{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 Mr. Richard Bologna Site V ice President First Energy N uclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, P A 15077-0004 SUBJEC T: ANNUAL ASSESSMENT LETTER FOR BE A VER VALLEY POWER S T ATION UNITS 1 AND 2 (REPORTS 05000334/201 7 006 AND 0500412/2017006 05000334/2017402 AND 05000412/2017402 AND 05000334/2017501 AND 05000412/2017501)
{{#Wiki_filter:February 28, 2018
 
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION UNITS 1 AND 2 (REPORTS 05000334/2017006 AND 0500412/2017006 05000334/2017402 AND 05000412/2017402 AND 05000334/2017501 AND 05000412/2017501)


==Dear Mr. Bologna:==
==Dear Mr. Bologna:==
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 a nd 2 , reviewing performance indicators (PIs), inspection results , and enforcement actions from January 1, 2017 , through December 31, 2017. This l etter informs you of the NRC's assessment o f y our facility during this period and its pl ans for future inspections at your facilit y. The NRC concluded that overall performance at your facility pr eserved public health and safet y. T he NRC determi ned the performance at Beaver Valley Power Station, Units 1 and 2 , during the most recent quarter w as within the Licensee Response Colum n (Colum n 1) o f t he NRC's React or Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," because all inspecti on findings had very low sa fety significance (i.e., Green), and all PIs were within the expected rang e (i.e., Green). Therefore, the NRC pl ans t o conduct ROP baseline inspections at y our facilit y. The enclosed inspecti on plan lists t he inspections scheduled through December 31 , 2019. This updated inspecti on plan now i ncludes pl anned security inspections which wer e formerly transmitted under separate correspondence.
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.


T he NRC provides the inspection plan to allow for t he resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by r esident inspectors are not included in the inspection pl an. The inspections listed during the l ast twelve months o f the inspection plan are t entative and may be revised.
The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The NRC will contact y ou as soo n as possible to discuss changes t o t he inspection plan should circumstances w arrant a ny changes. The N RC w ill al so be performi ng TI-19 1, "Inspection of Li censee's R esponses t o Order EA-12-04 9, E A-12-05 1 and EP Info Request M arch 12, 2012i n the first quarter o f 2018. In accordance wit h Titl e 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "R ules o f P ractice," a co py of t his l etter w ill be available electronically f or public i nspection in the NRC P ublic D ocument R oom o r from the Publicly Available Records (P ARS) co mponent o f NRC's document system (ADAMS). ADAMS i s accessibl e from the NRC's Website at http://ww w.nrc.gov/reading-rm/adams.html (the Public Electronic R eading Room). Please contact me at 610-337-5205 with any questions you may have regarding this letter.
The enclosed inspection plan lists the inspections scheduled through December 31, 2019.


Sincerely,
This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
/RA/ Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.


50-334 and 50-412 License Nos. DPR-66 and NPF-73 Enclosure:
The NRC will also be performing TI-191, Inspection of Licensees Responses to Order EA-12-049, EA-12-051 and EP Info Request March 12, 2012," in the first quarter of 2018.
Inspection/Activity Plan


ML180047A001 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-Publicly AvailableOFFICE RI/DRP RI/DRP NAME SShaffer MYoung DATE 2/28/18 /2/18 Beaver Valley
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5205 with any questions you may have regarding this letter.


01/01/2018 - 12/31/2019
Sincerely,
/RA/  


Unit Start End Activity CAC Title Staff Count
Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects


BV1 REQUAL INSP W/ P/F RESULTS
Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73


1 01/22/2018
Enclosure:
Inspection/Activity Plan


01/26/2018
ML180047A001


IP 71111.11A
SUNSI Review


000703 Licensed Operator Requalification Program and Licensed Operator Performance -  
Non-Sensitive


Annual
Sensitive


01/22/2018
Publicly Available


01/26/2018
Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer MYoung DATE 2/28/18 2/28/18


IP 71111.11B
Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count BV1 REQUAL INSP W/ P/F RESULTS


000704 Licensed Operator Requalification Program and Licensed Operator Performance -  
1 01/22/2018 01/26/2018 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -
Annual


01/22/2018 01/26/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial RAD SAFETY INSP
Biennial RAD SAFETY INSP


1, 2 01/22/2018
1, 2 01/22/2018 01/26/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/22/2018 01/26/2018 IP 71151 000746 Performance Indicator Verification CYBER FULL IMP
 
01/26/2018


IP 71124.06
1, 2 01/29/2018 02/02/2018 IP 71130.10P 000741 Cyber Security 1, 2 02/12/2018 02/16/2018 IP 71130.10P 000741 Cyber Security FUKUSHIMA LESSONS LEARNED TI-191


000730 Radioactive Gaseous and Liquid Effluent Treatment
1, 2 02/19/2018 02/23/2018 TI 2515/191 000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 UNIT 1 INSERVICE INSPECTION


1, 2 01/22/2018
1 04/23/2018 05/04/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RAD SAFETY INSP


01/26/2018
1, 2 04/23/2018 04/27/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/23/2018 04/27/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/23/2018 04/27/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/23/2018 04/27/2018 IP 71124.04 000729 Occupational Dose Assessment ACCESS CONTROL, PROTECTIVE STRATEGY, TSR


IP 71151 000746 Performance Indicator Verification
1, 2 06/04/2018 06/08/2018 IP 71130.02 000734 Access Control 1, 2 06/04/2018 06/08/2018 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 06/04/2018 06/08/2018 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 06/04/2018 06/08/2018 IP 71151 001338 Performance Indicator Verification EP EXERCISE INSPECTION


CYBER FULL IMP
1, 2 06/11/2018 06/15/2018 IP 71114.01 000716 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 71151 001397 Performance Indicator Verification 1/4/2018 10:49:52 AM Page 1 of 4 This report does not include INPO and OUTAGE activities.
 
1, 2 01/29/2018
 
02/02/2018
 
IP 71130.10P
 
000741 Cyber Security
 
1, 2 02/12/2018
 
02/16/2018
 
IP 71130.10P
 
000741 Cyber Security
 
FUKUSHIMA LESSONS LEARNED TI-191
 
1, 2 02/19/2018
 
02/23/2018
 
TI 2515/191
 
000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request
 
March 12, 2012
 
UNIT 1 INSERVICE INSPECTION
 
1 04/23/2018
 
05/04/2018
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
RAD SAFETY INSP
 
1, 2 04/23/2018
 
04/27/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 04/23/2018
 
04/27/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 04/23/2018
 
04/27/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 04/23/2018
 
04/27/2018
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
 
1, 2 06/04/2018
 
06/08/2018
 
IP 71130.02
 
000734 Access Control
 
1, 2 06/04/2018
 
06/08/2018
 
IP 71130.05
 
000737 Protective Strategy Evaluation
 
1, 2 06/04/2018
 
06/08/2018
 
IP 71130.14
 
000743 Review of Power Reactor Target Sets
 
1, 2 06/04/2018
 
06/08/2018
 
IP 71151 001338 Performance Indicator Verification
 
EP EXERCISE INSPECTION
 
1, 2 06/11/2018
 
06/15/2018
 
IP 71114.01
 
000716 Exercise Evaluation
 
1, 2 06/11/2018
 
06/15/2018
 
IP 71151 001397 Performance Indicator Verification
 
1/4/2018 10:49:52 AM
 
Page  
 
of  
 
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Line 210: Line 85:
IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report


Beaver Valley
Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count MC&A
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
MC&A
 
1, 2 06/11/2018
 
06/15/2018
 
IP 71130.11
 
000742 Material Control and Accounting (MC&A)


1, 2 06/11/2018 06/15/2018 IP 71130.11 000742 Material Control and Accounting (MC&A)
TRIENNIAL FIRE PROTECTION
TRIENNIAL FIRE PROTECTION


1, 2 07/23/2018
1, 2 07/23/2018 07/27/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
 
1, 2 08/06/2018 08/10/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
07/27/2018
 
IP 71111.05XT
 
000697 Fire Protection - NFPA 805 (Triennial)
 
1, 2 08/06/2018
 
08/10/2018
 
IP 71111.05XT
 
000697 Fire Protection - NFPA 805 (Triennial)
 
BEAVER VALLEY 1 INITIAL OL EXAM
BEAVER VALLEY 1 INITIAL OL EXAM


1 08/20/2018
1 08/20/2018 08/24/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 09/17/2018 09/28/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
08/24/2018
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 09/17/2018
 
09/28/2018
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
 
RAD INSTRUMENTATION
RAD INSTRUMENTATION


1, 2 09/10/2018
1, 2 09/10/2018 09/14/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation Unit 2 Inservice Inspection
 
09/14/2018
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation
 
Unit 2 Inservice Inspection
 
2 10/29/2018
 
11/09/2018
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
Rad Safety Inspection
 
1, 2 10/29/2018
 
11/02/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 10/29/2018
 
11/02/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 10/29/2018
 
11/02/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 10/29/2018
 
11/02/2018
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
RADWASTE
 
1, 2 11/05/2018
 
11/09/2018
 
IP 71124.08
 
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
 
Transportation
 
RAD SAFETY INSPECTION
 
1, 2 12/10/2018
 
12/14/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 12/10/2018
 
12/14/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 12/10/2018
 
12/14/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 12/10/2018
 
12/14/2018


IP 71124.04
2 10/29/2018 11/09/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR Rad Safety Inspection


000729 Occupational Dose Assessment
1, 2 10/29/2018 11/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/29/2018 11/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/29/2018 11/02/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/29/2018 11/02/2018 IP 71124.04 000729 Occupational Dose Assessment RADWASTE


1, 2 12/10/2018
1, 2 11/05/2018 11/09/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RAD SAFETY INSPECTION


12/14/2018
1, 2 12/10/2018 12/14/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 12/10/2018 12/14/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 12/10/2018 12/14/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/10/2018 12/14/2018 IP 71124.04 000729 Occupational Dose Assessment 1, 2 12/10/2018 12/14/2018 IP 71151 000746 Performance Indicator Verification PI&R BIENNIAL


IP 71151 000746 Performance Indicator Verification
1, 2 03/04/2019 03/08/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 03/18/2019 03/22/2019 IP 71152B 000747 Problem Identification and Resolution 1/4/2018 10:49:52 AM Page 2 of 4 This report does not include INPO and OUTAGE activities.
 
PI&R BIENNIAL
 
1, 2 03/04/2019
 
03/08/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
1, 2 03/18/2019
 
03/22/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
1/4/2018 10:49:52 AM
 
Page  
 
of  
 
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Line 390: Line 114:
IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report


Beaver Valley
Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
RAD SAFETY 01,02,03,04
 
1, 2 03/18/2019
 
03/22/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 03/18/2019
 
03/22/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 03/18/2019
 
03/22/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 03/18/2019
 
03/22/2019
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
FORCE-ON-FORCE PLANNING AND EXERCISES
 
1, 2 03/25/2019
 
03/29/2019
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
1, 2 04/15/2019
 
04/19/2019
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
EQ PROGRAM
 
1, 2 06/10/2019
 
06/14/2019
 
IP 71111.21N
 
000714 Design Bases Assurance Inspection (Programs)
 
1, 2 06/24/2019


06/28/2019
1, 2 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/18/2019 03/22/2019 IP 71124.04 000729 Occupational Dose Assessment FORCE-ON-FORCE PLANNING AND EXERCISES


IP 71111.21N
1, 2 03/25/2019 03/29/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 04/15/2019 04/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EQ PROGRAM
 
000714 Design Bases Assurance Inspection (Programs)


1, 2 06/10/2019 06/14/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
1, 2 06/24/2019 06/28/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
EP PROGRAM INSPECTION
EP PROGRAM INSPECTION


1, 2 06/10/2019
1, 2 06/10/2019 06/14/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/10/2019 06/14/2019 IP 71114.03 000718 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/10/2019 06/14/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/10/2019 06/14/2019 IP 71151 001397 Performance Indicator Verification RAD SAFETY REMP
 
06/14/2019
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
1, 2 06/10/2019
 
06/14/2019
 
IP 71114.03
 
000718 Emergency Preparedness Organization Staffing and Augmentation System
 
1, 2 06/10/2019
 
06/14/2019
 
IP 71114.05
 
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
 
1, 2 06/10/2019
 
06/14/2019
 
IP 71151 001397 Performance Indicator Verification
 
RAD SAFETY REMP
 
1, 2 07/08/2019
 
07/12/2019
 
IP 71124.07
 
000731 Radiological Environmental Monitoring Program
 
1, 2 07/08/2019
 
07/12/2019
 
IP 71151 000746 Performance Indicator Verification
 
Triennial Heat Sink
 
1, 2 07/15/2019
 
07/19/2019
 
IP 71111.07T
 
000700 Heat Sink Performance -Triennial
 
ACCESS CONTROL, EQUIP PERF, TRAINING
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.02
 
000734 Access Control
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71130.07
 
000739 Security Training
 
1, 2 07/22/2019
 
07/26/2019
 
IP 71151 001338 Performance Indicator Verification
 
50.59 Process


1, 2 08/12/2019
1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink


08/16/2019
1, 2 07/15/2019 07/19/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial ACCESS CONTROL, EQUIP PERF, TRAINING


IP 71111.17T
1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification 50.59 Process


000709 Evaluations of Changes, Tests, and Experiments
1, 2 08/12/2019 08/16/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments 1/4/2018 10:49:52 AM Page 3 of 4 This report does not include INPO and OUTAGE activities.
 
1/4/2018 10:49:52 AM
 
Page  
 
of  
 
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Line 578: Line 138:
IP 22 Inspection Activity Plan Report
IP 22 Inspection Activity Plan Report


Beaver Valley
Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04
 
01/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
RAD SAFETY 01,02,03,04
 
1, 2 08/12/2019
 
08/16/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 08/12/2019
 
08/16/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 08/12/2019
 
08/16/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 08/12/2019
 
08/16/2019
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
BV2 REQUAL INSP WITH P/F RESULTS
 
2 08/26/2019
 
08/30/2019
 
IP 71111.11A


000703 Licensed Operator Requalification Program and Licensed Operator Performance -  
1, 2 08/12/2019 08/16/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 08/12/2019 08/16/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/12/2019 08/16/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/12/2019 08/16/2019 IP 71124.04 000729 Occupational Dose Assessment BV2 REQUAL INSP WITH P/F RESULTS


2 08/26/2019 08/30/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -
Annual
Annual


08/26/2019
08/26/2019 08/30/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -
 
08/30/2019
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance -  
 
Biennial BEAVER VALLEY 2 INITIAL OL EXAM
Biennial BEAVER VALLEY 2 INITIAL OL EXAM


2 08/26/2019
2 08/26/2019 08/30/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
08/30/2019
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
09/23/2019
 
10/04/2019
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)


09/23/2019 10/04/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
RAD SAFETY OUT
RAD SAFETY OUT


1, 2 09/23/2019
1, 2 09/23/2019 09/27/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/23/2019 09/27/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 09/23/2019 09/27/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/23/2019 09/27/2019 IP 71124.04 000729 Occupational Dose Assessment 1, 2 09/23/2019 09/27/2019 IP 71151 000746 Performance Indicator Verification INSERVICE INSPECTION - UNIT 1
 
09/27/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 09/23/2019
 
09/27/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 09/23/2019
 
09/27/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 09/23/2019
 
09/27/2019
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
1, 2 09/23/2019
 
09/27/2019
 
IP 71151 000746 Performance Indicator Verification
 
INSERVICE INSPECTION - UNIT 1
 
1 10/07/2019
 
10/18/2019
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
1/4/2018 10:49:52 AM
 
Page
 
of


This report does not include INPO and OUTAGE activities.
1 10/07/2019 10/18/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR 1/4/2018 10:49:52 AM Page 4 of 4 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.

Latest revision as of 10:06, 6 January 2025

Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2(Reports 05000334/2017006 and 0500412/2017006; 05000334/2017402 and 05000412/2017402 and 05000334-2017501 and 05000412/2017501)
ML18047A001
Person / Time
Site: Beaver Valley
Issue date: 02/28/2018
From: Matt Young
NRC/RGN-I/DRP/PB6
To: Bologna R
FirstEnergy Nuclear Operating Co
Young M
Shared Package
ML18046A504 List:
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18047A001 (7)


Text

February 28, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION UNITS 1 AND 2 (REPORTS 05000334/2017006 AND 0500412/2017006 05000334/2017402 AND 05000412/2017402 AND 05000334/2017501 AND 05000412/2017501)

Dear Mr. Bologna:

The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019.

This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC will also be performing TI-191, Inspection of Licensees Responses to Order EA-12-049, EA-12-051 and EP Info Request March 12, 2012," in the first quarter of 2018.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5205 with any questions you may have regarding this letter.

Sincerely,

/RA/

Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73

Enclosure:

Inspection/Activity Plan

ML180047A001

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer MYoung DATE 2/28/18 2/28/18

Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count BV1 REQUAL INSP W/ P/F RESULTS

1 01/22/2018 01/26/2018 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual

01/22/2018 01/26/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial RAD SAFETY INSP

1, 2 01/22/2018 01/26/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/22/2018 01/26/2018 IP 71151 000746 Performance Indicator Verification CYBER FULL IMP

1, 2 01/29/2018 02/02/2018 IP 71130.10P 000741 Cyber Security 1, 2 02/12/2018 02/16/2018 IP 71130.10P 000741 Cyber Security FUKUSHIMA LESSONS LEARNED TI-191

1, 2 02/19/2018 02/23/2018 TI 2515/191 000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 UNIT 1 INSERVICE INSPECTION

1 04/23/2018 05/04/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RAD SAFETY INSP

1, 2 04/23/2018 04/27/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/23/2018 04/27/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/23/2018 04/27/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/23/2018 04/27/2018 IP 71124.04 000729 Occupational Dose Assessment ACCESS CONTROL, PROTECTIVE STRATEGY, TSR

1, 2 06/04/2018 06/08/2018 IP 71130.02 000734 Access Control 1, 2 06/04/2018 06/08/2018 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 06/04/2018 06/08/2018 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 06/04/2018 06/08/2018 IP 71151 001338 Performance Indicator Verification EP EXERCISE INSPECTION

1, 2 06/11/2018 06/15/2018 IP 71114.01 000716 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 71151 001397 Performance Indicator Verification 1/4/2018 10:49:52 AM Page 1 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count MC&A

1, 2 06/11/2018 06/15/2018 IP 71130.11 000742 Material Control and Accounting (MC&A)

TRIENNIAL FIRE PROTECTION

1, 2 07/23/2018 07/27/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

1, 2 08/06/2018 08/10/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

BEAVER VALLEY 1 INITIAL OL EXAM

1 08/20/2018 08/24/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 09/17/2018 09/28/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RAD INSTRUMENTATION

1, 2 09/10/2018 09/14/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation Unit 2 Inservice Inspection

2 10/29/2018 11/09/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR Rad Safety Inspection

1, 2 10/29/2018 11/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/29/2018 11/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/29/2018 11/02/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/29/2018 11/02/2018 IP 71124.04 000729 Occupational Dose Assessment RADWASTE

1, 2 11/05/2018 11/09/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RAD SAFETY INSPECTION

1, 2 12/10/2018 12/14/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 12/10/2018 12/14/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 12/10/2018 12/14/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/10/2018 12/14/2018 IP 71124.04 000729 Occupational Dose Assessment 1, 2 12/10/2018 12/14/2018 IP 71151 000746 Performance Indicator Verification PI&R BIENNIAL

1, 2 03/04/2019 03/08/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 03/18/2019 03/22/2019 IP 71152B 000747 Problem Identification and Resolution 1/4/2018 10:49:52 AM Page 2 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04

1, 2 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/18/2019 03/22/2019 IP 71124.04 000729 Occupational Dose Assessment FORCE-ON-FORCE PLANNING AND EXERCISES

1, 2 03/25/2019 03/29/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 04/15/2019 04/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EQ PROGRAM

1, 2 06/10/2019 06/14/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1, 2 06/24/2019 06/28/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP PROGRAM INSPECTION

1, 2 06/10/2019 06/14/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/10/2019 06/14/2019 IP 71114.03 000718 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/10/2019 06/14/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/10/2019 06/14/2019 IP 71151 001397 Performance Indicator Verification RAD SAFETY REMP

1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink

1, 2 07/15/2019 07/19/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial ACCESS CONTROL, EQUIP PERF, TRAINING

1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification 50.59 Process

1, 2 08/12/2019 08/16/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments 1/4/2018 10:49:52 AM Page 3 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04

1, 2 08/12/2019 08/16/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 08/12/2019 08/16/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/12/2019 08/16/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/12/2019 08/16/2019 IP 71124.04 000729 Occupational Dose Assessment BV2 REQUAL INSP WITH P/F RESULTS

2 08/26/2019 08/30/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual

08/26/2019 08/30/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial BEAVER VALLEY 2 INITIAL OL EXAM

2 08/26/2019 08/30/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

09/23/2019 10/04/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RAD SAFETY OUT

1, 2 09/23/2019 09/27/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/23/2019 09/27/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 09/23/2019 09/27/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/23/2019 09/27/2019 IP 71124.04 000729 Occupational Dose Assessment 1, 2 09/23/2019 09/27/2019 IP 71151 000746 Performance Indicator Verification INSERVICE INSPECTION - UNIT 1

1 10/07/2019 10/18/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR 1/4/2018 10:49:52 AM Page 4 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report