AFW Line Isolation   - Go Circuit     (K617)
Osl 7.10 Train A Loo 3
(continued)
AFW Line Isolation - Go Circuit (K617)
: b.     1B MDAFW Pump (1)   lAF-39, AFWP 1B   First 'Isol. to   C   S/G.
(continued) b.
LOCKED OPEN VERIF (2)   1AF-42, AFWP 1B   Isolation to   B S/G.
1B MDAFW Pump (1) lAF-39, AFWP 1B First 'Isol. to C S/G.
LOCKED OPEN VERIF 7.11 Train   A SI for Switchover to Recirculation -         Go Circuit (K739     K740   K741)
LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G.
: 1. Prepare the equipment       for testing   as follows:
LOCKED OPEN VERIF 7.11 Train A SI for Switchover to Recirculation - Go Circuit (K739 K740 K741) 1.
: a.     1SI-300,   CNMT Sump   to RHR Pump A   Isol       SHUT
Prepare the equipment for testing as follows:
: b.      1SI-310,   CNMT Sump   to RHR Pump A   Isol       SHUT C ~    1CT-105,   CNMT Sump   to CS Pump A   Suet       SHUT
a.
: d.     1CT-26,   CNMT Spray   Pump A Suction             SHUT
b.
: e.     RWST/   Lo-Lo LVL Bistables on TSLB-4, LB990C, LB991C, LB992C, and LB993C                 OFF
C ~
: f.     CS Pump A Breaker on Emer Bus 1A2"SA Cub.           4C RACKED OUT
1SI-300, CNMT Sump to RHR Pump A Isol SHUT 1SI-310, CNMT Sump to RHR Pump A Isol SHUT 1CT-105, CNMT Sump to CS Pump A Suet SHUT d.
: g.     1CT-26 Breaker   at MCC 1A21-SA Compt. 10B.
1CT-26, CNMT Spray Pump A Suction SHUT e.
OFF 2~     Have a Maintenance Electrician install a jumper across terminals 20 and 24 in MTC 8A-SA Panel 1 to simulate CS Pump   breaker closure.
RWST/ Lo-Lo LVL Bistables on TSLB-4,
CAUTION The water in the       CNMT Spray System is contaminated,         use appropriate actions in accordance with AP-503 in handling the contaminated     fluid.
: LB990C, LB991C,
: 3. Drain Containment Spray System         A as   follows:
: LB992C, and LB993C OFF f.
OST-1083 Rev. 3                                                       Page 46 of 52
CS Pump A Breaker on Emer Bus 1A2"SA Cub.
4C RACKED OUT g.
1CT-26 Breaker at MCC 1A21-SA Compt.
10B.
OFF 2 ~
Have a Maintenance Electrician install a jumper across terminals 20 and 24 in MTC 8A-SA Panel 1 to simulate CS Pump breaker closure.
CAUTION The water in the CNMT Spray System is contaminated, use appropriate actions in accordance with AP-503 in handling the contaminated fluid.
3.
Drain Containment Spray System A as follows:
OST-1083 Rev.
3 Page 46 of 52


Osl 7.11 Train   A SI for Switchover to Recirculation -       Go Circuit (K739     K740     K741) (continued) a ~     Shut or check     SHUT the following valves:
Osl 7.11 Train A SI for Switchover to Recirculation - Go Circuit (K739 K740 K741) (continued) a
(1)   1CT-50 CNMT SPRAY PUMP   A-SA DISCHARGE (2)   1CT-47 CNMT SPRAY PUMP   A-SA RECIRC (3)   1CT-36 CS PUMP A EDUCTOR LINE INLET ISOL (4,)   1CT-39 CS PUMP A EDUCTOR LINE OUTLET ISOL
~
: b.     Open the low   point drain at   CNMT Spray. Pump (RAB 190):
Shut or check SHUT the following valves:
(1)   1CT-28 CS PUMP A SUCTION LINE DRAIN (2)   1CT-29 CS PUMP A SUCTION LINE DRAIN C ~     Open   the high point vent at   CNMT Penetration   23 (RAB   236):
(1) 1CT-50 CNMT SPRAY PUMP A-SA DISCHARGE (2) 1CT-47 CNMT SPRAY PUMP A-SA RECIRC (3) 1CT-36 CS PUMP A EDUCTOR LINE INLET ISOL (4,)
(1)   1CT-45 SPRAY   HDR A TEST CONN (2)   1CT-46 SPRAY   HDR A TEST CONN Mhen   piping is empty, shut the low point drain valves:
1CT-39 CS PUMP A EDUCTOR LINE OUTLET ISOL b.
(1)   1CT-28 CS PUMP A SUCTION   LINE DRAIN Verif.
Open the low point drain at CNMT Spray. Pump (RAB 190):
(2)   1CT-29 CS PUMP A SUCTION   LINE DRAIN Verif.
(1) 1CT-28 CS PUMP A SUCTION LINE DRAIN (2) 1CT-29 CS PUMP A SUCTION LINE DRAIN C ~
: 4. Establish communications between operators in the Main Control Room and the Safeguards Test Cabinet.
Open the high point vent at CNMT Penetration 23 (RAB 236):
: 5. Open   Protection System Safeguards Test Train "A" Cabinet 2 door and, with Ship Foreman's approval, 'commence the slave relay test.
(1) 1CT-45 SPRAY HDR A TEST CONN (2) 1CT-46 SPRAY HDR A TEST CONN Mhen piping is empty, shut the low point drain valves:
: 6. Energize slave relay K740 by turning test switch S940 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
(1) 1CT-28 CS PUMP A SUCTION LINE DRAIN (2) 1CT-29 CS PUMP A SUCTION LINE DRAIN Verif.
OST-1083 Rev. 3                                                   Page 47 of 52
Verif.
4.
Establish communications between operators in the Main Control Room and the Safeguards Test Cabinet.
5.
Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Ship Foreman's
: approval,
'commence the slave relay test.
6.
Energize slave relay K740 by turning test switch S940 clockwise and depressing momentarily.
(Test switch will spring return to the normal left-hand position.)
OST-1083 Rev.
3 Page 47 of 52


OS1 7.11 Train A SI     for Switchover to Recirculation                   Go Circuit (K739   K740   K741) (continued)
OS1 7.11 Train A SI for Switchover to Recirculation Go Circuit (K739 K740 K741) (continued) 7.
: 7. Verify   Bypass Permiss ve Light Panel light 4-8 SI Actuated   RHR SUCT will xfer   on RWST LO-LO LEVEL illuminates.
Verify Bypass Permiss ve Light Panel light 4-8 SI Actuated RHR SUCT will xfer on RWST LO-LO LEVEL illuminates.
: 8. Verify light on     SI SUCTION   AUTO SWITCH OVER RESET TRAIN A illuminates.
8.
: 9. Energize slave relay K741 by turning test switcn S941 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
Verify light on SI SUCTION AUTO SWITCH OVER RESET TRAIN A illuminates.
: 10. Verify the valves realign       as   follows:
9.
: a.     1SI-300, CNMT Sump   to RHR Pump A               Isol   OPEN
Energize slave relay K741 by turning test switcn S941 clockwise and depressing momentarily.
: b.     1CT-105, CNMT Sump   to CS Pump A               Suet   OPEN ll. Realign the valves as follows'.
(Test switch will spring return to the normal left-hand position.)
: a.     1SI-300, CNMT Sump   to RHR Pump             A Isol   SHUT
10.
: b.     1CT"105, CNMT Sump   to CS             Pump A   Suet   SHUT
Verify the valves realign as follows:
: 12. Energize slave relay K739 by turning test switch S942 clockwise and depressing momentarily. (Test switch will spring return to the normal left-hand position.)
a.
: 13. Verify the valves realign       as   follows.'.
1SI-300, CNMT Sump to RHR Pump A Isol OPEN b.
1SL-310, CNMT Sump to   RHR Pump A             Isol   OPEN
1CT-105, CNMT Sump to CS Pump A Suet OPEN ll.
: b.     1CT-105, CNMT Sump to   CS Pump A             Suet   OPEN
Realign the valves as follows'.
: 14. Realign the valves as follows'.
a.
: a.     1SI"310, CNMT Supp to   RHR Pump A             Isol   SHUT
1SI-300, CNMT Sump to RHR Pump A Isol SHUT b.
: b.     1CT-105, CNMT Sump to   CS           Pump A   Suet   SHUT
1CT"105, CNMT Sump to CS Pump A Suet SHUT 12.
: 15. Position reset switch     S921   to           RESET.
Energize slave relay K739 by turning test switch S942 clockwise and depressing momentarily.
OST-1083 Rev. 3                                                         Page 48 of 52
(Test switch will spring return to the normal left-hand position.)
13.
Verify the valves realign as follows.'.
1SL-310, CNMT Sump to RHR Pump A Isol OPEN b.
1CT-105, CNMT Sump to CS Pump A Suet OPEN 14.
Realign the valves as follows'.
a.
1SI"310, CNMT Supp to RHR Pump A Isol SHUT b.
1CT-105, CNMT Sump to CS Pump A Suet SHUT 15.
Position reset switch S921 to RESET.
OST-1083 Rev.
3 Page 48 of 52


Os 1 7.11 Train A SI Eor Switchover to Recirculation Go           Circuit (K739   K740   K741)   continued
Os 1 7.11 Train A SI Eor Switchover to Recirculation Go Circuit (K739 K740 K741) continued 16.
: 16. Position SI   SUCTION AUTO SWITCHOVER RESET TRAIN A         switch to RESET.
Position SI SUCTION AUTO SWITCHOVER RESET TRAIN A switch to RESET.
: 17. VeriEy Bypass Permissive'ight Panel           light 4-8 SI ACTUATED RHR SUCT WILL XFER ON RWST LO-L'0 LEVEL extinguishes.                         N 18e   Verify light   on SI SUCTION AUTO SWITCH OVER RESET TRAIN A extinguishes.
17.
: 19. Have the Maintenance     Electrician     remove the jumper across terminals   20 and 24   in MTC 8A-SA Panel 1.
VeriEy Bypass Permissive'ight Panel light 4-8 SI ACTUATED RHR SUCT WILL XFER ON RWST LO-L'0 LEVEL extinguishes.
Electrician Verifier
N 18e Verify light on SI SUCTION AUTO SWITCH OVER RESET TRAIN A extinguishes.
: 20. Refill   the Containment Spray System       A piping as follows:
19.
: a. Turn on power supply MCC 1A21-SA Compt. 10B and then open 1CT"26 RWST to CNMT SPRAY PUMP A-SA.
Have the Maintenance Electrician remove the jumper across terminals 20 and 24 in MTC 8A-SA Panel 1.
breaker ON valve OPEN
Electrician Verifier 20.
: b. When a solid water stream flows from the vent, close the following', independent verificatrion is required.
Refill the Containment Spray System A piping as follows:
1CT-45 SPRAY   HDR A TEST CONN           CLOSED 1CT-46 SPRAY   HDR A TEST CONN           CLOSED c~    Vent the   CS Pump A-SA   casing.             VENTED
a.
: d. Vent aEfected instrumentation:
b.
PI-7120A   CSP"SA Suction Pressure             VENTED PI-7120A   CSP"S'A'eduction   Pressure         VENTED PI-7130A   CSP-SA Discharge Pressure           VENTED PI-7131A   CSP-SA Discharge Pressure           VENTED FT-7122A CSP-SA Flow                           VENTED OST-1083 Rev. 3                                                 Page 49 of 52
Turn on power supply MCC 1A21-SA Compt.
10B and then open 1CT"26 RWST to CNMT SPRAY PUMP A-SA.
breaker ON valve OPEN When a solid water stream flows from the vent, close the following', independent verificatrion is required.
c ~
1CT-45 SPRAY HDR A TEST CONN 1CT-46 SPRAY HDR A TEST CONN Vent the CS Pump A-SA casing.
CLOSED CLOSED VENTED d.
Vent aEfected instrumentation:
PI-7120A CSP"SA Suction Pressure PI-7120A CSP"S'A'eduction Pressure PI-7130A CSP-SA Discharge Pressure PI-7131A CSP-SA Discharge Pressure FT-7122A CSP-SA Flow VENTED VENTED VENTED VENTED VENTED OST-1083 Rev.
3 Page 49 of 52


OS1 7.11 Train A SI for Switchover to Recirculation       Go Circuit (K739   K740   K741) (continued)
OS1 7.11 Train A SI for Switchover to Recirculation Go Circuit (K739 K740 K741) (continued) 21.
: 21. Realign the follcwing equipment as required for plant operations:
Realign the follcwing equipment as required for plant operations:
: a. 1SI-300, CNMT Sump   to RHR Pump A Isol Final Position         Positioner         Verifier
a.
: b. 1SI-310, CNMT Sump   to RHR Pump A Isol Final Position         Positioner         Verifier
1SI-300, CNMT Sump to RHR Pump A Isol Final Position Positioner Verifier b.
: c. 1CT-105, CNMT to CS Pump A Suet Final Position         Positioner         Verifier
1SI-310, CNMT Sump to RHR Pump A Isol Final Position Positioner Verifier c.
: d. 1CT-26, CNMT Spray   Pump A Suction Final Position         Positioner         Verifier
1CT-105, CNMT to CS Pump A Suet Final Position Positioner d.
: e. CNMT Spray Pump A Breaker on Emer Bus 1A2-SA Compt. 4C Final Position         Positioner         Verifier
1CT-26, CNMT Spray Pump A Suction Verifier Final Position Positioner Verifier e.
: f. 1CT-36, CS Pump A   Eductor Line   Inlet Isol Final Position         Positioner         Verifier
CNMT Spray Pump A Breaker on Emer Bus 1A2-SA Compt.
: g. 1CT-39, CS Pump   A Eductor Line Outlet Isol Final Position         Positioner         Verifier 8.0 DIAGRAMS/ATTACHMENTS Attachment   I - Calibration   Data Attachment   II Certifications     and Reviews OST-1083 Rev. 3                                               Page 50 of 52
4C Final Position Positioner Verifier f.
1CT-36, CS Pump A Eductor Line Inlet Isol Final Position Positioner Verifier g.
1CT-39, CS Pump A Eductor Line Outlet Isol Final Position Positioner Verifier 8.0 DIAGRAMS/ATTACHMENTS Attachment I - Calibration Data Attachment II Certifications and Reviews OST-1083 Rev.
3 Page 50 of 52


OSl ATTACHMENT I                                     Page 1 of 1 Calibration Data INST/MODEL 0         DESCRIPTION INST I.D. CPL DUE DATE VOLTMETER STOP MATCH
OSl ATTACHMENT I Calibration Data Page 1 of 1
* RONAN
INST/MODEL 0 DESCRIPTION INST I.D.
* RONAN
CPL DUE DATE VOLTMETER STOP MATCH RONAN RONAN RONAN RONAN RONAN RONAN
* RONAN
- If required due to Drained S/G OST-1083 Rev.
* RONAN
3 Page 51 of 52
* RONAN
* RONAN
- If required due to Drained S/G OST-1083 Rev. 3                                   Page 51   of 52


Osl
Osl
    'TTACHMENT II CERTIFICATIONS               AND REVIEWS                         Page'1 of   1 This   OST was                 erformed as a.'eriodic   surveillance requirement Post-Maintenance                   Operability Test           Redundant Subsystem Test Plant   Conditions.'ST Mode:
'TTACHMENT II CERTIFICATIONS AND REVIEWS Page'1 of 1
Completed by.
This OST was erformed as a.'eriodic surveillance requirement Post-Maintenance Operability Test Redundant Subsystem Test Plant Conditions.'ST Completed by.
DATE       TIME OST   Performed                 B Initials                         Name (Print)                 Initials         Name (Print)
Mode:
General Comments/Recommendations/Corrective                     Actions:
DATE TIME OST Performed B
Pages   Used:
Initials Name (Print)
Fill out     Task Sheet OSRM019                 if done during refueling.
Initials Name (Print)
Fill out     Task Sheet OSER019                 if done during cold shutdown >72 hours.
General Comments/Recommendations/Corrective Actions:
OST Has Been                   Satisfactoril /Unsatisfactoril   Com leted:
Pages Used:
Shift   Foreman                                                                             Date REVIEWED BY:
Fill out Task Sheet OSRM019 if done during refueling.
Manager - Shift Operations                     Date OST-1083 Rev. 3                                                                       Page 52 of   52}}
Fill out Task Sheet OSER019 if done during cold shutdown
>72 hours.
OST Has Been Satisfactoril /Unsatisfactoril Com leted:
Shift Foreman Date REVIEWED BY:
Manager - Shift Operations Date OST-1083 Rev.
3 Page 52 of 52}}

Latest revision as of 06:40, 7 January 2025

Rev 3 to Vol 3,Part 9 of Plant Operating Manual Procedure OST-1083, ESFAS Train a Slave Relay Test 18 Months Interval Modes 5 & 6
ML18010A837
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/04/1992
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18010A832 List:
References
OST-1083-P09, OST-1083-P9, NUDOCS 9210280094
Download: ML18010A837 (61)


Text

Osl 9210280094 921009 PDR ADOCK 0500040 P

PDR CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 3 PART 9

PROCEDURE TYPE'perations Surveillance Test OST-1083 TITLE'SFAS Train "A" Slave Relay Test 18 Months Interval Modes 5 and 6

REVISION 3 HNP 00CUMKMTCGMTRQ.

NOTE: This procedure has been screened in accordance with PLP-100 AQ criteria and determined to be a Case II procedure.

This procedure requires POD or Outage meeting, SubUnit Manager, or higher, 3

)

evaluation as to level of management required to be involved in preparations and conduct of this test.

~FFFl >~E APR )

6 Ml APPROVED:

xgna re

~~J Date TITLE:

MANAGER - OPERATIONS HNP CONTROLLED COPYP~

Page 1 of 52

OS1 List of Effective Pa es

~Pa e

Revision 1,

2 3,

4 5,

5a 6-52

~

~

~

~

\\

I

~

~

I

~

~

AC-3/1

~

~

AC-3/1 3

OST-1083 Rev.

3 Page 2 of 52

OS1 1.0 PURPOSE

, The purpose of this procedure is to test the operability of the slave relays of the Solid State Protection System using the Go Circuits.

This test will be performed every 18 months during refueling and during each cold shutdown greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> unless the relay has been tested within the previous 92 days.

This procedure satisfies the requirements of Technical Specifications 4.3.2', Table 4.3-2, Steps l.b, 3.a.2, 3.a.3, 3.c.3, 5.c, 6.d, 6g, 7.a, 7.b, 8.a, and 8.b for Train A.

ESFAS Slave Relay Response testing via OST's

1809, 1812, and 1825 or 1826 fulfills the requirements of this test.

2.0 REFERENCES

L.

Tech.

Spec.

3.3.2 2.

FSAR Section 7.3 3.

SD-103, Reactor Protection/Engineered Safety Features Actuation System 4.

Procedures:

a.

OP-155, Diesel Generator Emergency Power System b.

OST-1825, Safety Injection - ESF Response Time Train A c.

OST-1812; AFW Isolation ESF Response Time d.

OST-1809, Switchover to Recirc Sump " ESF,Response Time e.

OST-1826, Safety Injection ESF Response Time Train B

5.

Drawings:

a.

Simplified Flow Diagrams 2165-S (1)

544, Feedwater System (2) 547, Circulating

& Service Water System (3) 550, Containment Spray System (4)

551, Steam Generator Blowdown System (5)
552, Sample System (Nuclear)

(6)

1303, Chemi'cal

& Volume Control System (7)

1308, 1309, 1310, Safety Injection System OST"1083 Rev.

3 Page 3 of 52

OS1

2.0 REFERENCES

(continued) b.

Control Wiring Diagrams 2166-8401 (1)

Shs.

270, 409, 413,
1206, 1988 Safety Injection (K601)

(2)

Shs.

242, 243,
972, 1211, Safety Injection (K602)

(3)

Shs.

271, 407, 411,
1207, 2972. " Safety Ingectxon (K603)

(4)

Shs.

1204, 1205,
1209, 2286 Safety Injection (K608)

(5)

Shs.

1988, 2639,
2641, 3177 - Safety Injection (K610)

(6)

Shs.

1933, 1944, - Loop 1

AFW Isolation (K615)

(7)

Shs.

1934, 1945 Loop 2

AFW Isolation (K616)

(8)

Shs.

1935, 1946 Loop 3

AFW Isolation (K617)

(9)

Shs.

286, 421,
2253, 2254, 2703 - Containment Phase A Isolation (K622)

(10) Shs.

416, 418, 458 " Safety Injection (K740)

(11) Shs.

418, 1039 -

RWST Lo-Lo Level (K739, K741)

(12) Shs.

317 Safety Injection (K636) c.

Vendor'Drawings.'1)

EBASCO Dwg. 1364-46575 Sheets 9, 10, ll (2)

EBASCO Dwg. 1364-2776 Sheets 16-31 (3)

EBASCO. Dwg. 1364-46576 Sheets 9,

10, 11 6.

Solid State Protection System Equipment Reference Manual PRL Volume 1.

7.

Solid State Protection System Equipment Reference Manual PRL Volume 2.

OST-10&3 Rev.

3 Page 4 of 52

Osl 3.0 PRERE UISITES 1.

Review the Control Room Status File and verify that the systems being tested are aligned in a manner that will support the performance of this test.

2.

The performance of this OST has been coordinated with other plant evolutions such that the minimum operability requirements of Technical Specifications will continue to be satisfied during the performance of the OST or the appropriate LCO's have been written.

3.

Any special tools and equipment required per Section 5.0 of this procedure have been obtained.

Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.

5.

IGC support required for this test has been obtained.

6.

Electrical Maintenance support required for this test has been obtained.

7.-

All switches in the Safeguards Test Cabinet are in the "NORMAL" position.

CAUTION This procedure involves an infrequent test or evolution with the potential to reduce margins of safety or introduce unwanted transients or accidents if performed incorrectly, depending on the specific plant conditions at the time of the test.

Conditions and management involvement are documented on PLP-100-1.

'A 7a.

A PLP-100 shift brief has been performed by the applicable level of management,.

8.

The Shift Foreman has given permission to perform this OST and all prerequisites are met.

Shift Foreman Date OST-1083 Rev.

3 Page 5 og 52 r

OS1 4.0 PRECAUTIONS AND LIMITATIONS Prior to performing safeguards actuations, plant configuration should be established to allow for minimum disturbance to plant operation (i.e., valve positions, starting of redundant equipment).

OST-1083 Rev.

3 Page 5a of 52 AC

(

Osl 4.0 PRECAUTIONS AND LIMITATIONS (continued) 2.

Before starting a new step, clear all trips and reset any associated

alarms, lights and relays unless the procedure specifies otherwise.

3.

If any response is not as required, stop procedure and immediately notify the Shift Foreman for resolution.

4.

During Solid Plant Operation, steps that isolate charging and/or letdown should not be performed unless the alternate pressure= control methods are readily available and the operators are aware of expected pressure fluctuations.

5.

Steps within a procedure section must be completed in the order written before the next section is started.

5.0 TOOLS AND E UIPMENT 1.

Headsets or Radios (as required),,

2.

Voltmeter Fluke 8600A (or equivalent) 3.

Stopwatch Fischer Model 14-649-5 (or equivalent) 4.

Electrical Jumper(s) 5.

Ronan X-85 Calibrator or equivalent (as required per drained S/G) 6.0 ACCEPTANCE CRITERIA 1.

For Go Circuit testing, all components listed respond as specified after the slave relay is energized and after it is reset.

2.

Each device that was activated shall be documented as to the condition left at the completion of the section.

7 '

PROCEDURE STEPS NOTE:

To reopen isolation valves after. test, control switch for motor"operated valve must be placed momentarily to the SHUT position, then to OPEN position to reset seal"in relays.

The associated flow control valve of the opposite header.gay then also be re-opened.

OST-1083 Rev.

3 Page 6 of 52

Osl 7.1 Train A Safet In'ection Go Circuit (K601) (continued) 2.

Establish phone communications between operations in the Hain Control Room and the Safeguards Test Cabinet.

CAUTION At SSPS (A) Output Cabinet multimeter across Terminal TB604 and ground to ensure multimeter.

No.

1 have an I&C Technician connect a

1 of TB604 and ground and Terminal 2 of no voltage is present which may damage 3.

At SSPS (A) Output Cabinet No.

1, have an I&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.

4.

Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman,'s

approval, commence slave rel,ay test.

5.

Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K601 by turning test switch S907 clockwise then depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

6.

Verify the following equipment starts or repositions as follows; a.

Diesel Generator 1A STARTS b.

1CS-214, CSIP's Miniflow Isolation SHUT c.

1SI-248, Accumulator 1C-SA Discharge OPEN d.

1SI-1, CSIP's to BIT Isolation OPEN 7 ~

e.

1SP-227, S/G 1C-SN Sample CNMT Isol SHUT At SSPS (A) Output Cabinet No. 1, have an I&C Technician connect a multimeter across Terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are closed.

This verifies the DG 1A-SA Breaker 106 trip clrcul t ~

OST-1083 Rev.

3 Page 8 of 52

OS1 7.1 Train A Safet In 'ection Go Circuit (K601) (continued) 8.

Position reset switch S921 to RESET.

9.

Verify the following equipment status'.

a.

Diesel Generator 1A-SA RUNNING H

s ICS-2l4, CSIP's Miniiloe Isolation SHUT c.

1SI-248, Accumulator 1C-SA Discharge SHUT d.

1SI-1, CSIP's to BIT Isolation OPEN e.

1SP-227, S/GP 1C-SN Sample CNHT Isol SHUT 10.

At SSPS (A) Output Cabinet No.

1, have an 1&C Technician connect a multimeter across terminals 1 and 2 of TB604 and verify contacts 11 and 12 of Output Relay K601 are open.

11.

Direct the I&C Technician to disconnect the multimeter from terminals 1 and 2 of TB604 in SSPS (A) Output Cabinet No.

1.

Technician Verifier 12.

Secure Diesel Generator 1A-SA per OP-155.

13.

Realign the following valves as required for plant operations'.

a.

1CS-214, CSIP's Miniflow Isolation Final Position Positioner b.

1SI-248, Accumulator 1C-SA Discharge Verifier Final Position 'ositioner c.

1SI-1, CSIP's to BIT Isolation Verifier Final Position Positioner Verifier OST-1083 Rev.

3 Page 9 of 52

OS1 7.1 Train A Safet In'ection Go Circuit (K601) (continued) d.

1SP-227, S/G 1C-SN Sample CNMT Isolation Final Position Positioner Verifier e.

1SI-248 breaker on MCC 1A21-SA Cub.

3D Final Position Positioner Verifier 14.

Verify Accumulator 1C-SA is repressurized once discharge valve 1SI-248 is SHUT if depressurized in a previous step.

7.2 Train A Safet In'ection Go Circuit (K602)

CAUTION Ensure the CSIP suction valves are aligned properly to maintain adequate suction flow to the pumps during the test.

1.

Direct the I&C Technician to install jumper between terminals 21 and 35 in ARP"19A (SA)F3 to defeat the SG Low Pressure interlock for 1BD-49 unless already done by OP"183.03.

(Ref. 2.5.b.2) 2 ~

If any Steam Generator level is below 38.5X, direct the 1&C Technician to lift the lead at Terminal 60 in ARP-19A (SA) F3 to defeat the S.G.

low level interlock for 1BD-49.

3 E Prepare the following equipment for testing as follows.'

~

b.

1CS-291, RWST to CSIP Isolation 1CS-165, VCT Outlet Isolation SHUT OPEN C ~

d.

1CC-114, CCW to Sample HX Isolation 1BD-49, S/G 1C-SN Blowdown CNMT Isol OPEN OPEN e.

1CC-304, CCW to Gross Failed Fuel Detector OPEN f.

SGWLU pump for C S/G SECURED OST-1083 Rev.

3 Page 10 of 52

OS1 7.2 Train A Safet In'ection - Go Circuit (K602) (continued) 4.

Have the I&C Technician perform the following steps:

a.

At SSPS (A) Output Cabinet No.

1, verify the voltage between Time Delay Relay TD1 Terminal 6 (+)

and Logic Ground (-) is 48

+

2 VDC.

b.

At SSPS (A) Output Cabinet No.

1, verify the voltage between Time Delay Relay TD1 Terminal 2 (+)

and Logic Ground (-) is 0

+

2 VDC.

c.

At SSPS (A) Logic Cabinet, connect the multimeter between TB505-7 (+) and Signal Ground (-).

d.

If a Reactor Trip Signal is present as a result of a drained steam generator(s), lift and tape transmitter field leads and install Ronans (transmitter simulator) on the following points to clear the Lo-Lo Level Bistable on the appropriate steam generator(s):

'A'team Generator PIC-2 TBF 10 and 11 PIC-3 TBF 10 and 11

'B'team Generator PIC-2 PIC-3 TBF 13 and 14 V

TBF 13 and 14

'C'team Generator PIC-2 TBF 16 and 17 PIC-3 TBF 16 and 17 e.

Adjust Ronan(s) as necessary to clear the Lo-Lo Level Bistables for the appropriate steam generator.

OST-1083 Rev.

3 Page 11 of 52

Os 1 7.2 Train A Safet In 'ection '- Go circuit (K602) (continued)

NOTE:

To prevent flashing in Sample HX, secure sampling prior to energizing slave relay K602.

5.

Establish phone communications between operations in the Main Control Room and Safeguards Test Cabinet.

a.

Close then reopen the Reactor Trip Beakers as needed to reset the P-4 interlock.

6.

Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's

approval, commence the slave relay test.

7.

Simultaneously start a stop watch to time the SI Time Delay Relay and energize slave relay K602 by turning test switch S908 clockwise and depressing momentarily.

(Test switch will spring return to the normal left"hand position.)

NOTES The following two steps must be performed within 60 seconds after K602 has been energized to verify SI will not reset.

8.

Place the Safety Injection Train A Reset Switch to RESET.

9.

Verify the SI RESET AUTO-SI BLOCKED Light is OFF at Bypass Permissive Light Box (BPLB).

10.

Veri.fy the following valves reposition as follows:

a ~

1CS"291, RWST to CSIP Isolation OPEN b.

C ~

1CS-165, VCT,Outlet Isolation 1CC-114, CCW to Sample HX Isolation SHUT SHUT d.

1BD-49, S/G 1C-SN Blowdown CNMT Isol SHUT e.

1CC-304, CCW to Gross Failed Fuel Detector SHUT OST-1083 Rev.

3 Page 12 of 52

OS1 7.2 Train A Safet In'ection - Go circuit (K602) (continued) 11.

Verify the voltage on the multimeter connected in Step 7.2.4 increases to 48

+

2 VDC one minute

+

3 Sec. after slave relay K602 is energized.

VDC T'e 12.

Place the Safety Injection Train A Reset switch to Reset.

13.

Verify the voltage on the multimeter connected in Step 7.2.4 decreases to 0 +

2 VDC.

VDC 14.

Verify the SI RESET AUTO-SI BLOCKED Light is ON at Bypass Permissive Light Box (BPLB).

15.

Position Test Switch S921 to Reset.

16.

Verify the following valve status.'.

1CS-291, RWST to CSIP Isolation OPEN b.

1CS-165, VCT Outlet Isolation c.

1CC-114, CCW to Sample HX Isolation SHUT SHUT d.

1BD-49, S/G 1C-SN Blowdown CNMT Isol SHUT e.

1CC-304, CCW to Cross Failed Fuel Detector SHUT 17.

Direct the I&C Technician to disconnect the multimeter connected in Step 7.2.4.

Technician Verifier 18.

Direct the I&C Technician to remove jumper installed in Step 7.2.1 unless required by OP-183.03.

Technician Verifier OST-1083 Rev.

3 Page 13 of 52

OS1 7.2 Train A Safet Iniection Go circuit (K602) (continued) 19.

Direct the I&C Technician to reconnect the lead lifted in Step 7.2.2 (Mark this step NA if Section 7.3 is to be performed next).

.echnician Verifier 20.

Reposition the following valves as required for plant operations:

CAUTION 1CS-165, VCT Outlet Isolation, must be reopened before closing 1CS-291, RWST to CSIP Isolation, to prevent losing suction to the CSIP's.

a.

1CS-165, VCT Outlet Isolation Final Position Positioner b.

1CS-291, RWST to CSIP Isolation Verifier Final Position Positioner c.

1CC-114, CCW to Sample HX Isolation Verifier Final Position Positioner Verifier d.

1BD-49, S/G 1C-SN BLovdovn CNMT Isolation Final Position Positioner Verifier e.

1CC-304, CCW to Cross Failed Fuel Detector Final Position Positioner Verifier 21.

Return the SGWLU System to desired lineup per OP-183.03.

OST"1083 Rev.

3 Page 14 of 52

OS1 7.2 Train A Safet In 'ection - Go Circuit (K602) (continued) 22.

Remove Ronans and land leads lifted in Step 7.2.4.d on the appropriate points:

'A'team Generator PIC-2 TBF 10 and 11 TECHNICIAN VERIFIER PIC-3 TBF 10 and 11 TECHNICIAN

'B'team Generator VERIFIER PIC-2 TBF 13 and 14 TECHNICIAN VERIFIER PIC-3 TBF 13 and 14 TECHNICIAN

'C'team Generator VERIFIER PIC-2 TBF 16 and 17 TECHNICIAN PIC-3 TBF 16 and 17 VERIFIER TECHNICIAN 7.3 Train A Safet In ection - Go Circuit (K603)

VERIFIER CAUTION The following test isolates the normal charging line.

1.

Direct the I6C Technician to install jumper between terminals 44 and 58 in ARP-19A (SA)F3 to defeat the SG Low Pressure interlock for 1BD-11 unless already done by OP-183.01.

(Ref. 2.5.b.3)

OST-1083 Rev.

3 Page 15 of 52

Os 1 7.3 Train A Safet In'ection - Go Circuit (K603) (continued) 2.

If any Steam Generator level is below 38.5X, direct the I&C Technician to lift the lead at terminal 60 in ARP-19A (SA)

F3 to defeat the S.G.

low level interlock for 1BD-11 (Mark this step NA if. the lead was not reconnected in Section 7.2).

- 3.

Prepare the following equipment for testing as follows'.

a ~

b.

1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation OPEN SHUT C ~

1SI-246, Accumulator 1A-SA Discharge SHUT d.

1SI-246, Control Switch SHUT e.

1BD-11, S/G 1A-SN Blowdown Isolation OPEN 1SI-246 Breaker on MCC 1A21-SA Cob.e SC SHUT g ~

h.

1 ~

1SI-1, CSIP's to BIT Isolation 1SI-2, CSIP's to BIT Isolation SGWLU pump for A SIG SHUT SHUT SECURED j.

Train A Ventilation'.

(1) 3CZ-B1(SA-1),

CR Norm Intake (MCB)

OPEN (2) 3CZ-B3(SA-1),

CR Norm Exh (MCB)

OPEN (3)

E-9(1A-SA), Normal Exhaust Fan ON (MCB)

(4) 3CZ-BS(SA-l), Equip Prot Room Air OPEN (AEP-1)

Inlet Vlv (5)

(6) 3CZ-B7(SA"1), Elec Equip Prot Room OPEN (AEP-1)

Vent Isol L

3AC-D4(SA-~)s RAB Swgr Rm A Ret SHUT (AEP-1)

Air Damper (7)

E-28(1A-SA),

Swgr Rm A Exh Fan ON (AEP-1)

OST-1083 Rev.

3 Page 16 of 52

Osl 7.3 Train A Safet In 'ection - Co Circuit (K603) (continued)

(8)

E-28(1B-SA),

Swgr Rm A Exh Fan ON (AEP-1)

(9) 3AC-D3(SA-1), Swgr Rm. A OAI 1st 1 OPEN (AEP-', SLB-11)

(10) E-10(1A-SA), Elec Equip Rm Exh Fan ON (A P-1)

(11) 3CZ-Bll(SA-1),

CR Em Filt OAI Vlv OPEN (MCB)

(12) 3CZ"B9(SA-1)

CR Em Filt OAI Vlv (MCB)

OPEN (13) R-13(l&2A-NNS), ARR For Comp/Comm OFF (AEP-3)

Rm (14) R-13(1&2B-NNS)

ARR For Comp/Comm Rm (AEP-3)

OFF (15) CK-B7-1&2, Comp Rm Normal Intake OPEN (AEP-3)

(16) CK"B8-1&2, Comp Rm Normal Intake OPEN (AEP-3)

(17) 3CZ-D16(SA"1),

CR EM Filt Recirc SHUT (MCB)

NOTE:

Accumulator 1A-SA must be depressurized or at the same pressure as the RCS to prevent injection of water into the loops.

If necessary, use 1SI"295 and 1SI-298 to reduce the pressure in the accumulator.

4.

Verify Accumulator 1A"SA pressure is less than or equal to RCS pressure.

5 Establish phone communications between operations in the Main Control Room and the Safeguards Test Cabinet.

6.

Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's

approval, commence the slave relay test.

OST-1083 Rev.

3 Page 17 of 52

Osl 7.3 Train A Safet In 'ection - Go Circuit (K603) (continued) 7.

Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

8.

Verify the equipment, realigns as follows:

a ~

b.

C ~

e.

1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation 1SI-246, Accumulator 1A-SA Discharge 1BD-11, S/G lA"SN Blowdown Isolation Train A Ventilation:

SHUT OPEN OPEN SHUT (1) 3CZ-B1(SA-l),

CR Norm Intake (MCB)

(2) 3CZ-B3(SA-1),

CR Norm Exh (MCB)

(3)

E-9(1A-SA) Normal Exhaust Fan (MCB)

SHUT SHUT OFF (4) 3CZ-B5(SA-1), Equip Prot Room Air SHUT (AEP-1)

Inlet Vlv (5) 3CZ-B7(SA-1), Elec Equip Prot Room SHUT (AEP-1)

Vent Isol (6) 3AC-D4(SA-1),

RAB Swgr Rm A Ret (AEP-1)

Air Damper (7)

E-28(lA-SA), Swgr Rm A Exh Fan (AEP-1)

(8)

E-28(1B-SA),

Swgr Rm A Exh Fan (AEP-1)

OPEN OFF OFF (9) 3AC-D3(SA-1),

Swgr Rm A OAI Isol (AEP-l, SLB-11)

(10) E-10(lA-SAQ, Elec Equip Rm Exh Fan (AEP-1)

(ll) 3CZ-Bll(SA-1),

CR Emer Filt OAI (MCB)

Vlv SHUT OFF SHUT OST-1083 Rev.

3 Page 18 of 52

OS1 7.3 Train A Safet in'ection Go Circuit (K603) (continued)

(12) 3CZ-B9(SA-1),

CR Emer Filt OAI Vlv SHUT (MCB)

(13) R-13(l&"A-NNS), ARR For Comp/Comm ON (AEP-3)

Rm (14) R-13(1&2B-NNS),

ARR For Comp/Comm ON (AEP-3)

Rm (15) CK-B7-1&2, Comp Rm Normal Intake SHUT (AEP-3)

(16) CK-B8-1&2, Comp Rm Normal Intake SHUT (AEP-3)

(17) 3CZ-D16(SA-1),

CR Em Filt Recirc OPEN (MCB) 9.

Position reset svitch S921 to RESET.

10.

Reset the Control Room Isolation Signal ll.

Prepare following equipment for testing as follows'.

a.

Train A ventilation (1)

CK-B6 (1&2), Smoke Pur In Comp Rm OPEN (AEP-3)

(2)

ES-7(1&2-NNS),

Smoke Pur Exh Fan ON (AEP"3)

(3)

ES-1A, Purge Exhaust Fan (MCB)

ON (4) 3CZ-B17(SA-1),

CR Purge Makeup Vlv OPEN (MCB)

(5) 3CZ-B13(SA-1),

CR Purge Exh (MCB)

OPEN 12.

Energize slave relay K603 by turning test switch S909 clockwise and depressing momentarily.

(Test svitch vill spring return to the 'Normal left-hand position).

OST-1083 Rev.

3 Page 19 of 52

OSl 7.3 Train A Safet In'ection Go Circuit (K603) (continued) 13.

Verify the following equipment realigns as follows:

a.

Train A ventilation (1)

CK-B6 (1&2), Smoke Pur In Comp Rm SHUT (2)

ES-7(1&2-NNS),

Smoke Pur Exh Fan OFF (3)

ES-lA, Purge Exhaust Fan OFF (4) 3CZ-B17(SA-1),

CR Purge Makeup Vlv SHUT (5) 3CZ-B13(SA-1),

CR Purge Exh 14.

Position reset switch S921 to RESET.

SHUT 15.

Verify the following equipment status:

b.

C ~

1CS-238, Charging Line Isolation 1SI-4, BIT Outlet Isolation 1SI-246, Accumulator lA-SA Discharge SHUT OPEN SHUT d.

e.

1BD-'ll, S/G 1A-SN Blowdown Isolation SHUT Train A Ventilation (1) 3CZ-Bl(SA-1),

CR Norm Intake (MCB)

(2) 3CZ-B3(SA-1),

CR Norm Exh (MCB)

SHUT SHUT (3)

E-9(1A-SA), Normal Exhaust Fan (MCB)

(4) 3CZ-B5(SA-1), Equip Prot Rm Air (AEP"1)

Inlet Vlv (5) 3CZ-B7(SA-l), Elec Equip Prot Rm (AEP-1)

Vent Isol I

(6) 3AC-D4(SA-1')p RAB Swgr Rm A Ret (AEP-1)

Damper (7)

E"28(lA-SA), Swgr Rm A Exh Fan (AEP-1)

OFF SHUT SHUT OPEN OFF OST-1083 Rev.

3 Page 20 of 52

OS1 7.3 Train A Safet In'ection - Go Circuit (K603) (continued)

(8)

E-28(1B-SA),

Swgr Rm A Exh Fan OFF (AEP-1) 3AC-D3(SA-1),

Swgr Pw A OAI Isol SHUT (AEP-1, SLB-ll)

(10) E"10(1A-SA), Elec Equip Rm Exh Fan OFF (AEP-1)

(11) 3CZ-B17(SA-1),

CR Purge Makeup Vlv SHUT (MCB)

(12) 3CZ-B11(SA-1),

CR Emer Filt OAI SHUT (MCB)

Vlv (13) R-13(1&2A-NNS),

ARR for Comp/Comm Rm (AEP-3)

ON (14) R-13(1&2B-NNS),

ARR for Comp/Comm Rm (AEP-3)

ON (15) ES-7(l&2X-NNS), Smoke Purge Exh OFF Fan (AEP-3)

(16) CK"B7-1&2, Comp Rm Normal Intake SHUT (AEP-3)

(17) CK-B8-1&2,Comp Rm Normal Intake SHUT (AEP-3)

(18) CK-B6-1&2, Smoke Pur Intake (AEP"3)

SHUT (19)

(20)

SHUT 3CZ-D16(SA-1),

CR Em Filt Recirc OPEN (MCB) 3CZ"B13(SA-1),

CR Purge Exh (MCB)

(21) ES-1A, Purge Exhaust Fan (MCB)

OFF (22) 3CZ-B9(SA"1),

CR Emer Filt OAI Vlv (MCB)

SHUT 16.

Direct the I&C Technician to remove jumper installed in Step.

7.3.1 unless required by OP-183.01

'echnicianVerifier OST-1083 Rev.

3 Page 21 of 52

OS1 7.3 Train A Safet Iniection Go Circuit (K603) (continued) 17.

Direct the I&C Technician to reconnect the lead lifted in Step 7.3.2 (Mark this Step NA if Section 7.4 is to be performed next).

Techni"ian Verifier 18.

Realign the following equipment as required for plant operations',

a.

1CS-238, Charging Line Isolation Final Position Positioner Verifier b.

1SI-4, BIT Outlet Isolation Final Position Positioner Verifier c.

1SI-246, Accumulator lA-SA Discharge Final Position Positioner d.

1BD-ll, S/G 1A-SN Blowdown Isolation Verifier Final Position Positioner Verifier e.

1SI-246 Breaker on MCC 1A21-SA Cub.

5C Final Position Positioner Verifier f.

Train A Ventilation (1) 3CZ-B1(SA-1),

CR Norm Intake (MCB)

Final Position Positioner Verifier (2)

E-9(lA-SA), Normal Exhaust Fan (MCB)

Final Position Positioner Verifier OST-1083 Rev.

3 Page 22 of 52

OS1 7.3 Train A Safet In ection " Go Circuit (K603) (continued)

(3) 3CZ-B3(SA-1),

CR Norm Exh (HCB)

Final Position Positioner Verifier (4) 3CZ-B5(SA-I), Equip Pro" Room Air Inlet Valve (AEP-1)

Final Position Positioner Verifier (5) 3CZ-B7(SA-l), Elec Equip Prot Rm Vent Isol (AEP-1)

Final Position Positioner Verifier (6) 3AC-D4(SA"1),

RAB SWGR Rm A Ret Air Damper (AEP-1)

Final Position Positioner Verifier (7)

E-28(1A-SA),

SWGR Rm A Exh Fan (AEP-1)

Final Position Positioner Verifier (8)

E-28(lB-SA),

SWGR Rm A Exh Fan (AEP-1)

Final Position Positioner Verifier (9) 3AC-D3(SA-1),

SWGR Rm A OAI Isol (AEP"1, SLB-11)

Final Position Positioner Verifier (10) E-10(1A-SA), Elec Equip Rm Exh Fan (AEP-1)

Final Position Positioner Verifier

( 11) 3CZ-B17 ( SA-1),

CR Purge Nakeup Vlv (MCB)

Final Position Positioner Verifier OST-1083 Rev.

3 Page 23 of 52

Osl 7.3 Train A Safet In ection - Co Circuit (K603) (continued)

(12) 3"2-811(SA-1),

CR Emer Filt OAI Vlv (MCB)

Final Position Positioner Verifier (13) R-13(l&2A-NNS), ARR for Comp/Comm Rm (AEP-3)

Final Position'ositioner Verifier (14) ES-7(1&2X-NNS),

Smoke Pur Exh Fan (AEP-3)

Final Position Positioner Verifier (15) CK-B7-1&2, Computer Room Normal Intake (AEP-3)

Final Position Positioner Verifier (16) CK-B8-1&2, Computer Room Normal intake (AEP"3)

Final Position Positioner Verifier (17) CK-B6-1&2, Smoke Pur Intake (AEP-3)

Final Position Positioner (18) 3CZ-D16(SA-l),

CR Em Filt Recirc (MCB)

Verifier Final Position Positioner Verifier (19) 3CZ-B13(SA-1),

CR Purge Exh (MCB)

Final Position Positioner Verifier (20) ES-1A, Purge Exhaust Fan OST-1083 Rev.

3 Final Position Positioner Verifier Page 24 of 52

Osl 7.3 Train A Safet In'ection - Go Circuit (K603) (continued)

(21) 3CZ"B9(SA-1),

CR Emer Filt OAI Vlv Final Position Positioner Verifier (22) R-13(162B)

ARR for Comp/Comm Rm (AEP-3)

Final Position Positioner Verifier

]9.

Verify Accumulator 1A-SA is repressurized once discharge valve 1SI-246 is SHUT if depressurized in a previous step.

20.

Return the SGMLU System to the desired lineup per OP-183.01.

7.4 Train A Safet In'ection Go Circuit (K608)

CAUTION The perEormance of this test diverts the A Train ESM Return Header to the Auxiliary Reservoir.

This test should not be performed if the Circulating Mater System has been recently chlorinated (check with Chemistry to determine restrictions)

OR if the CTMU System is not available for makeup to the cooling tower basin.

Maintain maximum makeup Elow and monitor basin level to avoid the cavitation of a Service Water Pump.

1.

Direct the I&C Technician to install jumper between terminals 93 and 107 in ARP-19A (SA)F3 to defeat the SG Low Pressure interlock Eor 1BD-30 unless already done by OP-183.02.

(Ref. 2.5.b.2) 2.

If any Steam Generator level is below 38.5X, direct the ISC Technician to lift the lead at terminal 60 in ARP" 19A (SA) F3 to defeat the SG low level interlock Eor 1BD-30 (Mark this sXep NA if lead not reconnected in Section 7.3) ~

OST-1083 Rev.

3 Page 25 of 52

OS1 7.3 Train A Safet In 'ection " Go Circuit (K603) (continued) 3.

Prepare the following equipment for testing as fcl.lows:

a.

1SW-270, ESW Hdr A Return to Aux Rsvr SHUT B

s 1BD-30, S/G IE-SN Bloudoun CNHT Isol OPEN c.

1SP-222, S/G 1B-SN Sample CNMT Isol OPEN d.

1SP-217, S/G 1A"SN Sample CNMT Isol OPEN e.

SGWLU pump for B S/G SECURED 4e Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

5.

Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's

approval, commence the slave relay test.

NOTE:

1SM-270 will cycle from shut to open then back to shut when K608 is energized.

6.

Energize slave relay K608 by turning test switch S910 clockwise and depressing momentarily.

(Test s~itch will spring return to the normal left"hand position.)

7.

Verify the following valves realign as follows',

a.

1SM-270, ESM Hdr A Return to Aux Rsvr OPEN THEN SHUT U.

IBD-30, S7G IB-SN Bloudoun CNHT Isol SHUT c.

1SP-222, S/G 1B-SN Sample CNMT Isol SHUT d.

1SP-217, S/G lA-SN Sample CNMT Isol SHUT 8.

Position reset switch S921 to RESET.

9.

Verify the following valve status'.

a.

1SW-270, ESW Hdr A Return to Aux Rsvr SHUT OST-1083 Rev.

3 Page 26 of 52

Osl 7.4 Train A Safet In ection - Go Circuit (K608) (continued) b.

1BD-30, S/G 1B"SN Bio+down CNMT Isol SHUT c.

1SP-222, S/G 1B-SN Sample CNMT Isol SHUT d.

1SP-217, S/G 1A-SN Sample CNMT Isol SHUT 10.

Direct the I&C Technician to remove jumper installed in Step.

7.4.1 unless required by OP-183.02.

Technician Verifier 11.

Direct the 16C Technician to reconnect the lead lifted in Step 7.4.2.

Technician Verifier 12.

Reposition the following valves as required for plant operations:

a.

1SW-270, ESW Hdr A Return to Aux Rsvr Final Position Positioner Verifier b.

1BD-30, S/G 18-SN Blovdown CNMT Isol Final Position Positioner c.

1SP-222, S/G 1B-SN Sample CNMT Isol Verifier Final Position Positioner Verifier d.

1SP-217, S/G lA-SN Sample CNMT Isol Final Position Positioner Verifier 13.

Return the SGWLU System to the desired lineup per OP-183.02.

OST-1083 Rev.

3 Page 27 of 52

OS1 7.5 Train A Safet In'ection Go Circuit (K610) 1.

Prepare the equipment for testing as follows:

a.

Diesel Generator 1A-SA Prepare for startup per OP-155 b.

1CH-149, Chill Water to NESSR Fan Clrs OPEN c.

1CH-197, Chill Water to NESSR Fan Clrs OPEN d.

ALB-23-3-7, RAB NORM EXE XBOL DMPR TRBL OPP e.

A Train RAB Normal Exhaust Dampers:

(1)

AV-D3SA-1 (2)

AV-D5SA-1 (3)

AV-D7SA-1 (4)

AV-D9SA-1 (5)

AV-D11SA-1 (6)

AV-D13SA-1 (7)

AV-D15SA-1 (8)

AV-D17SA-1 (9)

AV"D19SA-1 (10) AV-D21SA-1 (11) AV-D23SA-1 (12) AV"D25SA-1 (13) AV-D27SA-1 (14) AV-D29SA-1 (15) AV-D31SA-1 (16) AV-D33SA-1

'17)

AV-D35SA-1 (18) AV-D37SA-1 OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OST"1083 Rev.

3 Page 28 of 52

OS1 7.5 Train A Safet In ection - Go Circuit (K610) (continued)

(19) AV-D52SA-1 (20) AV-D58SA-1 (21) AV-D62SA-1 (22) AV-D66SA"1 (23) AV-D70SA-1 (24) AV-D74SA-1 (25) AV-D78SA-1 (26) AV-D82SA-1 (27) AV-D86SA-1 OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN 2.

Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

3.

Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's

approval, commence the slave relay test.

4.

Coordinate with the diesel operator to prelube the Diesel Generator and energize slave relay K610 by turning test switch S912 clockvise and depressing momentarily.

(Test switch vill spring return to the normal left"hand position.)

5'erify the equipment realigns as follows:

Diesel Generator 1A-SA STARTS b.

C ~

'd ~

1CH-149, Chill Water to NESSR Fan Clrs SHUT 1CH-197, Chill Water to NESSR Fan Clrs SHUT ALB-23-3-7, RAB CFORM EXH ISOL DMPR TRBL ON e.

OST-1083 Rev.

3 A Train RAB Normal Exhaust Dampers:

(1)

AV-D3SA-1 (2 )

AV-D5SA-1 SHUT SHUT Page 29 of 52

OS1 7.5 Train A Safet In'ection - Go Circuit (K610) (continued)

(3)

AV-D7SA-1 (4)

AV-D9SA-1 (5)

AV-011SA-1 (6)

AV-D13SA-1 (7)

AV-D15SA-1 (8)

AV"D17SA-1 (9)

AV-D19SA-1 (10) AV-D21SA-1 (11) AV-D23SA-1 (12) AV-D25SA-1 (13) AV-D27SA-1 (14) AV-D29SA-1 (15) AV-D31SA-1 (16) AV-D33SA-1 (1/) AV-D35SA-1 (18) AV-D37SA-1 (19) AV-D52SA-1 (20) AV-D58SA-1 (21) AV-D62SA-1 (22) AV-D66SA"1 (23) AV-D70SA-1 (24) AV-D74SA-1 (25) AV-D78SA-.3.

(26) AV-D82SA-1 (27) AV-D86SA-1 6.

Position reset switch S921 to RESET.

SHUT SHUT SBUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT SHUT OST-1083 Rev.

3 Page 30 of 52

S

Osl 7.5 Train A Safet In'ection - Go Circuit (K610) (continued) 7.

Verify the folloving equipment status'.

a.

Diesel Generator 1A-SA RlJNNING b."

1CH-149, Chill Water to NESSR Fan C's SHUT C ~

1CH-197, Chill Water to. NESSR Fan Clrs SHUT d.

ALB-23-3-7, RAB NORM EXH ISOL DMPR TRBL OFF e.

A Train RAB Normal Exhaust Dampers:

(1)

AV-D3SA-1 (2)

AV-D5SA-1 (3)

AV-D7SA"1 (4)

AV"D9SA-1 (5)

AV-D11SA-1 (6)

AV-D13SA-1 (7)

AV-D15SA-1 (8)

AV-D17SA-1 (9)

AV-D19SA-1 (10) AV-D21SA-1 (11) AV-D23SA-1 (12) AV-D25SA-1 (13) AV-D27SA-1 (14) AV-D29SA-1 (15) AV"D31SA-1 (16) AV-D33SA-1 (17) AV-D35SA~l

': "C.

(18) AV-D37SA-1

,OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN (19) AV"D52SA-1 (20) AV-D58SA-1 OPEN OPEN OST-1083 Rev.

3 Page 31 of 52

OS1 7.5 Train A Safet ln 'ection Go Circuit (K610) (continued)

(21) AV-D62SA-1 (22) AV-D66SA-1 (23) AV-D70SA-1 OPEN OPEN OPEN (24) AV-D74SA-'PEN (25) AV-D78SA-1 (26) AV-D82SA-1 (27) AV-D86SA-1 OPEN OPEN OPEN 8.

Secure the 1A-SA Diesel Generator per OP-155.

9.

Return RAB Normal Ventilation to service per OP-172, RAB HVAC System.

10.

Realign the following equipment as required for plant operations:

a.

1CH-149, Chilled Water to NESSR Fan Coolers Final Position Positioner Verifier b.

1CH-197, Chilled Water to NESSR Fan Coolers Final Position Positioner Verifier OST-1083 Rev.

3 Page 32 of 52

OS1 7.6 Train A Safet In'ection - Go Circuit (K636)

CAUTION 1CS-745, CSIP A Alt Miniflow Val.ve, must be CLOSED prior to opening 1CS-746 to prevent lifting the Miniflow Line relief valve.

1.

Prepare the valves for testing as follows:

a.

1CS-746, CSIP A Alt Miniflow Valve b.

1CS-745, CSIP A Alt Miniflow Valve SHUT SHUT 2 ~

Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

3.

Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's

approval, commence slave relay test.

4.

Energize slave relay K636 by turning test switch S911 clockwise and depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

5.

Verify the valves realign as follows.

a.

1CS-746, CSIP A Alt Miniflow Valve OPEN 6.

Position reset switch S921 to RESET.

7.

Verify the following valve status.

a.

1CS-746, CSIP A Alt Miniflow Valve OPEN OST-1083 Rev.

3 Page 33 of 52

Osl 7,6 Train A Safet Zn ection Go Circuit (K636) (continued)

CAUTION 1CS-745, CSIP A Alt Miniflow Valve, must be CLOSED prior to opening 1CS-746 to prevent lifting the Miniflow Line relief valve.

8.

Reposition the following valves as required for plant operations:

a.

1CS-745, CSIP 1A-SA Alternate MiniflowValve Final Position Positioner Verifier b.

1CS-746, CSIP lA-SA Alternate Miniflow Valve Final Position Positioner Verifier OST"1083 Rev.

3 Page 34 of 52

Os 1 7 '

Train A Containment Isolation Phase A - Go Circuit (K622)

NOTE:

The actuation of this slave relay will cause one letdown orifice isolation valve to SHUT.

1.

Prepare the equipment for testing as follows:

a.

1CS-9, Letdown Orifice C Isolation OPEN b.

1SI-263, Accumulator Test Return Isol OPEN c.

1SW-231, NNS CENT Peo Cooler SW Supply OPEN d.

1SW-2402 NNS CNMT Fan Cooler SW Return OPEN e.

CNMT Fan Coolers:

(1)

AH-37 (1A-NNS)

(2)

AH-37 (1B-NNS)

(3)

AH-38 (1A-NNS)

(4)

AH-38 (1B-NNS)

(5)

AH-39 (1A-NNS)

(6)

AH-39 (18-NNS)

ON ON ON ON ON ON 2.

Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

NOTE:

Monitor CNMT area temperatures and RCP motor and winding temperatures while CNMT Fans are out of service.

3 ~

Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's

approval, commence the slave relay test.

4.

Energize slave relay K622 by turning test switch S916 clockwise and depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

5 ~

Verify the equipment realigns as follows.'.

1CS-9, Letdown Orifice C Isolation SHUT b.

1SI-263, Accumulator Test Return Isol SHUT OST-1083 Rev.

3 Page 35 of 52

0$ 1 7.7 Train A Containment Isolation Phase A - Go Circuit (K622)

(continued) c.

1SW"231>

NNS CNMT Fan Cooler SW Supply SHUT d.

1SW-240, NNS CNMT Fan Cooler SW Return SHUT e.

CNMT Fan Coolers:

(1)

AH-37 (1A-NNS)

(2)

AH-37 (1B"NNS)

(3)

AH-38 (1A-NNS)

(4 )

AH-38 ( 1B-NNS )

(5)

AH-39 (1A-NNS)

(6)

AH-39 (1B-NNS) 6.

Position reset switch S921 to RESET.

OFF OFF OFF OFF OFF OFF 7.

Verify the following equipment status'.

a ~

b.

C ~

d.

1CS-9, Letdown Orifice C Isolation

'HUT 1SI-263, Accumulator Test Return Isol SHUT 1SW-231, NNS CNMT Fan Cooler SW Supply SHUT 1SW"240, NNS CNMT Fan Cooler SW Return SHUT e.

CNMT Fan Coolers:

(1)

,AH-37 (1A-NNS)

(2)

AH-37 (1B-NNS)

(3)

AH-38 (1A-NNS)

(4)

AH"38 (1B-NNS)

(5)

AH-39 (1A-NNS)

L

~'~

(6)

AH-39 (1B-NNS)

OFF OFF OFF OFF OFF OST-1083 Rev.

3 Page 36 of 52

Osl 7.7 Train A Containment Isolation Phase A " Go Circuit (K622)

(continued 8.

Realign the following equioment as required for plant operations:

a.

1CS-9, Letdown Orifice C Isolation Final Positior Positioner Verifier b.

1SI-263, Accumulator Test Return Isolation Final Pos tion Positioner Ver'fier c.

1SW-231, NNS CNMT Fan Cooler SW Supply Final Position Positioner Verifier d.

1SW-240, NNS CNMT Fan Cooler SW Return Final Position Positioner Verifier e.

CNMT Coolers:

(1)

AH"37 (lA-NNS)

Final Position Positioner (2)

AH"37 (18-NNS)

Verifier Final Position Positioner (3)

AH-38 (1A-NNS)

Verifier Final Position Positioner (4) 'H-38 (1B-NNS)

Verifier Final Position Positioner

E.

(5)

AH-39 (1A-NNS)

Verifier Final Position Positioner Verifier OST-1083 Rev.

3 Page 37 of 52

0

OS1

~

7.7 Train A Containment Isolation Phase A - Co Circuit (K622) continued)

(6)

AH-39 (1B-NNS)

Final. Positior.

Positioner Verifier OST-1083 Rev.

3 Page 38 of 52

OS1 7.8 Train A Loo 1

AFW Line Isolation Go Circuit (K615) 1.

Prepare the valves for testing as follows:

a..

1AF-137, AFW Pump 1X"SAB to S/G 1A-SN OPEN b.

1AF-49, AFW Reg Valve to S/G 1A-SN OPEN 2.

Unlock and Shut the. following valves to preven't cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running.

(NA for pump not to be run) a.

1A MDAFW Pump (1) 1AF-36, AFWP 1A First Isol. to C S/G.

(2) 1AF-40, AFWP 1A Isolation to A S/G.

b.

1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isolation to C S/G.

(2) 1AF-42, AFWP 1B Isol,ation to B S/G.

3.

Start Aux Feedwater Pump 1A OR 1B (NA pump not used).

a.

1A MDAFW Pump b.

1B MDAFW Pump 4.

Establish phone communications between operators the Main Control Room and the Safeguards Test Cabinet.

5.

Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's

approval, commence the slave relay test.

6 Energize slave relay K615 by turning test switch S922 clockwise and 'depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

OST-1083 Rev.

3 Page 39 of 52

Osl 7.8 Train A Loo 1

AFW Line Isolation -

Go Circuit (K615)

(continued) 7.

Verify the valves realign as follows:

a.

1AF-137, AFW Pump 1X-SAB to S/G 1A-SN SHUT b.

1AF-49, AFW Reg Valve to S/G 1A-SN SHUT 8.

Release test switch S922 (Test s~itch will spring return to the normal left"hand position).

9.

Position reset switch S921 to RESET.

10.

Realign the following valves as required for plant operations:

a. 'AF-137, AFW Pump 1X"SAB to S/G 1A"SN Final Position Positioner b.

1AF-49, AFW Reg Valve to S/G 1A-SN Verifier Final Position Positioner Verifier NOTE:

Mark the following steps N/A if Section 7.9 is to be performed next.

Stop the Aux Feedwater Pump started in Step 3 per OP-137.

(NA pump not used) a ~

lA MDAFW Pump 12.

b.

1B MDAFW Pump Open and lock open the following valves'(NA valves not shut in Step 2) a.

1A MDAFW Pump.

(1) 1AF-36, AFWP 1A First Isol to C S/G LOCKED OPEN VERIF OST-1083 Rev.

3 Page 40 of 52

OS1 7.8 Train A"Loo 1

AFW Line Isolation Go Circuit (K615) continued (2) 1AF-40, AFWP 1A Isolation to A S/G LOCKED OPEN VERIF b.

1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isol to C S/G LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G LOCKED OPEN VERIF 7.9 Train A Loo 2

AFW Line Isolation - Go Circuit (K616) 1.

Prepare the valves for testing as follows:

a.

1AF"143, AFW Pump 1X-SAB to S/G )B-SB OPEN B.

1AF-51, AFW ReS Valve te S/G 1B-SB OPEN NOTE:

2 ~

Mark the following 2 steps N/A if this equipment was left in the required lineup in Section 7.8.

Unlock and Shut the following valves to prevent cold water from being injected to the Steam Generators when Motor Driven Auxiliary Feedwater Pump is running.

(NA for pump not to be run) a ~

b.

1A MDAFW Pump (1) 1AF-36, AFWP 1A First Isol. to C S/G.

(2) 1AF-40, AFWP lA Isolation to A S/G.

1B MDAFW Pump (1) 1AF-39, AFA'B First Isol. to C S/G.

(2) 1AF-42, AFWP 1B Isolation to B S/G.

OST-1083 Rev.

3 Page 41 of 52

Osl 7.9 Train A Loon 2

AFW Line isolation Go Circuit (K616)

(continued 3.

Start Aux Feedwater Pump lA OR 1B.

(NA pump not used) a.

1A MDAFW Pump b.

1B MDAFW Pump 4.

Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

1 Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with the Shift Foreman's

approval, commence the slave relay test.

6, Energize slave relay K616 by turning test switch S923 clockwise and depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

7.

Verify the valves realign as follows:

a.

1AF-143, AFW Pump 1X-SAB to S/G 1B-SN SHUT B.

1AF-51, AFW Reg Valve to S/G 1B-SN SHUT 8.

Release test switch S923 (Test switch will spring return to the normal left-hand position).

9.

Position reset s~itch S921 to RESET.

10'ealign the following valves as required for plant operations:

a.

1AF-143, AFW Pump 1X-SAB to S/G 1B-SN Final Position 'ositioner E.

Verifier b.

1AF-51, AFW Reg Valve to S/G 1B-SN Final Position Positioner Verifier OST-1083 Rev.

3 Page 42 of 52

OS1 7.9 Train A Loo 2

AFW Line Isolation - Go Circuit (616)

(continued)

NOTE:

Mark the following steps N/A if Section 7,10 is'to be performed next.

Stop the Aux Feedwater Pump started in Step 3 per OP-137.

(NA pump not used) a

~

b.

1A MDAFW Pump 1B MDAFW Pump 12.

Open and lock open the following valves'(NA valves not shut in Step 2 of this section or 7.8) a ~

1A MDAFW Pump (1) 1AF-36 AFWP 1A First Isol to C S/G.

LOCKED OPEN VERIF (2) 1AF-40 AFWP 1A Isolation to A S/G.

LOCKED OPEN VERIF b.

1B MDAFW Pump (1) 1AF-39, AFWP 1B First Isol. to C S/G LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G LOCKED OPEN VERIF 7.10 Train A Loo 3

AFW Line Isolation - Go Circuit (K617) 1.

Prepare the valves Efor testing as follows'.

a.

1AF-149, AFW Pump 1X-SAB to S/G 1C-SN b.

1AF-50, AFW Reg Valve to S/G 1C-SN OPEN OPEN OST-1083 Rev.

3 Page 43 of 52

Osl 7.10 Train A Loo 3

AFW Line Isolation - Go Circuit (K617)

(continued)

NOTE:

Mark the following 2 steps N/A if this equ'pment was left in the requireo lineup 'n Sr tion 7.9 2.

Unlock and Shut the following valves to prevent co'.d water from being inj cted to the Steam Generators when Motor Driven Auxiliary Feedwate" Pump is running.

(NA for pump not to be run) a.

1A MDAFW Pump (1) lAF-36, AFWP 1A First Isol. to C S/G.

(2) 1AF-40, AFWP 1A Isolation to A S/G.

b.

1B MDAFW Pump (1) 1AF-39, AFWP 1B First isoi. to C S/U ~

(2) 1AF-42, AFWP 1B Isolation to B S/G.

3.

Start Aux Feedwater Pump 1A OR 1B.

(NA pump not used) a.

1A MDAFW Pump b.

1B MDAFW Pump 4.

Establish phone communications between operators in the Main Control Room and the Safeguards Test Cabinet.

5 ~

Open the Protection System Safeguards Test Train "A" Cabinet 2 door and, with Shift Foreman's

approval, commence the slave relay test.

6.

Energize slave relay K617 by turning test switch S924 clockwise and depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

7.

Verify the valves.realign as follows'.

t a.

1AF-149, AFW Pump 1X"SAB to S/G 1C-SN SHUT b.

1AF-50, AFW Reg Valve to S/G 1C-SN SHUT OST-1083 Rev.

3 Page 44 of 52

Osl 7.10 Train A Loo 3

AFW Line Isolation - Go Circuit (K617) continued 8.

Release test s~itch S924 (Test switch w'll spring return to the normal left-hand position).

9.

Position reset switch S921 to RESET.

10.

Realign the following valves as required for plant operations:

a.

1AF-149, AFW Pump 1X-SAB to S/G 1C-SN Final Position Positioner b.

1AF-50, AFW Reg Valve to S/G 1C-SN Verifier Final Position Positioner Verifier 11.

Stop the Aux Feedwater Pump started in Step 3 per OP-137.

(NA pump not used) a.

1A MDAFW Pump b.

1B MDAFW Pump 12.

Open and lock open the following valves:

(NA valves not shut in Step 2 of this section or 7.8 or 7.9) a.

1A MDAFW Pump (1) lAF-36, AFWP 1A First Isol to C S/G ~

LOCKED OPEN VERIF.

(2) 1AF"40, AFWP 1A Isolation to "B" S/G.

LOCKED OPEN VERIF.

OST-1083 Rev.

3 Page 45 of 52

Osl 7.10 Train A Loo 3

AFW Line Isolation - Go Circuit (K617)

(continued) b.

1B MDAFW Pump (1) lAF-39, AFWP 1B First 'Isol. to C S/G.

LOCKED OPEN VERIF (2) 1AF-42, AFWP 1B Isolation to B S/G.

LOCKED OPEN VERIF 7.11 Train A SI for Switchover to Recirculation - Go Circuit (K739 K740 K741) 1.

Prepare the equipment for testing as follows:

a.

b.

C ~

1SI-300, CNMT Sump to RHR Pump A Isol SHUT 1SI-310, CNMT Sump to RHR Pump A Isol SHUT 1CT-105, CNMT Sump to CS Pump A Suet SHUT d.

1CT-26, CNMT Spray Pump A Suction SHUT e.

RWST/ Lo-Lo LVL Bistables on TSLB-4,

LB990C, LB991C,
LB992C, and LB993C OFF f.

CS Pump A Breaker on Emer Bus 1A2"SA Cub.

4C RACKED OUT g.

1CT-26 Breaker at MCC 1A21-SA Compt.

10B.

OFF 2 ~

Have a Maintenance Electrician install a jumper across terminals 20 and 24 in MTC 8A-SA Panel 1 to simulate CS Pump breaker closure.

CAUTION The water in the CNMT Spray System is contaminated, use appropriate actions in accordance with AP-503 in handling the contaminated fluid.

3.

Drain Containment Spray System A as follows:

OST-1083 Rev.

3 Page 46 of 52

Osl 7.11 Train A SI for Switchover to Recirculation - Go Circuit (K739 K740 K741) (continued) a

~

Shut or check SHUT the following valves:

(1) 1CT-50 CNMT SPRAY PUMP A-SA DISCHARGE (2) 1CT-47 CNMT SPRAY PUMP A-SA RECIRC (3) 1CT-36 CS PUMP A EDUCTOR LINE INLET ISOL (4,)

1CT-39 CS PUMP A EDUCTOR LINE OUTLET ISOL b.

Open the low point drain at CNMT Spray. Pump (RAB 190):

(1) 1CT-28 CS PUMP A SUCTION LINE DRAIN (2) 1CT-29 CS PUMP A SUCTION LINE DRAIN C ~

Open the high point vent at CNMT Penetration 23 (RAB 236):

(1) 1CT-45 SPRAY HDR A TEST CONN (2) 1CT-46 SPRAY HDR A TEST CONN Mhen piping is empty, shut the low point drain valves:

(1) 1CT-28 CS PUMP A SUCTION LINE DRAIN (2) 1CT-29 CS PUMP A SUCTION LINE DRAIN Verif.

Verif.

4.

Establish communications between operators in the Main Control Room and the Safeguards Test Cabinet.

5.

Open Protection System Safeguards Test Train "A" Cabinet 2 door and, with Ship Foreman's

approval,

'commence the slave relay test.

6.

Energize slave relay K740 by turning test switch S940 clockwise and depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

OST-1083 Rev.

3 Page 47 of 52

OS1 7.11 Train A SI for Switchover to Recirculation Go Circuit (K739 K740 K741) (continued) 7.

Verify Bypass Permiss ve Light Panel light 4-8 SI Actuated RHR SUCT will xfer on RWST LO-LO LEVEL illuminates.

8.

Verify light on SI SUCTION AUTO SWITCH OVER RESET TRAIN A illuminates.

9.

Energize slave relay K741 by turning test switcn S941 clockwise and depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

10.

Verify the valves realign as follows:

a.

1SI-300, CNMT Sump to RHR Pump A Isol OPEN b.

1CT-105, CNMT Sump to CS Pump A Suet OPEN ll.

Realign the valves as follows'.

a.

1SI-300, CNMT Sump to RHR Pump A Isol SHUT b.

1CT"105, CNMT Sump to CS Pump A Suet SHUT 12.

Energize slave relay K739 by turning test switch S942 clockwise and depressing momentarily.

(Test switch will spring return to the normal left-hand position.)

13.

Verify the valves realign as follows.'.

1SL-310, CNMT Sump to RHR Pump A Isol OPEN b.

1CT-105, CNMT Sump to CS Pump A Suet OPEN 14.

Realign the valves as follows'.

a.

1SI"310, CNMT Supp to RHR Pump A Isol SHUT b.

1CT-105, CNMT Sump to CS Pump A Suet SHUT 15.

Position reset switch S921 to RESET.

OST-1083 Rev.

3 Page 48 of 52

Os 1 7.11 Train A SI Eor Switchover to Recirculation Go Circuit (K739 K740 K741) continued 16.

Position SI SUCTION AUTO SWITCHOVER RESET TRAIN A switch to RESET.

17.

VeriEy Bypass Permissive'ight Panel light 4-8 SI ACTUATED RHR SUCT WILL XFER ON RWST LO-L'0 LEVEL extinguishes.

N 18e Verify light on SI SUCTION AUTO SWITCH OVER RESET TRAIN A extinguishes.

19.

Have the Maintenance Electrician remove the jumper across terminals 20 and 24 in MTC 8A-SA Panel 1.

Electrician Verifier 20.

Refill the Containment Spray System A piping as follows:

a.

b.

Turn on power supply MCC 1A21-SA Compt.

10B and then open 1CT"26 RWST to CNMT SPRAY PUMP A-SA.

breaker ON valve OPEN When a solid water stream flows from the vent, close the following', independent verificatrion is required.

c ~

1CT-45 SPRAY HDR A TEST CONN 1CT-46 SPRAY HDR A TEST CONN Vent the CS Pump A-SA casing.

CLOSED CLOSED VENTED d.

Vent aEfected instrumentation:

PI-7120A CSP"SA Suction Pressure PI-7120A CSP"S'A'eduction Pressure PI-7130A CSP-SA Discharge Pressure PI-7131A CSP-SA Discharge Pressure FT-7122A CSP-SA Flow VENTED VENTED VENTED VENTED VENTED OST-1083 Rev.

3 Page 49 of 52

OS1 7.11 Train A SI for Switchover to Recirculation Go Circuit (K739 K740 K741) (continued) 21.

Realign the follcwing equipment as required for plant operations:

a.

1SI-300, CNMT Sump to RHR Pump A Isol Final Position Positioner Verifier b.

1SI-310, CNMT Sump to RHR Pump A Isol Final Position Positioner Verifier c.

1CT-105, CNMT to CS Pump A Suet Final Position Positioner d.

1CT-26, CNMT Spray Pump A Suction Verifier Final Position Positioner Verifier e.

CNMT Spray Pump A Breaker on Emer Bus 1A2-SA Compt.

4C Final Position Positioner Verifier f.

1CT-36, CS Pump A Eductor Line Inlet Isol Final Position Positioner Verifier g.

1CT-39, CS Pump A Eductor Line Outlet Isol Final Position Positioner Verifier 8.0 DIAGRAMS/ATTACHMENTS Attachment I - Calibration Data Attachment II Certifications and Reviews OST-1083 Rev.

3 Page 50 of 52

OSl ATTACHMENT I Calibration Data Page 1 of 1

INST/MODEL 0 DESCRIPTION INST I.D.

CPL DUE DATE VOLTMETER STOP MATCH RONAN RONAN RONAN RONAN RONAN RONAN

- If required due to Drained S/G OST-1083 Rev.

3 Page 51 of 52

Osl

'TTACHMENT II CERTIFICATIONS AND REVIEWS Page'1 of 1

This OST was erformed as a.'eriodic surveillance requirement Post-Maintenance Operability Test Redundant Subsystem Test Plant Conditions.'ST Completed by.

Mode:

DATE TIME OST Performed B

Initials Name (Print)

Initials Name (Print)

General Comments/Recommendations/Corrective Actions:

Pages Used:

Fill out Task Sheet OSRM019 if done during refueling.

Fill out Task Sheet OSER019 if done during cold shutdown

>72 hours.

OST Has Been Satisfactoril /Unsatisfactoril Com leted:

Shift Foreman Date REVIEWED BY:

Manager - Shift Operations Date OST-1083 Rev.

3 Page 52 of 52