ML18037A828: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 | {{#Wiki_filter:Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 Turkey Point Subsequent License Renewal Application Enclosure Summary (4 Total Pages) | ||
L-2018-004 Enclosure 1 | Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 - CAW-17-4686 Affidavit for Westinghouse CUFs in SLR Tables (Enclosure 5 Attachment 1-SLRA Section 4, Attachment 4, & ) - CAW-17-4675 Affidavit for Westinghouse EAF Calculations (Enclosure 5 Attachment 1-SLRA Section 4 & Attachment 7) - CAW-17-4621 Affidavit for Westinghouse LBB (Enclosure 5 - SLRA Section 4 & Attachment 9) - EPRI Affidavit for MRP 2017-038 (Enclosure 5 Attachment 1 - | ||
SLRA Appendix C & Attachment 11) - Areva Affidavit for Topical Reports | |||
: i. | |||
ANP-3646P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & ) | |||
ii. | |||
ANP-3647P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & ) - Areva Affidavit for CUFs in SLRA Tables (Enclosure 5 - SLRA Section 4, Attachment 4, & Attachment 5) - Areva Affidavit for EAF Calculations (Enclosure 5 Attachment 1 | |||
- SLRA Section 4 & Attachment 8) - PWROG Affidavit for PWROG 17033-P Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems dated October 2017 (Enclosure 5 0) - Westinghouse Affidavit CAW-17-4683 for withholding Data Package for Pressurizer Spray and Surge Nozzle Analysis (Enclosure 5 - SLRA Section 4 & Attachment 6) - Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Public Version) - Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) | |||
: a. Attachment 1 -LTR-REA-17-116-NP, Revision 0, Reactor Vessel Neutron Exposure Data | |||
: b. Attachment 2 - Areva Topical Report ANP-3646NP Revision 0 | |||
: c. Attachment 3 - ArevaTopical Report ANP-3647NP Revision 0 | |||
: d. Attachment 4 - SIA Report No. 1700109.402P, Revision 3 - REDACTED | |||
: e. Attachment 5 - SIA Report No. 1700109.401P, Revision 3 - REDACTED | |||
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 | Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 | ||
: f. Attachment 6 - SIA Environmentally Assisted Fatigue Calculations | |||
: i. | |||
Pressurizer Lower Head - 1700804.316P Revision 0 REDACTED, 1700804.317 Revision 0, and 1700804.318 Revision 0, ii. Pressurizer Spray - 1700804.313P Revision 1 REDACTED, 1700804.314P Revision 1 REDACTED, and 1700804.315P Revision 1 REDACTED | |||
: g. Attachment 7 - Westinghouse Environmentally Assisted Fatigue Calculations | |||
: i. LTR-SDA-II-17-13-NP, Rev. 2, Pressurizer Upper Head, RV Core Support Blocks ii. LTR-CECO-17-025-NP, Rev. 1, Replacement Steam Generators | |||
: h. Attachment 8 - Areva Environmentally Assisted Fatigue Calculations: | |||
Areva Letter No. AREVA-17-02742, dated December 6, 2017, Final CUFEN Results - Turkey Point 3 & 4 - SLR EAF Analyses | |||
: i. 32-9280707, Rev. 0, CRDM Nozzle to Adapter Weld Connection ii. 32-9280708, Rev. 0, Replacement RVCH J Groove iii. 32-9280709, Rev. 0, CRDM Latch Housing iv. 32-9280710, Rev. 0, Vent Nozzle | |||
: v. 32-9280711, Rev. 0, Reactor Vessel Flange vi. 32-9280712, Rev. 0, CRDM Lower Joint | |||
: i. Attachment 9 - PWROG-17031-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-15338-A | |||
: j. Attachment 10 - PWROG-17011-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-14535A and WCAP-15666-A | |||
: k. Attachment 11 - WCAP-15354-NP, Rev. 1, Technical Justification for Eliminating Primary Loop Pipe Rupture as a Structural Design Basis | |||
: l. Attachment 12 - SIA Leak-Before-Break Evaluation for Auxiliary Lines 0901350-401 Rev. 3 and 0901350-304 Rev. 3 | |||
: m. Attachment 13 - PWROG-17033-NP, Rev. 0, Update for Subsequent License Renewal: WCAP-13045 - 10 CFR 2.390 Withheld Proprietary Documents | |||
: a. Attachment 1 - Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Proprietary Version) | |||
: b. Attachment 2 - Areva Topical Report ANP-3646P Revision 0 | |||
: c. Attachment 3 - Areva Topical Report ANP-3647P Revision 0 | |||
: d. Attachment 4 - SIA Task 1 Report - SIA Report No. 1700109.402P Revision 3 | |||
: e. Attachment 5 - SIA Task 2 Report - SIA Report No. 1700109.401P Revision 3 | |||
: f. Attachment 6 - SIA EAF Calculations | |||
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 | |||
: i. Pressurizer Lower Head - SIA Calculation No. 1700804.316P Revision 0. | |||
ii. Pressurizer Spray - SIA Calculation Nos. 1700804.313P Revision 1, 1700804.314P Revision 1, and 1700804.315P Revision 1 | |||
: g. Attachment 7 - Westinghouse EAF Calculations | |||
: i. Pressurizer Upper Head, RV Core Support Blocks - LTR-SDA-II-17-13-P, Revision 2 ii. Steam Generators LTR-CECO-17-025-P, Revision 1 | |||
: h. Attachment 8 - Areva EAF Calculations (6) | |||
: i. CRDM Bi-Metallic - Areva Calculation No. 32-9279174, Revision 1, 12/14/17 ii. CRDM J-Groove Weld - Areva Calculation No. 32-9279212, Revision 1, 12/12/17 iii. CRDM Latch Housing - Areva Calculation No. 32-9279367, Revision 1, 12/15/17 iv. CRDM Vent Nozzle - Areva Calculation No. 32-9279362, Revision 1, 12/14/17 | |||
: v. CRDM Vessel Flange - Areva Calculation No. 32-9279161, Revision 1, 12/14/17 vi. CRDM Lower Joint - Areva Calculation No. 32-9280202, Revision 1, 12/15/17 | |||
: i. Attachment 9 - WCAP-15354-P, Revision 1, Westinghouse LBB Analysis | |||
- Proprietary | |||
: j. Attachment 10 - PWROG-17033-P, Revision 0 - RCP Code Case N-481 | |||
- Proprietary | |||
L-2018-004 Enclosure 1 | |||
: | |||
: g. Attachment 7 - Westinghouse EAF Calculations i. Pressurizer Upper Head, RV Core Support Blocks - LTR-SDA-II-17-13-P, Revision 2 ii. Steam Generators LTR- | |||
: h. Attachment 8 - Areva EAF Calculations (6) i. CRDM Bi-Metallic - Areva Calculation No. 32-9279174, Revision 1, 12/14/17 ii. CRDM J-Groove Weld - Areva | |||
- Proprietary | |||
- Proprietary | |||
: k. Attachment 11 - MRP 2017-038}} | : k. Attachment 11 - MRP 2017-038}} | ||
Latest revision as of 01:19, 7 January 2025
| ML18037A828 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/30/2018 |
| From: | Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18037A812 | List: |
| References | |
| L-2018-004 | |
| Download: ML18037A828 (4) | |
Text
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 Turkey Point Subsequent License Renewal Application Enclosure Summary (4 Total Pages)
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 - CAW-17-4686 Affidavit for Westinghouse CUFs in SLR Tables (Enclosure 5 Attachment 1-SLRA Section 4, Attachment 4, & ) - CAW-17-4675 Affidavit for Westinghouse EAF Calculations (Enclosure 5 Attachment 1-SLRA Section 4 & Attachment 7) - CAW-17-4621 Affidavit for Westinghouse LBB (Enclosure 5 - SLRA Section 4 & Attachment 9) - EPRI Affidavit for MRP 2017-038 (Enclosure 5 Attachment 1 -
SLRA Appendix C & Attachment 11) - Areva Affidavit for Topical Reports
- i.
ANP-3646P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & )
ii.
ANP-3647P Revision 0 (Enclosure 5 Attachment 1 -SLRA Section 4 & ) - Areva Affidavit for CUFs in SLRA Tables (Enclosure 5 - SLRA Section 4, Attachment 4, & Attachment 5) - Areva Affidavit for EAF Calculations (Enclosure 5 Attachment 1
- SLRA Section 4 & Attachment 8) - PWROG Affidavit for PWROG 17033-P Update for Subsequent License Renewal: WCAP-13045, Compliance to ASME Code Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems dated October 2017 (Enclosure 5 0) - Westinghouse Affidavit CAW-17-4683 for withholding Data Package for Pressurizer Spray and Surge Nozzle Analysis (Enclosure 5 - SLRA Section 4 & Attachment 6) - Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Public Version) - Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)
- a. Attachment 1 -LTR-REA-17-116-NP, Revision 0, Reactor Vessel Neutron Exposure Data
- b. Attachment 2 - Areva Topical Report ANP-3646NP Revision 0
- c. Attachment 3 - ArevaTopical Report ANP-3647NP Revision 0
- d. Attachment 4 - SIA Report No. 1700109.402P, Revision 3 - REDACTED
- e. Attachment 5 - SIA Report No. 1700109.401P, Revision 3 - REDACTED
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1
- f. Attachment 6 - SIA Environmentally Assisted Fatigue Calculations
- i.
Pressurizer Lower Head - 1700804.316P Revision 0 REDACTED, 1700804.317 Revision 0, and 1700804.318 Revision 0, ii. Pressurizer Spray - 1700804.313P Revision 1 REDACTED, 1700804.314P Revision 1 REDACTED, and 1700804.315P Revision 1 REDACTED
- g. Attachment 7 - Westinghouse Environmentally Assisted Fatigue Calculations
- i. LTR-SDA-II-17-13-NP, Rev. 2, Pressurizer Upper Head, RV Core Support Blocks ii. LTR-CECO-17-025-NP, Rev. 1, Replacement Steam Generators
- h. Attachment 8 - Areva Environmentally Assisted Fatigue Calculations:
Areva Letter No. AREVA-17-02742, dated December 6, 2017, Final CUFEN Results - Turkey Point 3 & 4 - SLR EAF Analyses
- i. 32-9280707, Rev. 0, CRDM Nozzle to Adapter Weld Connection ii. 32-9280708, Rev. 0, Replacement RVCH J Groove iii. 32-9280709, Rev. 0, CRDM Latch Housing iv. 32-9280710, Rev. 0, Vent Nozzle
- i. Attachment 9 - PWROG-17031-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-15338-A
- j. Attachment 10 - PWROG-17011-NP, Rev. 0 - Update for Subsequent License Renewal: WCAP-14535A and WCAP-15666-A
- k. Attachment 11 - WCAP-15354-NP, Rev. 1, Technical Justification for Eliminating Primary Loop Pipe Rupture as a Structural Design Basis
- l. Attachment 12 - SIA Leak-Before-Break Evaluation for Auxiliary Lines 0901350-401 Rev. 3 and 0901350-304 Rev. 3
- m. Attachment 13 - PWROG-17033-NP, Rev. 0, Update for Subsequent License Renewal: WCAP-13045 - 10 CFR 2.390 Withheld Proprietary Documents
- a. Attachment 1 - Turkey Point Nuclear Plant Units 3 and 4 Subsequent License Renewal Application (Proprietary Version)
- b. Attachment 2 - Areva Topical Report ANP-3646P Revision 0
- c. Attachment 3 - Areva Topical Report ANP-3647P Revision 0
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 L-2018-004 Enclosure 1
- i. Pressurizer Lower Head - SIA Calculation No. 1700804.316P Revision 0.
ii. Pressurizer Spray - SIA Calculation Nos. 1700804.313P Revision 1, 1700804.314P Revision 1, and 1700804.315P Revision 1
- g. Attachment 7 - Westinghouse EAF Calculations
- i. Pressurizer Upper Head, RV Core Support Blocks - LTR-SDA-II-17-13-P, Revision 2 ii. Steam Generators LTR-CECO-17-025-P, Revision 1
- h. Attachment 8 - Areva EAF Calculations (6)
- i. CRDM Bi-Metallic - Areva Calculation No. 32-9279174, Revision 1, 12/14/17 ii. CRDM J-Groove Weld - Areva Calculation No. 32-9279212, Revision 1, 12/12/17 iii. CRDM Latch Housing - Areva Calculation No. 32-9279367, Revision 1, 12/15/17 iv. CRDM Vent Nozzle - Areva Calculation No. 32-9279362, Revision 1, 12/14/17
- v. CRDM Vessel Flange - Areva Calculation No. 32-9279161, Revision 1, 12/14/17 vi. CRDM Lower Joint - Areva Calculation No. 32-9280202, Revision 1, 12/15/17
- i. Attachment 9 - WCAP-15354-P, Revision 1, Westinghouse LBB Analysis
- Proprietary
- j. Attachment 10 - PWROG-17033-P, Revision 0 - RCP Code Case N-481
- Proprietary
- k. Attachment 11 - MRP 2017-038